22nd July 2011
Distribution of Power
Supply
.
220kV or 66kV supply is received from
DISCOMS at RSS.
This supply is stepped down to 33kV for auxiliary
supply at stations.
Two cables run along the via-duct and at each
station to form ring main system.
In ASSs, the supply is further stepped down to
415V and fed to MDB of ESR.
Main Distribution Board
It receives two inputs I/C-I & I/C-II at 3 phase,
50Hz, 415V supply.
The inputs can be identified from the RYB
indicators available on the incoming feeders.
These two inputs feed two 3 phase bus bars of
MDB panel separated by bus coupler ACB through
ACB-I (for I/C-I ) & ACB-II ( For I/C-II ).
The generalized ratings of ACB`S for L-1
stations is- 415V 4P, 800A. With breaking
capacity –50kA
ACB-I (I/C-1), ACB-II (I/C-II) & B/C ACB are
interlocked electrically & mechanically. i.e.
During normal operation only two of the three
remain in ON condition. This avoids the
possibility of dead short circuiting of the two
incomers.
I/C-I I/C-II B/C Remark
ON OFF ON
I/C-1 has been given
priority & this condition is
generally observed.
OFF ON ON
I/C-2 has been given 2nd
priority.
ON ON OFF
Can be achieved
manually to service the
B/C ACB.
. In short :
Following outgoing supplies are taken
out from MDB
MLP-I
MLP-II
EsPP (Escalator Power Panel)
FPP (Fire Pump Panel)
WPP (Water Pump Panel)
Capacitor Bank-1,2,3,4,5 & 6
ACCP
S&T UPS
EPP-I (Essential Power Panel)
EPP-II
For switching the input supplies from I/C-I
to I/C-II automatically, following two
systems are generally used:
1) Contactor based source change over
system
2) ASTS (Auto Source Transfer System)
APFCR
(Auto Power Factor Correcting Relay)
Capacitor feeder shall be operated in
Auto/Manual mode.
 Auto Mode: APFC Relay senses the power factor
and release close/trip command to respective
capacitor feeders.
 Manual Mode: All Capacitor Feeder will operate
by pressing respective push buttons.
Auto mode, minimum 10% load should be
available.
Measurements
160/5A, CTs are provided for current
measurements, which feed Digital Ammeter &
current of different phases can be measured
with ASS ( Ammeter Selector Switch ).
230V/415V direct connect digital voltmeter
gives the different combination of Line &
Phase Voltages.
A digital integral meter is provided for the
measurement of other electrical parameters.
Essential Power Panel
All the essential loads are fed through this
panel.
This panel receives two inputs of normal
supply from MDB & the third from DG set.
There is interlocking between the three
incoming feeder
Priority has been given to I/C-I then I/C-II & in
absence of both I/C- I&II, the DG MCCB is
switched ON.
Capacity of DG set
CPCB norms
• Stack Height
• Sound proof enclosure
EIG approval
DG sets
The essential loads supplied by this panel
are:
1) S&T UPS
2) FPP
3) ELPP
4) ASS Battery Charger
5) EsLP- Essential Lighting Panel
6) MDB panel battery charger
7) UPS ( E & M )
8) MLP
Essential Power Panel
PROPERTY DEVELOPMENT
•Power supply
•Fire fighting regulation
•Differential Charges
The UPS (uninterrupted power supply )
Receives 3-phase, 415V, AC input from EPP,
it converts it to DC supply through converter.
The DC is fed for charging the on load battery bank for
inverter of UPS.
Inverter inverts the DC output into single phase 230V
AC supply which is then fed to UPS DB panel (UPS
Distribution board panel) for feeding:
EmLP - Emergency Lighting Panel &
FACP ( Fire alarm control panel )
LIGHTING SYSTEM
• In Line-1, 30% lights is on UPS, 30% on DG
supply and 40% on normal supply. Lights are
controlled through timer.
• In Line-3, 50% lights is on battery pack system
and all lights are on DG supply. The lights are
controlled through Dimmer System based on
lux level and calendar of the year.
•On / Off based on sun set / sun rise time.
AIR-CONDITIONING
• Technical Rooms
•SER,TER, S&T UPS, El. UPS
•Temperature Setting
•Comfort ACs
•SCR, TOM
•Temperature Setting
•Split A/c (location of ODU, drain)
•VRV System (location of ODU, drain)
Fire Detection & suppression System
Fire detection system & suppression system
are :-
•Fire detection system
•Fire Hydrant System
•Inergen system
•Fire trace tube
•Manual gas flooding system
•Fire extinguishers
Fire Detection System
Fire detection system are of two types :-
Addressable type :- In addressable type fire
detection the complete address comes on
detection panel of activated detector.
Conventional type :- In conventional type fire
system the indication of zone comes on
Detection panel and manually the source is to
be detected.
Fire Hydrant System
Fire hydrant system consists of
Pumps
Underground tank
Hose Box
Fire Brigade connection / water withdrawal
connection
Branch pipe & Nozzle
Hydrant Valves
SECURITY SYSTEM
Baggage X-ray machine
DFMD
HHMD
Pumps
Stand by Pump/Diesel pump :- Stand by
hydrant pump starts automatically when the
pressure drops below 3.5 kg/cm2 and after
quenching the fire it has to be stopped
manually.
Sprinkler Pump :- Sprinkler pump starts when
the pressure falls below 4 kg/cm2 after the
bulb of sprinkler shatters when the
surrounding air reaches at 80 deg. C.
Portable Fire Extinguishers
Following types of portable fire
extinguishers are being used :-
Water-CO2 type extinguisher
CO2 type extinguisher
Foam type fire extinguisher
Dry Chemical Powder
Water Supply
Bore well pumps
Tanks
Booster pumps
Automation System
Sump pumps
ELEVATOR
SPECIFICATION
• MONO SPACE MACHINE ROOM LESS
• LOAD – 8 Passenger – 630 Kgs
13 passenger – 1000 Kgs
• SPEED – 1 m/s
• POWER SUPPLY – 415 V, +/-10% 50Hz,+/- 3%
• MAX STARTS/HOUR –180
• LEVELLING ACCURACY-- +/-5mm
• MOTOR WATTAGE—5.75 KW
• MOTOR TYPE—SYNCHRONOUS ,GEAR LESS
PUSH BUTTONS
Braille push buttons for the
handicapped
ESCALATORS
SPECIFICATION
Step width – 1000 mm
Step band speed – 0.65 m/s or 0.5 m/s
Incline – 30 degrees
Rise -- 4.29 to 14.50 m
Balustrade -- Glass, Steel
Truss --Non oscillating and distortion
free jig-welded structure of
rectangular hollow steel profile.
Motor --IP55,dyanamic braking,
THANK YOU

More Related Content

Similar to E&M lessons.ppt

Fp60 z catalogue-uk-rev0-04-2013
Fp60 z catalogue-uk-rev0-04-2013Fp60 z catalogue-uk-rev0-04-2013
Fp60 z catalogue-uk-rev0-04-2013
Đặng Hảo
 
X RAY IMAGING.ppt
X RAY IMAGING.pptX RAY IMAGING.ppt
X RAY IMAGING.ppt
Chirag Dalal
 
Railway coaches
Railway coachesRailway coaches
Railway coaches
noor patel
 
Knowledge sharing on UPS System (Updated).pptx
Knowledge sharing on UPS System (Updated).pptxKnowledge sharing on UPS System (Updated).pptx
Knowledge sharing on UPS System (Updated).pptx
Rilwan19
 
Electrostatic Precipitator
Electrostatic Precipitator Electrostatic Precipitator
Electrostatic Precipitator
Vinay Vishwakarma
 
video.ppt
video.pptvideo.ppt
video.ppt
ssuser66b5c5
 
Chapter-5.ppt
Chapter-5.pptChapter-5.ppt
Chapter-5.ppt
ManuE45
 
IRJET- Auto Selection of any Available Phase, in Three Phase Supply System
IRJET- Auto Selection of any Available Phase, in Three Phase Supply SystemIRJET- Auto Selection of any Available Phase, in Three Phase Supply System
IRJET- Auto Selection of any Available Phase, in Three Phase Supply System
IRJET Journal
 
havells ppt
havells ppthavells ppt
havells ppt
Raj Sharma
 
牵引变流器(CI).ppt
牵引变流器(CI).ppt牵引变流器(CI).ppt
牵引变流器(CI).ppt
Najihah Ab.
 
Modular UPS 40 - 1.5 MVA.pdf
Modular UPS 40 - 1.5 MVA.pdfModular UPS 40 - 1.5 MVA.pdf
Modular UPS 40 - 1.5 MVA.pdf
suman bala
 
A three phase ups systems operating under nonlinear loads with modified spwm ...
A three phase ups systems operating under nonlinear loads with modified spwm ...A three phase ups systems operating under nonlinear loads with modified spwm ...
A three phase ups systems operating under nonlinear loads with modified spwm ...
EditorIJAERD
 
DISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROLDISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROL
yohannes feleke
 
summer internship
summer internshipsummer internship
summer internship
ShahidMalik91
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
imkanhaiyalal
 
132 kv seminar ppt
132 kv seminar ppt132 kv seminar ppt
132 kv seminar ppt
Sourabh Bhattacharya
 
132 kv
132 kv132 kv
BEEE_seminor-1.pdf
BEEE_seminor-1.pdfBEEE_seminor-1.pdf
BEEE_seminor-1.pdf
SureshAnnadurai6
 
AuxCnv.ppsx
AuxCnv.ppsxAuxCnv.ppsx
uPSSP-1009
uPSSP-1009uPSSP-1009

Similar to E&M lessons.ppt (20)

Fp60 z catalogue-uk-rev0-04-2013
Fp60 z catalogue-uk-rev0-04-2013Fp60 z catalogue-uk-rev0-04-2013
Fp60 z catalogue-uk-rev0-04-2013
 
X RAY IMAGING.ppt
X RAY IMAGING.pptX RAY IMAGING.ppt
X RAY IMAGING.ppt
 
Railway coaches
Railway coachesRailway coaches
Railway coaches
 
Knowledge sharing on UPS System (Updated).pptx
Knowledge sharing on UPS System (Updated).pptxKnowledge sharing on UPS System (Updated).pptx
Knowledge sharing on UPS System (Updated).pptx
 
Electrostatic Precipitator
Electrostatic Precipitator Electrostatic Precipitator
Electrostatic Precipitator
 
video.ppt
video.pptvideo.ppt
video.ppt
 
Chapter-5.ppt
Chapter-5.pptChapter-5.ppt
Chapter-5.ppt
 
IRJET- Auto Selection of any Available Phase, in Three Phase Supply System
IRJET- Auto Selection of any Available Phase, in Three Phase Supply SystemIRJET- Auto Selection of any Available Phase, in Three Phase Supply System
IRJET- Auto Selection of any Available Phase, in Three Phase Supply System
 
havells ppt
havells ppthavells ppt
havells ppt
 
牵引变流器(CI).ppt
牵引变流器(CI).ppt牵引变流器(CI).ppt
牵引变流器(CI).ppt
 
Modular UPS 40 - 1.5 MVA.pdf
Modular UPS 40 - 1.5 MVA.pdfModular UPS 40 - 1.5 MVA.pdf
Modular UPS 40 - 1.5 MVA.pdf
 
A three phase ups systems operating under nonlinear loads with modified spwm ...
A three phase ups systems operating under nonlinear loads with modified spwm ...A three phase ups systems operating under nonlinear loads with modified spwm ...
A three phase ups systems operating under nonlinear loads with modified spwm ...
 
DISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROLDISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROL
 
summer internship
summer internshipsummer internship
summer internship
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
132 kv seminar ppt
132 kv seminar ppt132 kv seminar ppt
132 kv seminar ppt
 
132 kv
132 kv132 kv
132 kv
 
BEEE_seminor-1.pdf
BEEE_seminor-1.pdfBEEE_seminor-1.pdf
BEEE_seminor-1.pdf
 
AuxCnv.ppsx
AuxCnv.ppsxAuxCnv.ppsx
AuxCnv.ppsx
 
uPSSP-1009
uPSSP-1009uPSSP-1009
uPSSP-1009
 

Recently uploaded

The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
sachin chaurasia
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
HODECEDSIET
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 

Recently uploaded (20)

The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 

E&M lessons.ppt

  • 1. E&M Lessons for New Metros . Rajesh Agrawal DGM/E&M 22nd July 2011
  • 2. Distribution of Power Supply . 220kV or 66kV supply is received from DISCOMS at RSS. This supply is stepped down to 33kV for auxiliary supply at stations. Two cables run along the via-duct and at each station to form ring main system. In ASSs, the supply is further stepped down to 415V and fed to MDB of ESR.
  • 3. Main Distribution Board It receives two inputs I/C-I & I/C-II at 3 phase, 50Hz, 415V supply. The inputs can be identified from the RYB indicators available on the incoming feeders. These two inputs feed two 3 phase bus bars of MDB panel separated by bus coupler ACB through ACB-I (for I/C-I ) & ACB-II ( For I/C-II ).
  • 4. The generalized ratings of ACB`S for L-1 stations is- 415V 4P, 800A. With breaking capacity –50kA ACB-I (I/C-1), ACB-II (I/C-II) & B/C ACB are interlocked electrically & mechanically. i.e. During normal operation only two of the three remain in ON condition. This avoids the possibility of dead short circuiting of the two incomers.
  • 5. I/C-I I/C-II B/C Remark ON OFF ON I/C-1 has been given priority & this condition is generally observed. OFF ON ON I/C-2 has been given 2nd priority. ON ON OFF Can be achieved manually to service the B/C ACB. . In short :
  • 6. Following outgoing supplies are taken out from MDB MLP-I MLP-II EsPP (Escalator Power Panel) FPP (Fire Pump Panel) WPP (Water Pump Panel) Capacitor Bank-1,2,3,4,5 & 6 ACCP S&T UPS EPP-I (Essential Power Panel) EPP-II
  • 7. For switching the input supplies from I/C-I to I/C-II automatically, following two systems are generally used: 1) Contactor based source change over system 2) ASTS (Auto Source Transfer System)
  • 8. APFCR (Auto Power Factor Correcting Relay) Capacitor feeder shall be operated in Auto/Manual mode.  Auto Mode: APFC Relay senses the power factor and release close/trip command to respective capacitor feeders.  Manual Mode: All Capacitor Feeder will operate by pressing respective push buttons. Auto mode, minimum 10% load should be available.
  • 9. Measurements 160/5A, CTs are provided for current measurements, which feed Digital Ammeter & current of different phases can be measured with ASS ( Ammeter Selector Switch ). 230V/415V direct connect digital voltmeter gives the different combination of Line & Phase Voltages. A digital integral meter is provided for the measurement of other electrical parameters.
  • 10. Essential Power Panel All the essential loads are fed through this panel. This panel receives two inputs of normal supply from MDB & the third from DG set. There is interlocking between the three incoming feeder Priority has been given to I/C-I then I/C-II & in absence of both I/C- I&II, the DG MCCB is switched ON.
  • 11. Capacity of DG set CPCB norms • Stack Height • Sound proof enclosure EIG approval DG sets
  • 12. The essential loads supplied by this panel are: 1) S&T UPS 2) FPP 3) ELPP 4) ASS Battery Charger 5) EsLP- Essential Lighting Panel 6) MDB panel battery charger 7) UPS ( E & M ) 8) MLP Essential Power Panel
  • 13. PROPERTY DEVELOPMENT •Power supply •Fire fighting regulation •Differential Charges
  • 14. The UPS (uninterrupted power supply ) Receives 3-phase, 415V, AC input from EPP, it converts it to DC supply through converter. The DC is fed for charging the on load battery bank for inverter of UPS. Inverter inverts the DC output into single phase 230V AC supply which is then fed to UPS DB panel (UPS Distribution board panel) for feeding: EmLP - Emergency Lighting Panel & FACP ( Fire alarm control panel )
  • 15. LIGHTING SYSTEM • In Line-1, 30% lights is on UPS, 30% on DG supply and 40% on normal supply. Lights are controlled through timer. • In Line-3, 50% lights is on battery pack system and all lights are on DG supply. The lights are controlled through Dimmer System based on lux level and calendar of the year. •On / Off based on sun set / sun rise time.
  • 16. AIR-CONDITIONING • Technical Rooms •SER,TER, S&T UPS, El. UPS •Temperature Setting •Comfort ACs •SCR, TOM •Temperature Setting •Split A/c (location of ODU, drain) •VRV System (location of ODU, drain)
  • 17. Fire Detection & suppression System Fire detection system & suppression system are :- •Fire detection system •Fire Hydrant System •Inergen system •Fire trace tube •Manual gas flooding system •Fire extinguishers
  • 18. Fire Detection System Fire detection system are of two types :- Addressable type :- In addressable type fire detection the complete address comes on detection panel of activated detector. Conventional type :- In conventional type fire system the indication of zone comes on Detection panel and manually the source is to be detected.
  • 19. Fire Hydrant System Fire hydrant system consists of Pumps Underground tank Hose Box Fire Brigade connection / water withdrawal connection Branch pipe & Nozzle Hydrant Valves
  • 20. SECURITY SYSTEM Baggage X-ray machine DFMD HHMD
  • 21. Pumps Stand by Pump/Diesel pump :- Stand by hydrant pump starts automatically when the pressure drops below 3.5 kg/cm2 and after quenching the fire it has to be stopped manually. Sprinkler Pump :- Sprinkler pump starts when the pressure falls below 4 kg/cm2 after the bulb of sprinkler shatters when the surrounding air reaches at 80 deg. C.
  • 22. Portable Fire Extinguishers Following types of portable fire extinguishers are being used :- Water-CO2 type extinguisher CO2 type extinguisher Foam type fire extinguisher Dry Chemical Powder
  • 23. Water Supply Bore well pumps Tanks Booster pumps Automation System Sump pumps
  • 25. SPECIFICATION • MONO SPACE MACHINE ROOM LESS • LOAD – 8 Passenger – 630 Kgs 13 passenger – 1000 Kgs • SPEED – 1 m/s • POWER SUPPLY – 415 V, +/-10% 50Hz,+/- 3% • MAX STARTS/HOUR –180 • LEVELLING ACCURACY-- +/-5mm • MOTOR WATTAGE—5.75 KW • MOTOR TYPE—SYNCHRONOUS ,GEAR LESS
  • 26. PUSH BUTTONS Braille push buttons for the handicapped
  • 28. SPECIFICATION Step width – 1000 mm Step band speed – 0.65 m/s or 0.5 m/s Incline – 30 degrees Rise -- 4.29 to 14.50 m Balustrade -- Glass, Steel Truss --Non oscillating and distortion free jig-welded structure of rectangular hollow steel profile. Motor --IP55,dyanamic braking,