1. The document discusses questions about electrical power engineering topics. It defines abbreviations like PMG, MCB, and RTD. It explains the differences between demand factor and load factor. It discusses the meaning of CT burden = 10 VA and the function of an AVR. 2. Drawings and explanations are provided for speed control of 3 phase induction motors by varying frequency, transformer short circuit testing, and controlling parameters like active power, reactive power and voltage in a power generator. 3. Circuits are drawn for a full wave and half wave 3 phase rectifier for UPS systems. Contactor categories and an earth fault protection circuit for a power transformer are discussed. 4. A circuit is drawn