Work Summary Sheet
Department/
Slicer Dicer SD6/SD7
Date: 07-May-15 Rev #: 1 Written by
EH-INS-001
Section Page 1 Of 7 M.Elliker
Area: P2 & P3 Process Slicing & Dicing
Responsibilities
Product Type Polystyrene All Grades
Key:
Work Element
VA NVA
General Housekeeping
1 1 Setting up of the Machine WES 1.1 The area around the Machine to be swept following each job.
2 2 Adding the material to the Machine WES 1.2
3 3 Running the Machine WES 1.3a
3 3 Running the Machine WES 1.3b Emergency Stop
4 4 Packaging the finished material WES 1.4 In the event of an emergency hit the nearest E-Stop button.
Maintenance - LOTO
Handling of waste
All offcuts to be stored ready for reuse.
Storage of raw materials and product
Totals 0 0
Safety Dress Safety Helmet High Viz
Operator
Production Mgr M. Wasim
Locks Safety Glasses Safety Shoes Gloves Ear Protection Face Protection QHSE Manager
All employees, where applicable have a responsibility for ensuring that
machinery is in a safe condition prior to any work being undertaken. If
there is any uncertainty, the equipment should not be used until it has
been checked.
Time - Elements
(secs) "Key Points"
Safety, Quality, Cost, Technique
All maintenance operations on electrical equipment require LOTO
Instruction EH-INS-010 to be followed
Avoid contact with moisture or any other water source. Avoid storing
either raw material or finished product close to electrical equipment.
Elem
ent
Step
N
o
STANDARD IN-
PROCESS
STOCK
DELTA
CRITIC
AL
QUALIT
Y
CHECK
H & S
CONCERN
C KNA
CK
POIN
T
STEP No.
SEQUENC
E
Work Element Sheet
Department/ Date: 07-May-15
Rev #: 1
Written by
EH-INS-001
Section Page 2 of 7 M.Elliker
Plant Name Ecclestone & Hart Process Slicing & Dicing
Element Name: Adding material to the machineTakt Time
Cycle Time Product Type Polystyrene All Grades
Element No. 2
Main Steps Symbol Key Points
1 Adding the Material
2 Turn the heat on and off, switch is lit in red when on.
3
4
Element Time (secs) Date Name Revision History Rev No.
This Document Is Not Approved Until The First page Of These Instructions Have Been Signed Off
Slicer Dicer
SD6/SD7
Photographs / Drawings of Key Points and Safety Critical parts Step
No.
Material must be placed by the machine and either
lifted onto the machine utilising the manual handling
techniques (back straight, legs bent, hug load) or in
the case of MD material two people should lift onto
the machine.
Control Panel – Temperature
On/Off Switch
Control Panel – Temperature
Control
This is used to control the temperature, for most
jobs this is set to 600, the temperature should be set
as low as possible to minimise the risk of wire
breakage.
Control Panel – Moving the
wires
Apart from when loading or unloading pieces on and
off the machine table the machine can only be
operated from the remote console or hand control.
However once the program has been started it will
run until complete so care still needs to be taken to
not touch the cutting wires when the machine is in
use as the wires will be hot.
Sign off for individual element sheets is not required. Only sign the
First Page following any revisions. The Revision History should be
updated by the person making the changes to this document.
* All old level documents in this folder will be signed off to R-01
(Revision 1) providing the First Page is Signed Off.
KEY: STANDARD IN-
PROCESS
STOCK
DELTA
CRITIC
AL
QUALIT
Y
CHECK
H & S
CONCER
N
C KNA
CK
POIN
T
STEP No.
SEQUENC
E
2
Work Element Sheet
Department/ Date: 07-May-15
Rev #: 1
Written by
EH-INS-001
Section Page 4 of 7 M.Elliker
Plant Name Ecclestone & Hart Process Slicing & Dicing
Element Name: Running the MachineTakt Time
Cycle Time Product Type Polystyrene All Grades
Element No. 3
Main Steps Symbol Key Points
1
2
3 Setting the Temperature
Element Time (secs) Date Name Revision History Rev No.
This Document Is Not Approved Until The First page Of These Instructions Have Been Signed Off
Slicer Dicer
SD6/SD7
Photographs / Drawings of Key Points and Safety Critical parts Step
No.
Lining the material up to
correct location
Take care to not become tangled in the wires Ensure
that all loose clothing is secured and long hair is tied
back.
Lower the frame/ Move the
frame
Lower the dicer frame/ Move the slicer frame to the
top/ Edge of the material on the machine bed.
When the wires touch the foam adjust the
temperature and speed control as necessary,
remembering that the higher the temperature the
greater the wastage and the higher the risk of wire
breakage.
Sign off for individual element sheets is not required. Only sign the
First Page following any revisions. The Revision History should be
updated by the person making the changes to this document.
* All old level documents in this folder will be signed off to R-01
(Revision 1) providing the First Page is Signed Off.
KEY: STANDARD IN-
PROCESS
STOCK
DELTA
CRITIC
AL
QUALIT
Y
CHECK
H & S
CONCER
N
C KNA
CK
POIN
T
STEP No.
SEQUENC
E
5
Work Element Sheet
Department/ Date: 07-May-15
Rev #: 1
Written by
EH-INS-001
Section Page 5 of 7 M.Elliker
Plant Name Ecclestone & Hart Process Slicing & Dicing
Element Name: Running the machineTakt Time
Cycle Time Product Type Polystyrene All Grades
Element No. 3
Main Steps Symbol Key Points
1
2 Running the Machine
3
4 Glue Gun
Element Time (secs) Date Name Revision History Rev No.
This Document Is Not Approved Until The First page Of These Instructions Have Been Signed Off
Slicer Dicer
SD6/SD7
Photographs / Drawings of Key Points and Safety Critical parts Step
No.
Setting the Machine in
motion
Apart from when loading or unloading pieces on and
off the machine table the machine can only be
operated from the remote console or hand control.
However once the program has been started it will
run until complete so care still needs to be taken to
not touch the cutting wires when the machine is in
use as the wires will be hot.
Keep a safe distance from the machine, and whilst
the machine is in use take care to not touch the
wires as they will be hot. This machine has wires
that cut both vertically and horizontally so care
should be taken to ensure that both directions are
free of obstructions.
Whilst the machine is
running
Keep a safe distance from the machine as the fumes
will rise to the ceiling, if the operator feels that they
have been affected by the fumes they should
request a FFP2 Disposable Mask.
Material may need to be glued before it is moved to
one of the other machines, the glue gun needs to be
used with care following the instructions displayed in
the area.
Sign off for individual element sheets is not required. Only sign the
First Page following any revisions. The Revision History should be
updated by the person making the changes to this document.
* All old level documents in this folder will be signed off to R-01
(Revision 1) providing the First Page is Signed Off.
KEY: STANDARD IN-
PROCESS
STOCK
DELTA
CRITIC
AL
QUALIT
Y
CHECK
H & S
CONCER
N
C KNA
CK
POIN
T
STEP No.
SEQUENC
E
3
Operator Training Process Sign Off Sheet
Name Location Ecclehurst & Hart Date
Trainer M. Elliker Process
2. Operator understands the site PPE requirements and Yes No
additional requirements for this process.
3. Operator has read and understood the standardised Yes No
work for this process.
Trainer Signature Operator Signature
Stage 1: Operator is being trained in the process. He/She must be 100% supervised.
All activities carried out must be checked by a 'capable to train' operator or supervisor.
Stage 2: Operator understands the process steps however is not yet capable to work at
rate. Operator must be checked at each key stage in the process. Operator
understands quality standard for this process.
Stage 3: Operator understands the process steps and can can work unsupervised.
Operator fully understands quality standards for this process and is capable of
achieveing them.
Stage 4: Operator understands the process steps, can work unsupervised, Operator
fully understands quality standards for this process and is capable of achieveing them.
Operator is able to train others.
Training and Measurement Criteris to be
decided.
Training and Measurement Criteris to be
decided.
Training and Measurement Criteris to be
decided.
Training and Measurement Criteris to be
decided.
Training and Measurement Criteris to be
decided.
Training and Measurement Criteris to be
decided.
Training and Measurement Criteris to be
decided.
Training and Measurement Criteris to be
decided.
Training and Measurement Criteris to be
decided.
Is being instructed in the standard work
process and is not yet able to work
unsupervised.
Has carried out standard work process but
is not yet up to speed with no fault forward
(NFF) Quality or Safety.
Has carried out standard work process and
has completed a minimum of 10 pieces of
product with no fault forward (NFF) Quality
or Safety.

More Related Content

What's hot

World Quality Day 2011 - Kaizen Format
World Quality Day 2011 - Kaizen FormatWorld Quality Day 2011 - Kaizen Format
World Quality Day 2011 - Kaizen Format
Dubai Quality Group
 
Training ppt for control plan
Training ppt for control plan   Training ppt for control plan
Training ppt for control plan
Jitesh Gaurav
 
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework PosterTPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
Operational Excellence Consulting
 
OPL - One Point Lesson
OPL - One Point LessonOPL - One Point Lesson
OPL - One Point Lesson
5S BALAMURUGAN
 
Poka yoke
Poka yokePoka yoke
Poka yoke
Nirav Trivedi
 
Value Stream Mapping with ConceptDraw PRO
Value Stream Mapping with ConceptDraw PROValue Stream Mapping with ConceptDraw PRO
Value Stream Mapping with ConceptDraw PRO
Anastasia Krylova
 
Autonomous maintenance Jishu Hozen
Autonomous maintenance Jishu HozenAutonomous maintenance Jishu Hozen
Autonomous maintenance Jishu Hozen
ChetanMehta39
 
Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & Checklists
Anand Subramaniam
 
ISO/TS 16949:2009 to IATF 16949:2016
ISO/TS 16949:2009 to IATF 16949:2016ISO/TS 16949:2009 to IATF 16949:2016
ISO/TS 16949:2009 to IATF 16949:2016
Toyo Gustaman
 
Fmea handout
Fmea handoutFmea handout
Fmea handout
Monchito Del Mundo
 
PFMEA
PFMEAPFMEA
Maintenance Strategy, Types of Maintenance
Maintenance Strategy, Types of MaintenanceMaintenance Strategy, Types of Maintenance
Maintenance Strategy, Types of Maintenance
Dhanesh S
 
AUTONOMOUS MAINTENANCE
AUTONOMOUS MAINTENANCEAUTONOMOUS MAINTENANCE
AUTONOMOUS MAINTENANCE
FauziahIbrahim15
 
Lean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleLean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training Module
Frank-G. Adler
 
Fmea alignment aiag_and_vda_-_eng
Fmea alignment aiag_and_vda_-_engFmea alignment aiag_and_vda_-_eng
Fmea alignment aiag_and_vda_-_eng
erkinguler
 
FMEA
FMEAFMEA
Facility inspection checklist
Facility inspection checklistFacility inspection checklist
Facility inspection checklist
Jamie Leeper
 
Qms & iatf presentation1
Qms & iatf presentation1Qms & iatf presentation1
Qms & iatf presentation1
Krishna Kant Pandey
 
TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)
Operational Excellence Consulting
 
4M Change ppt.pptx
4M Change ppt.pptx4M Change ppt.pptx
4M Change ppt.pptx
veeramaniveltraining
 

What's hot (20)

World Quality Day 2011 - Kaizen Format
World Quality Day 2011 - Kaizen FormatWorld Quality Day 2011 - Kaizen Format
World Quality Day 2011 - Kaizen Format
 
Training ppt for control plan
Training ppt for control plan   Training ppt for control plan
Training ppt for control plan
 
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework PosterTPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
 
OPL - One Point Lesson
OPL - One Point LessonOPL - One Point Lesson
OPL - One Point Lesson
 
Poka yoke
Poka yokePoka yoke
Poka yoke
 
Value Stream Mapping with ConceptDraw PRO
Value Stream Mapping with ConceptDraw PROValue Stream Mapping with ConceptDraw PRO
Value Stream Mapping with ConceptDraw PRO
 
Autonomous maintenance Jishu Hozen
Autonomous maintenance Jishu HozenAutonomous maintenance Jishu Hozen
Autonomous maintenance Jishu Hozen
 
Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & Checklists
 
ISO/TS 16949:2009 to IATF 16949:2016
ISO/TS 16949:2009 to IATF 16949:2016ISO/TS 16949:2009 to IATF 16949:2016
ISO/TS 16949:2009 to IATF 16949:2016
 
Fmea handout
Fmea handoutFmea handout
Fmea handout
 
PFMEA
PFMEAPFMEA
PFMEA
 
Maintenance Strategy, Types of Maintenance
Maintenance Strategy, Types of MaintenanceMaintenance Strategy, Types of Maintenance
Maintenance Strategy, Types of Maintenance
 
AUTONOMOUS MAINTENANCE
AUTONOMOUS MAINTENANCEAUTONOMOUS MAINTENANCE
AUTONOMOUS MAINTENANCE
 
Lean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleLean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training Module
 
Fmea alignment aiag_and_vda_-_eng
Fmea alignment aiag_and_vda_-_engFmea alignment aiag_and_vda_-_eng
Fmea alignment aiag_and_vda_-_eng
 
FMEA
FMEAFMEA
FMEA
 
Facility inspection checklist
Facility inspection checklistFacility inspection checklist
Facility inspection checklist
 
Qms & iatf presentation1
Qms & iatf presentation1Qms & iatf presentation1
Qms & iatf presentation1
 
TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)
 
4M Change ppt.pptx
4M Change ppt.pptx4M Change ppt.pptx
4M Change ppt.pptx
 

Viewers also liked

Slips trips and falls tbt 1
Slips trips and falls tbt 1Slips trips and falls tbt 1
Slips trips and falls tbt 1
Melissa Elliker
 
PUWER Checklist
PUWER ChecklistPUWER Checklist
PUWER Checklist
Melissa Elliker
 
NVQ Storyboard 401
NVQ Storyboard 401NVQ Storyboard 401
NVQ Storyboard 401
Melissa Elliker
 
policies-and-procedures-template-1
policies-and-procedures-template-1policies-and-procedures-template-1
policies-and-procedures-template-1
Melissa Elliker
 
COSHH Simonix Clear Lacquer Cellulose
COSHH Simonix Clear Lacquer Cellulose COSHH Simonix Clear Lacquer Cellulose
COSHH Simonix Clear Lacquer Cellulose
Melissa Elliker
 
Spe 501 unit project assessments (1)
Spe 501 unit project assessments (1)Spe 501 unit project assessments (1)
Spe 501 unit project assessments (1)
kmshana89
 
Lean for Non Profits - Standard Pig
Lean for Non Profits - Standard PigLean for Non Profits - Standard Pig
Lean for Non Profits - Standard Pig
ASQ_Lafayette
 
Storyboard
StoryboardStoryboard
Storyboard
Jose Acosta
 
Quality Manual EN BS ISO 9001 2015 Rev 2
Quality Manual EN BS ISO 9001 2015 Rev 2Quality Manual EN BS ISO 9001 2015 Rev 2
Quality Manual EN BS ISO 9001 2015 Rev 2
Melissa Elliker
 
NG BB 43 Standardized Work
NG BB 43 Standardized WorkNG BB 43 Standardized Work
NG BB 43 Standardized Work
Leanleaders.org
 
Standard work for leaders
Standard work for leadersStandard work for leaders
Standard work for leaders
Lean Teams USA
 
Standardized Work
Standardized WorkStandardized Work
Standardized Work
exerciselean
 
7 Principles of Communications
7 Principles of Communications7 Principles of Communications
7 Principles of Communications
dexpan
 

Viewers also liked (13)

Slips trips and falls tbt 1
Slips trips and falls tbt 1Slips trips and falls tbt 1
Slips trips and falls tbt 1
 
PUWER Checklist
PUWER ChecklistPUWER Checklist
PUWER Checklist
 
NVQ Storyboard 401
NVQ Storyboard 401NVQ Storyboard 401
NVQ Storyboard 401
 
policies-and-procedures-template-1
policies-and-procedures-template-1policies-and-procedures-template-1
policies-and-procedures-template-1
 
COSHH Simonix Clear Lacquer Cellulose
COSHH Simonix Clear Lacquer Cellulose COSHH Simonix Clear Lacquer Cellulose
COSHH Simonix Clear Lacquer Cellulose
 
Spe 501 unit project assessments (1)
Spe 501 unit project assessments (1)Spe 501 unit project assessments (1)
Spe 501 unit project assessments (1)
 
Lean for Non Profits - Standard Pig
Lean for Non Profits - Standard PigLean for Non Profits - Standard Pig
Lean for Non Profits - Standard Pig
 
Storyboard
StoryboardStoryboard
Storyboard
 
Quality Manual EN BS ISO 9001 2015 Rev 2
Quality Manual EN BS ISO 9001 2015 Rev 2Quality Manual EN BS ISO 9001 2015 Rev 2
Quality Manual EN BS ISO 9001 2015 Rev 2
 
NG BB 43 Standardized Work
NG BB 43 Standardized WorkNG BB 43 Standardized Work
NG BB 43 Standardized Work
 
Standard work for leaders
Standard work for leadersStandard work for leaders
Standard work for leaders
 
Standardized Work
Standardized WorkStandardized Work
Standardized Work
 
7 Principles of Communications
7 Principles of Communications7 Principles of Communications
7 Principles of Communications
 

Similar to EH-INS-001 Slicer Dicer SD6:SD7

008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
FESTUS RICHARD SIAME
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
Atif767782
 
Standard operating procedure
Standard operating procedureStandard operating procedure
Standard operating procedure
Danai Thongsin
 
LoveShaw CF25 tManual
LoveShaw CF25  tManualLoveShaw CF25  tManual
LoveShaw CF25 tManual
Pyramid Packaging Inc.
 
iMovR Studio 470 DIY Electric Standing Desk Base User Manual
iMovR Studio 470 DIY Electric Standing Desk Base User ManualiMovR Studio 470 DIY Electric Standing Desk Base User Manual
iMovR Studio 470 DIY Electric Standing Desk Base User Manual
iMovR
 
Mwhe manual
Mwhe manualMwhe manual
Mwhe manual
Quang Bách
 
New holland eh35 compact excavator service repair manual
New holland eh35 compact excavator service repair manualNew holland eh35 compact excavator service repair manual
New holland eh35 compact excavator service repair manual
udjjsjkkddkmme
 
New holland eh35 compact excavator service repair manual
New holland eh35 compact excavator service repair manualNew holland eh35 compact excavator service repair manual
New holland eh35 compact excavator service repair manual
fijsfjskekmme
 
New holland eh35 compact excavator service repair manual
New holland eh35 compact excavator service repair manualNew holland eh35 compact excavator service repair manual
New holland eh35 compact excavator service repair manual
ufjjsefkksemme
 
New Holland EH35 Compact Excavator Service Repair Manual.pdf
New Holland EH35 Compact Excavator Service Repair Manual.pdfNew Holland EH35 Compact Excavator Service Repair Manual.pdf
New Holland EH35 Compact Excavator Service Repair Manual.pdf
fujskekdmd3e
 
New holland eh35 compact excavator service repair manual
New holland eh35 compact excavator service repair manualNew holland eh35 compact excavator service repair manual
New holland eh35 compact excavator service repair manual
pfiskdmjekm
 
Full Automatic Pcb loader Operation manual
Full Automatic Pcb loader Operation manualFull Automatic Pcb loader Operation manual
Full Automatic Pcb loader Operation manual
Shenzhen Southern Machinery Sales And Service Co., Ltd
 
PhotocopySuncorp - tài liệu sữa chữa máy photocopy ricoh afiico mp 171
PhotocopySuncorp - tài liệu sữa chữa máy photocopy ricoh afiico mp 171PhotocopySuncorp - tài liệu sữa chữa máy photocopy ricoh afiico mp 171
PhotocopySuncorp - tài liệu sữa chữa máy photocopy ricoh afiico mp 171
Photocopy Suncorp
 
Multiquip MTX70 Rammers Operation and Parts Manual
Multiquip MTX70 Rammers Operation and Parts ManualMultiquip MTX70 Rammers Operation and Parts Manual
Multiquip MTX70 Rammers Operation and Parts Manual
multiquipuk
 
CNC Operator WBT
CNC Operator WBTCNC Operator WBT
CNC Operator WBT
mking73
 
Extruder Manual Less System Essentials
Extruder Manual Less System EssentialsExtruder Manual Less System Essentials
Extruder Manual Less System Essentials
jperretto
 
Kobelco 140 srlc 3 hydraulic excavator service repair manual
Kobelco 140 srlc 3 hydraulic excavator service repair manualKobelco 140 srlc 3 hydraulic excavator service repair manual
Kobelco 140 srlc 3 hydraulic excavator service repair manual
fujsjefksekmm
 
Kobelco 140 srlc 3 hydraulic excavator service repair manual
Kobelco 140 srlc 3 hydraulic excavator service repair manualKobelco 140 srlc 3 hydraulic excavator service repair manual
Kobelco 140 srlc 3 hydraulic excavator service repair manual
fjsekdemmd
 
Kobelco 140 srlc 3 hydraulic excavator service repair manual
Kobelco 140 srlc 3 hydraulic excavator service repair manualKobelco 140 srlc 3 hydraulic excavator service repair manual
Kobelco 140 srlc 3 hydraulic excavator service repair manual
fhsejkdkmem
 
Kobelco 140 srlc 3 hydraulic excavator service repair manual
Kobelco 140 srlc 3 hydraulic excavator service repair manualKobelco 140 srlc 3 hydraulic excavator service repair manual
Kobelco 140 srlc 3 hydraulic excavator service repair manual
udfjjsjekdkdmm
 

Similar to EH-INS-001 Slicer Dicer SD6:SD7 (20)

008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
 
Standard operating procedure
Standard operating procedureStandard operating procedure
Standard operating procedure
 
LoveShaw CF25 tManual
LoveShaw CF25  tManualLoveShaw CF25  tManual
LoveShaw CF25 tManual
 
iMovR Studio 470 DIY Electric Standing Desk Base User Manual
iMovR Studio 470 DIY Electric Standing Desk Base User ManualiMovR Studio 470 DIY Electric Standing Desk Base User Manual
iMovR Studio 470 DIY Electric Standing Desk Base User Manual
 
Mwhe manual
Mwhe manualMwhe manual
Mwhe manual
 
New holland eh35 compact excavator service repair manual
New holland eh35 compact excavator service repair manualNew holland eh35 compact excavator service repair manual
New holland eh35 compact excavator service repair manual
 
New holland eh35 compact excavator service repair manual
New holland eh35 compact excavator service repair manualNew holland eh35 compact excavator service repair manual
New holland eh35 compact excavator service repair manual
 
New holland eh35 compact excavator service repair manual
New holland eh35 compact excavator service repair manualNew holland eh35 compact excavator service repair manual
New holland eh35 compact excavator service repair manual
 
New Holland EH35 Compact Excavator Service Repair Manual.pdf
New Holland EH35 Compact Excavator Service Repair Manual.pdfNew Holland EH35 Compact Excavator Service Repair Manual.pdf
New Holland EH35 Compact Excavator Service Repair Manual.pdf
 
New holland eh35 compact excavator service repair manual
New holland eh35 compact excavator service repair manualNew holland eh35 compact excavator service repair manual
New holland eh35 compact excavator service repair manual
 
Full Automatic Pcb loader Operation manual
Full Automatic Pcb loader Operation manualFull Automatic Pcb loader Operation manual
Full Automatic Pcb loader Operation manual
 
PhotocopySuncorp - tài liệu sữa chữa máy photocopy ricoh afiico mp 171
PhotocopySuncorp - tài liệu sữa chữa máy photocopy ricoh afiico mp 171PhotocopySuncorp - tài liệu sữa chữa máy photocopy ricoh afiico mp 171
PhotocopySuncorp - tài liệu sữa chữa máy photocopy ricoh afiico mp 171
 
Multiquip MTX70 Rammers Operation and Parts Manual
Multiquip MTX70 Rammers Operation and Parts ManualMultiquip MTX70 Rammers Operation and Parts Manual
Multiquip MTX70 Rammers Operation and Parts Manual
 
CNC Operator WBT
CNC Operator WBTCNC Operator WBT
CNC Operator WBT
 
Extruder Manual Less System Essentials
Extruder Manual Less System EssentialsExtruder Manual Less System Essentials
Extruder Manual Less System Essentials
 
Kobelco 140 srlc 3 hydraulic excavator service repair manual
Kobelco 140 srlc 3 hydraulic excavator service repair manualKobelco 140 srlc 3 hydraulic excavator service repair manual
Kobelco 140 srlc 3 hydraulic excavator service repair manual
 
Kobelco 140 srlc 3 hydraulic excavator service repair manual
Kobelco 140 srlc 3 hydraulic excavator service repair manualKobelco 140 srlc 3 hydraulic excavator service repair manual
Kobelco 140 srlc 3 hydraulic excavator service repair manual
 
Kobelco 140 srlc 3 hydraulic excavator service repair manual
Kobelco 140 srlc 3 hydraulic excavator service repair manualKobelco 140 srlc 3 hydraulic excavator service repair manual
Kobelco 140 srlc 3 hydraulic excavator service repair manual
 
Kobelco 140 srlc 3 hydraulic excavator service repair manual
Kobelco 140 srlc 3 hydraulic excavator service repair manualKobelco 140 srlc 3 hydraulic excavator service repair manual
Kobelco 140 srlc 3 hydraulic excavator service repair manual
 

EH-INS-001 Slicer Dicer SD6:SD7

  • 1. Work Summary Sheet Department/ Slicer Dicer SD6/SD7 Date: 07-May-15 Rev #: 1 Written by EH-INS-001 Section Page 1 Of 7 M.Elliker Area: P2 & P3 Process Slicing & Dicing Responsibilities Product Type Polystyrene All Grades Key: Work Element VA NVA General Housekeeping 1 1 Setting up of the Machine WES 1.1 The area around the Machine to be swept following each job. 2 2 Adding the material to the Machine WES 1.2 3 3 Running the Machine WES 1.3a 3 3 Running the Machine WES 1.3b Emergency Stop 4 4 Packaging the finished material WES 1.4 In the event of an emergency hit the nearest E-Stop button. Maintenance - LOTO Handling of waste All offcuts to be stored ready for reuse. Storage of raw materials and product Totals 0 0 Safety Dress Safety Helmet High Viz Operator Production Mgr M. Wasim Locks Safety Glasses Safety Shoes Gloves Ear Protection Face Protection QHSE Manager All employees, where applicable have a responsibility for ensuring that machinery is in a safe condition prior to any work being undertaken. If there is any uncertainty, the equipment should not be used until it has been checked. Time - Elements (secs) "Key Points" Safety, Quality, Cost, Technique All maintenance operations on electrical equipment require LOTO Instruction EH-INS-010 to be followed Avoid contact with moisture or any other water source. Avoid storing either raw material or finished product close to electrical equipment. Elem ent Step N o STANDARD IN- PROCESS STOCK DELTA CRITIC AL QUALIT Y CHECK H & S CONCERN C KNA CK POIN T STEP No. SEQUENC E
  • 2. Work Element Sheet Department/ Date: 07-May-15 Rev #: 1 Written by EH-INS-001 Section Page 2 of 7 M.Elliker Plant Name Ecclestone & Hart Process Slicing & Dicing Element Name: Adding material to the machineTakt Time Cycle Time Product Type Polystyrene All Grades Element No. 2 Main Steps Symbol Key Points 1 Adding the Material 2 Turn the heat on and off, switch is lit in red when on. 3 4 Element Time (secs) Date Name Revision History Rev No. This Document Is Not Approved Until The First page Of These Instructions Have Been Signed Off Slicer Dicer SD6/SD7 Photographs / Drawings of Key Points and Safety Critical parts Step No. Material must be placed by the machine and either lifted onto the machine utilising the manual handling techniques (back straight, legs bent, hug load) or in the case of MD material two people should lift onto the machine. Control Panel – Temperature On/Off Switch Control Panel – Temperature Control This is used to control the temperature, for most jobs this is set to 600, the temperature should be set as low as possible to minimise the risk of wire breakage. Control Panel – Moving the wires Apart from when loading or unloading pieces on and off the machine table the machine can only be operated from the remote console or hand control. However once the program has been started it will run until complete so care still needs to be taken to not touch the cutting wires when the machine is in use as the wires will be hot. Sign off for individual element sheets is not required. Only sign the First Page following any revisions. The Revision History should be updated by the person making the changes to this document. * All old level documents in this folder will be signed off to R-01 (Revision 1) providing the First Page is Signed Off. KEY: STANDARD IN- PROCESS STOCK DELTA CRITIC AL QUALIT Y CHECK H & S CONCER N C KNA CK POIN T STEP No. SEQUENC E 2
  • 3. Work Element Sheet Department/ Date: 07-May-15 Rev #: 1 Written by EH-INS-001 Section Page 4 of 7 M.Elliker Plant Name Ecclestone & Hart Process Slicing & Dicing Element Name: Running the MachineTakt Time Cycle Time Product Type Polystyrene All Grades Element No. 3 Main Steps Symbol Key Points 1 2 3 Setting the Temperature Element Time (secs) Date Name Revision History Rev No. This Document Is Not Approved Until The First page Of These Instructions Have Been Signed Off Slicer Dicer SD6/SD7 Photographs / Drawings of Key Points and Safety Critical parts Step No. Lining the material up to correct location Take care to not become tangled in the wires Ensure that all loose clothing is secured and long hair is tied back. Lower the frame/ Move the frame Lower the dicer frame/ Move the slicer frame to the top/ Edge of the material on the machine bed. When the wires touch the foam adjust the temperature and speed control as necessary, remembering that the higher the temperature the greater the wastage and the higher the risk of wire breakage. Sign off for individual element sheets is not required. Only sign the First Page following any revisions. The Revision History should be updated by the person making the changes to this document. * All old level documents in this folder will be signed off to R-01 (Revision 1) providing the First Page is Signed Off. KEY: STANDARD IN- PROCESS STOCK DELTA CRITIC AL QUALIT Y CHECK H & S CONCER N C KNA CK POIN T STEP No. SEQUENC E 5
  • 4. Work Element Sheet Department/ Date: 07-May-15 Rev #: 1 Written by EH-INS-001 Section Page 5 of 7 M.Elliker Plant Name Ecclestone & Hart Process Slicing & Dicing Element Name: Running the machineTakt Time Cycle Time Product Type Polystyrene All Grades Element No. 3 Main Steps Symbol Key Points 1 2 Running the Machine 3 4 Glue Gun Element Time (secs) Date Name Revision History Rev No. This Document Is Not Approved Until The First page Of These Instructions Have Been Signed Off Slicer Dicer SD6/SD7 Photographs / Drawings of Key Points and Safety Critical parts Step No. Setting the Machine in motion Apart from when loading or unloading pieces on and off the machine table the machine can only be operated from the remote console or hand control. However once the program has been started it will run until complete so care still needs to be taken to not touch the cutting wires when the machine is in use as the wires will be hot. Keep a safe distance from the machine, and whilst the machine is in use take care to not touch the wires as they will be hot. This machine has wires that cut both vertically and horizontally so care should be taken to ensure that both directions are free of obstructions. Whilst the machine is running Keep a safe distance from the machine as the fumes will rise to the ceiling, if the operator feels that they have been affected by the fumes they should request a FFP2 Disposable Mask. Material may need to be glued before it is moved to one of the other machines, the glue gun needs to be used with care following the instructions displayed in the area. Sign off for individual element sheets is not required. Only sign the First Page following any revisions. The Revision History should be updated by the person making the changes to this document. * All old level documents in this folder will be signed off to R-01 (Revision 1) providing the First Page is Signed Off. KEY: STANDARD IN- PROCESS STOCK DELTA CRITIC AL QUALIT Y CHECK H & S CONCER N C KNA CK POIN T STEP No. SEQUENC E 3
  • 5. Operator Training Process Sign Off Sheet Name Location Ecclehurst & Hart Date Trainer M. Elliker Process 2. Operator understands the site PPE requirements and Yes No additional requirements for this process. 3. Operator has read and understood the standardised Yes No work for this process. Trainer Signature Operator Signature Stage 1: Operator is being trained in the process. He/She must be 100% supervised. All activities carried out must be checked by a 'capable to train' operator or supervisor. Stage 2: Operator understands the process steps however is not yet capable to work at rate. Operator must be checked at each key stage in the process. Operator understands quality standard for this process. Stage 3: Operator understands the process steps and can can work unsupervised. Operator fully understands quality standards for this process and is capable of achieveing them. Stage 4: Operator understands the process steps, can work unsupervised, Operator fully understands quality standards for this process and is capable of achieveing them. Operator is able to train others. Training and Measurement Criteris to be decided. Training and Measurement Criteris to be decided. Training and Measurement Criteris to be decided. Training and Measurement Criteris to be decided. Training and Measurement Criteris to be decided. Training and Measurement Criteris to be decided. Training and Measurement Criteris to be decided. Training and Measurement Criteris to be decided. Training and Measurement Criteris to be decided. Is being instructed in the standard work process and is not yet able to work unsupervised. Has carried out standard work process but is not yet up to speed with no fault forward (NFF) Quality or Safety. Has carried out standard work process and has completed a minimum of 10 pieces of product with no fault forward (NFF) Quality or Safety.