Willem van Valkenburg
Manager Teaching & Learning Services
Delft University of Technology
President
Open Education Consortium
twitter.com/wfvanvalkenburg slideshare.net/wfvanvalkenburg
CC-BY-NC-ND Tom Roeleveld
CC-BY-NC-ND JL Palacios
• 16 BSc programmes
• 33 MSc programmes
• 8 Faculties
• 1 Graduate School
• 25 000 Students
Delft University of
Technology
Amara's law
we tend to overestimate the impact of
a new technology in the short run,
but we underestimate it in the long run
Source: https://en.wikipedia.org/wiki/Roy_Amara
5
Agenda
• TU Delft Open & Online Education
• Impact of the programme
• Long-term impact on the university
• Conclusions
E-Dean Director of
Education
Delft Extension School
MOOCs
Blended
Education
Online
Courses
7
Educate the world &
improve the quality of education
Deliver High Quality Open &
Online Education to the World
Find (new) revenue
models
Offer a
comprehensive
portfolio of courses
Deliver out-standing
learning experiences
Improve
Education
Improve campus
education
Conduct relevant
research
in the field of O2E
Innovate
in Education
Improve the quality
of online courses
Grow
Academic Output
Attract talent to the
University
Improve reputation
and visibility
Start or join new
learning & research
networks
Blended Education
OpenCourseWare MOOCs ProfEds
Online Academic
Courses
• Learning Activities &
Course Materials
• Free
• Enrolled students only,
massive numbers
• Mostly Bachelor level
• Certificate of
Completion
• Course Materials
• Free
• Big Exposure,
Worldwide audience
• Both Bachelor and
Master level
• No interaction with
faculty
• No accredited
certificate
• Learning Activities &
Course Materials
• Paid enrollment
• Enrolled students only,
limited numbers
• Accredited Course
Certificate
• Full Master Degree
• Learning Activities &
Course Materials
• Paid enrollment
• Enrolled students only,
moderate numbers
• Course Certificate
• Continuous Education
Units
Short Term Impact
95
MOOCs
35
Professional
Education
2,4M
enrolments
MOOCs
2.500
enrolments
ProfEds
25
Online
Courses
200
OCW
courses
25
blended
projects
500
enrolments
Online Courses
1.400 visits
OCW per
day
13 Open
Education
Awards
4 Wharton
Award
nominations
3 other
Award
Results
Long Term Impact
12
Long-run impact
• From Courses to Programmes to Credits
• From National to a Global World of Education
• From Initial Education to Continuous Education
• From Traditional lecture rooms to Blended Learning
• Towards Open Education
13
From Courses to Programmes to Credits
CC-BY Marco Verch
14
15
Short Learning Programmes
“Group courses into short learning programmes to guide the learner
through a relevant learning path to obtain a relevant certificate”
• Xseries
– understanding of specific subject through a series of courses.
– At least 3 courses
• Professional Certificate Programme
– Gain the critical skills and knowledge you need to stand out in your field.
– At least 2 courses
• MicroMaster
– A series of Master’s-level courses to advance your career, accelerate your
Master’s Degree
– MicroMasters Programs are credit-eligible and may be applied to accelerate a
Master’s Degree.
– At least 15 EC
16
PROFESSIONAL EDUCATION
17
Credits
• CEUs
– Credits for professionals
• MicroMaster
– Outside in (inverted admission)
• Credits for MOOCs
– Inside out
18
Virtual Exchange Programme – Credits for MOOCs
19
20
From National to Global World of Education
21
Educating the World
Dutch
Students
International
Students
Bachelor programmes
(mostly in Dutch)
93% 7%
Master programmes 66% 34%
PhD programmes 33% 67%
Online Paid Education 25% 75%
MOOCs 3% 97%
22
MOOCS USED IN CLASSES AROUND THE
WORLD
Some examples:
• Indian training
organisation is using
Functional Programming
• Glasgow Caledonian
University is using Solar
Energy
• Hochschule Ostwestfalen-
Lippe is using Industrial
Biotechnology https://twitter.com/pramode_ce/status/525643290964537344
23From initial education to Continuous Education
MOOC Learner = life long learner
Collaboration with industry
Co-creation
26
From lecture rooms to Blended Learning
CC-BY Brett Jordan: https://flic.kr/p/3f6m2C
27
CHANGING THE CLASSROOM
Cookbook Educational Spaces:
https://pietvanderzanden.weblog.tudelft.nl/2018/04/21/cookbook-education-spaces-version-2/
28
New education building Pulse
http://campusdevelopment.tudelft.nl/project/pulse/
Virtual tour: https://nmc360.tudelft.nl/vt_pulse/
The project partners embrace a
multilevel framework in order to
tackle conceptual and
implementation issues at the
course level (micro), at the
strategic level (meso) and with
the intent to give relevant input
to governmental policy (macro).
More info: https://embed.eadtu.eu/
Towards Open Education
CC-BY Alan Levine
32
WHAT IS OPEN EDUCATION?
Open Education encompasses resources, tools and practices that employ
a framework of open sharing to improve educational access and
effectiveness worldwide.
Open Education combines the traditions of knowledge sharing and creation
with 21st century technology to create a vast pool of openly shared
educational resources while harnessing today’s collaborative spirit to
develop educational approaches that are more responsive to learner’s
needs.
3333
OPEN = free + permissions
OPEN ≠ free
34
The 5Rs
• Make and own a copyRetain
• Use in a wide range of waysReuse
• Adapt, modify, and improveRevise
• Combine two or moreRemix
• Share with othersRedistribute
CC-BY David Wiley: http://www.opencontent.org/definition/
35
Open Education Activities
Initiatives
OpenScience
programme
Open & Online
Education
Programme
Operations
Copyright
helpdesk
MOOC
production
process
OCW
publication
process
open part of
procurement
process
Training
Introduction to
Open
Education
Finding, sharing
and caring for
educational
resources
Copyright
workshop for
Teachers
OpenTextBook
in a day
Open
Assets
OpenCourseW
are platform
•200 OCW
Courses
OpenTextBook
platform
•6 books
edX platform
•95 MOOCs
Open Exercise
platform
Projects
OEGlobal
2018
OpenTextbook
project
OER Search
Engine
PRIME
Digital Skills
36
LOCALISATION OF MOOCS
More info on Kienhoc: https://opencourseware.weblog.tudelft.nl/2016/06/10/open-sharing-of-education-making-education-accessible-to-everyone/
http://kienhoc.vn/ http://www.asuka-academy.com/
https://www.edraak.org/ https://www.xuetangx.com/
37
Open Education Consortium
30,000+
courses
240+
organizations
44
countries
29
languages
oeconsortium.org
Conclusion
39
Long-run impact
• From Courses to Programmes to Credits
• From National to a Global World of Education
• From Initial Education to Continuous Education
• From Traditional lecture rooms to Blended Learning
• Towards Open Education
Amara's law
we tend to overestimate the impact of
a new technology in the short run,
but we underestimate it in the long run
Source: https://en.wikipedia.org/wiki/Roy_Amara
41
ONLINE-LEARNING.TUDELFT.NL
@wfvanvalkenburg
slideshare.net/wfvanvalkenburg
Blog on e-learn.nl

#EAGE2019 longrun impact of moocs

  • 1.
    The long runimpact of MOOCs ir. Willem van Valkenburg @wfvanvalkenburg slideshare.net/wfvanvalkenburg Unless otherwise indicated, this presentation is licensed CC-BY 4.0. Please attribute TU Delft Extension School / Willem van Valkenburg PhotoCC-BYCoraBijsterveld
  • 2.
    2 Willem van Valkenburg ManagerTeaching & Learning Services Delft University of Technology President Open Education Consortium twitter.com/wfvanvalkenburg slideshare.net/wfvanvalkenburg
  • 3.
    CC-BY-NC-ND Tom Roeleveld CC-BY-NC-NDJL Palacios • 16 BSc programmes • 33 MSc programmes • 8 Faculties • 1 Graduate School • 25 000 Students Delft University of Technology
  • 4.
    Amara's law we tendto overestimate the impact of a new technology in the short run, but we underestimate it in the long run Source: https://en.wikipedia.org/wiki/Roy_Amara
  • 5.
    5 Agenda • TU DelftOpen & Online Education • Impact of the programme • Long-term impact on the university • Conclusions
  • 6.
    E-Dean Director of Education DelftExtension School MOOCs Blended Education Online Courses
  • 7.
    7 Educate the world& improve the quality of education Deliver High Quality Open & Online Education to the World Find (new) revenue models Offer a comprehensive portfolio of courses Deliver out-standing learning experiences Improve Education Improve campus education Conduct relevant research in the field of O2E Innovate in Education Improve the quality of online courses Grow Academic Output Attract talent to the University Improve reputation and visibility Start or join new learning & research networks
  • 8.
    Blended Education OpenCourseWare MOOCsProfEds Online Academic Courses • Learning Activities & Course Materials • Free • Enrolled students only, massive numbers • Mostly Bachelor level • Certificate of Completion • Course Materials • Free • Big Exposure, Worldwide audience • Both Bachelor and Master level • No interaction with faculty • No accredited certificate • Learning Activities & Course Materials • Paid enrollment • Enrolled students only, limited numbers • Accredited Course Certificate • Full Master Degree • Learning Activities & Course Materials • Paid enrollment • Enrolled students only, moderate numbers • Course Certificate • Continuous Education Units
  • 9.
  • 10.
  • 11.
  • 12.
    12 Long-run impact • FromCourses to Programmes to Credits • From National to a Global World of Education • From Initial Education to Continuous Education • From Traditional lecture rooms to Blended Learning • Towards Open Education
  • 13.
    13 From Courses toProgrammes to Credits CC-BY Marco Verch
  • 14.
  • 15.
    15 Short Learning Programmes “Groupcourses into short learning programmes to guide the learner through a relevant learning path to obtain a relevant certificate” • Xseries – understanding of specific subject through a series of courses. – At least 3 courses • Professional Certificate Programme – Gain the critical skills and knowledge you need to stand out in your field. – At least 2 courses • MicroMaster – A series of Master’s-level courses to advance your career, accelerate your Master’s Degree – MicroMasters Programs are credit-eligible and may be applied to accelerate a Master’s Degree. – At least 15 EC
  • 16.
  • 17.
    17 Credits • CEUs – Creditsfor professionals • MicroMaster – Outside in (inverted admission) • Credits for MOOCs – Inside out
  • 18.
    18 Virtual Exchange Programme– Credits for MOOCs
  • 19.
  • 20.
    20 From National toGlobal World of Education
  • 21.
    21 Educating the World Dutch Students International Students Bachelorprogrammes (mostly in Dutch) 93% 7% Master programmes 66% 34% PhD programmes 33% 67% Online Paid Education 25% 75% MOOCs 3% 97%
  • 22.
    22 MOOCS USED INCLASSES AROUND THE WORLD Some examples: • Indian training organisation is using Functional Programming • Glasgow Caledonian University is using Solar Energy • Hochschule Ostwestfalen- Lippe is using Industrial Biotechnology https://twitter.com/pramode_ce/status/525643290964537344
  • 23.
    23From initial educationto Continuous Education
  • 24.
    MOOC Learner =life long learner
  • 25.
  • 26.
    26 From lecture roomsto Blended Learning CC-BY Brett Jordan: https://flic.kr/p/3f6m2C
  • 27.
    27 CHANGING THE CLASSROOM CookbookEducational Spaces: https://pietvanderzanden.weblog.tudelft.nl/2018/04/21/cookbook-education-spaces-version-2/
  • 28.
    28 New education buildingPulse http://campusdevelopment.tudelft.nl/project/pulse/ Virtual tour: https://nmc360.tudelft.nl/vt_pulse/
  • 29.
    The project partnersembrace a multilevel framework in order to tackle conceptual and implementation issues at the course level (micro), at the strategic level (meso) and with the intent to give relevant input to governmental policy (macro). More info: https://embed.eadtu.eu/
  • 30.
  • 31.
    32 WHAT IS OPENEDUCATION? Open Education encompasses resources, tools and practices that employ a framework of open sharing to improve educational access and effectiveness worldwide. Open Education combines the traditions of knowledge sharing and creation with 21st century technology to create a vast pool of openly shared educational resources while harnessing today’s collaborative spirit to develop educational approaches that are more responsive to learner’s needs.
  • 32.
    3333 OPEN = free+ permissions OPEN ≠ free
  • 33.
    34 The 5Rs • Makeand own a copyRetain • Use in a wide range of waysReuse • Adapt, modify, and improveRevise • Combine two or moreRemix • Share with othersRedistribute CC-BY David Wiley: http://www.opencontent.org/definition/
  • 34.
    35 Open Education Activities Initiatives OpenScience programme Open& Online Education Programme Operations Copyright helpdesk MOOC production process OCW publication process open part of procurement process Training Introduction to Open Education Finding, sharing and caring for educational resources Copyright workshop for Teachers OpenTextBook in a day Open Assets OpenCourseW are platform •200 OCW Courses OpenTextBook platform •6 books edX platform •95 MOOCs Open Exercise platform Projects OEGlobal 2018 OpenTextbook project OER Search Engine PRIME Digital Skills
  • 35.
    36 LOCALISATION OF MOOCS Moreinfo on Kienhoc: https://opencourseware.weblog.tudelft.nl/2016/06/10/open-sharing-of-education-making-education-accessible-to-everyone/ http://kienhoc.vn/ http://www.asuka-academy.com/ https://www.edraak.org/ https://www.xuetangx.com/
  • 36.
  • 37.
  • 38.
    39 Long-run impact • FromCourses to Programmes to Credits • From National to a Global World of Education • From Initial Education to Continuous Education • From Traditional lecture rooms to Blended Learning • Towards Open Education
  • 39.
    Amara's law we tendto overestimate the impact of a new technology in the short run, but we underestimate it in the long run Source: https://en.wikipedia.org/wiki/Roy_Amara
  • 40.

Editor's Notes

  • #14 We reach all countries in the world. Only 3% from the Netherlands
  • #19 Hosting universities select MOOCs (TUD appr. 10), in total appr. 40 MOOCs in the ‘virtual exchange’ portfolio are offered to the university’s own students for credits as well TU Delft students can use MOOCs as electives, in free minor or in honour’s programme Additional assessment may be necessary to grant credits for the MOOC. Assessment is under academic conditions Student doesn’t travel, but exam does Each MOOC will have a max. number of students 3-year pilot: First MOOCs are offered from February 2017
  • #21 We reach all countries in the world. Only 3% from the Netherlands
  • #22 Couple of effects: The moocs have accelerated our international influx The non-standard students becomes the default
  • #23 This is a photo of a class in India Glasgow Caledonian University is using our Solar mooc
  • #26 Circular Economy – Ellen MacArthur Foundation Aeroacustics with Siemens Biotechnology with biobased consortium Leadership with McKinsey Geloogy with Shell Software Testing with Github
  • #27 We reach all countries in the world. Only 3% from the Netherlands
  • #29 No traditional classroom All setup for blended learning and especially for switching between project work and frontal instruction
  • #32 We reach all countries in the world. Only 3% from the Netherlands
  • #37 Kienhoc is a Vietnamese nonprofit organisation, founded in September 2015, by a team of young Vietnamese with a passion for education.