SlideShare a Scribd company logo
DESIGN, SUPPLY AND CONSTRUCTION OF
DRAIN AND POND REJUVENATION CIVIL
WORKS IN AKSHAR VIHAR POND IN BAREILLY
WITH 1 YEAR DEFECT LIABILITY
R0
PROJECT
TITLE
DRAWING NO. SCALE REV. NO.
1:100
PPS BUILDERS PVT. LTD.
122, HARI ENCLAVE, CHANDPUR ROAD
BULANDSHAHR - 203001, UP
DATE DESCRIPTION
REV. DRN CKD APD
BAREILLY SMART CITY LTD
CONTRACTOR
CLIENT
SWD-001
FORMWORK & RCC DETAILS OF
STORM WATER DRAIN
150
10Ø @ 150c/c (Distn.)
100 THK. PCC (1:4:8)
100 THK. COMPACTED
SAND BED
100 Typ.
10Ø @ 150c/c (Distn.)
12Ø @ 150c/c (Main Bars)
12Ø @ 150c/c (Main Bars)
1300
SCREED CONCRETE
FOR Dry Weather Flow
250
Typ.
100 Typ.
IL. VARIES
REFER LAYOUT
1250
(Avg.
Depth)
200 200
10Ø @ 150c/c (Distn.)
12Ø @ 150c/c (Main Bars)
EXISTING GL EXISTING GL
DRAIN DETAILS
200
~
CONC. (1:1.5:3)
2000
10Ø @ 150c/c (Distn.)
12Ø @ 150c/c (Main Bars)
200
1700mm x 500mm
PRECAST SLAB PANELS
WITH 30% PERFORATIONS
2200

More Related Content

What's hot

Presentation on steel, fabrication & erection Munger Ganga Bridge
Presentation on steel, fabrication & erection  Munger Ganga BridgePresentation on steel, fabrication & erection  Munger Ganga Bridge
Presentation on steel, fabrication & erection Munger Ganga Bridge
Ashish Kumar Yadav
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx
Sharad Naik
 
Storage tanks _emissions_and_emission_reductions_201312
Storage tanks _emissions_and_emission_reductions_201312Storage tanks _emissions_and_emission_reductions_201312
Storage tanks _emissions_and_emission_reductions_201312
salah jallali
 
Water flow pipe sizes
Water flow pipe sizesWater flow pipe sizes
Water flow pipe sizes
SARA WATER SOLUTIONS PVT. LTD.
 
Piping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdfPiping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdf
MDAbdullah621330
 
Engineering & Design of Pipe Supports
Engineering & Design of Pipe SupportsEngineering & Design of Pipe Supports
Engineering & Design of Pipe Supports
Piping Technology & Products, Inc.
 
Asme sec viii div 1 s
Asme sec viii div 1 sAsme sec viii div 1 s
Asme sec viii div 1 s
Jithu John
 
7) hydro test 3
7) hydro test 37) hydro test 3
7) hydro test 3
ALISAB123
 
WELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENTWELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENT
petroEDGE
 
143137557 storage-tanks
143137557 storage-tanks143137557 storage-tanks
143137557 storage-tanks
bernard347
 
Pipeline construction management
Pipeline construction managementPipeline construction management
Pipeline construction management
Farraz Sarmento Salim
 
Quality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipelineQuality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipeline
IEI GSC
 
Design of Foot Over Bridge
Design of Foot Over BridgeDesign of Foot Over Bridge
Design of Foot Over Bridge
jupallipavan2911
 
Pipe rack & rack piping
Pipe rack & rack pipingPipe rack & rack piping
Pipe rack & rack piping
Martin Alvaro Ramirez Lozada
 
Wellheads and Flow Lines.pdf
Wellheads and Flow Lines.pdfWellheads and Flow Lines.pdf
Wellheads and Flow Lines.pdf
Al AYAn University
 
Presentation on SECVIII
Presentation on SECVIIIPresentation on SECVIII
Presentation on SECVIII
Static Equipment Design
 
62617938 launching-girder
62617938 launching-girder62617938 launching-girder
62617938 launching-girder
lotuseye
 
Asme viii Div. 1 presentation rev.0
Asme viii Div. 1  presentation   rev.0Asme viii Div. 1  presentation   rev.0
Asme viii Div. 1 presentation rev.0
Mohammad Mahrous
 
Urea reactor liner leakage(a case study)
Urea reactor liner leakage(a case study)Urea reactor liner leakage(a case study)
Urea reactor liner leakage(a case study)
Prem Baboo
 
Introduction to Storage Tanks
Introduction to Storage TanksIntroduction to Storage Tanks
Introduction to Storage Tanks
Ankur Sharma
 

What's hot (20)

Presentation on steel, fabrication & erection Munger Ganga Bridge
Presentation on steel, fabrication & erection  Munger Ganga BridgePresentation on steel, fabrication & erection  Munger Ganga Bridge
Presentation on steel, fabrication & erection Munger Ganga Bridge
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx
 
Storage tanks _emissions_and_emission_reductions_201312
Storage tanks _emissions_and_emission_reductions_201312Storage tanks _emissions_and_emission_reductions_201312
Storage tanks _emissions_and_emission_reductions_201312
 
Water flow pipe sizes
Water flow pipe sizesWater flow pipe sizes
Water flow pipe sizes
 
Piping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdfPiping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdf
 
Engineering & Design of Pipe Supports
Engineering & Design of Pipe SupportsEngineering & Design of Pipe Supports
Engineering & Design of Pipe Supports
 
Asme sec viii div 1 s
Asme sec viii div 1 sAsme sec viii div 1 s
Asme sec viii div 1 s
 
7) hydro test 3
7) hydro test 37) hydro test 3
7) hydro test 3
 
WELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENTWELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENT
 
143137557 storage-tanks
143137557 storage-tanks143137557 storage-tanks
143137557 storage-tanks
 
Pipeline construction management
Pipeline construction managementPipeline construction management
Pipeline construction management
 
Quality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipelineQuality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipeline
 
Design of Foot Over Bridge
Design of Foot Over BridgeDesign of Foot Over Bridge
Design of Foot Over Bridge
 
Pipe rack & rack piping
Pipe rack & rack pipingPipe rack & rack piping
Pipe rack & rack piping
 
Wellheads and Flow Lines.pdf
Wellheads and Flow Lines.pdfWellheads and Flow Lines.pdf
Wellheads and Flow Lines.pdf
 
Presentation on SECVIII
Presentation on SECVIIIPresentation on SECVIII
Presentation on SECVIII
 
62617938 launching-girder
62617938 launching-girder62617938 launching-girder
62617938 launching-girder
 
Asme viii Div. 1 presentation rev.0
Asme viii Div. 1  presentation   rev.0Asme viii Div. 1  presentation   rev.0
Asme viii Div. 1 presentation rev.0
 
Urea reactor liner leakage(a case study)
Urea reactor liner leakage(a case study)Urea reactor liner leakage(a case study)
Urea reactor liner leakage(a case study)
 
Introduction to Storage Tanks
Introduction to Storage TanksIntroduction to Storage Tanks
Introduction to Storage Tanks
 

Similar to Drain details-final

“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
IRJET Journal
 
Silt in Canals
Silt in CanalsSilt in Canals
Silt in Canals
Farhan Hussain
 
Bakwena Lodge Mgmt House
Bakwena Lodge Mgmt HouseBakwena Lodge Mgmt House
Bakwena Lodge Mgmt House
Grant Hepburn
 
Storm water drainage problem of Surat city & its solutions due to flood in ri...
Storm water drainage problem of Surat city & its solutions due to flood in ri...Storm water drainage problem of Surat city & its solutions due to flood in ri...
Storm water drainage problem of Surat city & its solutions due to flood in ri...
Kishan Bhadiyadra
 
Sc 0009-rwpc-pip-civ-cal-0511 0-a
Sc 0009-rwpc-pip-civ-cal-0511 0-aSc 0009-rwpc-pip-civ-cal-0511 0-a
Sc 0009-rwpc-pip-civ-cal-0511 0-a
julio-civil
 
ProcContSite
ProcContSiteProcContSite
ProcContSite
Clyde Porter
 
Connecting Bridge
Connecting BridgeConnecting Bridge
Connecting Bridge
MahfuzurRahman939513
 
04 first floor plan dg (537 sq.m) sheet 1
04  first floor plan dg (537 sq.m) sheet 104  first floor plan dg (537 sq.m) sheet 1
04 first floor plan dg (537 sq.m) sheet 1
Harish Mahavar
 
003948_Old Treasury Building 17
003948_Old Treasury Building 17003948_Old Treasury Building 17
003948_Old Treasury Building 17
Mark Jumeaux
 
Syabas Standard Drawings.pdf
Syabas Standard Drawings.pdfSyabas Standard Drawings.pdf
Syabas Standard Drawings.pdf
WilliamLamKianSan
 
Hemant Oza_CV - July 16
Hemant Oza_CV - July 16Hemant Oza_CV - July 16
Hemant Oza_CV - July 16
Hemant Oza
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
Talal Bayoumi CCNA, MCSE
 
Ananth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_SampleAnanth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_Sample
Ananth K.Samy
 
GA-01.pdf
GA-01.pdfGA-01.pdf
GA-01.pdf
Sasanka Tharaka
 
BED Presentation BASIC DESIGN OF RE-ROUTE FUEL PIPELINE PROJECT.pptx
BED Presentation BASIC DESIGN OF RE-ROUTE FUEL PIPELINE PROJECT.pptxBED Presentation BASIC DESIGN OF RE-ROUTE FUEL PIPELINE PROJECT.pptx
BED Presentation BASIC DESIGN OF RE-ROUTE FUEL PIPELINE PROJECT.pptx
RochmadGSaputra
 
IRJET- Design of Energy Dissipator for Khadakwasla Dam to Control the Vel...
IRJET-  	  Design of Energy Dissipator for Khadakwasla Dam to Control the Vel...IRJET-  	  Design of Energy Dissipator for Khadakwasla Dam to Control the Vel...
IRJET- Design of Energy Dissipator for Khadakwasla Dam to Control the Vel...
IRJET Journal
 
Design of Kawlewada Dam and its Components.
Design of Kawlewada Dam and its Components.Design of Kawlewada Dam and its Components.
Design of Kawlewada Dam and its Components.
Raj Bisen
 
Hydraulic Manual (Dec 2014)
Hydraulic Manual (Dec 2014)Hydraulic Manual (Dec 2014)
Hydraulic Manual (Dec 2014)
Kai Li
 
PRESTIGE LTST 2O16 - Copy
PRESTIGE LTST 2O16 - CopyPRESTIGE LTST 2O16 - Copy
PRESTIGE LTST 2O16 - Copy
anil prashanth
 
Published-Badovli Mixture proportioning
Published-Badovli Mixture proportioningPublished-Badovli Mixture proportioning
Published-Badovli Mixture proportioning
Hamidreza Araghian
 

Similar to Drain details-final (20)

“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
 
Silt in Canals
Silt in CanalsSilt in Canals
Silt in Canals
 
Bakwena Lodge Mgmt House
Bakwena Lodge Mgmt HouseBakwena Lodge Mgmt House
Bakwena Lodge Mgmt House
 
Storm water drainage problem of Surat city & its solutions due to flood in ri...
Storm water drainage problem of Surat city & its solutions due to flood in ri...Storm water drainage problem of Surat city & its solutions due to flood in ri...
Storm water drainage problem of Surat city & its solutions due to flood in ri...
 
Sc 0009-rwpc-pip-civ-cal-0511 0-a
Sc 0009-rwpc-pip-civ-cal-0511 0-aSc 0009-rwpc-pip-civ-cal-0511 0-a
Sc 0009-rwpc-pip-civ-cal-0511 0-a
 
ProcContSite
ProcContSiteProcContSite
ProcContSite
 
Connecting Bridge
Connecting BridgeConnecting Bridge
Connecting Bridge
 
04 first floor plan dg (537 sq.m) sheet 1
04  first floor plan dg (537 sq.m) sheet 104  first floor plan dg (537 sq.m) sheet 1
04 first floor plan dg (537 sq.m) sheet 1
 
003948_Old Treasury Building 17
003948_Old Treasury Building 17003948_Old Treasury Building 17
003948_Old Treasury Building 17
 
Syabas Standard Drawings.pdf
Syabas Standard Drawings.pdfSyabas Standard Drawings.pdf
Syabas Standard Drawings.pdf
 
Hemant Oza_CV - July 16
Hemant Oza_CV - July 16Hemant Oza_CV - July 16
Hemant Oza_CV - July 16
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 
Ananth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_SampleAnanth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_Sample
 
GA-01.pdf
GA-01.pdfGA-01.pdf
GA-01.pdf
 
BED Presentation BASIC DESIGN OF RE-ROUTE FUEL PIPELINE PROJECT.pptx
BED Presentation BASIC DESIGN OF RE-ROUTE FUEL PIPELINE PROJECT.pptxBED Presentation BASIC DESIGN OF RE-ROUTE FUEL PIPELINE PROJECT.pptx
BED Presentation BASIC DESIGN OF RE-ROUTE FUEL PIPELINE PROJECT.pptx
 
IRJET- Design of Energy Dissipator for Khadakwasla Dam to Control the Vel...
IRJET-  	  Design of Energy Dissipator for Khadakwasla Dam to Control the Vel...IRJET-  	  Design of Energy Dissipator for Khadakwasla Dam to Control the Vel...
IRJET- Design of Energy Dissipator for Khadakwasla Dam to Control the Vel...
 
Design of Kawlewada Dam and its Components.
Design of Kawlewada Dam and its Components.Design of Kawlewada Dam and its Components.
Design of Kawlewada Dam and its Components.
 
Hydraulic Manual (Dec 2014)
Hydraulic Manual (Dec 2014)Hydraulic Manual (Dec 2014)
Hydraulic Manual (Dec 2014)
 
PRESTIGE LTST 2O16 - Copy
PRESTIGE LTST 2O16 - CopyPRESTIGE LTST 2O16 - Copy
PRESTIGE LTST 2O16 - Copy
 
Published-Badovli Mixture proportioning
Published-Badovli Mixture proportioningPublished-Badovli Mixture proportioning
Published-Badovli Mixture proportioning
 

Recently uploaded

Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
Kamal Acharya
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
MuhammadJazib15
 
openshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoinopenshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoin
snaprevwdev
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
PreethaV16
 
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
vmspraneeth
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
drshikhapandey2022
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Transcat
 
Butterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdfButterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdf
Lubi Valves
 
OOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming languageOOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming language
PreethaV16
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
paraasingh12 #V08
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
upoux
 
Assistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdfAssistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdf
Seetal Daas
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
ijseajournal
 
This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...
DharmaBanothu
 
Digital Image Processing Unit -2 Notes complete
Digital Image Processing Unit -2 Notes completeDigital Image Processing Unit -2 Notes complete
Digital Image Processing Unit -2 Notes complete
shubhamsaraswat8740
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
MadhavJungKarki
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
pvpriya2
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Balvir Singh
 

Recently uploaded (20)

Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
 
openshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoinopenshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoin
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
 
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
 
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUESAN INTRODUCTION OF AI & SEARCHING TECHIQUES
AN INTRODUCTION OF AI & SEARCHING TECHIQUES
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
 
Butterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdfButterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdf
 
OOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming languageOOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming language
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
 
Assistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdfAssistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdf
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
 
This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...
 
Digital Image Processing Unit -2 Notes complete
Digital Image Processing Unit -2 Notes completeDigital Image Processing Unit -2 Notes complete
Digital Image Processing Unit -2 Notes complete
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
 

Drain details-final

  • 1. DESIGN, SUPPLY AND CONSTRUCTION OF DRAIN AND POND REJUVENATION CIVIL WORKS IN AKSHAR VIHAR POND IN BAREILLY WITH 1 YEAR DEFECT LIABILITY R0 PROJECT TITLE DRAWING NO. SCALE REV. NO. 1:100 PPS BUILDERS PVT. LTD. 122, HARI ENCLAVE, CHANDPUR ROAD BULANDSHAHR - 203001, UP DATE DESCRIPTION REV. DRN CKD APD BAREILLY SMART CITY LTD CONTRACTOR CLIENT SWD-001 FORMWORK & RCC DETAILS OF STORM WATER DRAIN 150 10Ø @ 150c/c (Distn.) 100 THK. PCC (1:4:8) 100 THK. COMPACTED SAND BED 100 Typ. 10Ø @ 150c/c (Distn.) 12Ø @ 150c/c (Main Bars) 12Ø @ 150c/c (Main Bars) 1300 SCREED CONCRETE FOR Dry Weather Flow 250 Typ. 100 Typ. IL. VARIES REFER LAYOUT 1250 (Avg. Depth) 200 200 10Ø @ 150c/c (Distn.) 12Ø @ 150c/c (Main Bars) EXISTING GL EXISTING GL DRAIN DETAILS 200 ~ CONC. (1:1.5:3) 2000 10Ø @ 150c/c (Distn.) 12Ø @ 150c/c (Main Bars) 200 1700mm x 500mm PRECAST SLAB PANELS WITH 30% PERFORATIONS 2200