200X300X6MM THK COVER PLATE
100
300
150
100 100 100
100
18075
12
100
150
100
190(MAX)
825
50
100
50280
507015010210010215050
150
2 100 100 100 2 150
80
13 8
4010 150 102 100 102 150 69 50 50
10
150100
100
50
1:10 , 1:5
BP2-SD-02-EX-GT-005C28.10.2013 2
(GATES NO.:6 _ SLIDING GATE)
GATE.:#6
Note: This is reviewed in accordance with Section 01310 and other applicable
sections of the Specification and Contract Drawings. This approval does not relieve
the Contractor from his responsibilities Outlined in the Contract Documents and
remains fully responsible for accuracy of information, site and fabrication dimensions,
coordination with other trades and works. Changes of information contained in this
document shall invalidate any approval and shall be subject to a further review.
( SHEET 3 OF 3 )
8. RCC BEAM FOUNDATIONS ARE TO BE LAID KEEPING PARTLY
THE TOP PORTIONS OF THE REINFORCEMENTS EXPOSED BY
100MM. WE SHALL FIX THE RAIL AND INSERT PLATES BY
WELDING TO THESE EXPOSED REINFORCEMENTS. AFTER
FIXING OF THE RAILS AND PLATES THE GAPS BELOW THE
RAILS AND PLATES SHALL BE GROUTED WITH CONCRETE BY
YOU. CIVIL CONTRACTOR.
2. ALL LEVELS ARE CORRESPONDING TO KDL.
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS (ELEV.)
ARE IN METERS UNLESS OTHERWISE NOTED.
3. DRAWING SHOULD NOT BE SCALED
AS PER CONTRACT DRAWING'S
4. ENCLOSURE SHALL BE ORIENTED FOR UNOBSTRUCTED
STRAIGHT ACCESS BY A VEHICLE 35' IN LENGTH.
HELD IN THE OPEN POSITION WITH PINS.
6. ALL METAL TO RECEIVE ONE COAT OF PRIMER. (AS SPECIFIED)
7. POWER DRIVE:
AUTOMATION SYSTEM POWER-DRIVE FOR SWING GATE
CONSISTING OF TOONA, TRANSMITTER, PHOTOCELLS
MOUNTED ON POST/WALL, PHOTOCELL, FLASHING LIGHT WITH
BUILT IN AERIAL, CONTROL UNIT, DIGITAL, KEY SWITCHES,
BATTERY BOX, ETC , ARRANGEMENTS COMPLETE.
GATE LOCATION
NOTES:-
Ananth.K.Samy
Engr.Vlad Dascalu
www.hok.com
+44 207 636 1987+44 207 636 2006
London W1C 1DB,216 Oxford Street, UK
Fax:
Web:
Tel:
ARCHITECTURE, INTERIORS, PLANNING, PROJECT MANAGEMENT, CONSULTING
ISSUED FOR APPROVAL0
ENGINEER
Date
RESIDENT ENGINEER
Date
DATE RECEIVED:
TRANSMITTAL NO: Action
A
B
C
D
APPROVED
APPROVED AS NOTED
NOT APPROVED RESUBMIT
REJECTED
B-R APPROVED AS NOTED - RESUBMIT
Kuwait Engineering Industries
P.O.BOX: 270,SURRA-45703 KUWAIT
TEL;(965) 23263908/740/749 FAX:(965) 23263918
E-mail:admin@keikuwait.com Web: www. keikuwait.com
B.M.
CENTRAL BANK OF KUWAIT
NEW HEAD QUARTERS BUILDINGCBK
L-17305, L-17309,
L-17310 L-17311,
L-17312, L-17312(A),
L-17313, L-17314,
L-17315, L-17316(A),
L-17318, L-17320, A-11012.
/ / 2013
SECTION.: 02820
STEEL GATE PLAN AND ELEVATION
(ALONG WITH AS SHOWN GRID'S)
SHOP DRAWING FOR STEEL GATE
PLAN, ELEVATION AND SECTIONAL DETAIL'S
LEGEND:-
* F.F.L. : FINISH FLOOR LEVEL
* T.O.U. : TOP OF UPSTAND LEVEL
* T.O.C. : TOP OF CURB
* B.O.C. : BOTTOM OF CURB
* F.L.R.B. : FINISHED LEVEL TO ROAD BLOCKER
* T.B.S. : TOP OF BOLLARD SLAB
* F.P.L. : FLOOR PAVING LEVEL
Note: This is reviewed in accordance with Section 01310 and other applicable
sections of the Specification and Contract Drawings. This approval does not relieve
the Contractor from his responsibilities Outlined in the Contract Documents and
remains fully responsible for accuracy of information, site and fabrication dimensions,
coordination with other trades and works. Changes of information contained in this
document shall invalidate any approval and shall be subject to a further review.
CERTIFIED FOR COORDINATION AND COMPLIANCE
WITH THE CONTRACT DOCUMENTS
CONTRACTOR DATETRADE SIGNATURE
STRUCTURE
H.V.A.C.
ELECTRICAL
PLUMBING
M.A. KHARAFI
K.N.
K.N.
K.N.
K.N.
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
T. COORDINATOR
Sr. ARCHITECT C.S.C.E.C. ----/----/20----
CO-ORDINATOR
C.S.C.E.C.
STONE SAVEMA ----/----/20----
----/----/20----
WATER PROOFING AL BAHAR & BARDAWIL
----/----/20----
SECURITY HONEY WELL
SECURITY ENGINEER C.S.C.E.C.
----/----/20----
----/----/20----
LANDSCAPE AL ZAL ZALA
Rev.: 1
KEI / SD - 149
Rev.:2KEI / SD - 149
13.01.13
1 28.10.13
2 01.12.13
+11.45
T.O.STONE
+11.05
T.O.POST
+11.20
T.O.POST
+11.30
T.O.POST
100x100X5.4MM THK
STEEL BOX SECTION GATE
OUTER FRAME(ENAMEL
PAINTED TYPICAL)
OUTSIDE
INSIDE
+11.30
T.O.POST
100x100X5.4MM THK
STEEL BOX SECTION GATE
OUTER FRAME(ENAMEL
PAINTED TYPICAL)
OUTSIDE
INSIDE
+11.020
1:10 , 1:5
BP2-SD-02-EX-GT-005B28.10.2013
17.10.12
3
(GATES NO.:6 _ SLIDING GATE)
GATE.:#6
Note: This is reviewed in accordance with Section 01310 and other applicable
sections of the Specification and Contract Drawings. This approval does not relieve
the Contractor from his responsibilities Outlined in the Contract Documents and
remains fully responsible for accuracy of information, site and fabrication dimensions,
coordination with other trades and works. Changes of information contained in this
document shall invalidate any approval and shall be subject to a further review.
NOTES:-
Ananth.K.Samy
Engr.Vlad Dascalu
www.hok.com
+44 207 636 1987+44 207 636 2006
London W1C 1DB,216 Oxford Street, UK
Fax:
Web:
Tel:
ARCHITECTURE, INTERIORS, PLANNING, PROJECT MANAGEMENT, CONSULTING
ISSUED FOR APPROVAL0
ENGINEER
Date
RESIDENT ENGINEER
Date
DATE RECEIVED:
TRANSMITTAL NO: Action
A
B
C
D
APPROVED
APPROVED AS NOTED
NOT APPROVED RESUBMIT
REJECTED
B-R APPROVED AS NOTED - RESUBMIT
Kuwait Engineering Industries
P.O.BOX: 270,SURRA-45703 KUWAIT
TEL;(965) 23263908/740/749 FAX:(965) 23263918
E-mail:admin@keikuwait.com Web: www. keikuwait.com
B.M.
CENTRAL BANK OF KUWAIT
NEW HEAD QUARTERS BUILDINGCBK
L-17305, L-17309,
L-17310 L-17311,
L-17312, L-17312(A),
L-17313, L-17314,
L-17315, L-17316(A),
L-17318, L-17320, A-11012.
/ / 2013
SECTION.: 02820
STEEL GATE PLAN AND ELEVATION
(ALONG WITH AS SHOWN GRID'S)
SHOP DRAWING FOR STEEL GATE
PLAN, ELEVATION AND SECTIONAL DETAIL'S
LEGEND:-
* F.F.L. : FINISH FLOOR LEVEL
* T.O.U. : TOP OF UPSTAND LEVEL
* T.O.C. : TOP OF CURB
* B.O.C. : BOTTOM OF CURB
* F.L.R.B. : FINISHED LEVEL TO ROAD BLOCKER
* T.B.S. : TOP OF BOLLARD SLAB
* F.P.L. : FLOOR PAVING LEVEL
Note: This is reviewed in accordance with Section 01310 and other applicable
sections of the Specification and Contract Drawings. This approval does not relieve
the Contractor from his responsibilities Outlined in the Contract Documents and
remains fully responsible for accuracy of information, site and fabrication dimensions,
coordination with other trades and works. Changes of information contained in this
document shall invalidate any approval and shall be subject to a further review.
CERTIFIED FOR COORDINATION AND COMPLIANCE
WITH THE CONTRACT DOCUMENTS
CONTRACTOR DATETRADE SIGNATURE
STRUCTURE
H.V.A.C.
ELECTRICAL
PLUMBING
M.A. KHARAFI
K.N.
K.N.
K.N.
K.N.
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
T. COORDINATOR
Sr. ARCHITECT C.S.C.E.C. ----/----/20----
CO-ORDINATOR
C.S.C.E.C.
STONE SAVEMA ----/----/20----
----/----/20----
WATER PROOFING AL BAHAR & BARDAWIL
----/----/20----
SECURITY HONEY WELL
SECURITY ENGINEER C.S.C.E.C.
----/----/20----
----/----/20----
LANDSCAPE AL ZAL ZALA
Rev.: 2
KEI / SD - 142
Rev.:3KEI / SD - 142
( SHEET 2 OF 3 )
8. RCC BEAM FOUNDATIONS ARE TO BE LAID KEEPING PARTLY
THE TOP PORTIONS OF THE REINFORCEMENTS EXPOSED BY
100MM. WE SHALL FIX THE RAIL AND INSERT PLATES BY
WELDING TO THESE EXPOSED REINFORCEMENTS. AFTER
FIXING OF THE RAILS AND PLATES THE GAPS BELOW THE
RAILS AND PLATES SHALL BE GROUTED WITH CONCRETE BY
YOU. CIVIL CONTRACTOR.
2. ALL LEVELS ARE CORRESPONDING TO KDL.
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS (ELEV.)
ARE IN METERS UNLESS OTHERWISE NOTED.
3. DRAWING SHOULD NOT BE SCALED
AS PER CONTRACT DRAWING'S
4. ENCLOSURE SHALL BE ORIENTED FOR UNOBSTRUCTED
STRAIGHT ACCESS BY A VEHICLE 35' IN LENGTH.
HELD IN THE OPEN POSITION WITH PINS.
6. ALL METAL TO RECEIVE ONE COAT OF PRIMER. (AS SPECIFIED)
7. POWER DRIVE:
AUTOMATION SYSTEM POWER-DRIVE FOR SWING GATE
CONSISTING OF TOONA, TRANSMITTER, PHOTOCELLS
MOUNTED ON POST/WALL, PHOTOCELL, FLASHING LIGHT WITH
BUILT IN AERIAL, CONTROL UNIT, DIGITAL, KEY SWITCHES,
BATTERY BOX, ETC , ARRANGEMENTS COMPLETE.
GATE LOCATION
13.01.13AS PER CONSULTANT COMMENTS1
28.10.13AS PER CONSULTANT COMMENTS2
1.12.13AS PER CONSULTANT COMMENTS3
250
2200
2250
250
725
150
600
150
50
10
720
750
150
85
300100
470 415
260
115
TYP
8010080
250
R3512
550
60
115
400
105
300
200
8010080
150
150
250
95
95
TYPICAL ISOMETRIC ELEVATION FOR GATE FRAME
SCALE NTS
ENAMEL PAINTED (TYPICAL)
115 (TYP) 100
100
BOTTOM SLIDING TRACK PROFILE WELDED
TO GATE OUTER FRAME (BOTTOM)
1:50, 1:10 , 1:5
BP2-SD-02-EX-GT-005A28.10.2013
17.10.12
3
(GATES NO.:6 _ SLIDING GATE)
GATE.:#6
Note: This is reviewed in accordance with Section 01310 and other applicable
sections of the Specification and Contract Drawings. This approval does not relieve
the Contractor from his responsibilities Outlined in the Contract Documents and
remains fully responsible for accuracy of information, site and fabrication dimensions,
coordination with other trades and works. Changes of information contained in this
document shall invalidate any approval and shall be subject to a further review.
NOTES:-
Ananth.K.Samy
Engr.Vlad Dascalu
www.hok.com
+44 207 636 1987+44 207 636 2006
London W1C 1DB,216 Oxford Street, UK
Fax:
Web:
Tel:
ARCHITECTURE, INTERIORS, PLANNING, PROJECT MANAGEMENT, CONSULTING
ISSUED FOR APPROVAL0
ENGINEER
Date
RESIDENT ENGINEER
Date
DATE RECEIVED:
TRANSMITTAL NO: Action
A
B
C
D
APPROVED
APPROVED AS NOTED
NOT APPROVED RESUBMIT
REJECTED
B-R APPROVED AS NOTED - RESUBMIT
Kuwait Engineering Industries
P.O.BOX: 270,SURRA-45703 KUWAIT
TEL;(965) 23263908/740/749 FAX:(965) 23263918
E-mail:admin@keikuwait.com Web: www. keikuwait.com
B.M.
CENTRAL BANK OF KUWAIT
NEW HEAD QUARTERS BUILDINGCBK
L-17305, L-17309,
L-17310 L-17311,
L-17312, L-17312(A),
L-17313, L-17314,
L-17315, L-17316(A),
L-17318, L-17320, A-11012.
/ / 2013
SECTION.: 02820
STEEL GATE PLAN AND ELEVATION
(ALONG WITH AS SHOWN GRID'S)
SHOP DRAWING FOR STEEL GATE
PLAN, ELEVATION AND SECTIONAL DETAIL'S
LEGEND:-
* F.F.L. : FINISH FLOOR LEVEL
* T.O.U. : TOP OF UPSTAND LEVEL
* T.O.C. : TOP OF CURB
* B.O.C. : BOTTOM OF CURB
* F.L.R.B. : FINISHED LEVEL TO ROAD BLOCKER
* T.B.S. : TOP OF BOLLARD SLAB
* F.P.L. : FLOOR PAVING LEVEL
Note: This is reviewed in accordance with Section 01310 and other applicable
sections of the Specification and Contract Drawings. This approval does not relieve
the Contractor from his responsibilities Outlined in the Contract Documents and
remains fully responsible for accuracy of information, site and fabrication dimensions,
coordination with other trades and works. Changes of information contained in this
document shall invalidate any approval and shall be subject to a further review.
CERTIFIED FOR COORDINATION AND COMPLIANCE
WITH THE CONTRACT DOCUMENTS
CONTRACTOR DATETRADE SIGNATURE
STRUCTURE
H.V.A.C.
ELECTRICAL
PLUMBING
M.A. KHARAFI
K.N.
K.N.
K.N.
K.N.
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
T. COORDINATOR
Sr. ARCHITECT C.S.C.E.C. ----/----/20----
CO-ORDINATOR
C.S.C.E.C.
STONE SAVEMA ----/----/20----
----/----/20----
WATER PROOFING AL BAHAR & BARDAWIL
----/----/20----
SECURITY HONEY WELL
SECURITY ENGINEER C.S.C.E.C.
----/----/20----
----/----/20----
LANDSCAPE AL ZAL ZALA
Rev.: 2
KEI / SD - 141
Rev.:3KEI / SD - 141
( SHEET 1 OF 3 )
8. RCC BEAM FOUNDATIONS ARE TO BE LAID KEEPING PARTLY
THE TOP PORTIONS OF THE REINFORCEMENTS EXPOSED BY
100MM. WE SHALL FIX THE RAIL AND INSERT PLATES BY
WELDING TO THESE EXPOSED REINFORCEMENTS. AFTER
FIXING OF THE RAILS AND PLATES THE GAPS BELOW THE
RAILS AND PLATES SHALL BE GROUTED WITH CONCRETE BY
YOU. CIVIL CONTRACTOR.
2. ALL LEVELS ARE CORRESPONDING TO KDL.
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS (ELEV.)
ARE IN METERS UNLESS OTHERWISE NOTED.
3. DRAWING SHOULD NOT BE SCALED
AS PER CONTRACT DRAWING'S
4. ENCLOSURE SHALL BE ORIENTED FOR UNOBSTRUCTED
STRAIGHT ACCESS BY A VEHICLE 35' IN LENGTH.
HELD IN THE OPEN POSITION WITH PINS.
6. ALL METAL TO RECEIVE ONE COAT OF PRIMER. (AS SPECIFIED)
7. POWER DRIVE:
AUTOMATION SYSTEM POWER-DRIVE FOR SWING GATE
CONSISTING OF TOONA, TRANSMITTER, PHOTOCELLS
MOUNTED ON POST/WALL, PHOTOCELL, FLASHING LIGHT WITH
BUILT IN AERIAL, CONTROL UNIT, DIGITAL, KEY SWITCHES,
BATTERY BOX, ETC , ARRANGEMENTS COMPLETE.
GATE LOCATION
13.01.13AS PER CONSULTANT COMMENTS1
28.10.13AS PER CONSULTANT COMMENTS2
1.12.13AS PER CONSULTANT COMMENTS3
OUTSIDE
OUTSIDE
INSIDE
INSIDE
INSIDE
OUTSIDE
GATE No.8(B)
GATE No.8(C)
GATE No.8(A)
300
3300
10MM
GAP
100
1600100180100
409 290
5 TYPICAL SECTION
-
300
6 TYPICAL SECTION
-
2301006901620100180100
30
100
300
3150
50
100150
300
3300
10MMGAP
100
1600100180100
409290
30
7 TYPICAL SECTION
-
INSIDE
BDETAILED ELEVATION
-
Active IR Active IR Beam Active IR
CDETAILED ELEVATION
-
INSIDE
VIB300 VIBRATION SENSOR
Door Contact
Door Contact
Active IRActive IR BeamActive IR
400
30059
59
8024080
130
200
240
920
993
500
91
649
141
400
300
59
130 80190
200
91
240
993
500
131
131
131
920
1 TYPICAL DETAILED PLAN @ GATE
-
2 TYPICAL DETAILED PLAN @ GATE
-
300
300
102 85
80
100608060
306
200
100
94
70 30
100
3 TYPICAL DETAILED PLAN @ PEDESTRIAN GATE
-
4 TYPICAL DETAILED PLAN @ PEDESTRIAN GATE
-
649
300
85
70
85
100
F 510
1:50, 1:10 , 1:5
BP2-SD-02-EX-GT-00410.12.12
16.10.12
1
GATES NO.:8(A+B+C), _ SWING GATE
GATE.:#8
Note: This is reviewed in accordance with Section 01310 and other applicable
sections of the Specification and Contract Drawings. This approval does not relieve
the Contractor from his responsibilities Outlined in the Contract Documents and
remains fully responsible for accuracy of information, site and fabrication dimensions,
coordination with other trades and works. Changes of information contained in this
document shall invalidate any approval and shall be subject to a further review.
NOTES:-
Ananth.K.Samy
Engr.Vlad Dascalu
www.hok.com
+44 207 636 1987+44 207 636 2006
London W1C 1DB,216 Oxford Street, UK
Fax:
Web:
Tel:
ARCHITECTURE, INTERIORS, PLANNING, PROJECT MANAGEMENT, CONSULTING
ISSUED FOR APPROVAL0
ENGINEER
Date
RESIDENT ENGINEER
Date
DATE RECEIVED:
TRANSMITTAL NO: Action
A
B
C
D
APPROVED
APPROVED AS NOTED
NOT APPROVED RESUBMIT
REJECTED
B-R APPROVED AS NOTED - RESUBMIT
Kuwait Engineering Industries
P.O.BOX: 270,SURRA-45703 KUWAIT
TEL;(965) 23263908/740/749 FAX:(965) 23263918
E-mail:admin@keikuwait.com Web: www. keikuwait.com
B.M.
CENTRAL BANK OF KUWAIT
NEW HEAD QUARTERS BUILDINGCBK
L-17305, L-17309,
L-17310 L-17311,
L-17312, L-17312(A),
L-17313, L-17314,
L-17315, L-17316(A),
L-17318, L-17320, A-11012.
/ / 2012
SECTION.: 02820
STEEL GATE PLAN AND ELEVATION
(ALONG WITH AS SHOWN GRID'S)
SHOP DRAWING FOR STEEL GATE
PLAN, ELEVATION AND SECTIONAL DETAIL'S
LEGEND:-
* F.F.L. : FINISH FLOOR LEVEL
* T.O.U. : TOP OF UPSTAND LEVEL
* T.O.C. : TOP OF CURB
* B.O.C. : BOTTOM OF CURB
* F.L.R.B. : FINISHED LEVEL TO ROAD BLOCKER
* T.B.S. : TOP OF BOLLARD SLAB
* F.P.L. : FLOOR PAVING LEVEL
Note: This is reviewed in accordance with Section 01310 and other applicable
sections of the Specification and Contract Drawings. This approval does not relieve
the Contractor from his responsibilities Outlined in the Contract Documents and
remains fully responsible for accuracy of information, site and fabrication dimensions,
coordination with other trades and works. Changes of information contained in this
document shall invalidate any approval and shall be subject to a further review.
CERTIFIED FOR COORDINATION AND COMPLIANCE
WITH THE CONTRACT DOCUMENTS
CONTRACTOR DATETRADE SIGNATURE
STRUCTURE
H.V.A.C.
ELECTRICAL
PLUMBING
M.A. KHARAFI
K.N.
K.N.
K.N.
K.N.
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
T. COORDINATOR
Sr. ARCHITECT C.S.C.E.C. ----/----/20----
CO-ORDINATOR
C.S.C.E.C.
STONE SAVEMA ----/----/20----
----/----/20----
WATER PROOFING AL BAHAR & BARDAWIL
----/----/20----
SECURITY HONEY WELL
SECURITY ENGINEER C.S.C.E.C.
----/----/20----
----/----/20----
Rev.:
KEI / SD - 140
Rev.:1KEI / SD - 140
8. RCC BEAM FOUNDATIONS ARE TO BE LAID KEEPING PARTLY
THE TOP PORTIONS OF THE REINFORCEMENTS EXPOSED BY
100MM. WE SHALL FIX THE RAIL AND INSERT PLATES BY
WELDING TO THESE EXPOSED REINFORCEMENTS. AFTER
FIXING OF THE RAILS AND PLATES THE GAPS BELOW THE
RAILS AND PLATES SHALL BE GROUTED WITH CONCRETE BY
YOU. CIVIL CONTRACTOR.
2. ALL LEVELS ARE CORRESPONDING TO KDL.
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS (ELEV.)
ARE IN METERS UNLESS OTHERWISE NOTED.
3. DRAWING SHOULD NOT BE SCALED
AS PER CONTRACT DRAWING'S
4. ENCLOSURE SHALL BE ORIENTED FOR UNOBSTRUCTED
STRAIGHT ACCESS BY A VEHICLE 35' IN LENGTH.
HELD IN THE OPEN POSITION WITH PINS.
6. ALL METAL TO RECEIVE ONE COAT OF PRIMER. (AS SPECIFIED)
7. POWER DRIVE:
AUTOMATION SYSTEM POWER-DRIVE FOR SWING GATE
CONSISTING OF TOONA, TRANSMITTER, PHOTOCELLS
MOUNTED ON POST/WALL, PHOTOCELL, FLASHING LIGHT WITH
BUILT IN AERIAL, CONTROL UNIT, DIGITAL, KEY SWITCHES,
BATTERY BOX, ETC , ARRANGEMENTS COMPLETE.
GATE LOCATION
10.12.12AS PER CONSULTANT COMMENTS1
SHEET 1 OF 2
VD
VD
ATI-A3106 - TECHNICAL FEATURES
S.NO ITEM DESCRIPTION
1 SERIES : A-3106
REVERSIBLE 230V A.C.GEARMOTOR OPENING
2 DEGREE OF PROTECTION IP44
3 CONTROL BOARD POWER SUPPLY (50 / 60 Hz) 230 V - A.C.
4 MOTOR POWER SUPPLY 230 V - A.C. ( 50 / 60 Hz )
5 ABSORBED INPUT 1.2 A
6 MAX POWER 150 W
7 TRACTION FORCE 400 N
8 OPERATING INTERMITTENCE 50%
9 OPERATING TEMPERATURE C
LIMITS TO USE
S.NO ITEM DESCRIPTION
1 SERIES A-3106
2 MAXIMUM WIDTH OD GATE LEAF (MTR) 2.5
3 MAXIMUM WEIGHT OF GATE LEAF (KGS) 600
F 510 - TECHNICAL FEATURES
S.NO ITEM DESCRIPTION
1 SERIES : F 510
24V D.C. REVERSIBLE GEARMOTOR WITH STRAIGHT
ARM AND SLIDING GUIDE
TYPE F 510
DEGREE OF PROTECTION IP54
BOARD POWER SUPPLY 230 A.C ( 50 / 60 Hz )
MOTOR POWER SUPPLY 24V D.C
ABSORBED INPUT 2A
MAXIMUM POWER 48W
MAXIMUM TORQUE 100 NM
OPERATING INTERMITTENCE INTENSIVE USE
9s
OPERATING TEMPERATURE
GENERATOR
7 8 9 10 11 12
GENERATOR GENERATOR GENERATOR GENERATOR GENERATOR
GENERATOR
7 8 9 10 11 12
GENERATOR GENERATOR GENERATOR GENERATOR GENERATOR
0.67%
SLOPE
0.67%
SLOPE
0.70%
SLOPE
0.50%
SLO
PE
0.67%
SLOPE
0.70%
SLOPE
0.68%
SLOPE
0.67%
SLOPE
0.40%
SLOPE
0.50%SLOPE
1.22%
SLOPE
0.60% SLOPE
0.48%SLOPE
0.46%
SLOPE
0.88% SLOPE
1.10%
SLOPE
0.49%SLOPE
0.45%
SLOPE
0.82% SLOPE
1.13%
SLOPE
1.49%
SLOPE
0.45%
SLOPE
0.82% SLOPE
1.17%
SLOPE
1.39% SLOPE
0.90% SLOPE
0.43%SLOPE
1.33% SLOPE
0.89% SLOPE
1.30% SLOPE
0.45%SLOPE
1.30% SLOPE
0.98% SLOPE
0.43%SLOPE
0.45%SLOPE
0.63% SLOPE
1.54% SLOPE
0.46%SLOPE
0.39%SLOPE
0.46%SLOPE
LV-8LV-8
LV-8
LV-8 LV-8
LV-8 LV-8
LV-8
LV-8 LV-8 LV-8
LV-8
LV-8 LV-8
LV-8
LV-8
LV-8
LV-8
LV-8
LV-8
LV-8
LV-8
LV-8
LV-8 LV-8 LV-8 LV-8 LV-8
LV-8
LV-8
LV-8 LV-8 LV-8
LV-8
LV-8 LV-8
LV-8
LV-8
LV-8
LV-8
LV-8 LV-8 LV-8
LV-8
LV-8
LV-8
LV-8
LV-8
LV-8
LV-8LV-8
LV-8 LV-8
LV-8a
LV-8a
LV-8a LV-8a LV-8a
LV-8a
LV-8a
LV-8a
LV-8b
LV-8b
LV-8b
LV-8b
LV-8b
LV-8b
LV-8b
LV-8b
LV-8b
LV-8b
LV-8b
LV-8b
LV-8b
LV-8b
LV-8b
LV-8b
LV-8b
LV-8c
LV-8c
LV-8e
LV-8b
REFER. RFI.:
* KN / RFI / AC / 066 - 2011
ROLLING SHUTTER ( BY OTHERS)
(DUMMYLOUVER)(DUMMYLOUVER)
(DUMMYLOUVER)(DUMMYLOUVER)
(DUMMYLOUVER)(DUMMYLOUVER)
(DUMMYLOUVER)(DUMMYLOUVER)
(DUMMYLOUVER)
(DUMMYLOUVER)
REF. RFI.: KEI/RFI-009 RFI.: KEI/RFI-009
EL(+)27.450
REF.
LV-8e
LV-8b
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8d
LV-8
002
3
ROLLING SHUTTER ( BY OTHERS)
(DUMMY LOUVER)
(DUMMYLOUVER)
(DUMMYLOUVER)
(DUMMYLOUVER)(DUMMYLOUVER)
(DUMMYLOUVER)
(DUMMYLOUVER)
(DUMMYLOUVER)
(DUMMYLOUVER)
(DUMMYLOUVER)
(DUMMYLOUVER)(DUMMYLOUVER)
(DUMMYLOUVER)
(DUMMYLOUVER)
REF. RFI.: KEI/RFI-009 REF. RFI.: KEI/RFI-009
EL(+)23.600
T.O.SLAB
+27.45
B ELEVATION
-
(LVL +23.10MTR TO LVL +34.295MTR)
A ELEVATION
-
(LVL +23.10MTR TO LVL +34.295MTR)
C DETAILED P L A N
-
(LVL +23.10MTR )
22 TYPICAL DETAIL
-
24 DETAILED PLAN
-
(EXTEND DETAIL)23 DETAILED PLAN
-
25 DETAILED PLAN
-
26 DETAILED PLAN
-
BP2-SD-05-SP- LV-001
LOCATION (TYP)
STAFF CAR PARKING AREA
(S.S.LOUVER'S)
3
(STAFF CAR PARKING AREA _ LVL FROM +23.10 TO +36.25 Mtr)
PLAN AND ELEVATION'S AND TYPICAL SECTIONS
NOTES:-
KEY PLAN
02 03-4049-00 03876
Ananth.K.Samy
Eng.Vlad Dascalu
www.hok.com
+44 207 636 1987+44 207 636 2006
London W1C 1DB,216 Oxford Street, UK
Fax:
Web:
Tel:
ARCHITECTURE, INTERIORS, PLANNING, PROJECT MANAGEMENT, CONSULTING
LEGEND:-
F.F.L. : FINISH FLOOR LEVEL
S.S.L. : STRUCTURAL SLAB LEVEL
CERTIFIED FOR COORDINATION AND COMPLIANCE
WITH THE CONTRACT DOCUMENTS
CONTRACTOR DATETRADE SIGNATURE
ENGINEER
Date
RESIDENT ENGINEER
Date
ARCHITECTURE
STRUCTURE (R.C.C)
H.V.A.C.
ELECTRICAL
PLUMBING
M.A. KHARAFI
M.A. KHARAFI
K.N.
K.N.
K.N.
K.N.
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
DATE RECEIVED:
TRANSMITTAL NO: Action
A
B
C
D
APPROVED
APPROVED AS NOTED
NOT APPROVED RESUBMIT
REJECTED
B-R APPROVED AS NOTED - RESUBMIT
T. COORDINATOR
Sr. ARCHITECT C.S.C.E.C. ----/----/20----
CO-ORDINATOR
C.S.C.E.C.
Kuwait Engineering Industries
P.O.BOX: 270,SURRA-45703 KUWAIT
TEL;(965) 23263908/740/749 FAX:(965) 23263918
E-mail:admin@keikuwait.com Web: www. keikuwait.com
B.M.
T.O.SOIL : TOP OF SOILING LEVEL
CENTRAL BANK OF KUWAIT
NEW HEAD QUARTERS BUILDINGCBK
STONE SAVEMA
----/----/20----WATER PROOFING AL BAHAR & BARDAWIL
SHOP DRAWING FOR
STAINLESS STEEL LOUVER
2. ALL LEVELS ARE CORRESPONDING TO KDL.
3. DRAWING SHOULD NOT BE SCALED
AS PER CONTRACT DRAWING'S
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS
(ELEV.) ARE IN METERS UNLESS OTHERWISE NOTED.
05700 - STAINLESS STEEL LOUVER
PLAN AND ELEVATION
(ALONG WITH AS SHOWN GRID'S)
TYPE
CLEARAREA
WxH
SILL(LVL)
FINISH
(HVAC)
SCHEDULE OF LOUVERS
QUANTITY
REQUIRED
LOCATION
(LVL)
MATERIAL
LOUVERSIZE
WxH
REMARKS
*. Refer RFI.No.: KEI / RFI / 005. Dated On.:17/01/2011.
NOTE.:
A-11019, A-12404, A-11022,
A-13061, A-13316, A-12400,
A-13317, A-12200, A-12201,
A-12102, A-12103.
" CHANGE OF LOUVER FRAME (LV-08, LV-08A, LV-08B,
LV-08C, LV-08D, LV-08E,) FROM ALUMINIUM PROFILE
TO STAINLESS STEEL SECTION AS PER GRADE OF
S.S.304 - 2MM THICKNESS."
TOTAL
ACTIVE
LOUVER
INACTIVE
LOUVER
STRUCTURE (STEEL) M.C.C ----/----/20----
5. FOR GENERATOR ENCLOSURE TYPICAL DETAILS
4. STEEL COLUMN SUPPORT FOR HVAC DUCT WORKS
AND ELECT. WORKS REFER TO HVAC & ELECTRICAL
SUBCONTRACTOR.
Note: This is reviewed in accordance with Section 01310 and other applicable
sections of the Specification and Contract Drawings. This approval does not relieve
the Contractor from his responsibilities Outlined in the Contract Documents and
remains fully responsible for accuracy of information, site and fabrication dimensions,
coordination with other trades and works. Changes of information contained in this
document shall invalidate any approval and shall be subject to a further review.
(DUMMY)
STONE STRUCTURE ISG ----/----/20----
/ / 2012
KEI / SD - 063
[Rev.: 3 ]
Dwg.Submittal No.: KEI / SD - 063 [Rev.:3 ]
20
002
LV-8B
9DETAIL
001
DETAILED SECTION29
-
-
29
TYPE.: LV-08B
LV-8E
12 DETAIL
001
DETAILED SECTION 31
-
-
31
TYPE.: LV-08E
LV-8C
14 DETAIL
001
DETAILED SECTION 33
-
-
33
TYPE.: LV-08C
LV-8
11 DETAIL
001
DETAILED SECTION 30
-
-
30
TYPE.: LV-08
BP2-SD-05-SP- LV-003 3
TYPICAL SECTIONS
/ / 2012
KEI / SD - 053
REV.: 3
Submittal No.:KEI / SD - 053 [REV.:3 ]
(STAFF CAR PARKING AREA _ LVL FROM +23.10 TO +36.25 MTR)
LOCATION (TYP)
STAFF CAR PARKING AREA
(S.S.LOUVER'S)
NOTES:-
KEY PLAN
02 03-4049-00 03876
Ananth.K.Samy
Eng.Vlad Dascalu
www.hok.com
+44 207 636 1987+44 207 636 2006
London W1C 1DB,216 Oxford Street, UK
Fax:
Web:
Tel:
ARCHITECTURE, INTERIORS, PLANNING, PROJECT MANAGEMENT, CONSULTING
LEGEND:-
F.F.L. : FINISH FLOOR LEVEL
S.S.L. : STRUCTURAL SLAB LEVEL
CERTIFIED FOR COORDINATION AND COMPLIANCE
WITH THE CONTRACT DOCUMENTS
CONTRACTOR DATETRADE SIGNATURE
ENGINEER
Date
RESIDENT ENGINEER
Date
ARCHITECTURE
STRUCTURE (R.C.C)
H.V.A.C.
ELECTRICAL
PLUMBING
M.A. KHARAFI
M.A. KHARAFI
K.N.
K.N.
K.N.
K.N.
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
----/----/20----
DATE RECEIVED:
TRANSMITTAL NO: Action
A
B
C
D
APPROVED
APPROVED AS NOTED
NOT APPROVED RESUBMIT
REJECTED
B-R APPROVED AS NOTED - RESUBMIT
T. COORDINATOR
Sr. ARCHITECT C.S.C.E.C. ----/----/20----
CO-ORDINATOR
C.S.C.E.C.
Kuwait Engineering Industries
P.O.BOX: 270,SURRA-45703 KUWAIT
TEL;(965) 23263908/740/749 FAX:(965) 23263918
E-mail:admin@keikuwait.com Web: www. keikuwait.com
B.M.
T.O.SOIL : TOP OF SOILING LEVEL
CENTRAL BANK OF KUWAIT
NEW HEAD QUARTERS BUILDINGCBK
STONE SAVEMA
----/----/20----WATER PROOFING AL BAHAR & BARDAWIL
SHOP DRAWING FOR
STAINLESS STEEL LOUVER
2. ALL LEVELS ARE CORRESPONDING TO KDL.
3. DRAWING SHOULD NOT BE SCALED
AS PER CONTRACT DRAWING'S
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS
(ELEV.) ARE IN METERS UNLESS OTHERWISE NOTED.
05700 - STAINLESS STEEL LOUVER
PLAN AND ELEVATION
(ALONG WITH AS SHOWN GRID'S)
TYPE
CLEARAREA
WxH
SILL(LVL)
FINISH
(HVAC)
SCHEDULE OF LOUVERS
QUANTITY
REQUIRED
LOCATION
(LVL)
MATERIAL
LOUVERSIZE
WxH
REMARKS
*. Refer RFI.No.: KEI / RFI / 005. Dated On.:17/01/2011.
NOTE.:
A-11019, A-12404, A-11022,
A-13061, A-13316, A-12400,
A-13317, A-12200, A-12201,
A-12102, A-12103.
" CHANGE OF LOUVER FRAME (LV-08, LV-08A, LV-08B,
LV-08C, LV-08D, LV-08E,) FROM ALUMINIUM PROFILE
TO STAINLESS STEEL SECTION AS PER GRADE OF
S.S.304 - 2MM THICKNESS."
TOTAL
ACTIVE
LOUVER
INACTIVE
LOUVER
STRUCTURE (STEEL) M.C.C ----/----/20----
5. FOR GENERATOR ENCLOSURE TYPICAL DETAILS
4. STEEL COLUMN SUPPORT FOR HVAC DUCT WORKS
AND ELECT. WORKS REFER TO HVAC & ELECTRICAL
SUBCONTRACTOR.
Note: This is reviewed in accordance with Section 01310 and other applicable
sections of the Specification and Contract Drawings. This approval does not relieve
the Contractor from his responsibilities Outlined in the Contract Documents and
remains fully responsible for accuracy of information, site and fabrication dimensions,
coordination with other trades and works. Changes of information contained in this
document shall invalidate any approval and shall be subject to a further review.
(DUMMY)
ISGSTONE STRUCTURE ----/----/20----

More Related Content

Similar to Ananth.K.Samy_PRo_Sample

SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSunit Dhingra
 
Brisbane ferries project drawings
Brisbane ferries project drawingsBrisbane ferries project drawings
Brisbane ferries project drawings
Girish Ravikumar
 
131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINE131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINELee Yung Anchor
 
Schematics & Diagrams
Schematics & DiagramsSchematics & Diagrams
Schematics & DiagramsTrevor Wilcox
 
DCS Infra Structure
DCS Infra StructureDCS Infra Structure
DCS Infra Structure
PrashantSoni481584
 
Tes p-122.08-r0
Tes p-122.08-r0Tes p-122.08-r0
Tes p-122.08-r0
Ibrahim Ali
 
viewNitPdf_3777461.pdf
viewNitPdf_3777461.pdfviewNitPdf_3777461.pdf
viewNitPdf_3777461.pdf
DivyanshTotla
 
KZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdfKZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdf
AmitKunduDVC
 
Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...
Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...
Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...
AUTHELECTRONIC
 
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...Rodger McKinley
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major project
Yolanda Sewpersad
 
LDavis_work_examples
LDavis_work_examplesLDavis_work_examples
LDavis_work_examplesLoren Davis
 
Appendix 8.1 - Station Pier Formwork Drawings
Appendix 8.1 - Station Pier Formwork DrawingsAppendix 8.1 - Station Pier Formwork Drawings
Appendix 8.1 - Station Pier Formwork Drawingsimteyaz ali
 
13-0002 REV A LMDS2004-2A1B.PDF
13-0002 REV A LMDS2004-2A1B.PDF13-0002 REV A LMDS2004-2A1B.PDF
13-0002 REV A LMDS2004-2A1B.PDFShane Cutchall
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
hepemod733
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URSSunit Dhingra
 

Similar to Ananth.K.Samy_PRo_Sample (20)

SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
 
Brisbane ferries project drawings
Brisbane ferries project drawingsBrisbane ferries project drawings
Brisbane ferries project drawings
 
ProcContSite
ProcContSiteProcContSite
ProcContSite
 
131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINE131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINE
 
Schematics & Diagrams
Schematics & DiagramsSchematics & Diagrams
Schematics & Diagrams
 
E3.pdf
E3.pdfE3.pdf
E3.pdf
 
DCS Infra Structure
DCS Infra StructureDCS Infra Structure
DCS Infra Structure
 
Tes p-122.08-r0
Tes p-122.08-r0Tes p-122.08-r0
Tes p-122.08-r0
 
viewNitPdf_3777461.pdf
viewNitPdf_3777461.pdfviewNitPdf_3777461.pdf
viewNitPdf_3777461.pdf
 
KZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdfKZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdf
 
Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...
Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...
Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...
 
20150811-Allied Telecom
20150811-Allied Telecom20150811-Allied Telecom
20150811-Allied Telecom
 
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
 
Dick Smith
Dick SmithDick Smith
Dick Smith
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major project
 
LDavis_work_examples
LDavis_work_examplesLDavis_work_examples
LDavis_work_examples
 
Appendix 8.1 - Station Pier Formwork Drawings
Appendix 8.1 - Station Pier Formwork DrawingsAppendix 8.1 - Station Pier Formwork Drawings
Appendix 8.1 - Station Pier Formwork Drawings
 
13-0002 REV A LMDS2004-2A1B.PDF
13-0002 REV A LMDS2004-2A1B.PDF13-0002 REV A LMDS2004-2A1B.PDF
13-0002 REV A LMDS2004-2A1B.PDF
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
 

Ananth.K.Samy_PRo_Sample

  • 1. 60 140 190(MAX) 100 100 200X300X6MM THK COVER PLATE 100 300 150 100 100 100 100 18075 12 100 150 100 190(MAX) 825 50 100 50280 507015010210010215050 150 2 100 100 100 2 150 80 13 8 4010 150 102 100 102 150 69 50 50 10 150100 100 50 1:10 , 1:5 BP2-SD-02-EX-GT-005C28.10.2013 2 (GATES NO.:6 _ SLIDING GATE) GATE.:#6 Note: This is reviewed in accordance with Section 01310 and other applicable sections of the Specification and Contract Drawings. This approval does not relieve the Contractor from his responsibilities Outlined in the Contract Documents and remains fully responsible for accuracy of information, site and fabrication dimensions, coordination with other trades and works. Changes of information contained in this document shall invalidate any approval and shall be subject to a further review. ( SHEET 3 OF 3 ) 8. RCC BEAM FOUNDATIONS ARE TO BE LAID KEEPING PARTLY THE TOP PORTIONS OF THE REINFORCEMENTS EXPOSED BY 100MM. WE SHALL FIX THE RAIL AND INSERT PLATES BY WELDING TO THESE EXPOSED REINFORCEMENTS. AFTER FIXING OF THE RAILS AND PLATES THE GAPS BELOW THE RAILS AND PLATES SHALL BE GROUTED WITH CONCRETE BY YOU. CIVIL CONTRACTOR. 2. ALL LEVELS ARE CORRESPONDING TO KDL. 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS (ELEV.) ARE IN METERS UNLESS OTHERWISE NOTED. 3. DRAWING SHOULD NOT BE SCALED AS PER CONTRACT DRAWING'S 4. ENCLOSURE SHALL BE ORIENTED FOR UNOBSTRUCTED STRAIGHT ACCESS BY A VEHICLE 35' IN LENGTH. HELD IN THE OPEN POSITION WITH PINS. 6. ALL METAL TO RECEIVE ONE COAT OF PRIMER. (AS SPECIFIED) 7. POWER DRIVE: AUTOMATION SYSTEM POWER-DRIVE FOR SWING GATE CONSISTING OF TOONA, TRANSMITTER, PHOTOCELLS MOUNTED ON POST/WALL, PHOTOCELL, FLASHING LIGHT WITH BUILT IN AERIAL, CONTROL UNIT, DIGITAL, KEY SWITCHES, BATTERY BOX, ETC , ARRANGEMENTS COMPLETE. GATE LOCATION NOTES:- Ananth.K.Samy Engr.Vlad Dascalu www.hok.com +44 207 636 1987+44 207 636 2006 London W1C 1DB,216 Oxford Street, UK Fax: Web: Tel: ARCHITECTURE, INTERIORS, PLANNING, PROJECT MANAGEMENT, CONSULTING ISSUED FOR APPROVAL0 ENGINEER Date RESIDENT ENGINEER Date DATE RECEIVED: TRANSMITTAL NO: Action A B C D APPROVED APPROVED AS NOTED NOT APPROVED RESUBMIT REJECTED B-R APPROVED AS NOTED - RESUBMIT Kuwait Engineering Industries P.O.BOX: 270,SURRA-45703 KUWAIT TEL;(965) 23263908/740/749 FAX:(965) 23263918 E-mail:admin@keikuwait.com Web: www. keikuwait.com B.M. CENTRAL BANK OF KUWAIT NEW HEAD QUARTERS BUILDINGCBK L-17305, L-17309, L-17310 L-17311, L-17312, L-17312(A), L-17313, L-17314, L-17315, L-17316(A), L-17318, L-17320, A-11012. / / 2013 SECTION.: 02820 STEEL GATE PLAN AND ELEVATION (ALONG WITH AS SHOWN GRID'S) SHOP DRAWING FOR STEEL GATE PLAN, ELEVATION AND SECTIONAL DETAIL'S LEGEND:- * F.F.L. : FINISH FLOOR LEVEL * T.O.U. : TOP OF UPSTAND LEVEL * T.O.C. : TOP OF CURB * B.O.C. : BOTTOM OF CURB * F.L.R.B. : FINISHED LEVEL TO ROAD BLOCKER * T.B.S. : TOP OF BOLLARD SLAB * F.P.L. : FLOOR PAVING LEVEL Note: This is reviewed in accordance with Section 01310 and other applicable sections of the Specification and Contract Drawings. This approval does not relieve the Contractor from his responsibilities Outlined in the Contract Documents and remains fully responsible for accuracy of information, site and fabrication dimensions, coordination with other trades and works. Changes of information contained in this document shall invalidate any approval and shall be subject to a further review. CERTIFIED FOR COORDINATION AND COMPLIANCE WITH THE CONTRACT DOCUMENTS CONTRACTOR DATETRADE SIGNATURE STRUCTURE H.V.A.C. ELECTRICAL PLUMBING M.A. KHARAFI K.N. K.N. K.N. K.N. ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- T. COORDINATOR Sr. ARCHITECT C.S.C.E.C. ----/----/20---- CO-ORDINATOR C.S.C.E.C. STONE SAVEMA ----/----/20---- ----/----/20---- WATER PROOFING AL BAHAR & BARDAWIL ----/----/20---- SECURITY HONEY WELL SECURITY ENGINEER C.S.C.E.C. ----/----/20---- ----/----/20---- LANDSCAPE AL ZAL ZALA Rev.: 1 KEI / SD - 149 Rev.:2KEI / SD - 149 13.01.13 1 28.10.13 2 01.12.13
  • 2. +11.45 T.O.STONE +11.05 T.O.POST +11.20 T.O.POST +11.30 T.O.POST 100x100X5.4MM THK STEEL BOX SECTION GATE OUTER FRAME(ENAMEL PAINTED TYPICAL) OUTSIDE INSIDE +11.30 T.O.POST 100x100X5.4MM THK STEEL BOX SECTION GATE OUTER FRAME(ENAMEL PAINTED TYPICAL) OUTSIDE INSIDE +11.020 1:10 , 1:5 BP2-SD-02-EX-GT-005B28.10.2013 17.10.12 3 (GATES NO.:6 _ SLIDING GATE) GATE.:#6 Note: This is reviewed in accordance with Section 01310 and other applicable sections of the Specification and Contract Drawings. This approval does not relieve the Contractor from his responsibilities Outlined in the Contract Documents and remains fully responsible for accuracy of information, site and fabrication dimensions, coordination with other trades and works. Changes of information contained in this document shall invalidate any approval and shall be subject to a further review. NOTES:- Ananth.K.Samy Engr.Vlad Dascalu www.hok.com +44 207 636 1987+44 207 636 2006 London W1C 1DB,216 Oxford Street, UK Fax: Web: Tel: ARCHITECTURE, INTERIORS, PLANNING, PROJECT MANAGEMENT, CONSULTING ISSUED FOR APPROVAL0 ENGINEER Date RESIDENT ENGINEER Date DATE RECEIVED: TRANSMITTAL NO: Action A B C D APPROVED APPROVED AS NOTED NOT APPROVED RESUBMIT REJECTED B-R APPROVED AS NOTED - RESUBMIT Kuwait Engineering Industries P.O.BOX: 270,SURRA-45703 KUWAIT TEL;(965) 23263908/740/749 FAX:(965) 23263918 E-mail:admin@keikuwait.com Web: www. keikuwait.com B.M. CENTRAL BANK OF KUWAIT NEW HEAD QUARTERS BUILDINGCBK L-17305, L-17309, L-17310 L-17311, L-17312, L-17312(A), L-17313, L-17314, L-17315, L-17316(A), L-17318, L-17320, A-11012. / / 2013 SECTION.: 02820 STEEL GATE PLAN AND ELEVATION (ALONG WITH AS SHOWN GRID'S) SHOP DRAWING FOR STEEL GATE PLAN, ELEVATION AND SECTIONAL DETAIL'S LEGEND:- * F.F.L. : FINISH FLOOR LEVEL * T.O.U. : TOP OF UPSTAND LEVEL * T.O.C. : TOP OF CURB * B.O.C. : BOTTOM OF CURB * F.L.R.B. : FINISHED LEVEL TO ROAD BLOCKER * T.B.S. : TOP OF BOLLARD SLAB * F.P.L. : FLOOR PAVING LEVEL Note: This is reviewed in accordance with Section 01310 and other applicable sections of the Specification and Contract Drawings. This approval does not relieve the Contractor from his responsibilities Outlined in the Contract Documents and remains fully responsible for accuracy of information, site and fabrication dimensions, coordination with other trades and works. Changes of information contained in this document shall invalidate any approval and shall be subject to a further review. CERTIFIED FOR COORDINATION AND COMPLIANCE WITH THE CONTRACT DOCUMENTS CONTRACTOR DATETRADE SIGNATURE STRUCTURE H.V.A.C. ELECTRICAL PLUMBING M.A. KHARAFI K.N. K.N. K.N. K.N. ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- T. COORDINATOR Sr. ARCHITECT C.S.C.E.C. ----/----/20---- CO-ORDINATOR C.S.C.E.C. STONE SAVEMA ----/----/20---- ----/----/20---- WATER PROOFING AL BAHAR & BARDAWIL ----/----/20---- SECURITY HONEY WELL SECURITY ENGINEER C.S.C.E.C. ----/----/20---- ----/----/20---- LANDSCAPE AL ZAL ZALA Rev.: 2 KEI / SD - 142 Rev.:3KEI / SD - 142 ( SHEET 2 OF 3 ) 8. RCC BEAM FOUNDATIONS ARE TO BE LAID KEEPING PARTLY THE TOP PORTIONS OF THE REINFORCEMENTS EXPOSED BY 100MM. WE SHALL FIX THE RAIL AND INSERT PLATES BY WELDING TO THESE EXPOSED REINFORCEMENTS. AFTER FIXING OF THE RAILS AND PLATES THE GAPS BELOW THE RAILS AND PLATES SHALL BE GROUTED WITH CONCRETE BY YOU. CIVIL CONTRACTOR. 2. ALL LEVELS ARE CORRESPONDING TO KDL. 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS (ELEV.) ARE IN METERS UNLESS OTHERWISE NOTED. 3. DRAWING SHOULD NOT BE SCALED AS PER CONTRACT DRAWING'S 4. ENCLOSURE SHALL BE ORIENTED FOR UNOBSTRUCTED STRAIGHT ACCESS BY A VEHICLE 35' IN LENGTH. HELD IN THE OPEN POSITION WITH PINS. 6. ALL METAL TO RECEIVE ONE COAT OF PRIMER. (AS SPECIFIED) 7. POWER DRIVE: AUTOMATION SYSTEM POWER-DRIVE FOR SWING GATE CONSISTING OF TOONA, TRANSMITTER, PHOTOCELLS MOUNTED ON POST/WALL, PHOTOCELL, FLASHING LIGHT WITH BUILT IN AERIAL, CONTROL UNIT, DIGITAL, KEY SWITCHES, BATTERY BOX, ETC , ARRANGEMENTS COMPLETE. GATE LOCATION 13.01.13AS PER CONSULTANT COMMENTS1 28.10.13AS PER CONSULTANT COMMENTS2 1.12.13AS PER CONSULTANT COMMENTS3
  • 3. 250 2200 2250 250 725 150 600 150 50 10 720 750 150 85 300100 470 415 260 115 TYP 8010080 250 R3512 550 60 115 400 105 300 200 8010080 150 150 250 95 95 TYPICAL ISOMETRIC ELEVATION FOR GATE FRAME SCALE NTS ENAMEL PAINTED (TYPICAL) 115 (TYP) 100 100 BOTTOM SLIDING TRACK PROFILE WELDED TO GATE OUTER FRAME (BOTTOM) 1:50, 1:10 , 1:5 BP2-SD-02-EX-GT-005A28.10.2013 17.10.12 3 (GATES NO.:6 _ SLIDING GATE) GATE.:#6 Note: This is reviewed in accordance with Section 01310 and other applicable sections of the Specification and Contract Drawings. This approval does not relieve the Contractor from his responsibilities Outlined in the Contract Documents and remains fully responsible for accuracy of information, site and fabrication dimensions, coordination with other trades and works. Changes of information contained in this document shall invalidate any approval and shall be subject to a further review. NOTES:- Ananth.K.Samy Engr.Vlad Dascalu www.hok.com +44 207 636 1987+44 207 636 2006 London W1C 1DB,216 Oxford Street, UK Fax: Web: Tel: ARCHITECTURE, INTERIORS, PLANNING, PROJECT MANAGEMENT, CONSULTING ISSUED FOR APPROVAL0 ENGINEER Date RESIDENT ENGINEER Date DATE RECEIVED: TRANSMITTAL NO: Action A B C D APPROVED APPROVED AS NOTED NOT APPROVED RESUBMIT REJECTED B-R APPROVED AS NOTED - RESUBMIT Kuwait Engineering Industries P.O.BOX: 270,SURRA-45703 KUWAIT TEL;(965) 23263908/740/749 FAX:(965) 23263918 E-mail:admin@keikuwait.com Web: www. keikuwait.com B.M. CENTRAL BANK OF KUWAIT NEW HEAD QUARTERS BUILDINGCBK L-17305, L-17309, L-17310 L-17311, L-17312, L-17312(A), L-17313, L-17314, L-17315, L-17316(A), L-17318, L-17320, A-11012. / / 2013 SECTION.: 02820 STEEL GATE PLAN AND ELEVATION (ALONG WITH AS SHOWN GRID'S) SHOP DRAWING FOR STEEL GATE PLAN, ELEVATION AND SECTIONAL DETAIL'S LEGEND:- * F.F.L. : FINISH FLOOR LEVEL * T.O.U. : TOP OF UPSTAND LEVEL * T.O.C. : TOP OF CURB * B.O.C. : BOTTOM OF CURB * F.L.R.B. : FINISHED LEVEL TO ROAD BLOCKER * T.B.S. : TOP OF BOLLARD SLAB * F.P.L. : FLOOR PAVING LEVEL Note: This is reviewed in accordance with Section 01310 and other applicable sections of the Specification and Contract Drawings. This approval does not relieve the Contractor from his responsibilities Outlined in the Contract Documents and remains fully responsible for accuracy of information, site and fabrication dimensions, coordination with other trades and works. Changes of information contained in this document shall invalidate any approval and shall be subject to a further review. CERTIFIED FOR COORDINATION AND COMPLIANCE WITH THE CONTRACT DOCUMENTS CONTRACTOR DATETRADE SIGNATURE STRUCTURE H.V.A.C. ELECTRICAL PLUMBING M.A. KHARAFI K.N. K.N. K.N. K.N. ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- T. COORDINATOR Sr. ARCHITECT C.S.C.E.C. ----/----/20---- CO-ORDINATOR C.S.C.E.C. STONE SAVEMA ----/----/20---- ----/----/20---- WATER PROOFING AL BAHAR & BARDAWIL ----/----/20---- SECURITY HONEY WELL SECURITY ENGINEER C.S.C.E.C. ----/----/20---- ----/----/20---- LANDSCAPE AL ZAL ZALA Rev.: 2 KEI / SD - 141 Rev.:3KEI / SD - 141 ( SHEET 1 OF 3 ) 8. RCC BEAM FOUNDATIONS ARE TO BE LAID KEEPING PARTLY THE TOP PORTIONS OF THE REINFORCEMENTS EXPOSED BY 100MM. WE SHALL FIX THE RAIL AND INSERT PLATES BY WELDING TO THESE EXPOSED REINFORCEMENTS. AFTER FIXING OF THE RAILS AND PLATES THE GAPS BELOW THE RAILS AND PLATES SHALL BE GROUTED WITH CONCRETE BY YOU. CIVIL CONTRACTOR. 2. ALL LEVELS ARE CORRESPONDING TO KDL. 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS (ELEV.) ARE IN METERS UNLESS OTHERWISE NOTED. 3. DRAWING SHOULD NOT BE SCALED AS PER CONTRACT DRAWING'S 4. ENCLOSURE SHALL BE ORIENTED FOR UNOBSTRUCTED STRAIGHT ACCESS BY A VEHICLE 35' IN LENGTH. HELD IN THE OPEN POSITION WITH PINS. 6. ALL METAL TO RECEIVE ONE COAT OF PRIMER. (AS SPECIFIED) 7. POWER DRIVE: AUTOMATION SYSTEM POWER-DRIVE FOR SWING GATE CONSISTING OF TOONA, TRANSMITTER, PHOTOCELLS MOUNTED ON POST/WALL, PHOTOCELL, FLASHING LIGHT WITH BUILT IN AERIAL, CONTROL UNIT, DIGITAL, KEY SWITCHES, BATTERY BOX, ETC , ARRANGEMENTS COMPLETE. GATE LOCATION 13.01.13AS PER CONSULTANT COMMENTS1 28.10.13AS PER CONSULTANT COMMENTS2 1.12.13AS PER CONSULTANT COMMENTS3
  • 4. OUTSIDE OUTSIDE INSIDE INSIDE INSIDE OUTSIDE GATE No.8(B) GATE No.8(C) GATE No.8(A) 300 3300 10MM GAP 100 1600100180100 409 290 5 TYPICAL SECTION - 300 6 TYPICAL SECTION - 2301006901620100180100 30 100 300 3150 50 100150 300 3300 10MMGAP 100 1600100180100 409290 30 7 TYPICAL SECTION - INSIDE BDETAILED ELEVATION - Active IR Active IR Beam Active IR CDETAILED ELEVATION - INSIDE VIB300 VIBRATION SENSOR Door Contact Door Contact Active IRActive IR BeamActive IR 400 30059 59 8024080 130 200 240 920 993 500 91 649 141 400 300 59 130 80190 200 91 240 993 500 131 131 131 920 1 TYPICAL DETAILED PLAN @ GATE - 2 TYPICAL DETAILED PLAN @ GATE - 300 300 102 85 80 100608060 306 200 100 94 70 30 100 3 TYPICAL DETAILED PLAN @ PEDESTRIAN GATE - 4 TYPICAL DETAILED PLAN @ PEDESTRIAN GATE - 649 300 85 70 85 100 F 510 1:50, 1:10 , 1:5 BP2-SD-02-EX-GT-00410.12.12 16.10.12 1 GATES NO.:8(A+B+C), _ SWING GATE GATE.:#8 Note: This is reviewed in accordance with Section 01310 and other applicable sections of the Specification and Contract Drawings. This approval does not relieve the Contractor from his responsibilities Outlined in the Contract Documents and remains fully responsible for accuracy of information, site and fabrication dimensions, coordination with other trades and works. Changes of information contained in this document shall invalidate any approval and shall be subject to a further review. NOTES:- Ananth.K.Samy Engr.Vlad Dascalu www.hok.com +44 207 636 1987+44 207 636 2006 London W1C 1DB,216 Oxford Street, UK Fax: Web: Tel: ARCHITECTURE, INTERIORS, PLANNING, PROJECT MANAGEMENT, CONSULTING ISSUED FOR APPROVAL0 ENGINEER Date RESIDENT ENGINEER Date DATE RECEIVED: TRANSMITTAL NO: Action A B C D APPROVED APPROVED AS NOTED NOT APPROVED RESUBMIT REJECTED B-R APPROVED AS NOTED - RESUBMIT Kuwait Engineering Industries P.O.BOX: 270,SURRA-45703 KUWAIT TEL;(965) 23263908/740/749 FAX:(965) 23263918 E-mail:admin@keikuwait.com Web: www. keikuwait.com B.M. CENTRAL BANK OF KUWAIT NEW HEAD QUARTERS BUILDINGCBK L-17305, L-17309, L-17310 L-17311, L-17312, L-17312(A), L-17313, L-17314, L-17315, L-17316(A), L-17318, L-17320, A-11012. / / 2012 SECTION.: 02820 STEEL GATE PLAN AND ELEVATION (ALONG WITH AS SHOWN GRID'S) SHOP DRAWING FOR STEEL GATE PLAN, ELEVATION AND SECTIONAL DETAIL'S LEGEND:- * F.F.L. : FINISH FLOOR LEVEL * T.O.U. : TOP OF UPSTAND LEVEL * T.O.C. : TOP OF CURB * B.O.C. : BOTTOM OF CURB * F.L.R.B. : FINISHED LEVEL TO ROAD BLOCKER * T.B.S. : TOP OF BOLLARD SLAB * F.P.L. : FLOOR PAVING LEVEL Note: This is reviewed in accordance with Section 01310 and other applicable sections of the Specification and Contract Drawings. This approval does not relieve the Contractor from his responsibilities Outlined in the Contract Documents and remains fully responsible for accuracy of information, site and fabrication dimensions, coordination with other trades and works. Changes of information contained in this document shall invalidate any approval and shall be subject to a further review. CERTIFIED FOR COORDINATION AND COMPLIANCE WITH THE CONTRACT DOCUMENTS CONTRACTOR DATETRADE SIGNATURE STRUCTURE H.V.A.C. ELECTRICAL PLUMBING M.A. KHARAFI K.N. K.N. K.N. K.N. ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- T. COORDINATOR Sr. ARCHITECT C.S.C.E.C. ----/----/20---- CO-ORDINATOR C.S.C.E.C. STONE SAVEMA ----/----/20---- ----/----/20---- WATER PROOFING AL BAHAR & BARDAWIL ----/----/20---- SECURITY HONEY WELL SECURITY ENGINEER C.S.C.E.C. ----/----/20---- ----/----/20---- Rev.: KEI / SD - 140 Rev.:1KEI / SD - 140 8. RCC BEAM FOUNDATIONS ARE TO BE LAID KEEPING PARTLY THE TOP PORTIONS OF THE REINFORCEMENTS EXPOSED BY 100MM. WE SHALL FIX THE RAIL AND INSERT PLATES BY WELDING TO THESE EXPOSED REINFORCEMENTS. AFTER FIXING OF THE RAILS AND PLATES THE GAPS BELOW THE RAILS AND PLATES SHALL BE GROUTED WITH CONCRETE BY YOU. CIVIL CONTRACTOR. 2. ALL LEVELS ARE CORRESPONDING TO KDL. 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS (ELEV.) ARE IN METERS UNLESS OTHERWISE NOTED. 3. DRAWING SHOULD NOT BE SCALED AS PER CONTRACT DRAWING'S 4. ENCLOSURE SHALL BE ORIENTED FOR UNOBSTRUCTED STRAIGHT ACCESS BY A VEHICLE 35' IN LENGTH. HELD IN THE OPEN POSITION WITH PINS. 6. ALL METAL TO RECEIVE ONE COAT OF PRIMER. (AS SPECIFIED) 7. POWER DRIVE: AUTOMATION SYSTEM POWER-DRIVE FOR SWING GATE CONSISTING OF TOONA, TRANSMITTER, PHOTOCELLS MOUNTED ON POST/WALL, PHOTOCELL, FLASHING LIGHT WITH BUILT IN AERIAL, CONTROL UNIT, DIGITAL, KEY SWITCHES, BATTERY BOX, ETC , ARRANGEMENTS COMPLETE. GATE LOCATION 10.12.12AS PER CONSULTANT COMMENTS1 SHEET 1 OF 2 VD VD ATI-A3106 - TECHNICAL FEATURES S.NO ITEM DESCRIPTION 1 SERIES : A-3106 REVERSIBLE 230V A.C.GEARMOTOR OPENING 2 DEGREE OF PROTECTION IP44 3 CONTROL BOARD POWER SUPPLY (50 / 60 Hz) 230 V - A.C. 4 MOTOR POWER SUPPLY 230 V - A.C. ( 50 / 60 Hz ) 5 ABSORBED INPUT 1.2 A 6 MAX POWER 150 W 7 TRACTION FORCE 400 N 8 OPERATING INTERMITTENCE 50% 9 OPERATING TEMPERATURE C LIMITS TO USE S.NO ITEM DESCRIPTION 1 SERIES A-3106 2 MAXIMUM WIDTH OD GATE LEAF (MTR) 2.5 3 MAXIMUM WEIGHT OF GATE LEAF (KGS) 600 F 510 - TECHNICAL FEATURES S.NO ITEM DESCRIPTION 1 SERIES : F 510 24V D.C. REVERSIBLE GEARMOTOR WITH STRAIGHT ARM AND SLIDING GUIDE TYPE F 510 DEGREE OF PROTECTION IP54 BOARD POWER SUPPLY 230 A.C ( 50 / 60 Hz ) MOTOR POWER SUPPLY 24V D.C ABSORBED INPUT 2A MAXIMUM POWER 48W MAXIMUM TORQUE 100 NM OPERATING INTERMITTENCE INTENSIVE USE 9s OPERATING TEMPERATURE
  • 5. GENERATOR 7 8 9 10 11 12 GENERATOR GENERATOR GENERATOR GENERATOR GENERATOR GENERATOR 7 8 9 10 11 12 GENERATOR GENERATOR GENERATOR GENERATOR GENERATOR 0.67% SLOPE 0.67% SLOPE 0.70% SLOPE 0.50% SLO PE 0.67% SLOPE 0.70% SLOPE 0.68% SLOPE 0.67% SLOPE 0.40% SLOPE 0.50%SLOPE 1.22% SLOPE 0.60% SLOPE 0.48%SLOPE 0.46% SLOPE 0.88% SLOPE 1.10% SLOPE 0.49%SLOPE 0.45% SLOPE 0.82% SLOPE 1.13% SLOPE 1.49% SLOPE 0.45% SLOPE 0.82% SLOPE 1.17% SLOPE 1.39% SLOPE 0.90% SLOPE 0.43%SLOPE 1.33% SLOPE 0.89% SLOPE 1.30% SLOPE 0.45%SLOPE 1.30% SLOPE 0.98% SLOPE 0.43%SLOPE 0.45%SLOPE 0.63% SLOPE 1.54% SLOPE 0.46%SLOPE 0.39%SLOPE 0.46%SLOPE LV-8LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8 LV-8LV-8 LV-8 LV-8 LV-8a LV-8a LV-8a LV-8a LV-8a LV-8a LV-8a LV-8a LV-8b LV-8b LV-8b LV-8b LV-8b LV-8b LV-8b LV-8b LV-8b LV-8b LV-8b LV-8b LV-8b LV-8b LV-8b LV-8b LV-8b LV-8c LV-8c LV-8e LV-8b REFER. RFI.: * KN / RFI / AC / 066 - 2011 ROLLING SHUTTER ( BY OTHERS) (DUMMYLOUVER)(DUMMYLOUVER) (DUMMYLOUVER)(DUMMYLOUVER) (DUMMYLOUVER)(DUMMYLOUVER) (DUMMYLOUVER)(DUMMYLOUVER) (DUMMYLOUVER) (DUMMYLOUVER) REF. RFI.: KEI/RFI-009 RFI.: KEI/RFI-009 EL(+)27.450 REF. LV-8e LV-8b LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8d LV-8 002 3 ROLLING SHUTTER ( BY OTHERS) (DUMMY LOUVER) (DUMMYLOUVER) (DUMMYLOUVER) (DUMMYLOUVER)(DUMMYLOUVER) (DUMMYLOUVER) (DUMMYLOUVER) (DUMMYLOUVER) (DUMMYLOUVER) (DUMMYLOUVER) (DUMMYLOUVER)(DUMMYLOUVER) (DUMMYLOUVER) (DUMMYLOUVER) REF. RFI.: KEI/RFI-009 REF. RFI.: KEI/RFI-009 EL(+)23.600 T.O.SLAB +27.45 B ELEVATION - (LVL +23.10MTR TO LVL +34.295MTR) A ELEVATION - (LVL +23.10MTR TO LVL +34.295MTR) C DETAILED P L A N - (LVL +23.10MTR ) 22 TYPICAL DETAIL - 24 DETAILED PLAN - (EXTEND DETAIL)23 DETAILED PLAN - 25 DETAILED PLAN - 26 DETAILED PLAN - BP2-SD-05-SP- LV-001 LOCATION (TYP) STAFF CAR PARKING AREA (S.S.LOUVER'S) 3 (STAFF CAR PARKING AREA _ LVL FROM +23.10 TO +36.25 Mtr) PLAN AND ELEVATION'S AND TYPICAL SECTIONS NOTES:- KEY PLAN 02 03-4049-00 03876 Ananth.K.Samy Eng.Vlad Dascalu www.hok.com +44 207 636 1987+44 207 636 2006 London W1C 1DB,216 Oxford Street, UK Fax: Web: Tel: ARCHITECTURE, INTERIORS, PLANNING, PROJECT MANAGEMENT, CONSULTING LEGEND:- F.F.L. : FINISH FLOOR LEVEL S.S.L. : STRUCTURAL SLAB LEVEL CERTIFIED FOR COORDINATION AND COMPLIANCE WITH THE CONTRACT DOCUMENTS CONTRACTOR DATETRADE SIGNATURE ENGINEER Date RESIDENT ENGINEER Date ARCHITECTURE STRUCTURE (R.C.C) H.V.A.C. ELECTRICAL PLUMBING M.A. KHARAFI M.A. KHARAFI K.N. K.N. K.N. K.N. ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- DATE RECEIVED: TRANSMITTAL NO: Action A B C D APPROVED APPROVED AS NOTED NOT APPROVED RESUBMIT REJECTED B-R APPROVED AS NOTED - RESUBMIT T. COORDINATOR Sr. ARCHITECT C.S.C.E.C. ----/----/20---- CO-ORDINATOR C.S.C.E.C. Kuwait Engineering Industries P.O.BOX: 270,SURRA-45703 KUWAIT TEL;(965) 23263908/740/749 FAX:(965) 23263918 E-mail:admin@keikuwait.com Web: www. keikuwait.com B.M. T.O.SOIL : TOP OF SOILING LEVEL CENTRAL BANK OF KUWAIT NEW HEAD QUARTERS BUILDINGCBK STONE SAVEMA ----/----/20----WATER PROOFING AL BAHAR & BARDAWIL SHOP DRAWING FOR STAINLESS STEEL LOUVER 2. ALL LEVELS ARE CORRESPONDING TO KDL. 3. DRAWING SHOULD NOT BE SCALED AS PER CONTRACT DRAWING'S 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS (ELEV.) ARE IN METERS UNLESS OTHERWISE NOTED. 05700 - STAINLESS STEEL LOUVER PLAN AND ELEVATION (ALONG WITH AS SHOWN GRID'S) TYPE CLEARAREA WxH SILL(LVL) FINISH (HVAC) SCHEDULE OF LOUVERS QUANTITY REQUIRED LOCATION (LVL) MATERIAL LOUVERSIZE WxH REMARKS *. Refer RFI.No.: KEI / RFI / 005. Dated On.:17/01/2011. NOTE.: A-11019, A-12404, A-11022, A-13061, A-13316, A-12400, A-13317, A-12200, A-12201, A-12102, A-12103. " CHANGE OF LOUVER FRAME (LV-08, LV-08A, LV-08B, LV-08C, LV-08D, LV-08E,) FROM ALUMINIUM PROFILE TO STAINLESS STEEL SECTION AS PER GRADE OF S.S.304 - 2MM THICKNESS." TOTAL ACTIVE LOUVER INACTIVE LOUVER STRUCTURE (STEEL) M.C.C ----/----/20---- 5. FOR GENERATOR ENCLOSURE TYPICAL DETAILS 4. STEEL COLUMN SUPPORT FOR HVAC DUCT WORKS AND ELECT. WORKS REFER TO HVAC & ELECTRICAL SUBCONTRACTOR. Note: This is reviewed in accordance with Section 01310 and other applicable sections of the Specification and Contract Drawings. This approval does not relieve the Contractor from his responsibilities Outlined in the Contract Documents and remains fully responsible for accuracy of information, site and fabrication dimensions, coordination with other trades and works. Changes of information contained in this document shall invalidate any approval and shall be subject to a further review. (DUMMY) STONE STRUCTURE ISG ----/----/20---- / / 2012 KEI / SD - 063 [Rev.: 3 ] Dwg.Submittal No.: KEI / SD - 063 [Rev.:3 ]
  • 6. 20 002 LV-8B 9DETAIL 001 DETAILED SECTION29 - - 29 TYPE.: LV-08B LV-8E 12 DETAIL 001 DETAILED SECTION 31 - - 31 TYPE.: LV-08E LV-8C 14 DETAIL 001 DETAILED SECTION 33 - - 33 TYPE.: LV-08C LV-8 11 DETAIL 001 DETAILED SECTION 30 - - 30 TYPE.: LV-08 BP2-SD-05-SP- LV-003 3 TYPICAL SECTIONS / / 2012 KEI / SD - 053 REV.: 3 Submittal No.:KEI / SD - 053 [REV.:3 ] (STAFF CAR PARKING AREA _ LVL FROM +23.10 TO +36.25 MTR) LOCATION (TYP) STAFF CAR PARKING AREA (S.S.LOUVER'S) NOTES:- KEY PLAN 02 03-4049-00 03876 Ananth.K.Samy Eng.Vlad Dascalu www.hok.com +44 207 636 1987+44 207 636 2006 London W1C 1DB,216 Oxford Street, UK Fax: Web: Tel: ARCHITECTURE, INTERIORS, PLANNING, PROJECT MANAGEMENT, CONSULTING LEGEND:- F.F.L. : FINISH FLOOR LEVEL S.S.L. : STRUCTURAL SLAB LEVEL CERTIFIED FOR COORDINATION AND COMPLIANCE WITH THE CONTRACT DOCUMENTS CONTRACTOR DATETRADE SIGNATURE ENGINEER Date RESIDENT ENGINEER Date ARCHITECTURE STRUCTURE (R.C.C) H.V.A.C. ELECTRICAL PLUMBING M.A. KHARAFI M.A. KHARAFI K.N. K.N. K.N. K.N. ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- ----/----/20---- DATE RECEIVED: TRANSMITTAL NO: Action A B C D APPROVED APPROVED AS NOTED NOT APPROVED RESUBMIT REJECTED B-R APPROVED AS NOTED - RESUBMIT T. COORDINATOR Sr. ARCHITECT C.S.C.E.C. ----/----/20---- CO-ORDINATOR C.S.C.E.C. Kuwait Engineering Industries P.O.BOX: 270,SURRA-45703 KUWAIT TEL;(965) 23263908/740/749 FAX:(965) 23263918 E-mail:admin@keikuwait.com Web: www. keikuwait.com B.M. T.O.SOIL : TOP OF SOILING LEVEL CENTRAL BANK OF KUWAIT NEW HEAD QUARTERS BUILDINGCBK STONE SAVEMA ----/----/20----WATER PROOFING AL BAHAR & BARDAWIL SHOP DRAWING FOR STAINLESS STEEL LOUVER 2. ALL LEVELS ARE CORRESPONDING TO KDL. 3. DRAWING SHOULD NOT BE SCALED AS PER CONTRACT DRAWING'S 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS (ELEV.) ARE IN METERS UNLESS OTHERWISE NOTED. 05700 - STAINLESS STEEL LOUVER PLAN AND ELEVATION (ALONG WITH AS SHOWN GRID'S) TYPE CLEARAREA WxH SILL(LVL) FINISH (HVAC) SCHEDULE OF LOUVERS QUANTITY REQUIRED LOCATION (LVL) MATERIAL LOUVERSIZE WxH REMARKS *. Refer RFI.No.: KEI / RFI / 005. Dated On.:17/01/2011. NOTE.: A-11019, A-12404, A-11022, A-13061, A-13316, A-12400, A-13317, A-12200, A-12201, A-12102, A-12103. " CHANGE OF LOUVER FRAME (LV-08, LV-08A, LV-08B, LV-08C, LV-08D, LV-08E,) FROM ALUMINIUM PROFILE TO STAINLESS STEEL SECTION AS PER GRADE OF S.S.304 - 2MM THICKNESS." TOTAL ACTIVE LOUVER INACTIVE LOUVER STRUCTURE (STEEL) M.C.C ----/----/20---- 5. FOR GENERATOR ENCLOSURE TYPICAL DETAILS 4. STEEL COLUMN SUPPORT FOR HVAC DUCT WORKS AND ELECT. WORKS REFER TO HVAC & ELECTRICAL SUBCONTRACTOR. Note: This is reviewed in accordance with Section 01310 and other applicable sections of the Specification and Contract Drawings. This approval does not relieve the Contractor from his responsibilities Outlined in the Contract Documents and remains fully responsible for accuracy of information, site and fabrication dimensions, coordination with other trades and works. Changes of information contained in this document shall invalidate any approval and shall be subject to a further review. (DUMMY) ISGSTONE STRUCTURE ----/----/20----