Disaster Management Plan for
Thermal Power Plants
By : H.M. Gangopadhyay
Dy. General Manager (Safety)
Corporate Safety Department
NTPC Limited
Presentation Outline
 Classification of Disaster
 Requirement under the Laws
 Objective of the Plan
 Disasters in Thermal Power Plants
 Risk Assessment & Vulnerability Mapping
 Emergency Equipments, Training & Mock Drills
 Disaster Management Organisation
 Responsibilities of Team Members
 Emergency Control Centre (ECC)
 Evacuation and Assembly Points
 Mutual Aid Scheme
• Natural disasters (earth quake, flood, Tsunami
etc.,)
• Technical disasters – collapse of buildings, release
of gases, major fires, explosions.
 A disaster occurring in the plant may affect/cause
 several sections within it
 serious injuries / loss of lives,
 Extensive damage to property
 Serious disruption out side the works area
 It requires the best use of internal resources as well as
outside resources to handle it effectively.
Classification of Disaster
 ON-SITE EMERGENCY : An accident which takes place
in an industry handling hazardous materials and its
effects are confined to the factory premises involving
only the people working in the factory.
 OFF-SITE EMERGENCY: If an accident takes place
in an industry handling hazardous materials and its
effects are felt outside the factory premises, the situation
thus generated is called an Off-Site Emergency
Factories Act Requirement
In accordance with the provision of Section 2 (cb), read
with The Factories Act - 1948, “power generating
industry” is classified as hazardous process under item
5 thereof.
According to Section 41-b, para –4, of Factories Act- 1948,
all factories engaged in hazardous processes must have
Disaster Management Plan.
Every occupier shall, with the approval of the Chief
Inspector, draw up an on site emergency plan and detailed
disaster control measures for his factory and make known
to the workers employed there in and to the general public
living in the vicinity of factory, the safety measures required
to be taken in the event of an accident taking place.
Section 41-b, Para -4 of Factories Act-1948
Approach and Objective of the Plan
The plan is developed to make best possible use of
resources at its command and / or out side agencies
for the following purposes.89
 Prevention, Mitigation & Preparedness (Pre phase)
 Response, Rehabilitation & Recovery (Post phase)
 Safe guard others by evacuating them to safer places;
 Rescue of victims and treating them suitably to effect
speedy recovery at hospital;
 Identify the personnel affected / dead;
 Inform relatives of those deceased / affected;
 Providing relevant records / data needed as evidence
for subsequent enquiry;
 Rehabilitation of the affected persons;
Possible Disasters in Thermal Power Plants
 Fast spreading fires
 Explosions
 Bursting of pipe lines / vessels
 Uncontrolled release of toxic / corrosive / flammable
liquids
 Slow isolated fires
 Breach of dams / ash dykes
 Floods
Fire Hazards In Thermal Power Plants
 Coal handling plant:
 Coal dust accumulation on
 conveyor decks,
 cable trays,
 head & tail pulleys,
 Crusher house and vibrating screen floors,
 Bunker house ,
 Belt sway, belt tension,
 Failure of belt joints,
 Snapping of belts,
 Partially damaged belt in operation,
 Smoldering fire in bunkers,
 Jamming of idlers and pulleys,
Fire Hazards In Thermal Power Plants
 Cables in cable galleries and on trays in all plant
sections,
 Coal dust deposited on cable trays in mill area
 Fuel oil handling and oil tanks (HSD, HFO, Petrol )
 Transformer oil, turbine oil, control fluid, seal oil,
 Electrical system
 Heat path damaged insulation
 Dry grasses
 Accumulation of waste materials etc.
Explosion Hazard In Thermal Power Plant
 Hydrogen plant
 Turbo generators where hydrogen is used for cooling of
TG.
 Transformer (oil cooled).
 Boiler (Coal/Oil fired).
 Coal dust in Mills and Boilers.
Bursting of Pipe Lines, Vessels
 Water / Steam pipes due to high pressure/
temperature
 H2 Gas lines and Acid lines.
 Acid/Alkali tanks
 H2 Gas Cylinders
 Compressed air header.
 Compressed air receivers.
 H2 Gas Holder.
Release of Gases / Dust
 Chlorine in water treatment plant
 Hydrogen in turbo generator area of main plant
 Pulverized coal dust from mills and associated piping
 Fly ash from chimneys and ash ponds, ESP hoppers and
bottom ash system
 Coal dust in transfer points, CHP, Crusher & mill area.
 Flue gas from the ducts
Release Of Liquid
 Acid and alkali tanks in water treatment plants
 Chlorine toners in WTPs
 Fuel oil tanks in fuel oil handling section
 Ash dyke
 Turbine oil and seal oil leakage
Floods
 Breach of balancing reservoir.
 Breach of ash dykes
Sections prone to Emergencies
 Coal handling plant
 Main plant, including Boiler, TG, ESP
 Water treatment plant, use of Chlorine gas
 Hydrogen generation plant
 Fuel Oil Handling areas
Common elements of a model
Disaster Management Plan
Components of Disaster Management Plan
 Plant emergency organization
 Plant & area risk evaluation
 Notification procedures & communication systems
 Emergency equipments and facilities available
 Procedure for returning to normal operations
 Training and mock-drills for specialized services
 Regular tests of emergency organization and procedures
 Review of Plan and updates
 Emergency response procedures
 Detailed operating manual
Risk Assesment & Vulnerability Mapping
Consists of the following components:
 Maximum quantitative and qualitative assessment of
hazards at any given point of time
 Location of hazardous operations and systems
 Properties of hazardous systems (MSDS)
 Location of isolation systems
 Special fire-fighting procedures
 Special handling requirements.
Communication systems
 Alarm systems
 Communication equipments
 Plant management, Local Officials, Response Agencies,
Neighbouring industries, Neighbourhood population
 Names and telephone numbers of the designated officials
and their alternates
 Designated persons for media contacts
 Procedures for notifying families of injured employees
 Central reporting office (ECC).
Emergency equipments & facilities
 Fire-fighting equipment
 Emergency medical supplies
 Toxic gas detectors
 Wind direction (wind sock)/speed indicators
 Self-contained breathing apparatus
 Protective clothings
 Other on-site equipments according to the local conditions
 Containment facilities around tanks/vessels
 Interfaces & lines of communication with off-site officials,
neighbouring industries.
Training, Simulation & Mock Drills
 Knowledge of chemicals (properties, toxicity, etc.)
and procedures for reporting emergencies
 Alarm systems and communication network
 Location of fire-fighting/first-aid equipment
 Use of fire-fighting/first-aid equipment
 Use of protective equipment(respirators, breathing
apparatus, clothing, etc.)
 Decontamination procedure for protective clothing and
equipment; demolition and repair
 Evaluation procedures and rescue services
 Records of documented simulated emergencies which
should be conducted frequently.
 Training and drills for specialized services
 Regular tests of emergency organization and
procedures
 Plan updates
 Emergency response procedures
 Detailed operating manual
Training, Simulation & Mock Drills
Work Incident
Controller
Chief Incident
Controller
Task Force
Team
HR Team
Matls Mgmt.
Team
Rescue Team
Medical team
Autobase
Team Security Team
Support Team
Communication
team
Maint
Team
Support
Team
Disaster Management Organisation
Responsibilities of WIC
The WIC shall identify;
 All probable emergency causing situations and take
proper precautionary measures to prevent / control such
situations;
 Ensure that all emergency team under him are informed
about their functions before and during emergency;
 Direct all operations within the affected area with the
following priority;
 Secure the safety of personnel
 Minimise damage to plant & environment
 Minimise loss of material
Responsibilities of WIC
 Ensure that all non-essential workers in the affected areas
are evacuated to appropriate assembly point.
 Set up communication contact through telephone /
messenger etc. With emergency control centre (ECC).
 Report significant developments to the chief incident
controller.
 Assume duties of chief incident controller pending his arrival
and in particular;
1. Direct the shut down and evacuation of plant and affected
areas likely to be threatened by the emergency.
2. Ensure key personnel are informed and they are called in
Responsibilities of CIC
 Relieve the works incidence controller from the
responsibility of over all main control.
 Declare major emergency, if considered necessary and
ensure out side emergency services are called in and near
by industries are informed.
 Directing shutting down and evacuation of plant, establish
liaison with head of fire, safety, medical, HR, security and
local police.
 Arrange for relief of personnel and catering facilities for
affected in emergency.
 Ensure information / reporting to Corporate Office and
Statutory authorities as per provisions of state Factory rules
and Factory Act
Emergency Control Centre (ECC)
 Emergency control centre shall be established and
equipped with adequate means of communication to
areas inside and outside.
 The emergency control room will be manned by the Chief
Incident Controller, Work Incident Controller, key
personnel and Sr.Officers of out side services called for
assistance.
 It should have general map and guide for Assembly
Points, location of Hazardous process/operation
 No other personnel shall have access to the ECC.
Emergency Control Centre (ECC)
ECC must contain the following information:
 Safety data pertaining to all hazardous materials likely to
cause emergency.
 Procedure of major and special fire fighting, rescue
operations, first aid etc.
 Emergency call out list of persons drafted for emergency
control eg key personnel from fire, safety, medical, HR,
security, local police and District Admn. Authorities.
Evacuation And Assembly Points
 In an emergency, it will almost certainly be necessary to
evacuate personnel from affected areas.
 On evacuation, employees shall assemble at assembly
points.
 Assembly point must be shown in Disaster Management
Plan.
Key Personnel
 Apart from WIC and CIC, other works personnel will have
key role to play in providing advice and in implementing
the decisions made by CIC.
 Key personnel includes
1. Incharge of generation, electrical & mechanical
maintenance, C&I, Chemistry (& WTP)
2. Heads of HR, safety, PR, Medical, Security & Fire
Department.
Mutual Aid Scheme
 An understanding for mutual aid between nearby
industries to send assistance to each other in case of an
emergency;
 Details of facilities offered by the mutual aid partners
should be mentioned in the plan;
 Details of contact phone nos. of officers responsible for
emergency action of mutual aid partners should be
mentioned in the plan
Support team to CIC & WIC
 In addition to the teams already mentioned there will be
one additional team known as support team.
 This team will assist CIC & WIC during an emergency.
The responsibilities of the team given below;
 Contacting statutory authorities.
 Arranging for relievers and catering facilities.
 Giving information to media.
Responsibilities Of Support Team
 Arranging shelters for affected persons.
 Contacting medical centres and nursing homes.
 Providing all other support, as necessary.
 Arranging for urgently required materials through cash
purchase or whatever means.
 Arranging funds for various relief measures as
emergency purchase of materials.
 Departmental heads:
 The departmental heads will provide assistance as required
by the works incident controller. They will decide which
members of their departments are required at the incident
site.
 Head of Tech. Services
 On knowing the major emergency, he will proceed to the
site and report to CIC.
 He will provide technical information as required to
CIC/WIC.
 Head of Safety:
 On knowing the emergency, he will immediately report to
site and keep in touch with CIC
 He will make sure that all safety equipments are made
available to the emergency teams.
 Participate in rescue operations.
 Maintain inventory of items in ECC.
Responsibilities of key personnel
Mock Drill
 Mock-drills are conducted to test the effectiveness of
action plan / emergency preparedness.
 Periodicity of mock drill is at least once in every six
months (As per Factories Act-1948).
 Deficiencies found are to be recorded and corrective
actions are to be taken immediately for effectiveness of
the plan.
Emergency Siren
-------------------------------------------------------------------------------------------
T y p e Duration
-------------------------------------------------------------------------------------------
 In case of fire 10 seconds on
05 seconds off,
3 times
 In case of 20 seconds on,
Heavy chlorine leak 10 seconds off,
5 times.
 All clear signal Continuous
siren for 3 min,
only once.
---------------------------------------------------------------------------------
Thank you
Let us develop a positive safety culture
involving all our employees & associates

More Related Content

What's hot

Safety (1)
Safety (1)Safety (1)
Safety (1)
khaneducation
 
40 DUTIES OF A SAFETY OFFICER.pdf
40 DUTIES OF A SAFETY OFFICER.pdf40 DUTIES OF A SAFETY OFFICER.pdf
40 DUTIES OF A SAFETY OFFICER.pdf
Karnav Rana
 
Working at height slides
Working at height slidesWorking at height slides
Working at height slides
kingsley okeke.
 
Loto presentation
Loto presentationLoto presentation
Loto presentation
LalitSharma508
 
LOTO Training (bahasa version)
LOTO Training (bahasa version)LOTO Training (bahasa version)
LOTO Training (bahasa version)
Danu Jaya Wiguna
 
K3 mekanik
K3 mekanikK3 mekanik
Dasar- Dasar K3 Panas Bumi.ppt
Dasar- Dasar K3 Panas Bumi.pptDasar- Dasar K3 Panas Bumi.ppt
Dasar- Dasar K3 Panas Bumi.ppt
AhmadIbrahimi4
 
PPT K3.pptx
PPT K3.pptxPPT K3.pptx
PPT K3.pptx
diansuradi
 
fdokumen.com_02-k3-konstruksi-bangunan.ppt
fdokumen.com_02-k3-konstruksi-bangunan.pptfdokumen.com_02-k3-konstruksi-bangunan.ppt
fdokumen.com_02-k3-konstruksi-bangunan.ppt
AryanaPutraImade
 
Cold Work Permit
Cold Work PermitCold Work Permit
Cold Work Permit
Adnan Muazzam
 
Fire Safety Dip. OSH
Fire Safety Dip. OSHFire Safety Dip. OSH
Fire Safety Dip. OSH
Eiyla Hamdan
 
LOTO Training
LOTO TrainingLOTO Training
LOTO Training
CM Tiwari
 
Permit to Work Training
Permit to Work TrainingPermit to Work Training
Permit to Work Training
SUDHEER KUMAR KALYANAM
 
Katalog Safety Poster - Agustus 2015
Katalog Safety Poster - Agustus 2015Katalog Safety Poster - Agustus 2015
Katalog Safety Poster - Agustus 2015
PT Safety Sign Indonesia
 
BBS TRAINING.pptx
BBS TRAINING.pptxBBS TRAINING.pptx
BBS TRAINING.pptx
Mirza Saifullah Baig
 
K3 Pesawat Tenaga dan Produksi
K3 Pesawat Tenaga dan ProduksiK3 Pesawat Tenaga dan Produksi
K3 Pesawat Tenaga dan Produksi
Al Marson
 
Hirarc
HirarcHirarc
Hirarc
Hazim Talib
 
Hiradc pemeliharaan chiller
Hiradc pemeliharaan chillerHiradc pemeliharaan chiller
Hiradc pemeliharaan chiller
adnan sintan
 
K3-Modul 4 : Tanggap Darurat
K3-Modul 4 : Tanggap DaruratK3-Modul 4 : Tanggap Darurat
K3-Modul 4 : Tanggap Darurat
Mokh Afifuddin Machfudz
 
Kiken-Yochi-Training-ppt.ppt
Kiken-Yochi-Training-ppt.pptKiken-Yochi-Training-ppt.ppt
Kiken-Yochi-Training-ppt.ppt
Rafathar3
 

What's hot (20)

Safety (1)
Safety (1)Safety (1)
Safety (1)
 
40 DUTIES OF A SAFETY OFFICER.pdf
40 DUTIES OF A SAFETY OFFICER.pdf40 DUTIES OF A SAFETY OFFICER.pdf
40 DUTIES OF A SAFETY OFFICER.pdf
 
Working at height slides
Working at height slidesWorking at height slides
Working at height slides
 
Loto presentation
Loto presentationLoto presentation
Loto presentation
 
LOTO Training (bahasa version)
LOTO Training (bahasa version)LOTO Training (bahasa version)
LOTO Training (bahasa version)
 
K3 mekanik
K3 mekanikK3 mekanik
K3 mekanik
 
Dasar- Dasar K3 Panas Bumi.ppt
Dasar- Dasar K3 Panas Bumi.pptDasar- Dasar K3 Panas Bumi.ppt
Dasar- Dasar K3 Panas Bumi.ppt
 
PPT K3.pptx
PPT K3.pptxPPT K3.pptx
PPT K3.pptx
 
fdokumen.com_02-k3-konstruksi-bangunan.ppt
fdokumen.com_02-k3-konstruksi-bangunan.pptfdokumen.com_02-k3-konstruksi-bangunan.ppt
fdokumen.com_02-k3-konstruksi-bangunan.ppt
 
Cold Work Permit
Cold Work PermitCold Work Permit
Cold Work Permit
 
Fire Safety Dip. OSH
Fire Safety Dip. OSHFire Safety Dip. OSH
Fire Safety Dip. OSH
 
LOTO Training
LOTO TrainingLOTO Training
LOTO Training
 
Permit to Work Training
Permit to Work TrainingPermit to Work Training
Permit to Work Training
 
Katalog Safety Poster - Agustus 2015
Katalog Safety Poster - Agustus 2015Katalog Safety Poster - Agustus 2015
Katalog Safety Poster - Agustus 2015
 
BBS TRAINING.pptx
BBS TRAINING.pptxBBS TRAINING.pptx
BBS TRAINING.pptx
 
K3 Pesawat Tenaga dan Produksi
K3 Pesawat Tenaga dan ProduksiK3 Pesawat Tenaga dan Produksi
K3 Pesawat Tenaga dan Produksi
 
Hirarc
HirarcHirarc
Hirarc
 
Hiradc pemeliharaan chiller
Hiradc pemeliharaan chillerHiradc pemeliharaan chiller
Hiradc pemeliharaan chiller
 
K3-Modul 4 : Tanggap Darurat
K3-Modul 4 : Tanggap DaruratK3-Modul 4 : Tanggap Darurat
K3-Modul 4 : Tanggap Darurat
 
Kiken-Yochi-Training-ppt.ppt
Kiken-Yochi-Training-ppt.pptKiken-Yochi-Training-ppt.ppt
Kiken-Yochi-Training-ppt.ppt
 

Viewers also liked

Fire Safety Guideline
Fire Safety GuidelineFire Safety Guideline
Fire Safety Guideline
Abu Xafar Ansari Bin Kayes Akik
 
DOSH 6 FIRSTAID CURRICULUM
DOSH 6 FIRSTAID CURRICULUMDOSH 6 FIRSTAID CURRICULUM
DOSH 6 FIRSTAID CURRICULUM
Amb Steve Mbugua
 
Preethi from 6 Patience
Preethi from 6 PatiencePreethi from 6 Patience
Preethi from 6 Patience
yewteeps
 
Unit7 disaster mgmt plan
Unit7 disaster mgmt planUnit7 disaster mgmt plan
Unit7 disaster mgmt plan
Menchanical Engineering Community forum
 
DOSH 7 OSH CURRICULUM
DOSH 7 OSH CURRICULUMDOSH 7 OSH CURRICULUM
DOSH 7 OSH CURRICULUM
Amb Steve Mbugua
 
Safety And Health In Chemical Industries
Safety And Health In Chemical IndustriesSafety And Health In Chemical Industries
Safety And Health In Chemical Industries
purna1048
 
Lupin Summer training
Lupin Summer trainingLupin Summer training
Lupin Summer training
Rajat Gandhi
 
Private Security Agencies Regulation Act 2005
Private Security Agencies Regulation Act 2005Private Security Agencies Regulation Act 2005
Private Security Agencies Regulation Act 2005
Capt Rajeshwar singh
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction
Mereia Kali
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
Wilden How
 

Viewers also liked (10)

Fire Safety Guideline
Fire Safety GuidelineFire Safety Guideline
Fire Safety Guideline
 
DOSH 6 FIRSTAID CURRICULUM
DOSH 6 FIRSTAID CURRICULUMDOSH 6 FIRSTAID CURRICULUM
DOSH 6 FIRSTAID CURRICULUM
 
Preethi from 6 Patience
Preethi from 6 PatiencePreethi from 6 Patience
Preethi from 6 Patience
 
Unit7 disaster mgmt plan
Unit7 disaster mgmt planUnit7 disaster mgmt plan
Unit7 disaster mgmt plan
 
DOSH 7 OSH CURRICULUM
DOSH 7 OSH CURRICULUMDOSH 7 OSH CURRICULUM
DOSH 7 OSH CURRICULUM
 
Safety And Health In Chemical Industries
Safety And Health In Chemical IndustriesSafety And Health In Chemical Industries
Safety And Health In Chemical Industries
 
Lupin Summer training
Lupin Summer trainingLupin Summer training
Lupin Summer training
 
Private Security Agencies Regulation Act 2005
Private Security Agencies Regulation Act 2005Private Security Agencies Regulation Act 2005
Private Security Agencies Regulation Act 2005
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 

Similar to Dmp tpp

Emergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdfEmergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdf
sursh2
 
Emergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdfEmergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdf
sursh2
 
Industrial-Hazards-and-Safety-Measures.pdf
Industrial-Hazards-and-Safety-Measures.pdfIndustrial-Hazards-and-Safety-Measures.pdf
Industrial-Hazards-and-Safety-Measures.pdf
UVAS
 
Safety methods in pharmaceutical industry
Safety methods in pharmaceutical industrySafety methods in pharmaceutical industry
Safety methods in pharmaceutical industry
Imran Nur Manik
 
Ai Ch E Facility Siting Presentation
Ai Ch E Facility Siting PresentationAi Ch E Facility Siting Presentation
Ai Ch E Facility Siting Presentation
ernestvictor
 
Business Emergency Response Plans
Business Emergency Response PlansBusiness Emergency Response Plans
Business Emergency Response Plans
WBDC of Florida
 
EmergencyPlan-On-SiteAndOff-Site plan for secure
EmergencyPlan-On-SiteAndOff-Site plan for secureEmergencyPlan-On-SiteAndOff-Site plan for secure
EmergencyPlan-On-SiteAndOff-Site plan for secure
ShaileshPal24
 
FIRE AND EXPLOSION (Industrial Hazards).pptx
FIRE AND EXPLOSION (Industrial Hazards).pptxFIRE AND EXPLOSION (Industrial Hazards).pptx
FIRE AND EXPLOSION (Industrial Hazards).pptx
SnehaGhadigaonkar
 
Industrial hazards
Industrial hazardsIndustrial hazards
Industrial hazards
Kiran Rodge
 
Annual ed epp2010 jan
Annual ed  epp2010 janAnnual ed  epp2010 jan
Annual ed epp2010 jan
capstonerx
 
Hazard identification and risk assessment
Hazard identification and risk assessmentHazard identification and risk assessment
Hazard identification and risk assessment
Seshadhiri Palraj
 
On site and offsite emergency plans on chemical
On site and offsite emergency plans on chemicalOn site and offsite emergency plans on chemical
On site and offsite emergency plans on chemical
Shahrukh Vahora
 
FFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptx
FFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptxFFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptx
FFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptx
IlyasKhan84634
 
Compling with terminal process safety
Compling with terminal process safetyCompling with terminal process safety
Compling with terminal process safety
Preeju Anirudhan
 
HTHA Report IOCL_publish
HTHA Report IOCL_publishHTHA Report IOCL_publish
HTHA Report IOCL_publish
Arijit Karmakar
 
Environmental Risk Assessment (Disaster Management Plan)
Environmental Risk Assessment (Disaster Management Plan)Environmental Risk Assessment (Disaster Management Plan)
Environmental Risk Assessment (Disaster Management Plan)
bharathbalji
 
Fire Safety Network for Fertilizers Industries.pdf
Fire Safety Network for Fertilizers Industries.pdfFire Safety Network for Fertilizers Industries.pdf
Fire Safety Network for Fertilizers Industries.pdf
PremBaboo4
 
Bhopal disaster could safe by Abid Nadeem khan
Bhopal disaster could safe by Abid Nadeem khanBhopal disaster could safe by Abid Nadeem khan
Bhopal disaster could safe by Abid Nadeem khan
guestda7ab4
 
Industrial technology and Accidents, clean technology, Clean Development Mech...
Industrial technology and Accidents, clean technology, Clean Development Mech...Industrial technology and Accidents, clean technology, Clean Development Mech...
Industrial technology and Accidents, clean technology, Clean Development Mech...
H. M. Touhidul Islam
 
Reduction of false alarms
Reduction of false alarmsReduction of false alarms
Reduction of false alarms
William Gutierrez
 

Similar to Dmp tpp (20)

Emergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdfEmergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdf
 
Emergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdfEmergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdf
 
Industrial-Hazards-and-Safety-Measures.pdf
Industrial-Hazards-and-Safety-Measures.pdfIndustrial-Hazards-and-Safety-Measures.pdf
Industrial-Hazards-and-Safety-Measures.pdf
 
Safety methods in pharmaceutical industry
Safety methods in pharmaceutical industrySafety methods in pharmaceutical industry
Safety methods in pharmaceutical industry
 
Ai Ch E Facility Siting Presentation
Ai Ch E Facility Siting PresentationAi Ch E Facility Siting Presentation
Ai Ch E Facility Siting Presentation
 
Business Emergency Response Plans
Business Emergency Response PlansBusiness Emergency Response Plans
Business Emergency Response Plans
 
EmergencyPlan-On-SiteAndOff-Site plan for secure
EmergencyPlan-On-SiteAndOff-Site plan for secureEmergencyPlan-On-SiteAndOff-Site plan for secure
EmergencyPlan-On-SiteAndOff-Site plan for secure
 
FIRE AND EXPLOSION (Industrial Hazards).pptx
FIRE AND EXPLOSION (Industrial Hazards).pptxFIRE AND EXPLOSION (Industrial Hazards).pptx
FIRE AND EXPLOSION (Industrial Hazards).pptx
 
Industrial hazards
Industrial hazardsIndustrial hazards
Industrial hazards
 
Annual ed epp2010 jan
Annual ed  epp2010 janAnnual ed  epp2010 jan
Annual ed epp2010 jan
 
Hazard identification and risk assessment
Hazard identification and risk assessmentHazard identification and risk assessment
Hazard identification and risk assessment
 
On site and offsite emergency plans on chemical
On site and offsite emergency plans on chemicalOn site and offsite emergency plans on chemical
On site and offsite emergency plans on chemical
 
FFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptx
FFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptxFFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptx
FFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptx
 
Compling with terminal process safety
Compling with terminal process safetyCompling with terminal process safety
Compling with terminal process safety
 
HTHA Report IOCL_publish
HTHA Report IOCL_publishHTHA Report IOCL_publish
HTHA Report IOCL_publish
 
Environmental Risk Assessment (Disaster Management Plan)
Environmental Risk Assessment (Disaster Management Plan)Environmental Risk Assessment (Disaster Management Plan)
Environmental Risk Assessment (Disaster Management Plan)
 
Fire Safety Network for Fertilizers Industries.pdf
Fire Safety Network for Fertilizers Industries.pdfFire Safety Network for Fertilizers Industries.pdf
Fire Safety Network for Fertilizers Industries.pdf
 
Bhopal disaster could safe by Abid Nadeem khan
Bhopal disaster could safe by Abid Nadeem khanBhopal disaster could safe by Abid Nadeem khan
Bhopal disaster could safe by Abid Nadeem khan
 
Industrial technology and Accidents, clean technology, Clean Development Mech...
Industrial technology and Accidents, clean technology, Clean Development Mech...Industrial technology and Accidents, clean technology, Clean Development Mech...
Industrial technology and Accidents, clean technology, Clean Development Mech...
 
Reduction of false alarms
Reduction of false alarmsReduction of false alarms
Reduction of false alarms
 

Recently uploaded

Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
Madhumitha Jayaram
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
PuktoonEngr
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
Ratnakar Mikkili
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
PauloRodrigues104553
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 

Recently uploaded (20)

Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 

Dmp tpp

  • 1. Disaster Management Plan for Thermal Power Plants By : H.M. Gangopadhyay Dy. General Manager (Safety) Corporate Safety Department NTPC Limited
  • 2. Presentation Outline  Classification of Disaster  Requirement under the Laws  Objective of the Plan  Disasters in Thermal Power Plants  Risk Assessment & Vulnerability Mapping  Emergency Equipments, Training & Mock Drills  Disaster Management Organisation  Responsibilities of Team Members  Emergency Control Centre (ECC)  Evacuation and Assembly Points  Mutual Aid Scheme
  • 3. • Natural disasters (earth quake, flood, Tsunami etc.,) • Technical disasters – collapse of buildings, release of gases, major fires, explosions.
  • 4.  A disaster occurring in the plant may affect/cause  several sections within it  serious injuries / loss of lives,  Extensive damage to property  Serious disruption out side the works area  It requires the best use of internal resources as well as outside resources to handle it effectively. Classification of Disaster
  • 5.  ON-SITE EMERGENCY : An accident which takes place in an industry handling hazardous materials and its effects are confined to the factory premises involving only the people working in the factory.  OFF-SITE EMERGENCY: If an accident takes place in an industry handling hazardous materials and its effects are felt outside the factory premises, the situation thus generated is called an Off-Site Emergency
  • 6. Factories Act Requirement In accordance with the provision of Section 2 (cb), read with The Factories Act - 1948, “power generating industry” is classified as hazardous process under item 5 thereof. According to Section 41-b, para –4, of Factories Act- 1948, all factories engaged in hazardous processes must have Disaster Management Plan.
  • 7. Every occupier shall, with the approval of the Chief Inspector, draw up an on site emergency plan and detailed disaster control measures for his factory and make known to the workers employed there in and to the general public living in the vicinity of factory, the safety measures required to be taken in the event of an accident taking place. Section 41-b, Para -4 of Factories Act-1948
  • 8. Approach and Objective of the Plan The plan is developed to make best possible use of resources at its command and / or out side agencies for the following purposes.89  Prevention, Mitigation & Preparedness (Pre phase)  Response, Rehabilitation & Recovery (Post phase)  Safe guard others by evacuating them to safer places;  Rescue of victims and treating them suitably to effect speedy recovery at hospital;  Identify the personnel affected / dead;  Inform relatives of those deceased / affected;  Providing relevant records / data needed as evidence for subsequent enquiry;  Rehabilitation of the affected persons;
  • 9. Possible Disasters in Thermal Power Plants  Fast spreading fires  Explosions  Bursting of pipe lines / vessels  Uncontrolled release of toxic / corrosive / flammable liquids  Slow isolated fires  Breach of dams / ash dykes  Floods
  • 10. Fire Hazards In Thermal Power Plants  Coal handling plant:  Coal dust accumulation on  conveyor decks,  cable trays,  head & tail pulleys,  Crusher house and vibrating screen floors,  Bunker house ,  Belt sway, belt tension,  Failure of belt joints,  Snapping of belts,  Partially damaged belt in operation,  Smoldering fire in bunkers,  Jamming of idlers and pulleys,
  • 11. Fire Hazards In Thermal Power Plants  Cables in cable galleries and on trays in all plant sections,  Coal dust deposited on cable trays in mill area  Fuel oil handling and oil tanks (HSD, HFO, Petrol )  Transformer oil, turbine oil, control fluid, seal oil,  Electrical system  Heat path damaged insulation  Dry grasses  Accumulation of waste materials etc.
  • 12. Explosion Hazard In Thermal Power Plant  Hydrogen plant  Turbo generators where hydrogen is used for cooling of TG.  Transformer (oil cooled).  Boiler (Coal/Oil fired).  Coal dust in Mills and Boilers.
  • 13. Bursting of Pipe Lines, Vessels  Water / Steam pipes due to high pressure/ temperature  H2 Gas lines and Acid lines.  Acid/Alkali tanks  H2 Gas Cylinders  Compressed air header.  Compressed air receivers.  H2 Gas Holder.
  • 14. Release of Gases / Dust  Chlorine in water treatment plant  Hydrogen in turbo generator area of main plant  Pulverized coal dust from mills and associated piping  Fly ash from chimneys and ash ponds, ESP hoppers and bottom ash system  Coal dust in transfer points, CHP, Crusher & mill area.  Flue gas from the ducts
  • 15. Release Of Liquid  Acid and alkali tanks in water treatment plants  Chlorine toners in WTPs  Fuel oil tanks in fuel oil handling section  Ash dyke  Turbine oil and seal oil leakage
  • 16. Floods  Breach of balancing reservoir.  Breach of ash dykes
  • 17. Sections prone to Emergencies  Coal handling plant  Main plant, including Boiler, TG, ESP  Water treatment plant, use of Chlorine gas  Hydrogen generation plant  Fuel Oil Handling areas
  • 18. Common elements of a model Disaster Management Plan
  • 19. Components of Disaster Management Plan  Plant emergency organization  Plant & area risk evaluation  Notification procedures & communication systems  Emergency equipments and facilities available  Procedure for returning to normal operations  Training and mock-drills for specialized services  Regular tests of emergency organization and procedures  Review of Plan and updates  Emergency response procedures  Detailed operating manual
  • 20. Risk Assesment & Vulnerability Mapping Consists of the following components:  Maximum quantitative and qualitative assessment of hazards at any given point of time  Location of hazardous operations and systems  Properties of hazardous systems (MSDS)  Location of isolation systems  Special fire-fighting procedures  Special handling requirements.
  • 21. Communication systems  Alarm systems  Communication equipments  Plant management, Local Officials, Response Agencies, Neighbouring industries, Neighbourhood population  Names and telephone numbers of the designated officials and their alternates  Designated persons for media contacts  Procedures for notifying families of injured employees  Central reporting office (ECC).
  • 22. Emergency equipments & facilities  Fire-fighting equipment  Emergency medical supplies  Toxic gas detectors  Wind direction (wind sock)/speed indicators  Self-contained breathing apparatus  Protective clothings  Other on-site equipments according to the local conditions  Containment facilities around tanks/vessels  Interfaces & lines of communication with off-site officials, neighbouring industries.
  • 23. Training, Simulation & Mock Drills  Knowledge of chemicals (properties, toxicity, etc.) and procedures for reporting emergencies  Alarm systems and communication network  Location of fire-fighting/first-aid equipment  Use of fire-fighting/first-aid equipment  Use of protective equipment(respirators, breathing apparatus, clothing, etc.)  Decontamination procedure for protective clothing and equipment; demolition and repair  Evaluation procedures and rescue services  Records of documented simulated emergencies which should be conducted frequently.
  • 24.  Training and drills for specialized services  Regular tests of emergency organization and procedures  Plan updates  Emergency response procedures  Detailed operating manual Training, Simulation & Mock Drills
  • 25. Work Incident Controller Chief Incident Controller Task Force Team HR Team Matls Mgmt. Team Rescue Team Medical team Autobase Team Security Team Support Team Communication team Maint Team Support Team Disaster Management Organisation
  • 26. Responsibilities of WIC The WIC shall identify;  All probable emergency causing situations and take proper precautionary measures to prevent / control such situations;  Ensure that all emergency team under him are informed about their functions before and during emergency;  Direct all operations within the affected area with the following priority;  Secure the safety of personnel  Minimise damage to plant & environment  Minimise loss of material
  • 27. Responsibilities of WIC  Ensure that all non-essential workers in the affected areas are evacuated to appropriate assembly point.  Set up communication contact through telephone / messenger etc. With emergency control centre (ECC).  Report significant developments to the chief incident controller.  Assume duties of chief incident controller pending his arrival and in particular; 1. Direct the shut down and evacuation of plant and affected areas likely to be threatened by the emergency. 2. Ensure key personnel are informed and they are called in
  • 28. Responsibilities of CIC  Relieve the works incidence controller from the responsibility of over all main control.  Declare major emergency, if considered necessary and ensure out side emergency services are called in and near by industries are informed.  Directing shutting down and evacuation of plant, establish liaison with head of fire, safety, medical, HR, security and local police.  Arrange for relief of personnel and catering facilities for affected in emergency.  Ensure information / reporting to Corporate Office and Statutory authorities as per provisions of state Factory rules and Factory Act
  • 29. Emergency Control Centre (ECC)  Emergency control centre shall be established and equipped with adequate means of communication to areas inside and outside.  The emergency control room will be manned by the Chief Incident Controller, Work Incident Controller, key personnel and Sr.Officers of out side services called for assistance.  It should have general map and guide for Assembly Points, location of Hazardous process/operation  No other personnel shall have access to the ECC.
  • 30. Emergency Control Centre (ECC) ECC must contain the following information:  Safety data pertaining to all hazardous materials likely to cause emergency.  Procedure of major and special fire fighting, rescue operations, first aid etc.  Emergency call out list of persons drafted for emergency control eg key personnel from fire, safety, medical, HR, security, local police and District Admn. Authorities.
  • 31. Evacuation And Assembly Points  In an emergency, it will almost certainly be necessary to evacuate personnel from affected areas.  On evacuation, employees shall assemble at assembly points.  Assembly point must be shown in Disaster Management Plan.
  • 32. Key Personnel  Apart from WIC and CIC, other works personnel will have key role to play in providing advice and in implementing the decisions made by CIC.  Key personnel includes 1. Incharge of generation, electrical & mechanical maintenance, C&I, Chemistry (& WTP) 2. Heads of HR, safety, PR, Medical, Security & Fire Department.
  • 33. Mutual Aid Scheme  An understanding for mutual aid between nearby industries to send assistance to each other in case of an emergency;  Details of facilities offered by the mutual aid partners should be mentioned in the plan;  Details of contact phone nos. of officers responsible for emergency action of mutual aid partners should be mentioned in the plan
  • 34. Support team to CIC & WIC  In addition to the teams already mentioned there will be one additional team known as support team.  This team will assist CIC & WIC during an emergency. The responsibilities of the team given below;  Contacting statutory authorities.  Arranging for relievers and catering facilities.  Giving information to media.
  • 35. Responsibilities Of Support Team  Arranging shelters for affected persons.  Contacting medical centres and nursing homes.  Providing all other support, as necessary.  Arranging for urgently required materials through cash purchase or whatever means.  Arranging funds for various relief measures as emergency purchase of materials.
  • 36.  Departmental heads:  The departmental heads will provide assistance as required by the works incident controller. They will decide which members of their departments are required at the incident site.  Head of Tech. Services  On knowing the major emergency, he will proceed to the site and report to CIC.  He will provide technical information as required to CIC/WIC.  Head of Safety:  On knowing the emergency, he will immediately report to site and keep in touch with CIC  He will make sure that all safety equipments are made available to the emergency teams.  Participate in rescue operations.  Maintain inventory of items in ECC. Responsibilities of key personnel
  • 37. Mock Drill  Mock-drills are conducted to test the effectiveness of action plan / emergency preparedness.  Periodicity of mock drill is at least once in every six months (As per Factories Act-1948).  Deficiencies found are to be recorded and corrective actions are to be taken immediately for effectiveness of the plan.
  • 38. Emergency Siren ------------------------------------------------------------------------------------------- T y p e Duration -------------------------------------------------------------------------------------------  In case of fire 10 seconds on 05 seconds off, 3 times  In case of 20 seconds on, Heavy chlorine leak 10 seconds off, 5 times.  All clear signal Continuous siren for 3 min, only once. ---------------------------------------------------------------------------------
  • 39. Thank you Let us develop a positive safety culture involving all our employees & associates