 DLW was founded by Railway Minister Mr. Lal Bahadur Shastri on 23 April
1956. It is spread in 300 acres area at Varanasi.
 It is a production unit owned by Indian railways , for which it manufactures
diesel- electric locomotives and its spares parts.
 To meet the increased transportation needs of the Indian railways it was
established in collaboration with ALCO( American Locomotive Company ),
USA in 1961.
 DLW rolled out its first locomotive three years late, on January 3, 1964. It
manufactures locomotives.
INTRODUCTION
 DLW IS A production unit under the ministry of railway, it is one of the
factories in the world which can be called diesel locomotive
manufacturing plant .
 It had made over 2000 component s are manufactured.
 Set up in 1961 technical collaboration with ALCO of USA for manufacture
of diesel electric locomotive .
 In 1995 , Indian railway entered into an agreement with general motors
,USA is transfer this technology for manufacture of 4000hp
microprocessor controller.
INTRODUCTION
 Got its first ISO certification in 1997 and ISO-9001 and ISO-14001 in
December 2002.
 At present the locomotive produced by DLW; i.e. GM engine has capacity
up to 5000HP & try to make it 5500 HP.
 It has supplied locomotive to other countries such as Sri lanka ,
Bangladesh , Malaysia, Vietnam etc.
 DLW is supplied locos to PSU’s & Industries like NTPC , coal ,
INDOGULF etc.
SOME FACTS ABOUT DIESEL ELECTRIC LOCOMOTIVE
 DLW’S annul Production -275
 Component are manufacture -2000 component
 Cost of one LOCO -25 crore(EMD)
-15 crore (ALCO)
 Weight of one LOCO -121 ton
 Fuel consumption at full load -540 lit/hr
 Fuel consumption at idle load -40 lit/hr
 Max. Speed -160km/hr
 Dia. of wheel -1092mm
SOME FACTS ABOUT DIESEL ELECTRIC LOCOMOTIVE
Alco engine assembly
BLOCK
CRANK SHAFT
GM ENGINE ASSEMBLY
PRODUCTION SHOPS
1) BLOCK DIVISIONS
2) ENGINE DIVISIONS
3) LOCO DIVISIONS
BLOCK DIVISIONS
1. Heavy Weld Shop
2. Heavy Machine Shop
Engine Division
1.Engine Erection Shop
2. Engine Testing Shop
3. Light Machine Shop
4. Sub Assembly Shop
5. Rotor Shop
6. Heat Treatment Shop
7. Turbo Section
LOCO DIVISION
1. Loco Frame Shop
2. Pipe Shop
3. Truck Machine Shop
4. Traction assembly Shop
5. Sheet Metal Shop
6. Loco Assembly Shop
7. Loco assembly Shop
8. Loco Paint Shop
9. Loco test Shop
Types of Welding used in DLW
1. Shielded Metal Arc Welding (SMAW)
2. Submerged Arc Welding (SAW)
3. Gas Shielded Metal Arc Welding (MIG)
4. Flux Cored Arc Welding (FCAW)
Rotor shop
 This shop is deals with the manufacturing of Turbocharger. Turbocharger is
known as the Heart of Diesel Locomotive. Basically in this section
manufacturing of assembly & sub assembly of Turbocharger is made. But
the outer casing of Turbocharger is made up in Heavy Machine Shop.
 Turbocharger is use for the providing fresh air to the engine. Due to
this the efficiency & power generated by engine is increased. For the
running of Turbocharger we are not using any extra energy source like
generator, motor etc. For starting of Turbocharger generally we use
exhaust gasses.
Components of Turbocharger
 For assembly of Turbojet following parts are manufactures in rotor shop---
 1. Impeller
 2. Inducer
 3. Nose piece
 4. Stud Rotor
 5. Nut
 6. Washer
 7. Thrust Washer
 8. Key
 9. Oil Slinger
Assembly of Turbocharger:--
 The assembly of turbocharger is done by dividing whole turbocharger in
three parts. These are as follows----
 1. Rotor
 2. Compressor
 3. Casing
1. Rotor:--
Rotor is the inlet part of turbocharger which is comprises with following
parts. Turbo Disc, Rotor stud, Turbo shaft, thrust collar, Nose disc, Washer &
Nut.
Rotor is rotating at speed of 18000 rpm & working at high temperature
due to that the rotor is made of steel.
2. Compressor:--
Compressor is the combination of impeller & inducer. Impeller is made up of
Al-alloy. Impeller & inducer is use for sucking of fresh air from environment.
3. Casing:--
Casing is made of M.S. & also a special type of coating is done. Due to that
coating it can easily resist the heat.
For the proper working & life of Turbocharger balancing of impeller, inducer &
turbine disc is done by help of Dynamics Balancing Machine
Traction motor
Since the diesel- locomotive uses electric transmission , traction motors are
provided on the axles to give the final drive .These motors were traditionally
DC but the development of the modern power and control electronics has led
to the introduction of 3Φ AC motors.
TRUCK FRAME:-
This is part (called the bogie in the UK) carrying the wheels and traction
motors of the locomotive
ANGULAR BORING MACHINE
LOCO & ENGINE TEST SHOP
types of testing
Lubricating oil testing
 Lubrication is done for better performance of the engine parts.
 Testing is done by checking the circulation of lubricant oil.
 For rotating parts checking is done by seeing the returning path of the oil
i.e. checking not only the forward path but also the returning path.
 RR40 is used as lubricating oil.
water testing
 Water acts as a coolant for moving part of the engine because
constant movement or rotation causes various parts to heat up and
water working as coolant cooled down the concerned part.
Load testing
 For load testing electrical load is provided to the engine. If there is
any abnormal sound then the engine is again tested for lubrication
so that any flaw which is there can be removed.
Engine test operation sequence
 Check over speed trip of recheck 3 times.
 Check bake in nozzles and set tapped clearance.
 Inspection before fist hour performance.
 First hour performance on full load.
 Base inspection.
 Second hour performance on full load.
 Attend defects of first hour performance.
 Final base inspection.
 Check engine deficiencies.
 Engine clearance.
Engine test operation sequence
 Base inspection under screen and fitting over
screen.
 Water circulation.
 Lube oil filling and check deflection crank shaft.
 Lube oil circulation.
 Pre run on no load 3 to 5 times of duration 10 to 30
min each 400 rpm.
 Intermediate runs 12 runs of 30 min duration each
from 400 to 1000 rpm.
Dlw summer training animated persentation by shoaib

More Related Content

What's hot

Summer Training Presentation, DLW Varanasi
Summer Training Presentation, DLW VaranasiSummer Training Presentation, DLW Varanasi
Summer Training Presentation, DLW Varanasi
SHAILESH SHUKLA
 
Dlw locomotive workshop
Dlw locomotive workshopDlw locomotive workshop
Dlw locomotive workshop
Shivam Prajapati
 
Dlw varanasi training ppt
Dlw varanasi training pptDlw varanasi training ppt
Dlw varanasi training ppt
Praveen Tiwari
 
DLW SUMMER TRAINING REPORT FOR ECE BRANCH
DLW SUMMER TRAINING REPORT FOR ECE BRANCH DLW SUMMER TRAINING REPORT FOR ECE BRANCH
DLW SUMMER TRAINING REPORT FOR ECE BRANCH
SUBHAM SINGH
 
Diesel locomotive works - Truck Machine Shop
Diesel locomotive works - Truck Machine ShopDiesel locomotive works - Truck Machine Shop
Diesel locomotive works - Truck Machine Shop
Gaurav Mishra
 
DLW Summer training report
DLW Summer  training  reportDLW Summer  training  report
DLW Summer training report
Eshver chandra
 
ROHIT KUMAR BHARDWAJ MADHUBAN MAU
ROHIT KUMAR BHARDWAJ MADHUBAN MAUROHIT KUMAR BHARDWAJ MADHUBAN MAU
ROHIT KUMAR BHARDWAJ MADHUBAN MAU
Rohitkumar Bhardwaj
 
Shubhankar Singh
Shubhankar SinghShubhankar Singh
Shubhankar Singh
Shubhankar Singh
 
Dlw short ppt
Dlw short pptDlw short ppt
Dlw short ppt
Jasdeep Singh
 
4 weeks at internship - DLW VARANASI (U.P.) By Parvind Gupta
4 weeks at internship - DLW VARANASI (U.P.) By Parvind Gupta4 weeks at internship - DLW VARANASI (U.P.) By Parvind Gupta
4 weeks at internship - DLW VARANASI (U.P.) By Parvind Gupta
Parvind Gupta
 
Prince ppt
Prince pptPrince ppt
Prince ppt
PRINCE GUPTA
 
Summer training repoart on dlw ,varanasi
Summer training repoart on dlw ,varanasiSummer training repoart on dlw ,varanasi
Summer training repoart on dlw ,varanasi
ARJUN MAURYA
 
Diesel loco modernization
Diesel loco modernizationDiesel loco modernization
Diesel loco modernizationAmitoj Kaur
 
DLW vocational training report
DLW vocational training reportDLW vocational training report
DLW vocational training report
PrashantSharma897
 
Ppt of training dlw varanasi
Ppt of training dlw varanasiPpt of training dlw varanasi
Ppt of training dlw varanasi
Ram Bahadur
 
Dlw summer trainning project electrical branch by shubhang pandey
Dlw summer trainning project electrical branch by shubhang pandeyDlw summer trainning project electrical branch by shubhang pandey
Dlw summer trainning project electrical branch by shubhang pandey
shubhangpandey5
 
Dlw trainig report by Sumit Tiwari
Dlw trainig report by Sumit TiwariDlw trainig report by Sumit Tiwari
Dlw trainig report by Sumit Tiwari
SumitTiwari76
 
Summer training at dlw varanasi
Summer training at dlw varanasi Summer training at dlw varanasi
Summer training at dlw varanasi
ravi jaiswal
 
D.M.W patiala TRAINING PPT BY Lakhvinder (GNIT)
D.M.W patiala TRAINING PPT BY Lakhvinder (GNIT)D.M.W patiala TRAINING PPT BY Lakhvinder (GNIT)
D.M.W patiala TRAINING PPT BY Lakhvinder (GNIT)
Lakhvinder Singh
 
Diesel Locomotive Works Training, Varanasi Presentation ppt
Diesel Locomotive Works Training, Varanasi Presentation pptDiesel Locomotive Works Training, Varanasi Presentation ppt
Diesel Locomotive Works Training, Varanasi Presentation ppt
Sarvesh Mishra
 

What's hot (20)

Summer Training Presentation, DLW Varanasi
Summer Training Presentation, DLW VaranasiSummer Training Presentation, DLW Varanasi
Summer Training Presentation, DLW Varanasi
 
Dlw locomotive workshop
Dlw locomotive workshopDlw locomotive workshop
Dlw locomotive workshop
 
Dlw varanasi training ppt
Dlw varanasi training pptDlw varanasi training ppt
Dlw varanasi training ppt
 
DLW SUMMER TRAINING REPORT FOR ECE BRANCH
DLW SUMMER TRAINING REPORT FOR ECE BRANCH DLW SUMMER TRAINING REPORT FOR ECE BRANCH
DLW SUMMER TRAINING REPORT FOR ECE BRANCH
 
Diesel locomotive works - Truck Machine Shop
Diesel locomotive works - Truck Machine ShopDiesel locomotive works - Truck Machine Shop
Diesel locomotive works - Truck Machine Shop
 
DLW Summer training report
DLW Summer  training  reportDLW Summer  training  report
DLW Summer training report
 
ROHIT KUMAR BHARDWAJ MADHUBAN MAU
ROHIT KUMAR BHARDWAJ MADHUBAN MAUROHIT KUMAR BHARDWAJ MADHUBAN MAU
ROHIT KUMAR BHARDWAJ MADHUBAN MAU
 
Shubhankar Singh
Shubhankar SinghShubhankar Singh
Shubhankar Singh
 
Dlw short ppt
Dlw short pptDlw short ppt
Dlw short ppt
 
4 weeks at internship - DLW VARANASI (U.P.) By Parvind Gupta
4 weeks at internship - DLW VARANASI (U.P.) By Parvind Gupta4 weeks at internship - DLW VARANASI (U.P.) By Parvind Gupta
4 weeks at internship - DLW VARANASI (U.P.) By Parvind Gupta
 
Prince ppt
Prince pptPrince ppt
Prince ppt
 
Summer training repoart on dlw ,varanasi
Summer training repoart on dlw ,varanasiSummer training repoart on dlw ,varanasi
Summer training repoart on dlw ,varanasi
 
Diesel loco modernization
Diesel loco modernizationDiesel loco modernization
Diesel loco modernization
 
DLW vocational training report
DLW vocational training reportDLW vocational training report
DLW vocational training report
 
Ppt of training dlw varanasi
Ppt of training dlw varanasiPpt of training dlw varanasi
Ppt of training dlw varanasi
 
Dlw summer trainning project electrical branch by shubhang pandey
Dlw summer trainning project electrical branch by shubhang pandeyDlw summer trainning project electrical branch by shubhang pandey
Dlw summer trainning project electrical branch by shubhang pandey
 
Dlw trainig report by Sumit Tiwari
Dlw trainig report by Sumit TiwariDlw trainig report by Sumit Tiwari
Dlw trainig report by Sumit Tiwari
 
Summer training at dlw varanasi
Summer training at dlw varanasi Summer training at dlw varanasi
Summer training at dlw varanasi
 
D.M.W patiala TRAINING PPT BY Lakhvinder (GNIT)
D.M.W patiala TRAINING PPT BY Lakhvinder (GNIT)D.M.W patiala TRAINING PPT BY Lakhvinder (GNIT)
D.M.W patiala TRAINING PPT BY Lakhvinder (GNIT)
 
Diesel Locomotive Works Training, Varanasi Presentation ppt
Diesel Locomotive Works Training, Varanasi Presentation pptDiesel Locomotive Works Training, Varanasi Presentation ppt
Diesel Locomotive Works Training, Varanasi Presentation ppt
 

Viewers also liked

Presentation on Industrial Training
Presentation on Industrial TrainingPresentation on Industrial Training
Presentation on Industrial TrainingManglesh Singh
 
DLW varanasi summer training report
DLW varanasi summer training reportDLW varanasi summer training report
DLW varanasi summer training report
shubham chaurasiya
 
Ppt presentation on 4 weeks EE DLW Summer Traning
 Ppt presentation on 4 weeks  EE DLW Summer Traning Ppt presentation on 4 weeks  EE DLW Summer Traning
Ppt presentation on 4 weeks EE DLW Summer Traning
Gaurav Singh
 
Brijeh yadav ppt
Brijeh yadav pptBrijeh yadav ppt
Brijeh yadav ppt
bky2756
 
presentation on diesel locomotive works (dlw)
presentation on diesel locomotive works (dlw)presentation on diesel locomotive works (dlw)
presentation on diesel locomotive works (dlw)
shubham vishwakarma
 
Mechanical Vibration
Mechanical VibrationMechanical Vibration
Mechanical Vibration
Ankur Shukla
 
Diesel Locomotive Works (DLW)
 Diesel Locomotive Works (DLW) Diesel Locomotive Works (DLW)
Diesel Locomotive Works (DLW)
Neha Gethe
 
Summer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSummer Training Report, DLW Varanasi
Summer Training Report, DLW Varanasi
SHAILESH SHUKLA
 
Presentaion on BHEL- Diesel Locomotive
Presentaion on BHEL- Diesel LocomotivePresentaion on BHEL- Diesel Locomotive
Presentaion on BHEL- Diesel LocomotiveAbhishek Agarwal
 

Viewers also liked (9)

Presentation on Industrial Training
Presentation on Industrial TrainingPresentation on Industrial Training
Presentation on Industrial Training
 
DLW varanasi summer training report
DLW varanasi summer training reportDLW varanasi summer training report
DLW varanasi summer training report
 
Ppt presentation on 4 weeks EE DLW Summer Traning
 Ppt presentation on 4 weeks  EE DLW Summer Traning Ppt presentation on 4 weeks  EE DLW Summer Traning
Ppt presentation on 4 weeks EE DLW Summer Traning
 
Brijeh yadav ppt
Brijeh yadav pptBrijeh yadav ppt
Brijeh yadav ppt
 
presentation on diesel locomotive works (dlw)
presentation on diesel locomotive works (dlw)presentation on diesel locomotive works (dlw)
presentation on diesel locomotive works (dlw)
 
Mechanical Vibration
Mechanical VibrationMechanical Vibration
Mechanical Vibration
 
Diesel Locomotive Works (DLW)
 Diesel Locomotive Works (DLW) Diesel Locomotive Works (DLW)
Diesel Locomotive Works (DLW)
 
Summer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSummer Training Report, DLW Varanasi
Summer Training Report, DLW Varanasi
 
Presentaion on BHEL- Diesel Locomotive
Presentaion on BHEL- Diesel LocomotivePresentaion on BHEL- Diesel Locomotive
Presentaion on BHEL- Diesel Locomotive
 

Similar to Dlw summer training animated persentation by shoaib

Diesel locomotive workshop
Diesel locomotive workshopDiesel locomotive workshop
Diesel locomotive workshop
Home
 
DLW Industrial training presentation
DLW Industrial training presentationDLW Industrial training presentation
DLW Industrial training presentation
SaurabhGupta912
 
Indian Railway Diesel shed Training report
Indian Railway Diesel shed Training reportIndian Railway Diesel shed Training report
Indian Railway Diesel shed Training report
aman1312
 
railway internship presentation
railway internship presentationrailway internship presentation
railway internship presentation
ahmedalvi01
 
INDUSTRIAL TRAINING(PPT) DLW,Varanasi
INDUSTRIAL TRAINING(PPT) DLW,VaranasiINDUSTRIAL TRAINING(PPT) DLW,Varanasi
INDUSTRIAL TRAINING(PPT) DLW,Varanasi
ak3793
 
dokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptx
dokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptxdokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptx
dokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptx
7009AKASHMODANWAL
 
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
Meerut Institute of Engineering and Technology
 
diesel shed izzatnagar report part 2
diesel shed izzatnagar report part 2diesel shed izzatnagar report part 2
diesel shed izzatnagar report part 2
Mechanical Engineering Student
 
introuduction DLW varanaesi
introuduction DLW varanaesiintrouduction DLW varanaesi
introuduction DLW varanaesi
Niranjan kumar sah
 
blw summer training varanasi uttarpradesh
blw summer training varanasi uttarpradeshblw summer training varanasi uttarpradesh
blw summer training varanasi uttarpradesh
7009AKASHMODANWAL
 
Dlw SUMMER TRAINING
Dlw SUMMER TRAININGDlw SUMMER TRAINING
Dlw SUMMER TRAINING
Saurabh Yadav
 
dlw taining file
dlw taining filedlw taining file
dlw taining file
Ram Bahadur
 
Loco diesel shed, pulera
Loco diesel shed, puleraLoco diesel shed, pulera
Loco diesel shed, pulera
ashjm
 
AE2028 AEMR
AE2028 AEMRAE2028 AEMR
AE2028 AEMR
Aghilesh V
 
DLW SUMMER TRAINING
DLW SUMMER TRAINING DLW SUMMER TRAINING
DLW SUMMER TRAINING
PRASHANT TIWARI
 
VOCATIONAL TRAINING PROJECT ON FAILURE OF CRANKSHAFT IN DIESEL LOCOMOTIVE
VOCATIONAL TRAINING PROJECT ON FAILURE OF CRANKSHAFT IN DIESEL LOCOMOTIVEVOCATIONAL TRAINING PROJECT ON FAILURE OF CRANKSHAFT IN DIESEL LOCOMOTIVE
VOCATIONAL TRAINING PROJECT ON FAILURE OF CRANKSHAFT IN DIESEL LOCOMOTIVE
MdParwezAlam15
 
Failure of crankshaft in diesel locomotive
Failure of crankshaft in diesel locomotiveFailure of crankshaft in diesel locomotive
Failure of crankshaft in diesel locomotive
MdParwezAlam15
 
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Arjun Gaur
 
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Arjun Gaur
 

Similar to Dlw summer training animated persentation by shoaib (20)

Diesel locomotive workshop
Diesel locomotive workshopDiesel locomotive workshop
Diesel locomotive workshop
 
DLW Industrial training presentation
DLW Industrial training presentationDLW Industrial training presentation
DLW Industrial training presentation
 
Indian Railway Diesel shed Training report
Indian Railway Diesel shed Training reportIndian Railway Diesel shed Training report
Indian Railway Diesel shed Training report
 
railway internship presentation
railway internship presentationrailway internship presentation
railway internship presentation
 
INDUSTRIAL TRAINING(PPT) DLW,Varanasi
INDUSTRIAL TRAINING(PPT) DLW,VaranasiINDUSTRIAL TRAINING(PPT) DLW,Varanasi
INDUSTRIAL TRAINING(PPT) DLW,Varanasi
 
dokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptx
dokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptxdokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptx
dokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptx
 
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
 
diesel shed izzatnagar report part 2
diesel shed izzatnagar report part 2diesel shed izzatnagar report part 2
diesel shed izzatnagar report part 2
 
introuduction DLW varanaesi
introuduction DLW varanaesiintrouduction DLW varanaesi
introuduction DLW varanaesi
 
blw summer training varanasi uttarpradesh
blw summer training varanasi uttarpradeshblw summer training varanasi uttarpradesh
blw summer training varanasi uttarpradesh
 
Dlw SUMMER TRAINING
Dlw SUMMER TRAININGDlw SUMMER TRAINING
Dlw SUMMER TRAINING
 
dlw taining file
dlw taining filedlw taining file
dlw taining file
 
Loco diesel shed, pulera
Loco diesel shed, puleraLoco diesel shed, pulera
Loco diesel shed, pulera
 
mmp.pdf
mmp.pdfmmp.pdf
mmp.pdf
 
AE2028 AEMR
AE2028 AEMRAE2028 AEMR
AE2028 AEMR
 
DLW SUMMER TRAINING
DLW SUMMER TRAINING DLW SUMMER TRAINING
DLW SUMMER TRAINING
 
VOCATIONAL TRAINING PROJECT ON FAILURE OF CRANKSHAFT IN DIESEL LOCOMOTIVE
VOCATIONAL TRAINING PROJECT ON FAILURE OF CRANKSHAFT IN DIESEL LOCOMOTIVEVOCATIONAL TRAINING PROJECT ON FAILURE OF CRANKSHAFT IN DIESEL LOCOMOTIVE
VOCATIONAL TRAINING PROJECT ON FAILURE OF CRANKSHAFT IN DIESEL LOCOMOTIVE
 
Failure of crankshaft in diesel locomotive
Failure of crankshaft in diesel locomotiveFailure of crankshaft in diesel locomotive
Failure of crankshaft in diesel locomotive
 
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
 
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
 

Recently uploaded

在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 

Recently uploaded (20)

在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 

Dlw summer training animated persentation by shoaib

  • 1.
  • 2. TRAINING AT DLW VANARASI Presented By….. Enter Your Name Mechanical Engineering Enter Roll Number Submitted To…. Enter Teacher Name
  • 3. introductioN  DLW was founded by Railway Minister Mr. Lal Bahadur Shastri on 23 April 1956. It is spread in 300 acres area at Varanasi.  It is a production unit owned by Indian railways , for which it manufactures diesel- electric locomotives and its spares parts.  To meet the increased transportation needs of the Indian railways it was established in collaboration with ALCO( American Locomotive Company ), USA in 1961.  DLW rolled out its first locomotive three years late, on January 3, 1964. It manufactures locomotives.
  • 4. INTRODUCTION  DLW IS A production unit under the ministry of railway, it is one of the factories in the world which can be called diesel locomotive manufacturing plant .  It had made over 2000 component s are manufactured.  Set up in 1961 technical collaboration with ALCO of USA for manufacture of diesel electric locomotive .  In 1995 , Indian railway entered into an agreement with general motors ,USA is transfer this technology for manufacture of 4000hp microprocessor controller.
  • 5. INTRODUCTION  Got its first ISO certification in 1997 and ISO-9001 and ISO-14001 in December 2002.  At present the locomotive produced by DLW; i.e. GM engine has capacity up to 5000HP & try to make it 5500 HP.  It has supplied locomotive to other countries such as Sri lanka , Bangladesh , Malaysia, Vietnam etc.  DLW is supplied locos to PSU’s & Industries like NTPC , coal , INDOGULF etc.
  • 6. SOME FACTS ABOUT DIESEL ELECTRIC LOCOMOTIVE  DLW’S annul Production -275  Component are manufacture -2000 component  Cost of one LOCO -25 crore(EMD) -15 crore (ALCO)  Weight of one LOCO -121 ton  Fuel consumption at full load -540 lit/hr  Fuel consumption at idle load -40 lit/hr  Max. Speed -160km/hr  Dia. of wheel -1092mm
  • 7. SOME FACTS ABOUT DIESEL ELECTRIC LOCOMOTIVE
  • 8.
  • 10.
  • 11. BLOCK
  • 13.
  • 15. PRODUCTION SHOPS 1) BLOCK DIVISIONS 2) ENGINE DIVISIONS 3) LOCO DIVISIONS BLOCK DIVISIONS 1. Heavy Weld Shop 2. Heavy Machine Shop
  • 16. Engine Division 1.Engine Erection Shop 2. Engine Testing Shop 3. Light Machine Shop 4. Sub Assembly Shop 5. Rotor Shop 6. Heat Treatment Shop 7. Turbo Section
  • 17. LOCO DIVISION 1. Loco Frame Shop 2. Pipe Shop 3. Truck Machine Shop 4. Traction assembly Shop 5. Sheet Metal Shop 6. Loco Assembly Shop 7. Loco assembly Shop 8. Loco Paint Shop 9. Loco test Shop
  • 18. Types of Welding used in DLW 1. Shielded Metal Arc Welding (SMAW) 2. Submerged Arc Welding (SAW) 3. Gas Shielded Metal Arc Welding (MIG) 4. Flux Cored Arc Welding (FCAW)
  • 19. Rotor shop  This shop is deals with the manufacturing of Turbocharger. Turbocharger is known as the Heart of Diesel Locomotive. Basically in this section manufacturing of assembly & sub assembly of Turbocharger is made. But the outer casing of Turbocharger is made up in Heavy Machine Shop.  Turbocharger is use for the providing fresh air to the engine. Due to this the efficiency & power generated by engine is increased. For the running of Turbocharger we are not using any extra energy source like generator, motor etc. For starting of Turbocharger generally we use exhaust gasses.
  • 20. Components of Turbocharger  For assembly of Turbojet following parts are manufactures in rotor shop---  1. Impeller  2. Inducer  3. Nose piece  4. Stud Rotor  5. Nut  6. Washer  7. Thrust Washer  8. Key  9. Oil Slinger
  • 21. Assembly of Turbocharger:--  The assembly of turbocharger is done by dividing whole turbocharger in three parts. These are as follows----  1. Rotor  2. Compressor  3. Casing 1. Rotor:-- Rotor is the inlet part of turbocharger which is comprises with following parts. Turbo Disc, Rotor stud, Turbo shaft, thrust collar, Nose disc, Washer & Nut. Rotor is rotating at speed of 18000 rpm & working at high temperature due to that the rotor is made of steel.
  • 22. 2. Compressor:-- Compressor is the combination of impeller & inducer. Impeller is made up of Al-alloy. Impeller & inducer is use for sucking of fresh air from environment. 3. Casing:-- Casing is made of M.S. & also a special type of coating is done. Due to that coating it can easily resist the heat. For the proper working & life of Turbocharger balancing of impeller, inducer & turbine disc is done by help of Dynamics Balancing Machine
  • 23. Traction motor Since the diesel- locomotive uses electric transmission , traction motors are provided on the axles to give the final drive .These motors were traditionally DC but the development of the modern power and control electronics has led to the introduction of 3Φ AC motors.
  • 24. TRUCK FRAME:- This is part (called the bogie in the UK) carrying the wheels and traction motors of the locomotive
  • 26. LOCO & ENGINE TEST SHOP
  • 27. types of testing Lubricating oil testing  Lubrication is done for better performance of the engine parts.  Testing is done by checking the circulation of lubricant oil.  For rotating parts checking is done by seeing the returning path of the oil i.e. checking not only the forward path but also the returning path.  RR40 is used as lubricating oil.
  • 28. water testing  Water acts as a coolant for moving part of the engine because constant movement or rotation causes various parts to heat up and water working as coolant cooled down the concerned part. Load testing  For load testing electrical load is provided to the engine. If there is any abnormal sound then the engine is again tested for lubrication so that any flaw which is there can be removed.
  • 29. Engine test operation sequence  Check over speed trip of recheck 3 times.  Check bake in nozzles and set tapped clearance.  Inspection before fist hour performance.  First hour performance on full load.  Base inspection.  Second hour performance on full load.  Attend defects of first hour performance.  Final base inspection.  Check engine deficiencies.  Engine clearance.
  • 30. Engine test operation sequence  Base inspection under screen and fitting over screen.  Water circulation.  Lube oil filling and check deflection crank shaft.  Lube oil circulation.  Pre run on no load 3 to 5 times of duration 10 to 30 min each 400 rpm.  Intermediate runs 12 runs of 30 min duration each from 400 to 1000 rpm.