The document provides information about training conducted at DLW Varanasi, an Indian Railways production unit that manufactures diesel-electric locomotives. It details the establishment of DLW in 1956 in collaboration with ALCO, its production of over 2000 components, and manufacturing processes for locomotive components like engines, rotors, and trucks. It also describes testing procedures for locomotives and engines including lubrication, water circulation, and load testing.
The slides will provide an overview of some of the shops in diesel locomotive works, Varanasi. I tried to cover maximum content in this ppt. Still you can add some of yours :)
The slides will provide an overview of some of the shops in diesel locomotive works, Varanasi. I tried to cover maximum content in this ppt. Still you can add some of yours :)
DLW is an integrated plant and its manufacturing facilities are flexible in nature. These can be utilized for manufacture of different design of locomotives of various gauges suiting customer requirements and other products.
DLW SUMMER TRAINING REPORT FOR ECE BRANCH SUBHAM SINGH
this report is very usful for student who are doing in a DLW summer training and also learns a lot of thing from this report .I have learnt a lot of things from DLW training and i feel lucky to this part of summer training in a DLW ,varanasi .And last things,I suggest to all of u ,please dont do training for attendance purpose ,honestly u should learn a lot of things which is better for ur future.DLW is an integrated plant and its manufacturing facilities are flexible in nature.
4 weeks at internship - DLW VARANASI (U.P.) By Parvind GuptaParvind Gupta
About the industry:
Diesel Locomotive Works [DLW] is production unit under the ministry of railways. DLW is only manufacture of diesel electric locomotive with ALCO & General Motors [GM] based technologies in the words.
this is ppt based on my 4 weeks training at D.L.W varanasi I have included brief introduction along with introduction and working of various shops hope you will find helpful
DLW is an integrated plant and its manufacturing facilities are flexible in nature. These can be utilized for manufacture of different design of locomotives of various gauges suiting customer requirements and other products.
DLW SUMMER TRAINING REPORT FOR ECE BRANCH SUBHAM SINGH
this report is very usful for student who are doing in a DLW summer training and also learns a lot of thing from this report .I have learnt a lot of things from DLW training and i feel lucky to this part of summer training in a DLW ,varanasi .And last things,I suggest to all of u ,please dont do training for attendance purpose ,honestly u should learn a lot of things which is better for ur future.DLW is an integrated plant and its manufacturing facilities are flexible in nature.
4 weeks at internship - DLW VARANASI (U.P.) By Parvind GuptaParvind Gupta
About the industry:
Diesel Locomotive Works [DLW] is production unit under the ministry of railways. DLW is only manufacture of diesel electric locomotive with ALCO & General Motors [GM] based technologies in the words.
this is ppt based on my 4 weeks training at D.L.W varanasi I have included brief introduction along with introduction and working of various shops hope you will find helpful
The Diesel Locomotive Works (DLW) in Varanasi, India, is a production unit owned by Indian Railways, that manufactures diesel-electric locomotives and its spare parts. It is the largest diesel-electric locomotive manufacturer in India.
Locally it is called as D L W.
DLW is an integrated plant and its manufacturing facilities are flexible in nature. These can be utilized for manufacture of different design of locomotives of various gauges suiting customer requirements and other products.
HELLO FRINDS THIS REPORT IS OF INDUSTRIAL TRAINING ON DIESEL LOCOMOTIVE TECHNOLOGY.
IT IS VERY HELP FULL FOR YOU .
SO GO THROUGH IT .
**********************Best Of Luck ************************
INTRODUCTION OF INDIAN RAILWAY
DIESEL LOCOMOTIVE WORKSHOP .CHARBAGH
DIESEL ELECTRIC LOCOMOTIVE
WORKING MECHANISIM
IMPORTANT COMPONENTS OF LOCOMOTIVES
a) POWER PACK
b) FUEL SECTION
c) LUBE OIL CONTROL SECTION
i. FUEL INJECTION PUMP (FIP)
ii. INJECTORS
d) TURBO SUPER CHARGING (TSC)
e) BRAKES
f) COMPRESSOR / EXPRESSOR
g) GOVERNORS
h) TRACTION MOTER
i) BOGIE
j) GENERATOR
k) RADIATOR
l) ENGINE SECTION
m) CROSS HEAD
i. INLET AND EXHAUST VALVE
FAILURE ANALYSIS
a) MAGNAFLUX LAB
b) ULTRASONIC TEST
c) ZYGLO TEST
d) RDP TEST
Diesel locomotive shed is an industrial – technical setup, where repair & maintenance works of diesel of diesel locomotives is carried out, so as keep loco working properly.
VOCATIONAL TRAINING PROJECT ON FAILURE OF CRANKSHAFT IN DIESEL LOCOMOTIVEMdParwezAlam15
This project deals with the analysis about the various causes of
failures of the crankshaft of the diesel locomotive engine. It is found that
the cost for the crankshaft is very high whereas the lifecycle is not
satisfactory. The causes for the failure of the crankshaft and the possible
ways of minimising the failure effects were briefly studied from the past
failure specimen. The load bearing capacity of the crankshaft is
theoretically calculated and compared with the actual load acting on the
crankshaft. The suggestion were made for maximising the life of
crankshaft. Thus the lifecycle of the crankshaft is increased and the cost
for the maintenance is reduced.
Failure of crankshaft in diesel locomotiveMdParwezAlam15
This project deals with the analysis about the various causes of
failures of the crankshaft of the diesel locomotive engine. It is found that
the cost for the crankshaft is very high whereas the lifecycle is not
satisfactory. The causes for the failure of the crankshaft and the possible
ways of minimising the failure effects were briefly studied from the past
failure specimen. The load bearing capacity of the crankshaft is
theoretically calculated and compared with the actual load acting on the
crankshaft. The suggestion were made for maximising the life of
crankshaft. Thus the lifecycle of the crankshaft is increased and the cost
for the maintenance is reduced.
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaArjun Gaur
The presentation is related to my Internship at D.M.W, Patiala, one of the primate manufacturers for Indian Railways. The project assigned to me was to study the rehabilitation and remanufacturing of the Engine Block of a locomotive. Although there might be some minute loop holes in the presentation as it has been 2 years since I left that very place, but more or less everything is same. In fact, it was during my training that the Ministry of Railways decided to manufacture and roll out Multi- Genset loco called WDM 2G. So for any basic queries regarding the presentation feel free to contact.
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaArjun Gaur
The presentation is related to my Internship at D.M.W, Patiala, one of the primate manufacturers for Indian Railways. The project assigned to me was to study the rehabilitation and remanufacturing of the Engine Block of a locomotive. Although there may be some minute loop holes in the presentation as it has been 2 years since I left that very place, but more or less everything is same. In fact, it was during my training that the Ministry of Railways decided to manufacture and roll out Multi- Genset loco called WDM 2G. So for any basic queries regarding the presentation feel free to contact.
Similar to Dlw summer training animated persentation by shoaib (20)
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Dlw summer training animated persentation by shoaib
1.
2. TRAINING AT DLW VANARASI
Presented By…..
Enter Your Name
Mechanical Engineering
Enter Roll Number
Submitted To….
Enter Teacher Name
3. introductioN
DLW was founded by Railway Minister Mr. Lal Bahadur Shastri on 23 April
1956. It is spread in 300 acres area at Varanasi.
It is a production unit owned by Indian railways , for which it manufactures
diesel- electric locomotives and its spares parts.
To meet the increased transportation needs of the Indian railways it was
established in collaboration with ALCO( American Locomotive Company ),
USA in 1961.
DLW rolled out its first locomotive three years late, on January 3, 1964. It
manufactures locomotives.
4. INTRODUCTION
DLW IS A production unit under the ministry of railway, it is one of the
factories in the world which can be called diesel locomotive
manufacturing plant .
It had made over 2000 component s are manufactured.
Set up in 1961 technical collaboration with ALCO of USA for manufacture
of diesel electric locomotive .
In 1995 , Indian railway entered into an agreement with general motors
,USA is transfer this technology for manufacture of 4000hp
microprocessor controller.
5. INTRODUCTION
Got its first ISO certification in 1997 and ISO-9001 and ISO-14001 in
December 2002.
At present the locomotive produced by DLW; i.e. GM engine has capacity
up to 5000HP & try to make it 5500 HP.
It has supplied locomotive to other countries such as Sri lanka ,
Bangladesh , Malaysia, Vietnam etc.
DLW is supplied locos to PSU’s & Industries like NTPC , coal ,
INDOGULF etc.
6. SOME FACTS ABOUT DIESEL ELECTRIC LOCOMOTIVE
DLW’S annul Production -275
Component are manufacture -2000 component
Cost of one LOCO -25 crore(EMD)
-15 crore (ALCO)
Weight of one LOCO -121 ton
Fuel consumption at full load -540 lit/hr
Fuel consumption at idle load -40 lit/hr
Max. Speed -160km/hr
Dia. of wheel -1092mm
17. LOCO DIVISION
1. Loco Frame Shop
2. Pipe Shop
3. Truck Machine Shop
4. Traction assembly Shop
5. Sheet Metal Shop
6. Loco Assembly Shop
7. Loco assembly Shop
8. Loco Paint Shop
9. Loco test Shop
18. Types of Welding used in DLW
1. Shielded Metal Arc Welding (SMAW)
2. Submerged Arc Welding (SAW)
3. Gas Shielded Metal Arc Welding (MIG)
4. Flux Cored Arc Welding (FCAW)
19. Rotor shop
This shop is deals with the manufacturing of Turbocharger. Turbocharger is
known as the Heart of Diesel Locomotive. Basically in this section
manufacturing of assembly & sub assembly of Turbocharger is made. But
the outer casing of Turbocharger is made up in Heavy Machine Shop.
Turbocharger is use for the providing fresh air to the engine. Due to
this the efficiency & power generated by engine is increased. For the
running of Turbocharger we are not using any extra energy source like
generator, motor etc. For starting of Turbocharger generally we use
exhaust gasses.
20. Components of Turbocharger
For assembly of Turbojet following parts are manufactures in rotor shop---
1. Impeller
2. Inducer
3. Nose piece
4. Stud Rotor
5. Nut
6. Washer
7. Thrust Washer
8. Key
9. Oil Slinger
21. Assembly of Turbocharger:--
The assembly of turbocharger is done by dividing whole turbocharger in
three parts. These are as follows----
1. Rotor
2. Compressor
3. Casing
1. Rotor:--
Rotor is the inlet part of turbocharger which is comprises with following
parts. Turbo Disc, Rotor stud, Turbo shaft, thrust collar, Nose disc, Washer &
Nut.
Rotor is rotating at speed of 18000 rpm & working at high temperature
due to that the rotor is made of steel.
22. 2. Compressor:--
Compressor is the combination of impeller & inducer. Impeller is made up of
Al-alloy. Impeller & inducer is use for sucking of fresh air from environment.
3. Casing:--
Casing is made of M.S. & also a special type of coating is done. Due to that
coating it can easily resist the heat.
For the proper working & life of Turbocharger balancing of impeller, inducer &
turbine disc is done by help of Dynamics Balancing Machine
23. Traction motor
Since the diesel- locomotive uses electric transmission , traction motors are
provided on the axles to give the final drive .These motors were traditionally
DC but the development of the modern power and control electronics has led
to the introduction of 3Φ AC motors.
24. TRUCK FRAME:-
This is part (called the bogie in the UK) carrying the wheels and traction
motors of the locomotive
27. types of testing
Lubricating oil testing
Lubrication is done for better performance of the engine parts.
Testing is done by checking the circulation of lubricant oil.
For rotating parts checking is done by seeing the returning path of the oil
i.e. checking not only the forward path but also the returning path.
RR40 is used as lubricating oil.
28. water testing
Water acts as a coolant for moving part of the engine because
constant movement or rotation causes various parts to heat up and
water working as coolant cooled down the concerned part.
Load testing
For load testing electrical load is provided to the engine. If there is
any abnormal sound then the engine is again tested for lubrication
so that any flaw which is there can be removed.
29. Engine test operation sequence
Check over speed trip of recheck 3 times.
Check bake in nozzles and set tapped clearance.
Inspection before fist hour performance.
First hour performance on full load.
Base inspection.
Second hour performance on full load.
Attend defects of first hour performance.
Final base inspection.
Check engine deficiencies.
Engine clearance.
30. Engine test operation sequence
Base inspection under screen and fitting over
screen.
Water circulation.
Lube oil filling and check deflection crank shaft.
Lube oil circulation.
Pre run on no load 3 to 5 times of duration 10 to 30
min each 400 rpm.
Intermediate runs 12 runs of 30 min duration each
from 400 to 1000 rpm.