Contents
Definition of Distress
Causes of Distress
Constructional errors
Design Deficiencies
Deterioration of concrete
Need for repairs in structure
Concrete repair system
Durable concrete repair
DISTRESS
• Distress means damage.
• Because of the varying conditions under which it is produced at various
locations, the quality of concrete suffers occasionally either during
production or during service conditions resulting in distress.
2
Causes of distress of concrete
1. Structural causes
- Externally applied loads
- Environmental loads
- Accidents
- Subsidence etc.
2. Errors in design and detailing
3. Poor construction practice
4. Construction overloads
5. Drying shrinkage
6. Thermal stress
7. Weathering
8. Corrosion
3
• In addition to distress in hardened concrete, the plastic concrete may suffer
damage due to,
- Plastic shrinkage
- settlement cracking
- early removal of formwork
- improper design of formwork
4
Construction Errors
1. Use of inferior quality of construction materials.
2. Use of waste water or saline water in construction.
3. Adding of more water to improve workability which increase the w/c
ratio.
4. Poor grading of concrete ingredients.
5. Poor mixing of concrete.
6. Batching of concrete by volume using mortar pans.
7. Insufficient compaction of concrete.
8. Dropping concrete from the height results into segregation.
9. Insufficient reinforcement into slab, beam, column etc.
10. Improper location of reinforcing steel.
5
11. Hooks , bends , overlaps are not properly provided.
12. Formwork props are not resting on a hard surface.
13. Early removal of formwork props.
14. Using props of insufficient strength.
15. Joints are not properly provided.
16. Improper curing of concrete.
17. Segregation of concrete during transportation.
18. Settlement of foundation
6
Design deficiencies
• Inadequate structural design :
1. Error in load calculations.
2. SBC is assumed without carrying out any field test.
3. Design not confirming to IS - 456 : 2000 and IS – 1893 : 1987 guidelines.
4. Design with many cantilevers.
5. Shear wall is not designed in multi storey building.
6. Stiffness in both direction is unequal resulting into torsion.
7. Effect of the short column in single storey.
8. Lack of knowledge of using structural design software like STAAD PRO,
ETABS etc.
7
• Poor design detailing :
1. Abrupt change in section.
2. Insufficient reinforcement at re – entrant corners and openings.
3. Inadequate provision for deflection.
4. Inadequate expansion joints.
5. Inadequate provision of drainage.
6. Material incompatibility.
7. Bent up bars are not properly shown.
8. Spacing of vertical stirrups is wrongly shown.
9. Column spacing of lateral ties is wrongly shown.
10. Ductile detailing is not as per IS – 13920.
8
DETERIORATION in concrete
• Causes of deterioration in concrete :
1. Accidental loading
2. Chemical reactions
- Acid attack
- Alkali carbonate rock reaction
- Alkali silica reaction
- Aggressive water attack
- Sulphate attack
3. Construction errors
4. Corrosion of metals
5. Design errors
- Inadequate structural design
- Poor design details
9
6. Erosion
- Abrasion
- Cavitations
7. Freezing and thawing
8. Settlement and movements
9. Shrinkage
- plastic shrinkage
- Drying shrinkage
10. Temperature changes
- Internally generated
- Externally generated
11. Weathering
10
Need for Repairs of structures
a) Workmanship:
• Repair personnel are responsible for making repairs that are durable and
well bonded to existing structure.
• Workmen should be fully instructed regarding repair procedures and
critical aspects.
• Constant vigilance should be exercised by contractor’s and government
forces to ensure maintenance of necessary standards of workmanship.
11
b) Procedures:
• Use procedures that have been successful or that have a proven high
reliability factor.
• Repairs on new work will develop best bond and likely to be durable and
permanent as original work.
• The method and materials proposed for use should be approved by an
authorized inspector.
12
c) Materials:
• They must be of high quality, relatively fresh and capable of meeting
specifications requirements for particular application or intended use.
• Mill reports or testing laboratory reports is required.
• New, unproven materials should be used only when,
- Standard repair materials are unsuitable
- The owners and parties should be informed about risks associated
with it.
13
Evaluate structures
Project needs
Determine causes of damage & effect
Repair analysis
User needs
Determine repair strategies
Methods and materials
Repair and protect
Urgency Aesthetics Lifespan Environment
Contractibility &
Effectiveness
14
Durable concrete repair
1. Determine the causes of damage
2. Evaluate the extent of damage
3. Evaluate the need of repair
4. Select the repair method
5. Prepare the old concrete for repair
6. Apply the repair method
7. Cure the repair properly
15
1. Determine the causes of damage :
If the cause of the original damage to concrete is not determined and
eliminated , or if an incorrect determination is made, whatever damaged
the original concrete will likely also damage the repaired concrete.
2. Evaluate the extent of damage :
The intent of this step is to determine how much concrete has been
damaged and how this damage will affect serviceability of this structure.
3. Evaluate the need to repair :
With early detection it may be possible to arrest the rate of
deterioration using maintenance procedure . Even if repairs is required,
early detection of damage will allow orderly budgeting of funds to pat the
cost of repair.
16
4. Select the repair methods :
With insufficient information, it is very difficult to make proper ,
economical , and successful selections. This steps define the types of
conditions the repair must resist the available repair construction time
period and when repair must be accomplished.
5. Prepare the old concrete for repair :
Preparation of the old concrete for application of repair material is of
primary importance in the accomplishment of durable repairs.
6. Apply the repair material :
The selected repair material should be applied on the prepared surface
using equipment with proper care.
7. Cure the repair properly :
The repaired concrete should be cured for about 14 days.
17
THANK YOU
18

More Related Content

What's hot

HIGH STRENGTH CONCRETE PPT
HIGH STRENGTH CONCRETE PPTHIGH STRENGTH CONCRETE PPT
HIGH STRENGTH CONCRETE PPT
abdul raheem
 
REPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURESREPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURES
brijlata sharma
 
Crack repair techniques
Crack repair techniquesCrack repair techniques
Crack repair techniques
Nayana 54321
 
TYPES OF TESTS ON CONCRETE
TYPES OF TESTS ON CONCRETETYPES OF TESTS ON CONCRETE
TYPES OF TESTS ON CONCRETE
JASHU JASWANTH
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
pjainrahul
 
GROUND IMPROVEMENT-DENSIFICATION METHODS
GROUND IMPROVEMENT-DENSIFICATION METHODSGROUND IMPROVEMENT-DENSIFICATION METHODS
GROUND IMPROVEMENT-DENSIFICATION METHODS
ramgsvhce
 
High strength concrete
High strength concreteHigh strength concrete
High strength concrete
Dr K M SONI
 
Pull out test for concrete
Pull out test for concretePull out test for concrete
Pull out test for concrete
Ayaz khan
 
Polymer concrete and it's types
Polymer concrete and it's typesPolymer concrete and it's types
Polymer concrete and it's types
MONISHA K Y
 
Special concrete
Special concreteSpecial concrete
Special concrete
Dr V Kannan B.E., M.E., PhD
 
Sulphur infiltrated concrete
Sulphur infiltrated concreteSulphur infiltrated concrete
Sulphur infiltrated concrete
suraj bhanushali
 
Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures
kamariya keyur
 
Vacuum dewatering
Vacuum dewateringVacuum dewatering
Vacuum dewatering
Aglaia Connect
 
Reinforced earth structures
Reinforced earth structuresReinforced earth structures
Reinforced earth structures
Umer Farooq
 
Pile load test
Pile load testPile load test
Pile load test
Naman Kantesaria
 
Materials and Techniques For Repair
Materials and Techniques For RepairMaterials and Techniques For Repair
Materials and Techniques For Repair
Piyush Purshottam Lalwani
 
Design of rigid pavements
Design of rigid pavementsDesign of rigid pavements
Design of rigid pavements
GARRE RAVI KUMAR
 
Non destructive test on concrete
Non destructive test on concreteNon destructive test on concrete
Non destructive test on concrete
Aglaia Connect
 
retrofitting of fire damaged rcc slabs,colums,beams
retrofitting of fire damaged rcc slabs,colums,beamsretrofitting of fire damaged rcc slabs,colums,beams
retrofitting of fire damaged rcc slabs,colums,beams
Nayana 54321
 

What's hot (20)

HIGH STRENGTH CONCRETE PPT
HIGH STRENGTH CONCRETE PPTHIGH STRENGTH CONCRETE PPT
HIGH STRENGTH CONCRETE PPT
 
REPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURESREPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURES
 
Crack repair techniques
Crack repair techniquesCrack repair techniques
Crack repair techniques
 
TYPES OF TESTS ON CONCRETE
TYPES OF TESTS ON CONCRETETYPES OF TESTS ON CONCRETE
TYPES OF TESTS ON CONCRETE
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
GROUND IMPROVEMENT-DENSIFICATION METHODS
GROUND IMPROVEMENT-DENSIFICATION METHODSGROUND IMPROVEMENT-DENSIFICATION METHODS
GROUND IMPROVEMENT-DENSIFICATION METHODS
 
High strength concrete
High strength concreteHigh strength concrete
High strength concrete
 
Pull out test for concrete
Pull out test for concretePull out test for concrete
Pull out test for concrete
 
Polymer concrete and it's types
Polymer concrete and it's typesPolymer concrete and it's types
Polymer concrete and it's types
 
Concrete repair
Concrete repairConcrete repair
Concrete repair
 
Special concrete
Special concreteSpecial concrete
Special concrete
 
Sulphur infiltrated concrete
Sulphur infiltrated concreteSulphur infiltrated concrete
Sulphur infiltrated concrete
 
Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures
 
Vacuum dewatering
Vacuum dewateringVacuum dewatering
Vacuum dewatering
 
Reinforced earth structures
Reinforced earth structuresReinforced earth structures
Reinforced earth structures
 
Pile load test
Pile load testPile load test
Pile load test
 
Materials and Techniques For Repair
Materials and Techniques For RepairMaterials and Techniques For Repair
Materials and Techniques For Repair
 
Design of rigid pavements
Design of rigid pavementsDesign of rigid pavements
Design of rigid pavements
 
Non destructive test on concrete
Non destructive test on concreteNon destructive test on concrete
Non destructive test on concrete
 
retrofitting of fire damaged rcc slabs,colums,beams
retrofitting of fire damaged rcc slabs,colums,beamsretrofitting of fire damaged rcc slabs,colums,beams
retrofitting of fire damaged rcc slabs,colums,beams
 

Similar to distress of concrete

Construction practices aphb
Construction practices aphbConstruction practices aphb
Construction practices aphbhlksd
 
Maintenance and repair strategies Question answers
Maintenance and repair strategies Question answersMaintenance and repair strategies Question answers
Maintenance and repair strategies Question answers
RAMPRASAD KUMAWAT
 
13324396.pptx
13324396.pptx13324396.pptx
13324396.pptx
AdelFerdousi
 
Question & Answers RR&S
Question & Answers RR&SQuestion & Answers RR&S
Question & Answers RR&S
RAMPRASAD KUMAWAT
 
Concreting of super structure
Concreting of super structureConcreting of super structure
Concreting of super structureMinh Bui Si
 
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra MalaysiaBuilding defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
Nangkula utaberta
 
Deterioration of Concrete
Deterioration of ConcreteDeterioration of Concrete
Deterioration of Concrete
Ramanuj Jaldhari
 
Bps 5205 sustainability construction and maintainability velpandi & maria
Bps 5205  sustainability construction and maintainability  velpandi & mariaBps 5205  sustainability construction and maintainability  velpandi & maria
Bps 5205 sustainability construction and maintainability velpandi & maria
Maria Archana
 
Prefabricated Column
Prefabricated ColumnPrefabricated Column
Prefabricated Column
Anees Khan
 
Chapter 1 repair stratergies
Chapter 1 repair stratergiesChapter 1 repair stratergies
Chapter 1 repair stratergies
Ankit Patel
 
Innovation in construction industry
Innovation in construction industryInnovation in construction industry
Innovation in construction industry
Yamini K
 
Thesis PPT.pptxqefwefqewfwefqefqefqefqefqefqe
Thesis PPT.pptxqefwefqewfwefqefqefqefqefqefqeThesis PPT.pptxqefwefqewfwefqefqefqefqefqefqe
Thesis PPT.pptxqefwefqewfwefqefqefqefqefqefqe
USAMAUSAMA26
 
Retrofitting Sequences of Existing Factory Buildings In Chittagong, Banglades...
Retrofitting Sequences of Existing Factory Buildings In Chittagong, Banglades...Retrofitting Sequences of Existing Factory Buildings In Chittagong, Banglades...
Retrofitting Sequences of Existing Factory Buildings In Chittagong, Banglades...Mostafa Sameer
 
Retrofitting sequences by mostafa sameer
Retrofitting sequences by mostafa sameerRetrofitting sequences by mostafa sameer
Retrofitting sequences by mostafa sameer
Mostafa Sameer
 
Precast
PrecastPrecast
Structural Analysis for Rehabilitation of Reinforced Concrete Structure
Structural Analysis for Rehabilitation of Reinforced Concrete StructureStructural Analysis for Rehabilitation of Reinforced Concrete Structure
Structural Analysis for Rehabilitation of Reinforced Concrete Structure
IJERA Editor
 
Cost effectiveness in qulaity construction
Cost effectiveness in qulaity constructionCost effectiveness in qulaity construction
Cost effectiveness in qulaity construction
Seetha Ram P G
 
REPAIR AND REHABILITATION OF STRUCTURES.pptx
REPAIR AND REHABILITATION OF STRUCTURES.pptxREPAIR AND REHABILITATION OF STRUCTURES.pptx
REPAIR AND REHABILITATION OF STRUCTURES.pptx
KavinKumars19
 
Maintenance and repair strategies
Maintenance and repair strategiesMaintenance and repair strategies
Maintenance and repair strategies
Manikandan
 

Similar to distress of concrete (20)

Construction practices aphb
Construction practices aphbConstruction practices aphb
Construction practices aphb
 
Maintenance and repair strategies Question answers
Maintenance and repair strategies Question answersMaintenance and repair strategies Question answers
Maintenance and repair strategies Question answers
 
13324396.pptx
13324396.pptx13324396.pptx
13324396.pptx
 
Column & beam
Column & beamColumn & beam
Column & beam
 
Question & Answers RR&S
Question & Answers RR&SQuestion & Answers RR&S
Question & Answers RR&S
 
Concreting of super structure
Concreting of super structureConcreting of super structure
Concreting of super structure
 
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra MalaysiaBuilding defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
Building defect, Structure 1, ARC3400, FRSB, Universiti Putra Malaysia
 
Deterioration of Concrete
Deterioration of ConcreteDeterioration of Concrete
Deterioration of Concrete
 
Bps 5205 sustainability construction and maintainability velpandi & maria
Bps 5205  sustainability construction and maintainability  velpandi & mariaBps 5205  sustainability construction and maintainability  velpandi & maria
Bps 5205 sustainability construction and maintainability velpandi & maria
 
Prefabricated Column
Prefabricated ColumnPrefabricated Column
Prefabricated Column
 
Chapter 1 repair stratergies
Chapter 1 repair stratergiesChapter 1 repair stratergies
Chapter 1 repair stratergies
 
Innovation in construction industry
Innovation in construction industryInnovation in construction industry
Innovation in construction industry
 
Thesis PPT.pptxqefwefqewfwefqefqefqefqefqefqe
Thesis PPT.pptxqefwefqewfwefqefqefqefqefqefqeThesis PPT.pptxqefwefqewfwefqefqefqefqefqefqe
Thesis PPT.pptxqefwefqewfwefqefqefqefqefqefqe
 
Retrofitting Sequences of Existing Factory Buildings In Chittagong, Banglades...
Retrofitting Sequences of Existing Factory Buildings In Chittagong, Banglades...Retrofitting Sequences of Existing Factory Buildings In Chittagong, Banglades...
Retrofitting Sequences of Existing Factory Buildings In Chittagong, Banglades...
 
Retrofitting sequences by mostafa sameer
Retrofitting sequences by mostafa sameerRetrofitting sequences by mostafa sameer
Retrofitting sequences by mostafa sameer
 
Precast
PrecastPrecast
Precast
 
Structural Analysis for Rehabilitation of Reinforced Concrete Structure
Structural Analysis for Rehabilitation of Reinforced Concrete StructureStructural Analysis for Rehabilitation of Reinforced Concrete Structure
Structural Analysis for Rehabilitation of Reinforced Concrete Structure
 
Cost effectiveness in qulaity construction
Cost effectiveness in qulaity constructionCost effectiveness in qulaity construction
Cost effectiveness in qulaity construction
 
REPAIR AND REHABILITATION OF STRUCTURES.pptx
REPAIR AND REHABILITATION OF STRUCTURES.pptxREPAIR AND REHABILITATION OF STRUCTURES.pptx
REPAIR AND REHABILITATION OF STRUCTURES.pptx
 
Maintenance and repair strategies
Maintenance and repair strategiesMaintenance and repair strategies
Maintenance and repair strategies
 

More from kamariya keyur

estimation of structure
estimation of structureestimation of structure
estimation of structure
kamariya keyur
 
Pavement
PavementPavement
Pavement
kamariya keyur
 
Curing
CuringCuring
Connections
Connections Connections
Connections
kamariya keyur
 
Tunneling in soft ground and hard rock
Tunneling in soft ground and hard rockTunneling in soft ground and hard rock
Tunneling in soft ground and hard rock
kamariya keyur
 
Theory of errors
Theory of errors Theory of errors
Theory of errors
kamariya keyur
 
traffic characteristics
traffic characteristicstraffic characteristics
traffic characteristics
kamariya keyur
 
column and strut
column and strutcolumn and strut
column and strut
kamariya keyur
 
Plain sedimentation
Plain sedimentationPlain sedimentation
Plain sedimentation
kamariya keyur
 
Open channel flow
Open channel flowOpen channel flow
Open channel flow
kamariya keyur
 
Isolated column footing
Isolated column footingIsolated column footing
Isolated column footing
kamariya keyur
 
Flat slab
Flat slab Flat slab
Flat slab
kamariya keyur
 
durability and permeability of concrete
durability and permeability of concretedurability and permeability of concrete
durability and permeability of concrete
kamariya keyur
 
Cost & value management
Cost & value management Cost & value management
Cost & value management
kamariya keyur
 
Retaining wall
 Retaining wall  Retaining wall
Retaining wall
kamariya keyur
 
Compression member
Compression memberCompression member
Compression member
kamariya keyur
 

More from kamariya keyur (16)

estimation of structure
estimation of structureestimation of structure
estimation of structure
 
Pavement
PavementPavement
Pavement
 
Curing
CuringCuring
Curing
 
Connections
Connections Connections
Connections
 
Tunneling in soft ground and hard rock
Tunneling in soft ground and hard rockTunneling in soft ground and hard rock
Tunneling in soft ground and hard rock
 
Theory of errors
Theory of errors Theory of errors
Theory of errors
 
traffic characteristics
traffic characteristicstraffic characteristics
traffic characteristics
 
column and strut
column and strutcolumn and strut
column and strut
 
Plain sedimentation
Plain sedimentationPlain sedimentation
Plain sedimentation
 
Open channel flow
Open channel flowOpen channel flow
Open channel flow
 
Isolated column footing
Isolated column footingIsolated column footing
Isolated column footing
 
Flat slab
Flat slab Flat slab
Flat slab
 
durability and permeability of concrete
durability and permeability of concretedurability and permeability of concrete
durability and permeability of concrete
 
Cost & value management
Cost & value management Cost & value management
Cost & value management
 
Retaining wall
 Retaining wall  Retaining wall
Retaining wall
 
Compression member
Compression memberCompression member
Compression member
 

Recently uploaded

ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 

Recently uploaded (20)

ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 

distress of concrete

  • 1. Contents Definition of Distress Causes of Distress Constructional errors Design Deficiencies Deterioration of concrete Need for repairs in structure Concrete repair system Durable concrete repair
  • 2. DISTRESS • Distress means damage. • Because of the varying conditions under which it is produced at various locations, the quality of concrete suffers occasionally either during production or during service conditions resulting in distress. 2
  • 3. Causes of distress of concrete 1. Structural causes - Externally applied loads - Environmental loads - Accidents - Subsidence etc. 2. Errors in design and detailing 3. Poor construction practice 4. Construction overloads 5. Drying shrinkage 6. Thermal stress 7. Weathering 8. Corrosion 3
  • 4. • In addition to distress in hardened concrete, the plastic concrete may suffer damage due to, - Plastic shrinkage - settlement cracking - early removal of formwork - improper design of formwork 4
  • 5. Construction Errors 1. Use of inferior quality of construction materials. 2. Use of waste water or saline water in construction. 3. Adding of more water to improve workability which increase the w/c ratio. 4. Poor grading of concrete ingredients. 5. Poor mixing of concrete. 6. Batching of concrete by volume using mortar pans. 7. Insufficient compaction of concrete. 8. Dropping concrete from the height results into segregation. 9. Insufficient reinforcement into slab, beam, column etc. 10. Improper location of reinforcing steel. 5
  • 6. 11. Hooks , bends , overlaps are not properly provided. 12. Formwork props are not resting on a hard surface. 13. Early removal of formwork props. 14. Using props of insufficient strength. 15. Joints are not properly provided. 16. Improper curing of concrete. 17. Segregation of concrete during transportation. 18. Settlement of foundation 6
  • 7. Design deficiencies • Inadequate structural design : 1. Error in load calculations. 2. SBC is assumed without carrying out any field test. 3. Design not confirming to IS - 456 : 2000 and IS – 1893 : 1987 guidelines. 4. Design with many cantilevers. 5. Shear wall is not designed in multi storey building. 6. Stiffness in both direction is unequal resulting into torsion. 7. Effect of the short column in single storey. 8. Lack of knowledge of using structural design software like STAAD PRO, ETABS etc. 7
  • 8. • Poor design detailing : 1. Abrupt change in section. 2. Insufficient reinforcement at re – entrant corners and openings. 3. Inadequate provision for deflection. 4. Inadequate expansion joints. 5. Inadequate provision of drainage. 6. Material incompatibility. 7. Bent up bars are not properly shown. 8. Spacing of vertical stirrups is wrongly shown. 9. Column spacing of lateral ties is wrongly shown. 10. Ductile detailing is not as per IS – 13920. 8
  • 9. DETERIORATION in concrete • Causes of deterioration in concrete : 1. Accidental loading 2. Chemical reactions - Acid attack - Alkali carbonate rock reaction - Alkali silica reaction - Aggressive water attack - Sulphate attack 3. Construction errors 4. Corrosion of metals 5. Design errors - Inadequate structural design - Poor design details 9
  • 10. 6. Erosion - Abrasion - Cavitations 7. Freezing and thawing 8. Settlement and movements 9. Shrinkage - plastic shrinkage - Drying shrinkage 10. Temperature changes - Internally generated - Externally generated 11. Weathering 10
  • 11. Need for Repairs of structures a) Workmanship: • Repair personnel are responsible for making repairs that are durable and well bonded to existing structure. • Workmen should be fully instructed regarding repair procedures and critical aspects. • Constant vigilance should be exercised by contractor’s and government forces to ensure maintenance of necessary standards of workmanship. 11
  • 12. b) Procedures: • Use procedures that have been successful or that have a proven high reliability factor. • Repairs on new work will develop best bond and likely to be durable and permanent as original work. • The method and materials proposed for use should be approved by an authorized inspector. 12
  • 13. c) Materials: • They must be of high quality, relatively fresh and capable of meeting specifications requirements for particular application or intended use. • Mill reports or testing laboratory reports is required. • New, unproven materials should be used only when, - Standard repair materials are unsuitable - The owners and parties should be informed about risks associated with it. 13
  • 14. Evaluate structures Project needs Determine causes of damage & effect Repair analysis User needs Determine repair strategies Methods and materials Repair and protect Urgency Aesthetics Lifespan Environment Contractibility & Effectiveness 14
  • 15. Durable concrete repair 1. Determine the causes of damage 2. Evaluate the extent of damage 3. Evaluate the need of repair 4. Select the repair method 5. Prepare the old concrete for repair 6. Apply the repair method 7. Cure the repair properly 15
  • 16. 1. Determine the causes of damage : If the cause of the original damage to concrete is not determined and eliminated , or if an incorrect determination is made, whatever damaged the original concrete will likely also damage the repaired concrete. 2. Evaluate the extent of damage : The intent of this step is to determine how much concrete has been damaged and how this damage will affect serviceability of this structure. 3. Evaluate the need to repair : With early detection it may be possible to arrest the rate of deterioration using maintenance procedure . Even if repairs is required, early detection of damage will allow orderly budgeting of funds to pat the cost of repair. 16
  • 17. 4. Select the repair methods : With insufficient information, it is very difficult to make proper , economical , and successful selections. This steps define the types of conditions the repair must resist the available repair construction time period and when repair must be accomplished. 5. Prepare the old concrete for repair : Preparation of the old concrete for application of repair material is of primary importance in the accomplishment of durable repairs. 6. Apply the repair material : The selected repair material should be applied on the prepared surface using equipment with proper care. 7. Cure the repair properly : The repaired concrete should be cured for about 14 days. 17