SlideShare a Scribd company logo
Ecoservity
Demand Driven Production Management
Powered by Data
Process &Technology brief-
Nov, 2017
Ecoservity
For most manufacturing organizations, while demand may
have significant variance the capacity is usually finite
Key challenge for plant managers is to:
Gain visibility across the lines for current and scheduled jobs
Ability to meet the demand based on dynamic business parameters
(customer, order volume, line conditions etc)
Monitor next available time for production line & plan accordingly
Setup downtime as needed for the line
Dispatch Planned / Production order to Production lines
Automate Good receipt / HFI into ERP system
Monitor / alert for key parameters of production line
Upcoming changes for SAP solution roadmap
Challenges for Manufacturing with Production Operations
Ecoservity
Future Plant Operations need to be Demand Sensing, Agile and Integrated E2E:
Demand Driven Production Management (DDPM)
Transform
Ecoservity
Production Scheduling in DDPM: Scheduling Cockpit
Plant
MRP Controller
Production Line (Optional)
# of days to plan for
Control verification & Availability
Check
Ecoservity
Production Scheduling in DDPM: Scheduling Cockpit
List of unassigned
Planned orders
List of assigned planned
order to Production line
Assign Planned order
to a scheduled line
Current Production /
Process Order
Change Quantity of
PRD Order
Reschedule orders based on new qty & priority
Unassign from Prod lineShift to another Prod lineSetup Prod line downtime
Change Qty
Create Planned Order
Delete Planned Order
Copy Planned Order
Prod Line dashboard Locked Order Change Locked Order Unassign
List of unassigned
Planned orders
Line Actual Vs Std
runrate
Check Availability of
key resources
Ecoservity
Production Operations in DDPM: Scheduling Cockpit
List of assigned planned
order to Production line
Running Production /
Process Order
Refresh Data (Auto refresh in nn mins)
List of Production Lines
Execute Production Changeover Line details Prd. Ord Material Long text
Material Long text
Pl. Ord Long text
Order Long text
Remaining Qty
HFI Qty
Prd. Scheduled Qty
GR Qty
Ecoservity
Desktop Mobile
Web / Mobile based Plant line Status in DDPM
Monitor key plant operational data (line / PRD Order / next Order / Status etc) from any device
Ecoservity
Plant line monitoring Dashboard & Alerts in DDPM
IoT & HANA based Line health check monitoring (eg, temperature / humidity / emissions / gas etc)
DigitalPhysical
ERP
HFI (manual) GR
Label:
#####
##
E
A
Ia
c
d
g h
e
f
i
j
kl
j
b
m
# Description
a ERP with Demand2Supply processes
b Production schedule
c Jobs list pushed to PRD line IoT
d EAI middleware
e IoT device
f Camera module + OCR on IoT
g Produced goods
h Label on produced good
i Camera image capture (time / event
based)
j Goods Receipt to ERP
Changeover trigger to Plant Line upon
completed Order(Optional)
k Goods received (OCR successful)
l Manual inspection / HFI ((OCR
unsuccessful)
m IoT Signal to PLC to control the routing
of produced goods
n Plant line / conveyor
n
PLC
Inventory Management: Automated Goods Receipt
Automate GR from production / procurement using IoT & OCR
Ecoservity
Benefits for Production Operations using DDPM
1. Improve Plant assets Utilization and
Monetization
2. Enable Demand Driven Production Operations
3. Built for Simplified usability, designed by users
like Yourself
Ecoservity
Ecoservity
Q&A / Next
Steps
Anupam
Ecoservity Inc,
Anupam.jaiswal@ecoservity.com
+1.214.519.9601

More Related Content

What's hot

Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
Delwin Arikatt
 
manufacturing resource planning
manufacturing resource planningmanufacturing resource planning
manufacturing resource planning
Dinesh Nikam
 
Mrp 2 Manufact Resou Plannin
Mrp 2 Manufact Resou PlanninMrp 2 Manufact Resou Plannin
Mrp 2 Manufact Resou Plannin
menonroopesh
 
Erp sap ecc mm training by lokesh
Erp sap ecc  mm training by lokeshErp sap ecc  mm training by lokesh
Erp sap ecc mm training by lokesh
Lokesh Modem
 
MRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERPMRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERP
Tom Matys
 
material requirement planning Presentation
material requirement planning Presentationmaterial requirement planning Presentation
material requirement planning Presentation
haitham elshennawy
 

What's hot (20)

Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
Operations MRP
Operations MRPOperations MRP
Operations MRP
 
SAP MM PP Material requirement planning
SAP MM PP Material requirement planning SAP MM PP Material requirement planning
SAP MM PP Material requirement planning
 
manufacturing resource planning
manufacturing resource planningmanufacturing resource planning
manufacturing resource planning
 
Mrp structure
Mrp structureMrp structure
Mrp structure
 
Material requirement planning (mrp)
Material requirement planning (mrp)Material requirement planning (mrp)
Material requirement planning (mrp)
 
Input to MRP
Input to MRPInput to MRP
Input to MRP
 
Plant-Floor-Integration - r2
Plant-Floor-Integration - r2Plant-Floor-Integration - r2
Plant-Floor-Integration - r2
 
Material Requirement planning (factors,inputs,outputs,benifits)
Material Requirement planning  (factors,inputs,outputs,benifits)Material Requirement planning  (factors,inputs,outputs,benifits)
Material Requirement planning (factors,inputs,outputs,benifits)
 
Mrp 2 Manufact Resou Plannin
Mrp 2 Manufact Resou PlanninMrp 2 Manufact Resou Plannin
Mrp 2 Manufact Resou Plannin
 
Erp viva
Erp  vivaErp  viva
Erp viva
 
Erp sap ecc mm training by lokesh
Erp sap ecc  mm training by lokeshErp sap ecc  mm training by lokesh
Erp sap ecc mm training by lokesh
 
MRP system series 1 - What is MRP?
MRP system series 1 - What is MRP?MRP system series 1 - What is MRP?
MRP system series 1 - What is MRP?
 
MRP IN SERVICES & ERP
MRP IN SERVICES & ERPMRP IN SERVICES & ERP
MRP IN SERVICES & ERP
 
MRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERPMRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERP
 
MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)
 
Material requirement planning (mrp1)
Material requirement planning (mrp1)Material requirement planning (mrp1)
Material requirement planning (mrp1)
 
Mrp
MrpMrp
Mrp
 
material requirement planning Presentation
material requirement planning Presentationmaterial requirement planning Presentation
material requirement planning Presentation
 
MRP (Material requirements planning)
MRP (Material requirements planning)MRP (Material requirements planning)
MRP (Material requirements planning)
 

Similar to Demand Driven Production Management

SAP Roadmap in Essar Offshore Subsea Ltd.
SAP Roadmap in Essar Offshore Subsea Ltd.SAP Roadmap in Essar Offshore Subsea Ltd.
SAP Roadmap in Essar Offshore Subsea Ltd.
Pankaj K Sinha
 
Track3, session 5, implementing documentum and captiva based application and ...
Track3, session 5, implementing documentum and captiva based application and ...Track3, session 5, implementing documentum and captiva based application and ...
Track3, session 5, implementing documentum and captiva based application and ...
EMC Forum India
 
New Charts Architectures (2)
New Charts Architectures (2)New Charts Architectures (2)
New Charts Architectures (2)
guestf73e68
 
Kcf bp-project-module
Kcf bp-project-moduleKcf bp-project-module
Kcf bp-project-module
Esh_Crystal
 

Similar to Demand Driven Production Management (20)

Production module
Production moduleProduction module
Production module
 
Qguar APS - ENGLISH
Qguar APS - ENGLISHQguar APS - ENGLISH
Qguar APS - ENGLISH
 
Rethinking Stamping Die Shop Operations
Rethinking Stamping Die Shop OperationsRethinking Stamping Die Shop Operations
Rethinking Stamping Die Shop Operations
 
Modernization Lessons Learned - Part 1
Modernization Lessons Learned - Part 1Modernization Lessons Learned - Part 1
Modernization Lessons Learned - Part 1
 
SAP Roadmap in Essar Offshore Subsea Ltd.
SAP Roadmap in Essar Offshore Subsea Ltd.SAP Roadmap in Essar Offshore Subsea Ltd.
SAP Roadmap in Essar Offshore Subsea Ltd.
 
Track3, session 5, implementing documentum and captiva based application and ...
Track3, session 5, implementing documentum and captiva based application and ...Track3, session 5, implementing documentum and captiva based application and ...
Track3, session 5, implementing documentum and captiva based application and ...
 
Integration of Manufacturing Execution Systems - Harsh Infotech Case Studies
Integration of Manufacturing Execution Systems - Harsh Infotech Case StudiesIntegration of Manufacturing Execution Systems - Harsh Infotech Case Studies
Integration of Manufacturing Execution Systems - Harsh Infotech Case Studies
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec doms
 
Mrp 1
Mrp 1Mrp 1
Mrp 1
 
ARC's Greg Gorbach's Global Manufacturing Presentation at ARC's 2008 Industry...
ARC's Greg Gorbach's Global Manufacturing Presentation at ARC's 2008 Industry...ARC's Greg Gorbach's Global Manufacturing Presentation at ARC's 2008 Industry...
ARC's Greg Gorbach's Global Manufacturing Presentation at ARC's 2008 Industry...
 
On-Demand: Is It Right For Your Company?
On-Demand: Is It Right For Your Company?On-Demand: Is It Right For Your Company?
On-Demand: Is It Right For Your Company?
 
Appendix c
Appendix cAppendix c
Appendix c
 
SYSPRO ERP
SYSPRO ERPSYSPRO ERP
SYSPRO ERP
 
ICE Overview : SAP - ERP Journey
ICE Overview : SAP - ERP JourneyICE Overview : SAP - ERP Journey
ICE Overview : SAP - ERP Journey
 
SAP An Introduction
SAP An IntroductionSAP An Introduction
SAP An Introduction
 
WFX Cloud ERP
WFX Cloud ERPWFX Cloud ERP
WFX Cloud ERP
 
New Charts Architectures (2)
New Charts Architectures (2)New Charts Architectures (2)
New Charts Architectures (2)
 
Kcf bp-project-module
Kcf bp-project-moduleKcf bp-project-module
Kcf bp-project-module
 
Demantra Case Study Doug
Demantra Case Study DougDemantra Case Study Doug
Demantra Case Study Doug
 
OrchestratedBEER Brewery Software Product Presentation
OrchestratedBEER Brewery Software Product PresentationOrchestratedBEER Brewery Software Product Presentation
OrchestratedBEER Brewery Software Product Presentation
 

Recently uploaded

NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
Khaled Al Awadi
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 

Recently uploaded (20)

NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
 
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case StudyTransforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
 
TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024
 
sales plan presentation by mckinsey alum
sales plan presentation by mckinsey alumsales plan presentation by mckinsey alum
sales plan presentation by mckinsey alum
 
Using Generative AI for Content Marketing
Using Generative AI for Content MarketingUsing Generative AI for Content Marketing
Using Generative AI for Content Marketing
 
Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
Falcon Invoice Discounting Setup for Small Businesses
Falcon Invoice Discounting Setup for Small BusinessesFalcon Invoice Discounting Setup for Small Businesses
Falcon Invoice Discounting Setup for Small Businesses
 
Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024
 
India’s Recommended Women Surgeons to Watch in 2024.pdf
India’s Recommended Women Surgeons to Watch in 2024.pdfIndia’s Recommended Women Surgeons to Watch in 2024.pdf
India’s Recommended Women Surgeons to Watch in 2024.pdf
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
 
LinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptxLinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptx
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
The Inspiring Personality To Watch In 2024.pdf
The Inspiring Personality To Watch In 2024.pdfThe Inspiring Personality To Watch In 2024.pdf
The Inspiring Personality To Watch In 2024.pdf
 
Hyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings releaseHyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings release
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdfMatt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
Matt Conway - Attorney - A Knowledgeable Professional - Kentucky.pdf
 

Demand Driven Production Management

  • 1. Ecoservity Demand Driven Production Management Powered by Data Process &Technology brief- Nov, 2017
  • 2. Ecoservity For most manufacturing organizations, while demand may have significant variance the capacity is usually finite Key challenge for plant managers is to: Gain visibility across the lines for current and scheduled jobs Ability to meet the demand based on dynamic business parameters (customer, order volume, line conditions etc) Monitor next available time for production line & plan accordingly Setup downtime as needed for the line Dispatch Planned / Production order to Production lines Automate Good receipt / HFI into ERP system Monitor / alert for key parameters of production line Upcoming changes for SAP solution roadmap Challenges for Manufacturing with Production Operations
  • 3. Ecoservity Future Plant Operations need to be Demand Sensing, Agile and Integrated E2E: Demand Driven Production Management (DDPM) Transform
  • 4. Ecoservity Production Scheduling in DDPM: Scheduling Cockpit Plant MRP Controller Production Line (Optional) # of days to plan for Control verification & Availability Check
  • 5. Ecoservity Production Scheduling in DDPM: Scheduling Cockpit List of unassigned Planned orders List of assigned planned order to Production line Assign Planned order to a scheduled line Current Production / Process Order Change Quantity of PRD Order Reschedule orders based on new qty & priority Unassign from Prod lineShift to another Prod lineSetup Prod line downtime Change Qty Create Planned Order Delete Planned Order Copy Planned Order Prod Line dashboard Locked Order Change Locked Order Unassign List of unassigned Planned orders Line Actual Vs Std runrate Check Availability of key resources
  • 6. Ecoservity Production Operations in DDPM: Scheduling Cockpit List of assigned planned order to Production line Running Production / Process Order Refresh Data (Auto refresh in nn mins) List of Production Lines Execute Production Changeover Line details Prd. Ord Material Long text Material Long text Pl. Ord Long text Order Long text Remaining Qty HFI Qty Prd. Scheduled Qty GR Qty
  • 7. Ecoservity Desktop Mobile Web / Mobile based Plant line Status in DDPM Monitor key plant operational data (line / PRD Order / next Order / Status etc) from any device
  • 8. Ecoservity Plant line monitoring Dashboard & Alerts in DDPM IoT & HANA based Line health check monitoring (eg, temperature / humidity / emissions / gas etc)
  • 9. DigitalPhysical ERP HFI (manual) GR Label: ##### ## E A Ia c d g h e f i j kl j b m # Description a ERP with Demand2Supply processes b Production schedule c Jobs list pushed to PRD line IoT d EAI middleware e IoT device f Camera module + OCR on IoT g Produced goods h Label on produced good i Camera image capture (time / event based) j Goods Receipt to ERP Changeover trigger to Plant Line upon completed Order(Optional) k Goods received (OCR successful) l Manual inspection / HFI ((OCR unsuccessful) m IoT Signal to PLC to control the routing of produced goods n Plant line / conveyor n PLC Inventory Management: Automated Goods Receipt Automate GR from production / procurement using IoT & OCR
  • 10. Ecoservity Benefits for Production Operations using DDPM 1. Improve Plant assets Utilization and Monetization 2. Enable Demand Driven Production Operations 3. Built for Simplified usability, designed by users like Yourself
  • 12. Ecoservity Q&A / Next Steps Anupam Ecoservity Inc, Anupam.jaiswal@ecoservity.com +1.214.519.9601