Manufacturing Resource Planning
MRP-2
Presented by
Abhijeet Karmakar
MT14IND001
Industrial Engineering
Historical perspective
Manufacturing resource planning evolved from
material requirement planning in the 1980s.
It abbreviated as MRP-ΙΙ to distinguish from
MRP.
Oliver Wight and Walter Goddard developed
manufacturing resource planning from MRP.
ERPMRP -ΙΙMRP
Types of System
1. Dependent demand- are the component, parts, or sub
assemblies of finish goods.
2. Independent demand-Finish goods
EX-
Bikes(2000)
Tyres(4000) Lights(4000)
Demand
forecast
MRPisacomputerizedinventorysystemfor
inventorycontrol-
Purpose of MRP
• Control inventory levels
• Assign operating priorities
• Plant capacity to load the production system
Purpose of
MRP
Inventori
es
Priority capacities
Order-
• Right part
• Right quantity
• Right Quality
Order-
• With due date
• Keep due date
valid
Plan for-
• Complete Load
• Adequate Load
• Future Load
MRP-(material requirement planning)
• Material requirement planning is a system used for
planning the future requirement of the dependent
demand items.
• Black and decker was the first company who used
MRP in 1964.
• Material requirement planning typically determine
“when to order” based on a average usage for a
planned replenishment lead time + safety stock to
protect the severer demand.
Inputs in MRP
The main objective of MRP system is to convert the MPS
into the detailed for raw material and components.
Following major inputs to the MRP-
1.Bill of Material
2. Master production schedule
3. Inventory Status
Bill of material
Bill of Material is a document which tell about an items product
structure, showing the sequence in which components are
assembled and their number.
Bike
Wheel(2)
Tyre(1)
Hub(1)
Lights(2) Engine(1)
Finish Product
Sub
Assembly
components
Master production schedule
MPS provide information about-
• What end product are to be produced
• How many o each type of product is to be produced
• When the product is likely to be dispatched.
The MPS is an extension of the aggregate production plan.
Example
Month No of Cars
Jan. 10000
Feb 12000
March 8000
April 5000
May 5000
MPS structure
Weeks Of
Jan.
1 2 3 4 Total
Santro 1200 2000 2500 700 6400
Accent 700 950 1300 250 3200
Sonata 100 50 200 50 400
Total 2000 3000 4000 1000 10000
Inventory status
• The inventory record file covers each item record separately
indicating its inventory status on a period by period basis.
• This file also keep information about supplier, lead time, lot
size etc.
Ex-
X
A(3)
LT=1
Inventory=200
B(2)
LT=2
800 items of X
800×2=1600
Complete MRP structure-
• MPS
• Order
release
report
PROBLEMS WITH MRP
• The user has to specify how long it takes a factory to make a
product from its components.
• This system assume lead time is constant.
• This system could not include resource planning in its system.
• MPS is only depends on Forecast value or firm order.
Why MRP-ΙΙ ?
Component
Manufacturer
Equipment
Manufacturer
Consumer Goods
Manufacturer
Labor 110 70 40
Material 280 430 250
Overhead 200 210 100
Factory Cost 590 710 390
Operating Cost 250 150 400
Total 840 860 790
Profit 160 140 210
Total Sales 1000/- 1000/- 1000/-
MRP-2
• A method for the effective planning of all resources of
manufacturing-
• Financial accounting incorporated
• Sales
• Operations Planning
• Simulate capacity requirements of different possible Master
Production Schedules.
• MRP 2 is the incremental information integration business
process strategy implemented using hardware and modular
software application linked to central database that store
business data and information.
MRP2 is a closed cycle MRP…!!
 Rough Cut capacity Planning
• Quick check on a few key resources required to implement the
MPS.
• Rough cut capacity plans are “Finite capacity plan” because
they have to operated within certain constrains.
Capacity Planning
• It provide more detailed information than Rough cut capacity
planning.
• It explode the manufacturing order through routine specified
in the shop floor control system.
• It provide information about what capacity is required in each
work center.
Features of MRP-2
• Fluctuation of forecast is taken into account by including
simulation of MPS.
• MRP2 is a total company management concept for using
more human resources effectively.
• The MRP2 is carried out by a synergistic combination of
computer and human resources.
• The integration extends from strategic to operational
level and encompasses long term planning up to short
term control.
Problem:
To schedule the resources for enabling uninterrupted
production of 100 units of product P 9 weeks from now.
MATL - A
1 UNIT
MATL – P
I UNIT
MATL - C
3 UNITS
MATL - B
2 UNITS
Resource
Requirement
Matl A Matl B Matl C
Lead time
(Wks)
1 2 4
Raw Matl Cost
(Rs)
2 5 5
Labor Reqd
(Hrs)
10 10 2
Machine Reqd
(Hrs)
2 2 1
Bill Of Materials
A typical resource planning problem
Week-7 Week-8 Week-9
Units Of “P” 100
Lead Time(0)
Order Release date
100
Week
5 6 7 8
A. Units (lead time 1 week) 100
Labor: 10 hours each 1,000
Machine: 2 hours each 200
Payable: Rs 2 each 200
B. Units (lead time 2 weeks,
2 each required) 200
Labor: 10 hours each 2,000
Machine: 2 hours each 400
Payable: Raw material at Rs 5 each 1,000
C. Units (lead time 4 weeks,
3 each required) 300
Labor: 2 hours each 600
Machine: 1 hour each 300
Payable: Raw material at Rs 10 each 3,000
22
Resource Estimation
• Increased direct labor productivity
• High accuracy of inventory and manufacturing capacity
• Effective interaction between different functions due to
common databases and improved information flow
• Quicker implementation of engineering changes
• Simulation capability to test what-if scenarios in a risk
free environment
• Company focus shifts from crisis management to
process control 23
Benefits Of MRP-2
• For Manufacturing Functions:
• Better control of inventories
• Improved scheduling
• Productive relationships with suppliers
• For Financial and Costing Functions :
• Reduced working capital for inventory
• Improved cash flow through quicker deliveries
• Accurate inventory records
• Timely and valid cost and profitability information
• For Design / Engineering Functions :
• Improved design control
• Better quality and quality control
24
Benefits Of MRP-2
• Capacity can be considered only after the MRP schedule has
been prepared.
• It may happen that insufficient time was allowed within the
MRP schedule for the individual operations to be completed,
thus leading to erroneous data.
• All the planning, if done on the basis of misleading data, will
slow down the production process.
• If unexpected input changes occur, the planning process has
to be recalculated from start. 25
Limitation of MRP-2
Questionnaire?
• What is the difference between MRP-1 and
MRP-2?
• Explain the inputs and outputs of MRP?
• What are the various benefits and limitation of
MRP-2 over MRP-1?
• Which system is easy to implement MRP or
MRP-2?
• Differentiate between Independent and
dependent system?
• Define RCCP and capacity planning?
References
• Production management by Kanishka Bedi oxford university
publisher.
• http//www.slideshare.net/MRP2
• http//www.wikipedia.org/MRP2
Thank You

More Related Content

What's hot

Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Snehav Sharma
 
Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop schedulingSujeet TAMBE
 
Production planning control ppt
Production planning control pptProduction planning control ppt
Production planning control pptsudhir pawar
 
Material Requirement planning (factors,inputs,outputs,benifits)
Material Requirement planning  (factors,inputs,outputs,benifits)Material Requirement planning  (factors,inputs,outputs,benifits)
Material Requirement planning (factors,inputs,outputs,benifits)razinbabaria786
 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource PlanningBiswajit Ghosh
 
Material resource planning
Material resource planningMaterial resource planning
Material resource planningNishant Agrawal
 
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING Aqib ali
 
Inventory management
Inventory managementInventory management
Inventory managementKuldeep Uttam
 
Material requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementMaterial requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementSuryakumar Thangarasu
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencingAkanksha Gupta
 
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL Junaid Hassan
 
Manufacturing Resource Planning | Management
Manufacturing Resource Planning | ManagementManufacturing Resource Planning | Management
Manufacturing Resource Planning | ManagementTransweb Global Inc
 
types of production system
types of production systemtypes of production system
types of production systemram4181
 
Material requirement planning (mrp1)
Material requirement planning (mrp1)Material requirement planning (mrp1)
Material requirement planning (mrp1)saleh asgari
 

What's hot (20)

Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Material Requirement Planning (mrp)
Material Requirement Planning (mrp)
 
Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop scheduling
 
Production planning control ppt
Production planning control pptProduction planning control ppt
Production planning control ppt
 
Material Requirement planning (factors,inputs,outputs,benifits)
Material Requirement planning  (factors,inputs,outputs,benifits)Material Requirement planning  (factors,inputs,outputs,benifits)
Material Requirement planning (factors,inputs,outputs,benifits)
 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource Planning
 
Material resource planning
Material resource planningMaterial resource planning
Material resource planning
 
Input to MRP
Input to MRPInput to MRP
Input to MRP
 
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING
 
Kanban system presentation
Kanban system presentationKanban system presentation
Kanban system presentation
 
Inventory management
Inventory managementInventory management
Inventory management
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Material requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementMaterial requirement planning - Production and Operation Management
Material requirement planning - Production and Operation Management
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
 
(Mrp 1) Prsntation Slides
(Mrp 1) Prsntation Slides(Mrp 1) Prsntation Slides
(Mrp 1) Prsntation Slides
 
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
 
Manufacturing Resource Planning | Management
Manufacturing Resource Planning | ManagementManufacturing Resource Planning | Management
Manufacturing Resource Planning | Management
 
Time study
Time studyTime study
Time study
 
types of production system
types of production systemtypes of production system
types of production system
 
Material requirement planning (mrp1)
Material requirement planning (mrp1)Material requirement planning (mrp1)
Material requirement planning (mrp1)
 
Forecasting Techniques
Forecasting TechniquesForecasting Techniques
Forecasting Techniques
 

Viewers also liked

Master production schedule
Master production scheduleMaster production schedule
Master production scheduleyashbhhardwaj260
 
Raw material of screen protectors
Raw material of screen protectorsRaw material of screen protectors
Raw material of screen protectorsViola Pan
 
Ball & gel pen manufacturing
Ball & gel pen manufacturingBall & gel pen manufacturing
Ball & gel pen manufacturingSudiksha Mahajan
 
How it is made Plastic Chair? Erdi Karaçal Mechanical Engineer
How it is made Plastic Chair? Erdi Karaçal Mechanical EngineerHow it is made Plastic Chair? Erdi Karaçal Mechanical Engineer
How it is made Plastic Chair? Erdi Karaçal Mechanical EngineerErdi Karaçal
 
Manufacture of Paint, Varnishes
Manufacture of Paint, Varnishes Manufacture of Paint, Varnishes
Manufacture of Paint, Varnishes Ajjay Kumar Gupta
 
Manufacturing process of tiles
Manufacturing process of  tilesManufacturing process of  tiles
Manufacturing process of tilesNishant Sinha
 
Plastic Chairs & Tables by Uma Plastics Limited, Kolkata
Plastic Chairs & Tables by Uma Plastics Limited, KolkataPlastic Chairs & Tables by Uma Plastics Limited, Kolkata
Plastic Chairs & Tables by Uma Plastics Limited, KolkataIndiaMART InterMESH Limited
 
Costing master budget
Costing master budgetCosting master budget
Costing master budgetAdil Shaikh
 
Automated manufacturing process of ball-pen by injection molding.
Automated manufacturing process of ball-pen by injection molding.Automated manufacturing process of ball-pen by injection molding.
Automated manufacturing process of ball-pen by injection molding.Danial Sohail
 
MICRO ECONOMICS-CHAPTER-1
MICRO ECONOMICS-CHAPTER-1MICRO ECONOMICS-CHAPTER-1
MICRO ECONOMICS-CHAPTER-1Mahofuzur Masum
 
Manufacturing process of ceramic tiles
Manufacturing process of ceramic tilesManufacturing process of ceramic tiles
Manufacturing process of ceramic tilesVamsi Krishna
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentationjhanakshah
 
The Top Skills That Can Get You Hired in 2017
The Top Skills That Can Get You Hired in 2017The Top Skills That Can Get You Hired in 2017
The Top Skills That Can Get You Hired in 2017LinkedIn
 

Viewers also liked (18)

MRP,MRP-II,JIT
MRP,MRP-II,JITMRP,MRP-II,JIT
MRP,MRP-II,JIT
 
Master production schedule
Master production scheduleMaster production schedule
Master production schedule
 
Raw material of screen protectors
Raw material of screen protectorsRaw material of screen protectors
Raw material of screen protectors
 
Uma Plastics Limited, Kolkata, Plastic Chairs
Uma Plastics Limited, Kolkata, Plastic ChairsUma Plastics Limited, Kolkata, Plastic Chairs
Uma Plastics Limited, Kolkata, Plastic Chairs
 
Ball & gel pen manufacturing
Ball & gel pen manufacturingBall & gel pen manufacturing
Ball & gel pen manufacturing
 
How it is made Plastic Chair? Erdi Karaçal Mechanical Engineer
How it is made Plastic Chair? Erdi Karaçal Mechanical EngineerHow it is made Plastic Chair? Erdi Karaçal Mechanical Engineer
How it is made Plastic Chair? Erdi Karaçal Mechanical Engineer
 
Ball pens from ancient times to now
Ball pens from ancient times to nowBall pens from ancient times to now
Ball pens from ancient times to now
 
Manufacture of Paint, Varnishes
Manufacture of Paint, Varnishes Manufacture of Paint, Varnishes
Manufacture of Paint, Varnishes
 
Manufacturing process of tiles
Manufacturing process of  tilesManufacturing process of  tiles
Manufacturing process of tiles
 
Plastic Chairs & Tables by Uma Plastics Limited, Kolkata
Plastic Chairs & Tables by Uma Plastics Limited, KolkataPlastic Chairs & Tables by Uma Plastics Limited, Kolkata
Plastic Chairs & Tables by Uma Plastics Limited, Kolkata
 
Costing master budget
Costing master budgetCosting master budget
Costing master budget
 
Automated manufacturing process of ball-pen by injection molding.
Automated manufacturing process of ball-pen by injection molding.Automated manufacturing process of ball-pen by injection molding.
Automated manufacturing process of ball-pen by injection molding.
 
MICRO ECONOMICS-CHAPTER-1
MICRO ECONOMICS-CHAPTER-1MICRO ECONOMICS-CHAPTER-1
MICRO ECONOMICS-CHAPTER-1
 
Manufacturing process of ceramic tiles
Manufacturing process of ceramic tilesManufacturing process of ceramic tiles
Manufacturing process of ceramic tiles
 
Manufacturing processes
Manufacturing processesManufacturing processes
Manufacturing processes
 
Product costing
Product costingProduct costing
Product costing
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
The Top Skills That Can Get You Hired in 2017
The Top Skills That Can Get You Hired in 2017The Top Skills That Can Get You Hired in 2017
The Top Skills That Can Get You Hired in 2017
 

Similar to manufacturing resource planning

mohsin dalvi mrp ii presentation
mohsin dalvi   mrp ii presentationmohsin dalvi   mrp ii presentation
mohsin dalvi mrp ii presentationAkash Maurya
 
Presentation on MRP Work flow
Presentation on MRP Work flowPresentation on MRP Work flow
Presentation on MRP Work flowShehzada Sohail
 
Mrp systems & scheduling
Mrp systems & schedulingMrp systems & scheduling
Mrp systems & schedulingvarun0610
 
Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Akash Maurya
 
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBSession 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBDrDeeptiSharma12
 
Module 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxModule 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxShivakumar Malagihal
 
Material requirement planning (mrp)
Material requirement planning (mrp)Material requirement planning (mrp)
Material requirement planning (mrp)Somashekar S.M
 
Manufacturing resource planning and capacity resource planning ppt
Manufacturing resource planning and capacity resource planning pptManufacturing resource planning and capacity resource planning ppt
Manufacturing resource planning and capacity resource planning pptAlbin Mathew
 
SCM 304 Supply Chain Management Material Requirements .docx
SCM 304 Supply Chain Management Material Requirements .docxSCM 304 Supply Chain Management Material Requirements .docx
SCM 304 Supply Chain Management Material Requirements .docxbagotjesusa
 
Sap mrp materials requirements planning
Sap mrp   materials requirements planningSap mrp   materials requirements planning
Sap mrp materials requirements planningmadhu jetty
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)Mostafa Ewees
 
Material Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptxMaterial Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptxIrelynJasmin
 
Sap MRP materials requirements planning
Sap MRP materials requirements planningSap MRP materials requirements planning
Sap MRP materials requirements planningnagarajusap06
 

Similar to manufacturing resource planning (20)

mohsin dalvi mrp ii presentation
mohsin dalvi   mrp ii presentationmohsin dalvi   mrp ii presentation
mohsin dalvi mrp ii presentation
 
Erp chapter 3
Erp chapter 3Erp chapter 3
Erp chapter 3
 
Presentation on MRP Work flow
Presentation on MRP Work flowPresentation on MRP Work flow
Presentation on MRP Work flow
 
Mrp systems & scheduling
Mrp systems & schedulingMrp systems & scheduling
Mrp systems & scheduling
 
Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009
 
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBSession 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2
 
Module 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxModule 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptx
 
Material requirement planning (mrp)
Material requirement planning (mrp)Material requirement planning (mrp)
Material requirement planning (mrp)
 
Lect 6.ppt
Lect 6.pptLect 6.ppt
Lect 6.ppt
 
Manufacturing resource planning and capacity resource planning ppt
Manufacturing resource planning and capacity resource planning pptManufacturing resource planning and capacity resource planning ppt
Manufacturing resource planning and capacity resource planning ppt
 
MRP
MRPMRP
MRP
 
SCM 304 Supply Chain Management Material Requirements .docx
SCM 304 Supply Chain Management Material Requirements .docxSCM 304 Supply Chain Management Material Requirements .docx
SCM 304 Supply Chain Management Material Requirements .docx
 
Sap mrp materials requirements planning
Sap mrp   materials requirements planningSap mrp   materials requirements planning
Sap mrp materials requirements planning
 
Production Planning And Control
Production Planning And ControlProduction Planning And Control
Production Planning And Control
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)
 
MRP & ERP.pdf
MRP & ERP.pdfMRP & ERP.pdf
MRP & ERP.pdf
 
Material Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptxMaterial Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptx
 
Sap mrp
Sap mrpSap mrp
Sap mrp
 
Sap MRP materials requirements planning
Sap MRP materials requirements planningSap MRP materials requirements planning
Sap MRP materials requirements planning
 

More from Dinesh Nikam (20)

inspection of stores
inspection of storesinspection of stores
inspection of stores
 
dgsnd
dgsnddgsnd
dgsnd
 
logistics
logisticslogistics
logistics
 
material handling system
material handling systemmaterial handling system
material handling system
 
exim policy of india
exim policy of indiaexim policy of india
exim policy of india
 
import substitution
import substitutionimport substitution
import substitution
 
rate contract
rate contractrate contract
rate contract
 
dgs&d
dgs&ddgs&d
dgs&d
 
logistics by waterways
logistics by waterwayslogistics by waterways
logistics by waterways
 
rfid presentation
rfid presentationrfid presentation
rfid presentation
 
exsice duty
exsice dutyexsice duty
exsice duty
 
packaging
packagingpackaging
packaging
 
e commerce
e commercee commerce
e commerce
 
jit
jitjit
jit
 
air logistics
air logisticsair logistics
air logistics
 
DGS&D
DGS&DDGS&D
DGS&D
 
enterprise resource planning
enterprise resource planningenterprise resource planning
enterprise resource planning
 
warehouse
warehousewarehouse
warehouse
 
Advertising strategy case study
Advertising strategy case studyAdvertising strategy case study
Advertising strategy case study
 
Sales promotion
Sales promotionSales promotion
Sales promotion
 

manufacturing resource planning

  • 1. Manufacturing Resource Planning MRP-2 Presented by Abhijeet Karmakar MT14IND001 Industrial Engineering
  • 2. Historical perspective Manufacturing resource planning evolved from material requirement planning in the 1980s. It abbreviated as MRP-ΙΙ to distinguish from MRP. Oliver Wight and Walter Goddard developed manufacturing resource planning from MRP.
  • 4. Types of System 1. Dependent demand- are the component, parts, or sub assemblies of finish goods. 2. Independent demand-Finish goods EX- Bikes(2000) Tyres(4000) Lights(4000) Demand forecast
  • 6. Purpose of MRP • Control inventory levels • Assign operating priorities • Plant capacity to load the production system Purpose of MRP Inventori es Priority capacities Order- • Right part • Right quantity • Right Quality Order- • With due date • Keep due date valid Plan for- • Complete Load • Adequate Load • Future Load
  • 7. MRP-(material requirement planning) • Material requirement planning is a system used for planning the future requirement of the dependent demand items. • Black and decker was the first company who used MRP in 1964. • Material requirement planning typically determine “when to order” based on a average usage for a planned replenishment lead time + safety stock to protect the severer demand.
  • 8. Inputs in MRP The main objective of MRP system is to convert the MPS into the detailed for raw material and components. Following major inputs to the MRP- 1.Bill of Material 2. Master production schedule 3. Inventory Status
  • 9. Bill of material Bill of Material is a document which tell about an items product structure, showing the sequence in which components are assembled and their number. Bike Wheel(2) Tyre(1) Hub(1) Lights(2) Engine(1) Finish Product Sub Assembly components
  • 10. Master production schedule MPS provide information about- • What end product are to be produced • How many o each type of product is to be produced • When the product is likely to be dispatched. The MPS is an extension of the aggregate production plan. Example Month No of Cars Jan. 10000 Feb 12000 March 8000 April 5000 May 5000
  • 11. MPS structure Weeks Of Jan. 1 2 3 4 Total Santro 1200 2000 2500 700 6400 Accent 700 950 1300 250 3200 Sonata 100 50 200 50 400 Total 2000 3000 4000 1000 10000
  • 12. Inventory status • The inventory record file covers each item record separately indicating its inventory status on a period by period basis. • This file also keep information about supplier, lead time, lot size etc. Ex- X A(3) LT=1 Inventory=200 B(2) LT=2 800 items of X 800×2=1600
  • 13. Complete MRP structure- • MPS • Order release report
  • 14. PROBLEMS WITH MRP • The user has to specify how long it takes a factory to make a product from its components. • This system assume lead time is constant. • This system could not include resource planning in its system. • MPS is only depends on Forecast value or firm order.
  • 15. Why MRP-ΙΙ ? Component Manufacturer Equipment Manufacturer Consumer Goods Manufacturer Labor 110 70 40 Material 280 430 250 Overhead 200 210 100 Factory Cost 590 710 390 Operating Cost 250 150 400 Total 840 860 790 Profit 160 140 210 Total Sales 1000/- 1000/- 1000/-
  • 16. MRP-2 • A method for the effective planning of all resources of manufacturing- • Financial accounting incorporated • Sales • Operations Planning • Simulate capacity requirements of different possible Master Production Schedules. • MRP 2 is the incremental information integration business process strategy implemented using hardware and modular software application linked to central database that store business data and information.
  • 17. MRP2 is a closed cycle MRP…!!
  • 18.  Rough Cut capacity Planning • Quick check on a few key resources required to implement the MPS. • Rough cut capacity plans are “Finite capacity plan” because they have to operated within certain constrains. Capacity Planning • It provide more detailed information than Rough cut capacity planning. • It explode the manufacturing order through routine specified in the shop floor control system. • It provide information about what capacity is required in each work center.
  • 19. Features of MRP-2 • Fluctuation of forecast is taken into account by including simulation of MPS. • MRP2 is a total company management concept for using more human resources effectively. • The MRP2 is carried out by a synergistic combination of computer and human resources. • The integration extends from strategic to operational level and encompasses long term planning up to short term control.
  • 20. Problem: To schedule the resources for enabling uninterrupted production of 100 units of product P 9 weeks from now. MATL - A 1 UNIT MATL – P I UNIT MATL - C 3 UNITS MATL - B 2 UNITS Resource Requirement Matl A Matl B Matl C Lead time (Wks) 1 2 4 Raw Matl Cost (Rs) 2 5 5 Labor Reqd (Hrs) 10 10 2 Machine Reqd (Hrs) 2 2 1 Bill Of Materials A typical resource planning problem
  • 21. Week-7 Week-8 Week-9 Units Of “P” 100 Lead Time(0) Order Release date 100
  • 22. Week 5 6 7 8 A. Units (lead time 1 week) 100 Labor: 10 hours each 1,000 Machine: 2 hours each 200 Payable: Rs 2 each 200 B. Units (lead time 2 weeks, 2 each required) 200 Labor: 10 hours each 2,000 Machine: 2 hours each 400 Payable: Raw material at Rs 5 each 1,000 C. Units (lead time 4 weeks, 3 each required) 300 Labor: 2 hours each 600 Machine: 1 hour each 300 Payable: Raw material at Rs 10 each 3,000 22 Resource Estimation
  • 23. • Increased direct labor productivity • High accuracy of inventory and manufacturing capacity • Effective interaction between different functions due to common databases and improved information flow • Quicker implementation of engineering changes • Simulation capability to test what-if scenarios in a risk free environment • Company focus shifts from crisis management to process control 23 Benefits Of MRP-2
  • 24. • For Manufacturing Functions: • Better control of inventories • Improved scheduling • Productive relationships with suppliers • For Financial and Costing Functions : • Reduced working capital for inventory • Improved cash flow through quicker deliveries • Accurate inventory records • Timely and valid cost and profitability information • For Design / Engineering Functions : • Improved design control • Better quality and quality control 24 Benefits Of MRP-2
  • 25. • Capacity can be considered only after the MRP schedule has been prepared. • It may happen that insufficient time was allowed within the MRP schedule for the individual operations to be completed, thus leading to erroneous data. • All the planning, if done on the basis of misleading data, will slow down the production process. • If unexpected input changes occur, the planning process has to be recalculated from start. 25 Limitation of MRP-2
  • 26. Questionnaire? • What is the difference between MRP-1 and MRP-2? • Explain the inputs and outputs of MRP? • What are the various benefits and limitation of MRP-2 over MRP-1? • Which system is easy to implement MRP or MRP-2? • Differentiate between Independent and dependent system? • Define RCCP and capacity planning?
  • 27. References • Production management by Kanishka Bedi oxford university publisher. • http//www.slideshare.net/MRP2 • http//www.wikipedia.org/MRP2