This document summarizes a presentation on a residential building construction project. It provides an overview of the project, including the location, number of floors, timeline, and project manager. It also describes the company undertaking the project, M k mehta enterprise, and its past projects. Additionally, it outlines the various steps of construction including site clearance, surveying, excavation, foundation, concreting, beams and columns. Key materials and equipment used are also summarized such as cement, aggregates, bricks, water, admixtures, and concrete pumping equipment. Building bylaws regarding plinth area regulations are also briefly mentioned.
Residential Building Construction Project Overview
1. DR. AKHILESH DAS GUPTA INSTITUTE OF TECHNOLOGY & MANAGEMENT
A Practical training and industrial visit presentation
on
Residential building
Submitted to :- Submitted by:-
Mr. Ankur Tayal Suraj jha
(Industrial training incharge,CVE) (08415603416)
2. CONTENT
Introduction
Company overview
Types of building
Steps of constructions
Material used
Equipment used
Building by law
Conclusion
3. INTRODUCTION
Name of project : Multi storey resendential building
Company name : M k mehta enterprise
Location of site : GH-05A, tech zone IV, Gautam budh
,greater noida , uttar pradesh
No. of floors : 6 floors
Project start : December 2018
Project end : 2020 (estimated)
Project manager : Mr Piyush Koley
4. COMPANY OVERVIEW
The M K MEHTA govt. contractor & general order suppliers established
on August 2015.
The CEO of company is MR. Mk Mehta , and the major work by this
company are
1) The construction of Irrigation & flood control department
located at Basai darapur punjabi bagh near ESI metro
stations.
2) The construction of public park equipped with ground
water table enhance technique.
5. TYPES OF BUILDING
RESIDENTIAL BUILDING
EDUCATIONAL BUILDING
ISTITUTIONAL BUILDING
INDUSTRIAL BUILDING
* I have worked in residential building construction
project in summer training.
6. FORM WORK
Form work is a mould to support concrete for its shape
until it gets hardened.
Contains 30% of cost and 60% of total time.
CHARACTERSTICS OF A GOOD FORMWORK
Easy removal and smooth surface
Strength and rigidity
Economy
Less leakage
Light surface
7. TYPES OF FORM WORK
FLEX
FORMWORK
ALUFORM
FORMWORK
ALUMINIUM
FORMWORK
9. STEPS INVOLVED IN CONSTRUCTION
1) SITE CLEARANCE :
* Location of site
* local legally binding rules
2) SURVEYING AND LAYOUT:
* Total station
* Auto level
3) EXACAVATION
* Proper timbering while excavation
* Dewatering should be done earlier
10. 4) FOUNDATION :
SHALLOW FOUNDATION: - According to Terzagi
shallow foundation having ( Df / B) <= 2
e.g- * Raft foundation
* Isolated footing
* Combined footing
PILE FOUNDATION:- According to Terzagi shallow
foundation having ( Df / B) >= 2
e.g- * End bearing pile foundation
* Friction pile foundation
12. 5) CONCRETING:-
Equipments: * Concrete mixer
* Mounted concrete pump
* Concrete vibrators
Instructions: *There should proper compaction of concrete
* Should be proper cover of reinforcement.
*Proper curing of concrete
6) BEAMS AND COLUMNS:-
* There should be fixed rigid joint in framed structure.
* Reinforcement provided in (+ve) & (-ve) area both.
16. 3) BRICKS
Burnt clay bricks
Concrete bricks
Engineering bricks
Fly ash bricks
Sand lime bricks
4) WATER
Water should be free from salts and solid particles.
Water which is fit for human consumption (potable).
17. 5) ADMIXTURES:-
Types of admixtures: * Accelerators
* Retarders
*Water reducers / plasticizers
*Air entraining admixtures
6) FLY ASH :-
Main advantage are: * Free of cost.
* Its consumption reduces environment
pollution
* It has good bonding properties
19. BUILDING BY LAWS
For the construction of any building, certain restrictions are
laid down by municipal body , urban development authority
, and other government departments as Town planning trusts
to clear open space to be left around the building .
PLINTH AREA REGULATIONS
20. CONCLUSION
Durability of a building depends mainly on proper
constructions process and proper used of material .
As per my training I have conclude that , during my
training days I was familiar with the main elements of the
structure such as beam , columns, slab etc.