DDU-GKY Project Orientation
Program
1Mahesh kumar-B-ABLE
DDU-GKY
DDU-GKYY (Background)
Mahesh kumar-B-ABLE 2
1-It was launched on 25 September 2014 by Union Ministers Nitin Gadkari and Venkaiah
Naidu on the occasion of 98th birth anniversary of Pandit Deendayal Upadhyaya . The
Vision of DDU-GKY is to "Transform rural poor youth into an economically independent
and globally relevant workforce”
2-Government of India has set up a target to provide skill training to 50 Lakh of its youth
by 2022.
3-Ministry of Rural Development (MoRD) has initiated DDU-GKY as a skill training and
placement program for youth aged between 15 to 35 years living in rural areas. The
program emphasizes on sustainable employment through the prominence and incentives
given to post-placement tracking, retention and career progression.
DDU-GKY
OVERVIEW
3
1. Unique programme of MoRD
Objective is poverty alleviation and skill training of rural poor youth Focuses on
placement i.e. sustainable wage employment, Enables poor and socially
disadvantaged groups to access benefits
2. Nation wide coverage with special schemes
Himayat - J&K
Roshini - 27 Left Wing extremist affected districts
3. Funding
MoRD : 60%
States : 40%
Exceptions:
 North East – MoRD :90%; States : 10%
 J&K – MoRD : 100%
Covers support for training costs, boarding and lodging (residential programmes),
transportation costs, post‐placement support costs, Incentives to PIAs
DDU-GKY
PIA’s: Necessary Conditions & Eligibility Criteria for PIA
A’ CATEGORY PIA
Foreign Placements
for over 500 candidates
p.a.
‘B’ CATEGORY PIA
Foreign Placements
for between 220-499
candidates
Captive Employers for
between 200-499
candidates
Educational Institutes
of high repute
Completed 1 DDU-
GKY project
Training Institutes
with an annual
turnover of Rs. 15
Crores and more
•NSDC Partner
‘C’ CATEGORY PIA
•All entities that do not
qualify as either ‘A’ or
‘B’
NECESSARY
CONDITIONS
a)Legal Entity more
than 3 years old
b)Positive Net Worth
for at least 2 out of last
3 years
c)Turnover in excess of
at least 25% of the
proposed project
EXCEPTIONS
NSDC Partners
exempted from a) and
b) above
Mahesh kumar-B-ABLE 4
DDU-GKY
SALIENT FETAURES
5
Target Group
Training Cost &
Duration
Standards
Assessment &
Certification
Implementation
Post Placement
Support
Specific
Outcomes
DDU-GKY
Targets rural youth from rural poor families - Age group of 15 to 35
(45 for vulnerable groups
• Training is free of cost
• Could be of any duration
• PC/Tablets to all students
• Standards led programme delivery
• All inspections are supported by geo‐tagged,
• time stamped videos/photographs
• Independent 3rd party assessment
and certification by assessment bodies
empanelled by the SSCs.
• Implementation through training providers
• Focus on captive, global and reputed educational
partners
• Minimum duration of Project 3 years
• Incentives for Candidates
Migration Support centres
• Incentives to PIAs
• Guaranteed Placement for at
least 70% trained candidates
• Specifies minimum wage
outcomes ranging from 6000
to 15000
DDU-GKY
IMPLEMENTATION MODEL
6
MoRD
CTSAs
PIA PIA
SRLMs
PIA
DDU‐GKY follows a 3‐tier implementation model
Functions as the policy‐making &
technical support body at national level
State Missions provide
implementation support for AP
States
Implement the programme through skilling and placement projects.
Provide
implementation
support for YP Sates
DDU-GKY
OVERVIEW - Purpose
7
Unemployed youth
DDU GKY
Skilled Manpower shortage
DDU-GKY
Project Appraisal and Sanction process in DDU-GKY
•PRN Registration
• Project Application Submission
•Initial Screening
•Qualitative Appraisal
• PAC
Mahesh kumar-B-ABLE 8
DDU-GKY
Special components of DDU-GKY
DDU-GKY Roshni Himayat
Applicable for all
states except J&K
and LWE Areas
 Roshni a special initiative for most
critical left-wing extremist affected areas
mandatory residential course with
40% coverage to women candidates.
 Roshni project introduce towards
addressing the infrastructure, education
and health deficiencies in these areas,
and leveraging the availability of natural
resources and traditional skills and
knowledge.
A special scheme for
Jammu and Kashmir
 MoRD operates a special
scheme which covers:
1-Urban as well as rural
youth
2- Below Poverty Line(BPL)
as well as Above Poverty
Line(APL) persons
3-Wage employment in the
formal sector as well as self-
employment.
Mahesh kumar-B-ABLE 9
DDU-GKY
PPWS
In case the project duration is 3 years or less but
more than 2 years,
 At least 30% of training should commence within
12 months
At least 65% training should commence within 24
months
 100% of training should completed in project
duration.
Mahesh kumar-B-ABLE 10
DDU-GKY
OVERVIEW – Key Stakeholders
Mahesh kumar-B-ABLE 11
DDU-GKY
GP’s/District
team
MoRD
CTSA
SRLM
Industry/Cor
porates
PIA
DDU-GKY
Key Component of DDU-GKY Project
Centre setup and DDR submission
Mobilization –Candidate eligibility
Training & Certification
Placement & Tracking
SF,s and documentation
21 July 2020 12
DDU-GKY
S.N Aspects Explanation
1 Eligibility (Section 3.1.1,Ch-
3)
Rural Youth: 18-35 Yrs
SC/ST/Women/TG/PWD: upto 45 Yrs
Identification through: BPL/MNREGA/RSBY/AAY PDS Cards/SHG/PIP
2 Focus on
SC/ST/Women/Minorities/S
pecialGroups (Sec 3.1.2 &
3.1.3,Ch-3)
SC/ST: 50%
Minorities: 15%
Women: 1/3rd of all beneficiaries
PWD: 3-5% of all beneficiaries
State Provisions for special groups like victims of trafficking , manual
scavengers ,transgender ,bonded labours etc.
3 Activities by SRLM(Sec
3.2.1-3.2.1.6,Ch-3)
Skill Gap Assessment: data to be taken from SECC,NSDC,GP wise
demands etc.
Job Melas : Organized by SRLM’s & PIA’s
IEC: Budget of 1.5% of project cost paid to PIA available from MoRD
Migration Support Centres : help with movement of candidates to place
of work outside own state
Mahesh Kumar-b-able 7
Key aspects of DDU-GKY Project
DDU-GKY
S.N Aspects Explanation
4 Activities by PIA (Sec
3.2.2.1-3.2.2.3,Ch-3)
Mobilisation: SRLM can suggest ,PIA can suggest or Hybrid
approach(GP/PIP)
Counselling : To prospective trainees on the nature of work in the
sector/trade, availability of jobs, deliverables by the employer,
entitlements, growth prospects and risks involved
Selection : on the basis of aptitude tests (psychometric and others)
and counselling (by trained counsellors)
Training: Infrastructure-
Furniture, layout, colour scheme & signage-establishing the DDU-GKY
brand
Lab, classroom and IT facilities-Training aids
Geo-tagged time-stamped aadhar authenticated biometric attendance
Fire fighting equipment
First aid, hygiene, drinking water, canteen & washroom facilities
Internet and email access ,Access control facilities
Power back up, Projector and copying equipment
High speed access to the workflow driven, internet enabled ERP of the
PIA (and SRLM and MoRD when ready) CCTV recording facilities
Mahesh Kumar-B-ABLE 14
DDU-GKY
Mahesh Kumar-B-ABLE 15
S.N Aspects Explanation
Activities by
PIA(Contd.)
Other Aspects in Infrastructure-
Each training centre(TC) should have separate space for each domain
Training infrastructure may be owned, hired or part of a franchise agreement
Each TC should remain in existence for at least three months from the date of completion
of training or until 70% of those trained have been placed (whichever is later).
Mobile canters are not permitted
Non-residential TCs should be located near the homes of trainees
Residential should be approved or certified by SRLM/CTSA
MoRD to setup cost committee to look into trade wise cost for skilling which require high
cost
Trainers:
Should possess the knowledge, skills and attitude needed to be a good trainer in his/her
domain
Tested and verified by the Q team of the PIA and verified by the SRLM or its TSA CCTV
recording to be used for attitude assessment
Content:
Certified by National Council for Vocational Training (NCVT) or Sector Skills Council (SSC) or
any other agency notified for the purpose by MoRD
DDU-GKY
Mahesh Kumar-B-ABLE
16
S.N Aspects Explanation
Activities by
PIA(Contd.)
Training Methods:
Training is delivered in an innovative and trainee friendly manner with
adequate audio visual tools and participatory methods
Finishing and work readiness Module: centres should be staffed
by specially trained high quality trainers who are adept at providing inputs that ensure high
success rates at placement interviews and post
placement retention. These centres should:
Run short residential courses typically 7-10 days long. During this training alumni should
meet and inspire the current batch
Have a dedicated team that helps candidates find accommodation, get access to health care
etc.
Finding alternate jobs
Provide counselling and advice on personal issues
Note: one-time travel cost to the training centres will be allowed based on actual with a
maximum limit of Rs4500/-per trainee
Assessment & Certification:
Continuous Assessment-in the form of announced and unannounced quizzes, assignments and
other types of tests. The questions asked, answers given and marks obtained by each trainee
should available in the password protected area of the PIAs web site
DDU-GKY
Mahesh Kumar-B-ABLE
17
S.N Aspects Explanation
Activities by
PIA(Contd.)
These marks will be verified during bimonthly inspections of each training
centre by the SRLM or its TSA as well as by NIRD/NABARD Consultancy
(NABCONS)
Third party certification- Independent certification and assessment by third
party agencies (empanelled by SSC/ notified by MoRD) of both curriculum and
the skill, knowledge and attitude level of each trainee as acceptable to the
industry or employer is mandatory.
Own certification- Own certification in cases of established brands can be used
if approved by MoRD in advance.
PLACEMENT: a minimum placement of 70% of trained candidates is a non-
negotiable in DDU-GKY
Captive placement-PIAs can train and absorb the trained persons in their own
organisations. They should submit own manpower requirement based on a
realistic estimate of current needs. Captive placement for a second batch of
trainees will not be allowed, if more than 50 % of DDU-GKY youth placed with
the same organisation has left within a span of six months.
DDU-GKY
Mahesh Kumar-B-ABLE
18
S.N Aspects Explanation
Activities by
PIA(Contd.)
Placement providing jobs having regular monthly wages at or above the
minimum wages: salary slip from the HRD/certificate issued by the employer
indicating wages paid and counter signed by the employee along with the
bank statement indicating that wages have been paid by crossed demand
draft or money transfer will demonstrate proof of regular wage employment
Placement in government organisations/with government contractors involved
in public service delivery-Placement in public service delivery programs such as
NRHM, MGNREGS etc. & institutions such as PRI, etc. are allowed provided it is
continuous & full time and minimum wages is provided and proof of
employment is available
Placement foreign countries: Jobs which can provide a minimum salary of Rs.
25,000 are permitted. Trainings that have the potential to provide salaries in
the above range will only be approved.
*Cost Norms of PIAs: Attached in the next slide
DDU-GKY
National Policy on Skill Development & Entrepreneurship-2020
Vision
To create an ecosystem of empowerment by
Skilling on a large Scale at Speed with high
Standards and to promote a culture of
innovation
Mission
Create a demand for skilling across
country
Correct & align skilling with
competencies
Connect supply of skilled human
Resources With sectoral demands
Certify and assess in alignment with
global and national standards
Objectives
Make quality vocational training for both youth and employers
Ensure both vertical and horizontal pathways to skilled workforce
Increased employability and better livelihoods for individuals
Increase the capacity and quality of training infrastructure & trainers
Aligning supply of skilled workers with sectoral requirements / Use of IT
Promote national standards in skilling through active involvement of employers
Ensure skilling needs of socially & geographically disadvantaged are met
Leverage modern technology to ensure scale ,access and outreach
Recognize the value of on-the-job training
DDU-GKY
Challenges Ahead
Mahesh kumar-B-ABLE 20
Poor recognition of “skill ” in skilled/semi skilled sector
Lack of job oriented training/skill development programs
Skill development programs of the Central Government over
the years have been spread across more than 20
Ministries/Departments without any robust coordination and
monitoring mechanism to ensure convergence
Ensuring participation of women & vulnerable :Chance to
include them into productive work force
Matching the requirements of market according to needs
Rural Migration
DDU-GKY
Mahesh kumae-B-ABLE 21
Policy
Framework
Capacity
Quality
Synergy
Aspiration
and
AdvocacyInclusivity
Trainers
and
Assesor
s
Outreac
h Promotio
n of
skilling
among
women
ICT
Enable
met
DDU-GKY
21 July 2020 22
Role of Industry/ Corporate
Sector Skill Councils
Industry led & industry governed bodies to link industry with manpower
Preparing a catalogue of types of skills
Development of a sector skill development plan and maintain skill inventory
Standardization of affiliation , accreditation, examination and certification process
in accordance with NSQF
Plan and facilitate the execution of Training of Trainers along with NSDC and States
Promotion of academies of excellence
Will lay special emphasis on the skilling needs of ST/ SC, differently abled and
minority ,woman populations
Employment at decent wages
DDU-GKY
National Unit (NU) MoRD &
NIRD
• Policy making
• Technical Support
• Facilitation
• Monitoring and
Implementation
support where needed
• Ensure compliance to
Standards
• Invest Central
Government
component in projects
SRLM/
State Skills Missions (SSMs)
• Ensure compliance
with Standards
• Monitoring and
Implementation
Support
• Invest State
Government
components in
projects
Project Implementing
Agencies (PIAs)
• Plan, implement skilling courses
and placements in accordance
with Guidelines and SOPs
• Skill Gap Analysis to understand
market demand as well as
aspiration of rural youth
• Mobilize, Train and Certify
through a Third-party Assessor,
where the curricula is in
accordance with SSCs
• Ensure 70% placements and
support for 1 year post
placement
• Establish quality management
• Set-up website and provide up-
to-date MIS
Mahesh kumar-B-ABLE 23
Three-tier Implementation and
delivery process
DDU-GKY
Centre setup and DDR submission
 Main points about Due Diligence
What is due diligence ?
Facilitates verification of availability of minimum infrastructure before a
training centre is opened
Main areas of due- diligence ?
Physical infrastructure • Conformance of centre to standards • Equipment:
common equipment and domain specific equipment, IT equipment • TLM
and availability of ToT certified trainers
When does it happen ?
• It happens before a training centre becomes operational • When capacity
of a TC is proposed to be increased • When new trade/domain is added •
When Training centre shifted to other location
Mahesh kumar-B-ABLE 24
DDU-GKY
SF 5.1 D1: Due diligence of a training centre (excluding residential facilities)
DDR form is divided into 8 sections. Into the following sections:
Section 1: Basic Information
Section 2: Physical Infrastructure
2.1. Basic Information
2.2. Conformance to the Standards
Section 3: Physical Infrastructure and Equipment for Non Academic and Academic
Area
Section 4: Common Equipment
Section 5: Teaching Learning Materials
5.1.Information available at the training Centre
5.2.Details of the Course Content, Trainers Kit and Assessment Material
5.3.Avaliability of Trainers
21 July 2020 25
DDU-GKY
SF 5.1 D1: Due diligence of a training centre (excluding residential facilities)
Section 6: Others
Section 7: Standard Forms and Registers available at the centre
Section 8: Annexure:
I: Specifications for Toilets
II: Specification for Biometric based attendance system for DDU-GKY
III: Description about the Standard, Instructions and Maintenance
IV: Proforma of Self Declaration Statement
21 July 2020 26
DDU-GKY
Section 1: Basic Information
S.NO Particulars Details
1 Name of PIA XYZ
2 Name of Project DDU-GKY/Roshani / Himayat
3 SRLM sanction letter No. and
date
XYZ
4 Name of training centre PIA Name , city
Address-
5 Training centre photographs All academic /Lab / Lobby / office /Reception/ facilites
etc
6 Training centre Address SDC Complete address with Latitude and Longitude
7 Training centre in charge Name: :Employee id
Profile:
Address:
Email id : Mobile
Mahesh kumar-B-ABLE 27
DDU-GKY
Section 2: Physical Infrastructure, 2.1 Basic Information
Sl. No. Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
1 Ownership of the
building (Own(O),
Rent(R), Govt.(G)
Standard:
A self-declaration statement
from the PIA that the PIA has
necessary permissions and
authority to occupy the
premises to open the training
Centre ,Relaxation: Nil
Rent deed /agreement copy
2 Area of the building (Sq.
Ft.) (Including corridors
but excluding spaces
open to sky such as
court yards etc.)
Standard:
No specific standards
Instruction: Schematic of the building plan with
clear marking of dimensions of the training centre
To be noted: Separate measurements should be
taken for individual areas for Office Room, Class
Rooms, Domain Labs, IT Lab, etc.,
Proof: Scanned copy of the schematic plan from
PIA on with seal and signature
Mahesh kumar-B-ABLE 28
DDU-GKY
Section 2: Physical Infrastructure, 2.1 Basic Information
Mahesh kumar-B-ABLE 29
Sl. No. Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
3 Is the roof RCC/ Non
RCC
Standard:
No specific standards
Proof: Photographs of Building, Ceiling
and Roof of the training Centre
4 If it is non RCC,
Whether it is structurally
sound on visual
inspection
Standard:
No specific standards
Proof: Photographs of Building, Ceiling
and Roof of the training Centre
5 Plastering and painting
of internal and external
walls and ceiling
Standard:
The training centre should be
plastered and painted or
white washed. Preferably the
colour scheme of DDU-GKY
should be used.
Relaxation: 100%
Instruction: To be used for the grading
purpose.
DDU-GKY
Section 2: Physical Infrastructure, 2.1 Basic Information
Mahesh kumar-B-ABLE 30
Sl. No. Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
6 Class rooms (in
number)
Total Number of class rooms for
imparting Training Program as per
Schematic plan
7 Domain labs (in
number)
Total Number of Domain Lab Rooms for
imparting Training Program as per
Schematic plan (If Domain lab is
combined with Class Room then it is
counted as a Class Room )
8 IT labs (in number) Total Number of IT Labs for imparting
Training Program as per Schematic plan
DDU-GKY
Section 2: Physical Infrastructure, 2.1 Basic Information
Mahesh kumar-B-ABLE 31
Sl. No. Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
9 Reception Area Standard:
No specific standards
If reception area is available then
mention as 1 else 0 as per
Schematic plan
10 Office room Standard:
No specific standards
If office room is available then
mention as 1 else 0 as per
Schematic plan
11 Counselling Area Standard:
No specific standards
If Counselling area is available
indicate it as 1 else 0 as per
Schematic plan
DDU-GKY
Section 2: Physical Infrastructure, 2.2 Conformance of centre to
standards.
Mahesh kumar-B-ABLE 32
Sl.
No.
Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
1 Visible signs of
leakages from walls and
roof - applicable for both
RCC and Non RCC
structures
Standard: There should not be any visible
marks of leakages from walls and ceiling.
Proof:
At least one photograph for
each academic room
(One File)
2 Protection of stairs,
balconies, and other
locations
Standard: All areas should be protected with
railings or walls (Even if one place is not
protected the centre should not be
commissioned). Railing or wall height: 3 feet or
above Relaxation:16.7% relaxation (6 inches)
Proof:
A photograph of the railings
and stairs
3 Conformance to DDUGKY
look and feel
standards as per sub
section 5.1.1
The training centre should
conform to DDU-GKY look
and feel standards as section
5.1.1 of SOP
Instruction: To be used for the
grading purpose.
DDU-GKY
Section 2: Physical Infrastructure, 2.2 Conformance of centre to
standards.
Mahesh kumar -B-ABLE 33
Sl. No. Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
4 Ventilation (in sq.
ft.)
Standard:
12% of the Total Area
Relaxation:
A relaxation of 2% is permitted.
Proof:
photograph for
each academic/Lab room
5 Corridor Standard:
No entry to or exit from an academic
area should be through another
academic area.
Proof: Scanned copy of the
Schematic floor plan with
clear marking of Entry and
Exit to all academic areas
DDU-GKY
Section 2: Physical Infrastructure, 2.2 Conformance of centre to standards.
6- specifications for Toilets-
Number of toilets and washbasins for
female candidates
Number
of toilets
Number of
washbasins
Urinal
1-10
11-50
51-80
81-125
126-175
For every addition of 40 candidates or less,
1
2
3
4
5
one toilet
1
2
3
4
5
and one wash
0
0
0
0
0
wash basin should be added.
1-20
21-50
51-75
76-125
126-150
For every addition of 50 candidates or less,
1
2
2
3
3
one toilet
1
1
2
2
3
and one wash
1
1
2
2
2
basin , one urinal should be added.
Mahesh kumar-B-ABLE 34
DDU-GKY
Section 2: Physical Infrastructure, 2.2 Conformance of centre to standards.
Mahesh kumar-B-ABLE 35
Sl. No.
Sl.
No.
Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
7 Type of Flooring (write
whether it is tiled,
cemented etc.)
Standard: Flooring should be provided with
cement/tiles/polished stones
Relaxation : Neatly made mud flooring as a part
of aesthetic building design can be permitted.
Proof:
Photograph of the Flooring
8 Over Head Tank Standard: There should be an Over Head Tank
(OHT) for a training centre. The water
connection in the taps and toilets should
connect to the OHT.
Instruction: Water should be
available during the working hours
of the training centre. The water
source must be thoroughly
disinfected once every 30 days.
Proof: Photograph of OHT
9 Distance from the
training centre in Kms. to
various transport
locations:
Standard:
No specific standards.
Instruction : It is advisable to be
well connected to different
transport locations.
DDU-GKY
Section 2: Physical Infrastructure, 2.2 Conformance of centre to standards.
Mahesh kumar-B-ABLE 36
Sl.
No.
Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
10 Open space for people
to gather and interact
( in sq.ft )
Standard:100 sq. ft. recommended , but
not mandatory centres with open spaces
will get better rating
Relaxation: Nil
Proof: A photograph of open
space
11 Parking space (
number
in terms of bicycle
parking slots)
Standard: No minimum is prescribed
However, 5 bicycle parking slots for
every100 nonresidential trainees is
recommended
Relaxation: Nil
staff parking. Proof:
A photograph of parking space
12 Securing of wires Standard: All the wires should be properly
secured and taped.
Relaxation :Nil
Proof:A photograph of wiring at
the
training centre on sample basis
DDU-GKY
Section 2: Physical Infrastructure, 2.2 Conformance of centre to standards.
21 July 2020 37
Sl.
No
.
Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
13 Switch boards and
panel boards
Standard:
Fully covered.
Relaxation: Nil
Proof: A photographs of switch
board and panel boards on sample
basis
14 Training centre name
board
Instruction:
Conform with SF-5.1A2
Relaxation : Nil
Instruction: For Sizes and Fixtures
please
refer to s.no 3 of the
Annexure – III
15 Activity summary and
achievement board
Standard:
Conform with SF-5.1B1 Relaxation :
Nil
Proof: A photograph after installing
the pin board with the minimum
dimensions of 4 feet X 3 Feet with
proper fixtures
DDU-GKY
Section 3: Physical Infrastructure and Equipment : 3.1 Non Academic
and Equipment related to Office
Mahesh kumar-B-ABKE 38
Sl.
No.
Particulars Standards and Relaxations (Relaxation
permitted with permission of competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
1 Office room Area (in
Sq.ft)
Standard: No minimum area is prescribed;
however, the equipment specified for the
office room should fit into the office room.
Relaxation Nil
Proof: A Photograph of office room
after arranging all the
equipments as per sop
2 Counselling area Area (in
Sq.ft)
Reception area has to be located in the
prominent place preferably at the entrance
of the training centre.
Proof:
A Photograph of reception
area
3 Office Chairs Equipment 1- Office/guest chairs-6
2-Office almirah -1
3-office table-1
4-Office computer-1
5-Printer cum scanner-1
6-Digital camera-1
7-Electrical Power Back up for office room
Proof:
A Photograph of Items
DDU-GKY
Section 3: Physical Infrastructure and Equipment : 3.2 Is the following equipment
available in the IT lab?
Mahesh kumar-B-ABLE 39
Sl.
No.
Particulars Standards and Relaxations (Relaxation permitted with permission of
competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
1 IT Lab 1-Type of roof (RCC/ Non RCC)
2-If false ceiling Height of Ceiling - 8ft
3-Internal Signage -A flex/ Vinyl banner with (3X3) Sq. ft.
4-CCTV cameras with audio facility
5-LAN enabled computers
6-Internet connections-2 ( 1mbps/512 kbps)
7-all computers should have typing tutor
8-Tablets - 1:1 (The number of tablets must be as per approve
centre capacity )
9-Stools/ chairs (in number)-1:1
10-Trainer Table -1
11-Lights- 1 fluorescent light (2400 Lumens) for each 150 sq.ft.
or part thereof per room.
12-Fans -1 ceiling fan for each 150sq.ft.or part thereof per room.
13-Electrical Power backup for lab
Proof: A Screenshot
which shows the
internet speed in the IT
Lab of the proposed
training
centre.
Photographs of IT Lab
DDU-GKY
Section 3: Physical Infrastructure and Equipment : Academic and
Equipment related to class room/ Domain lab
Mahesh kumar-B-ABLE 40
Sl.
No.
Particulars Standards and Relaxations (Relaxation permitted with permission of
competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
1 Academic
Area
Class/Lab
1-Theory class room combined with domain lab
2- Area per student in all academic rooms is 10 sq. ft.
3-Combining of theory and practical class room is permissible and
area per student is 15 sq. ft.
4-Ventilation area (in sq. ft.)-12% area of the class room Relaxation:
2 % relaxation
5-Sound level (in dBA)-75 decibels (A) or less Relaxation
:6.7%relaxation
6-LCD/ Digital Projector-1 projector for two class rooms.
7-Chair for candidates -One chair for one candidate
8- Trainer’s Table- 1 (2 feet by 3 feet.)
9-Writing board- 1 (5 feet X 3 feet)
10-List of Domain related equipment-As per SSC
11-Lights & Fan - 1 for each 150 sq.ft.
Proof:
Photographs of academic
area
DDU-GKY
Section 4: Common Equipment
Mahesh kumar-B-ABLE 41
Sl.
No.
Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
1 Electrical Power Back
up:
1-Gensets / UPS or Inverter/ Solar
power backup
Proof: A Photograph
2 Installation of Biometric
devices
Installation of Biometric devices- One
Device for every 200 candidate
Proof: A Photograph
3 Installation of CCTV
Monitor
Standard: As per SF 5.2B Proof: After commissioned in all
areas a screen shot of CCTV
Monitor
4 Grievance register One each for centre / Hostel Proof: Photograph of Grievance
register
5 Minimum equipment As per SF 5.1P Proof: A Photograph
6 Direction Boards As per the Notification 31 Proof:A photograph after installing
DDU-GKY
Section 5: Teaching Learning Materials (TLM) 5.1.Information available
at the training Centre
21 July 2020 42
Sl.
No
.
Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
1 Training plan (SF- 4.1A) Should be as per SF 4.1A Proof: A Photograph
2 Activity cum lesson
planner
Should be as per SF 4.5A Proof: A Photograph
3 Welcome Kit (SF-5.1A) Should be as per SF 5.1C2 Proof:A Photograph of all the items
that are placed in the welcome kit
DDU-GKY
Section 5 : Teaching Learning Materials (TLM) 5.2 Details of course
content , trainers kit and assessment material
21 July 2020 43
Sl.
No.
Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
1 IT Course Content 1-IT Trainers Kit
2-IT Assessment material
3-IT Course Material for candidate
Proof: A Photograph (Note:
Swachh Bharat Abhiyan Logo to be
stamped on all course material)
2 Soft Skills Course
Content
1-Soft Skills Trainers Kit
2-Soft Skills Assessment material
3-Soft Skills Course Material for candidate
Proof: A Photograph
3 English Course
Content
1-English Trainers Kit
2-English Assessment material
3-English Course Material for candidate
Proof: A Photograph
4 Domain Course
Content
1-Domain Course Trainers Kit
2-Domain Assessment material
3-Domain Course Material for candidate
Proof: A Photograph (Teaching
Learning Material (TLM) should be
aligned with NCVT/SSC)
DDU-GKY
Section 5 :Teaching Learning Materials (TLM) 5.3 Availability
of trainers
Mahesh kumar-B-ABLE 44
Sl. No.
Sl.
N
o.
Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about
Proof
1 Centre in charge Centre in charge can teach a maximum
of 4 hours per day
Proof: Joining report
2 IT , Soft skills ,
English
Soft skills, IT and English may have the
same trainer
Proof: Joining report
3 Domain Trainers
– 1,2,3,4
Domain Trainer should have required
eligibility qualification as per QP/Job role
Proof: Joining report
DDU-GKY
Section 6 : Others ,6.1 infrastructure available at training
centre
Mahesh kumar-B-ABLE 45
Sl.
No
.
Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about
Proof
1 Safe drinking
water
1. RO/ Ozonised treated
2. Packaged drinking water certified by
ISI or BIS
Proof: A photograph
2 First aid kit As per 5.1C3 Proof: A photograph
3 Firefighting
equipment
A Training centre should have at least 2
fire extinguishers
Proof: A photograph
DDU-GKY
SF 5.1D2: Due diligence for residential facilities
SF 5.1D2 divided into 4 sections.
Section 1: Basic Information
Section 2: Physical Infrastructure
2.1. Basic Information
2.2. Conformance to the Standards
Section 3: Details of the Residential Facilities
3.1.Residential Areas
3.2.Assessement of Maximum Number of Candidates permissible
3.3. Non Residential areas of the hostel: Kitchen, Dining and Recreation areas.
3.4. Facilities available at the centre.
Section 4: Others
Mahesh kumar-B-ABLE 46
DDU-GKY
Section 1: Basic Information
Mahesh kumar-B-ABLE 47
S.NO Particulars Details
1 Name of PIA XYZ
2 Name of Project DDU-GKY/Roshani / Himayat
3 SRLM sanction letter No. and date XYZ
4 Name of training centre PIA Name , city Address-
5 Training centre photographs All academic /Lab / Lobby / office
/Reception/ facilities etc
6 Training centre Address SDC Complete address with Latitude and
Longitude
7 Warden (for female hostel, if available)
Warden (for male hostel, if available)
Name: :Employee id
Profile:
Address:
Email id : Mobile
DDU-GKY
Section 2: Physical Infrastructure
Mahesh kumar-B-ABLE 48
Sl. No.
Sl. No. Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
1 Ownership of the
building (Own(O),
Rent(R), Govt.(G)
Standard:
A self-declaration statement
from the PIA that the PIA has
necessary permissions and
authority to occupy the
premises to open the training
Centre ,Relaxation: Nil
Rent deed /agreement copy
2 Area of the building (Sq.
Ft.) (Including corridors
but excluding spaces
open to sky such as
court yards etc.)
Standard:
No specific standards
Instruction: Schematic of the building plan with
clear marking of dimensions of the Hostel building
To be noted: Separate measurements should be
taken for individual areas for living rooms, kitchen
area, dining hall, recreation rea, etc.,
DDU-GKY
Section 2: Physical Infrastructure
Mahesh kumar-B-ABLE 49
Sl. No.
Sl. No. Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
3 Is the roof RCC/ Non
RCC
Standard:
No specific standards
Proof: Photographs of Building, Ceiling
and Roof of the hostel building
4 If it is non RCC,
Whether it is structurally
sound on visual
inspection
Standard:
No specific standards
Proof: Photographs of Building, Ceiling
and Roof of the hostel building
5 Plastering and painting
of internal and external
walls and ceiling
Standard:
The training centre should be
plastered and painted or
white washed. Preferably the
colour scheme of DDU-GKY
should be used.
Relaxation: 100%
Instruction: To be used for the grading
purpose.
DDU-GKY
Section 2: Physical Infrastructure , 2.2 Conformance of
centre to standards.
Mahesh kumar-B-ABLE 50
Sl.
No.
Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
1 Visible signs of
leakages from walls and
roof - applicable for both
RCC and Non RCC
structures
Standard: There should not be any visible
marks of leakages from walls and ceiling.
Proof:
At least one photograph for
each living room
(One File)
2 Protection of stairs,
balconies, and other
locations
Standard: All areas should be protected with
railings or walls (Even if one place is not
protected the centre should not be
commissioned). Railing or wall height: 3 feet or
above Relaxation:16.7% relaxation (6 inches)
Proof:
A photograph of the railings
and stairs
3 Conformance to DDUGKY
look and feel standards
as per sub section 5.1.1
The training centre (Hostel) should
conform to DDU-GKY look
and feel standards as section 5.1.1 of SOP
Instruction: To be used for the
grading purpose.
DDU-GKY
Section 2: Physical Infrastructure , 2.2 Conformance of
centre to standards.
Mahesh kumar-B-ABLE 51
Sl. No. Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
4 Ventilation (in sq.
ft.)
Standard:
12% of the Total Area
Relaxation:
A relaxation of 2% is permitted.
Proof:
photograph for
each academic/Lab room
5 Corridor Standard:
No entry to or exit from an academic
area should be through another
academic area.
Proof: Scanned copy of the
Schematic floor plan with
clear marking of Entry and
Exit to all academic areas
DDU-GKY
Section 2: Physical Infrastructure , 2.2 Conformance of centre to
standards.
Mahesh kumar-B-ABLE 52
6- specifications for Toilets-
Number of toilets and washbasins
for male female candidates
Number
of
toilets
Number of
washbasins
Urinal
1-10 (ratio of 1:10)
11-19
20-100
101-140
*If the bath and the toilet are combined,
then
1
2
10
14
the ratio
(washbasins
for males
should be in
1:15 ratio.)
should be
(Urinals for males should be in 1:20
ratio.)
1: 12
DDU-GKY
Section 2: Physical Infrastructure , 2.2 Conformance of centre to
standards.
Mahesh kumar-B-ABLE 53
Sl.
No.
Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
7 Type of Flooring (write
whether it is tiled,
cemented etc.)
Standard: Flooring should be provided with
cement/tiles/polished stones
Relaxation : Neatly made mud flooring as a part
of aesthetic building design can be permitted.
Proof:
Photograph of the Flooring
8 Over Head Tank Standard: There should be an Over Head Tank
(OHT) for a training centre. The water
connection in the taps and toilets should
connect to the OHT.
Instruction: Water should be
available during the working hours
of the training centre. The water
source must be thoroughly
disinfected once every 30 days.
Proof: Photograph of OHT
9 Distance from the
training centre to
Residential centre
Standard:
Should not exceed 1.5 km
Instruction : It is advisable to be
well connected to different
transport locations.
DDU-GKY
Section 2: Physical Infrastructure , 2.2 Conformance of centre to
standards.
Mahesh kumar-B-ABLE 54
Sl.
No.
Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
10 Pick up and drop
facilities
Standard: If the training centre is
more than 1.5 km, then the
availability of pick up and drop
facilities
Proof: A scanned of the
letter from the travel agent
for the vehicle
11 Securing of wires Standard: All the wires should be
properly secured and taped.
Relaxation :Nil
Proof:A photograph of
wiring at the training centre
on sample basis
12 Switch boards and
panel boards
Standard: Fully covered.
Relaxation: Nil
Proof: A photographs of
switch board and panel
boards on sample basis
DDU-GKY
Section 2: Physical Infrastructure , 2.2 Conformance of centre to
standards.
Mahesh kumar-B-ABLE 55
Sl.
No
.
Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
13 Hostel Name Board Conform with SF-5.1A2
Size-4x3 sf
Proof: A photographs
14 Student entitlement
board and
responsibilities board
Standard: Should conform with
standard form SF-5.1C1
Proof: A photographs
15 Food specification
board
Standard: Conform with standard
form SF-5.1B8
Proof: A photographs
16 Open space for
physical activities and
outdoor games
Standard: Minimum of 1000 square
yards for the doing physical activity
and
outdoor games is recommended.
Instruction: The place can be
owned/hired/lease or arrangements
can be made with public authorities
for using parks and other openspaces
DDU-GKY
Section 3: Details of residential facilities
Mahesh kumar-B-ABLE 56
Sl.
No.
Particul
ars
Standards and Relaxations (Relaxation permitted with permission of competent
authority of CTSA/SRLM)
Instructions and
Description about
Proof
1 Living
Area
1- Area per student in all living rooms is 25sq. ft.
2-Cot - One per candidate
3-Mattress - One per candidate
4-:Bed sheet - One per candidate
5-Cupboard/ almirah/ Trunk with locking arrangements -One per
candidate
(length = 30 inches, width = 18 inches and height = 12 inches)
6-LCD/TV -1
7-Living area information Board-1
8-Lights & Fan - 1 for each 150 sq.ft.
Ventilation area (in sq. ft.)-12% area of the living room Relaxation: 2%
*If a PIA is having a room size of 450 sq. ft. but they are using only 300
sq.ft. then the PIA can install only 2 fans.
Proof:
Photographs of
academic area
DDU-GKY
Section 3: 3.2 Non-residential areas of the hostel: Kitchen, dining
and recreation areas
Mahesh kumar-B-ABLE 57
Sl.
No.
Particulars Standards and Relaxations (Relaxation permitted with
permission of competent authority of CTSA/SRLM)
Instructions and
Description about Proof
1 Kitchen Area (in
sq.ft.)
Standard: No minimum area is prescribed for
kitchen.However the kitchen has to be hygienic and
spacious enough to cook and storematerial
Proof:
Photograph of Kitchen
are a
2 Recreation and
dining areas (If
separate )
1-Dining areaStandard: 2.3 sq.ft for every inmate (or
8 sq.ft X one third of the inmate strength) subject to
a minimum of 100 sq. ft.
2-Recreation area-Standard:3.3 sq. ft. for every
inmate (or 10 sq.ft. X one third of the inmate
strength) subject to a minimum of 120 sq. ft. If the
recreation area is separate from dining area.
Proof:
A Photograph of the
Recreation and Dining
area
3 Recreation and
dining areas (If
combined )
Standard: 4 sq.ft for every inmate (or 12 sq.ft X one
third of the inmate strength) subject to a minimum of
175 sq. ft.
Proof: A Photograph
DDU-GKY
Section 4: 4.1 Is the following support facilities available at
Residential centre
Mahesh kumar-B-ABLE 58
Sl.
No.
Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about
Proof
1 Safe drinking water Standard: Should be RO treated Proof: Photograph
2 First aid kit Standard: As per 5.1C3 Proof: Photograph
3 Fire-fighting
equipment
A Residential centre should have at least 2
fire extinguishers
Proof: Photograph
4 Biometric device At least 1 device for every 200 candidates Proof: Photograph
5 Electrical Power
Back
Electrical Power Backup should have
connection to: All electrical items relating to
monitoring of centre activities such as CCTV,
bio metric device, office computers etc.
Proof: Photograph
DDU-GKY
Section 3: 3.2 Non-residential areas of the hostel: Kitchen, dining
and recreation areas
Mahesh kumar-B-ABLE 59
Sl.
No.
Particulars Standards and Relaxations
(Relaxation permitted with
permission of competent
authority of CTSA/SRLM)
Instructions and
Description about Proof
7 Type of Flooring (write
whether it is tiled,
cemented etc.)
Standard: Flooring should be provided with
cement/tiles/polished stones
Relaxation : Neatly made mud flooring as a part
of aesthetic building design can be permitted.
Proof:
Photograph of the Flooring
8 Over Head Tank Standard: There should be an Over Head Tank
(OHT) for a training centre. The water
connection in the taps and toilets should
connect to the OHT.
Instruction: Water should be
available during the working hours
of the training centre. The water
source must be thoroughly
disinfected once every 30 days.
Proof: Photograph of OHT
9 Distance from the
training centre to
Residential centre
Standard:
Should not exceed 1.5 km
Instruction : It is advisable to be
well connected to different
transport locations.
DDU-GKY
Mobilization-Eligibility check
Mahesh kumar-B-ABLE
60
For a successful mobilization
1. Generate adequate pool of eligible rural poor youth
2. Measure the ‘frame of mind’ of candidates
3. Counsel family members
4. Mobilise candidates as per SOP eligibility criteria for Poor/ Category /Rural
5. Dossier pendency list should be ready within 10 days of Batch Freeze and
pending doc. Should be collect in next 20 days by MIS/Centre Manager
6. Q-team will be check all candidates dossiers and SF,s and share report to State Head
7. State Head will be cross check all dossiers and SFs and share report to Zonal Manager
8. After eligibility check, Candidate training dossier should be scan and upload in e-voc in candidates profile
Results
1. Reduce drop outs, improve placements and retention
2. Better youth for skilling - Better PIA Image - objective of the program will be met
3. Backup for future record, preparatory work for Instalment clam , Clear figure of trained candidates
DDU-GKYCandidate dossier checking process
S.N
o
Proof of Poor Documen
t name
Remarks
1 BPL Ration Card BPL Card 1-Candidate having BPL card in name of self/father/mother /grand father and all names are
matching with educational doc.
2-Candidate having BPL card in name of father/mother and any name are miss matching
with educational doc./ Adhar card need to be collect affidavit for the same .
3-BPL card should be clear / readable
4-Front page of BPL card and back side of card (List of family members) should be attach
2 Anthodiya
Card
Ration
card
All requirement as above
3 MNREGA Job card 1-Any family member (self, mother, father , brother, sister , Grandfather
/mother) of candidate should have job card and received minimum 15 days wage in
previous FY
2-If training is start in FY 2019-2020, then 15 day wages should be received in FY 2018-19
4 SHG SHG card 1-SHG Cars copy ,card should be on the name of his/her mother only
2-SHG deceleration letter from SRLM /Concern department
5 PIP PIP Form •1-PIP form from Panchayat and sign by sarpanch / secoatry
21 July 2020 61
DDU-GKY
Training & Certification
Start of training and batch freezing -
1-Enrolment of required number of candidates per batch (maximum
permissible strength is 35 candidates per batch)
2- Batch freeze summary (including number of SC/ST, women, minority
and candidates )
3-Batch freezing: 10 days after training starts
4-Permissible droop out for batch size 35 its 4 ,up to 30 its 3 ,up 20 and
below 2 .these permissible droop out will be count for reimbursement not
for count of training
5-Minimum 75% attendance required( out of total working days of
training) to completed training and to claim boarding and loading amount
candidates attendance should be 75 % (calculation of days between batch
start date to Batch end date including Sundays and Holidays during the
batch )
Mahesh kumar-B-ABLE
62
DDU-GKY
Training & Certification
Marking of attendance for residential purposes
1. Centre Attendance will be taken Two time in day morning Before 9 am and in
evening after 6 pm .
2. Hostel Attendance will be taken once a day between 6 PM and 10 PM.
Dropping out of candidates and related issues
1. PIAs should take all precautions during the selection of candidates so that the
number of dropped out candidates in a batch is minimized.
2. Some of the reasons for candidates dropping out or being dropped from a
course are:
3-Not meeting the minimum attendance requirements
4-Not following the code of conduct
5-Not keeping up to the expected academic standards
6. PIAs shall record the date from which a candidate is treated as dropped out.
Mahesh kumar-B-ABLE
63
DDU-GKY
Training & Certification
7. The candidates shall be disbursed all allowances as per norms, and there shall
be no deduction of any allowances to dropped out candidates. For
example, allowances for food and to-and-fro travel shall be provided to a
candidate till the date of delisting/ drop out.
8. Deemed drop out: If a candidate is absent for more than 25% of classes in a
course then she/he is deemed to have dropped out.
9. Permitted drop outs for reimbursement of candidate entitlements: Since
the reasons for trainees dropping out are complex and may be beyond the
control of a PIA, drop outs are permitted in a batch as per the following:
a. 2 candidates if batch strength is 20 or less
b. 3 candidates if batch strength is 21 or above but up to 30
c. 4 candidates if batch strength is above 31
The above drop outs are permitted only for the purpose of reimbursement
of candidate entitlements.
Mahesh kumar-B-ABLE 64
DDU-GKY
Centre Inspection
Mahesh kumar-B-ABLE
65
At least a total 13 inspection per year by Q team of PIA, SRLM,
CTSA
6 inspections - Q team of PIA
• 4 inspections – planned that a centre is inspected around 35 days after a
batch starts.
• 2 inspections – surprise visits
4 inspections – SRLM
• 2 inspections – Detailed visit
• 2 inspections – surprise visits
3 inspections – CTSA
• 1 inspection – Detailed visit
• 2 inspections – surprise visits
DDU-GKY
As per guidelines placement is defined as
1. “continuous employment for minimum of 3 months
2. “The minimum wages for placement in India (per month) - valued as per Cost to Company
(CTC), is:
a. ₹ 6000, ₹ 8000, ₹ 12000 and Rs.15000 for 3, 6 9 and 12 months course duration respectively
Or
b. minimum wages of the state
For the time being it is fixed as ₹ 6000, ₹ 8000, ₹ 12000 and ₹15000 for 3, 6 9 and 12 months
course duration respectively
Proof for placement
1) Salary slips
2) Salary payment proof (one of the following)
successfully completed bank transfer, like NEFT or RTGS, from the employer or
bank statement or
passbook entries of the candidate’s account indicating that wages have been paid.
3) Joint certificate issued by the employer and candidate (as per SF 7.1D) If HR Department is not
available in Org.
As three months of continuous employment is needed total salary for the three month period for
3, 6, 9, and 12 month training programmes would be ₹18000, ₹ 24000, ₹ 36000 and ₹ 45000
respectively.
Mahesh kumar-B-ABLE
66
Placement & Tracking
DDU-GKY
Mahesh kumar-B-ABLE
67
• Treatment of first month of employment: If the candidate is employed for a full month (joins on the 1st of
the month) then first month will be treated as a normal month.
• However, if the candidate joins after 1st of a month then depending on the salary paid in the first month
decision whether to consider first month as placed or not is decided.
A- If she/he gets more than the minimum salary (as indicated in Table above) then she/he will be considered
as placed in the first month. Then the candidate has to fulfil the placement criteria within next three months.
However, if best three months out of the four month window does not fulfil the cumulative salary criterion
then first month is removed and one more month can be considered for fulfilling the placement criteria.
B- Otherwise first month will not be counted and she/he still has 4 month window for fulfilling the placement
criteria.
e. Further, as employment also involves migration to cities and towns – places which are not only unfamiliar
physically but also culturally; the transition is difficult and more than often painful. Thus the youth have a
tendency to relapse back to more familiar home environment. Hence to facilitate slow transition to new
environments instead of three months continuously a four month window is considered and if the candidate
fulfils all the conditions of placement in any of these three months he would be considered as placed.
DDU-GKY
Placement Incentives
Mahesh kumar-B-ABLE
68
1. Incentives for Placement of more than 70%
a. Rs.3000/- above 70% - 85%
b. Rs.5000/- above 85%
2. Retention Support
a. Continuous work for12 months
b. Rs.3000/- per candidate out of which Rs.1000/- shared with candidate
c. continuous work over a period of 365 days with a maximum break of 60 calendar days
during this period
3. Career Progression Support
a. Candidate who crosses salary of Rs.15,000/- per month
b. Rs.5000/- per candidate out of which 1/3rd i.e. Rs.1333/- to be shared with the
candidate.
c. If a candidate earn a salary of Rs 15,000/- per month and holds it for a minimum of 90
calendar days within one year of completion of training.
DDU-GKY
INCENTIVES
69
4. Foreign Placement Support
a. Minimum salary Rs. 25,000 per month
b. Rs.10,000/- per candidate
5. Mobile Tracking Support Cost
a. Rs.50/- mobile top up
6. Special Area Allowance
a. Addl. 10% for in special areas (NE States, J&K, HP, UK, And &
NIC Island, Lakshadweep & Left Wing Extremism areas)
7. Assessment Certification Cost
a. Rs.1,500/- per candidate
DDU-GKY
FUND RELEASE CONDITIONS
Mahesh kumar-B-ABLE
70
1st
Instalment
(25%)
• 25 % of Project cost
• Release on sanction of project
• Signing of MoU , Centre approval, Training start ( 12.5-12.5%)
2nd
Instalment
(25%)
• Training Completion of 20 % & 7 % of placement target of total project target
• Submission of audited financial reports and 60 % Fund Utilization of 1ST Instalment
3rd
Instalment
(25%)
• Training Completion of 60 % & 25 % of placement target of total project target
• Submission of audited financial reports and 60 % Fund Utilization of 2nd Instalment
4th
Instalment
(25%)
• Training Completion of 100 % & 70 % of placement target of total project target
• Submission of audited financial reports and 100 % Fund Utilization of Project.
DDU-GKY
TRAINING COST
71
Cost Item Details
1 Training Cost - (Any duration) Covers
PC Tablet cost and live distance
training cost also
Category I – Rs. 40.40 per hour
Category II – Rs. 34.65 per hour
Category III – Rs. 28.80 per hour
2 Boarding and Lodging ‘X’ Category cities Rs. 300 per day
‘Y’ Category cities Rs. 250 per day
‘Z’ Category cities Rs. 200 per day
Other Places Rs. 175 per day
3 Food and To & Fro Charges
(Non-residential)
Rs.100/- per day
4 Post Placement Support Placement within district of domicile Rs. 2000 for 2 months
Placement within state of domicile Rs. 3000 for 3 months
Placement outside state of domicile Rs. 6000 for 6 months
Himayat: For 3 months training, Rs. 2000 per month for 6 month & more
than 3 months training, Rs. 1000 per month for 2 months
5 Cost of uniforms Courses with duration <=6 months - Rs. 1000/- & for >6 months – Rs.2000/-
6 One Time Travel Cost Rs.4,500/- or Actual cost whichever is less
Refundable Security Deposit: A PIA may charge Rs.250/- as refundable security deposit from each candidate selected for a
training batch. It will be collected at the time of commencement of training batch & shall be refunded to a candidate who
completes the training and is successfully certified.
DDU-GKY
Standard Forms
SOP Chapter Chapter Content No. of Standard Forms
1 Introduction 1
3 Project Implementation Procedures 14
4 Training Design and Plan 12
5 Training Centres 43
6 Training Initiation and Completion 15
7 Tracking and Placement 37
8 Project Financial Procedures 53
9 Grading of a Project and Project Implementing
Agency
11
Total 186
72
DDU-GKY
List of Standard Forms
S.N
o
Name of
SF,s
Content of SFs Time and Use of SFs
1 SF 3.1A Prospective project work schedule At the time of Project MoU , can be revise
once during the project tenure by PIA
2 SF 3.1B Standard terms & conditions At the time of Project MoU by SRLM
3 SF 3.1C Special terms & conditions At the time of Project MoU by SRLM
4 SF 3.1D Power of Attorney At the time of Project MoU by PIA
5 SF 3.2A Bank account details At the time of Project MoU by PA
6 SF 3.2B Project commencement order After MoU by SRLM to PIA
7 SF 3.3A Project execution readiness assessment After MoU by PIA
8 SF 3.10A Details of Centre in-charge and trainers By PIA During DDR Preparation and submission
9 SF 3.10B Details of PIA Q-team members By PIA During DDR Preparation and submission
10 SF 4.1A Plan of training After MoU by PIA
11 SF 4.5A Activity cum lesson planner By PIA During DDR Preparation and submission
Mahesh kumar-B-ABLE 73
DDU-GKY
Mahesh kumar-B-ABLE 74
S.N
o
Name of
SF,s
Content of SFs Time and Use of SFs
12 SF 4.6A On the job training plan for the batch After 20 days batch freeze
13 SF4.6B On the job training confirmation letter for
candidates
Before sending candidates for OJT by Employer
14 SF 4.6C OJT completion certificate for candidates After completion of OJT by Employer
15 SF 4.6D Verification for OJT Around mid of OJT
16 SF 5.1 D1 Due diligence of a training centre (excluding
residential facilities)
At the time of Centre setup
17 SF 5.1D2 Due diligence for residential facilities At the time of Centre setup
18 SF 5.1E1 Summary of staff deployed at the training
centre
Available and update whenever employee
change at center
19 SF 5.1E2 Trainers’ profile Available and update whenever employee
change at center
20 SF 5.1H1: Batch summary as on day of batch freezing 10th day of batch freeze
21 SF 5.1H2: List of candidates in the batch and their
profile
At the time of batch start
DDU-GKY
Mahesh kumar-B-ABLE 75
S.N
o
Name of
SF,s
Content of SFs Time and Use of SFs
22 SF 5.1I Attendance registers for candidates (as per
biometric device)
At the time of batch start
23 SF 5.1L1 Candidate feedback form At the time of batch end
24 SF 5.1M Summary of evaluation and assessment
done
After every 15 day assessment
25 SF 5.1O1 Training certificate After completion of training
26 SF 5.1T Daily failure items report On daily basis
27 SF 5.1U 15 day summary of centre status After every 15th day during training
28 SF 6.2A3 Candidate application form Before batch start
29 SF 6.3A1 Batch details On the day of batch start
30 SF 6.3A2 Batch enrolment summary On the day of batch start
31 SF 6.3A3 Batch freeze summary 10th day of batch start
DDU-GKY
Mahesh kumar-B-ABLE 76
S.N
o
Name of
SF,s
Content of SFs Time and Use of SFs
32 SF 6.3A4 Batch completion summary At the time of batch batch completion
33 SF 5.1L1 Candidate feedback form At the time of batch end
34 SF 5.1M Summary of evaluation and assessment
done
After every 15 day assessment
35 SF 5.1O1 Training certificate After completion of training
36 SF 5.1T Daily failure items report On daily basis
37 SF 5.1U 15 day summary of centre status After every 15th day during training
38 SF 6.2A3 Candidate application form Before batch start
39 SF 6.3A1 Batch details On the day of batch start
40 SF 6.3A2 Batch enrolment summary On the day of batch start
41 SF 6.3A3 Batch freeze summary 10th day of batch start
DDU-GKY
Mahesh kumar-B-ABLE 77
S.N
o
Name of
SF,s
Content of SFs Time and Use of SFs
42 SF 6.3A5 List of candidates who were enrolled At the time on batch start
43 SF 6.3A6 List of candidates after freezing of the batch At the time of batch freeze (10th day)
44 SF 6.3A7 List of candidates after completion of
training of the batch
At the time of batch completion
45 SF 6.3B Candidate Attendance After completion of training
46 SF 7.1B1 Tracking form for candidates in Group A After placement , Every month before 15th
47 SF 7.1B2 Tracking form for candidates in group B After placement , Every month before 15th
48 SF 7.1C Certificate for employment location After Placement
49 SF 7.1G: List of candidates who are in Group ‘A’ List of candidates who has completed 3 month
in placement
50 SF 7.3B List of candidates for PPS payment After placement
DDU-GKY
Thank you
Mahesh kumar-B-ABLE 78

More Related Content

What's hot

Sustainable skill development
Sustainable skill developmentSustainable skill development
Sustainable skill development
Ajay Mohan Goel
 
jibin cv 1 5 (1)
jibin cv 1 5 (1)jibin cv 1 5 (1)
jibin cv 1 5 (1)jibin babu
 
Group b exam reforms ppt 28.9.20
Group b exam reforms ppt 28.9.20Group b exam reforms ppt 28.9.20
Group b exam reforms ppt 28.9.20
Nageswara Rao M
 
Skill india
Skill indiaSkill india
Skill india
Pooja Negi
 
Income of skilled and unskilled worker
Income of skilled and unskilled workerIncome of skilled and unskilled worker
Income of skilled and unskilled worker
Shree Devkota
 
laxmi kc cv
laxmi kc cvlaxmi kc cv
laxmi kc cvLaxmi Kc
 
Business Development Manager- Oil and Gas- Dheeraj Bafila
Business Development Manager- Oil and Gas- Dheeraj BafilaBusiness Development Manager- Oil and Gas- Dheeraj Bafila
Business Development Manager- Oil and Gas- Dheeraj BafilaDheeraj Bafila
 
Pmkvy | Pradhan Mantri Kaushal Vikas Yojana
Pmkvy | Pradhan Mantri Kaushal Vikas YojanaPmkvy | Pradhan Mantri Kaushal Vikas Yojana
Pmkvy | Pradhan Mantri Kaushal Vikas Yojana
Muskan
 
Policy for skill development and entrepreneurship 2015
Policy for skill development and entrepreneurship 2015Policy for skill development and entrepreneurship 2015
Policy for skill development and entrepreneurship 2015
Hardik Patel
 
Electrical Engineer Mafijur Rahman
Electrical Engineer Mafijur RahmanElectrical Engineer Mafijur Rahman
Electrical Engineer Mafijur RahmanRazu Khan
 
Resume Cv Format
Resume Cv FormatResume Cv Format
Resume Cv Format
ArnoldDsouza16
 
27029986 17770112-contoh-resume-terbaik
27029986 17770112-contoh-resume-terbaik27029986 17770112-contoh-resume-terbaik
27029986 17770112-contoh-resume-terbaikcastroid1
 
Information Guide on Tamil Nadu Government Welfare Schemes 2017
Information Guide on  Tamil Nadu Government Welfare Schemes 2017Information Guide on  Tamil Nadu Government Welfare Schemes 2017
Information Guide on Tamil Nadu Government Welfare Schemes 2017
hrf chennai
 
Document Controller - Resume
Document Controller - ResumeDocument Controller - Resume
Document Controller - ResumeMaqbool Ansari
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineer
Iram shahzad khan
 
Harun CV for a voluntery job
Harun CV for a voluntery jobHarun CV for a voluntery job
Harun CV for a voluntery job
Harun Or Rashid
 
Sadiq-CV- Document Controller
Sadiq-CV- Document ControllerSadiq-CV- Document Controller
Sadiq-CV- Document ControllerSadiq Ali
 

What's hot (20)

Sustainable skill development
Sustainable skill developmentSustainable skill development
Sustainable skill development
 
CV of HR Officer
CV of HR OfficerCV of HR Officer
CV of HR Officer
 
jibin cv 1 5 (1)
jibin cv 1 5 (1)jibin cv 1 5 (1)
jibin cv 1 5 (1)
 
Group b exam reforms ppt 28.9.20
Group b exam reforms ppt 28.9.20Group b exam reforms ppt 28.9.20
Group b exam reforms ppt 28.9.20
 
Skill india
Skill indiaSkill india
Skill india
 
Income of skilled and unskilled worker
Income of skilled and unskilled workerIncome of skilled and unskilled worker
Income of skilled and unskilled worker
 
laxmi kc cv
laxmi kc cvlaxmi kc cv
laxmi kc cv
 
Business Development Manager- Oil and Gas- Dheeraj Bafila
Business Development Manager- Oil and Gas- Dheeraj BafilaBusiness Development Manager- Oil and Gas- Dheeraj Bafila
Business Development Manager- Oil and Gas- Dheeraj Bafila
 
Pmkvy | Pradhan Mantri Kaushal Vikas Yojana
Pmkvy | Pradhan Mantri Kaushal Vikas YojanaPmkvy | Pradhan Mantri Kaushal Vikas Yojana
Pmkvy | Pradhan Mantri Kaushal Vikas Yojana
 
Policy for skill development and entrepreneurship 2015
Policy for skill development and entrepreneurship 2015Policy for skill development and entrepreneurship 2015
Policy for skill development and entrepreneurship 2015
 
SOHEL CV 06.01.16
SOHEL CV 06.01.16SOHEL CV 06.01.16
SOHEL CV 06.01.16
 
Electrical Engineer Mafijur Rahman
Electrical Engineer Mafijur RahmanElectrical Engineer Mafijur Rahman
Electrical Engineer Mafijur Rahman
 
Resume Cv Format
Resume Cv FormatResume Cv Format
Resume Cv Format
 
27029986 17770112-contoh-resume-terbaik
27029986 17770112-contoh-resume-terbaik27029986 17770112-contoh-resume-terbaik
27029986 17770112-contoh-resume-terbaik
 
Ayessha_cv
Ayessha_cvAyessha_cv
Ayessha_cv
 
Information Guide on Tamil Nadu Government Welfare Schemes 2017
Information Guide on  Tamil Nadu Government Welfare Schemes 2017Information Guide on  Tamil Nadu Government Welfare Schemes 2017
Information Guide on Tamil Nadu Government Welfare Schemes 2017
 
Document Controller - Resume
Document Controller - ResumeDocument Controller - Resume
Document Controller - Resume
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineer
 
Harun CV for a voluntery job
Harun CV for a voluntery jobHarun CV for a voluntery job
Harun CV for a voluntery job
 
Sadiq-CV- Document Controller
Sadiq-CV- Document ControllerSadiq-CV- Document Controller
Sadiq-CV- Document Controller
 

Similar to DDU-GKY_Project Orientation_B-ABLE BY Mahesh Kumar

DDU-GKY Project orientation PPT B-ABLE by Mahesh Kumar
DDU-GKY Project orientation PPT B-ABLE by Mahesh KumarDDU-GKY Project orientation PPT B-ABLE by Mahesh Kumar
DDU-GKY Project orientation PPT B-ABLE by Mahesh Kumar
Mahesh Kumar
 
Pmkvy 2.0 guidelines (2016 2020)
Pmkvy 2.0 guidelines (2016 2020)Pmkvy 2.0 guidelines (2016 2020)
Pmkvy 2.0 guidelines (2016 2020)
SUNAINA SAMRIDDHI FOUNDATION
 
DDU-GKY - A Support to HR
DDU-GKY - A Support to HRDDU-GKY - A Support to HR
DDU-GKY - A Support to HRRamadoss V
 
Pmky by prime minister
Pmky by prime ministerPmky by prime minister
Pmky by prime minister
Alen philip
 
About Learning & SADDT briefing to CT hospitality/tourism stakeholders - 24 M...
About Learning & SADDT briefing to CT hospitality/tourism stakeholders - 24 M...About Learning & SADDT briefing to CT hospitality/tourism stakeholders - 24 M...
About Learning & SADDT briefing to CT hospitality/tourism stakeholders - 24 M...
Linda Roos
 
Cce introduction v4
Cce introduction v4Cce introduction v4
Cce introduction v4
RaajuGanieshSunder
 
An Overview of Various Skill Developments Programs By Government of India
An Overview of Various Skill Developments Programs By Government of IndiaAn Overview of Various Skill Developments Programs By Government of India
An Overview of Various Skill Developments Programs By Government of India
VARUN KESAVAN
 
Mes Mod
Mes ModMes Mod
SKILLZUP ACADEMY - LIST OF TRAINING COURSES
SKILLZUP ACADEMY - LIST OF TRAINING COURSESSKILLZUP ACADEMY - LIST OF TRAINING COURSES
SKILLZUP ACADEMY - LIST OF TRAINING COURSES
NordinRamli
 
Admission booklet pg diploma courses cdac-v4
Admission booklet pg diploma courses cdac-v4Admission booklet pg diploma courses cdac-v4
Admission booklet pg diploma courses cdac-v4
prabhatjon
 
Tesda programs presentation dti2
Tesda programs presentation dti2Tesda programs presentation dti2
Tesda programs presentation dti2Ernesto Jr Casiple
 
Nsdc star scheme in Chetna
Nsdc star scheme in Chetna Nsdc star scheme in Chetna
Nsdc star scheme in Chetna
varmagroup
 
PGDM (SCM) @ Llyod.pdf
PGDM (SCM) @ Llyod.pdfPGDM (SCM) @ Llyod.pdf
PGDM (SCM) @ Llyod.pdf
Partha P Saikia
 
TM1-Micro-teaching_Food Processing NC II .pptx
TM1-Micro-teaching_Food Processing NC II .pptxTM1-Micro-teaching_Food Processing NC II .pptx
TM1-Micro-teaching_Food Processing NC II .pptx
Marione Calveen Gueta
 
PMKK BANJARA HILLS-Ppt for orientation
PMKK BANJARA HILLS-Ppt for orientationPMKK BANJARA HILLS-Ppt for orientation
PMKK BANJARA HILLS-Ppt for orientation
KrishnaNds
 
Sdi Mumbai
Sdi MumbaiSdi Mumbai
Sdi Mumbai
devenderjatav15
 
PMKVY Franchise | Pradhan Mantri Kuashal Vikas Yojana Franchise
PMKVY Franchise | Pradhan Mantri Kuashal Vikas Yojana FranchisePMKVY Franchise | Pradhan Mantri Kuashal Vikas Yojana Franchise
PMKVY Franchise | Pradhan Mantri Kuashal Vikas Yojana Franchise
PMKVY Franchise
 
Pradhan Mantri Kaushal Vikas Yojana PMKVY Scheme
Pradhan Mantri Kaushal Vikas Yojana PMKVY SchemePradhan Mantri Kaushal Vikas Yojana PMKVY Scheme
Pradhan Mantri Kaushal Vikas Yojana PMKVY Scheme
Muskan
 
Best Online PGDM Course In india
Best Online PGDM Course In indiaBest Online PGDM Course In india
Best Online PGDM Course In india
Prattush Das
 

Similar to DDU-GKY_Project Orientation_B-ABLE BY Mahesh Kumar (20)

DDU-GKY Project orientation PPT B-ABLE by Mahesh Kumar
DDU-GKY Project orientation PPT B-ABLE by Mahesh KumarDDU-GKY Project orientation PPT B-ABLE by Mahesh Kumar
DDU-GKY Project orientation PPT B-ABLE by Mahesh Kumar
 
Pmkvy 2.0 guidelines (2016 2020)
Pmkvy 2.0 guidelines (2016 2020)Pmkvy 2.0 guidelines (2016 2020)
Pmkvy 2.0 guidelines (2016 2020)
 
DDU-GKY - A Support to HR
DDU-GKY - A Support to HRDDU-GKY - A Support to HR
DDU-GKY - A Support to HR
 
Pmky by prime minister
Pmky by prime ministerPmky by prime minister
Pmky by prime minister
 
About Learning & SADDT briefing to CT hospitality/tourism stakeholders - 24 M...
About Learning & SADDT briefing to CT hospitality/tourism stakeholders - 24 M...About Learning & SADDT briefing to CT hospitality/tourism stakeholders - 24 M...
About Learning & SADDT briefing to CT hospitality/tourism stakeholders - 24 M...
 
Cce introduction v4
Cce introduction v4Cce introduction v4
Cce introduction v4
 
An Overview of Various Skill Developments Programs By Government of India
An Overview of Various Skill Developments Programs By Government of IndiaAn Overview of Various Skill Developments Programs By Government of India
An Overview of Various Skill Developments Programs By Government of India
 
Mes Mod
Mes ModMes Mod
Mes Mod
 
Advaita
AdvaitaAdvaita
Advaita
 
SKILLZUP ACADEMY - LIST OF TRAINING COURSES
SKILLZUP ACADEMY - LIST OF TRAINING COURSESSKILLZUP ACADEMY - LIST OF TRAINING COURSES
SKILLZUP ACADEMY - LIST OF TRAINING COURSES
 
Admission booklet pg diploma courses cdac-v4
Admission booklet pg diploma courses cdac-v4Admission booklet pg diploma courses cdac-v4
Admission booklet pg diploma courses cdac-v4
 
Tesda programs presentation dti2
Tesda programs presentation dti2Tesda programs presentation dti2
Tesda programs presentation dti2
 
Nsdc star scheme in Chetna
Nsdc star scheme in Chetna Nsdc star scheme in Chetna
Nsdc star scheme in Chetna
 
PGDM (SCM) @ Llyod.pdf
PGDM (SCM) @ Llyod.pdfPGDM (SCM) @ Llyod.pdf
PGDM (SCM) @ Llyod.pdf
 
TM1-Micro-teaching_Food Processing NC II .pptx
TM1-Micro-teaching_Food Processing NC II .pptxTM1-Micro-teaching_Food Processing NC II .pptx
TM1-Micro-teaching_Food Processing NC II .pptx
 
PMKK BANJARA HILLS-Ppt for orientation
PMKK BANJARA HILLS-Ppt for orientationPMKK BANJARA HILLS-Ppt for orientation
PMKK BANJARA HILLS-Ppt for orientation
 
Sdi Mumbai
Sdi MumbaiSdi Mumbai
Sdi Mumbai
 
PMKVY Franchise | Pradhan Mantri Kuashal Vikas Yojana Franchise
PMKVY Franchise | Pradhan Mantri Kuashal Vikas Yojana FranchisePMKVY Franchise | Pradhan Mantri Kuashal Vikas Yojana Franchise
PMKVY Franchise | Pradhan Mantri Kuashal Vikas Yojana Franchise
 
Pradhan Mantri Kaushal Vikas Yojana PMKVY Scheme
Pradhan Mantri Kaushal Vikas Yojana PMKVY SchemePradhan Mantri Kaushal Vikas Yojana PMKVY Scheme
Pradhan Mantri Kaushal Vikas Yojana PMKVY Scheme
 
Best Online PGDM Course In india
Best Online PGDM Course In indiaBest Online PGDM Course In india
Best Online PGDM Course In india
 

Recently uploaded

Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
Get Government Grants
 
2024: The FAR - Federal Acquisition Regulations, Part 39
2024: The FAR - Federal Acquisition Regulations, Part 392024: The FAR - Federal Acquisition Regulations, Part 39
2024: The FAR - Federal Acquisition Regulations, Part 39
JSchaus & Associates
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Congressional Budget Office
 
Invitation Letter for an alumni association
Invitation Letter for an alumni associationInvitation Letter for an alumni association
Invitation Letter for an alumni association
elmerdalida001
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
JSchaus & Associates
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
SERUDS INDIA
 
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
johnmarimigallon
 
A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
Roger Valdez
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
850fcj96
 
kupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptxkupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptx
viderakai
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
ARCResearch
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
Cuyahoga County Planning Commission
 
2024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 382024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 38
JSchaus & Associates
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
GrantManagementInsti
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Christina Parmionova
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
850fcj96
 
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
Congressional Budget Office
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
AjayVejendla3
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
ResolutionFoundation
 

Recently uploaded (20)

Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
 
2024: The FAR - Federal Acquisition Regulations, Part 39
2024: The FAR - Federal Acquisition Regulations, Part 392024: The FAR - Federal Acquisition Regulations, Part 39
2024: The FAR - Federal Acquisition Regulations, Part 39
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
 
Invitation Letter for an alumni association
Invitation Letter for an alumni associationInvitation Letter for an alumni association
Invitation Letter for an alumni association
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
 
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
 
A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
 
kupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptxkupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptx
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
 
2024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 382024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 38
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
 
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
 

DDU-GKY_Project Orientation_B-ABLE BY Mahesh Kumar

  • 2. DDU-GKY DDU-GKYY (Background) Mahesh kumar-B-ABLE 2 1-It was launched on 25 September 2014 by Union Ministers Nitin Gadkari and Venkaiah Naidu on the occasion of 98th birth anniversary of Pandit Deendayal Upadhyaya . The Vision of DDU-GKY is to "Transform rural poor youth into an economically independent and globally relevant workforce” 2-Government of India has set up a target to provide skill training to 50 Lakh of its youth by 2022. 3-Ministry of Rural Development (MoRD) has initiated DDU-GKY as a skill training and placement program for youth aged between 15 to 35 years living in rural areas. The program emphasizes on sustainable employment through the prominence and incentives given to post-placement tracking, retention and career progression.
  • 3. DDU-GKY OVERVIEW 3 1. Unique programme of MoRD Objective is poverty alleviation and skill training of rural poor youth Focuses on placement i.e. sustainable wage employment, Enables poor and socially disadvantaged groups to access benefits 2. Nation wide coverage with special schemes Himayat - J&K Roshini - 27 Left Wing extremist affected districts 3. Funding MoRD : 60% States : 40% Exceptions:  North East – MoRD :90%; States : 10%  J&K – MoRD : 100% Covers support for training costs, boarding and lodging (residential programmes), transportation costs, post‐placement support costs, Incentives to PIAs
  • 4. DDU-GKY PIA’s: Necessary Conditions & Eligibility Criteria for PIA A’ CATEGORY PIA Foreign Placements for over 500 candidates p.a. ‘B’ CATEGORY PIA Foreign Placements for between 220-499 candidates Captive Employers for between 200-499 candidates Educational Institutes of high repute Completed 1 DDU- GKY project Training Institutes with an annual turnover of Rs. 15 Crores and more •NSDC Partner ‘C’ CATEGORY PIA •All entities that do not qualify as either ‘A’ or ‘B’ NECESSARY CONDITIONS a)Legal Entity more than 3 years old b)Positive Net Worth for at least 2 out of last 3 years c)Turnover in excess of at least 25% of the proposed project EXCEPTIONS NSDC Partners exempted from a) and b) above Mahesh kumar-B-ABLE 4
  • 5. DDU-GKY SALIENT FETAURES 5 Target Group Training Cost & Duration Standards Assessment & Certification Implementation Post Placement Support Specific Outcomes DDU-GKY Targets rural youth from rural poor families - Age group of 15 to 35 (45 for vulnerable groups • Training is free of cost • Could be of any duration • PC/Tablets to all students • Standards led programme delivery • All inspections are supported by geo‐tagged, • time stamped videos/photographs • Independent 3rd party assessment and certification by assessment bodies empanelled by the SSCs. • Implementation through training providers • Focus on captive, global and reputed educational partners • Minimum duration of Project 3 years • Incentives for Candidates Migration Support centres • Incentives to PIAs • Guaranteed Placement for at least 70% trained candidates • Specifies minimum wage outcomes ranging from 6000 to 15000
  • 6. DDU-GKY IMPLEMENTATION MODEL 6 MoRD CTSAs PIA PIA SRLMs PIA DDU‐GKY follows a 3‐tier implementation model Functions as the policy‐making & technical support body at national level State Missions provide implementation support for AP States Implement the programme through skilling and placement projects. Provide implementation support for YP Sates
  • 7. DDU-GKY OVERVIEW - Purpose 7 Unemployed youth DDU GKY Skilled Manpower shortage
  • 8. DDU-GKY Project Appraisal and Sanction process in DDU-GKY •PRN Registration • Project Application Submission •Initial Screening •Qualitative Appraisal • PAC Mahesh kumar-B-ABLE 8
  • 9. DDU-GKY Special components of DDU-GKY DDU-GKY Roshni Himayat Applicable for all states except J&K and LWE Areas  Roshni a special initiative for most critical left-wing extremist affected areas mandatory residential course with 40% coverage to women candidates.  Roshni project introduce towards addressing the infrastructure, education and health deficiencies in these areas, and leveraging the availability of natural resources and traditional skills and knowledge. A special scheme for Jammu and Kashmir  MoRD operates a special scheme which covers: 1-Urban as well as rural youth 2- Below Poverty Line(BPL) as well as Above Poverty Line(APL) persons 3-Wage employment in the formal sector as well as self- employment. Mahesh kumar-B-ABLE 9
  • 10. DDU-GKY PPWS In case the project duration is 3 years or less but more than 2 years,  At least 30% of training should commence within 12 months At least 65% training should commence within 24 months  100% of training should completed in project duration. Mahesh kumar-B-ABLE 10
  • 11. DDU-GKY OVERVIEW – Key Stakeholders Mahesh kumar-B-ABLE 11 DDU-GKY GP’s/District team MoRD CTSA SRLM Industry/Cor porates PIA
  • 12. DDU-GKY Key Component of DDU-GKY Project Centre setup and DDR submission Mobilization –Candidate eligibility Training & Certification Placement & Tracking SF,s and documentation 21 July 2020 12
  • 13. DDU-GKY S.N Aspects Explanation 1 Eligibility (Section 3.1.1,Ch- 3) Rural Youth: 18-35 Yrs SC/ST/Women/TG/PWD: upto 45 Yrs Identification through: BPL/MNREGA/RSBY/AAY PDS Cards/SHG/PIP 2 Focus on SC/ST/Women/Minorities/S pecialGroups (Sec 3.1.2 & 3.1.3,Ch-3) SC/ST: 50% Minorities: 15% Women: 1/3rd of all beneficiaries PWD: 3-5% of all beneficiaries State Provisions for special groups like victims of trafficking , manual scavengers ,transgender ,bonded labours etc. 3 Activities by SRLM(Sec 3.2.1-3.2.1.6,Ch-3) Skill Gap Assessment: data to be taken from SECC,NSDC,GP wise demands etc. Job Melas : Organized by SRLM’s & PIA’s IEC: Budget of 1.5% of project cost paid to PIA available from MoRD Migration Support Centres : help with movement of candidates to place of work outside own state Mahesh Kumar-b-able 7 Key aspects of DDU-GKY Project
  • 14. DDU-GKY S.N Aspects Explanation 4 Activities by PIA (Sec 3.2.2.1-3.2.2.3,Ch-3) Mobilisation: SRLM can suggest ,PIA can suggest or Hybrid approach(GP/PIP) Counselling : To prospective trainees on the nature of work in the sector/trade, availability of jobs, deliverables by the employer, entitlements, growth prospects and risks involved Selection : on the basis of aptitude tests (psychometric and others) and counselling (by trained counsellors) Training: Infrastructure- Furniture, layout, colour scheme & signage-establishing the DDU-GKY brand Lab, classroom and IT facilities-Training aids Geo-tagged time-stamped aadhar authenticated biometric attendance Fire fighting equipment First aid, hygiene, drinking water, canteen & washroom facilities Internet and email access ,Access control facilities Power back up, Projector and copying equipment High speed access to the workflow driven, internet enabled ERP of the PIA (and SRLM and MoRD when ready) CCTV recording facilities Mahesh Kumar-B-ABLE 14
  • 15. DDU-GKY Mahesh Kumar-B-ABLE 15 S.N Aspects Explanation Activities by PIA(Contd.) Other Aspects in Infrastructure- Each training centre(TC) should have separate space for each domain Training infrastructure may be owned, hired or part of a franchise agreement Each TC should remain in existence for at least three months from the date of completion of training or until 70% of those trained have been placed (whichever is later). Mobile canters are not permitted Non-residential TCs should be located near the homes of trainees Residential should be approved or certified by SRLM/CTSA MoRD to setup cost committee to look into trade wise cost for skilling which require high cost Trainers: Should possess the knowledge, skills and attitude needed to be a good trainer in his/her domain Tested and verified by the Q team of the PIA and verified by the SRLM or its TSA CCTV recording to be used for attitude assessment Content: Certified by National Council for Vocational Training (NCVT) or Sector Skills Council (SSC) or any other agency notified for the purpose by MoRD
  • 16. DDU-GKY Mahesh Kumar-B-ABLE 16 S.N Aspects Explanation Activities by PIA(Contd.) Training Methods: Training is delivered in an innovative and trainee friendly manner with adequate audio visual tools and participatory methods Finishing and work readiness Module: centres should be staffed by specially trained high quality trainers who are adept at providing inputs that ensure high success rates at placement interviews and post placement retention. These centres should: Run short residential courses typically 7-10 days long. During this training alumni should meet and inspire the current batch Have a dedicated team that helps candidates find accommodation, get access to health care etc. Finding alternate jobs Provide counselling and advice on personal issues Note: one-time travel cost to the training centres will be allowed based on actual with a maximum limit of Rs4500/-per trainee Assessment & Certification: Continuous Assessment-in the form of announced and unannounced quizzes, assignments and other types of tests. The questions asked, answers given and marks obtained by each trainee should available in the password protected area of the PIAs web site
  • 17. DDU-GKY Mahesh Kumar-B-ABLE 17 S.N Aspects Explanation Activities by PIA(Contd.) These marks will be verified during bimonthly inspections of each training centre by the SRLM or its TSA as well as by NIRD/NABARD Consultancy (NABCONS) Third party certification- Independent certification and assessment by third party agencies (empanelled by SSC/ notified by MoRD) of both curriculum and the skill, knowledge and attitude level of each trainee as acceptable to the industry or employer is mandatory. Own certification- Own certification in cases of established brands can be used if approved by MoRD in advance. PLACEMENT: a minimum placement of 70% of trained candidates is a non- negotiable in DDU-GKY Captive placement-PIAs can train and absorb the trained persons in their own organisations. They should submit own manpower requirement based on a realistic estimate of current needs. Captive placement for a second batch of trainees will not be allowed, if more than 50 % of DDU-GKY youth placed with the same organisation has left within a span of six months.
  • 18. DDU-GKY Mahesh Kumar-B-ABLE 18 S.N Aspects Explanation Activities by PIA(Contd.) Placement providing jobs having regular monthly wages at or above the minimum wages: salary slip from the HRD/certificate issued by the employer indicating wages paid and counter signed by the employee along with the bank statement indicating that wages have been paid by crossed demand draft or money transfer will demonstrate proof of regular wage employment Placement in government organisations/with government contractors involved in public service delivery-Placement in public service delivery programs such as NRHM, MGNREGS etc. & institutions such as PRI, etc. are allowed provided it is continuous & full time and minimum wages is provided and proof of employment is available Placement foreign countries: Jobs which can provide a minimum salary of Rs. 25,000 are permitted. Trainings that have the potential to provide salaries in the above range will only be approved. *Cost Norms of PIAs: Attached in the next slide
  • 19. DDU-GKY National Policy on Skill Development & Entrepreneurship-2020 Vision To create an ecosystem of empowerment by Skilling on a large Scale at Speed with high Standards and to promote a culture of innovation Mission Create a demand for skilling across country Correct & align skilling with competencies Connect supply of skilled human Resources With sectoral demands Certify and assess in alignment with global and national standards Objectives Make quality vocational training for both youth and employers Ensure both vertical and horizontal pathways to skilled workforce Increased employability and better livelihoods for individuals Increase the capacity and quality of training infrastructure & trainers Aligning supply of skilled workers with sectoral requirements / Use of IT Promote national standards in skilling through active involvement of employers Ensure skilling needs of socially & geographically disadvantaged are met Leverage modern technology to ensure scale ,access and outreach Recognize the value of on-the-job training
  • 20. DDU-GKY Challenges Ahead Mahesh kumar-B-ABLE 20 Poor recognition of “skill ” in skilled/semi skilled sector Lack of job oriented training/skill development programs Skill development programs of the Central Government over the years have been spread across more than 20 Ministries/Departments without any robust coordination and monitoring mechanism to ensure convergence Ensuring participation of women & vulnerable :Chance to include them into productive work force Matching the requirements of market according to needs Rural Migration
  • 22. DDU-GKY 21 July 2020 22 Role of Industry/ Corporate Sector Skill Councils Industry led & industry governed bodies to link industry with manpower Preparing a catalogue of types of skills Development of a sector skill development plan and maintain skill inventory Standardization of affiliation , accreditation, examination and certification process in accordance with NSQF Plan and facilitate the execution of Training of Trainers along with NSDC and States Promotion of academies of excellence Will lay special emphasis on the skilling needs of ST/ SC, differently abled and minority ,woman populations Employment at decent wages
  • 23. DDU-GKY National Unit (NU) MoRD & NIRD • Policy making • Technical Support • Facilitation • Monitoring and Implementation support where needed • Ensure compliance to Standards • Invest Central Government component in projects SRLM/ State Skills Missions (SSMs) • Ensure compliance with Standards • Monitoring and Implementation Support • Invest State Government components in projects Project Implementing Agencies (PIAs) • Plan, implement skilling courses and placements in accordance with Guidelines and SOPs • Skill Gap Analysis to understand market demand as well as aspiration of rural youth • Mobilize, Train and Certify through a Third-party Assessor, where the curricula is in accordance with SSCs • Ensure 70% placements and support for 1 year post placement • Establish quality management • Set-up website and provide up- to-date MIS Mahesh kumar-B-ABLE 23 Three-tier Implementation and delivery process
  • 24. DDU-GKY Centre setup and DDR submission  Main points about Due Diligence What is due diligence ? Facilitates verification of availability of minimum infrastructure before a training centre is opened Main areas of due- diligence ? Physical infrastructure • Conformance of centre to standards • Equipment: common equipment and domain specific equipment, IT equipment • TLM and availability of ToT certified trainers When does it happen ? • It happens before a training centre becomes operational • When capacity of a TC is proposed to be increased • When new trade/domain is added • When Training centre shifted to other location Mahesh kumar-B-ABLE 24
  • 25. DDU-GKY SF 5.1 D1: Due diligence of a training centre (excluding residential facilities) DDR form is divided into 8 sections. Into the following sections: Section 1: Basic Information Section 2: Physical Infrastructure 2.1. Basic Information 2.2. Conformance to the Standards Section 3: Physical Infrastructure and Equipment for Non Academic and Academic Area Section 4: Common Equipment Section 5: Teaching Learning Materials 5.1.Information available at the training Centre 5.2.Details of the Course Content, Trainers Kit and Assessment Material 5.3.Avaliability of Trainers 21 July 2020 25
  • 26. DDU-GKY SF 5.1 D1: Due diligence of a training centre (excluding residential facilities) Section 6: Others Section 7: Standard Forms and Registers available at the centre Section 8: Annexure: I: Specifications for Toilets II: Specification for Biometric based attendance system for DDU-GKY III: Description about the Standard, Instructions and Maintenance IV: Proforma of Self Declaration Statement 21 July 2020 26
  • 27. DDU-GKY Section 1: Basic Information S.NO Particulars Details 1 Name of PIA XYZ 2 Name of Project DDU-GKY/Roshani / Himayat 3 SRLM sanction letter No. and date XYZ 4 Name of training centre PIA Name , city Address- 5 Training centre photographs All academic /Lab / Lobby / office /Reception/ facilites etc 6 Training centre Address SDC Complete address with Latitude and Longitude 7 Training centre in charge Name: :Employee id Profile: Address: Email id : Mobile Mahesh kumar-B-ABLE 27
  • 28. DDU-GKY Section 2: Physical Infrastructure, 2.1 Basic Information Sl. No. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 1 Ownership of the building (Own(O), Rent(R), Govt.(G) Standard: A self-declaration statement from the PIA that the PIA has necessary permissions and authority to occupy the premises to open the training Centre ,Relaxation: Nil Rent deed /agreement copy 2 Area of the building (Sq. Ft.) (Including corridors but excluding spaces open to sky such as court yards etc.) Standard: No specific standards Instruction: Schematic of the building plan with clear marking of dimensions of the training centre To be noted: Separate measurements should be taken for individual areas for Office Room, Class Rooms, Domain Labs, IT Lab, etc., Proof: Scanned copy of the schematic plan from PIA on with seal and signature Mahesh kumar-B-ABLE 28
  • 29. DDU-GKY Section 2: Physical Infrastructure, 2.1 Basic Information Mahesh kumar-B-ABLE 29 Sl. No. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 3 Is the roof RCC/ Non RCC Standard: No specific standards Proof: Photographs of Building, Ceiling and Roof of the training Centre 4 If it is non RCC, Whether it is structurally sound on visual inspection Standard: No specific standards Proof: Photographs of Building, Ceiling and Roof of the training Centre 5 Plastering and painting of internal and external walls and ceiling Standard: The training centre should be plastered and painted or white washed. Preferably the colour scheme of DDU-GKY should be used. Relaxation: 100% Instruction: To be used for the grading purpose.
  • 30. DDU-GKY Section 2: Physical Infrastructure, 2.1 Basic Information Mahesh kumar-B-ABLE 30 Sl. No. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 6 Class rooms (in number) Total Number of class rooms for imparting Training Program as per Schematic plan 7 Domain labs (in number) Total Number of Domain Lab Rooms for imparting Training Program as per Schematic plan (If Domain lab is combined with Class Room then it is counted as a Class Room ) 8 IT labs (in number) Total Number of IT Labs for imparting Training Program as per Schematic plan
  • 31. DDU-GKY Section 2: Physical Infrastructure, 2.1 Basic Information Mahesh kumar-B-ABLE 31 Sl. No. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 9 Reception Area Standard: No specific standards If reception area is available then mention as 1 else 0 as per Schematic plan 10 Office room Standard: No specific standards If office room is available then mention as 1 else 0 as per Schematic plan 11 Counselling Area Standard: No specific standards If Counselling area is available indicate it as 1 else 0 as per Schematic plan
  • 32. DDU-GKY Section 2: Physical Infrastructure, 2.2 Conformance of centre to standards. Mahesh kumar-B-ABLE 32 Sl. No. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 1 Visible signs of leakages from walls and roof - applicable for both RCC and Non RCC structures Standard: There should not be any visible marks of leakages from walls and ceiling. Proof: At least one photograph for each academic room (One File) 2 Protection of stairs, balconies, and other locations Standard: All areas should be protected with railings or walls (Even if one place is not protected the centre should not be commissioned). Railing or wall height: 3 feet or above Relaxation:16.7% relaxation (6 inches) Proof: A photograph of the railings and stairs 3 Conformance to DDUGKY look and feel standards as per sub section 5.1.1 The training centre should conform to DDU-GKY look and feel standards as section 5.1.1 of SOP Instruction: To be used for the grading purpose.
  • 33. DDU-GKY Section 2: Physical Infrastructure, 2.2 Conformance of centre to standards. Mahesh kumar -B-ABLE 33 Sl. No. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 4 Ventilation (in sq. ft.) Standard: 12% of the Total Area Relaxation: A relaxation of 2% is permitted. Proof: photograph for each academic/Lab room 5 Corridor Standard: No entry to or exit from an academic area should be through another academic area. Proof: Scanned copy of the Schematic floor plan with clear marking of Entry and Exit to all academic areas
  • 34. DDU-GKY Section 2: Physical Infrastructure, 2.2 Conformance of centre to standards. 6- specifications for Toilets- Number of toilets and washbasins for female candidates Number of toilets Number of washbasins Urinal 1-10 11-50 51-80 81-125 126-175 For every addition of 40 candidates or less, 1 2 3 4 5 one toilet 1 2 3 4 5 and one wash 0 0 0 0 0 wash basin should be added. 1-20 21-50 51-75 76-125 126-150 For every addition of 50 candidates or less, 1 2 2 3 3 one toilet 1 1 2 2 3 and one wash 1 1 2 2 2 basin , one urinal should be added. Mahesh kumar-B-ABLE 34
  • 35. DDU-GKY Section 2: Physical Infrastructure, 2.2 Conformance of centre to standards. Mahesh kumar-B-ABLE 35 Sl. No. Sl. No. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 7 Type of Flooring (write whether it is tiled, cemented etc.) Standard: Flooring should be provided with cement/tiles/polished stones Relaxation : Neatly made mud flooring as a part of aesthetic building design can be permitted. Proof: Photograph of the Flooring 8 Over Head Tank Standard: There should be an Over Head Tank (OHT) for a training centre. The water connection in the taps and toilets should connect to the OHT. Instruction: Water should be available during the working hours of the training centre. The water source must be thoroughly disinfected once every 30 days. Proof: Photograph of OHT 9 Distance from the training centre in Kms. to various transport locations: Standard: No specific standards. Instruction : It is advisable to be well connected to different transport locations.
  • 36. DDU-GKY Section 2: Physical Infrastructure, 2.2 Conformance of centre to standards. Mahesh kumar-B-ABLE 36 Sl. No. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 10 Open space for people to gather and interact ( in sq.ft ) Standard:100 sq. ft. recommended , but not mandatory centres with open spaces will get better rating Relaxation: Nil Proof: A photograph of open space 11 Parking space ( number in terms of bicycle parking slots) Standard: No minimum is prescribed However, 5 bicycle parking slots for every100 nonresidential trainees is recommended Relaxation: Nil staff parking. Proof: A photograph of parking space 12 Securing of wires Standard: All the wires should be properly secured and taped. Relaxation :Nil Proof:A photograph of wiring at the training centre on sample basis
  • 37. DDU-GKY Section 2: Physical Infrastructure, 2.2 Conformance of centre to standards. 21 July 2020 37 Sl. No . Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 13 Switch boards and panel boards Standard: Fully covered. Relaxation: Nil Proof: A photographs of switch board and panel boards on sample basis 14 Training centre name board Instruction: Conform with SF-5.1A2 Relaxation : Nil Instruction: For Sizes and Fixtures please refer to s.no 3 of the Annexure – III 15 Activity summary and achievement board Standard: Conform with SF-5.1B1 Relaxation : Nil Proof: A photograph after installing the pin board with the minimum dimensions of 4 feet X 3 Feet with proper fixtures
  • 38. DDU-GKY Section 3: Physical Infrastructure and Equipment : 3.1 Non Academic and Equipment related to Office Mahesh kumar-B-ABKE 38 Sl. No. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 1 Office room Area (in Sq.ft) Standard: No minimum area is prescribed; however, the equipment specified for the office room should fit into the office room. Relaxation Nil Proof: A Photograph of office room after arranging all the equipments as per sop 2 Counselling area Area (in Sq.ft) Reception area has to be located in the prominent place preferably at the entrance of the training centre. Proof: A Photograph of reception area 3 Office Chairs Equipment 1- Office/guest chairs-6 2-Office almirah -1 3-office table-1 4-Office computer-1 5-Printer cum scanner-1 6-Digital camera-1 7-Electrical Power Back up for office room Proof: A Photograph of Items
  • 39. DDU-GKY Section 3: Physical Infrastructure and Equipment : 3.2 Is the following equipment available in the IT lab? Mahesh kumar-B-ABLE 39 Sl. No. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 1 IT Lab 1-Type of roof (RCC/ Non RCC) 2-If false ceiling Height of Ceiling - 8ft 3-Internal Signage -A flex/ Vinyl banner with (3X3) Sq. ft. 4-CCTV cameras with audio facility 5-LAN enabled computers 6-Internet connections-2 ( 1mbps/512 kbps) 7-all computers should have typing tutor 8-Tablets - 1:1 (The number of tablets must be as per approve centre capacity ) 9-Stools/ chairs (in number)-1:1 10-Trainer Table -1 11-Lights- 1 fluorescent light (2400 Lumens) for each 150 sq.ft. or part thereof per room. 12-Fans -1 ceiling fan for each 150sq.ft.or part thereof per room. 13-Electrical Power backup for lab Proof: A Screenshot which shows the internet speed in the IT Lab of the proposed training centre. Photographs of IT Lab
  • 40. DDU-GKY Section 3: Physical Infrastructure and Equipment : Academic and Equipment related to class room/ Domain lab Mahesh kumar-B-ABLE 40 Sl. No. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 1 Academic Area Class/Lab 1-Theory class room combined with domain lab 2- Area per student in all academic rooms is 10 sq. ft. 3-Combining of theory and practical class room is permissible and area per student is 15 sq. ft. 4-Ventilation area (in sq. ft.)-12% area of the class room Relaxation: 2 % relaxation 5-Sound level (in dBA)-75 decibels (A) or less Relaxation :6.7%relaxation 6-LCD/ Digital Projector-1 projector for two class rooms. 7-Chair for candidates -One chair for one candidate 8- Trainer’s Table- 1 (2 feet by 3 feet.) 9-Writing board- 1 (5 feet X 3 feet) 10-List of Domain related equipment-As per SSC 11-Lights & Fan - 1 for each 150 sq.ft. Proof: Photographs of academic area
  • 41. DDU-GKY Section 4: Common Equipment Mahesh kumar-B-ABLE 41 Sl. No. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 1 Electrical Power Back up: 1-Gensets / UPS or Inverter/ Solar power backup Proof: A Photograph 2 Installation of Biometric devices Installation of Biometric devices- One Device for every 200 candidate Proof: A Photograph 3 Installation of CCTV Monitor Standard: As per SF 5.2B Proof: After commissioned in all areas a screen shot of CCTV Monitor 4 Grievance register One each for centre / Hostel Proof: Photograph of Grievance register 5 Minimum equipment As per SF 5.1P Proof: A Photograph 6 Direction Boards As per the Notification 31 Proof:A photograph after installing
  • 42. DDU-GKY Section 5: Teaching Learning Materials (TLM) 5.1.Information available at the training Centre 21 July 2020 42 Sl. No . Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 1 Training plan (SF- 4.1A) Should be as per SF 4.1A Proof: A Photograph 2 Activity cum lesson planner Should be as per SF 4.5A Proof: A Photograph 3 Welcome Kit (SF-5.1A) Should be as per SF 5.1C2 Proof:A Photograph of all the items that are placed in the welcome kit
  • 43. DDU-GKY Section 5 : Teaching Learning Materials (TLM) 5.2 Details of course content , trainers kit and assessment material 21 July 2020 43 Sl. No. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 1 IT Course Content 1-IT Trainers Kit 2-IT Assessment material 3-IT Course Material for candidate Proof: A Photograph (Note: Swachh Bharat Abhiyan Logo to be stamped on all course material) 2 Soft Skills Course Content 1-Soft Skills Trainers Kit 2-Soft Skills Assessment material 3-Soft Skills Course Material for candidate Proof: A Photograph 3 English Course Content 1-English Trainers Kit 2-English Assessment material 3-English Course Material for candidate Proof: A Photograph 4 Domain Course Content 1-Domain Course Trainers Kit 2-Domain Assessment material 3-Domain Course Material for candidate Proof: A Photograph (Teaching Learning Material (TLM) should be aligned with NCVT/SSC)
  • 44. DDU-GKY Section 5 :Teaching Learning Materials (TLM) 5.3 Availability of trainers Mahesh kumar-B-ABLE 44 Sl. No. Sl. N o. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 1 Centre in charge Centre in charge can teach a maximum of 4 hours per day Proof: Joining report 2 IT , Soft skills , English Soft skills, IT and English may have the same trainer Proof: Joining report 3 Domain Trainers – 1,2,3,4 Domain Trainer should have required eligibility qualification as per QP/Job role Proof: Joining report
  • 45. DDU-GKY Section 6 : Others ,6.1 infrastructure available at training centre Mahesh kumar-B-ABLE 45 Sl. No . Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 1 Safe drinking water 1. RO/ Ozonised treated 2. Packaged drinking water certified by ISI or BIS Proof: A photograph 2 First aid kit As per 5.1C3 Proof: A photograph 3 Firefighting equipment A Training centre should have at least 2 fire extinguishers Proof: A photograph
  • 46. DDU-GKY SF 5.1D2: Due diligence for residential facilities SF 5.1D2 divided into 4 sections. Section 1: Basic Information Section 2: Physical Infrastructure 2.1. Basic Information 2.2. Conformance to the Standards Section 3: Details of the Residential Facilities 3.1.Residential Areas 3.2.Assessement of Maximum Number of Candidates permissible 3.3. Non Residential areas of the hostel: Kitchen, Dining and Recreation areas. 3.4. Facilities available at the centre. Section 4: Others Mahesh kumar-B-ABLE 46
  • 47. DDU-GKY Section 1: Basic Information Mahesh kumar-B-ABLE 47 S.NO Particulars Details 1 Name of PIA XYZ 2 Name of Project DDU-GKY/Roshani / Himayat 3 SRLM sanction letter No. and date XYZ 4 Name of training centre PIA Name , city Address- 5 Training centre photographs All academic /Lab / Lobby / office /Reception/ facilities etc 6 Training centre Address SDC Complete address with Latitude and Longitude 7 Warden (for female hostel, if available) Warden (for male hostel, if available) Name: :Employee id Profile: Address: Email id : Mobile
  • 48. DDU-GKY Section 2: Physical Infrastructure Mahesh kumar-B-ABLE 48 Sl. No. Sl. No. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 1 Ownership of the building (Own(O), Rent(R), Govt.(G) Standard: A self-declaration statement from the PIA that the PIA has necessary permissions and authority to occupy the premises to open the training Centre ,Relaxation: Nil Rent deed /agreement copy 2 Area of the building (Sq. Ft.) (Including corridors but excluding spaces open to sky such as court yards etc.) Standard: No specific standards Instruction: Schematic of the building plan with clear marking of dimensions of the Hostel building To be noted: Separate measurements should be taken for individual areas for living rooms, kitchen area, dining hall, recreation rea, etc.,
  • 49. DDU-GKY Section 2: Physical Infrastructure Mahesh kumar-B-ABLE 49 Sl. No. Sl. No. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 3 Is the roof RCC/ Non RCC Standard: No specific standards Proof: Photographs of Building, Ceiling and Roof of the hostel building 4 If it is non RCC, Whether it is structurally sound on visual inspection Standard: No specific standards Proof: Photographs of Building, Ceiling and Roof of the hostel building 5 Plastering and painting of internal and external walls and ceiling Standard: The training centre should be plastered and painted or white washed. Preferably the colour scheme of DDU-GKY should be used. Relaxation: 100% Instruction: To be used for the grading purpose.
  • 50. DDU-GKY Section 2: Physical Infrastructure , 2.2 Conformance of centre to standards. Mahesh kumar-B-ABLE 50 Sl. No. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 1 Visible signs of leakages from walls and roof - applicable for both RCC and Non RCC structures Standard: There should not be any visible marks of leakages from walls and ceiling. Proof: At least one photograph for each living room (One File) 2 Protection of stairs, balconies, and other locations Standard: All areas should be protected with railings or walls (Even if one place is not protected the centre should not be commissioned). Railing or wall height: 3 feet or above Relaxation:16.7% relaxation (6 inches) Proof: A photograph of the railings and stairs 3 Conformance to DDUGKY look and feel standards as per sub section 5.1.1 The training centre (Hostel) should conform to DDU-GKY look and feel standards as section 5.1.1 of SOP Instruction: To be used for the grading purpose.
  • 51. DDU-GKY Section 2: Physical Infrastructure , 2.2 Conformance of centre to standards. Mahesh kumar-B-ABLE 51 Sl. No. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 4 Ventilation (in sq. ft.) Standard: 12% of the Total Area Relaxation: A relaxation of 2% is permitted. Proof: photograph for each academic/Lab room 5 Corridor Standard: No entry to or exit from an academic area should be through another academic area. Proof: Scanned copy of the Schematic floor plan with clear marking of Entry and Exit to all academic areas
  • 52. DDU-GKY Section 2: Physical Infrastructure , 2.2 Conformance of centre to standards. Mahesh kumar-B-ABLE 52 6- specifications for Toilets- Number of toilets and washbasins for male female candidates Number of toilets Number of washbasins Urinal 1-10 (ratio of 1:10) 11-19 20-100 101-140 *If the bath and the toilet are combined, then 1 2 10 14 the ratio (washbasins for males should be in 1:15 ratio.) should be (Urinals for males should be in 1:20 ratio.) 1: 12
  • 53. DDU-GKY Section 2: Physical Infrastructure , 2.2 Conformance of centre to standards. Mahesh kumar-B-ABLE 53 Sl. No. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 7 Type of Flooring (write whether it is tiled, cemented etc.) Standard: Flooring should be provided with cement/tiles/polished stones Relaxation : Neatly made mud flooring as a part of aesthetic building design can be permitted. Proof: Photograph of the Flooring 8 Over Head Tank Standard: There should be an Over Head Tank (OHT) for a training centre. The water connection in the taps and toilets should connect to the OHT. Instruction: Water should be available during the working hours of the training centre. The water source must be thoroughly disinfected once every 30 days. Proof: Photograph of OHT 9 Distance from the training centre to Residential centre Standard: Should not exceed 1.5 km Instruction : It is advisable to be well connected to different transport locations.
  • 54. DDU-GKY Section 2: Physical Infrastructure , 2.2 Conformance of centre to standards. Mahesh kumar-B-ABLE 54 Sl. No. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 10 Pick up and drop facilities Standard: If the training centre is more than 1.5 km, then the availability of pick up and drop facilities Proof: A scanned of the letter from the travel agent for the vehicle 11 Securing of wires Standard: All the wires should be properly secured and taped. Relaxation :Nil Proof:A photograph of wiring at the training centre on sample basis 12 Switch boards and panel boards Standard: Fully covered. Relaxation: Nil Proof: A photographs of switch board and panel boards on sample basis
  • 55. DDU-GKY Section 2: Physical Infrastructure , 2.2 Conformance of centre to standards. Mahesh kumar-B-ABLE 55 Sl. No . Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 13 Hostel Name Board Conform with SF-5.1A2 Size-4x3 sf Proof: A photographs 14 Student entitlement board and responsibilities board Standard: Should conform with standard form SF-5.1C1 Proof: A photographs 15 Food specification board Standard: Conform with standard form SF-5.1B8 Proof: A photographs 16 Open space for physical activities and outdoor games Standard: Minimum of 1000 square yards for the doing physical activity and outdoor games is recommended. Instruction: The place can be owned/hired/lease or arrangements can be made with public authorities for using parks and other openspaces
  • 56. DDU-GKY Section 3: Details of residential facilities Mahesh kumar-B-ABLE 56 Sl. No. Particul ars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 1 Living Area 1- Area per student in all living rooms is 25sq. ft. 2-Cot - One per candidate 3-Mattress - One per candidate 4-:Bed sheet - One per candidate 5-Cupboard/ almirah/ Trunk with locking arrangements -One per candidate (length = 30 inches, width = 18 inches and height = 12 inches) 6-LCD/TV -1 7-Living area information Board-1 8-Lights & Fan - 1 for each 150 sq.ft. Ventilation area (in sq. ft.)-12% area of the living room Relaxation: 2% *If a PIA is having a room size of 450 sq. ft. but they are using only 300 sq.ft. then the PIA can install only 2 fans. Proof: Photographs of academic area
  • 57. DDU-GKY Section 3: 3.2 Non-residential areas of the hostel: Kitchen, dining and recreation areas Mahesh kumar-B-ABLE 57 Sl. No. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 1 Kitchen Area (in sq.ft.) Standard: No minimum area is prescribed for kitchen.However the kitchen has to be hygienic and spacious enough to cook and storematerial Proof: Photograph of Kitchen are a 2 Recreation and dining areas (If separate ) 1-Dining areaStandard: 2.3 sq.ft for every inmate (or 8 sq.ft X one third of the inmate strength) subject to a minimum of 100 sq. ft. 2-Recreation area-Standard:3.3 sq. ft. for every inmate (or 10 sq.ft. X one third of the inmate strength) subject to a minimum of 120 sq. ft. If the recreation area is separate from dining area. Proof: A Photograph of the Recreation and Dining area 3 Recreation and dining areas (If combined ) Standard: 4 sq.ft for every inmate (or 12 sq.ft X one third of the inmate strength) subject to a minimum of 175 sq. ft. Proof: A Photograph
  • 58. DDU-GKY Section 4: 4.1 Is the following support facilities available at Residential centre Mahesh kumar-B-ABLE 58 Sl. No. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 1 Safe drinking water Standard: Should be RO treated Proof: Photograph 2 First aid kit Standard: As per 5.1C3 Proof: Photograph 3 Fire-fighting equipment A Residential centre should have at least 2 fire extinguishers Proof: Photograph 4 Biometric device At least 1 device for every 200 candidates Proof: Photograph 5 Electrical Power Back Electrical Power Backup should have connection to: All electrical items relating to monitoring of centre activities such as CCTV, bio metric device, office computers etc. Proof: Photograph
  • 59. DDU-GKY Section 3: 3.2 Non-residential areas of the hostel: Kitchen, dining and recreation areas Mahesh kumar-B-ABLE 59 Sl. No. Particulars Standards and Relaxations (Relaxation permitted with permission of competent authority of CTSA/SRLM) Instructions and Description about Proof 7 Type of Flooring (write whether it is tiled, cemented etc.) Standard: Flooring should be provided with cement/tiles/polished stones Relaxation : Neatly made mud flooring as a part of aesthetic building design can be permitted. Proof: Photograph of the Flooring 8 Over Head Tank Standard: There should be an Over Head Tank (OHT) for a training centre. The water connection in the taps and toilets should connect to the OHT. Instruction: Water should be available during the working hours of the training centre. The water source must be thoroughly disinfected once every 30 days. Proof: Photograph of OHT 9 Distance from the training centre to Residential centre Standard: Should not exceed 1.5 km Instruction : It is advisable to be well connected to different transport locations.
  • 60. DDU-GKY Mobilization-Eligibility check Mahesh kumar-B-ABLE 60 For a successful mobilization 1. Generate adequate pool of eligible rural poor youth 2. Measure the ‘frame of mind’ of candidates 3. Counsel family members 4. Mobilise candidates as per SOP eligibility criteria for Poor/ Category /Rural 5. Dossier pendency list should be ready within 10 days of Batch Freeze and pending doc. Should be collect in next 20 days by MIS/Centre Manager 6. Q-team will be check all candidates dossiers and SF,s and share report to State Head 7. State Head will be cross check all dossiers and SFs and share report to Zonal Manager 8. After eligibility check, Candidate training dossier should be scan and upload in e-voc in candidates profile Results 1. Reduce drop outs, improve placements and retention 2. Better youth for skilling - Better PIA Image - objective of the program will be met 3. Backup for future record, preparatory work for Instalment clam , Clear figure of trained candidates
  • 61. DDU-GKYCandidate dossier checking process S.N o Proof of Poor Documen t name Remarks 1 BPL Ration Card BPL Card 1-Candidate having BPL card in name of self/father/mother /grand father and all names are matching with educational doc. 2-Candidate having BPL card in name of father/mother and any name are miss matching with educational doc./ Adhar card need to be collect affidavit for the same . 3-BPL card should be clear / readable 4-Front page of BPL card and back side of card (List of family members) should be attach 2 Anthodiya Card Ration card All requirement as above 3 MNREGA Job card 1-Any family member (self, mother, father , brother, sister , Grandfather /mother) of candidate should have job card and received minimum 15 days wage in previous FY 2-If training is start in FY 2019-2020, then 15 day wages should be received in FY 2018-19 4 SHG SHG card 1-SHG Cars copy ,card should be on the name of his/her mother only 2-SHG deceleration letter from SRLM /Concern department 5 PIP PIP Form •1-PIP form from Panchayat and sign by sarpanch / secoatry 21 July 2020 61
  • 62. DDU-GKY Training & Certification Start of training and batch freezing - 1-Enrolment of required number of candidates per batch (maximum permissible strength is 35 candidates per batch) 2- Batch freeze summary (including number of SC/ST, women, minority and candidates ) 3-Batch freezing: 10 days after training starts 4-Permissible droop out for batch size 35 its 4 ,up to 30 its 3 ,up 20 and below 2 .these permissible droop out will be count for reimbursement not for count of training 5-Minimum 75% attendance required( out of total working days of training) to completed training and to claim boarding and loading amount candidates attendance should be 75 % (calculation of days between batch start date to Batch end date including Sundays and Holidays during the batch ) Mahesh kumar-B-ABLE 62
  • 63. DDU-GKY Training & Certification Marking of attendance for residential purposes 1. Centre Attendance will be taken Two time in day morning Before 9 am and in evening after 6 pm . 2. Hostel Attendance will be taken once a day between 6 PM and 10 PM. Dropping out of candidates and related issues 1. PIAs should take all precautions during the selection of candidates so that the number of dropped out candidates in a batch is minimized. 2. Some of the reasons for candidates dropping out or being dropped from a course are: 3-Not meeting the minimum attendance requirements 4-Not following the code of conduct 5-Not keeping up to the expected academic standards 6. PIAs shall record the date from which a candidate is treated as dropped out. Mahesh kumar-B-ABLE 63
  • 64. DDU-GKY Training & Certification 7. The candidates shall be disbursed all allowances as per norms, and there shall be no deduction of any allowances to dropped out candidates. For example, allowances for food and to-and-fro travel shall be provided to a candidate till the date of delisting/ drop out. 8. Deemed drop out: If a candidate is absent for more than 25% of classes in a course then she/he is deemed to have dropped out. 9. Permitted drop outs for reimbursement of candidate entitlements: Since the reasons for trainees dropping out are complex and may be beyond the control of a PIA, drop outs are permitted in a batch as per the following: a. 2 candidates if batch strength is 20 or less b. 3 candidates if batch strength is 21 or above but up to 30 c. 4 candidates if batch strength is above 31 The above drop outs are permitted only for the purpose of reimbursement of candidate entitlements. Mahesh kumar-B-ABLE 64
  • 65. DDU-GKY Centre Inspection Mahesh kumar-B-ABLE 65 At least a total 13 inspection per year by Q team of PIA, SRLM, CTSA 6 inspections - Q team of PIA • 4 inspections – planned that a centre is inspected around 35 days after a batch starts. • 2 inspections – surprise visits 4 inspections – SRLM • 2 inspections – Detailed visit • 2 inspections – surprise visits 3 inspections – CTSA • 1 inspection – Detailed visit • 2 inspections – surprise visits
  • 66. DDU-GKY As per guidelines placement is defined as 1. “continuous employment for minimum of 3 months 2. “The minimum wages for placement in India (per month) - valued as per Cost to Company (CTC), is: a. ₹ 6000, ₹ 8000, ₹ 12000 and Rs.15000 for 3, 6 9 and 12 months course duration respectively Or b. minimum wages of the state For the time being it is fixed as ₹ 6000, ₹ 8000, ₹ 12000 and ₹15000 for 3, 6 9 and 12 months course duration respectively Proof for placement 1) Salary slips 2) Salary payment proof (one of the following) successfully completed bank transfer, like NEFT or RTGS, from the employer or bank statement or passbook entries of the candidate’s account indicating that wages have been paid. 3) Joint certificate issued by the employer and candidate (as per SF 7.1D) If HR Department is not available in Org. As three months of continuous employment is needed total salary for the three month period for 3, 6, 9, and 12 month training programmes would be ₹18000, ₹ 24000, ₹ 36000 and ₹ 45000 respectively. Mahesh kumar-B-ABLE 66 Placement & Tracking
  • 67. DDU-GKY Mahesh kumar-B-ABLE 67 • Treatment of first month of employment: If the candidate is employed for a full month (joins on the 1st of the month) then first month will be treated as a normal month. • However, if the candidate joins after 1st of a month then depending on the salary paid in the first month decision whether to consider first month as placed or not is decided. A- If she/he gets more than the minimum salary (as indicated in Table above) then she/he will be considered as placed in the first month. Then the candidate has to fulfil the placement criteria within next three months. However, if best three months out of the four month window does not fulfil the cumulative salary criterion then first month is removed and one more month can be considered for fulfilling the placement criteria. B- Otherwise first month will not be counted and she/he still has 4 month window for fulfilling the placement criteria. e. Further, as employment also involves migration to cities and towns – places which are not only unfamiliar physically but also culturally; the transition is difficult and more than often painful. Thus the youth have a tendency to relapse back to more familiar home environment. Hence to facilitate slow transition to new environments instead of three months continuously a four month window is considered and if the candidate fulfils all the conditions of placement in any of these three months he would be considered as placed.
  • 68. DDU-GKY Placement Incentives Mahesh kumar-B-ABLE 68 1. Incentives for Placement of more than 70% a. Rs.3000/- above 70% - 85% b. Rs.5000/- above 85% 2. Retention Support a. Continuous work for12 months b. Rs.3000/- per candidate out of which Rs.1000/- shared with candidate c. continuous work over a period of 365 days with a maximum break of 60 calendar days during this period 3. Career Progression Support a. Candidate who crosses salary of Rs.15,000/- per month b. Rs.5000/- per candidate out of which 1/3rd i.e. Rs.1333/- to be shared with the candidate. c. If a candidate earn a salary of Rs 15,000/- per month and holds it for a minimum of 90 calendar days within one year of completion of training.
  • 69. DDU-GKY INCENTIVES 69 4. Foreign Placement Support a. Minimum salary Rs. 25,000 per month b. Rs.10,000/- per candidate 5. Mobile Tracking Support Cost a. Rs.50/- mobile top up 6. Special Area Allowance a. Addl. 10% for in special areas (NE States, J&K, HP, UK, And & NIC Island, Lakshadweep & Left Wing Extremism areas) 7. Assessment Certification Cost a. Rs.1,500/- per candidate
  • 70. DDU-GKY FUND RELEASE CONDITIONS Mahesh kumar-B-ABLE 70 1st Instalment (25%) • 25 % of Project cost • Release on sanction of project • Signing of MoU , Centre approval, Training start ( 12.5-12.5%) 2nd Instalment (25%) • Training Completion of 20 % & 7 % of placement target of total project target • Submission of audited financial reports and 60 % Fund Utilization of 1ST Instalment 3rd Instalment (25%) • Training Completion of 60 % & 25 % of placement target of total project target • Submission of audited financial reports and 60 % Fund Utilization of 2nd Instalment 4th Instalment (25%) • Training Completion of 100 % & 70 % of placement target of total project target • Submission of audited financial reports and 100 % Fund Utilization of Project.
  • 71. DDU-GKY TRAINING COST 71 Cost Item Details 1 Training Cost - (Any duration) Covers PC Tablet cost and live distance training cost also Category I – Rs. 40.40 per hour Category II – Rs. 34.65 per hour Category III – Rs. 28.80 per hour 2 Boarding and Lodging ‘X’ Category cities Rs. 300 per day ‘Y’ Category cities Rs. 250 per day ‘Z’ Category cities Rs. 200 per day Other Places Rs. 175 per day 3 Food and To & Fro Charges (Non-residential) Rs.100/- per day 4 Post Placement Support Placement within district of domicile Rs. 2000 for 2 months Placement within state of domicile Rs. 3000 for 3 months Placement outside state of domicile Rs. 6000 for 6 months Himayat: For 3 months training, Rs. 2000 per month for 6 month & more than 3 months training, Rs. 1000 per month for 2 months 5 Cost of uniforms Courses with duration <=6 months - Rs. 1000/- & for >6 months – Rs.2000/- 6 One Time Travel Cost Rs.4,500/- or Actual cost whichever is less Refundable Security Deposit: A PIA may charge Rs.250/- as refundable security deposit from each candidate selected for a training batch. It will be collected at the time of commencement of training batch & shall be refunded to a candidate who completes the training and is successfully certified.
  • 72. DDU-GKY Standard Forms SOP Chapter Chapter Content No. of Standard Forms 1 Introduction 1 3 Project Implementation Procedures 14 4 Training Design and Plan 12 5 Training Centres 43 6 Training Initiation and Completion 15 7 Tracking and Placement 37 8 Project Financial Procedures 53 9 Grading of a Project and Project Implementing Agency 11 Total 186 72
  • 73. DDU-GKY List of Standard Forms S.N o Name of SF,s Content of SFs Time and Use of SFs 1 SF 3.1A Prospective project work schedule At the time of Project MoU , can be revise once during the project tenure by PIA 2 SF 3.1B Standard terms & conditions At the time of Project MoU by SRLM 3 SF 3.1C Special terms & conditions At the time of Project MoU by SRLM 4 SF 3.1D Power of Attorney At the time of Project MoU by PIA 5 SF 3.2A Bank account details At the time of Project MoU by PA 6 SF 3.2B Project commencement order After MoU by SRLM to PIA 7 SF 3.3A Project execution readiness assessment After MoU by PIA 8 SF 3.10A Details of Centre in-charge and trainers By PIA During DDR Preparation and submission 9 SF 3.10B Details of PIA Q-team members By PIA During DDR Preparation and submission 10 SF 4.1A Plan of training After MoU by PIA 11 SF 4.5A Activity cum lesson planner By PIA During DDR Preparation and submission Mahesh kumar-B-ABLE 73
  • 74. DDU-GKY Mahesh kumar-B-ABLE 74 S.N o Name of SF,s Content of SFs Time and Use of SFs 12 SF 4.6A On the job training plan for the batch After 20 days batch freeze 13 SF4.6B On the job training confirmation letter for candidates Before sending candidates for OJT by Employer 14 SF 4.6C OJT completion certificate for candidates After completion of OJT by Employer 15 SF 4.6D Verification for OJT Around mid of OJT 16 SF 5.1 D1 Due diligence of a training centre (excluding residential facilities) At the time of Centre setup 17 SF 5.1D2 Due diligence for residential facilities At the time of Centre setup 18 SF 5.1E1 Summary of staff deployed at the training centre Available and update whenever employee change at center 19 SF 5.1E2 Trainers’ profile Available and update whenever employee change at center 20 SF 5.1H1: Batch summary as on day of batch freezing 10th day of batch freeze 21 SF 5.1H2: List of candidates in the batch and their profile At the time of batch start
  • 75. DDU-GKY Mahesh kumar-B-ABLE 75 S.N o Name of SF,s Content of SFs Time and Use of SFs 22 SF 5.1I Attendance registers for candidates (as per biometric device) At the time of batch start 23 SF 5.1L1 Candidate feedback form At the time of batch end 24 SF 5.1M Summary of evaluation and assessment done After every 15 day assessment 25 SF 5.1O1 Training certificate After completion of training 26 SF 5.1T Daily failure items report On daily basis 27 SF 5.1U 15 day summary of centre status After every 15th day during training 28 SF 6.2A3 Candidate application form Before batch start 29 SF 6.3A1 Batch details On the day of batch start 30 SF 6.3A2 Batch enrolment summary On the day of batch start 31 SF 6.3A3 Batch freeze summary 10th day of batch start
  • 76. DDU-GKY Mahesh kumar-B-ABLE 76 S.N o Name of SF,s Content of SFs Time and Use of SFs 32 SF 6.3A4 Batch completion summary At the time of batch batch completion 33 SF 5.1L1 Candidate feedback form At the time of batch end 34 SF 5.1M Summary of evaluation and assessment done After every 15 day assessment 35 SF 5.1O1 Training certificate After completion of training 36 SF 5.1T Daily failure items report On daily basis 37 SF 5.1U 15 day summary of centre status After every 15th day during training 38 SF 6.2A3 Candidate application form Before batch start 39 SF 6.3A1 Batch details On the day of batch start 40 SF 6.3A2 Batch enrolment summary On the day of batch start 41 SF 6.3A3 Batch freeze summary 10th day of batch start
  • 77. DDU-GKY Mahesh kumar-B-ABLE 77 S.N o Name of SF,s Content of SFs Time and Use of SFs 42 SF 6.3A5 List of candidates who were enrolled At the time on batch start 43 SF 6.3A6 List of candidates after freezing of the batch At the time of batch freeze (10th day) 44 SF 6.3A7 List of candidates after completion of training of the batch At the time of batch completion 45 SF 6.3B Candidate Attendance After completion of training 46 SF 7.1B1 Tracking form for candidates in Group A After placement , Every month before 15th 47 SF 7.1B2 Tracking form for candidates in group B After placement , Every month before 15th 48 SF 7.1C Certificate for employment location After Placement 49 SF 7.1G: List of candidates who are in Group ‘A’ List of candidates who has completed 3 month in placement 50 SF 7.3B List of candidates for PPS payment After placement