Tell me what you pay attention to and I will tell you who you are.
Jose Ortega y Gasset, Spanish Philosopher, 1883
MATHEMATICS ACHIEVEMENT OF LOW
INCOME STUDENTS AT WILDWOOD
ELEMENTARY
THROUGH DATA ANALYSIS, TARGETED
INTERVENTION AND PROFESSIONAL
DEVELOPMENT

Heather McMullen
Professional Principal and Program Administrator Certification

University of Washington, Tacoma
December 3, 2012
Intervention Goals




To increase the number of low-income students meeting
standard in reading and mathematics as measured by the
Washington state MSP test grades 3-6 and DIBELS district
benchmark reading tests grades K-6 (2.1/2.2).
To provide systematic professional development to staff
regarding the culture of poverty and ways to support students
and families in poverty (2.3).
Keys to the Intervention

Developing
Professionally

Examining
Data

Building Capacity

Celebrating
Strengths
Wildwood Elementary


Serving 542 Students
 Built

in 1966
 53% Free and Reduced (2011)
 21% Special Education
 Pre-School to Sixth Grade


Staff
 28

classroom teachers and 25 support
staff
 16.3 years average experience
Changing Demographics

• Ninety percent of staff
at Wildwood had
worked there 10 years
or more

Percentage of Wildwood Students on Free and Reduced Lunch
60

Percentage of Student Body

• Number of students on
free and reduced
lunch almost tripled
from 2005 to 2011

50

40

30
Free and Reduced
Lunch

20

10

0
2005 2006 2007 2008 2009 2010 2011

• In 2011, 53.1% of all
Wildwood students
qualified as lowincome

Year
Analyzing Data –

artifact 1

• Persistent Achievement
Gap between non-low
income and low income
students
• Achievement Gap from
16% to 50%
• AYP pressures related
to progress of low
income students
• Depleted resources
due to sanctions
High Stakes Challenge
Elementary Uniform Bar (3-5)

88.1%
100

100

88.1
90

76.1

Percent Meeting Standard

80
70

79.0

64.2
64.9

60

52.2

58.0

50

47.3

40

Reading
Mathematics

30

29.7

58%

20
10
0
2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014
Intervening and Instructing -artifact 2
 Intervention,

Special Education and Title 1

coordination
 Schedule constructed around Instructional Blocks
Coordinated Services -artifact 2
 Common

Grade Level Reading and Math

Blocks
 Common Grade Level Intervention Blocks
 Included Special Education and Title schedule
coordination
Adhering to Targets -artifact 3
 Shift

to teaching to grade level
expectations in reading




Facilitated deep knowledge of state test question
stems
Wrote questions for a variety of reading materials
and levels (K-6)
Planned instruction and assessment of reading
comprehension strategies at all grade levels

 Aligned

mathematics instruction to
performance expectations





Met with teachers to deepen knowledge of tested
math targets
Wrote “student friendly” targets with success criteria
Coordinated grade level team meetings to align
current curriculum and supplement when needed
Adhering to Targets -artifact 3
 Students



assessed frequently in reading comprehension and mathematics

Grade levels teams met weekly to adjust groups based on assessments
Teachers communicated with parents weekly via progress reports from small
groups

 Instruction




in small groups based on skill deficits

Groups were grade level flexible
Students moved out of groups when the target skill was attained
Examining Data

-artifact 4

 Data

Spreadsheets compiled for team
discussions
 Multiple

levels and multiple data points entered
 MSP, DIBELS, CBAs, Intervention materials
assessment
 Data included multiple years of data
 Patterns in the data were highlighted
 Interventions for each student recorded
 Data sheets public and maintained for multiple
school years
Examining Data – artifact 4
 Data

Days 3x per year
 Shift in ownership – “my kids” vs. “our kids”
 Predictions and Commitments made publicly
Developing Professionally -artifact 5
 Focus

on:

 Gaining

poverty
knowledge
 Connecting with families
 Communication and
teaching styles
 Examining our biases
 Honoring students’
strengths
Prepared and Facilitated 6
 Knowing local resources
sessions
1.5 hours each – all Wildwood
Building Capacity and Connections

-artifact 6

Tour of local community resources in
order to build capacity and knowledge
 Bus

Tour
 St. Francis House
 Puyallup Food Bank
 Staff donations
On-site resources for struggling
families and support from
PTA, Wildwood Staff and District Staff
 Wildwood clothing bank
 Wildwood food bank
 Homework helpers
Celebrating Accomplishments

-artifact 7

Special Recognition:
Closing the Achievement
Gap 2011

Washington School
of Distinction in
2011
Out of the 1,388
schools on the
A.Y.P. failing
list, only 35
elementary
schools earned
their way off the
needs
improvement list.
Wildwood
Elementary beats
Students at
Wildwood
scored
above the
district and
the state in
reading and
math in
2011.
Closing the Achievement Gap
Over 85% of Wildwood
3rd Grade low income
students met standard in
reading in 2011.

We closed the gap in Reading (5.1% difference)
We closed the gap in Math (8.4% difference)
How can we raise math scores for all 3rd
grade students?
INCREASING THE READING AND MATHEMATICS
ACHIEVEMENT OF LOW INCOME STUDENTS
AT WILDWOOD ELEMENTARY

Profession
al
Developme
nt
Targeted
Instruction
and
Interventio
n
Data
Analysis

Building
Relationships
and
Connections
McMulen Data Vision Action 11.14.13

McMulen Data Vision Action 11.14.13

  • 1.
    Tell me whatyou pay attention to and I will tell you who you are. Jose Ortega y Gasset, Spanish Philosopher, 1883
  • 15.
    MATHEMATICS ACHIEVEMENT OFLOW INCOME STUDENTS AT WILDWOOD ELEMENTARY THROUGH DATA ANALYSIS, TARGETED INTERVENTION AND PROFESSIONAL DEVELOPMENT Heather McMullen Professional Principal and Program Administrator Certification University of Washington, Tacoma December 3, 2012
  • 16.
    Intervention Goals   To increasethe number of low-income students meeting standard in reading and mathematics as measured by the Washington state MSP test grades 3-6 and DIBELS district benchmark reading tests grades K-6 (2.1/2.2). To provide systematic professional development to staff regarding the culture of poverty and ways to support students and families in poverty (2.3).
  • 17.
    Keys to theIntervention Developing Professionally Examining Data Building Capacity Celebrating Strengths
  • 18.
    Wildwood Elementary  Serving 542Students  Built in 1966  53% Free and Reduced (2011)  21% Special Education  Pre-School to Sixth Grade  Staff  28 classroom teachers and 25 support staff  16.3 years average experience
  • 19.
    Changing Demographics • Ninetypercent of staff at Wildwood had worked there 10 years or more Percentage of Wildwood Students on Free and Reduced Lunch 60 Percentage of Student Body • Number of students on free and reduced lunch almost tripled from 2005 to 2011 50 40 30 Free and Reduced Lunch 20 10 0 2005 2006 2007 2008 2009 2010 2011 • In 2011, 53.1% of all Wildwood students qualified as lowincome Year
  • 20.
    Analyzing Data – artifact1 • Persistent Achievement Gap between non-low income and low income students • Achievement Gap from 16% to 50% • AYP pressures related to progress of low income students • Depleted resources due to sanctions
  • 21.
    High Stakes Challenge ElementaryUniform Bar (3-5) 88.1% 100 100 88.1 90 76.1 Percent Meeting Standard 80 70 79.0 64.2 64.9 60 52.2 58.0 50 47.3 40 Reading Mathematics 30 29.7 58% 20 10 0 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
  • 22.
    Intervening and Instructing-artifact 2  Intervention, Special Education and Title 1 coordination  Schedule constructed around Instructional Blocks
  • 23.
    Coordinated Services -artifact2  Common Grade Level Reading and Math Blocks  Common Grade Level Intervention Blocks  Included Special Education and Title schedule coordination
  • 24.
    Adhering to Targets-artifact 3  Shift to teaching to grade level expectations in reading    Facilitated deep knowledge of state test question stems Wrote questions for a variety of reading materials and levels (K-6) Planned instruction and assessment of reading comprehension strategies at all grade levels  Aligned mathematics instruction to performance expectations    Met with teachers to deepen knowledge of tested math targets Wrote “student friendly” targets with success criteria Coordinated grade level team meetings to align current curriculum and supplement when needed
  • 25.
    Adhering to Targets-artifact 3  Students   assessed frequently in reading comprehension and mathematics Grade levels teams met weekly to adjust groups based on assessments Teachers communicated with parents weekly via progress reports from small groups  Instruction   in small groups based on skill deficits Groups were grade level flexible Students moved out of groups when the target skill was attained
  • 26.
    Examining Data -artifact 4 Data Spreadsheets compiled for team discussions  Multiple levels and multiple data points entered  MSP, DIBELS, CBAs, Intervention materials assessment  Data included multiple years of data  Patterns in the data were highlighted  Interventions for each student recorded  Data sheets public and maintained for multiple school years
  • 27.
    Examining Data –artifact 4  Data Days 3x per year  Shift in ownership – “my kids” vs. “our kids”  Predictions and Commitments made publicly
  • 28.
    Developing Professionally -artifact5  Focus on:  Gaining poverty knowledge  Connecting with families  Communication and teaching styles  Examining our biases  Honoring students’ strengths Prepared and Facilitated 6  Knowing local resources sessions 1.5 hours each – all Wildwood
  • 29.
    Building Capacity andConnections -artifact 6 Tour of local community resources in order to build capacity and knowledge  Bus Tour  St. Francis House  Puyallup Food Bank  Staff donations
  • 30.
    On-site resources forstruggling families and support from PTA, Wildwood Staff and District Staff  Wildwood clothing bank  Wildwood food bank  Homework helpers
  • 31.
    Celebrating Accomplishments -artifact 7 SpecialRecognition: Closing the Achievement Gap 2011 Washington School of Distinction in 2011
  • 32.
    Out of the1,388 schools on the A.Y.P. failing list, only 35 elementary schools earned their way off the needs improvement list. Wildwood Elementary beats
  • 33.
    Students at Wildwood scored above the districtand the state in reading and math in 2011.
  • 34.
    Closing the AchievementGap Over 85% of Wildwood 3rd Grade low income students met standard in reading in 2011. We closed the gap in Reading (5.1% difference) We closed the gap in Math (8.4% difference) How can we raise math scores for all 3rd grade students?
  • 35.
    INCREASING THE READINGAND MATHEMATICS ACHIEVEMENT OF LOW INCOME STUDENTS AT WILDWOOD ELEMENTARY Profession al Developme nt Targeted Instruction and Interventio n Data Analysis Building Relationships and Connections