1. CURRICULUM VITAE
Contact No.-#00971 555728992(UAE)
# 0091 9732157329(INDIA)
RANJIT KUMAR SEN E-mail:ranjitkumar_sen@rediffmail.com
: ranjitkumar_sen@yahoo.co.in
AIMS/OBJECTIVE: To work in a professionally managed organization so as to add value to the
concern and self, enabling development of skills and abilities through hands on experience
to learn from the best.
EXPERTISE: Having more than 15 years’ experience as a QA/QC Engineer in Oil & Gas Projects in the
field of Monitoring & Inspection of Incoming Materials, Fit up, Welding, NDT, Blasting, Painting, Leak
Test, etc Preparation of Test Packs individual system wise of piping jobs and Well conversant with P&ID,
GA, Isometric Drawings and familiar with related ASME, ASTM, API, AWS, IS and related Codes. During
this period worked with (A)PETROLEUM REGENERATION AND PROCESSING FACILITY, ECOMAR
ENERGY SOLUTIONS FZC, FUJAIRAH, UAE. (B)DESIGN, FABRICATION & INSTALLATION OF 2 NOS
OF DESALINATED WATER STORAGE TANK (2 NOS@20mtr.) EPCL, DUBAI, UAE. (C) NEW PROJECT JOB OF
VERTICAL STORAGE TANK (6 NOS @15.5mtr.) & PIPING JOB OF ELOMP EXPANSION PROJECT, ENOC,
FUJAIRAH, UAE. (D) NEW PROJECT JOB OF VERTICAL STORAGE TANK (6 NOS @20mtr.)OF FUJAIRAH OIL
TERMINAL PROJECT, ROTARY, FUJAIRAH, UAE. (E) NEW PROJECT JOB OF VERTICAL STORAGE TANK
(12 NOS @29mtr. & 41mtr.) OF EFDTT PROJECT, ENOC, FUJAIRAH, UAE. (F) 6X135 MTPA STEEL&POWER
PLANT,JINDAL STEEL&POWER LTD. ANGUL,ODISHA,INDIA. (G) MSQ IMPROVEMENT PROJECT, INDIAN
OIL CORPORATION LTD- BONGAIGAON REFINERY, ASSAM, INDIA. (H) MSQ UPGRADATION PROJECT,
INDIAN OIL CORPORATION LTD - BARAUNI REFINERY, BIHAR, INDIA. (I) HGU & HCU PROJECT, INDIAN
OIL CORPORATION LTD - HALDIA REFINERY, INDIA. (J) NEW PROJECT JOB OF CROSS COUNTRY
PARAXYLENE PIPE LINES (18”dia. U/G&A/G), MCC PTA INDIA CORPORATION. PVT. LTD. - HALDIA, INDIA.
(K) EXPANSION PROJECT OF HINDALCO ALUMILIUM PLANT, HINDALCO- MURI, INDIA. (L) MSQ
PROJECT, INDIAN OIL CORPORATION LTD- HALDIA REFINERY, INDIA. (M) NEW PROJECT JOB OF
VERTICAL STORAGE TANK, HPCL-HALDIA TERMINAL, INDIA.
TECHNICAL QUALIFICATION:
I) Diploma in Mechanical Engineering.
II) Certificate in computer Aided Design (CAD).
III) ASNT-Level-II –Radiography Test.
IV) ASNT-Level-II-Ultrasonic Test.
V) ASNT-Level-II-Magnetic Particle Test.
VI) ASNT-Level-II-Liquid Penetrant Test.
VII) CSWIP 3.1 Welding Inspector.
VIII) Internal Auditor for Integrated Management System.
(ISO9001:2008,14001:2004 & OHSAS 18001:2007)
Present Job:
Organization CYLINGAS COMPANY LLC (Group of ENOC) DUBAI, UAE.
Duration August’2015’ To Till Date.
Project
PETROLEUM REGENERATION AND PROCESSING FACILITY
PROJECT, ECOMAR ENERGY SOLUTIONS FZC, FUJAIRAH, UAE.
CLIENT PYRAMID E&C FEZ, JLT DUBAI.
Position QA/QC Engineer.
Responsibilities includes at ECOMAR PIPE LINE Project (Ø24”,Ø20”,Ø20”,Ø8”):
As a main contractor QC Engineer –Which is includes following activity
1. All procedure (NDT, QAP, ITP, Consumable control etc.) Review & submit to client for approval.
2. Procedure & People qualification includes WPS/PQR/Welder qualification witness.
3. Incoming Materials Inspection (Pipe, pipe fittings, Valve etc.) & consumables inspection, MTC review etc.
4. Witness, result review during stage inspection performed with respect to fabrication & lowering /erection.
5. Coordinating with Client & contractor inspector at various stages of Inspection activities.
6. Conversant with International Codes like ASME section II, V, VIII, IX, ASME B31.3,AWS D1.1, API 1104,API 5L etc.
7. Weld edge preparation witness-100%.
8. Fit-up witness-100%
2. 9. Underground pipe laying witness-100%
10. RT film review -100%
11. Cutting age LPT witness-100%
12. Cutting age Ultrasonic Test witness-100%.
13. Check field joint sleeve coating, holiday test, peel test etc.
14. Blasting & Painting Inspection of above ground line.
15. Pipeline alignment check in U/G trench & A/G pipe rack.
16. Preparing punch List for Hydro Test clearance of PIPE LINE job.
17. Hydraulic Testing Witness.
18. Dewatering & Flushing inspection.
Previous Jobs:
Organization CYLINGAS COMPANY LLC (Group of ENOC) DUBAI, UAE.
Duration May’2015’ To July’2015’
Project
DESIGN, FABRICATION & INSTALLATION OF 2 NOS OF DESALINATED
WATER STORAGE TANK (2 NOS@20mtr.), DUBAI, UAE.
CLIENT ENOC PROCESSING COMPANY LLC.(EPCL)
Position QA/QC Engineer.
Responsibilities includes at EPCL Project: As a QC Engineer –
(1) Preparing of WPS, PQR and Quality Assurance Plane & Quality Control documents.
(2) Preparing Non Destructive Examination (NDE) Procedures in order to confirm as per project specification and
relevant International Standards. Witness, evaluation and interpretation of NDT techniques like RT, UT, MT, & PT. Co-
ordinate with NDT personal and making arrangement to complete the job in time.
(3) Coordinate in conducting Quality Audits, finding the Non conformities and suggesting corrective action to resolve.
(4) Preparing Welding Procedure Qualification Record (PQR) in case of variation in the essentials variable with existing
PQR, as per international standards and additional requirement of client.
(5) Preparing welding Procedure Specification (WPS) with relevant qualified PQR for the particular projects.
(6) Witness Welder Qualification Tests for various welding procedure specifications as per ASME section IX and ASME
B31.3, AWS D1.1 etc.
(7) Coordinating with TPI, client & contractors inspection department at various stages of Inspection activities.
(8) Conversant with International Codes like ASME section II, V, VIII, IX, ASME B31.3,AWS D1.1, API 1104,API 650 ,
ISO 5817, API 5L etc.
(9) Coordinating with Material Controller for Incoming Materials Inspection of varies steel materials, valves, pipes,
pipe fittings, consumables and equipment’s etc. with relevant documents like material test certificates. If required performing
mechanical test and chemical analysis in order to confirm as per project specification and relevant International Standards.
(10) Carrying out the welding inspection before, during and after welding operation as per approved test plan,
relevant engineering drawing, international standard and project specification.
(12) Maintain the latest version of all contracts documents, drawings, specifications and International standards.
(13) Preparing punch List/points of different test Package for Hydro Test clearance of TANKAGE job.
(14) Blasting & Painting Inspection of Internal Piping, Vertical Storage Tank.
(15) Preparing & Submission of Project Final Hand Over Documentation etc.
Organization CYLINGAS COMPANY LLC (Group of ENOC) DUBAI, UAE.
Duration June’2014’ To April’2015’.
Project ELOMP Expansion Project, Fujairah, UAE.
CLIENT ENOC(Emirates National Oil Company)
Position QA/QC Engineer.
Responsibilities includes at ELOMP Expansion Project: As a QC Engineer –
(1) Preparing of WPS, PQR and Quality Assurance Plane & Quality Control documents.
(2) Preparing Non Destructive Examination (NDE) Procedures in order to confirm as per project specification and
relevant International Standards. Witness, evaluation and interpretation of NDT techniques like RT, UT, MT, & PT. Co-
ordinate with NDT personal and making arrangement to complete the job in time.
(3) Coordinate in conducting Quality Audits, finding the Non conformities and suggesting corrective action to resolve.
(4) Preparing Welding Procedure Qualification Record (PQR) in case of variation in the essentials variable with existing
PQR, as per international standards and additional requirement of client.
(5) Preparing welding Procedure Specification (WPS) with relevant qualified PQR for the particular projects.
(6) Witness Welder Qualification Tests for various welding procedure specifications as per ASME section IX and ASME
B31.3, AWS D1.1 etc.
(7) Coordinating with TPI, client & contractors inspection department at various stages of Inspection activities.
(8) Conversant with International Codes like ASME section II, V, VIII, IX, ASME B31.3,AWS D1.1, API 1104,API 650 ,
ISO 5817, API 5L etc.
(9) Coordinating with Material Controller for Incoming Materials Inspection of varies steel materials, valves, pipes,
pipe fittings, consumables and equipments etc. with relevant documents like material test certificates. If required performing
mechanical test and chemical analysis in order to confirm as per project specification and relevant International Standards.
(10) Carrying out the welding inspection before, during and after welding operation as per approved test plan,
relevant engineering drawing, international standard and project specification.
3. (11) Carry out inspection and evaluation of static equipments like Tank, pressure vessels, etc.
(12) Maintain the latest version of all contracts documents, drawings, specifications and International standards.
(13) Preparing punch List/points of different test Package for Hydro Test clearance of PIPING & TANKAGE job.
(14) Blasting & Painting Inspection of Vertical Storage Tank.
(15) Preparing & Submission of Project Final Hand Over Documentation, Commissioning etc.
Organization CYLINGAS COMPANY LLC (Group of ENOC) DUBAI, UAE.
Duration December’2013 To June’2014’
Project Fujairah Oil Terminal, Fujairah, UAE.
CLIENT ROTARY, Singapore.
Position QA/QC Engineer.
Responsibilities includes at FOT Project: As a QC Engineer –
(1) Preparing of WPS, PQR and Quality Assurance Plane & Quality Control documents.
(2) Preparing Non Destructive Examination (NDE) Procedures in order to confirm as per project specification and
relevant International Standards. Witness, evaluation and interpretation of NDT techniques like RT, UT, MT, & PT. Co-
ordinate with NDT personal and making arrangement to complete the job in time.
(3) Coordinate in conducting Quality Audits, finding the Non conformities and suggesting corrective action to resolve.
(4) Preparing Welding Procedure Qualification Record (PQR) in case of variation in the essentials variable with existing
PQR, as per international standards and additional requirement of client.
(5) Preparing welding Procedure Specification (WPS) with relevant qualified PQR for the particular projects.
(6) Witness Welder Qualification Tests for various welding procedure specifications as per ASME section IX and ASME
B31.3, AWS D1.1 etc.
(7) Coordinating with TPI, client & contractors inspection department at various stages of Inspection activities.
(8) Conversant with International Codes like ASME section II, V, VIII, IX, ASME B31.3,AWS D1.1, API 1104,API 650 ,
ISO 5817, API 5L etc.
(9) Coordinating with Material Controller for Incoming Materials Inspection of varies steel materials, valves, pipes,
pipe fittings, consumables and equipments etc. with relevant documents like material test certificates. If required performing
mechanical test and chemical analysis in order to confirm as per project specification and relevant International Standards.
(10) Carrying out the welding inspection before, during and after welding operation as per approved test plan,
relevant engineering drawing, international standard and project specification.
(11) Maintain the latest version of all contracts documents, drawings, specifications and International standards.
(12) Preparing punch points of different test Package for Hydro Test clearance.
(13) Preparing & Submission of Project Final Hand Over Documentation etc.
Organization CYLINGAS COMPANY LLC (Group of ENOC) DUBAI, UAE.
Duration November’2011 To November ’2013.
Project Enoc Fujairah Distribution Trading Terminal, Fujairah, UAE.
CLIENT ENOC(Emirates National Oil Company)
Position QA/QC Engineer.
Responsibilities includes at EFDTT Project: As a QC Engineer –
(1) Preparing of WPS, PQR and Quality Assurance Plane & Quality Control documents.
(2) Preparing Non Destructive Examination (NDE) Procedures in order to confirm as per project specification and
relevant International Standards and coordinating. Witness, evaluation and interpretation of NDT techniques like RT, UT,
MT, & PT. Co-ordinate with NDT personnel and making arrangement to complete the job in time in proper quality.
(3) Coordinate in conducting Quality Audits, finding the Non conformities and suggesting corrective action to resolve.
(4) Preparing Welding Procedure Qualification Record (PQR) in case of variation in the essentials variable with existing
PQR, as per international standards and additional requirement of client.
(5) Preparing welding Procedure Specification (WPS) with relevant qualified PQR for the particular projects.
(6) Witness Welder Qualification Tests for various welding procedure specifications as per ASME section IX and ASME
B31.3, API 1104, AWS D1.1 etc.
(7) Coordinating with TPI, client & contractors inspection department at various stages of Inspection activities.
(8) Conversant with International Codes like ASME section II, V, VIII, IX, ASME B31.3,AWS D1.1, API 1104,API 650 ,
ISO 5817, API 5L etc.
(9) Coordinating with Material Controller for Incoming Materials Inspection of varies steel materials, valves, pipes,
pipe fittings, consumables and equipments etc. with relevant documents like material test certificates. If required performing
mechanical test and chemical analysis in order to confirm as per project specification and relevant International Standards.
(10) Carrying out the welding inspection before, during and after welding operation as per approved test plan,
relevant engineering drawing, international standard and project specification.
(11) Carry out inspection and evaluation of static equipments like Tank, pressure vessels, etc.
(12) Maintain the latest version/Revision of contracts documents, drawings, specifications and International standards.
(13) Preparing punch points of different test Package for Hydro Test clearance.
(14) Blasting & Painting Inspection of all relevant Raw Materials, Internal Piping & Vertical Storage Tank of EFDTT project.
(15) Preparing & Submission Project Final Hand Over Documentation, Commissioning etc.
4. Organization BUREAU VERITAS (INDIA) PVT.LTD. Mumbai, India.
Duration Sept’2011 To October 2011.
Project 6X135 MTPA STEEL & POWER PLANT,
CLIENT JINDAL STEEL & POWER LTD. ANGUL, ODISHA,
Position Sr. Surveyor.
Responsibilities includes at Jindal Steel & Power Project: As a Third Party Inspector –
(1) Reviewed & Approved of WPS, PQR and Quality Assurance Plane & Quality Control documents.
(2) Review and approve Non Destructive Examination (NDE) Procedures in order to confirm as per project specification
and relevant International Standards and co-ordinating. Witness, evaluation and interpretation of NDT techniques like RT,
UT, MT, & PT. Co-ordinate with NDT personnel and making arrangement to complete the job in time.
(3) Coordinate in conducting Quality Audits, finding the Non conformities and suggesting corrective action to resolve.
(4) Reviewed Welding Procedure Qualification Record (PQR) in case of variation in the essentials variable with existing
PQR, as per international standards and additional requirement of client.
(5) Reviewed/Preparing welding Procedure Specification (WPS) with relevant qualified PQR for the particular projects.
(6) Witness Welder Qualification Tests for various welding procedure specifications as per ASME section IX and ASME
B31.3, API 1104, AWS D1.1 etc.
(7) Coordinating with client & contractors inspection department at various stages of Inspection activities.
(8) Conversant with International Codes like ASME section II, V, VIII, IX, ASME B31.3,AWS D1.1, API 1104,API 650 ,
ISO 5817, API 5L etc.
(9) Coordinating with Material Controller for Incoming Materials Inspection of varies steel materials, valves, pipes,
pipe fittings, consumables and equipments etc. with relevant documents like material test certificates. If required performing
mechanical test and chemical analysis in order to confirm as per project specification and relevant International Standards.
(10) Carrying out the welding inspection before, during and after welding operation as per approved test plan,
relevant engineering drawing, international standard and project specification.
(11) Welding inspection of various piping materials like Carbon Steel, low temperature carbon steel, etc.
(12) Carry out inspection and evaluation of static equipments like pressure vessels, heat exchangers, columns, etc.
(13) Maintain the latest version of all contracts documents, drawings, specifications and International standards.
(14)Witness Calibration and documentation of measuring instruments, gauges, and equipments etc.
(15) Preparing punch points of different test loops for NDT clearance.
Organization UHDE INDIA LTD. MUMBAI.
Duration May’2010 To Aug’2011.
Project MSQ Improvement Project – IOCL Refinery-Bongaigaon, Assam.
CLIENT IOCL-Bongaigaon Refinery.
Position Asst. Construction Manager(QC)
Responsibilities includes at MSQ Improvement Project: As a Consultant –
(1) Reviewed & Approved of WPS, PQR and Quality Assurance Plane & Quality Control documents.
(2) Review and approve Non Destructive Examination (NDE) Procedures in order to confirm as per project specification
and relevant International Standards and coordinating. Witness, evaluation and interpretation of NDT techniques like RT,
UT, MT, & PT. Co-ordinate with Contractor QC personnel and making arrangement to complete the job in time.
(3) Coordinate in conducting Quality Audits, finding the Non conformities and suggesting corrective action to resolve.
(4) Reviewed Welding Procedure Qualification Record (PQR) in case of variation in the essentials variable with existing
PQR, as per international standards and additional requirement of client.
(5) Reviewed/Preparing welding Procedure Specification (WPS) with relevant qualified PQR for the particular projects.
(6) Witness Welder Qualification Tests for various welding procedure specifications as per ASME section IX and ASME
B31.3, API 1104, AWS D1.1 etc.
(7) Coordinating with client & contractors inspection department at various stages of Inspection activities.
(8) Conversant with International Codes like ASME section II, V, VIII, IX, ASME B31.3,AWS D1.1, API 1104,API 650 ,
ISO 5817, API 5L etc.
(9) Coordinating with Material Controller for Incoming Materials Inspection of varies steel materials, valves, pipes,
pipe fittings, consumables and equipments etc. with relevant documents like material test certificates. If required performing
mechanical test and chemical analysis in order to confirm as per project specification and relevant International Standards.
(10) Carrying out the welding inspection before, during and after welding operation as per approved test plan,
relevant engineering drawing, international standard and project specification.
(11) Welding inspection of various piping materials like Alloy Steel, low temperature carbon steel, stainless steel, etc.
(12) Witness the Hydrostatic test, pneumatic test, Pressure test and vacuum test as per project procedure.
(13) Carry out inspection and evaluation of static equipments like pressure vessels, heat exchangers, columns, etc.
(14) Maintain the latest version of all contracts documents, drawings, specifications and International standards.
(15) Witness Calibration and documentation of measuring instruments, gauges, and equipments etc.
(16) Preparing punch points of different test loops for NDT clearance.
(17) Issuing the punch point list to contractors to attend the points.
5. Organization PUNJ LLOYD LTD,NEW DELHI
Duration December’2009 to May’2010.
Project IOCL Refinery-Barauni – MSQ Up Gradation Unit.
CLIENT/CONSULTANT Toyo Engineering India Limited.
Position Sr. Engineer (QC)
Responsibilities includes at MSQ Up gradation Project : As a Sr. Engineer(QC) –
(1)Preparing and implementing Inspection Test Plan and Method Statement for various activities involved in the
construction of Oil & Gas Plant as project specification & relevant International Standards and getting approvals from the
client.
(2)Coordinate in conducting Quality Audits, finding the Non conformities and suggesting corrective action to resolve.
(3)Performing Welding Procedure Qualification Record (PQR) in case of variation in the essentials variable with existing
PQR, as per international standards and additional requirement of client.
(4)Preparing welding Procedure Specification (WPS) with relevant qualified PQR for the particular projects
(5)Performing Welder Qualification Tests for various welding procedure specifications as per ASME section IX and ASME
B31.3, API 1104, AWS D1.1 etc.
(6)Coordinating with consultant inspection department at various stages of fabrication, Erection, Welding, Testing
activities and getting approval.
(7)Conversant with International Codes like ASME section II, V, VIII, IX, ASME B31.3,AWS D1.1, API 1104,API 650 ,
ISO 5817, API 5L etc.
(9)Coordinating with Material Controller for Incoming Inspection of various steel materials, consumables, tools and
equipments etc. with relevant documents like material test certificates. If required performing mechanical test and chemical
analysis in order to confirm as per project specification and relevant International Standards.
(10)Carrying out the welding inspection before, during and after welding operation as per approved test plan, relevant
engineering drawing, international standard and project specification.
(11)Welding inspection of various piping materials like Carbon Steel, low temperature carbon steel, Alloy Steel,
stainless steel, etc.
(12)Witness the Hydrostatic test, pneumatic test, Pressure test and vacuum test as per project procedure.
(13)Carry out inspection and evaluation of fitness for service of equipments like pumps & motors, static equipments like
Vessels, heater package, flare stack etc. with third party and obtained final acceptance.
(14)Maintain the latest version of all contracts documents, drawings, specifications and International standards.
(15)Calibration and documentation of measuring instruments, gauges, and equipments etc.
(16) Monitoring over QA/QC of Prefabrication and Erection of different Process, Utility piping & Steel Structure Job.
(17) As a Inspector Inspected the Incoming Materials, Blasting, Painting, WQT, Fit up, PWHT, Weld visual, SR, Formal NDT
(RT,UT,LPT),Loop Clearance ,Hydro Test, etc.
Organization PUNJ LLOYD LTD,NEW DELHI
Duration February’2009 to December2009.
Project
IOCL Refinery-Haldia- Hydrogen Generation Unit & Hydro Cracker
Unit.
CLIENT/CONSULTANT Lurgi India Pvt. Ltd.
Position Sr. Engineer(QC)
Responsibility: As a Sr. Engineer(QC)-
Responsibilities includes at Hydrogen Generation Unit :
(1) Coordinating with Client, PMC & Sub-Contractors.
(2) Monitoring over mechanical clearance of total test loops.
(3) Preparing punch points of different test loops for mechanical clearance.
(4) Issuing the punch point list to subcontractor to attend the points.
(5) Offering the loops to PMC for final mechanical clearance after clearing the Punch points already issued to subcontractor.
(6) Attending the secondary punch points after completion of the pressure test
Responsibilities includes at Hydro Cracker Unit :
(7) Prepared & Monitoring of WPS, PQR and Quality Assurance Plane & Quality Control documents.
(8) Monitoring over QA/QC of Prefabrication and Erection of different Process, Utility piping & Steel Structure Job.
(9)As a Inspector Inspected the Incoming Materials, Blasting, Painting, WQT, Fit up, PWHT, Weld visual, Formal NDT
(RT,UT,LPT),Loop Clearance ,Hydro Test, etc.
6. Organization TUV-SUD South Asia Pvt. Ltd. MUMBAI.
Duration October’2007 to January’2009
Project
New Project Job Of Cross Country Paraxylene Pipe Lines - MCC PTA
INDIA CORPORATION. PVT. LTD.- HALDIA.
CLIENT/CONSULTANT MCC PTA INDIA CORPORATION. PVT. LTD.
Position Inspection Engineer.
Responsibility: As a Inspection Engineer -Handles TPIA of below mentioned assignments /Projects,
(1) Third Party Inspection at Indian Oil Corporation Ltd. Haldia Refinery during Shutdown 2007. Which
Includes Inspection of Piping, Tankage, Heat Exchangers, Pressure Vessels, Columns, and Furnace etc at TPS & LOB.
(2) Third Party Inspection of various SAIL Steel Structural materials i.e. Plates, Beam, Angles, Channels
Of Bokaro & Bhilai Steel Plants of IOTL. Mumbai,
(3) Third Party Inspection of UNICEF drinking water HDPE pipes at Ori-Plast, Balasore, and Orissa.
(4) Third Party Inspection Different items of Paharpur Cooling Towers Limited for the job of “Cooling
Water system for Panipat Naphtha Cracker Project of Indian Oil Corporation Ltd. at Panipath (Haryana).
(5) Third Party Inspection at WPIL Ltd. Stage wise inspection from casting to performance test for the job of Vertical Turbine
Pump of Alstom Projects India Ltd for NHPCL.
(6) Third Party Inspection at Indian Oil Corporation Ltd. Barauni Refinery during Shutdown 2008. This includes Inspection of
Piping, Tank age, Heat Exchangers, Pressure Vessels, Columns, and Furnace etc at Cocker Units (A&B), AVU-2 Unit.
Third Party Inspection of New Project job of Cross Country Paraxylene Pipe Lines (18”dia. U/G & A/G) of MCCPTA,
Haldia, Which is includes
a. QAP/ITP Review.
b. Procedure & People qualification includes WPS/PQR/Welder qualification witness.
c. Incoming Materials & consumables inspection, MTC review, verification.
d. Witness, result review & certification during stage inspection performed with respect to fabrication & erection
Including inspection of fit-up, welding, forming NDT, alignment.
e. Weld edge preparation witness-100%.
f. Fit-up witness-100%
g. Under ground pipe laying witness-100%
h. RT film review -100%
i. DP Test witness-100%
j. Ultrasonic Test witness-100%.
k. Daily Progress report shall be submitted to MCPI.
l. Check field joint coating, holiday test, peel test etc.
m. Pipeline alignment check in U/G trench & A/G pile T-support.
n. Test involving integrity check including hydraulic Testing Witness.
o. Issue of final inspection release certificate.
Organization
M/S Stewarts And Lloyds Of India Limited
(A subsidiary Of IOTL), Kolkata.
Duration January’ 2007 to September’2007.
Project
Expansion Project Of Hindalco Alumilium Plant, Hindalco – Muri,
Jharkhand.
CLIENT/CONSULTANT Engineers India Ltd,
Position Officer Project (QC).
Responsibility: (1) Prepared & Monitoring of WPS, PQR and Quality Assurance Plane & Quality Control documents.
(2) Monitoring over QA/QC of Prefabrication and Erection of different Process, Utility piping & Steel Structure Job.
(3) As a QC Engineer Perform & Inspected the Incoming Materials, Blasting, Painting, WQT, Fit up, Weld visual, Formal NDT
(RT,LPT),Loop Clearance ,Hydro/pneumatic Testing etc & all types’ documentation of Unit Piping jobs of Shed Classification
Unit, Air Compressor System Unit& LTD Unit. Of Hindalco Alumilium Plant,
(4) Preparation of Progress Report, Preparation of monthly invoice, Monitoring of Contractor Progress & various activities,
Checking of vendor invoice, Co-ordination with client & Management,
(5) Preparation of Test Packs individual system wise, which includes material certificates, welding history records, NDT
reports, equipment & installation and alignment report, hydrotest reports, pneumatic test reports, pressure test reports etc,
and getting client’s approval.
7. Organization M/s. Zenith Erectors Pvt. Ltd.
Duration April’2004 to December ’ 2006.
Project MSQ Project, Indian Oil Corporation Ltd- Haldia Refinery.
CLIENT/CONSULTANT Engineers India Ltd.
Position Sr. Engineer QC
Responsibility: As a QC Engineer Perform & Inspected the Incoming Materials, Blasting, Painting, WQT, Fit up, Weld
visual, PWHT, Formal NDT (RT,UT,LPT),Loop Clearance ,Hydro/pneumatic Testing etc of
1. Cross Country U/G Pipe Lines (24”dia) from BPCL to HPCL Haldia.
2. Provision of Dedicate VM & VB Steam line for CDW Unit (6”dia)to Offsite Pump House( Rack Piping)
3. 36” Dia CS Flare Line for MSQ Project.IOCL Haldia.
4. Cement Lining U/G Piping (26”dia) for MSQ Project.
5. Unit Piping of conventional part of MSQ Project in IOCL Haldia Refinery(SS304,SS321,SS316,P11,P5,P9,LTCS&CS)
6. Maintenances of heat exchanger, air cooler, column during shutdown at FCCU.
7. Maintenances of Rector, Furnace, Vessel and Piping during shutdown at CRU.
8. Replacement of Piping at off site area.
9. Checking of vendor invoice, Co-ordination with client & Management, Preparation of Final Bill & Reconciliation Statement
and checking with client.
10. Preparation of Test Packs individual system wise, which includes material certificates, welding history records, NDT
reports, equipment & installation and alignment report, CP reports, coating reports, hydrotest reports, pneumatic test
reports, pressure test reports etc, and getting client’s approval.
Organization M/s. Expo Gas Container Ltd. Mumbai.
Duration Aug’2001 To March’2004
Project
NEW PROJECT JOB OF VERTICAL STORAGE TANK & Cross Country
Pipe Line, HPCL-HALDIA TERMINAL.
CLIENT/CONSULTANT HPCL.
Position QC Engineer.
Responsibility: As a QC Engineer Perform & Inspected the Incoming Materials, Blasting, Painting, WQT, Fit up, Weld
visual, Formal NDT (LPT),Hydro/Pneumatic/Vacuum/Chalk Diesel Testing etc of below mentioned assignments /Projects.
1. Cross Country Crud Oil U/G Pipe Lines (12” & 14” dia) from Haldia Dock to USTTL Terminal, Haldia.
2. Vertical Storage Tank (20M Dia. X 4 No’s) and allied civil & structural jobs at USTTL Terminal, Haldia.
3. Vertical Storage Tank (25Mtr. Dia. X 2 No’s, 30Mtr. X 3 No’s, 40Mtr. X 2 No’s) and allied Civil & structural jobs at HPCL
Terminal. Haldia.
NB: Witnessing of cathodes protection system used in the pipeline and storage tank as per Project Requirement.
Personal Details
Father’s Name Narayan Chandra Sen.
Date of Birth 26th June 1977
Marital Status Married
Nationality Indian
Language Known English, Hindi, and Bengali.
Phone
Phone No – +971 555728992(UAE)
+91 9732157329(INDIA)
E-mail
ranjitkumar_sen@rediffmail.com
Passport No. N1423232. VALID UPTO 25.08.2025.
Date:-
Place :- (RANJIT KUMAR SEN)