NAME: Atef Abdulrahman Tayeb DATE: JAN 2015
POSITION TITLE Project Engineer
ORGANIZATION Royal Commission for Jubail and
Yanbu
LOCATION Jubail Industrial City, KSA
CITIZENSHIP Saudi Citizen
BORN 10 December, 1979
QUALIFICATIONS:
B.S., Civil Engineering, 2003 - Umm Al-Qura University Mecca, KSA.
LANGUAGES: English and Arabic.
FIELDS OF EXPERIENCE:
Project Engineer with over eleven years of Civil Site Development and Project Engineering
experience. Can contribute as member of an integrated design team or adopt the role of lead
engineer responsible for all aspects of project realization. Well placed to ensure that the design
and the specifications are thoroughly implemented and assured by close supervision of key
construction activities by utilizing inspection experience, checklist, witnessing and reviewing
different tests and investigations. Worked on a variety of mega and pioneering projects as
project engineer, especially working on the Royal Commission for Jubail contracts. Project
experience includes supervising engineering activities of other engineers, administrating
technical services contracts for site development prepared by consultant engineers,
performing civil engineering reviews and coordinate reviews with other disciplines
and departments . Experience also includes supervising construction activities. All design
done in accordance with internationally recognized standard as well as Saudi and Royal
Commission specifications. Extensive experience in the use of civil highway engineering design
software and AutoCad as well as Windows Applications.
ROYAL COMMISSION WORK HISTORY:
Sept
2006
Present Royal Commission for Jubail
Jubail Industrial City, KSA
Project Engineer, Engineering Department
Construction of New Army Base in Jubail
Project Engineer
The project includes developing an area of 100 hectares of
site with primary infrastructure for the Army Base in Jubail.
Site development includes roads, grading, storm drainage,
storm water retention ponds, potable water distribution,
sanitary wastewater system, irrigation system, medium
voltage electrical power distribution, roads lighting,
telecommunication system network, sidewalks, landscaping
and full construction of two (2) sewage lift stations, one (1)
pump station, erection of two (2) steel tanks, one concrete
tank, and more than 100 buildings.
Responsibilities:
As a Project Engineer, responsible for managing a multi
disciplines in- house design team including the preparation
of a project master plan. Managed the in- house team
members to insure the work is completed on schedule,
within budget and with expected quality. During the design,
coordinated the design between the disciplines and
conducted many design workshops and meeting including
stakeholder coordination meetings. Developed the WBS,
schedule and interference matrices.
Construction of Naval Base Project
Project Engineer
The project includes developing an area of 140 hectares of
site with primary infrastructure for the Marines Base in
Jubail. Site development includes roads, grading, storm
drainage, storm water retention ponds, potable water
distribution, sanitary wastewater system, irrigation system,
medium voltage electrical power distribution, roads lighting,
telecommunication system network, sidewalks, landscaping
and full construction of one (1) sewage lift station, two (2)
pump stations and erection of two (2) steel tanks, and more
than 100 buildings.
Responsibilities:
As a Project Engineer, responsible for the schedule, budget
and quality of the design deliverables including but limited
to defining the alternatives for rough grading of the area,
assisting the consultant in designing different infrastructure
utilities such as drainage, sewers and potable water
networks, participating in design workshops, value
engineering workshops, obtaining third parties approvals,
meetings with third parties, closing the design review
comments, preparing presentations to stakeholders and
Royal Commission management.
Jubail 2 Project
Core Team Civil Reviewer
The project is developing infrastructures for a complete
industrial city, Jubail 2.
Responsibilities:
As a Civil Engineer, responsible for reviewing civil design
packages prepared by consultants.
Al-Bustan Neighborhood
In-house Designer
The project is developing infrastructures for a small sector of
about 4 hectares.
Responsibilities:
As a Design Engineer, prepared the base map, potable water
network, sanitary waste water network, drainage network,
roads plan and profile.
Aug
2004
Feb
2006
Saudi ARAMCO
Al- Hugayet, KSA
Civil Inspector Engineer
Upgrading the Two Grade of Gasoline Project
Civil Inspector Engineer
Construction of tank farms and associated infrastructure for
Saudi Aramco bulk plants.
Responsibilities:
Responsible for civil inspection activities such as concrete,
asphalt, and piping work, as well as reviewing the projects
Quality Plans, interviewing QC personnel, witnessing and
reviewing field and laboratories tests.
Widening of Navigation Channel @ Red Sea, Jeddah
Civil Inspector Engineer
Widening of Navigation Channel at Red Sea, Jeddah
Responsibilities:
Responsible for civil inspection for construction activities
including dredging, wave protection, steel piles and some
contract work.
May
2003
Aug
2004
Al- Khodary for trading & Contracting Est.
Mecca, KSA
Site Engineer
Construction of community roads in Al-Jamoum and in Holy
Mecca
Site Engineer
Construction of community roads in Al- Jamoum and in Holy
Mecca.
Responsibilities:
As a Site Engineer, responsible for managing all the
activities in the site including the construction of different
road pavements as per the drawings and specifications.
Responsible also for the quality and the progress in the site.
RECOGNITIONS & CERTIFICATIONS:
 Associate Civil Engineer from Saudi Council of Engineers.
 Associated Value Specialist (AVS) from the society of American Value
engineers (S.A.V.E. international) since 2004.
 Certified Six Sigma Yellow Belt since 2010.
 Certificate of appreciation for excellent performance in engineering
management; Engineering Department, Royal Commission.
 Certificate of appreciation; Inspection Department, Saudi Aramco.
 Certificate of appreciation; Two Grades of Gasoline Program, Saudi
Aramco.
MEMBERSHIPS:
 Member in Saudi Engineering Consulting Committee.
 Member in Saudi Society of Civil Engineering.
 Member of Jubail Volunteer Club.
COURSES & WORKSHOPS
No. Course Title Organization Locati
on
Duration
1 Development of New Saudi
Entrepreneur
Designed by United Nation
of Industrial Development
Organization (UNIDO(
Jedda
h
28d
2 Value Engineering Mod I Saudi Engineering
Consulting Committee
Jedda
h
5d
3 Value Engineering Mod II Al-Yousefi Value
Engineering
Jubail 24hr
4 Training Program for Infra Structure
Design Work
Radicon Gulf Consultant &
Kentz Association (RGCK(
Khoba
r
3
months
5 Contracts Workshop BECHTEL Jubail 2d
6 Claims Preparation, analysis and
Defense Workshop
BECHTEL Jubail 1d
7 Safety Leadership Workshop BECHTEL Jubail 1day
8 Basic Front Line Supervisors
Training
Bechtel Jubail 1day
9 Conducting Effective Meetings Bechtel Jubail 1/2day
10 Management Skills Overview Bechtel Jubail 1/2day
11 Project Management Professional
(PMP(
Projacs Jubail 5days
12 Prime Contracts Management Bechtel Jubail 2 days
13 Ethic Awareness Workshop Bechtel Jubail 1day
14 Managing Multiple Projects Projacs Kuala
Lumpu
r
5 days
15 Negotiations Workshop Bechtel Jubail 1day
16 Auto CAD Civil 3D Essential Autodesk Jubail 5 days
17 Roadway design Projacs Jubail 5 days
18 Primavera Project Planner P6 Royal Commission Jubail 5 Days
19 Contracts and Specifications for
Construction and Maintenance
Projects
KFPUM Dhahr
an
5 Days
REFEREES:
1. Hasan M. Eldib
Project Engineer, Royal Commission
Email: eldibh@RCJuabil.gov.sa
Mobile: +966 50 3958405
2. Michael J. Shipione, PE, R.L.S.
Chief Civil Engineer, Bechtel
E-mail: shipionem@RCJubail.gov.sa
Mobile: +966 50 1276872
3. Theodoros Demetriou, PE
Area Engineering Manager, Bechtel
E-mail: demetriout@RCJubail.gov.sa
Mobile: +966 55 3797835

Atef_Tayeb_CV-Jan 2015 (2)

  • 1.
    NAME: Atef AbdulrahmanTayeb DATE: JAN 2015 POSITION TITLE Project Engineer ORGANIZATION Royal Commission for Jubail and Yanbu LOCATION Jubail Industrial City, KSA CITIZENSHIP Saudi Citizen BORN 10 December, 1979 QUALIFICATIONS: B.S., Civil Engineering, 2003 - Umm Al-Qura University Mecca, KSA. LANGUAGES: English and Arabic. FIELDS OF EXPERIENCE: Project Engineer with over eleven years of Civil Site Development and Project Engineering experience. Can contribute as member of an integrated design team or adopt the role of lead engineer responsible for all aspects of project realization. Well placed to ensure that the design and the specifications are thoroughly implemented and assured by close supervision of key construction activities by utilizing inspection experience, checklist, witnessing and reviewing different tests and investigations. Worked on a variety of mega and pioneering projects as project engineer, especially working on the Royal Commission for Jubail contracts. Project experience includes supervising engineering activities of other engineers, administrating technical services contracts for site development prepared by consultant engineers, performing civil engineering reviews and coordinate reviews with other disciplines and departments . Experience also includes supervising construction activities. All design done in accordance with internationally recognized standard as well as Saudi and Royal Commission specifications. Extensive experience in the use of civil highway engineering design software and AutoCad as well as Windows Applications. ROYAL COMMISSION WORK HISTORY: Sept 2006 Present Royal Commission for Jubail Jubail Industrial City, KSA Project Engineer, Engineering Department Construction of New Army Base in Jubail Project Engineer The project includes developing an area of 100 hectares of site with primary infrastructure for the Army Base in Jubail. Site development includes roads, grading, storm drainage, storm water retention ponds, potable water distribution, sanitary wastewater system, irrigation system, medium voltage electrical power distribution, roads lighting, telecommunication system network, sidewalks, landscaping
  • 2.
    and full constructionof two (2) sewage lift stations, one (1) pump station, erection of two (2) steel tanks, one concrete tank, and more than 100 buildings. Responsibilities: As a Project Engineer, responsible for managing a multi disciplines in- house design team including the preparation of a project master plan. Managed the in- house team members to insure the work is completed on schedule, within budget and with expected quality. During the design, coordinated the design between the disciplines and conducted many design workshops and meeting including stakeholder coordination meetings. Developed the WBS, schedule and interference matrices. Construction of Naval Base Project Project Engineer The project includes developing an area of 140 hectares of site with primary infrastructure for the Marines Base in Jubail. Site development includes roads, grading, storm drainage, storm water retention ponds, potable water distribution, sanitary wastewater system, irrigation system, medium voltage electrical power distribution, roads lighting, telecommunication system network, sidewalks, landscaping and full construction of one (1) sewage lift station, two (2) pump stations and erection of two (2) steel tanks, and more than 100 buildings. Responsibilities: As a Project Engineer, responsible for the schedule, budget and quality of the design deliverables including but limited to defining the alternatives for rough grading of the area, assisting the consultant in designing different infrastructure utilities such as drainage, sewers and potable water networks, participating in design workshops, value engineering workshops, obtaining third parties approvals, meetings with third parties, closing the design review comments, preparing presentations to stakeholders and Royal Commission management. Jubail 2 Project Core Team Civil Reviewer The project is developing infrastructures for a complete industrial city, Jubail 2. Responsibilities: As a Civil Engineer, responsible for reviewing civil design packages prepared by consultants. Al-Bustan Neighborhood In-house Designer The project is developing infrastructures for a small sector of about 4 hectares. Responsibilities: As a Design Engineer, prepared the base map, potable water network, sanitary waste water network, drainage network, roads plan and profile.
  • 3.
    Aug 2004 Feb 2006 Saudi ARAMCO Al- Hugayet,KSA Civil Inspector Engineer Upgrading the Two Grade of Gasoline Project Civil Inspector Engineer Construction of tank farms and associated infrastructure for Saudi Aramco bulk plants. Responsibilities: Responsible for civil inspection activities such as concrete, asphalt, and piping work, as well as reviewing the projects Quality Plans, interviewing QC personnel, witnessing and reviewing field and laboratories tests. Widening of Navigation Channel @ Red Sea, Jeddah Civil Inspector Engineer Widening of Navigation Channel at Red Sea, Jeddah Responsibilities: Responsible for civil inspection for construction activities including dredging, wave protection, steel piles and some contract work. May 2003 Aug 2004 Al- Khodary for trading & Contracting Est. Mecca, KSA Site Engineer Construction of community roads in Al-Jamoum and in Holy Mecca Site Engineer Construction of community roads in Al- Jamoum and in Holy Mecca. Responsibilities: As a Site Engineer, responsible for managing all the activities in the site including the construction of different road pavements as per the drawings and specifications. Responsible also for the quality and the progress in the site. RECOGNITIONS & CERTIFICATIONS:  Associate Civil Engineer from Saudi Council of Engineers.  Associated Value Specialist (AVS) from the society of American Value engineers (S.A.V.E. international) since 2004.  Certified Six Sigma Yellow Belt since 2010.  Certificate of appreciation for excellent performance in engineering management; Engineering Department, Royal Commission.  Certificate of appreciation; Inspection Department, Saudi Aramco.  Certificate of appreciation; Two Grades of Gasoline Program, Saudi Aramco. MEMBERSHIPS:  Member in Saudi Engineering Consulting Committee.
  • 4.
     Member inSaudi Society of Civil Engineering.  Member of Jubail Volunteer Club. COURSES & WORKSHOPS No. Course Title Organization Locati on Duration 1 Development of New Saudi Entrepreneur Designed by United Nation of Industrial Development Organization (UNIDO( Jedda h 28d 2 Value Engineering Mod I Saudi Engineering Consulting Committee Jedda h 5d 3 Value Engineering Mod II Al-Yousefi Value Engineering Jubail 24hr 4 Training Program for Infra Structure Design Work Radicon Gulf Consultant & Kentz Association (RGCK( Khoba r 3 months 5 Contracts Workshop BECHTEL Jubail 2d 6 Claims Preparation, analysis and Defense Workshop BECHTEL Jubail 1d 7 Safety Leadership Workshop BECHTEL Jubail 1day 8 Basic Front Line Supervisors Training Bechtel Jubail 1day 9 Conducting Effective Meetings Bechtel Jubail 1/2day 10 Management Skills Overview Bechtel Jubail 1/2day 11 Project Management Professional (PMP( Projacs Jubail 5days 12 Prime Contracts Management Bechtel Jubail 2 days 13 Ethic Awareness Workshop Bechtel Jubail 1day 14 Managing Multiple Projects Projacs Kuala Lumpu r 5 days 15 Negotiations Workshop Bechtel Jubail 1day 16 Auto CAD Civil 3D Essential Autodesk Jubail 5 days 17 Roadway design Projacs Jubail 5 days 18 Primavera Project Planner P6 Royal Commission Jubail 5 Days 19 Contracts and Specifications for Construction and Maintenance Projects KFPUM Dhahr an 5 Days REFEREES: 1. Hasan M. Eldib Project Engineer, Royal Commission Email: eldibh@RCJuabil.gov.sa Mobile: +966 50 3958405 2. Michael J. Shipione, PE, R.L.S. Chief Civil Engineer, Bechtel E-mail: shipionem@RCJubail.gov.sa Mobile: +966 50 1276872 3. Theodoros Demetriou, PE Area Engineering Manager, Bechtel E-mail: demetriout@RCJubail.gov.sa Mobile: +966 55 3797835