SlideShare a Scribd company logo
Engr. Saad Ahmed Khan
B.E (Civil), M.S (Engineering Management)
Registered Engineer (Civil/28893)
Pakistan Engineering Council
H.No 1727, Lane No.5, Mirza Road
Attock, Pakistan (43600)
Mobile: +92-3139822296
Email: saad.khan22@hotmail.com
Profile Civil Engineer possessing Masters Degree in Engineering Project Management & Bachelors Degree in
Civil Engineering having 6+ Years of experience with comprehensive and insightful understanding of
Project/ Site Management, Construction Supervision, Contract Administration and QA/QC practices for
Buildings, Residential Units & Civil Infrastructure Projects.
Objective
To obtain a challenging position in a high quality engineering environment, where I can impart my
unique capabilities, knowledge and skills with high standard of professionalism.
Professional
Achieveme
nts
 Received Employee Appreciation Award from the General Manager as a recognition of outstanding
performance during year 2013.
 Secured 3rd
position in 46th
Management Course at WAPDA Staff College, Islamabad.
 Life time member of Pakistan Engineering Council. (Civil/28893)
 Awarded with University Scholarship for good academic performance during undergraduate studies.
Page 1
Page 2
Work History Pakistan Water & Power Development Authority
Project Civil Engineer, Oct 2011 to Present
I am presently working as a Project Civil Engineer at Pakistan Water & Power Development Authority
which is a Federal Government entity having more than 200,000 employees and is responsible for
design, planning, construction & maintenance of Water, Power, Infrastructure & associated Buildings
projects in Pakistan. I am working at USD 2 Billion Hydropower Project consisting of a 71 Mm3
Barrage,
A 52 Km Concrete Lined Power Channel, 1450 Megawatt Power House, 02 Nos. Residential Colonies
with 830 Residential Units, Office Complex and allied infrastructure. My job description includes;
 Planning & scheduling of project activities.
 Site management from conception to completion.
 Setting out project works in accordance with approved plan & specifications.
 Devise cost effective and time saving construction methodology statements.
 Providing guidelines on unusual or difficult engineering issues.
 Establish and maintain communication with suppliers, sub contractors etc. to ensure that all
material, supplies, tools, equipment, and personnel are available at site on time.
 Manage the production of structural shop drawings and reinforcement bar bending schedules in
accordance with the construction drawings and specifications.
 Supervised mass concreting and develop measures in accordance with the relevant ASTM standards.
 Develop and deliver progress reports, proposals, documentation & presentations.
 Site Quality Control, Setting up project procedures and relevant quality forms.
 Prepare all required records and tracking sheets to control the project performance.
Earthquake Reconstruction & Rehabilitation Authority, Pakistan
Field Engineer, Oct 2009 to Sept 2011
Earthquake Reconstruction and Rehabilitation Authority is a Federal organization responsible for the
planning, construction and regulating the reconstruction and rehabilitation operations in the Oct 2005
earthquake affected areas of the country. I have worked as a Field Engineer and have supervised series
of donor funded projects including HH Sheikh Khalifa Bin Zayed Al Nahyan Hospital, Muzaffarabad City,
AJ&K University & Mzd City Development Project.
My main responsibilities included;
 Performing day-to-day management of site, including supervising and monitoring the labor force.
 Inspecting all activities and ensuring all work is done as per requirements.
 Ensuring health and safety standards on the site.
 Acting as the main technical adviser on a construction site for site staff.
 Planning the work and organizing the plant & site facilities to meet agreed deadlines.
 Resolving any unexpected technical difficulties & problems that may arise.
 Coordinating with supervisors, planners, quantity surveyors and the general workforce involved in
the project to ensure completion of projects within time.
 Coordination with local authority to ensure compliance with local construction regulations and laws.
 Attending all internal meetings & sorting out technical issues raised during execution.
 Meetings with stake holders to discuss the construction progress.
MCE Engineering Services (MCEES), Pakistan
Site Engineer, Jan 2009 to Sept 2009
MCE Engineering Services is a medium sized Private Sector Contractor Company undertaking buildings
& infrastructure projects throughout Pakistan. I have worked as Site Engineer on construction of pile
and raft foundations for multistory buildings. My main responsibilities included;
 Management of the construction process, resources, time, and work force.
 Preparing quantity estimates, various progress and technical reports.
 Read & understand construction drawings, specifications and technical information & advise others.
 Prepare bar bending schedule and supervise concreting activities.
 Dealing with consultants, preparing submittals & inspection requests and taking approvals.
 Planning the work & efficiently organizing the plant & site facilities to meet deadlines.
 Overseeing quality control, health and safety matters on site.
 Ensuring all materials used and work performed are as per specifications.
Academics Masters in Engineering Management
National University of Sciences & Technology, Pakistan (University World Ranking 398)
Graduation Date: August 2012, Grade: 3.1/4.0 GPA
Bachelors in Civil Engineering
National University of Sciences & Technology, Pakistan (University World Ranking 398)
Graduation Date: August 2009, Grade: 3.24/4.0 GPA
Trainings &
Courses
Completed 6x weeks extensive training course on Survey & Leveling from Frontier Works
Organization in 2009.
Completed 6x weeks Management Course from WAPDA Staff College, Islamabad in Feb 2012.
Short course on Total Quality Management organized by Pakistan Engineering Council, Islamabad in
March 2014.
Professional
Skills
Project/ Site Management, Construction Supervision, Project Estimation
Quality Control, FIDIC Contracts, Project Reporting & Technical Writing
Microsoft Office 2010, MS Project, Primavera P6, AutoCAD 2005.
Native/ bilingual proficiency in English, Urdu, Pashto & Hindi language.
Valid International Driving License.
Page 3

More Related Content

What's hot

Sunshine recorder
Sunshine recorderSunshine recorder
Sunshine recorder
girish_raghunathan4488
 
OTEC
OTECOTEC
Tidalpower and its future scope
Tidalpower and its future scopeTidalpower and its future scope
Tidalpower and its future scope
Manoj Chowdary
 
Lec3 principle virtual_work_method
Lec3 principle virtual_work_methodLec3 principle virtual_work_method
Lec3 principle virtual_work_method
Mahdi Damghani
 
SOLAR RADIATION MEASUREMENT
SOLAR RADIATION MEASUREMENTSOLAR RADIATION MEASUREMENT
SOLAR RADIATION MEASUREMENT
Vanita Thakkar
 
Phenomenon of lightning
Phenomenon of lightningPhenomenon of lightning
Phenomenon of lightning
Abduldaem kaheel
 
Oro551 res- unit 1 - extra terrestrial and terrestrial solar radiation
Oro551   res- unit 1 - extra terrestrial and terrestrial solar radiationOro551   res- unit 1 - extra terrestrial and terrestrial solar radiation
Oro551 res- unit 1 - extra terrestrial and terrestrial solar radiation
karthi keyan
 
Undamped free Vibration
Undamped free VibrationUndamped free Vibration
Power system planing and operation (pce5312) chapter five
Power system planing and operation (pce5312) chapter fivePower system planing and operation (pce5312) chapter five
Power system planing and operation (pce5312) chapter five
Adama Science and Technology University
 
Oro551 res- unit 1 - the solar energy option
Oro551   res- unit 1 - the solar energy optionOro551   res- unit 1 - the solar energy option
Oro551 res- unit 1 - the solar energy option
karthi keyan
 
Transient overvoltages and currents: ferroresonance effects
Transient overvoltages and currents: ferroresonance effectsTransient overvoltages and currents: ferroresonance effects
Transient overvoltages and currents: ferroresonance effects
Bruno De Wachter
 
Solar energy storage
Solar energy storageSolar energy storage
Solar energy storage
Ashish Bandewar
 
Principles of solar radiation
Principles of solar radiation Principles of solar radiation
Principles of solar radiation
SARAN RAJ I
 
Unit 03 -SOLAR PHOTOVOLTAIC SYSTEM
Unit 03 -SOLAR PHOTOVOLTAIC SYSTEMUnit 03 -SOLAR PHOTOVOLTAIC SYSTEM
Unit 03 -SOLAR PHOTOVOLTAIC SYSTEM
PremanandDesai
 
Equilibrium of rigid bodies
Equilibrium of rigid bodiesEquilibrium of rigid bodies
Equilibrium of rigid bodies
nvkhandare
 
Classification of hydro power plant
Classification of hydro power plantClassification of hydro power plant
Classification of hydro power plant
Satish Taji
 
Et wind
Et windEt wind
Lami's theorem
Lami's theoremLami's theorem
Lami's theorem
Chandresh Suthar
 
Solar radiation -
Solar radiation - Solar radiation -
Solar radiation -
Amitesh Kumar
 

What's hot (20)

Sunshine recorder
Sunshine recorderSunshine recorder
Sunshine recorder
 
OTEC
OTECOTEC
OTEC
 
Tidalpower and its future scope
Tidalpower and its future scopeTidalpower and its future scope
Tidalpower and its future scope
 
Lec3 principle virtual_work_method
Lec3 principle virtual_work_methodLec3 principle virtual_work_method
Lec3 principle virtual_work_method
 
SOLAR RADIATION MEASUREMENT
SOLAR RADIATION MEASUREMENTSOLAR RADIATION MEASUREMENT
SOLAR RADIATION MEASUREMENT
 
Phenomenon of lightning
Phenomenon of lightningPhenomenon of lightning
Phenomenon of lightning
 
Oro551 res- unit 1 - extra terrestrial and terrestrial solar radiation
Oro551   res- unit 1 - extra terrestrial and terrestrial solar radiationOro551   res- unit 1 - extra terrestrial and terrestrial solar radiation
Oro551 res- unit 1 - extra terrestrial and terrestrial solar radiation
 
Chapter 2
Chapter 2Chapter 2
Chapter 2
 
Undamped free Vibration
Undamped free VibrationUndamped free Vibration
Undamped free Vibration
 
Power system planing and operation (pce5312) chapter five
Power system planing and operation (pce5312) chapter fivePower system planing and operation (pce5312) chapter five
Power system planing and operation (pce5312) chapter five
 
Oro551 res- unit 1 - the solar energy option
Oro551   res- unit 1 - the solar energy optionOro551   res- unit 1 - the solar energy option
Oro551 res- unit 1 - the solar energy option
 
Transient overvoltages and currents: ferroresonance effects
Transient overvoltages and currents: ferroresonance effectsTransient overvoltages and currents: ferroresonance effects
Transient overvoltages and currents: ferroresonance effects
 
Solar energy storage
Solar energy storageSolar energy storage
Solar energy storage
 
Principles of solar radiation
Principles of solar radiation Principles of solar radiation
Principles of solar radiation
 
Unit 03 -SOLAR PHOTOVOLTAIC SYSTEM
Unit 03 -SOLAR PHOTOVOLTAIC SYSTEMUnit 03 -SOLAR PHOTOVOLTAIC SYSTEM
Unit 03 -SOLAR PHOTOVOLTAIC SYSTEM
 
Equilibrium of rigid bodies
Equilibrium of rigid bodiesEquilibrium of rigid bodies
Equilibrium of rigid bodies
 
Classification of hydro power plant
Classification of hydro power plantClassification of hydro power plant
Classification of hydro power plant
 
Et wind
Et windEt wind
Et wind
 
Lami's theorem
Lami's theoremLami's theorem
Lami's theorem
 
Solar radiation -
Solar radiation - Solar radiation -
Solar radiation -
 

Similar to CV Engr Saad Ahmed Khan(Wapda)

Khalid Farooq 04-01-16
Khalid Farooq 04-01-16Khalid Farooq 04-01-16
Khalid Farooq 04-01-16khalid Farooq
 
Khalid farooq 04 01-16
Khalid farooq 04 01-16Khalid farooq 04 01-16
Khalid farooq 04 01-16
khalid Farooq
 
Kaleemullah. cv
Kaleemullah. cvKaleemullah. cv
Kaleemullah. cv
Kaleemullah Khan
 
Site engineer zak
Site engineer zakSite engineer zak
Site engineer zak
Zishan khan
 
Amer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil EngineerAmer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil Engineeramer kallas
 
CV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
CV 25-12-15 M.K.Narayana _ Seaport Technology & EngineeringCV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
CV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
M.K NARAYANA
 
QC-_INSPECTOR_CIVIL_C.V._MR._RANA_AZHAR_AYOUB
QC-_INSPECTOR_CIVIL_C.V._MR._RANA_AZHAR_AYOUBQC-_INSPECTOR_CIVIL_C.V._MR._RANA_AZHAR_AYOUB
QC-_INSPECTOR_CIVIL_C.V._MR._RANA_AZHAR_AYOUBazhar ayoub
 
Engr Arif (1)
Engr Arif (1)Engr Arif (1)
Engr Arif (1)Arif Khan
 
B-tech civil with more than 5 years of working experience
B-tech civil with more than 5 years of working experienceB-tech civil with more than 5 years of working experience
B-tech civil with more than 5 years of working experience
Tufail Qadri
 
DHAKSHINA MURTHY RESUME normal
DHAKSHINA MURTHY RESUME normalDHAKSHINA MURTHY RESUME normal
DHAKSHINA MURTHY RESUME normalDhakshina murthy
 
Manoj resume
Manoj resumeManoj resume
Manoj resume
Manoj R Mishra
 

Similar to CV Engr Saad Ahmed Khan(Wapda) (20)

Khalid Farooq 04-01-16
Khalid Farooq 04-01-16Khalid Farooq 04-01-16
Khalid Farooq 04-01-16
 
Khalid farooq 04 01-16
Khalid farooq 04 01-16Khalid farooq 04 01-16
Khalid farooq 04 01-16
 
Kaleemullah. cv
Kaleemullah. cvKaleemullah. cv
Kaleemullah. cv
 
Shanmukharao K_resume
Shanmukharao K_resumeShanmukharao K_resume
Shanmukharao K_resume
 
CV of Mohammad Khalid Perwez.
CV of Mohammad Khalid Perwez.CV of Mohammad Khalid Perwez.
CV of Mohammad Khalid Perwez.
 
Site engineer zak
Site engineer zakSite engineer zak
Site engineer zak
 
Amer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil EngineerAmer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil Engineer
 
CV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
CV 25-12-15 M.K.Narayana _ Seaport Technology & EngineeringCV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
CV 25-12-15 M.K.Narayana _ Seaport Technology & Engineering
 
QC-_INSPECTOR_CIVIL_C.V._MR._RANA_AZHAR_AYOUB
QC-_INSPECTOR_CIVIL_C.V._MR._RANA_AZHAR_AYOUBQC-_INSPECTOR_CIVIL_C.V._MR._RANA_AZHAR_AYOUB
QC-_INSPECTOR_CIVIL_C.V._MR._RANA_AZHAR_AYOUB
 
Engr Arif (1)
Engr Arif (1)Engr Arif (1)
Engr Arif (1)
 
CV (2)
CV (2)CV (2)
CV (2)
 
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
 
MAKARAND GOVIND DHAWANE
MAKARAND GOVIND DHAWANEMAKARAND GOVIND DHAWANE
MAKARAND GOVIND DHAWANE
 
B-tech civil with more than 5 years of working experience
B-tech civil with more than 5 years of working experienceB-tech civil with more than 5 years of working experience
B-tech civil with more than 5 years of working experience
 
Ranjith_Kumar R - CV
Ranjith_Kumar R - CVRanjith_Kumar R - CV
Ranjith_Kumar R - CV
 
CV-Essam Saadeh
CV-Essam SaadehCV-Essam Saadeh
CV-Essam Saadeh
 
DHAKSHINA MURTHY RESUME normal
DHAKSHINA MURTHY RESUME normalDHAKSHINA MURTHY RESUME normal
DHAKSHINA MURTHY RESUME normal
 
Soumyajit Das
Soumyajit DasSoumyajit Das
Soumyajit Das
 
Manoj resume
Manoj resumeManoj resume
Manoj resume
 
CV
CVCV
CV
 

CV Engr Saad Ahmed Khan(Wapda)

  • 1. Engr. Saad Ahmed Khan B.E (Civil), M.S (Engineering Management) Registered Engineer (Civil/28893) Pakistan Engineering Council H.No 1727, Lane No.5, Mirza Road Attock, Pakistan (43600) Mobile: +92-3139822296 Email: saad.khan22@hotmail.com Profile Civil Engineer possessing Masters Degree in Engineering Project Management & Bachelors Degree in Civil Engineering having 6+ Years of experience with comprehensive and insightful understanding of Project/ Site Management, Construction Supervision, Contract Administration and QA/QC practices for Buildings, Residential Units & Civil Infrastructure Projects. Objective To obtain a challenging position in a high quality engineering environment, where I can impart my unique capabilities, knowledge and skills with high standard of professionalism. Professional Achieveme nts  Received Employee Appreciation Award from the General Manager as a recognition of outstanding performance during year 2013.  Secured 3rd position in 46th Management Course at WAPDA Staff College, Islamabad.  Life time member of Pakistan Engineering Council. (Civil/28893)  Awarded with University Scholarship for good academic performance during undergraduate studies. Page 1
  • 2. Page 2 Work History Pakistan Water & Power Development Authority Project Civil Engineer, Oct 2011 to Present I am presently working as a Project Civil Engineer at Pakistan Water & Power Development Authority which is a Federal Government entity having more than 200,000 employees and is responsible for design, planning, construction & maintenance of Water, Power, Infrastructure & associated Buildings projects in Pakistan. I am working at USD 2 Billion Hydropower Project consisting of a 71 Mm3 Barrage, A 52 Km Concrete Lined Power Channel, 1450 Megawatt Power House, 02 Nos. Residential Colonies with 830 Residential Units, Office Complex and allied infrastructure. My job description includes;  Planning & scheduling of project activities.  Site management from conception to completion.  Setting out project works in accordance with approved plan & specifications.  Devise cost effective and time saving construction methodology statements.  Providing guidelines on unusual or difficult engineering issues.  Establish and maintain communication with suppliers, sub contractors etc. to ensure that all material, supplies, tools, equipment, and personnel are available at site on time.  Manage the production of structural shop drawings and reinforcement bar bending schedules in accordance with the construction drawings and specifications.  Supervised mass concreting and develop measures in accordance with the relevant ASTM standards.  Develop and deliver progress reports, proposals, documentation & presentations.  Site Quality Control, Setting up project procedures and relevant quality forms.  Prepare all required records and tracking sheets to control the project performance. Earthquake Reconstruction & Rehabilitation Authority, Pakistan Field Engineer, Oct 2009 to Sept 2011 Earthquake Reconstruction and Rehabilitation Authority is a Federal organization responsible for the planning, construction and regulating the reconstruction and rehabilitation operations in the Oct 2005 earthquake affected areas of the country. I have worked as a Field Engineer and have supervised series of donor funded projects including HH Sheikh Khalifa Bin Zayed Al Nahyan Hospital, Muzaffarabad City, AJ&K University & Mzd City Development Project. My main responsibilities included;  Performing day-to-day management of site, including supervising and monitoring the labor force.  Inspecting all activities and ensuring all work is done as per requirements.  Ensuring health and safety standards on the site.  Acting as the main technical adviser on a construction site for site staff.  Planning the work and organizing the plant & site facilities to meet agreed deadlines.  Resolving any unexpected technical difficulties & problems that may arise.  Coordinating with supervisors, planners, quantity surveyors and the general workforce involved in the project to ensure completion of projects within time.  Coordination with local authority to ensure compliance with local construction regulations and laws.  Attending all internal meetings & sorting out technical issues raised during execution.  Meetings with stake holders to discuss the construction progress. MCE Engineering Services (MCEES), Pakistan Site Engineer, Jan 2009 to Sept 2009 MCE Engineering Services is a medium sized Private Sector Contractor Company undertaking buildings & infrastructure projects throughout Pakistan. I have worked as Site Engineer on construction of pile and raft foundations for multistory buildings. My main responsibilities included;  Management of the construction process, resources, time, and work force.  Preparing quantity estimates, various progress and technical reports.  Read & understand construction drawings, specifications and technical information & advise others.  Prepare bar bending schedule and supervise concreting activities.  Dealing with consultants, preparing submittals & inspection requests and taking approvals.  Planning the work & efficiently organizing the plant & site facilities to meet deadlines.  Overseeing quality control, health and safety matters on site.  Ensuring all materials used and work performed are as per specifications.
  • 3. Academics Masters in Engineering Management National University of Sciences & Technology, Pakistan (University World Ranking 398) Graduation Date: August 2012, Grade: 3.1/4.0 GPA Bachelors in Civil Engineering National University of Sciences & Technology, Pakistan (University World Ranking 398) Graduation Date: August 2009, Grade: 3.24/4.0 GPA Trainings & Courses Completed 6x weeks extensive training course on Survey & Leveling from Frontier Works Organization in 2009. Completed 6x weeks Management Course from WAPDA Staff College, Islamabad in Feb 2012. Short course on Total Quality Management organized by Pakistan Engineering Council, Islamabad in March 2014. Professional Skills Project/ Site Management, Construction Supervision, Project Estimation Quality Control, FIDIC Contracts, Project Reporting & Technical Writing Microsoft Office 2010, MS Project, Primavera P6, AutoCAD 2005. Native/ bilingual proficiency in English, Urdu, Pashto & Hindi language. Valid International Driving License. Page 3