Roberto S. Guevara is a licensed civil engineer with over 21 years of experience in construction planning and scheduling. He has worked on various projects in the Middle East and Asia Pacific regions, including power plants, pipelines, and transmission lines. His background includes experience in operation and maintenance of natural gas receiving facilities. He is seeking a new position where he can apply his engineering and planning skills.
Having 20+ experience in both Onshore and Offshore Oil & Gas, Petrochemicals, Fertilizer, Power Plants and Shutdown projects to develop the data/package such as Scheduling, Progress Measurements systems, reporting and trending and risk assessment for planning and project control. Also having well exposure in Earned Value Analysis, Costing, Budgeting, Risk Management, Fornesic delay analysis and EOT Claims
Having 20+ experience in both Onshore and Offshore Oil & Gas, Petrochemicals, Fertilizer, Power Plants and Shutdown projects to develop the data/package such as Scheduling, Progress Measurements systems, reporting and trending and risk assessment for planning and project control. Also having well exposure in Earned Value Analysis, Costing, Budgeting, Risk Management, Fornesic delay analysis and EOT Claims
Working as a Project Control Manager/Senior Planning Engineer of Multi-Discipline Projects, Planning, Scheduling, Resource Monitoring and Control, working with effective and prolifically implementation of EVM (Earned Value Management System) EVM (Earned Value Management System) and EAC (Estimate at Completion) for assigned projects.
Complete identification & analysis of Risk Management. Cover overall company’s business risks, ongoing prospect and individual change order requests while identifying various threats and opportunity factors. This strategy includes calculating the probable consequence, probability and manageability values to measure the pre-mitigation and post mitigation values having certain improvement factors. Risk registers to be updated on bi-monthly basis and discussed quarterly to maintain a follow-up for the action logs with individual assigned risk owners
Experienced in managing projects from conception to completion using latest IT tools like,P6 Ver7.0, AutoCAD and other Project Management Systems.
Working as a Project Control Manager/Senior Planning Engineer of Multi-Discipline Projects, Planning, Scheduling, Resource Monitoring and Control, working with effective and prolifically implementation of EVM (Earned Value Management System) EVM (Earned Value Management System) and EAC (Estimate at Completion) for assigned projects.
Complete identification & analysis of Risk Management. Cover overall company’s business risks, ongoing prospect and individual change order requests while identifying various threats and opportunity factors. This strategy includes calculating the probable consequence, probability and manageability values to measure the pre-mitigation and post mitigation values having certain improvement factors. Risk registers to be updated on bi-monthly basis and discussed quarterly to maintain a follow-up for the action logs with individual assigned risk owners
Experienced in managing projects from conception to completion using latest IT tools like,P6 Ver7.0, AutoCAD and other Project Management Systems.
• Responsible to organize, implement, conduct and manage the site QA/QC Programs as per the Company's Quality Policy.
• Coordinate the document controls of technical submittals, drawings and etc with the
project team and to ensure that the QA/QC validation has been done.
• Coordination with the Client’s and Consultant representatives for the conduct of
day-to-day quality related project activities.
• Coordinate with the project manager regarding work performance and hold
authority to stop work in any area where discrepancies remains uncorrected.
• Provide technical support to the Project Manager and guidance to site staff in
Registered Professional Civil Engineer in Philippines. A competent, highly-motivated, and dynamic engineering professional with an enriching cross functional experience of over 5 years in Philippines and in Qatar.
1. Roberto S. Guevara
#19 Caraballo St. Marikina Heights
Concepcion 2 Marikina City
email address: bobby_guevara88@yahoo.com
Mobile # +639083770578 (Philippines)
Skype ID: Roberto.Guevara28
KSA Mobile: +966570195684
Objective: To be able to apply/contribute the knowledge I acquired through my experiences in the field of
Operation & Maintenance of llijan Gas Receiving Facility, Power Transmission line and
various horizontal and vertical construction as well in electro mechanical instrumentation
works and Planning scheduling.
Qualification Summary
Licensed Civil Engineer, with twenty one year’s extensive experience in various constructions works
such as Structural Conveyors, Water Pipeline, Combined Cycle Power Plants, Pipelines, Power
Transmission Lines, Sub Stations and high rise buildings. Also included to this experience is the
Operation & Maintenance of Ilijan Natural Gas Receiving Facility. Multi-discipline and knowledge in
AUTOCAD, PRIMAVERA (P3 & P6.1) & MS Project software.
Personal Data:
Nickname: Bobby
Age: 47
Birth Date August 08, 1969
Birth Place: Marikina City
Height: 5’ 6”
Weight: 175 lbs.
Status: Married
Citizenship: Filipino
Religion: Catholic
Father’s Name : Ernesto G. Guevara
Mother’s Name: Helen S. Guevara
Spouse Name: Lerma S. Guevara
No. of Children: 3
Language/Dialect: Filipino, English, Thailand
Education: 1991 – 1985 Mapua Institute of Technology
B. S. Civil Engineering
1985 – 1981 Rizal High School
High School
1975 – 1981 Calumpang Elementary School
Grade School
2. Roberto S. Guevara Planning Engineer
Experience:
June 28, 2016 – Present Al Sharif Group (Transmission Line & Substation Project)
Planning Engineer
Performing Engineering Design and Construction Schedule.
Preparing Planning Package.
Preparation of cost and Progress Reports for Monthly reports.
Monitoring project progress, status of the schedule and reporting on progress
Identifying trends or potential slippages and report on these to Project Manager
Daily & Weekly coordination to various clients and sub-contractors
Preparing look ahead schedule and mitigation schedule
Preparing Invoice and Progress Billings (Weekly & Monthly)
Weekly coordination to various clients.
Dec 28, 2013 – Jan 31, 2016 Chiyoda-Almana, Design & Consulting Firm (Oil & Gas)
Planning Engineer
Performing Proposal Pre-FEED/FEED/DDE and Construction Schedule.
Preparing Planning Package.
Preparation of cost and Progress Reports for Monthly reports.
Performing Cash Flows and Resource Analysis.
Monitoring project progress, status of the schedule and reporting on progress
Identifying trends or potential slippages and report on these to Project Manager.
Preparing look ahead schedule and mitigation schedule
Preparing Invoice and Progress Billings (Weekly & Monthly)
Weekly coordination to various clients.
Dec 26, 2011 – Dec 14, 2013 WorleyParsons UAE, Design & Consulting Firm (Oil & Gas)
Project Control Engineer
Performing Proposal and Budget Baseline Schedule.
Performing Manpower Histogram and Manhour Estimate.
Preparation of cost and Progress Reports for Monthly reports.
Performing Cash Flows and Resource Analysis.
Preparing Invoice and Progress Billings (Weekly & Monthly)
March 27, 2011 – Dec.25, 2011 Chicago Bridge & Iron Co. EPFC – Oil/Gas/Petrochem, Al Khobar
Saudi Arabia
Scheduling Specialist II
Performing Pre-Bid & Project Baseline Schedule.
Performing Manpower Histogram and Manhour Estimate.
Preparation of cost and Progress Reports for Monthly reports.
Performing Cash Flows and Resource Analysis.
Coordination to all clients meeting regards to Pre Qualification Bid Projects.
Performing site visit to ensure that all programming is carried out within the
framework established in the planning procedures.
3. Roberto S. Guevara Planning Engineer
August 08, 2009 – Feb. 27, 2011 Hyundai Heavy Industries, 1200MW Combined Cycle Power
Plant & Desalination Plant Al-Dur Bahrain
Planning Engineer
Prepare comprehensive Planning & Cost Control Procedures for the project,
meeting the requirements of the Contract and internal requirements.
Liaise closely with the Construction teams and gain a detailed appreciation of
the key construction operations, taking into consideration alternative methods
and the optimum construction methodology.
Preparation of cost and progress reports for monthly reports.
Conducting analysis and forecasting project costs.
Ensure that the project runs to program by driving program dates and
communicating program constraints. Reprogram as necessary to recover any
delays and to achieve required milestone dates.
Oversee that all programming is carried out within the framework established
in the planning procedures
October 22, 2008 – May 22, 2009 Monadelphous Engineering Asc., Boddington Gold Mine &
Pluto Oil & Gas Project, East Perth Western Australia
Planning Engineer
Performs Planning and Scheduling for the progress of construction and
monitoring man hours usage for each phase of the scope of the project.
Performs weekly and monthly report for the entire scope of the project.
Preparation of progress and statistical reports, presentation reports using
Primavera & MS Project software.
Conduct coordination and interface meeting with the client and sub-contractor.
Conduct field inspection for the actual progress of the project.
Performs other duties such as cost control for the equipment, man hours and all
materials which is involve in the project.
September 16, 2007 – May 25, 2008 Al-Hejailan Consultants, Al-Khobar Saudi Arabia
Scheduling & Cost Control Engineer
Responsible for the development and presentation of cost control and manhour
estimates, manhour reporting, project schedule development and control.
Performs scheduling and monitor progress of design drawings, forecast
completion dates of design phases, and resource loading/off-loading.
Preparation of progress and statistical reports, presentation reports using
Primavera & MS Project software.
Performs construction project scheduling and cost analysis such as Structural,
Civil, Mechanical, Instrumentation, Electrical and Architectural in all types of
construction activities.
Maintains a data bank for all projects in all disciplines.
September 8, 2006 – May 20, 2007 Khursaniyah Upstream and Downstream Pipeline Project
Saudi Techint Ltd. (ARAMCO Project) Saudi Arabia
Planning & Cost Control Engineer
Performs planning and scheduling using Primavera software of Khursaniyah
Upstream & Downstream Pipeline Project.
4. Roberto S. Guevara Planning Engineer
Performs updating weekly and monthly schedule of pipeline constructions as
well in Power plant instrumentation and construction.
Performs weekly and monthly schedule reports submitted to Saudi Aramco.
Prepares daily, weekly and monthly progress reports and procurement progress
report.
Performs cost analysis and cost estimates for all constructions activities
including the manpower histogram, equipments report, shipments and air
freights.
Performs site inspection and quality control if all the materials are in place and
have arrive and installed in the specific location of the construction phase.
Performs monthly provisions/budget for all the cost that are used in the project.
October 2001 – August 2006 Operation & Maintenance of Ilijan, Natural Gas Pipeline
Receiving Facility National Power Corporation
Principal Engineer A – Gas Receiving Facility
Administers and supervises on shift operator in the operation of the master
control system (SCADA System) of the Ilijan Natural Gas Pipeline Receiving
Facility to enable:
- Central monitoring and control of all pipeline facilities/equipment and
auxiliary.
- Performs scheduling for the operation and maintenance of Ilijan Gas
Receiving Facility.
- Pipeline efficiency monitoring and pigging.
- Rapid identification and correction of unsafe operating equipment and
utilities.
- Pipeline integrity monitoring and gas leak detection.
- Maximize the safety of the employees, the general public and facility and
the environment.
- Tracking of the pig (Scrapper) during the maintenance of the pipeline.
- Verification of various instruments/equipment and accessories.
Analyzes critical reports involving complicated operating problems
encountered in the gas facility. Conducts studies and research for the
preparation of recommendation for appropriate solutions of the problems
encountered thereby minimizing or eliminating its occurrence in the future.
Directs and checks the analysis of the natural gas parameters in coordination
with SPEX and KEILCO to determine and ensure operating parameters are safe
and contributory to the efficient operation of the gas pipeline receiving facility.
Properly nominates SPEX the quantity of natural gas needed for the operation
of the power plant each day in accordance with the provisions of the GSPA and
ECA.
Assist in the administration and maintenance of the pipeline and other related
facilities.
Directs and implements energy conservation guidelines and safety rules and
regulations.
Performs other duties as may be assigned.
July 1999 – September 2001 Ilijan Natural Gas Pipeline and Receiving Facility Project National
Power Corporation
Principal Engineer B
Supervises and monitors all construction works such as pipe string works, tie-
in, non destructive test, excavation and foundation works.
5. Roberto S. Guevara Planning Engineer
Performs scheduling in construction and stringing activities of Naga Tayabas –
Kaliraya 500KV & 230KV T/L.
Prepares weekly and monthly progress report.
Reviews and evaluates manufacturer’s drawings and specifications for revision
and approval.
Handles coordination with contractors of the project concerning all civil works
Nov. 1996 – June 1999 NPC-Eng’g Northwestern Luzon Trans., System Project, San Jose
Substation, San, Jose del Monte, Bulacan, National Power
Corporation
Principal Engineer B
Supervises & monitors all site inspection & activities related to civil works,
stringing and tower election.
Prepares weekly & monthly progress report.
Performs scheduling for construction, equipment and manpower for San
Manuel – San Jose Del Monte 500KV T/L.
Reviews and evaluates manufacturer’s drawings & specifications for revision
& approval.
Handles coordination with contractors of the project concerning all civil works.
Monitors and supervise stringing activities and tower erection of 500 & 230 kV
transmission lines.
September 1994 – June 1996 Leyte Luzon Interconnection Project, National Power Corporation
Engineer A
Conducts supervision and inspecting the quality in the execution of the
foundation works and tower erection.
Prepares cost estimates of all items and other necessary equipment
corresponding to various components and segments of the on-going projects.
Prepares bid documents and other related documents needed for bidding.
March 1993 – March 1994 International Blaster Co. Ltd. Bangkok, Thailand
Project Engineer
Performs supervision and inspection of all constructions materials equipment
in constructing highways, airports and power plants.
Prepares cost estimates of all items and other necessary equipment
corresponding to various components and segments of the on-going projects.
Prepares monthly and weekly report for the project. Prepares billing and bid
documents and other related documents needed for bidding.
November 1991 – March 1993 LA MESA Treatment Plant, (M. Oreta CO. Inc)
Materials Engineer
Performs laboratory test such as tensile and yield strength, compressive strength
test, field density test, sounding test and soil test.
Performs in fabrication of filter slab and other pre-cast structure including the
design mix of all foundations and other structures.
6. Roberto S. Guevara Planning Engineer
Seminars Attended:
Computer-Aided Construction Project Management (Primavera Ver. 3.1) June 18,
2006 – July 16, 2006 CADVISION ENGINEER TECHNOLOGIES
· SIMATIC S7 Handling & programming (S7-7MICRO) July 22-23
2004, Siemens Manila
· Training Program On Design, Construction, Operation &
Maintenance of Natural Gas Pipeline, August 29 – September 13,
2001 KVAERNER Philippine Corporation Inc., Surabaya Indonesia
· Corrosion & Catholic Protection Monitoring Training Course, June
28, 2001, SOLOMON Corrosion Control Services PTY LTD. SM
Travelodge, Batangas Philippines
· Seminar on 500KV Transmission Line and Substation Projects,
January 25, 2001, NEW JEC, Batangas City
· Effective Negotiating Skills & Salesmanship, November 15 – 18,
1999, NPC/HRTD, Alpha Hotel, Batangas City
· Better Driving Course, May 18, 1999, NPC/HRTD, NPC Diliman
· Civil Engineer in the Midst of Crisis, May 13 – 15, 1999,
Philippine Institute of Civil Engineers, Philam Homes Subdivision,
Quezon City
· Seminar/Workshop On Project Cost Estimating, November 10-14,
1997, NPC/HRTD, La Montana Resort, Tagaytay Cavite
· EHV Power Transmission Line (Design, Project Management,
Construction Supervision and Test & Commissioning), April 01-21,
1997, NEWJEC Engineering Consultants, NPC Diliman
· Right-Of-Way (ROW) Seminar Workshop February 26-29, 1996,
NPC/HRTD, Angat GH, Norzagaray, Bulacan
· Course On Project Design, October 07-11, 1996, Development
Academy Of The Philippines, Pasig City
· Public Speaking For Civil Engineers & Construction Monitoring &
Control, August 04, 1995, PICE, West Avenue, Quezon City
· Comprehensive Computer-Aided Design, Drafting & Color
Rendering, January 16–March 01, 1995, MICROCADD
Technologies Quezon city
· Information Sharing Product Updates & Technology Strategies in
Civil Engineering, July 29-30, 1994, Angeles Fried Chicken
Restaurant, Balibago, Angeles City
· Computer-Aided Structural Analysis & Design for Building
Construction, June 28 – August 02, 1994, MICROCADD
Technologies, Quezon City
· The Effective Supervisor: A Basic Supervisory Course, Northstar
Management
Examination Passed:
1991 Civil Engineer Licensure Examination
Foreign Travel:
August 28 – September 13, Operation & Maintenance Of Natural Gas
2001 Pipeline
Social Civic Organizations:
7. Roberto S. Guevara Planning Engineer
1991 – Present Philippine Institute Of Civil Engineers
National Chapter
1994 – Present Knights of Columbus (4th Degree)
Marikina Chapter
Special Skills:
Computer Literate (MS Office/AUTOCAD Rel.12/Primavera)
Knowledge in Primavera Ver 6.1 and 3.0 and MS Project 2007
Drafting, Civil Planning & Design
Operation & Maintenance of Gas Facility
Troubleshooting
And other related Civil, Mechanical, Electrical & Inst. works
Character References:
· Grace Gepes Principal Cost Engineer
WorleyParsons Abu Dhabi
Mobile # +971508271779
· Renante Tactaquin Lead Planning Engineer –
Chiyoda Almana Engineering
Mobile No. +97455355895
· Florida. D. Cornejo Division Manager – Industrial Relations
Division / HRD
National Power Corporation
Tel No. (02)-9245304
· Rolando. G. Amiscaray Department Manager – IPP Contracts
Management Department
National Power Corporation
Tel No. (02)-9224036