Khan Sardar is a Pakistani civil engineer with over 10 years of experience working on infrastructure projects in Pakistan. He holds an MS in Structural Engineering and is currently working as a senior engineer on the 10.2 MW Jabori Hydro Power Project. He has extensive experience managing, monitoring, and supervising construction projects in hydroelectric power, irrigation, bridges, buildings and more for organizations such as AGES Consultants and KARSAZ Private Limited. He is proficient in several engineering software programs and construction management tools.
My qualification is B-Tech pass. I have 16 years experience including years gulf experience. My Cv is Approved from Ministry of Transportation and Ministry of housing.
Make sure you do not miss this opportunity and come meet Magna Tyres Group at the MINExpo in Las Vegas! We would be very pleased to inform you about all the benefits of Magna and MTP Tyres.
My qualification is B-Tech pass. I have 16 years experience including years gulf experience. My Cv is Approved from Ministry of Transportation and Ministry of housing.
Make sure you do not miss this opportunity and come meet Magna Tyres Group at the MINExpo in Las Vegas! We would be very pleased to inform you about all the benefits of Magna and MTP Tyres.
The Ville Resort-Casino features a variety of well-appointed rooms with stunning views and all your dining and entertainment needs catered for on-site. Whether travelling alone or in a group, for business, leisure or adventure – we have the room for you.
Enjoy some of the best dining in Townsville at The Ville 3 award-winning restaurants. We offers something which fit the occasion to provide you relaxed dining experience.
Enjoy a delicious Christmas buffet dinner including gourmet
seafood selections, a glass of sparkling wine or soft drink on
arrival & Christmas fanfare. For more details visit http://www.the-ville.com.au/dine/festive-season/
I am Manish Kumar, currently working in L&T Construction, as a Senior Planning Engineer (Electrical) having 3.7 years of experience in Project Planning & Control.
Completed 2 years of regular PG Program from NICMAR, Pune in Project Engineering Management.
My overall Experience 16 year and 8 year in Saudi Arab. Supervise the
mega Highways, water pipe line, sewerage pipeline, infrastructure,
Buildings, Architect, Bridges projects in KSA Responsible position as a
Site Inspector. where my educational potential and Professional
Experience endeavors, chances of growth and challenge.
As construction industry professional with over 30 years’ insightful experience in planning and execution of civil, structural & mechanical construction projects predominantly for diverse industrial facilities; I offer the distinction of spearheading construction projects costing up to INR 800 Cr. for last 15+ years, and currently working as Project Head with Godrej & Boyce mfg Co. Company, since August’15. Previously I have worked with Linde Engineering India , UDHE India Ltd. & Shapoorji Pallonji in the capacities of Sr. Construction Manager & Construction manager at different stages of my career.
In my current capacity I am leading a multidisciplinary INR 300 Cr. Factory expansion Project at Mohali Punjab. I have developed and demonstrated leadership skills in post-contract engineering, procurement and contracting functions including technical and commercial administration of contracts, and coordination with project participants & external agencies to bring out on time deliveries in alignment with approved schedule while resolving all execution conflicts and bottlenecks. I am proficient in working in ERP environment and computerized office working. I am fully conversant with steel structures and till date have carried out app 25000 tos of fabrication and erection of steel structures. In Algeria I have handled app 17000 M tons of steel fabrication and erection for Sorfert Fertilizers. I am also fully coversant with architectural finishes of buildings, landscaping and construction of hospitals and hotels. I am also conversant with specialized piping activities for SS Duplex and other special metals. I have experience in heavy lift erection including tandem lift. I have successfully carried out erection of 45 mt 350 ton columns and hydrogen buffer vessel 250 mts. I have experience in erection of aluminium silos and other highly complicated erection of misc equipments.
1. CURRICULUM VITAE
1. Name of Nominee : Khan Sardar
2. Father Name : Umer Sardar
3. Date of Birth : September 26, 1980
4. Nationality : Pakistan
5. Marital status : Married
6. Passport Number : EL5971511
7. PEC Registration No. : Civil / 26495
8. Mailing Address : Shama
Hotel Main Bazaar near Rest House Road Timergara,
Tehsil & District Dir Lower, Khyber Pakhtun khwa,
Pakistan.
9. Email ID :
engr.khansardar@gmail.com
10. Cell No : 0346-
9388980 & 0301-8533808
11. Education : MS Structure Engineering from CECOS University
Peshawar.
B. Sc. Civil Engineering from Jalalabad in 2005,
12. Membership of Profession Societies: Member Pakistan Engineering Council (P.E.C)
Civil/26495,
13. Key Qualifications : Master in Structure Engineering and an overall
experience of more than 10 years of working on
different sector including hydro powers, irrigation,
Bridges, Buildings, Culverts, and infrastructure both
at national and provincial level. Attended the
following lectures / seminars / workshops,
• Two days Workshop on quality control arranged by
CDM (Camp dresser & MacKay)
• Ten days seminar on SCIP (Structure concrete
insulated panels) technology arranged by
NORWEST at NESPAK head quarter Islamabad.
• Workshop on Primavera arranged by AGES
Consultant M&E Services KP-RP.
14. Summary of Experience :
No. NAME OF PROJECT
DATE
FROM - TO
NAME & ADDRESS
OF
ORGANIZATION
DESIGNATION
OR POSITION
LENGTH
OF
SERVICE
1
Jabori Hydro Power Project
Mansehra, KPK
April, 2015 to
Date.
AGES Consultants
Peshawar
Senior Engineer Continue
1 of 5
2. 2
Ranolia Hydro Power Project
Besham, KPK. ADB Funded
Feb, 2014 to
March, 2015
AGES Consultants,
Peshawar
QCE Engineer. 1-year & 2-
Month
3
Monitoring & evaluation services
KP-RP. USAID Funded
July, 2010 to
January, 2014
AGES Consultants,
Peshawar
M&E Engineer
3-Years & 6-
Month
4
Mansehra Irrigation
Rehabilitation Project. JBIC
Funded. May, 2008 to
June, 2010
AGES Consultants,
Peshawar
Field Engr./
Senior Engr.
2-Years & 1-
Month
5
CORDAID School project
Mansehra (Monitoring and
evaluation). Holand Funded
6
Construction of 384 family flats
at Gadoon Amazi District Swabi.
May, 2007 to
May, 2008
AGES Consultants,
Peshawar
Field Engineer 1-Year
7
Mangla Dam Raising Project,
MDR-24 AJK… March 2006,
to May 2007.
Habib Rafiq Pvt.
Ltd.
Structure Engr. /
Asst. Structure
Engineer.
15- Months
8
Mangla Dam Raising Project,
MDR-25 AJK...
9 Timergara by pass Road
September
2005 to
February 2006.
KARSAZ Pvt. Ltd. Site Engineer 6- Months
10
Gulshan-e-Sehat E-18
Islamabad (Zone-II),
February 2005
to April 01,
2005
Design Man
Consultant,
Islamabad
Trainee Engineer 2-Months
15. Employment Record :
Designation : QCE Engr. /M&E Engr. / Senior Engr. / Site
Engr.
Duration : May, 2007 to Date.
Organization : Consultants, Peshawar
Project : Jabori Hydro Power Project 10.2 MW, A joint
venture of IDC, Hydro Consult (NEPAL) and a
leading firm AGES Consultants Peshawar. Working
as a senior engineer in the caption project,
Ranolia Hydro Power Project 17-MW, a joint
venture of Sheladia, IDC, WINROKE and a leading
firm of AGES Consultants, Working as Quality
control engineer in the caption project,
Monitoring & Evaluation Services KP-RP
As Monitoring & evaluation Engineer monitors the
Re-construction/rehabilitation works of the above
project.
Mansehra Irrigation Rehabilitation Project
As senior Engineer Construction supervision of Siran
canals rehabilitation system.
Cordaid School Project Mansehra (As Field
Engineer Monitoring/ Supervision of 3-no’s RCC
Schools & 8-no’s EPS/ SCIP technology Schools),
384-Family flats 4-storyed building at Gadoon
Amazi, District Sawabi (As Site Engineer
Construction supervision of labour’s colony.)
2 of 5
3. Responsibilities: Construction supervision and
Monitoring of all components of project works
including Employer’s Colony, Powerhouse Complex
(10.2-MW), 60-M long RCC Bridge, Weir and intake
structure, Gravel Trap and Sediment/Sand Traps, 1-
KM long Headrace Channel, 2.8 KM long power
tunnel, aqueduct, Coffer Dams, Surge tank, Penstock,
Tailrace Tunnel, Switchyard and 2.5-KM access
Road as per approved design and specifications.
Review the method statement of each activity
submitted by EPC Contractor.
Monitoring Quality Control and Supervising of the
Construction works executed by the EPC Contractor.
Participated regularly in progress review meeting
with Client and Contractor,
Checking and Verification of Interim Payment
Certificates submitted by Contractor.
Closed coordination with local administration and
communities regarding the resolution of issues,
Responsibilities: Construction supervision and
Monitoring of all components of project works
including Employer’s Colony, Powerhouse Complex
(17-MW), Weir and intake structure, Gravel Trap
and Sediment/Sand Traps, 2.5KM long Headrace
Channel, Siphon with inlet and outlet Ponds, Coffer
Dams, Fore-bay, Penstock, Tailrace Tunnel, Outlet
Structure, Switchyard and 5-KM access Road as per
approved design and specifications.
Review the method statement of each activity
submitted by EPC Contractor.
Monitoring Quality Control and Supervising of the
Construction works executed by the EPC Contractor.
Participated regularly in progress review meeting
with Client and Contractor,
Checking and Verification of Interim Payment
Certificates submitted by Contractor.
Closed coordination with local administration and
communities regarding the resolution of issues,
Responsibilities : Monitoring and managing all
the construction Activity of USAID funded, Holland
funded and JBIC Japan Bank projects in the
operation affected area Malakand, earth quake
affected area at Mansehra and worker Colony Swabi.
Prepare progress reports on daily, weekly and
monthly basis regarding physical and financial
assessment of the project. Prepare construction
schedule for the site activity planned as per work
order and as per contractor capacity. Checking/
certification of the IPC’s (In term payment
certificates) and Escalation bills of various school
sites, approval of bar bending schedules. Dealing with
3 of 5
4. the supervisory consultants, C&W deportment and
contractors for the smooth execution of the
construction Activity, Supervision of different type of
Lab tests i.e. Concrete Compressive strength, brick
masonry tests, FDT, Sieves analysis of fine
aggregates & Coarse aggregates etc for quality
control, Leading a team of Site Engineers, Site
inspectors, Admin officer, Accountant and computer
Section.
Designation : Structure Engineer.
Duration : March 2006, to May 2007.
Organization : Habib Rafiq Pvt. Ltd.
Project : Mangla Dam
Raising Project, MDR-24 & MDR-25 Mirpur AJK.
Responsibilities : Preparation and approvals of
Detail Shop Drawings, Structure Drawings,
Drawings of Drain, Box Culverts And Pipe Culverts,
preparation and approval of bar binding Schedules of
Box Culvers, Pipe Culverts and retaining Walls from
the consultant. Co-ordination B/W Client and
Consultants, Providing Supporting Documents to Q.S
Section for the preparation of I.P.Cs
Designation : Site Engineer
Duration : September, 2005 to February 2006.
Organization : KARSAZ Pvt. Ltd
Project : Timergara by pass
road
Responsibilities : Preparation and approvals of
Detail Shop Drawings, Steel Related Drawings of
Culverts, bar binding Schedule of Box Culverts, Pipe
Culverts, and Retaining Walls. Co-ordination B/W
Client and Consultants, Providing Supporting
Documents to QS Section for the preparation of
I.P.Cs
Designation : Trainee Engineer
Duration : February, 2005 to April 01, 2005
Organization : Design Man Consultants.
Project : Gulshan-e-Sehat E-18 Islamabad (Zone-11) Project.
Responsibilities : Consulting, Monitoring and
Managing all the construction process. Preparing of
progress report on Daily & Weekly basis, preparing
measurement books for the executed work,
Coordinate with Senior Engineer and Resident
Engineer regarding the construction work.
16. Computer Proficiency :
⇒ Microsoft Office (Excel, Word)
⇒ AutoCAD 2006
⇒ GRASP
⇒ Sap 2000
4 of 5