SlideShare a Scribd company logo
RAJINDER KUMAR
S/O Sh.Hari Kishan ,H.NO 477/16,Joginder Nagar, District Yamuna Nagar, Haryana,Pin code- 135001
D.O.B- 1st May 1978, Marital Status :- Married,Lauguage Know: Hindi,English
Phone: +91 8221062377,+91 9017991914;Email:rajinderlove1978@gmail.com
Objective
Seeking assignments across Construction Management/Work (Highway/Bridge, Oil bulk depot, Canal, Thermal
Power Plant, Mobile Tower Projects)
Profile
 Proven success with 10+ years of experience in Construction Planning/Management, Project Site work,
QA/QC, Material Testing & Management, Lab & Plant, Survey, with proficiency in swiftly ramping up
construction projects within pre-set time & cost parameters.
 Demonstrated professional agility in project planning, scheduling, defining layout, drawing, project
estimates/bill of materials, technical specifications, procurement, quality Control & management quantity
etc to ensure project delivery within defined costand time lines.
 Proven strengths in mobilizing and managing manpower, equipment, and material resources to achieve
desired operational efficiency. Skilled in implementing cost rationalization measures to contain project
operational expenses within budgetary parameters.
 Possess knowledge of all testing processes follows up with standards as: MOST&H, IS, IRC, BS, & ASTM
specification.
Technical Proficiencies
 Planning and Execution of work as per Design and Drawing, Study of related Document such as Design,
Drawing, Plan etc.
 Preparation of daily, Weekly, Monthly report on work progress & evaluating as per the planned schedule.
 Inspecting job sites of various activities like Earthwork, GSB, WMM, BM, DBM, BC & Structural concrete
works. Earthwork, pavement construction related Survey & layout work.
 All Specified test are done as per project specification, monitoring project Quality and checking the work as
per Approved Drawing & specification.
 Selection & testing of Borrow Area material for earth fill Embankment, Sub-grade, Sub-base & earthen
shoulder establishing suitability of soil material by conducting Grain size analysis, LL/PL, Proctor, F.S.I, CBR &
other required test confirming to project specification & preparation of Location/Grid maps of submit for
Approval of Borrow Area, Quarries & Plant.
 Testing of field Density and compaction test of Earth fill material; Bitumen like Penetration, ductility,
softening point, specific gravity; Bitumen material test like, stability of mix, binder content, gradation,
temperature test, AIV, FI&EI Index, Density of compacted layer.
 Pre-testing of construction material i.e. Fine & coarse Aggregate, Cement, Steel, Bricks, Bitumen, water in
outside/ Project laboratories prior to their acceptance for use in project.
 Preparation of mix designs for P.C.C & Structure concrete like, M-15, M-20, M-25, M-30 etc. As per project
requirement. Quality checking of daily concrete production at batching plant, testing of concrete slump &
compressive strength.
Education
3 Yr. Diploma in Civil Engineering; Government Polytechnic,Ambala City, Haryana;2001
App. /Training: Junior Engineer in PWD (B&R) Sub. Division Ladwa, (Kurukshetra) Haryana;31 mar’03- Mar’04
Experience
SITARAM BUILDERS, NASIK (MAHARASTRA):- LAB TECHNICIAN: - 5 FEB.2015 to 30 JUNE.2016.
Project Title: - Up gradation of intermediate lane to two lane with paved shoulders including strengthening in K.M.
no. 11/600 to 16/000, K.M. 34/000 to 39/000 and K.M. 57/000 to 62/000 of Thane-Nasik-Peth-Kaparda-Pardi Road
(NH-848) at Nasik,Maharashtra.
Client: - National Highway Authorities,Division No.-9,Nasik,Maharashtra.
Consultant/Authorities Engineer: - S.N. Bhobe & AssociatePvt. Ltd., Navi Mumbai.
Project Length: - 14.400 K.M.
Project Cost :-22.50/- Crore Rs.
Job Description: Responsible for Lab and Material testing for Construction of Road Project. All specified test are
done as per project specification, monitoring project Quality and checking the work as per approved drawing &
specification.Attending client/consultantmeeting.
ESSAR PROJECTS (INDIA) LTD (Payroll of Adecco India Pvt. Ltd.); Civil Engineer; 28 July’14-27 Jan’15
Project Title: Miscellaneous Civil Work for implementation of MB Lal Committee report at IOCL Depot. Jhansi,U.P.
Client: Indian Oil Corporation Ltd.
Project Cost: - 12.15/- croreRs.
Job Description: - Broad scope of project management service& sitesupervision butnot limited to the following.
 Consulting assistance during execution & site supervision of contractor work. Design, Drawing, Data sheet,
Drawing Approval. Overall Project management service & site supervision. Witness & Approving factory & Site
Acceptance test. Quality Assurance and Safety plan, Quality Control Supervision. Project implementation
Procedure. Cost Control. Progress Measurement & Report, Certification of Quantity/Bill etc. Handing Over &
Closureof Site. Documentation.
SAI CONSULTING ENGINEERS PVT LTD, AHMEDABAD; Asst Quality/Material Engineer; 25 Oct’12-Oct’13
Project Title: Development of State Highway in Gujarat under the state Highway Development Project (SHDP) on
Design, Build, Finance, Operate and Transfer (DBFOT)-Annuity basis for Dwarka-Mithapur-Okha Port and Sikkapatia
to Sikka,Jamnagar,Package-01, Section of SH-25 &SH-92, Contract package-NS-38(PB)-BAL.
Project Length: - 29.800 KM+ 5.1 KM= 34.900 KM.
Project Cost :- 110/- Crore Rs.
Client: - P.W.D. (B&R) SHDP, Br.-Jamnagar,Gujarat.
Project Title: Development of State Highway in Gujarat under the state Highway Development Project (SHDP) on
Design, Build, Finance, Operate and Transfer (DBFOT)-Annuity basis for RO-RO Point Ghogha to NH-8E Bhavnagar,
Package-06,(Connecting with SH-36 &SH-35)
Project Length: - 14.700K.M.&Two Minor Bridge & Culverts.
Project Cost : - 29.45/- croreRs.
Client: P.W.D. (B&R), SHDP,Br.-Bhavnagar, Gujarat
Job Description: - Independently handle of all QA/QC cum Material testing work of project (Lab & field). Attending
client & contractor meeting. Checking and approving monthly Material and field test reports, coordinating with the
Client, Contractor and Services Authorities.
KARAM CHAND THAPAR &BROS. (COAL SALES) LTD; Deputy Manger Civil (QA/QC); 25 Nov’11-23Oct’12
Project Title: Constructing Distributaries canal & its Minor’s work for command Area under Limbdi Branch canal
(12 Distributaries canal & its Minor),Limbdi, Disst.- Surender Nagar,Gujarat
Project Length: - 115 K.M. Distributaries Canal & its minor canal.
Project Cost : - 200/- croreRs.
Principal Client:Sardar Sarovar Narmada NigamLtd., Gujarat.
Client: Hindustan Construction Company Ltd.
Job Description: Responsible for QA/QC and Material testing for Construction of Canal Project. All specified test
are done as per project specification, monitoring project Quality and checking the work as per approved drawing &
specification.Attending Client meeting.
M/S CONSULTING ENGINEERS ASSOCIATES, PANCHKULA; QA/QC & Site Engineer; Feb’09-Oct’11
Project Title: Dean Bandu Chhotu Ram Thermal Residential colony ProjectatYamuna Nagar, Haryana.
Project Title: Up gradation of Deodhar Naina Wali Road and link in Yamuna Nagar Haryana. (HSRDC/C-16/2008)
Road A, B, C, D & E, Total length 20km.with Major & Minor Bridges.
Client: Haryana State Road Development Corporation.(HSRDC)
Project Length: - 20.00 K.M. & 1 Major and 3 Minor Bridge & Culverts.
Project Cost: - 42.85/- Crore Rs.
Job Description: - Monitoring project Quality and checking the work as per approved drawing and specification, all
specified test are done as per project specification. Inspecting site job of various activities like Earthwork,GSB,
WMM, BM, DBM, BC & Structural concrete work. Summits site daily report, inspecting request and all applicable
monitoringreport on regular basisor as required.
M/S NEW EDGE ENGG & CONSTRUCTION COMPANY PVT LTD; Site Engineer; Aug’05-Dec’08
Project Title: 2*25 MW power plant for Ultratech Cement limited at Tadipatri in Andra Pardesh.
Client : - Aditya Birla Group.(Ultra cement Limited)
Project Cost: - 200/- Crore Rs.
Project Title: 2*300 MW Dean Bandu Chhotu Ram Thermal Power PlantProjectat Yamuna Nagar, Haryana.
Client : Haryana State Power generation Corporation Limited.
Project Cost:-2400/-CroreRs.
KCA INFRASTRUCTURE PVT LTD; Civil Engineer; Apr’04-July’05
Project Title: Mobile Tower Project‘s at Haryana &Himachal Pradesh.
Client :Bharti Airtel Limited.
Project Cost: - 7-10 Crore Rs. for (one tower)

More Related Content

What's hot (20)

Resume-1 (1) (1)
Resume-1 (1) (1)Resume-1 (1) (1)
Resume-1 (1) (1)
 
CV_Mohammad Golam Sarowar _Civil Engineer
CV_Mohammad Golam Sarowar  _Civil EngineerCV_Mohammad Golam Sarowar  _Civil Engineer
CV_Mohammad Golam Sarowar _Civil Engineer
 
imran syed
imran syed imran syed
imran syed
 
Muhammad Aslam Bhutto Cv 2015
Muhammad Aslam Bhutto Cv 2015Muhammad Aslam Bhutto Cv 2015
Muhammad Aslam Bhutto Cv 2015
 
CV- bala qa
CV- bala qaCV- bala qa
CV- bala qa
 
MAKARAND GOVIND DHAWANE
MAKARAND GOVIND DHAWANEMAKARAND GOVIND DHAWANE
MAKARAND GOVIND DHAWANE
 
Ramendu cv - for Bd
Ramendu cv - for BdRamendu cv - for Bd
Ramendu cv - for Bd
 
Surveyor cv
Surveyor cvSurveyor cv
Surveyor cv
 
anoop-CV 2016
anoop-CV 2016anoop-CV 2016
anoop-CV 2016
 
CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
M.A.Iqbal C.V
M.A.Iqbal C.VM.A.Iqbal C.V
M.A.Iqbal C.V
 
Giri - CV
Giri - CVGiri - CV
Giri - CV
 
Md._Habibur_Rahman_CV
Md._Habibur_Rahman_CVMd._Habibur_Rahman_CV
Md._Habibur_Rahman_CV
 
Anil_CV_Recent
Anil_CV_RecentAnil_CV_Recent
Anil_CV_Recent
 
Jayasankar_CV_for QA Manager
Jayasankar_CV_for QA ManagerJayasankar_CV_for QA Manager
Jayasankar_CV_for QA Manager
 
Senior Surveyor CV
Senior Surveyor CV Senior Surveyor CV
Senior Surveyor CV
 
GIRIRAJAN
GIRIRAJANGIRIRAJAN
GIRIRAJAN
 
Anand ponnaiah
Anand ponnaiahAnand ponnaiah
Anand ponnaiah
 
CV (2)
CV (2)CV (2)
CV (2)
 

Similar to Rajinder kumar updated resume (20)

MCV
MCVMCV
MCV
 
Sankar CV
Sankar CVSankar CV
Sankar CV
 
Abhishek Resume
Abhishek ResumeAbhishek Resume
Abhishek Resume
 
Khan Sardar New C.V.DOC
Khan Sardar New C.V.DOCKhan Sardar New C.V.DOC
Khan Sardar New C.V.DOC
 
Sharma cv
Sharma  cv Sharma  cv
Sharma cv
 
Resume_Pramod Chaudhari
Resume_Pramod ChaudhariResume_Pramod Chaudhari
Resume_Pramod Chaudhari
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
Manoj cv
Manoj cv Manoj cv
Manoj cv
 
Engr.riyaz cv 02 11-15-2
Engr.riyaz cv 02 11-15-2Engr.riyaz cv 02 11-15-2
Engr.riyaz cv 02 11-15-2
 
My Fresh Cv.pdf
My Fresh Cv.pdfMy Fresh Cv.pdf
My Fresh Cv.pdf
 
CV Mr. Haribabu
CV Mr. HaribabuCV Mr. Haribabu
CV Mr. Haribabu
 
Aqeel Ahmed se (2)
Aqeel Ahmed se (2)Aqeel Ahmed se (2)
Aqeel Ahmed se (2)
 
gandham2910@yahoo.co.inCIVIL Site Manager
gandham2910@yahoo.co.inCIVIL Site Managergandham2910@yahoo.co.inCIVIL Site Manager
gandham2910@yahoo.co.inCIVIL Site Manager
 
Resume q.surveyor - amanat ali (updated)
Resume   q.surveyor - amanat ali (updated)Resume   q.surveyor - amanat ali (updated)
Resume q.surveyor - amanat ali (updated)
 
CV M.Ilyas - 1
CV M.Ilyas - 1CV M.Ilyas - 1
CV M.Ilyas - 1
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
B_Naik-CV1
B_Naik-CV1B_Naik-CV1
B_Naik-CV1
 
ER. PRASHANT'S CV pdf
ER. PRASHANT'S CV pdfER. PRASHANT'S CV pdf
ER. PRASHANT'S CV pdf
 
Updated cv (2)
Updated cv (2)Updated cv (2)
Updated cv (2)
 
Cv 01
Cv 01Cv 01
Cv 01
 

Recently uploaded

Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxMd. Shahidul Islam Prodhan
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfAbrahamGadissa
 
Electrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineElectrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineJulioCesarSalazarHer1
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageRCC Institute of Information Technology
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdfKamal Acharya
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdfKamal Acharya
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfKamal Acharya
 
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...Amil baba
 
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdfONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdfKamal Acharya
 
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationDr. Radhey Shyam
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationRobbie Edward Sayers
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdfKamal Acharya
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringDr. Radhey Shyam
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdfKamal Acharya
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamDr. Radhey Shyam
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-IVigneshvaranMech
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdfKamal Acharya
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringC Sai Kiran
 

Recently uploaded (20)

Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
 
Electrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineElectrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission line
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltage
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdf
 
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
NO1 Pandit Black Magic Removal in Uk kala jadu Specialist kala jadu for Love ...
 
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdfONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
 
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdf
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 

Rajinder kumar updated resume

  • 1. RAJINDER KUMAR S/O Sh.Hari Kishan ,H.NO 477/16,Joginder Nagar, District Yamuna Nagar, Haryana,Pin code- 135001 D.O.B- 1st May 1978, Marital Status :- Married,Lauguage Know: Hindi,English Phone: +91 8221062377,+91 9017991914;Email:rajinderlove1978@gmail.com Objective Seeking assignments across Construction Management/Work (Highway/Bridge, Oil bulk depot, Canal, Thermal Power Plant, Mobile Tower Projects) Profile  Proven success with 10+ years of experience in Construction Planning/Management, Project Site work, QA/QC, Material Testing & Management, Lab & Plant, Survey, with proficiency in swiftly ramping up construction projects within pre-set time & cost parameters.  Demonstrated professional agility in project planning, scheduling, defining layout, drawing, project estimates/bill of materials, technical specifications, procurement, quality Control & management quantity etc to ensure project delivery within defined costand time lines.  Proven strengths in mobilizing and managing manpower, equipment, and material resources to achieve desired operational efficiency. Skilled in implementing cost rationalization measures to contain project operational expenses within budgetary parameters.  Possess knowledge of all testing processes follows up with standards as: MOST&H, IS, IRC, BS, & ASTM specification. Technical Proficiencies  Planning and Execution of work as per Design and Drawing, Study of related Document such as Design, Drawing, Plan etc.  Preparation of daily, Weekly, Monthly report on work progress & evaluating as per the planned schedule.  Inspecting job sites of various activities like Earthwork, GSB, WMM, BM, DBM, BC & Structural concrete works. Earthwork, pavement construction related Survey & layout work.  All Specified test are done as per project specification, monitoring project Quality and checking the work as per Approved Drawing & specification.  Selection & testing of Borrow Area material for earth fill Embankment, Sub-grade, Sub-base & earthen shoulder establishing suitability of soil material by conducting Grain size analysis, LL/PL, Proctor, F.S.I, CBR & other required test confirming to project specification & preparation of Location/Grid maps of submit for Approval of Borrow Area, Quarries & Plant.  Testing of field Density and compaction test of Earth fill material; Bitumen like Penetration, ductility, softening point, specific gravity; Bitumen material test like, stability of mix, binder content, gradation, temperature test, AIV, FI&EI Index, Density of compacted layer.  Pre-testing of construction material i.e. Fine & coarse Aggregate, Cement, Steel, Bricks, Bitumen, water in outside/ Project laboratories prior to their acceptance for use in project.  Preparation of mix designs for P.C.C & Structure concrete like, M-15, M-20, M-25, M-30 etc. As per project requirement. Quality checking of daily concrete production at batching plant, testing of concrete slump & compressive strength. Education 3 Yr. Diploma in Civil Engineering; Government Polytechnic,Ambala City, Haryana;2001 App. /Training: Junior Engineer in PWD (B&R) Sub. Division Ladwa, (Kurukshetra) Haryana;31 mar’03- Mar’04 Experience SITARAM BUILDERS, NASIK (MAHARASTRA):- LAB TECHNICIAN: - 5 FEB.2015 to 30 JUNE.2016. Project Title: - Up gradation of intermediate lane to two lane with paved shoulders including strengthening in K.M. no. 11/600 to 16/000, K.M. 34/000 to 39/000 and K.M. 57/000 to 62/000 of Thane-Nasik-Peth-Kaparda-Pardi Road (NH-848) at Nasik,Maharashtra.
  • 2. Client: - National Highway Authorities,Division No.-9,Nasik,Maharashtra. Consultant/Authorities Engineer: - S.N. Bhobe & AssociatePvt. Ltd., Navi Mumbai. Project Length: - 14.400 K.M. Project Cost :-22.50/- Crore Rs. Job Description: Responsible for Lab and Material testing for Construction of Road Project. All specified test are done as per project specification, monitoring project Quality and checking the work as per approved drawing & specification.Attending client/consultantmeeting. ESSAR PROJECTS (INDIA) LTD (Payroll of Adecco India Pvt. Ltd.); Civil Engineer; 28 July’14-27 Jan’15 Project Title: Miscellaneous Civil Work for implementation of MB Lal Committee report at IOCL Depot. Jhansi,U.P. Client: Indian Oil Corporation Ltd. Project Cost: - 12.15/- croreRs. Job Description: - Broad scope of project management service& sitesupervision butnot limited to the following.  Consulting assistance during execution & site supervision of contractor work. Design, Drawing, Data sheet, Drawing Approval. Overall Project management service & site supervision. Witness & Approving factory & Site Acceptance test. Quality Assurance and Safety plan, Quality Control Supervision. Project implementation Procedure. Cost Control. Progress Measurement & Report, Certification of Quantity/Bill etc. Handing Over & Closureof Site. Documentation. SAI CONSULTING ENGINEERS PVT LTD, AHMEDABAD; Asst Quality/Material Engineer; 25 Oct’12-Oct’13 Project Title: Development of State Highway in Gujarat under the state Highway Development Project (SHDP) on Design, Build, Finance, Operate and Transfer (DBFOT)-Annuity basis for Dwarka-Mithapur-Okha Port and Sikkapatia to Sikka,Jamnagar,Package-01, Section of SH-25 &SH-92, Contract package-NS-38(PB)-BAL. Project Length: - 29.800 KM+ 5.1 KM= 34.900 KM. Project Cost :- 110/- Crore Rs. Client: - P.W.D. (B&R) SHDP, Br.-Jamnagar,Gujarat. Project Title: Development of State Highway in Gujarat under the state Highway Development Project (SHDP) on Design, Build, Finance, Operate and Transfer (DBFOT)-Annuity basis for RO-RO Point Ghogha to NH-8E Bhavnagar, Package-06,(Connecting with SH-36 &SH-35) Project Length: - 14.700K.M.&Two Minor Bridge & Culverts. Project Cost : - 29.45/- croreRs. Client: P.W.D. (B&R), SHDP,Br.-Bhavnagar, Gujarat Job Description: - Independently handle of all QA/QC cum Material testing work of project (Lab & field). Attending client & contractor meeting. Checking and approving monthly Material and field test reports, coordinating with the Client, Contractor and Services Authorities. KARAM CHAND THAPAR &BROS. (COAL SALES) LTD; Deputy Manger Civil (QA/QC); 25 Nov’11-23Oct’12 Project Title: Constructing Distributaries canal & its Minor’s work for command Area under Limbdi Branch canal (12 Distributaries canal & its Minor),Limbdi, Disst.- Surender Nagar,Gujarat Project Length: - 115 K.M. Distributaries Canal & its minor canal. Project Cost : - 200/- croreRs. Principal Client:Sardar Sarovar Narmada NigamLtd., Gujarat. Client: Hindustan Construction Company Ltd. Job Description: Responsible for QA/QC and Material testing for Construction of Canal Project. All specified test are done as per project specification, monitoring project Quality and checking the work as per approved drawing & specification.Attending Client meeting. M/S CONSULTING ENGINEERS ASSOCIATES, PANCHKULA; QA/QC & Site Engineer; Feb’09-Oct’11 Project Title: Dean Bandu Chhotu Ram Thermal Residential colony ProjectatYamuna Nagar, Haryana. Project Title: Up gradation of Deodhar Naina Wali Road and link in Yamuna Nagar Haryana. (HSRDC/C-16/2008) Road A, B, C, D & E, Total length 20km.with Major & Minor Bridges. Client: Haryana State Road Development Corporation.(HSRDC) Project Length: - 20.00 K.M. & 1 Major and 3 Minor Bridge & Culverts. Project Cost: - 42.85/- Crore Rs.
  • 3. Job Description: - Monitoring project Quality and checking the work as per approved drawing and specification, all specified test are done as per project specification. Inspecting site job of various activities like Earthwork,GSB, WMM, BM, DBM, BC & Structural concrete work. Summits site daily report, inspecting request and all applicable monitoringreport on regular basisor as required. M/S NEW EDGE ENGG & CONSTRUCTION COMPANY PVT LTD; Site Engineer; Aug’05-Dec’08 Project Title: 2*25 MW power plant for Ultratech Cement limited at Tadipatri in Andra Pardesh. Client : - Aditya Birla Group.(Ultra cement Limited) Project Cost: - 200/- Crore Rs. Project Title: 2*300 MW Dean Bandu Chhotu Ram Thermal Power PlantProjectat Yamuna Nagar, Haryana. Client : Haryana State Power generation Corporation Limited. Project Cost:-2400/-CroreRs. KCA INFRASTRUCTURE PVT LTD; Civil Engineer; Apr’04-July’05 Project Title: Mobile Tower Project‘s at Haryana &Himachal Pradesh. Client :Bharti Airtel Limited. Project Cost: - 7-10 Crore Rs. for (one tower)