Critical Review on Causes and Effects of Variation Orders in Construction Projects
•
3 likes
•
246 views
AI-enhanced title
IRJET Journal
Follow
https://www.irjet.net/archives/V4/i12/IRJET-V4I12295.pdf
Read less
Read more
Engineering
Report
Share
Report
Share
1 of 5
Download now
Download to read offline
Recommended
Construction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential Building
SHAZEBALIKHAN1
Building services planning manual 2007
Building services planning manual 2007
Mahmoud Awwad, PMP, MCIOB
Project delay and_cost_overrun-libre
Project delay and_cost_overrun-libre
UTHM
IRJET- Delay in Construction its Causes and Mitigation: A Review
IRJET- Delay in Construction its Causes and Mitigation: A Review
IRJET Journal
Managing the Construction Claims Effectively
Managing the Construction Claims Effectively
SHAZEBALIKHAN1
Process of pre construction phase drawbacks
Process of pre construction phase drawbacks
glibson rojer
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
Gaurav Verma
J.S. Daniel paper for practical checklist of schedule
J.S. Daniel paper for practical checklist of schedule
J.S. Daniel
Recommended
Construction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential Building
SHAZEBALIKHAN1
Building services planning manual 2007
Building services planning manual 2007
Mahmoud Awwad, PMP, MCIOB
Project delay and_cost_overrun-libre
Project delay and_cost_overrun-libre
UTHM
IRJET- Delay in Construction its Causes and Mitigation: A Review
IRJET- Delay in Construction its Causes and Mitigation: A Review
IRJET Journal
Managing the Construction Claims Effectively
Managing the Construction Claims Effectively
SHAZEBALIKHAN1
Process of pre construction phase drawbacks
Process of pre construction phase drawbacks
glibson rojer
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
Gaurav Verma
J.S. Daniel paper for practical checklist of schedule
J.S. Daniel paper for practical checklist of schedule
J.S. Daniel
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET Journal
A Review of Cost overruns in Construction Project Management
A Review of Cost overruns in Construction Project Management
ijsrd.com
project on construction of house report.
project on construction of house report.
Hagi Sahib
Claims
Claims
Mike Debiak
Construction Compliance Consultants
Construction Compliance Consultants
bfitzsimons1974
Construction project management
Construction project management
saif hasan
Effect of construction delays on project time overrun
Effect of construction delays on project time overrun
eSAT Publishing House
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
iosrjce
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
World-Academic Journal
Basement remodel rev eh
Basement remodel rev eh
esands2437
5 Popular Types of Construction Contracts
5 Popular Types of Construction Contracts
SHAZEBALIKHAN1
Project Engineer 3
Project Engineer 3
Sunil Mall
Project change management plan template
Project change management plan template
Vivek Srivastava
My 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project Management
SHAZEBALIKHAN1
Reasons for the Delay and Cost Overrun in Residential Projects - 2017
Reasons for the Delay and Cost Overrun in Residential Projects - 2017
Sankalp Swarnkar
How Does MS Project Works 6- Task Controlling Factors
How Does MS Project Works 6- Task Controlling Factors
SHAZEBALIKHAN1
“Investigation of Time-Cost Effectiveness on Construction Projects”
“Investigation of Time-Cost Effectiveness on Construction Projects”
IOSR Journals
Project Management Control
Project Management Control
Vinay Mangrulkar
Resume - Khalid Hussain Project
Resume - Khalid Hussain Project
Khalid Hussain
Construction Project Management Class Project Presentation
Construction Project Management Class Project Presentation
Wayne Holley
A Study for the Causes of Variation Orders in Different Sectors of Constructi...
A Study for the Causes of Variation Orders in Different Sectors of Constructi...
Sarah Adams
TOPIC7.pdf
TOPIC7.pdf
HASMANIRA
More Related Content
What's hot
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET Journal
A Review of Cost overruns in Construction Project Management
A Review of Cost overruns in Construction Project Management
ijsrd.com
project on construction of house report.
project on construction of house report.
Hagi Sahib
Claims
Claims
Mike Debiak
Construction Compliance Consultants
Construction Compliance Consultants
bfitzsimons1974
Construction project management
Construction project management
saif hasan
Effect of construction delays on project time overrun
Effect of construction delays on project time overrun
eSAT Publishing House
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
iosrjce
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
World-Academic Journal
Basement remodel rev eh
Basement remodel rev eh
esands2437
5 Popular Types of Construction Contracts
5 Popular Types of Construction Contracts
SHAZEBALIKHAN1
Project Engineer 3
Project Engineer 3
Sunil Mall
Project change management plan template
Project change management plan template
Vivek Srivastava
My 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project Management
SHAZEBALIKHAN1
Reasons for the Delay and Cost Overrun in Residential Projects - 2017
Reasons for the Delay and Cost Overrun in Residential Projects - 2017
Sankalp Swarnkar
How Does MS Project Works 6- Task Controlling Factors
How Does MS Project Works 6- Task Controlling Factors
SHAZEBALIKHAN1
“Investigation of Time-Cost Effectiveness on Construction Projects”
“Investigation of Time-Cost Effectiveness on Construction Projects”
IOSR Journals
Project Management Control
Project Management Control
Vinay Mangrulkar
Resume - Khalid Hussain Project
Resume - Khalid Hussain Project
Khalid Hussain
Construction Project Management Class Project Presentation
Construction Project Management Class Project Presentation
Wayne Holley
What's hot
(20)
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
A Review of Cost overruns in Construction Project Management
A Review of Cost overruns in Construction Project Management
project on construction of house report.
project on construction of house report.
Claims
Claims
Construction Compliance Consultants
Construction Compliance Consultants
Construction project management
Construction project management
Effect of construction delays on project time overrun
Effect of construction delays on project time overrun
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...
Basement remodel rev eh
Basement remodel rev eh
5 Popular Types of Construction Contracts
5 Popular Types of Construction Contracts
Project Engineer 3
Project Engineer 3
Project change management plan template
Project change management plan template
My 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project Management
Reasons for the Delay and Cost Overrun in Residential Projects - 2017
Reasons for the Delay and Cost Overrun in Residential Projects - 2017
How Does MS Project Works 6- Task Controlling Factors
How Does MS Project Works 6- Task Controlling Factors
“Investigation of Time-Cost Effectiveness on Construction Projects”
“Investigation of Time-Cost Effectiveness on Construction Projects”
Project Management Control
Project Management Control
Resume - Khalid Hussain Project
Resume - Khalid Hussain Project
Construction Project Management Class Project Presentation
Construction Project Management Class Project Presentation
Similar to Critical Review on Causes and Effects of Variation Orders in Construction Projects
A Study for the Causes of Variation Orders in Different Sectors of Constructi...
A Study for the Causes of Variation Orders in Different Sectors of Constructi...
Sarah Adams
TOPIC7.pdf
TOPIC7.pdf
HASMANIRA
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun
Dr Fereidoun Dejahang
Project change request template v2.0
Project change request template v2.0
Aditya Pandey
A study on the analysis and evaluation of delays in private construction Proj...
A study on the analysis and evaluation of delays in private construction Proj...
IRJET Journal
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
IRJET Journal
Changes in construction
Changes in construction
Mohamed Abdalla
Changes in construction projects
Changes in construction projects
Mohamed Abdalla
1616-5398-2-PB.pdf
1616-5398-2-PB.pdf
EyobMiteku
Unit 1
Unit 1
Durgesh Kumar Sahu
Study on the analysis and evaluation of delays in public sector construction ...
Study on the analysis and evaluation of delays in public sector construction ...
IRJET Journal
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
IRJET Journal
Change management
Change management
mehak1990
014 changes-cost overrun measurement
014 changes-cost overrun measurement
DrFereydounDejahang
014 changes-cost overrun measurement
014 changes-cost overrun measurement
Dr Fereidoun Dejahang
014 changes-cost overrun measurement
014 changes-cost overrun measurement
drdej19
014 changes-cost overrun measurement
014 changes-cost overrun measurement
DrFereydounDejahang
014 changes-cost overrun measurement
014 changes-cost overrun measurement
Dr Fereidoun Dejahang
014 changes-cost overrun measurement
014 changes-cost overrun measurement
Dr Fereidoun Dejahang
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET Journal
Similar to Critical Review on Causes and Effects of Variation Orders in Construction Projects
(20)
A Study for the Causes of Variation Orders in Different Sectors of Constructi...
A Study for the Causes of Variation Orders in Different Sectors of Constructi...
TOPIC7.pdf
TOPIC7.pdf
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun
Project change request template v2.0
Project change request template v2.0
A study on the analysis and evaluation of delays in private construction Proj...
A study on the analysis and evaluation of delays in private construction Proj...
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
Changes in construction
Changes in construction
Changes in construction projects
Changes in construction projects
1616-5398-2-PB.pdf
1616-5398-2-PB.pdf
Unit 1
Unit 1
Study on the analysis and evaluation of delays in public sector construction ...
Study on the analysis and evaluation of delays in public sector construction ...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Change management
Change management
014 changes-cost overrun measurement
014 changes-cost overrun measurement
014 changes-cost overrun measurement
014 changes-cost overrun measurement
014 changes-cost overrun measurement
014 changes-cost overrun measurement
014 changes-cost overrun measurement
014 changes-cost overrun measurement
014 changes-cost overrun measurement
014 changes-cost overrun measurement
014 changes-cost overrun measurement
014 changes-cost overrun measurement
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
More from IRJET Journal
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
React based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
More from IRJET Journal
(20)
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
React based fullstack edtech web application
React based fullstack edtech web application
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Recently uploaded
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
DeepakSakkari2
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur High Profile
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
Call Girls in Nagpur High Profile
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
Mark Billinghurst
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
ranjana rawat
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
misbanausheenparvam
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
Asst.prof M.Gokilavani
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
959SahilShah
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
PoojaBan
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
KurinjimalarL3
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
RajaP95
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
João Esperancinha
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
ssuser7cb4ff
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
Asst.prof M.Gokilavani
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
rehmti665
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
britheesh05
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ranjana rawat
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Low Rate Call Girls In Saket, Delhi NCR
Recently uploaded
(20)
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
Critical Review on Causes and Effects of Variation Orders in Construction Projects
1.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 12 | Dec-2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1602 Critical Review on Causes and Effects of Variation Order on Construction Project Anatol Berhanu Gobana1, Abhishek Singh Thakur 2 1PG Student, Dept. of Civil Engineering, Parul University, Gujarat, India 2Assistant professor, Dept. of Civil Engineering, Parul University, Gujarat, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract -The greatest inevitable situation in construction projects is variation. This variation orders are available in all kind of construction projects and acting a significant part in defining the ultimate budget and duration of the projects. Variation Order is a common occurrence in construction projects. It includes a modification of the prior scope of tasks as in the contract. Change order of scope of work is caused from various issues. The origins of variation orders are characterized under employer related, consultant related, building executor related and other related causes. The down side of this variation order was it brought cost and schedule overrun and causes disagreement and claims among the contract parties. Thus, this paper is an effort to define variation order, causes and effect of variation order, waste related with change orders and differentliteraturereviewsare discussed. Key Words: variation order, causes, effects, construction projects. 1. INTRODUCTION The charge of a construction project is one of the greatest important factors in the construction manufacturing. Because of different reasons, the budget of a project can suggestively differ from the first valued price. Their sources might be alterations in scope of task, specifications, or any other agreement form. In the construction business, variation orders are made after changes occur. Itcoversaset of orders which permitsalterations or alterationstobedone to an earlier consent in case of capacity or nature of work to be carried out. When a variation order is created, it brings several undesirable effects to both the employer and the construction executors. For completionoflargeconstruction projects we have to complete small construction tasks in regular manner. For that lot of exertions are taken. The variation orders are unlucky causes to interrupt the movement of construction procedure instantaneously stay the construction project. They involved alteration, extra work, deleting, and exchanging in terms of quality, quantity and duration of work. When extra work, subtraction, or any other revision had done project goalmouths and scope of project are considered to be variation, whether they accelerate or deduct the project budget or schedule.Changes in construction projects means to an modification to design, construction tasks, project sequencers or project characteristics produced by adjustments of previous situations, assumptions, or requirements. Variation orders have effect on complete project routine because changesare able to bring considerable alteration to the agreement period, total direct and indirect cost, or both. [10] The tackling of these variations needs sufficientskill;inwhat manner we manage that change without affecting our final achievement. Monitoring change order is the greatest importance to the achievement of construction project. These variations sometimes occur after the grant of the preliminary agreement or after work might have started at the construction sites. The key reasons of variation orders are characterized beneath employer related, consultant related and contractor related and other related sources of change orders. When the number of change order on a project rises, in the similar way the likelihood of misinterpretation between the agreement teams. Such a misinterpretation may happen due to one of the parties has no talent of the variation order procedure itself, the budget included in executing changes, or the postponements, disagreements, and interruption of the construction sequence and calendar which can unfavourably impact project management. [4] 1.1 Variation order in construction project A construction contract is a business agreement that is subject to variability. Contractual articles relating to variations allow contractual teams involved in the tender to easily motivate change orders within the influence of the scope of the works without altering the original contract. Change orders involve extra work, subtraction, alterations and replacements in terms of quality, quantity and duration of works. Without contractual Clauses, the contractors who were licensed on building should have to decide to upright the building as per the design and represented in the agreement forms. Any insignificant alteration that the employer needs to prepare far along mean that the contract must be removed and a fresh added was drawn up. [5] Variation order is the eccentricity practiced in some scheme from base agreement or task scope equally agreed at contracting duration. It is written contract among the construction partiesthat symbolize extra work,omission, or reconsideration to the agreement documents, identifies the alteration in price and time and describes the nature of the task involved.Change ordersincreases for altered sourcesof whichcertain reasons are predictable and the leftonearenot predicted. [11]
2.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 12 | Dec-2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1603 1.2 Causes of variation orders. Many papers had identified that different originof variation orders in construction project. The enormity of the many origins of change order were listed before this time by different researchers revealsthat changeshasbecomeoneof the construction project factors that weakens construction projects and it focuses many stakeholders.Thisvariationhas been characterized into consultantrelated,employerrelated, building executor related and other related change order and the other variation is listed asforce majeure.Theorigins of project change in project may originate from either external or internal pressures that are being applied to the project. External causes may be due to of technological changes, changes in the customer expectations and tastes, alterations in competitor’s activities, modifications in government and policies, adjustments in the economy and finally demographic amendments in the society. Internal causes may emanate as of changes in management policy, changes in organizational objectives andchangesinthelong- term survival strategy of the organizations involved. [1] The foremost origin of change orders on construction projects are inadequate working drawing, design inconsistencies, disagreement between contract sum, the alteration of plans by employers, impairment in rapid decision making procedure, insufficient project aim and objectives, and replacement of materials or procedures, location of site, lack of expert manpower, building executor anticipation on profit and contractor’s financial difficulties. As a results of literature reviews, origins of change orders were listed out such as: Alteration of schedule, differencesin scope, employers financial difficulties, Weakness to quick decision-making process, stubborn nature of the employer, Change in specifications by the employers, Alteration in design by the consultant, disagreement among contract documents, Design complexity,Insufficientworkingdrawing, Alteration in specification by the consultant, Unobtainability of equipment, lack of well-trained manpower, Contractor’s monetary problems and Poor workmanship. [1, 3] Below figure reveals that origin of change order in many construction projects using a survey study analysis focused on the amount of incidences and percentage. [9] Fig 1. Causes of variation order, Adopted from [9] 1.3 Effects of Variation Orders Variation orders exert various effects on the projects. Numerousresearchershave emphasized theeffectofchange order. Impact is the pressure of hollow of one thing on another. In construction, extra work or omission of scope of activitiesof the project can bring effect on the portionsofthe project directly or indirectly. Therefore, itisalwaysaspecific issue as the contractor feels that the disadvantage due to change order is the burden of the designers and owners. Conversely, employers characteristically claim that the slowdown of outcome is because of poor monitoring due to building executors. However, not every variation order will impact the consequence of the project. Changes in any prearranged activity will bring a disorder and needs the rearrangement or rechecking of the existing plan under the recent developments. It was found that variation orders issued during many stages of constructionprojectsadversely exaggerated equally budget and calendar of projects. [10] 1.4 Waste associated with variation orders The origin of variation orders can be strong-minded by referring to both the reasons for their incidence and following effects. Variation orders cab be classified as, beneficial and detrimental change orders. A beneficial change order is one delivered to increase the quality standard, decrease price, calendar, or grade of effort in a project. A beneficial variation order abolishes needless prices from a project; and hence, it improves the employer welfarescontrary to the reserve inputbyabolishingneedless prices. While most construction industry stakeholders are debatably interested in the lessening of overall production prices, they are not always mindful of theextentofnon-value providing extra tasks on construction projects. Accordingly, there is a lack of knowledge about valueless costs related with change orders. The realistic quantification ofsuch costs is sticky because of shortage of suitable techniques for their measurement. In common practice, non-value-addingprices ascending from change ordersthat are typically transported to be miscalculated. For instance, one may capable to compute the pricesof terminated works, but valuelessprice arising from non-productive period; redesign and expenditures are not credited to such an action. Very often these prices are unwittingly relocated beneaththeversionof contingencies. [10] 2. LITERATURE REVIEWS OjoAyodeji, Sunday (2010), published a paper on impact of variation orders on public construction projects. The investigation proves that insufficient workings drawing details, design inconsistencies, and disagreement between contract parties are the most predominant sources of changesdue to consultants, alteration of plansbyemployers, impairment in quick decision making process, and insufficient project objectives contributed mostly to variations by the employers. Contractors’ predominant reasons for variations are opposing site situations, lack of
3.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 12 | Dec-2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1604 skilled manpower, and contractor’s desired cost- effectiveness. There is a connection among the assessments by the respondent concerning the consultant related variations and the projects fingered by the consultants. The investigation has shown that effect of variation has superior important effect on the projects held by the consultantsthan the in-house project staff regardless of the kind and scope of the projects. It is expected that these will support the administration to recheck the conditions at which the consultant and the in-house staff operate to better understand the usefulness of the consultantandthein-house construction professional staff. R.U.Halwatura and N.P.N.P.Ranasinghe, (2013), have published a paper on causes of change order in road construction Projects. The study concluded that the consultants do not take about satisfactory investigations at the initial investigation and design phase. Therefore,several site conditions rise in the construction stage. Additionally, employers do not have talented professional stafftoprepare inquiries and estimates, which are prepared by consultants and are not precise in most situations. Therefore, several needless variations happen during the construction phase. Apart from this most of the time the foremost reasons were, the fault of the client is not pointed out and not documented. According to the survey results, a political force during construction phase is listed out as a leading factor. A.A. Oladapo,(2007), has studied a paper on assessment of the cost and time impact of variation orderson construction projects. The study has discovered that alterations in specifications and scope, initiated mostly by project owners and their consultants, are the maximum predominant sources of variation. This results mainly from changes in owners’ income/financial ability, changes in owners’ interests/requirements, design errors and insufficient time for preparation of agreement forms. The study concludes that variation had a significant impact on project budgetand schedule invades and that project size and type did not significantly affect the project prices and calendar. The expectation of this study was that to enable project clients, consultants, contractors and other stakeholders to realize and appreciate the real effect of variation on project routine. Amiruddin, Ismail, Towhid and Pourrostam, (2012), published paper on factors causing variation orders and their effects in roadway construction projects. This study which was held on an estate in the southern part of Iran has been capable to separate origins and impacts of variation orders in construction projects. It was observed that alteration of plans or scope by employer, errors and omissions in design and clients’ financialdifficultieswerethe serious factors that cause the existence variation orders in roadway construction projects. In addition, the consequences prove that schedule and budget overrunsand disagreement had great important effectsonprojectroutine. It is to the advantage of this study that its applications are very relevant not only in Iran’s roadwayconstructionsystem but also in other developing countries construction industries. Alia Alaryan, Emadelbeltagi, Ashraf Elshahat and Mahmoud Dawood,(2014), published a paper on change orders on construction Projects. The investigation found that the most five common causes of change orders can be listed out as: alteration of plans by client, alteration of project scope by client, difficulties on site, errors and omission in design, insufficient design and inadequate working drawing details. The most five common effects of change orderareincreasing the project’s budget, accelerate the duration of individual events, postponing in completionschedule,additionalmoney for contractor, and delaying in payment. Finally, themostsix common control actions are: inspecting and reviewing the contract documents, reviewing design before change approval, the change order must be negotiated by educated persons, the scope of change orders must be precisely done, careful checking in writing must be handed, and the respectable utensils to control the incidence of change including the areas of concern in monthly reports and meetings. Ijaola, I.A and Iyagba R.O, (2012), published paper on comparative study of causes of change orders in construction project. This study investigated the causes, effect, advantage and solutions of variation order in Nigeria and compare it with that of Oman. It was concluded that the major causesof change ordersin NigeriaandOmanarethose related to employers and the major reason is that owner request for additional works. The impact of these changes has leads to claims and disputes, time overrun and cost inflation in both Nigeria and Oman. The study also identified the contractor asthe most helping partiesof change orderin Nigeria as most respondents believed that the building executor uses suitable areas in general conditions and asks extra payment to be paid for them. The contractor was also ranked as most beneficiary of variation order in Oman. Noraziah Mohammad, Adi Irfan Che Ani , Riza Atiq O.K. Rakmat (2017), published paper on causes and effects of variation orders in the construction of terrace housing Projects. The 18 causes of changes that are identified through a literature review were used as a guide or foundation in collecting information to know the sources of changes in working in strip Selangor, found that only 10 causes of employment changes are related to changes in work for the terrace houses in the district of Selangor. From the consequences of case studies there are five main causes that led to the introduction of changes in the housing projects in the state. The causes are as follows: Changes in the scope of the work by the client. Exchange of construction materials by the client. Specification changes by the client. Changes in building design by the consultant. Differences between the contract forms and drawings.
4.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 12 | Dec-2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1605 Among the main effects were identified and investigated in joining with variation order are as follows: Increase project time The increase in the project cost. delay logistics The impact on the quality of the project Destruction and reconstruction M.Gokulkarthi, K.S. Gowrishankar (2015), publishedapaper on a study on impacts of change order in construction projects. Based on the field survey conducted and the consequences were achieved, the following as can be determined and outlined: Changing the plans by the owners is the main source of change orders. This is because shortageof participation in the design growth and incapability to imagine it while not appreciating the undesirable impact on it. Because of new materialsare becoming availablein the market or change in mind, substituting materials and/or proceduresis thesecondsourceof change orders. Consultants are the second major contributor to changes by generating conflictingdesigndocuments or through alteration in design afterwards. Rise in project price and duration are the main two effects being noted for change orders. Clarity of scope of change orders ranked the first among controls adopted. Onkar U. Jadhav , Prof. Abhijit N. Bhirud (2015), published paper on an analysis of causes and effects of change orders on construction Projects. As per survey carried out get different kinds of answers and responses from the construction place .The root sources of variation order in construction projects in is client alterations, extra activities and adjustment to prior work. Another key reason is lack of building executor participation in design phase. It may indicate absence of thoughtful design at the period of actual construction. The other causes are unrealistic design periods, the absence of information between contractorand the consultants. The effects are the most important change orders increases the cost of the projects. Probably increase the period of individual activates that effect on completion timetable of the projects. Paying extra money for the contractor is the mostly effects caused on different construction sites. Ruben Ndihokubwayo, Theo Haupt (2009), published paper on Variation orders on constructionprojects:valueaddingor waste? Study found that consultants accepted time frames proposed by clients instead of proposing realistic timeframes to accomplish the design. As a result they embarked on tendering whether the design was completed or not because they knew other required changes would be permissible under the conditions of contract. It was therefore determined that the employerwasthefurthermost leading source agent of variation orders. Most variation ordersadded value to the project. However, waste wasstilla consequence of them. It was investigated that changeorders were not persuasively estimated resulting in increased construction budget. Time and cost escalation and disputes had foremost effects on project routine. There were no standard methodsfor recording and administeringvariation orders. While respondentssuggestedthatchangeordermust be reduced, they acknowledged that clients had the right to initiate changes provided they were contractually permissible and were preparedtoremuneratetheassociated costs. Aftab Hameed Memon, Ismail AbdulRahman and Mohamad Faris AbulHasan (2014), published a paper on Significant Causes and Effects of Variation Orders in Construction Projects. The investigation was attempting to list out the foremost sources and impacts of changes in construction projects. Average index analysisof the collected information through survey shows that: In Malaysian construction projects, variations are often experienced in JKR projects. Five most important causes are absence of apparatus, poor workmanship, design difficulty, alteration of schedule and impairment to quick decision making procedure. Logistic delays, postponement in conclusion and increase project budget are important impact of variations confronted in construction projects. 3. CONCLUSION Based on various literature reviews the causes and effect of variation orders were categorized under employer related, consultant related, contractors related and other related grounded on type of the task. The employer related causes were change of plans, alteration of project scope, extra tasks and adjustment to previous work and financial difficulties, The consultant related causes were; insufficient workings drawing details, design inconsistencies, and disagreement among contract documents are the most predominant origins of variations, Contractors’ prevalent reasons for variations were differing site conditions, lack of trained manpower, and contractor’sdesiredprofitability.Theimpact of change order within construction project wereresultedin claims and disputes, time overrun and cost overrun, delay logistics, impact on the quality of the project, anddemolition and rebuilding. Yet, no unique method is available for minimizing variation orderseffectively.However,theireffect can be minimized with an appropriate study about the causes. The consultants’ and the contractors’ response
5.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 12 | Dec-2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1606 argued on the strategy that states adequate planning in advance is required by all involved parties before works start on site to minimize variation orders. This was because a well-planned project can eliminate change that will increase because of shortage of prior project development. REFERENCES [1] OjoAyodeji, Sunday, published a paper on Impact of Variation Orders on Public Construction Projects, Ministry of National Development,IndependenceHouse, Victoria, Volume 1, Issue September, PP 101-110, 2010. [2] R.U. Halwatura and N.P.N.P. Ranasinghe Hindawi, Causes of Variation Orders in Road Construction Projects, Publishing Corporation ISRN Construction Engineering 2013, in Sri Lanka, Volume 13, PP1-7,2013 [3] A.A. Oladapo, Durban, Assessment of the cost and time impact of variation orders on construction projects ,Journal of Engineering, Design and Technology, South Africa, Volume 5, Issue 1, PP 35-48, 2007 [4] Amiruddin Ismail, Towhid Pourrostam, Amir Soleymanzadeh and Majid Ghouyounchizad, Factors Causing Variation Orders and their Effects in Roadway Construction Projects, Research Journal of Applied Sciences, Engineering and Technology, Shoushtar, Iran, Volume 4, Issue 23, PP 4669-4972, 2012. [5] Alia Alaryan, Emadelbeltagi Ashraf Elshahat and Mahmoud Dawood Alia Alaryan et, Causes and Effectsof Change Orders on Construction Projects, Int. Journal of Engineering Research and Applications, Volume4,Issue 2, PP 2248-962201, 2014. [6] Ijaola, I.A and Iyagba R.OA, Comparative StudyofCauses of Change Orders in Public Construction Project in Nigeria and Oman, Journal of Emerging Trends in Economics and ManagementSciences(JETEMS),Volume 3, Issue 5,PP 495-501, 2012. [7] Noraziah Mohammad, Adi Irfan Che Ani , Riza Atiq O.K. Rakmat, Causes and Effects of Variation Orders in the Constructionof Terrace Housing Projects, International Journal of Supply Chain Management, Volume6,Issue,1, PP 226-223, 2017 [8] M.Gokulkarthi, K.S.Gowrishankar, A ComparativeStudy of Causes of Change Orders in Public Construction Project ,Journal of Emerging Trends in Economics and Management Sciences, Volume 3, Issue 1, PP 65-72, 2015. [9] Onkar U. Jadhav , Prof. Abhijit N. Bhirud, An Analysis Of Causes and Effects Of Change Orders On Construction, International Journal of Engineering Research and General Science,Volume 4, Issue 2, PP 2248-962201, 2015. [10] Ruben Ndihokubwayo and Theo Haupt,Variation Orders On Construction Projects: Value Adding Or Waste?, International Journal of Construction Project Management, Volume 1, PP 1-17, 2009 [11] Aftab Hameed Memon, Ismail Abdul Rahman and Mohamad Faris Abul Hasan, Published paper on Significant Causes and Effects of Variation Orders in Construction Projects, Research Journal of Applied Sciences, Engineering and Technology, Volume 7, Issue 21, PP 4494-4502, 2014.
Download now