PROJECT CHANGEMANAGEMENT PLAN TEMPLATE
COMPANY NAME
STREET ADDRESS
CITY, STATE ZIP CODE
DATE
2
TABLE OF CONTENTS
INTRODUCTION.................................................................................................................................... 3
CHANGE MANAGEMENT APPROACH ........................................................................................................ 3
DEFINITIONS OF CHANGE....................................................................................................................... 3
CHANGE CONTROLBOARD..................................................................................................................... 4
ROLES AND RESPONSIBILITIES.................................................................................................................. 5
CHANGE CONTROL PROCESS................................................................................................................... 5
3
INTRODUCTION
Change Management is an important part of any project. Changes must be vetted and
managed to ensure that they are within the scope of the project and are communicated to all
stakeholders if they are approved. The process for submitting, reviewing, and approving
changes must also be communicated to all stakeholders in order to properly set expectations.
If changes are allowed to be submitted or are implemented in and unorganized way, any
project is sure to fail. All projects must include a Change Management Plan as part of the
overall Project Plan.
The Change Management Plan was created for the Inventory Services (IS) Project in order to set
expectations on how the approach to changes will be managed, what defines a change, the
purpose and role of the change control board, and the overall change management process. All
stakeholders will be expected to submit or request changes to the IS Project in accordance with
this Change Management Plan and all requests and submissions will follow the process detailed
herein.
CHANGE MANAGEMENTAPPROACH
The Change Management approach for the IS Project will ensure that all proposed changes are
defined, reviewed, and agreed upon so they can be properly implemented and communicated
to all stakeholders. This approach will also ensure that only changes within the scope of this
project are approved and implemented.
The Change Management approach is not to be confused with the Change Management
Process which will be detailed later in this plan. The Change Management approach consists of
three areas:
 Ensure changes are within scope and beneficial to the project
 Determine how the change will be implemented
 Manage the change as it is implemented
The Change Management process has been designed to make sure this approach is followed for
all changes. By using this approach methodology, the IS Project Team will prevent unnecessary
change from occurring and focus its resources only on beneficial changes within the project
scope.
DEFINITIONSOF CHANGE
There are several types of changes which may be requested and considered for the IS Project.
Depending on the extent and type of proposed changes, changes project documentation and
4
the communication of these changes will be required to include any approved changes into the
project plan and ensure all stakeholders are notified. Types of changes include:
 Scheduling Changes: changes which will impact the approved project schedule. These
changes may require fast tracking, crashing, or re-baselining the schedule depending on
the significance of the impact.
 Budget Changes: changes which will impact the approved project budget. These
changes may require requesting additional funding, releasing funding which would no
longer be required, or adding to project or management reserves. May require changes
to the cost baseline.
 Scope Changes: changes which are necessary and impact the project’s scope which may
be the result of unforeseen requirements which were not initially planned for. These
changes may also impact budget and schedule. These changes may require revision to
WBS, project scope statement, and other project documentation as necessary.
The project manager must ensure that any approved changes are communicated to the project
stakeholders. Additionally, as changes are approved, the project manager must ensure that the
changes are captured in the project documentation where necessary. These document updates
must then be communicated to the project team and stakeholders as well.
CHANGE CONTROL BOARD
The Change Control Board (CCB) is the approval authority for all proposed change requests
pertaining to the IS Project. The purpose of the CCB is to review all change requests, determine
their impacts on the project risk, scope, cost, and schedule, and to approve or deny each
change request. The following chart provides a list of the CCB members for the IS Project:
Name Position CCB Role
A. Smith IS Project Sponsor CCB Chair
T. White IS Project Manager CCB Member
B. Brown IS Project Technical Lead CCB Co-Chair
J. Jones IS Project Operations Lead CCB Member
As change requests are submitted to the IS Project Manager by the project team/stakeholders,
the Project Manager will log the requests in the change log and the CCB will convene every
other Friday to review all change requests. For a change request to be approved, all CCB
members must vote in favor. In the event more information is needed for a particular change
request, the request will be deferred and sent back to the requestor for more information or
5
clarification. If a change is deemed critical, an ad hoc CCB meeting can be called in order to
review the change prior to the next scheduled bi-weekly CCB meeting.
ROLES AND RESPONSIBILITIES
The following are the roles and responsibilities for all change management efforts related to
the IS Project:
Project Sponsor:
 Approve all changes to budget/funding allocations
 Approve all changes to schedule baseline
 Approve any changes in project scope
 Chair the CCB
Project Manager:
 Receive and log all change requests from project stakeholders
 Conduct preliminary risk, cost, schedule, scope analysis of change prior to CCB
 Seek clarification from change requestors on any open issues or concerns
 Make documentation revisions/edits as necessary for all approved changes
 Participate on CCB
Project Team/Stakeholders:
 Submit all change requests on standard organizational change request forms
 Provide all applicable information and detail on change request forms
 Be prepared to address questions regarding any submitted change requests
 Provide feedback as necessary on impact of proposed changes
CHANGE CONTROL PROCESS
The Change Control Process for the IS Project will follow the organizational standard change
process for all projects. The project manager has overall responsibility for executing the change
management process for each change request.
1) Identify the need for a change (Stakeholders) – Change requestor will submit a
completed change request form to the project manager.
2) Log change in the change request register (Project Manager) – The project manager will
keep a log of all submitted change requests throughout the project’s lifecycle.
3) Submit change request to CCB (Project Manager) – The project manager will submit the
change request, as well as the preliminary analysis, to the CCB for review.
6
4) Obtain Decision on change request (CCB) – The CCB will discuss the proposed change
and decide whether or not it will be approved based on all submitted information.
5) Implement change (Project Manager) – If a change is approved by the CCB, the project
manager will update and re-baseline project documentation as necessary.
SPONSOR ACCEPTANCE
Approved by the Project Sponsor:
__________________________________________ Date: ___________________
<Project Sponsor>
<Project Sponsor Title>

More Related Content

What's hot

J.S. Daniel paper for presentation cost management
J.S. Daniel paper for presentation cost managementJ.S. Daniel paper for presentation cost management
J.S. Daniel paper for presentation cost management
J.S. Daniel
 
Itil a guide to cab meetings pdf
Itil a guide to cab meetings pdfItil a guide to cab meetings pdf
Itil a guide to cab meetings pdf
viktech
 
J.S. Daniel presentation on planning
J.S. Daniel presentation on planningJ.S. Daniel presentation on planning
J.S. Daniel presentation on planning
J.S. Daniel
 
Post Implementation Review Template
Post Implementation Review TemplatePost Implementation Review Template
Post Implementation Review Template
Edmond Cheng
 
Schedule management-plan template
Schedule management-plan templateSchedule management-plan template
Schedule management-plan template
Vivek Srivastava
 
Project management-plan template
Project management-plan templateProject management-plan template
Project management-plan template
Vivek Srivastava
 

What's hot (20)

EPSC Module 3 Unit 1
EPSC Module 3 Unit 1EPSC Module 3 Unit 1
EPSC Module 3 Unit 1
 
Project client signoff template v2.0
Project client signoff template v2.0Project client signoff template v2.0
Project client signoff template v2.0
 
Project closure
Project closureProject closure
Project closure
 
J.S. Daniel paper for presentation cost management
J.S. Daniel paper for presentation cost managementJ.S. Daniel paper for presentation cost management
J.S. Daniel paper for presentation cost management
 
Ivy summary
Ivy summary Ivy summary
Ivy summary
 
Change Control Form
Change Control FormChange Control Form
Change Control Form
 
Itil a guide to cab meetings pdf
Itil a guide to cab meetings pdfItil a guide to cab meetings pdf
Itil a guide to cab meetings pdf
 
J.S. Daniel presentation on planning
J.S. Daniel presentation on planningJ.S. Daniel presentation on planning
J.S. Daniel presentation on planning
 
Post Implementation Review Template
Post Implementation Review TemplatePost Implementation Review Template
Post Implementation Review Template
 
Schedule management-plan template
Schedule management-plan templateSchedule management-plan template
Schedule management-plan template
 
Claim Presentation Rev 03 FINAL
Claim Presentation Rev 03 FINALClaim Presentation Rev 03 FINAL
Claim Presentation Rev 03 FINAL
 
Change control-request-template
Change control-request-templateChange control-request-template
Change control-request-template
 
Development Plan Review Process
Development Plan Review ProcessDevelopment Plan Review Process
Development Plan Review Process
 
Project management-plan template
Project management-plan templateProject management-plan template
Project management-plan template
 
Project closeout-report
Project closeout-reportProject closeout-report
Project closeout-report
 
PM-Project Closing-UiTM Project
PM-Project Closing-UiTM ProjectPM-Project Closing-UiTM Project
PM-Project Closing-UiTM Project
 
Qa plan1
Qa plan1Qa plan1
Qa plan1
 
User acceptance-report
User acceptance-reportUser acceptance-report
User acceptance-report
 
Project closing and methods
Project closing and methodsProject closing and methods
Project closing and methods
 
Project proposal document template
Project proposal document templateProject proposal document template
Project proposal document template
 

Similar to Project change management plan template

CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docxCHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
cravennichole326
 
Change management plan_template
Change management plan_templateChange management plan_template
Change management plan_template
rac2
 
Change Plan Template and Example
Change Plan Template and ExampleChange Plan Template and Example
Change Plan Template and Example
haroldtaylor1113
 
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
OmnaCool
 
Configuration management-plan template
Configuration management-plan templateConfiguration management-plan template
Configuration management-plan template
Vivek Srivastava
 
6 I need the overall earned value analysis.  (That is, overall i.docx
6 I need the overall earned value analysis.  (That is, overall i.docx6 I need the overall earned value analysis.  (That is, overall i.docx
6 I need the overall earned value analysis.  (That is, overall i.docx
alinainglis
 
Change management
Change managementChange management
Change management
mehak1990
 
Pm600 1103 a-02-schwappach-loren-p4-t3
Pm600 1103 a-02-schwappach-loren-p4-t3Pm600 1103 a-02-schwappach-loren-p4-t3
Pm600 1103 a-02-schwappach-loren-p4-t3
Loren Schwappach
 
Requirements management-plan template
Requirements management-plan templateRequirements management-plan template
Requirements management-plan template
Vivek Srivastava
 

Similar to Project change management plan template (20)

CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docxCHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
 
#Perform Integrated Change Control (PICC) Process for PMP Exam - By SN Panig...
#Perform Integrated Change Control (PICC)  Process for PMP Exam - By SN Panig...#Perform Integrated Change Control (PICC)  Process for PMP Exam - By SN Panig...
#Perform Integrated Change Control (PICC) Process for PMP Exam - By SN Panig...
 
How the change control process affects project quality
How the change control process affects project qualityHow the change control process affects project quality
How the change control process affects project quality
 
Change management plan_template
Change management plan_templateChange management plan_template
Change management plan_template
 
Change Plan Template and Example
Change Plan Template and ExampleChange Plan Template and Example
Change Plan Template and Example
 
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
 
Configuration management-plan template
Configuration management-plan templateConfiguration management-plan template
Configuration management-plan template
 
6 I need the overall earned value analysis.  (That is, overall i.docx
6 I need the overall earned value analysis.  (That is, overall i.docx6 I need the overall earned value analysis.  (That is, overall i.docx
6 I need the overall earned value analysis.  (That is, overall i.docx
 
Change control and variations
Change control and variationsChange control and variations
Change control and variations
 
Change control and variations
Change control and variationsChange control and variations
Change control and variations
 
Project change request template v2.0
Project change request template v2.0Project change request template v2.0
Project change request template v2.0
 
Change management
Change managementChange management
Change management
 
Pm600 1103 a-02-schwappach-loren-p4-t3
Pm600 1103 a-02-schwappach-loren-p4-t3Pm600 1103 a-02-schwappach-loren-p4-t3
Pm600 1103 a-02-schwappach-loren-p4-t3
 
Requirements management-plan template
Requirements management-plan templateRequirements management-plan template
Requirements management-plan template
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 

More from Vivek Srivastava

Relationship management-plan template
Relationship management-plan templateRelationship management-plan template
Relationship management-plan template
Vivek Srivastava
 
Quality management-plan template
Quality management-plan templateQuality management-plan template
Quality management-plan template
Vivek Srivastava
 
Procurement management-plan template
Procurement management-plan templateProcurement management-plan template
Procurement management-plan template
Vivek Srivastava
 
Process improvement-plan template
Process improvement-plan templateProcess improvement-plan template
Process improvement-plan template
Vivek Srivastava
 
Communications management-plan-template
Communications management-plan-templateCommunications management-plan-template
Communications management-plan-template
Vivek Srivastava
 

More from Vivek Srivastava (17)

Root cause-analysis template
Root cause-analysis templateRoot cause-analysis template
Root cause-analysis template
 
Risk management-plan template
Risk management-plan templateRisk management-plan template
Risk management-plan template
 
Relationship management-plan template
Relationship management-plan templateRelationship management-plan template
Relationship management-plan template
 
Quality management-plan template
Quality management-plan templateQuality management-plan template
Quality management-plan template
 
Project status-report template
Project status-report templateProject status-report template
Project status-report template
 
Procurement management-plan template
Procurement management-plan templateProcurement management-plan template
Procurement management-plan template
 
Process improvement-plan template
Process improvement-plan templateProcess improvement-plan template
Process improvement-plan template
 
Human resource-plan template
Human resource-plan templateHuman resource-plan template
Human resource-plan template
 
Communications management-plan-template
Communications management-plan-templateCommunications management-plan-template
Communications management-plan-template
 
Tableau desktop 10 (simplilearn)
Tableau desktop 10 (simplilearn)Tableau desktop 10 (simplilearn)
Tableau desktop 10 (simplilearn)
 
Machine learning advanced certification training (Simplilearn)
Machine learning advanced certification training (Simplilearn)Machine learning advanced certification training (Simplilearn)
Machine learning advanced certification training (Simplilearn)
 
Data Scientist Master Program
Data Scientist Master ProgramData Scientist Master Program
Data Scientist Master Program
 
Data science with R (simplilearn)
Data science with R (simplilearn)Data science with R (simplilearn)
Data science with R (simplilearn)
 
Data science capstone
Data science capstoneData science capstone
Data science capstone
 
Big data hadoop and spark developer (simplilearn)
Big data hadoop and spark developer  (simplilearn)Big data hadoop and spark developer  (simplilearn)
Big data hadoop and spark developer (simplilearn)
 
Master Program in Data Science
Master Program in Data ScienceMaster Program in Data Science
Master Program in Data Science
 
Sample usecase educationdetails
Sample usecase educationdetailsSample usecase educationdetails
Sample usecase educationdetails
 

Recently uploaded

Mount abu Escort💋 Kajal Rate 4500/- Cash Payment 24/7
Mount abu Escort💋 Kajal Rate 4500/- Cash Payment 24/7Mount abu Escort💋 Kajal Rate 4500/- Cash Payment 24/7
Mount abu Escort💋 Kajal Rate 4500/- Cash Payment 24/7
ickkoo5
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
AllTops
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
SandaliGurusinghe2
 

Recently uploaded (15)

thesis-and-viva-voce preparation for research scholars
thesis-and-viva-voce preparation for research scholarsthesis-and-viva-voce preparation for research scholars
thesis-and-viva-voce preparation for research scholars
 
Mount abu Escort💋 Kajal Rate 4500/- Cash Payment 24/7
Mount abu Escort💋 Kajal Rate 4500/- Cash Payment 24/7Mount abu Escort💋 Kajal Rate 4500/- Cash Payment 24/7
Mount abu Escort💋 Kajal Rate 4500/- Cash Payment 24/7
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
Internal Reconstruction Corporate accounting by bhumika Garg
Internal Reconstruction Corporate accounting by bhumika GargInternal Reconstruction Corporate accounting by bhumika Garg
Internal Reconstruction Corporate accounting by bhumika Garg
 
Group work -meaning and definitions- Characteristics and Importance
Group work -meaning and definitions- Characteristics and ImportanceGroup work -meaning and definitions- Characteristics and Importance
Group work -meaning and definitions- Characteristics and Importance
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docx
 
Spring-2024-Priesthoods of Augustus Yale Historical Review
Spring-2024-Priesthoods of Augustus Yale Historical ReviewSpring-2024-Priesthoods of Augustus Yale Historical Review
Spring-2024-Priesthoods of Augustus Yale Historical Review
 

Project change management plan template

  • 1. 1 PROJECT CHANGEMANAGEMENT PLAN TEMPLATE COMPANY NAME STREET ADDRESS CITY, STATE ZIP CODE DATE
  • 2. 2 TABLE OF CONTENTS INTRODUCTION.................................................................................................................................... 3 CHANGE MANAGEMENT APPROACH ........................................................................................................ 3 DEFINITIONS OF CHANGE....................................................................................................................... 3 CHANGE CONTROLBOARD..................................................................................................................... 4 ROLES AND RESPONSIBILITIES.................................................................................................................. 5 CHANGE CONTROL PROCESS................................................................................................................... 5
  • 3. 3 INTRODUCTION Change Management is an important part of any project. Changes must be vetted and managed to ensure that they are within the scope of the project and are communicated to all stakeholders if they are approved. The process for submitting, reviewing, and approving changes must also be communicated to all stakeholders in order to properly set expectations. If changes are allowed to be submitted or are implemented in and unorganized way, any project is sure to fail. All projects must include a Change Management Plan as part of the overall Project Plan. The Change Management Plan was created for the Inventory Services (IS) Project in order to set expectations on how the approach to changes will be managed, what defines a change, the purpose and role of the change control board, and the overall change management process. All stakeholders will be expected to submit or request changes to the IS Project in accordance with this Change Management Plan and all requests and submissions will follow the process detailed herein. CHANGE MANAGEMENTAPPROACH The Change Management approach for the IS Project will ensure that all proposed changes are defined, reviewed, and agreed upon so they can be properly implemented and communicated to all stakeholders. This approach will also ensure that only changes within the scope of this project are approved and implemented. The Change Management approach is not to be confused with the Change Management Process which will be detailed later in this plan. The Change Management approach consists of three areas:  Ensure changes are within scope and beneficial to the project  Determine how the change will be implemented  Manage the change as it is implemented The Change Management process has been designed to make sure this approach is followed for all changes. By using this approach methodology, the IS Project Team will prevent unnecessary change from occurring and focus its resources only on beneficial changes within the project scope. DEFINITIONSOF CHANGE There are several types of changes which may be requested and considered for the IS Project. Depending on the extent and type of proposed changes, changes project documentation and
  • 4. 4 the communication of these changes will be required to include any approved changes into the project plan and ensure all stakeholders are notified. Types of changes include:  Scheduling Changes: changes which will impact the approved project schedule. These changes may require fast tracking, crashing, or re-baselining the schedule depending on the significance of the impact.  Budget Changes: changes which will impact the approved project budget. These changes may require requesting additional funding, releasing funding which would no longer be required, or adding to project or management reserves. May require changes to the cost baseline.  Scope Changes: changes which are necessary and impact the project’s scope which may be the result of unforeseen requirements which were not initially planned for. These changes may also impact budget and schedule. These changes may require revision to WBS, project scope statement, and other project documentation as necessary. The project manager must ensure that any approved changes are communicated to the project stakeholders. Additionally, as changes are approved, the project manager must ensure that the changes are captured in the project documentation where necessary. These document updates must then be communicated to the project team and stakeholders as well. CHANGE CONTROL BOARD The Change Control Board (CCB) is the approval authority for all proposed change requests pertaining to the IS Project. The purpose of the CCB is to review all change requests, determine their impacts on the project risk, scope, cost, and schedule, and to approve or deny each change request. The following chart provides a list of the CCB members for the IS Project: Name Position CCB Role A. Smith IS Project Sponsor CCB Chair T. White IS Project Manager CCB Member B. Brown IS Project Technical Lead CCB Co-Chair J. Jones IS Project Operations Lead CCB Member As change requests are submitted to the IS Project Manager by the project team/stakeholders, the Project Manager will log the requests in the change log and the CCB will convene every other Friday to review all change requests. For a change request to be approved, all CCB members must vote in favor. In the event more information is needed for a particular change request, the request will be deferred and sent back to the requestor for more information or
  • 5. 5 clarification. If a change is deemed critical, an ad hoc CCB meeting can be called in order to review the change prior to the next scheduled bi-weekly CCB meeting. ROLES AND RESPONSIBILITIES The following are the roles and responsibilities for all change management efforts related to the IS Project: Project Sponsor:  Approve all changes to budget/funding allocations  Approve all changes to schedule baseline  Approve any changes in project scope  Chair the CCB Project Manager:  Receive and log all change requests from project stakeholders  Conduct preliminary risk, cost, schedule, scope analysis of change prior to CCB  Seek clarification from change requestors on any open issues or concerns  Make documentation revisions/edits as necessary for all approved changes  Participate on CCB Project Team/Stakeholders:  Submit all change requests on standard organizational change request forms  Provide all applicable information and detail on change request forms  Be prepared to address questions regarding any submitted change requests  Provide feedback as necessary on impact of proposed changes CHANGE CONTROL PROCESS The Change Control Process for the IS Project will follow the organizational standard change process for all projects. The project manager has overall responsibility for executing the change management process for each change request. 1) Identify the need for a change (Stakeholders) – Change requestor will submit a completed change request form to the project manager. 2) Log change in the change request register (Project Manager) – The project manager will keep a log of all submitted change requests throughout the project’s lifecycle. 3) Submit change request to CCB (Project Manager) – The project manager will submit the change request, as well as the preliminary analysis, to the CCB for review.
  • 6. 6 4) Obtain Decision on change request (CCB) – The CCB will discuss the proposed change and decide whether or not it will be approved based on all submitted information. 5) Implement change (Project Manager) – If a change is approved by the CCB, the project manager will update and re-baseline project documentation as necessary. SPONSOR ACCEPTANCE Approved by the Project Sponsor: __________________________________________ Date: ___________________ <Project Sponsor> <Project Sponsor Title>