THOUGHT LEADERS FOR MANUFACTURING & SUPPLY CHAIN
ARC INSIGHTS
By Simon Bragg
BP’s SCM Project Management Lessons
• Stagger sub-projects
• For each sub-project, first develop a
rough-cut model
• Define central and local project
management roles and responsibilities
• Clarify policy regarding standardization
vs localization
• Budget 5 to 10 percent/year of project
costs for support, maintenance, and
continuous improvement
INSIGHT# 2003-12E & MP
MARCH 19, 2003
Best Practices:
Implement Massive SCM Projects
Keywords
OpX, SCM, Project Management, Chemical
Summary
Managers currently regard large, multi-site, multi-year Supply Chain Man-
agement (SCM) implementations as too risky. Indeed, such projects require
extremely skilled project management. BP Chemicals implemented Aspen-
tech’s MIMI supply chain management solution across 17 businesses. It
was a huge, highly successful project, largely because of excellent project
management.
BP Chemicals
BP Chemicals manufactures petrochemicals, intermediates, and plastics,
which includes acetic acid, acrylonitrile, aromatics, purified terephthalic
acid (PTA), olefins, polyethylene, and polypro-
pylene. With 35 manufacturing sites
worldwide, BP Chemicals produces around 27
million tons of product a year. The supply
chain planning task is huge, around 100 unique
products, several thousand SKUs due to grade
and pack types, thousands of customers, and
hundreds of delivery points.
Project drivers were fairly typical of most large
chemical companies. By BP standards prior to
implementation, forecast accuracy, data and
information visibility, customer responsiveness (e.g. right product in right
place), were unsatisfactory. Some businesses had problems completing
their monthly planning cycle within four weeks, and purchasing would
procure against out of date forecasts. In addition, BP wanted to run proac-
tively, with a better understanding of customers’ requirements and wanted
to react faster to order changes.
ARC Insights, Page 2
©2003 • ARC • 3 Allied Drive • Dedham, MA 02026 USA • 781-471-1000 • ARCweb.com
The Supply Chain Implementation
For each business, the new process was:
1. Propose Supply Plan: incorporate maintenance plans, production ca-
pacity, co-producer capacity, and raw material availability.
2. Propose Demand Plan: incorporate segmentation and demand rules.
3. Resolve Supply Issues: obtain feedback from production.
4. Resolve Demand Issues: use feedback from sales managers.
5. Apply Supply Plan: use detailed production schedule and stock replen-
ishment movements including VMI.
6. Apply Demand Plan: communicate constrained demand plan, perform
ATP checks as appropriate, confirm customer order, schedule and exe-
cute delivery.
Across all 17 business lines, around 250 users touch collaborative demand
planning, including product, account, and sales managers. Approximately
30 users handle supply chain planning, and about 50 users tackle produc-
tion planning and scheduling.
BP split the implementation into two phases. Preliminary project definition
work and vendor selection began in September 1999. The first 9 business
lines, those that were most enthusiastic, began implementation in July 2000,
with completion in 12-18 months. Phase 2 kicked off in October 2001, and
is almost finished. BP split each phase into some 40 smaller sub-projects,
for instance focusing on demand forecasting for a business, or production
planning for a manufacturing plant. In total, the project required over 60
man years of effort and employed 40 outside consultants at its peak.
Project Payback
The quantified benefits are confidential, although BP would agree that most
projects achieved payback in a year. Based on our understanding of Aspen-
tech’s technology and the chemical industry, we suspect payback was
achieved within months.
Recommendations: The Lessons of BP
Phase 1 adopted many well-known good practices. The team sold each
sub-project to every business unit leader before beginning implementation.
The business unit leaders had to agree to the time commitments required of
ARC Insights, Page 3
©2003 • ARC • 3 Allied Drive • Dedham, MA 02026 USA • 781-471-1000 • ARCweb.com
their people, the scope of work, and the project timeline, cost, and value
delivery. After Phase 1, BP conducted an internal review of what worked
and what didn’t. This revealed 70 lessons; the main ones are:
Stagger Sub-projects
Kick-off one or two business lines and projects every month. Although this
extends the elapsed time, BP gained cost effective management of external
resources and better sharing of project lessons. In Phase 1, all business lines
kicked off together, proceeded in parallel, and ended more or less together.
This over-burdened central project management by requiring support for
all projects at about the same time and meant that project lessons could not
be shared across sub-projects.
For Each Sub-project, First Develop a Rough-cut Model
On each sub-project, have consultants develop a new rough-cut business
process and mathematical model to deliver some value in 1-3 months.
Then let users try it. Since sub-projects were staggered, BP central project
management could switch these consultants onto other projects. A few
months later, have the consultants return to the rough-cut model to incor-
porate users’ ideas and rework a final, definitive process and mathematical
model.
In Phase 1, for each sub-project, project consultants typically defined the
new processes and changes, then developed the mathematical model, and
handed it over to users. Unfortunately, at the outset, the users didn’t know
enough to, for instance, fully define some heuristics. The result was that
some models were too simple, others too complex. It also took 6-10 months
to put a model in front of the user.
Phase 1 work enabled BP to develop standard processes and model tem-
plates based on Aspen’s MIMI Configured Applications (CAPs). In Phase
2, these CAPs cut implementation work by up to 50 percent.
Balance Central and Local Management
Define clear roles and responsibilities for central and local project manage-
ment. For each business line, BP identified a local lead, responsible for
delivering an appropriate solution to their business line. The local lead, for
example, organized meetings with the implementation team, ensured end-
users were appropriately involved and trained, and solved the data issues.
ARC Insights, Page 4
©2003 • ARC • 3 Allied Drive • Dedham, MA 02026 USA • 781-471-1000 • ARCweb.com
Ideally, the local lead is a skilled networker, a good communicator with
plenty of initiative, and understands the entire business. At a minimum,
the lead should know the business areas where the most opportunity is ex-
pected. Some knowledge of supply chain concepts is nice, but an aptitude
for the technology outweighs an initial understanding.
BP’s central project management team managed the vendor relationship,
external resources, and schedules. By allocating available resources across
the sub-projects, it manages the trade-off between total costs and time-
scales. BP used more local consultants in Phase 2 because it found that hav-
ing Phase 1 consultants in time zones 6-8 hours away created difficulties.
Clarify Policy Regarding Standardization vs. Localization
Strike a balance between “thou shalt do this” and “this is the way, if you
wish to adopt it.” BP expected demand and production planning to be
common platforms because BP has many internal supply chains. Common
platforms enable visibility and supply chain optimization across multiple
business units. It’s the business unit’s decision whether or not to adopt the
other solutions, using their own ”fit-for-purpose” criteria.
Budget 5 to 10% of Project Costs for Continual Improvement
Continue tweaking your supply chain model, adding constraints and func-
tionality to reflect business and market changes. Going live does not equal
project completion. In the first year after going live, budget around 10 per-
cent of the total project cost for support, software maintenance, and
enhancements. Thereafter, budget about 5 percent of total project cost each
year. However, the costs of changing the planning model to handle a major
business change such as a plant closure or an acquisition should be borne
by that activity.
Please help us improve our deliverables to you – take our survey linked to this
transmittal e-mail or at www.arcweb.com/myarc in the Client Area. For further
information, contact your account manager or the author at sbragg@arcweb.com.
Recommended circulation: All EAS and MAS-P clients. ARC Insights are pub-
lished and copyrighted by ARC Advisory Group. The information is proprietary to
ARC and no part of it may be reproduced without prior permission from ARC.

More Related Content

What's hot

PMP Flash Card
PMP Flash CardPMP Flash Card
PMP Flash Card
asim78
 
071 Maturity Assessment
071 Maturity Assessment071 Maturity Assessment
071 Maturity Assessment
Dr Fereidoun Dejahang
 
Keynote 2 - SE and PPM a Match Made in Heaven
Keynote 2 - SE and PPM a Match Made in HeavenKeynote 2 - SE and PPM a Match Made in Heaven
Keynote 2 - SE and PPM a Match Made in Heaven
Glen Alleman
 
Reporting Within a PMO
Reporting Within a PMOReporting Within a PMO
Reporting Within a PMO
Boxalln
 
000 Brad E Magro PMP Resume September 2016
000 Brad E Magro PMP Resume September 2016000 Brad E Magro PMP Resume September 2016
000 Brad E Magro PMP Resume September 2016brad magro
 
CMMI - High Maturity Misconceptions and Pitfalls
CMMI - High Maturity Misconceptions and PitfallsCMMI - High Maturity Misconceptions and Pitfalls
CMMI - High Maturity Misconceptions and PitfallsRajesh Naik
 
Presentation by bhavesh thakkar
Presentation by bhavesh thakkarPresentation by bhavesh thakkar
Presentation by bhavesh thakkarPMI_IREP_TP
 
Top habits of successful project managers brown bag (v3.2)
Top habits of successful project managers brown bag (v3.2)Top habits of successful project managers brown bag (v3.2)
Top habits of successful project managers brown bag (v3.2)
Glen Alleman
 
Sameer Mitter | Introduction to Information technology Project Management
Sameer Mitter | Introduction to Information technology Project ManagementSameer Mitter | Introduction to Information technology Project Management
Sameer Mitter | Introduction to Information technology Project Management
Sameer Mitter
 
PGCS 2019 Master Class Integrating SE with PPM
PGCS 2019 Master Class Integrating SE with PPMPGCS 2019 Master Class Integrating SE with PPM
PGCS 2019 Master Class Integrating SE with PPM
Glen Alleman
 
Project planning
Project planningProject planning
Project planning
Mushood Badulla
 
Measurement News Webinar
Measurement News WebinarMeasurement News Webinar
Measurement News Webinar
Glen Alleman
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slides
Doreen Yeo
 
Transforming Project Delivery in MoD Defence Equipment and Support webinar
Transforming Project Delivery in MoD Defence Equipment and Support webinarTransforming Project Delivery in MoD Defence Equipment and Support webinar
Transforming Project Delivery in MoD Defence Equipment and Support webinar
Association for Project Management
 
johndermodyresume-ATS Results
johndermodyresume-ATS Resultsjohndermodyresume-ATS Results
johndermodyresume-ATS ResultsJohn Dermody
 

What's hot (20)

PMP Flash Card
PMP Flash CardPMP Flash Card
PMP Flash Card
 
071 Maturity Assessment
071 Maturity Assessment071 Maturity Assessment
071 Maturity Assessment
 
Kathy R Brown Resume Nov2016
Kathy R Brown Resume Nov2016Kathy R Brown Resume Nov2016
Kathy R Brown Resume Nov2016
 
Keynote 2 - SE and PPM a Match Made in Heaven
Keynote 2 - SE and PPM a Match Made in HeavenKeynote 2 - SE and PPM a Match Made in Heaven
Keynote 2 - SE and PPM a Match Made in Heaven
 
Reporting Within a PMO
Reporting Within a PMOReporting Within a PMO
Reporting Within a PMO
 
Ch01
Ch01Ch01
Ch01
 
000 Brad E Magro PMP Resume September 2016
000 Brad E Magro PMP Resume September 2016000 Brad E Magro PMP Resume September 2016
000 Brad E Magro PMP Resume September 2016
 
CMMI - High Maturity Misconceptions and Pitfalls
CMMI - High Maturity Misconceptions and PitfallsCMMI - High Maturity Misconceptions and Pitfalls
CMMI - High Maturity Misconceptions and Pitfalls
 
Presentation by bhavesh thakkar
Presentation by bhavesh thakkarPresentation by bhavesh thakkar
Presentation by bhavesh thakkar
 
Top habits of successful project managers brown bag (v3.2)
Top habits of successful project managers brown bag (v3.2)Top habits of successful project managers brown bag (v3.2)
Top habits of successful project managers brown bag (v3.2)
 
Sameer Mitter | Introduction to Information technology Project Management
Sameer Mitter | Introduction to Information technology Project ManagementSameer Mitter | Introduction to Information technology Project Management
Sameer Mitter | Introduction to Information technology Project Management
 
PGCS 2019 Master Class Integrating SE with PPM
PGCS 2019 Master Class Integrating SE with PPMPGCS 2019 Master Class Integrating SE with PPM
PGCS 2019 Master Class Integrating SE with PPM
 
Project planning
Project planningProject planning
Project planning
 
Amit_Kumar
Amit_KumarAmit_Kumar
Amit_Kumar
 
Measurement News Webinar
Measurement News WebinarMeasurement News Webinar
Measurement News Webinar
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slides
 
build-for-speed-brochure
build-for-speed-brochurebuild-for-speed-brochure
build-for-speed-brochure
 
Transforming Project Delivery in MoD Defence Equipment and Support webinar
Transforming Project Delivery in MoD Defence Equipment and Support webinarTransforming Project Delivery in MoD Defence Equipment and Support webinar
Transforming Project Delivery in MoD Defence Equipment and Support webinar
 
johndermodyresume-ATS Results
johndermodyresume-ATS Resultsjohndermodyresume-ATS Results
johndermodyresume-ATS Results
 
Purush_16Yrs and 8months Exp.
Purush_16Yrs and 8months Exp.Purush_16Yrs and 8months Exp.
Purush_16Yrs and 8months Exp.
 

Viewers also liked

Applying cmm model to asset information management
Applying cmm model to asset information managementApplying cmm model to asset information management
Applying cmm model to asset information managementARC Advisory Group
 
Rack and roll automation strategies in material handling systems
Rack and roll automation strategies in material handling systemsRack and roll automation strategies in material handling systems
Rack and roll automation strategies in material handling systemsARC Advisory Group
 
Wireless networks for industrial applications
Wireless networks for industrial applicationsWireless networks for industrial applications
Wireless networks for industrial applicationsARC Advisory Group
 
The industrial ethernet protocol wars fieldbus revisited
The industrial ethernet protocol wars fieldbus revisitedThe industrial ethernet protocol wars fieldbus revisited
The industrial ethernet protocol wars fieldbus revisitedARC Advisory Group
 
Are process industries ready for plm three suppliers think so
Are process industries ready for plm three suppliers think soAre process industries ready for plm three suppliers think so
Are process industries ready for plm three suppliers think soARC Advisory Group
 
2003 closes out as planned rays of sunshine for it market in 2004
2003 closes out as planned rays of sunshine for it market in 20042003 closes out as planned rays of sunshine for it market in 2004
2003 closes out as planned rays of sunshine for it market in 2004ARC Advisory Group
 
Sustainability: Process Field Networks
Sustainability: Process Field NetworksSustainability: Process Field Networks
Sustainability: Process Field NetworksARC Advisory Group
 
Controlled sine wave front end ac drives
Controlled sine wave front end ac drivesControlled sine wave front end ac drives
Controlled sine wave front end ac drivesARC Advisory Group
 
Material handling control system software extends supply chain visibility
Material handling control system software extends supply chain visibilityMaterial handling control system software extends supply chain visibility
Material handling control system software extends supply chain visibilityARC Advisory Group
 
Three market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next levelThree market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next levelARC Advisory Group
 
Fieldbus success stories and strategies
Fieldbus success stories and strategiesFieldbus success stories and strategies
Fieldbus success stories and strategiesARC Advisory Group
 
Arc user survey plc supplier preferences
Arc user survey plc supplier preferencesArc user survey plc supplier preferences
Arc user survey plc supplier preferencesARC Advisory Group
 
Closing the Gap on Digital Manufacturing
Closing the Gap on Digital ManufacturingClosing the Gap on Digital Manufacturing
Closing the Gap on Digital Manufacturing
ARC Advisory Group
 
Opportunities Challenges for Food Beverage and CPG
Opportunities Challenges for Food Beverage and CPGOpportunities Challenges for Food Beverage and CPG
Opportunities Challenges for Food Beverage and CPGARC Advisory Group
 

Viewers also liked (16)

Applying cmm model to asset information management
Applying cmm model to asset information managementApplying cmm model to asset information management
Applying cmm model to asset information management
 
Rack and roll automation strategies in material handling systems
Rack and roll automation strategies in material handling systemsRack and roll automation strategies in material handling systems
Rack and roll automation strategies in material handling systems
 
Wireless networks for industrial applications
Wireless networks for industrial applicationsWireless networks for industrial applications
Wireless networks for industrial applications
 
The industrial ethernet protocol wars fieldbus revisited
The industrial ethernet protocol wars fieldbus revisitedThe industrial ethernet protocol wars fieldbus revisited
The industrial ethernet protocol wars fieldbus revisited
 
Are process industries ready for plm three suppliers think so
Are process industries ready for plm three suppliers think soAre process industries ready for plm three suppliers think so
Are process industries ready for plm three suppliers think so
 
India Market Trends
India Market TrendsIndia Market Trends
India Market Trends
 
In Plant Mobility Solutions
In Plant Mobility SolutionsIn Plant Mobility Solutions
In Plant Mobility Solutions
 
2003 closes out as planned rays of sunshine for it market in 2004
2003 closes out as planned rays of sunshine for it market in 20042003 closes out as planned rays of sunshine for it market in 2004
2003 closes out as planned rays of sunshine for it market in 2004
 
Sustainability: Process Field Networks
Sustainability: Process Field NetworksSustainability: Process Field Networks
Sustainability: Process Field Networks
 
Controlled sine wave front end ac drives
Controlled sine wave front end ac drivesControlled sine wave front end ac drives
Controlled sine wave front end ac drives
 
Material handling control system software extends supply chain visibility
Material handling control system software extends supply chain visibilityMaterial handling control system software extends supply chain visibility
Material handling control system software extends supply chain visibility
 
Three market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next levelThree market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next level
 
Fieldbus success stories and strategies
Fieldbus success stories and strategiesFieldbus success stories and strategies
Fieldbus success stories and strategies
 
Arc user survey plc supplier preferences
Arc user survey plc supplier preferencesArc user survey plc supplier preferences
Arc user survey plc supplier preferences
 
Closing the Gap on Digital Manufacturing
Closing the Gap on Digital ManufacturingClosing the Gap on Digital Manufacturing
Closing the Gap on Digital Manufacturing
 
Opportunities Challenges for Food Beverage and CPG
Opportunities Challenges for Food Beverage and CPGOpportunities Challenges for Food Beverage and CPG
Opportunities Challenges for Food Beverage and CPG
 

Similar to Best Practices: Implement Massive SCM Projects

CHAPTER 3PROJECT MANAGEMENTT.docx
CHAPTER 3PROJECT MANAGEMENTT.docxCHAPTER 3PROJECT MANAGEMENTT.docx
CHAPTER 3PROJECT MANAGEMENTT.docx
walterl4
 
Foods Case StudyWhat to coverExecuti.docx
            Foods Case StudyWhat to coverExecuti.docx            Foods Case StudyWhat to coverExecuti.docx
Foods Case StudyWhat to coverExecuti.docx
hallettfaustina
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
Rahul Sudame
 
ATCO-BaasKaar Roadmap to SAP Quality Award 2014
ATCO-BaasKaar Roadmap to SAP Quality Award 2014ATCO-BaasKaar Roadmap to SAP Quality Award 2014
ATCO-BaasKaar Roadmap to SAP Quality Award 2014
Ahmed Rami Elsherif, PMP, ITBMC
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
smumbahelp
 
BPR ppt.pptx
BPR ppt.pptxBPR ppt.pptx
BizFlow - BPM at Jardine Lloyd Thompson for Sales, Document Handling, Custome...
BizFlow - BPM at Jardine Lloyd Thompson for Sales, Document Handling, Custome...BizFlow - BPM at Jardine Lloyd Thompson for Sales, Document Handling, Custome...
BizFlow - BPM at Jardine Lloyd Thompson for Sales, Document Handling, Custome...
Garth Knudson
 
Major Projects - Faster Better Cheaper
Major Projects - Faster Better CheaperMajor Projects - Faster Better Cheaper
Major Projects - Faster Better Cheaper
Ian Heptinstall
 
Article - Global Project Management
Article - Global Project ManagementArticle - Global Project Management
Article - Global Project ManagementGregory A. Garrett
 
Unit1 introduction bpr
Unit1 introduction bprUnit1 introduction bpr
Unit1 introduction bpr
geetanjalibabbar81
 
Dinesh Sharma and Jayeeta Dutta: Simplified Agile EVM - The Art Of Managing T...
Dinesh Sharma and Jayeeta Dutta: Simplified Agile EVM - The Art Of Managing T...Dinesh Sharma and Jayeeta Dutta: Simplified Agile EVM - The Art Of Managing T...
Dinesh Sharma and Jayeeta Dutta: Simplified Agile EVM - The Art Of Managing T...
Lviv Startup Club
 
Microsoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case StudiesMicrosoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case Studies
meritweb
 
Course project scenario the course project scenario in this c
Course project scenario the course project scenario in this cCourse project scenario the course project scenario in this c
Course project scenario the course project scenario in this c
AISHA232980
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
David Pedreno
 
Project Management ORION Systems
Project Management ORION SystemsProject Management ORION Systems
Project Management ORION Systemsreeza fazily
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
David Pedreno
 
Kjf13a1 chron
Kjf13a1 chronKjf13a1 chron
Kjf13a1 chron
KevinJosephFox
 

Similar to Best Practices: Implement Massive SCM Projects (20)

CHAPTER 3PROJECT MANAGEMENTT.docx
CHAPTER 3PROJECT MANAGEMENTT.docxCHAPTER 3PROJECT MANAGEMENTT.docx
CHAPTER 3PROJECT MANAGEMENTT.docx
 
Foods Case StudyWhat to coverExecuti.docx
            Foods Case StudyWhat to coverExecuti.docx            Foods Case StudyWhat to coverExecuti.docx
Foods Case StudyWhat to coverExecuti.docx
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
ATCO-BaasKaar Roadmap to SAP Quality Award 2014
ATCO-BaasKaar Roadmap to SAP Quality Award 2014ATCO-BaasKaar Roadmap to SAP Quality Award 2014
ATCO-BaasKaar Roadmap to SAP Quality Award 2014
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
BPR ppt.pptx
BPR ppt.pptxBPR ppt.pptx
BPR ppt.pptx
 
BizFlow - BPM at Jardine Lloyd Thompson for Sales, Document Handling, Custome...
BizFlow - BPM at Jardine Lloyd Thompson for Sales, Document Handling, Custome...BizFlow - BPM at Jardine Lloyd Thompson for Sales, Document Handling, Custome...
BizFlow - BPM at Jardine Lloyd Thompson for Sales, Document Handling, Custome...
 
Major Projects - Faster Better Cheaper
Major Projects - Faster Better CheaperMajor Projects - Faster Better Cheaper
Major Projects - Faster Better Cheaper
 
Article - Global Project Management
Article - Global Project ManagementArticle - Global Project Management
Article - Global Project Management
 
LRAFB_Project Profile
LRAFB_Project ProfileLRAFB_Project Profile
LRAFB_Project Profile
 
Unit1 introduction bpr
Unit1 introduction bprUnit1 introduction bpr
Unit1 introduction bpr
 
Dinesh Sharma and Jayeeta Dutta: Simplified Agile EVM - The Art Of Managing T...
Dinesh Sharma and Jayeeta Dutta: Simplified Agile EVM - The Art Of Managing T...Dinesh Sharma and Jayeeta Dutta: Simplified Agile EVM - The Art Of Managing T...
Dinesh Sharma and Jayeeta Dutta: Simplified Agile EVM - The Art Of Managing T...
 
Business process re engineering
Business process re engineeringBusiness process re engineering
Business process re engineering
 
Microsoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case StudiesMicrosoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case Studies
 
Course project scenario the course project scenario in this c
Course project scenario the course project scenario in this cCourse project scenario the course project scenario in this c
Course project scenario the course project scenario in this c
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
Project Management ORION Systems
Project Management ORION SystemsProject Management ORION Systems
Project Management ORION Systems
 
Tosin Fasidi
Tosin FasidiTosin Fasidi
Tosin Fasidi
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
Kjf13a1 chron
Kjf13a1 chronKjf13a1 chron
Kjf13a1 chron
 

More from ARC Advisory Group

Eam guide-video-2015
Eam guide-video-2015Eam guide-video-2015
Eam guide-video-2015
ARC Advisory Group
 
Information Driven Enterprise for the Connected World
Information Driven Enterprise for the Connected WorldInformation Driven Enterprise for the Connected World
Information Driven Enterprise for the Connected World
ARC Advisory Group
 
Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)
ARC Advisory Group
 
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry ForumAsset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
ARC Advisory Group
 
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
ARC Advisory Group
 
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
ARC Advisory Group
 
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
ARC Advisory Group
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
ARC Advisory Group
 
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
ARC Advisory Group
 
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
ARC Advisory Group
 
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
ARC Advisory Group
 
Current Automation Purchasing Strategies Fall Short
Current Automation Purchasing Strategies Fall ShortCurrent Automation Purchasing Strategies Fall Short
Current Automation Purchasing Strategies Fall Short
ARC Advisory Group
 
CPM Identified as RPM Engine at ARC Forum
CPM Identified as RPM Engine at ARC ForumCPM Identified as RPM Engine at ARC Forum
CPM Identified as RPM Engine at ARC Forum
ARC Advisory Group
 
Controls to CPM Connection: Are We There?
Controls to CPM Connection: Are We There?Controls to CPM Connection: Are We There?
Controls to CPM Connection: Are We There?
ARC Advisory Group
 
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayConoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
ARC Advisory Group
 
Component Based Solutions Well Aligned with Needs of Service Logistics Providers
Component Based Solutions Well Aligned with Needs of Service Logistics ProvidersComponent Based Solutions Well Aligned with Needs of Service Logistics Providers
Component Based Solutions Well Aligned with Needs of Service Logistics Providers
ARC Advisory Group
 
Combined Fluid Power and Mechatronic Technology Optimizes Solutions
Combined Fluid Power and Mechatronic Technology Optimizes SolutionsCombined Fluid Power and Mechatronic Technology Optimizes Solutions
Combined Fluid Power and Mechatronic Technology Optimizes Solutions
ARC Advisory Group
 
Collaborative Asset Lifecycle Management Vision and Strategies
Collaborative Asset Lifecycle Management Vision and StrategiesCollaborative Asset Lifecycle Management Vision and Strategies
Collaborative Asset Lifecycle Management Vision and Strategies
ARC Advisory Group
 
Cautious Optimism Pervades Hanover Fair
Cautious Optimism Pervades Hanover FairCautious Optimism Pervades Hanover Fair
Cautious Optimism Pervades Hanover Fair
ARC Advisory Group
 
Capital Expenditure Survey 2003
Capital Expenditure Survey 2003Capital Expenditure Survey 2003
Capital Expenditure Survey 2003
ARC Advisory Group
 

More from ARC Advisory Group (20)

Eam guide-video-2015
Eam guide-video-2015Eam guide-video-2015
Eam guide-video-2015
 
Information Driven Enterprise for the Connected World
Information Driven Enterprise for the Connected WorldInformation Driven Enterprise for the Connected World
Information Driven Enterprise for the Connected World
 
Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)
 
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry ForumAsset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
 
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
 
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
 
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
 
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
 
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
 
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
 
Current Automation Purchasing Strategies Fall Short
Current Automation Purchasing Strategies Fall ShortCurrent Automation Purchasing Strategies Fall Short
Current Automation Purchasing Strategies Fall Short
 
CPM Identified as RPM Engine at ARC Forum
CPM Identified as RPM Engine at ARC ForumCPM Identified as RPM Engine at ARC Forum
CPM Identified as RPM Engine at ARC Forum
 
Controls to CPM Connection: Are We There?
Controls to CPM Connection: Are We There?Controls to CPM Connection: Are We There?
Controls to CPM Connection: Are We There?
 
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayConoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
 
Component Based Solutions Well Aligned with Needs of Service Logistics Providers
Component Based Solutions Well Aligned with Needs of Service Logistics ProvidersComponent Based Solutions Well Aligned with Needs of Service Logistics Providers
Component Based Solutions Well Aligned with Needs of Service Logistics Providers
 
Combined Fluid Power and Mechatronic Technology Optimizes Solutions
Combined Fluid Power and Mechatronic Technology Optimizes SolutionsCombined Fluid Power and Mechatronic Technology Optimizes Solutions
Combined Fluid Power and Mechatronic Technology Optimizes Solutions
 
Collaborative Asset Lifecycle Management Vision and Strategies
Collaborative Asset Lifecycle Management Vision and StrategiesCollaborative Asset Lifecycle Management Vision and Strategies
Collaborative Asset Lifecycle Management Vision and Strategies
 
Cautious Optimism Pervades Hanover Fair
Cautious Optimism Pervades Hanover FairCautious Optimism Pervades Hanover Fair
Cautious Optimism Pervades Hanover Fair
 
Capital Expenditure Survey 2003
Capital Expenditure Survey 2003Capital Expenditure Survey 2003
Capital Expenditure Survey 2003
 

Recently uploaded

Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 

Recently uploaded (20)

Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 

Best Practices: Implement Massive SCM Projects

  • 1. THOUGHT LEADERS FOR MANUFACTURING & SUPPLY CHAIN ARC INSIGHTS By Simon Bragg BP’s SCM Project Management Lessons • Stagger sub-projects • For each sub-project, first develop a rough-cut model • Define central and local project management roles and responsibilities • Clarify policy regarding standardization vs localization • Budget 5 to 10 percent/year of project costs for support, maintenance, and continuous improvement INSIGHT# 2003-12E & MP MARCH 19, 2003 Best Practices: Implement Massive SCM Projects Keywords OpX, SCM, Project Management, Chemical Summary Managers currently regard large, multi-site, multi-year Supply Chain Man- agement (SCM) implementations as too risky. Indeed, such projects require extremely skilled project management. BP Chemicals implemented Aspen- tech’s MIMI supply chain management solution across 17 businesses. It was a huge, highly successful project, largely because of excellent project management. BP Chemicals BP Chemicals manufactures petrochemicals, intermediates, and plastics, which includes acetic acid, acrylonitrile, aromatics, purified terephthalic acid (PTA), olefins, polyethylene, and polypro- pylene. With 35 manufacturing sites worldwide, BP Chemicals produces around 27 million tons of product a year. The supply chain planning task is huge, around 100 unique products, several thousand SKUs due to grade and pack types, thousands of customers, and hundreds of delivery points. Project drivers were fairly typical of most large chemical companies. By BP standards prior to implementation, forecast accuracy, data and information visibility, customer responsiveness (e.g. right product in right place), were unsatisfactory. Some businesses had problems completing their monthly planning cycle within four weeks, and purchasing would procure against out of date forecasts. In addition, BP wanted to run proac- tively, with a better understanding of customers’ requirements and wanted to react faster to order changes.
  • 2. ARC Insights, Page 2 ©2003 • ARC • 3 Allied Drive • Dedham, MA 02026 USA • 781-471-1000 • ARCweb.com The Supply Chain Implementation For each business, the new process was: 1. Propose Supply Plan: incorporate maintenance plans, production ca- pacity, co-producer capacity, and raw material availability. 2. Propose Demand Plan: incorporate segmentation and demand rules. 3. Resolve Supply Issues: obtain feedback from production. 4. Resolve Demand Issues: use feedback from sales managers. 5. Apply Supply Plan: use detailed production schedule and stock replen- ishment movements including VMI. 6. Apply Demand Plan: communicate constrained demand plan, perform ATP checks as appropriate, confirm customer order, schedule and exe- cute delivery. Across all 17 business lines, around 250 users touch collaborative demand planning, including product, account, and sales managers. Approximately 30 users handle supply chain planning, and about 50 users tackle produc- tion planning and scheduling. BP split the implementation into two phases. Preliminary project definition work and vendor selection began in September 1999. The first 9 business lines, those that were most enthusiastic, began implementation in July 2000, with completion in 12-18 months. Phase 2 kicked off in October 2001, and is almost finished. BP split each phase into some 40 smaller sub-projects, for instance focusing on demand forecasting for a business, or production planning for a manufacturing plant. In total, the project required over 60 man years of effort and employed 40 outside consultants at its peak. Project Payback The quantified benefits are confidential, although BP would agree that most projects achieved payback in a year. Based on our understanding of Aspen- tech’s technology and the chemical industry, we suspect payback was achieved within months. Recommendations: The Lessons of BP Phase 1 adopted many well-known good practices. The team sold each sub-project to every business unit leader before beginning implementation. The business unit leaders had to agree to the time commitments required of
  • 3. ARC Insights, Page 3 ©2003 • ARC • 3 Allied Drive • Dedham, MA 02026 USA • 781-471-1000 • ARCweb.com their people, the scope of work, and the project timeline, cost, and value delivery. After Phase 1, BP conducted an internal review of what worked and what didn’t. This revealed 70 lessons; the main ones are: Stagger Sub-projects Kick-off one or two business lines and projects every month. Although this extends the elapsed time, BP gained cost effective management of external resources and better sharing of project lessons. In Phase 1, all business lines kicked off together, proceeded in parallel, and ended more or less together. This over-burdened central project management by requiring support for all projects at about the same time and meant that project lessons could not be shared across sub-projects. For Each Sub-project, First Develop a Rough-cut Model On each sub-project, have consultants develop a new rough-cut business process and mathematical model to deliver some value in 1-3 months. Then let users try it. Since sub-projects were staggered, BP central project management could switch these consultants onto other projects. A few months later, have the consultants return to the rough-cut model to incor- porate users’ ideas and rework a final, definitive process and mathematical model. In Phase 1, for each sub-project, project consultants typically defined the new processes and changes, then developed the mathematical model, and handed it over to users. Unfortunately, at the outset, the users didn’t know enough to, for instance, fully define some heuristics. The result was that some models were too simple, others too complex. It also took 6-10 months to put a model in front of the user. Phase 1 work enabled BP to develop standard processes and model tem- plates based on Aspen’s MIMI Configured Applications (CAPs). In Phase 2, these CAPs cut implementation work by up to 50 percent. Balance Central and Local Management Define clear roles and responsibilities for central and local project manage- ment. For each business line, BP identified a local lead, responsible for delivering an appropriate solution to their business line. The local lead, for example, organized meetings with the implementation team, ensured end- users were appropriately involved and trained, and solved the data issues.
  • 4. ARC Insights, Page 4 ©2003 • ARC • 3 Allied Drive • Dedham, MA 02026 USA • 781-471-1000 • ARCweb.com Ideally, the local lead is a skilled networker, a good communicator with plenty of initiative, and understands the entire business. At a minimum, the lead should know the business areas where the most opportunity is ex- pected. Some knowledge of supply chain concepts is nice, but an aptitude for the technology outweighs an initial understanding. BP’s central project management team managed the vendor relationship, external resources, and schedules. By allocating available resources across the sub-projects, it manages the trade-off between total costs and time- scales. BP used more local consultants in Phase 2 because it found that hav- ing Phase 1 consultants in time zones 6-8 hours away created difficulties. Clarify Policy Regarding Standardization vs. Localization Strike a balance between “thou shalt do this” and “this is the way, if you wish to adopt it.” BP expected demand and production planning to be common platforms because BP has many internal supply chains. Common platforms enable visibility and supply chain optimization across multiple business units. It’s the business unit’s decision whether or not to adopt the other solutions, using their own ”fit-for-purpose” criteria. Budget 5 to 10% of Project Costs for Continual Improvement Continue tweaking your supply chain model, adding constraints and func- tionality to reflect business and market changes. Going live does not equal project completion. In the first year after going live, budget around 10 per- cent of the total project cost for support, software maintenance, and enhancements. Thereafter, budget about 5 percent of total project cost each year. However, the costs of changing the planning model to handle a major business change such as a plant closure or an acquisition should be borne by that activity. Please help us improve our deliverables to you – take our survey linked to this transmittal e-mail or at www.arcweb.com/myarc in the Client Area. For further information, contact your account manager or the author at sbragg@arcweb.com. Recommended circulation: All EAS and MAS-P clients. ARC Insights are pub- lished and copyrighted by ARC Advisory Group. The information is proprietary to ARC and no part of it may be reproduced without prior permission from ARC.