CONTEXT-BASED ZONING AND OTHER
      INNOVATIVE APPROACHES TO PLACEMAKING
      A Status Report from New England




      SNEAPA Conference
      September 20, 2012



SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
THE WORKSHOP PANEL
    Ted Brovitz
    •   Howard/Stein-Hudson, Manager of Community Planning and Design
    •   Experience: Urban Planning, Design and Regulations
    •   Recent Projects: W. Springfield Merrick Neighborhood, Amherst Villages FBC,
        Manchester CT FBC, Buzzards Bay FBC, West Concord Village Center

    Donald Powers, AIA CNU-A, LEED AP
    •   Principal, Union Studios, Inc.
    •   Experience: Architecture , Urban Design, Planning
    •   Recent Projects: Jamestown, RI , Southfield, MA

    George Proakis, AICP
    •   Director of Planning, City of Somerville
    •   Experience: Urban Planning , Design and Regulations
    •   Recent Projects: Lowell, MA and CNU FBC Review Committee

    Matthew Lawlor, CNU-A
    •   Robinson & Cole LLP
    •   Experience: Land Use Lawyer and Urban Planner
    •   Recent Projects: Tri-Town and Lowell, MA

SNEAPA Conference – September 20, 2012                      Context-Based Zoning and Other Placemaking Tools
AGENDA AND SESSION OBJECTIVES
• Context-Based Zoning and Placemaking Toolbox
• Common Principles and Best Practices
• Typical Elements of Context-Based Zoning
• Where Form-Based Codes and Other Tools are being
  Applied in the Region
• Advantages & Challenges Going Forward




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
CONTEXT-BASED ZONING/PLACEMAKING TOOLS
Some Common Tools
• Form-Based Code (Used to Facilitate Other
  Placemaking Tool)
• Traditional Neighborhood Development (TND)
• Transit Oriented Development (TOD)
• Strip Commercial Corridor Retrofit Planning
• Smart Parking Standards
• Complete Street Design
• Civic Spaces, Livable Streets, the Outdoor Room
• Tactical Urbanism

SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE AND TND/ The Origins
Congress for the New Urbanism (CNU)
•   Founded in 1993 and dedicated to promoting traditional mixed-use
    neighborhood development and healthier living conditions.

Seaside Florida and Other Planned Development
•   1981 Seaside Development Code first modern day application of FBC.

Traditional Neighborhood Development (TND)
•   Late 1980s/early 1990s several cities in SE US adopted FBC variants::
     – Traditional Neighborhood Development (TND) ordinances.
                                                                                  Mashpee Commons, MA – Early TND
     – Unified Development Ordinances (UDO)                                       Cavendish Partnership/Cornish Assoc.

The SmartCode©
•   Released by Duany Plater-Zyberk (DPZ) in 2003
•   Model transect-based development code applied to all scales of planning
•   SmartCode Version 9.2 - Open source with new modules

From “Greenfields” to Existing Built Environments
•   Over the past 10 years, FBC has been applied city-wide as well as districts
    targeted for revitalization and redevelopment.
SNEAPA Conference – September 20, 2012                       Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE BASICS/Common Principles
Context-Based Zoning
• Focus on existing or desired context and spacial patterns of
  development and the surrounding environment (The Transect).

Public-Private Relationships
• Address the relationships between buildings and the “public
  realm” (such as streets, open spaces, and civic buildings and
  places).

Hierarchy of Purpose and Scale
• Buildings form, mass and scale
• Street types, purpose and treatments
• Active civic and open spaces

Physical Form vs. Land Use
• Focus on positioning of buildings and spaces rather than
  separation of uses

SNEAPA Conference – September 20, 2012           Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE BASICS/ The Transect
• System of ordered human habitats in a range from the most natural to the most urban.
• Defined by common physical characteristics of place, scale, density and intensity of land use.
• FBC is Transect Based Zoning integrating the elements of existing or intended habitats.




                 From the SmartCode©
                 Duany Plater-Zyberk

SNEAPA Conference – September 20, 2012            Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE BASICS
         Differences Between FBC and Conventional Zoning

• Integrated (Unified) Development Ordinance vs.
  separate regulations (zoning, subdivision, site plan)
• Uses (Separation vs. Mix of Uses)
• Dimensional Standards (Simple numerical vs.
  calibrated to shape public and private relationships.
• Building Placement, Orientation and Frontages
• Street Design Standards (to fit the context)
• Parking Standards (for shared uses)
• Civic and Open Space Standards (for active use)
• Design Standards vs. Guidelines                             TND vs Conventional Development
                                                                   Example - Pittsford, NY


SNEAPA Conference – September 20, 2012            Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE CALIBRATION
              Process of Creating Context-Based Zoning
Evaluate Existing/Desirable Development Patterns
• Key dimensional, design and use characteristics of
  existing/desirable development patterns
• Parking demand, distribution and occupancy trends
• Existing street “livability” characteristics
• Potential integration of desired civic and open space
• Identify performance standards for desired uses and street
  activities

Define and Translate Community Vision
• Visual (Image) Preference Surveys
• Public Visioning, Scenario Building, and Design Charrettes
• Preparing a Strategic Conceptual Development Plan

SNEAPA Conference – September 20, 2012          Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE CALIBRATION
                       Defining the Land Use Transect




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE CALIBRATION
 Comparing Existing Regulations to Existing/Desired Context




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE CALIBRATION
       Visioning, Scenario-Building and Design Workshops




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE CALIBRATION
                          Visual Preference Surveys

 Purpose
 • Public direction and preferences
 • Range of design and development
   characteristics for a given district
 Common VPS Categories
 • Building Design, Density, and Use
 • Building Frontage and Façade Treatments
 • Parks, Open Space and Public Amenities
 • Streetscape and Pedestrian Treatments
 • Traffic Circulation and Parking
SNEAPA Conference – September 20, 2012    Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE CALIBRATION
       Visual Preference Survey Example – Manchester, CT
       Highest Rated Images - Part 1 - Building Design, Density and Use
                                                1.2 Commercial/Mixed Use Buildings

            1.1 Adaptive Building Reuse




SNEAPA Conference – September 20, 2012    Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE CALIBRATION
      Visual Preference Survey Example – Manchester, CT
       Highest Rated Images Part 3 – Parks, Open Space and Amenities
             3.1 Parks and Open Space           3.2 Public Art and Focal Points




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE CALIBRATION
              Strategic and Illustrative Development Plans




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE ELEMENTS
                 Typical Elements of Form-Based Codes
•   Regulating Plan (or Zoning District Map)
•   Building and Lot Types with Character Examples
•   Frontage Types
•   Allowable Uses and Functional Standards
•   Dimensional and Placement Standards
•   Building Design Standards
•   Thoroughfare Design Hierarchy
•   Public and Private Open Space Types
•   Flexible Parking Standards
•   Administration and Review Process
•   Definitions
•   Optional Components:
      – Architectural Design Standards
      – Landscape Design Standards
      – Signage Standards
      – Environmental Resource Standards

SNEAPA Conference – September 20, 2012         Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE ELEMENTS
                                   Regulating Plan

Common Elements
  Transects or Zoning
  Subdistricts
  Street Types by
  Location
  Building/Lot Types
  Civic and Open Space
  Types and Location
  Frontage Zones
  Ground Floor
  Limitations




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE ELEMENTS
                              Building and Lot Types




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE ELEMENTS
            Frontage Zones and Ground Floor Limitations




                  Example from Broad Street Area FBC, Manchester, CT


SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE ELEMENTS
           Complete Street Network and Design Hierarchy




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE ELEMENTS
                            Smart Parking Standards

                                                   Common Requirements
                                                   • Parking Placement (to side and rear of
                                                     buildings)
                                                   • Minimum and Maximum Requirements
                                                   • Public On-Street/Off-Street Off-Sets
                                                   • Shared Parking/Access Reduction Factors
     Share Parking Reduction Table, SmartCode© DPZ • Remote/Satellite Parking Allowances

                                                   • Public Parking Contribution In- Lieu of
                                                     On-Site
                                                   • Landscaping and LID Standards


SNEAPA Conference – September 20, 2012       Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE ELEMENTS
                    Public and Civic Open Space Types
                                          Common Types
                                          • Parks and Open Spaces
                                          • Greens and Commons
                                          • Plazas and Civic Buildings
                                          • Playgrounds and Common Gardens
                                          • Community Gardens




                                           A Public Green, The SmartCode©, DPZ

SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE AND TND EXAMPLES
            Historic Downtowns, Village and Neighborhoods
  Location                 Description                                          Status
  Buzzards Bay, MA         FBC for older village center                         Adopted
  Simsbury Center, CT      FBC for historic downtown                            Adopted
  Jamestown, RI            FBC for Historic small coastal village               Adopted
  Amherst, MA              FBC for two small rural centers                      Pending
  Newport, VT              FBC for historic village center                      Adopted
  Dover, NH                FBC for historic downtown core                       Adopted
  Damariscotta, ME         FBC for historic coastal island community            Pending
  Stratham, NH             FBC for historic downtown Area                       Adopted
  W. Springfield, MA.      FBC for historic Merrick Neighborhood                Under Review




SNEAPA Conference – September 20, 2012           Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE AND TND EXAMPLES
           Targeted Redevelopment Areas and Greenfields
 Targeted Redevelopment Areas
Location             Description                                                Status
North Eastham, MA    New village center on major arterial (Rt. 6)               Under Review
Manchester, CT       Strip development redeveloped to mixed use                 Adopted
Hamden, CT           Commercial highway corridor overlay                        Adopted
Lowell, MA           Older mill redevelopment district                          Adopted
Newport, VT          Older village center                                       Adopted
Tri-Town Area        I-93 Interchange Initiative with 3 towns                   Under Review
Malta, NY            Replace strip development with new Town Center             Pending
Mashpee, MA          Mashpee Commons – TND on 1970s strip shopping plaza        Phased

 Greenfields
Location                        Description                                     Status
S. Weymouth/Southfield MA       Mixed use TND on former Naval Air station       Adopted
Windsor, CT                     Great Pond mixed use TND                        Adopted
Londonderry, NH                 Woodmont Commons TND                            Under Review

SNEAPA Conference – September 20, 2012          Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE AND TND EXAMPLES
                       New FBC and TND is the Works
  Location                      Description                                    Status
  York, ME                      FBC for corridor redevelopment                 In process
  Tiverton, RI                  FBC for corridor redevelopment                 In process
  Dover, NH                     FBC for corridor redevelopment                 In process
  Shelburne, VT                 FBC for corridor redevelopment                 In process
  S. Burlington, VT             FBC for new Town Center and corridor           In process
                                redevelopment
  St. Albans, VT                FBC for historic downtown                      In process
  Claremont, NH                 FBC for historic downtown                      In process
  Goffstown, NH                 FBC for Pinardville village center             In process




SNEAPA Conference – September 20, 2012          Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
                Merrick Neighborhood, W. Springfield MA
Traditional Settlement Patterns




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
                Merrick Neighborhood, W. Springfield MA
Historic Mill Neighborhood




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
                Merrick Neighborhood, W. Springfield MA

Existing Land and Building Use




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
                Merrick Neighborhood, W. Springfield MA
Existing Character Examples




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
                Merrick Neighborhood, W. Springfield MA

Current Zoning Compared to
Existing Settlement Patterns




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
             Merrick Neighborhood, W. Springfield MA
  Development Scenarios Under Current Zoning




 Residential C Zoning District
SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
             Merrick Neighborhood, W. Springfield MA
  Development Scenarios Under Current Zoning




 Residential C Zoning District
SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
             Merrick Neighborhood, W. Springfield MA
  Development Scenarios Under Current Zoning




 Neighborhood Business Zoning District
SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
             Merrick Neighborhood, W. Springfield MA
  Development Scenarios Under Current Zoning




 Neighborhood Business Zoning District
SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
                Merrick Neighborhood, W. Springfield MA
 Illustrative Conceptual Master Plans




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
                Merrick Neighborhood, W. Springfield MA
Redevelopment and Reuse Scenarios Under
Illustrative Master Plan and New Regulating Plan




   Existing Apartment Building                  Cottage Court at Same Density

SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
                    Merrick Neighborhood, W. Springfield MA

Proposed Regulating Plan
     Merrick Neighborhood Residential Zone (MNRZ)
     To replace portions of:
       • Residence A-1 (RA-1)
       • Residence B (RB)
       • Residence C (RC)
     Merrick Neighborhood Business Zone (MNBZ)
     To replace portions of:
       • Neighborhood Business (NB)
       • Business A (BA)
       • Business A-1 (BA-1)
       • Business B (BB)
     Mixed Use Employment Zone (MUEZ)
     To replace portions of:
       • Industrial (I)
     Merrick Natural and Civic Zone (MNCZ)
     To replace portions of:
       • Recreation (REC)

SNEAPA Conference – September 20, 2012              Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
                Merrick Neighborhood, W. Springfield MA

Complete Street Design Hierarchy




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
             Merrick Neighborhood, W. Springfield MA
Complete Streets Hierarchy Design and Standards
Street and Thoroughfare Types
•   Neighborhood Business Street
•   Mixed Use Street
•   Neighborhood Residential Street A and B
•   Business Park Street
•   Access Street and Alley
•   Multi-Purpose Pathway
Design and Development Standards
• Description
• Zone Applications
• Street Design Standards
    • Movement, Traffic Flow, Design Speed
    • ROW and Pavement Width
    • Travel Lane and Parking Lane
    • Curb Radius and Type
    • Bike and Pedestrian Facilities
    • Transit Facilities
• Streetscape Characteristics

SNEAPA Conference – September 20, 2012        Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
                Merrick Neighborhood, W. Springfield MA




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
              Merrick Neighborhood, W. Springfield MA
Building and Lot Design Standards
Building Types
•   Detached Home
•   Cottage Court, Carriage House Unit,
•   Multi-Family Building
•   Live/Work Unit and Rowhouse
•   Multi-Use Building (Small to Large)
•   Flex Commercial Building
•   Civic Building and Space
Design and Development Standards
•   Description
•   Character Examples
•   Lot Standards (Frontage, Depth Area)
•   Building Placement on Lot (Setback and BTZ)
•   Parking Placement on Lot
•   Open Space Types on Lot
•   Building and Street Activation Standards

SNEAPA Conference – September 20, 2012            Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
                Merrick Neighborhood, W. Springfield MA
Residential Building and Lot Types




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
                Merrick Neighborhood, W. Springfield MA
Residential Building and Lot Types




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
                Merrick Neighborhood, W. Springfield MA
Mixed Use and Commercial Building and Lot Types




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
                Merrick Neighborhood, W. Springfield MA
Mixed Use and Commercial Building and Lot Types




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
                Merrick Neighborhood, W. Springfield MA
Residential, Mixed Use and Commercial Lot Types




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
             Merrick Neighborhood, W. Springfield MA
Open Space Types (Public and Private)
 1.    Lawn
 2.    Garden
 3.    Terrace/Outdoor Dining Area
 4.    Pocket Park
 5.    Playground
 6.    Plaza or Square
 7.    Park
 8.    Common or Green
 9.    Ballfields
 10.   Community Garden


SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
         Broad Street Redevelopment Area, Manchester CT

     Existing Conditions Analysis




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
        Broad Street Redevelopment Area, Manchester CT




 Conceptual Redevelopment Plan              Regulating (Zoning District) Plan


SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
        Broad Street Redevelopment Area, Manchester CT
 Building Placement/Frontage Types                Building and Lot Types




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
        Broad Street Redevelopment Area, Manchester CT
Building and Lot Types




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
        Broad Street Redevelopment Area, Manchester CT
     Street Design Types                        Civic and Open Space Types




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
                       Great Pond TND, Windsor CT

                                              653 Acres Total Site
                                              365 Acres in Open Space
                                              4,010 Residential Units
                                              85,000 SF Neighborhood Comm.
                                              640,00 SF Comm. Office
                                              128,000 SF Civic and Institutional




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
                       Great Pond TND, Windsor CT

                                                                  Regulating Plan




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
                        Great Pond TND, Windsor CT

                                                               Complete Street
                                                               Network and
                                                               Design Hierarchy




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
                        Great Pond TND, Windsor CT

                                                               Parks, Open
                                                               Space and
                                                               Conservation Plan




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
                        Great Pond TND, Windsor CT

                                                               Phasing Plan – 8
                                                               stages over
                                                               several years




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                         Village Centers, Amherst, MA
Process
• Existing Zoning Evaluation
• Stakeholder Interviews
• Visioning Workshops
• Conceptual Master Plans
• Preparation of Form-Based Zoning
• Integration into Existing Regulations




SNEAPA Conference – September 20, 2012    Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                         Village Centers, Amherst, MA

North Amherst Village
Center
• Graphics prepared by
   The Cecil Group




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                        Village Centers, Amherst, MA
    Amherst Village Center Conceptual Development and Circulation Plans
    Graphics prepared by The Cecil Group




SNEAPA Conference – September 20, 2012     Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                        Village Centers, Amherst, MA
 FBC Residential Building Concepts for Amherst Village Center
 Graphics prepared by The Cecil Group




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                        Village Centers, Amherst, MA
 FBC Mixed Use Buildng Concepts for Amherst Village Center
 Graphics prepared by The Cecil Group




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                        Village Centers, Amherst, MA

                             FBC for Amherst Village Centers
                             Graphics prepared by The Cecil Group




SNEAPA Conference – September 20, 2012        Context-Based Zoning and Other Placemaking Tools
CONTEXT-BASED ZONING/PLACEMAKING TOOLS
            The Form-Based Code vs. “Hybrid” Approach
Challenges of Blending Conventional Zoning and FBC

• Calibration - Meshing New and Existing Development Patterns
  Accurately.
• Zoning Map/Districts vs. Regulating Plan/Transects.
• Dimensional Standards vs. Building Form Standards (Minimum and
  Maximum Requirements).
• Strict Use Regulations and Flexible Performance Standards.
• Design Guidelines vs. Design Standards.
• Incorporating Public Space and Infrastructure Design Standards.
• Streamlined Review Process – Facilitating administrative review.
• Public Education - Initial Confusion and time needed for
  understanding.


SNEAPA Conference – September 20, 2012          Context-Based Zoning and Other Placemaking Tools
TRADITIONAL NEIGHBORHOOD DEVELOPMENT (TOD)
         LEED Neighborhood Development Rating System

• LEED-ND Version 9.0 Adopted 2009, Updated 2011
• Collaboration of USGBC, CNU and NRDC
• Rating system prerequisites/credits address 5 topics:
     – Smart Location and Linkage (27 possible points)
     – Neighborhood Pattern and Design (44 possible points)
     – Green Infrastructure and Buildings (29 possible points)
     – Innovation and Design Process (6 possible points)
     – Regional Priority Credit (4 possible points)



SNEAPA Conference – September 20, 2012    Context-Based Zoning and Other Placemaking Tools
TRADITIONAL NEIGHBORHOOD DEVELOPMENT (TOD)
             LEED Neighborhood Development Rating System
Neighborhood Development and Design Criteria (44 possible points)
       Number             Criteria                                                      Credits
         prerequisite 1   Walkable Streets                                               Required
         prerequisite 2   Compact Development                                            Required
         prerequisite 3   Connected and open Community                                   Required
   ¨    Credit 1          Walkable Streets                                                   12
   ¨    Credit 2          Compact Development                                                 6
   ¨    Credit 3          Mixed-Use Neighborhood Centers                                      4
   ¨    Credit 4          Mixed-income Diverse Communities                                    7
   ¨    Credit 5          Reduced parking footprint                                           1
   ¨    Credit 6          Street Network                                                      2
   ¨    Credit 7          Transit facilities                                                  1
   ¨    Credit 8          Transportation Demand management                                    2
   ¨    Credit 9          Access to Civic and public Spaces                                   1
   ¨    Credit 10         Access to recreation facilities                                     1
   ¨    Credit 11         Visitability and Universal Design                                   1
   ¨    Credit 12         Community outreach and involvement                                  2
   ¨    Credit 13         Local food production                                               1
   ¨    Credit 14         Tree-Lined and Shaded Streets                                       2
   ¨    Credit 15         Neighborhood Schools                                                1

SNEAPA Conference – September 20, 2012                  Context-Based Zoning and Other Placemaking Tools
TRADITIONAL NEIGHBORHOOD DEVELOPMENT (TOD)
       LEED Neighborhood Development Rating System
 Smart Location and Linkage (27 possible points)
      Number             Criteria                                                         Credits
        prerequisite 1 Smart Location                                                       Required
        prerequisite 2   Imperiled Species and Ecological Communities                       Required
        prerequisite 3   Wetland and Water body Conservation                                Required
        prerequisite 4 Agricultural Land Conservation                                       Required
        prerequisite 5   Floodplain Avoidance                                               Required
     ¨ Credit 1          Preferred Locations                                                   10
     ¨ Credit 2          Brownfield redevelopment                                               2
     ¨ Credit 3          Locations with reduced Automobile Dependence                           7
     ¨ Credit 4          Bicycle Network and Storage                                            1
     ¨ Credit 5          Housing and Jobs proximity                                             3
     ¨ Credit 6          Steep Slope protection                                                 1
     ¨ Credit 7          Site Design for habitat or Wetland and Water body Conservation         1
     ¨ Credit 8          Restoration of habitat or Wetlands and Water bodies                    1
     ¨ Credit 9          Long-term Conservation management of habitat or Wetlands               1
                         and Water bodies

SNEAPA Conference – September 20, 2012             Context-Based Zoning and Other Placemaking Tools
CORRIDOR RETROFIT PLANNING AND ZONING
                     Changing Patterns of Development
Common Characteristics
• Expanding the Mix of Uses
• Infill Development, Redevelopment, Re-purposing
  Buildings and Sites (Higher Density)
• Improving Connectivity with Surrounding Area
• Internal Circulation and Shared Access
• Complete Street Design (Improve pedestrian, bicycle
  and transit facilities)                                     State Highway Poses Challenges to
                                                           Creating Supportive Public Realm for New
• Reduced and Shared Parking Standards                         Town Center, Route 9, Malta, NY
• Integrating Civic and Open Spaces



SNEAPA Conference – September 20, 2012        Context-Based Zoning and Other Placemaking Tools
CORRIDOR RETROFIT PLANNING AND ZONING
                     Changing Patterns of Development

                                                                        Alternative
                                                                        Development
                                                                        Scenarios




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
LIVABLE STREETS
                              Common Techniques
• Implement a Community Vision
• Achieve Traditional Development Patterns
• Supportive Public-Private Relationships
• Facilitate Diversity and Mixed Uses
• Create an “Outdoor Room” and Attractive                Street Enclosure Ratio Standard 1:25
  Pedestrian Environment                                   (Height to Width) Rochester, NY

• Facilitate Intermodal Transportation with
  “Complete Streets”
• Create Vibrant Civic Spaces
• Improve Property Values
• Create/Enhance a “Sense of Place”                       The “Outdoor Room” - Hyannis, MA

SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
COMPLETE STREETS
                       Hierarchy and Design Standards




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
TACTICAL URBANISM
                                  Common Tactics
•   Open Streets and Play Streets
•   Build a Better Block
•   Guerilla Gardening
•   Pop-Up Retail and Cafes
                                           Pop Up Cafe
•   PARK(ing) Day
                                                                            PARKing Day
•   Food Carts and Trucks
•   Mobile Venders
•   Chair Bombing
•   Pavement to Plazas
                                         Mobile Vendors
•   Street Fairs
                                                                   Solar Powered Kiosk/Pop Up Store
•   ETC
SNEAPA Conference – September 20, 2012         Context-Based Zoning and Other Placemaking Tools
CONTEXT-BASED ZONING/PLACEMAKING TOOLS




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE
       Case Studies - Narragansett Avenue, Jamestown, RI
Jamestown Vision:
   Team:
       DPA – Lead.
       Cornish Associates, (Buff Chace, Russ Preston) –
       Financial / Market Analysis
       Sandy Sorlien-Smart Code Specialist.
        New Commons- Community Outreach
  Asked by Town to help preserve the
  character, scale, walkability, and affordability
  of the Village through charrette, FBC, and
  Design Guidelines
  Restore and protect the character of the
  village.

SNEAPA Conference – September 20, 2012          Context-Based Zoning and Other Placemaking Tools
Step 1: Establish Community Vision – Online Surveys



   “walking to shops and restaurants and keeping East Ferry waterfront
   accessible“


   “don’t want to loose the small town character”


“Affordable housing for those whose families were born here.”



“That it is an island with open space, active farms and easy access to water”




SNEAPA Conference – September 20, 2012    Context-Based Zoning and Other Placemaking Tools
Step 1: Establish Community Vision –
                  Dotting Exercises / Visual Preference survey




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Community Preference came down to choice between this:




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
And This:




SNEAPA Conference – September 20, 2012        Context-Based Zoning and Other Placemaking Tools
Demonstrated to community that development will come and is
     already happening. (Inventoried current development proposals)

                      Can’t avoid development altogether.




                       Question is what type and form?


SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Much more potential for development than they realized
                 Used simple, rapid visualization techniques.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Showed that despite a single “village commercial” zone,
         character of Narragansett Ave varied greatly from one end to
         the other.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
“East Ferry” characterized by 2 to 3
      stories, with retail frontage on the 1st
      floor




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
West end of Narragansett distinctly
     more residential and loose. No retail
     frontage.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
“Four Corners” area much more auto-
        scaled. “Working” retail.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Observed and measured existing conditions. Presented this back to
      the community to better understand what they wanted to preserve.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Observed and measured existing conditions. Presented this back to
      the community to better understand what they wanted to preserve.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Observed and measured existing conditions. Presented this back to
      the community to better understand what they wanted to preserve.




                                            • Predominant 2-1/2 story form

                                            • Primarily retail or office at first floor

                                            • Second and third floor more residential in character

                                            • Third floor primarily in dormers



SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Observed and measured existing conditions. Presented this back to
      the community to better understand what they wanted to preserve.

                             • Lot parking at side or rear

                             • Variety of frontage
                             • Limited front setback




SNEAPA Conference – September 20, 2012                 Context-Based Zoning and Other Placemaking Tools
Repeated the exercise for each distinct area of the village.
     Made explicit what community understood intuitively.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
West end of Narragansett has a different pattern from East end




                                         • Predominantly 2 – 2-1/2 story form
                                         • Residential character at first floor.
                                         •Looser spacing, hedging instead of fencing, etc.
                                         •Third floor primarily in dormers




SNEAPA Conference – September 20, 2012     Context-Based Zoning and Other Placemaking Tools
West end of Narragansett has a different pattern from East end
                              • Driveways predominantly
                                at front or side
                              • Deeper front setbacks
                              • Still maintains strong street
                                edge




SNEAPA Conference – September 20, 2012               Context-Based Zoning and Other Placemaking Tools
“Four Corners” exhibits a post war, auto-centric pattern.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
“Four Corners” exhibits a post war, auto-centric pattern.
                                                  •Very deep setbacks.
                                                  •Parking in front
                                                  •Contemporary architectural styles




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
STEP 2: Demonstrated how the current ordinance does not do enough to
      protect what they have or ensure more of it.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Showed that Village was vulnerable to development along
        patterns of stuff they said they didn’t like


                                                            Present Conditions




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Showed that Village was vulnerable to development along
      patterns of stuff they said they didn’t like


                                                        What if Hurricane of
                                                        ‘38 struck again??




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
CURRENT ZONING ALLOWS (MANDATES!) VERY DIFFERENT
          KINDS OF DEVELOPMENT




Residents were shocked!



SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
For key sites demonstrated “risk” posed by current ordinance and
    alternative vision which could be encouraged by FBC




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Residents very anxious about future of 1 acre lot, zoned commercial, in
    residentially scaled end of Narrgansett Ave




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Gave specific design proposals to illustrate importance of “form” as
    opposed to lot coverage, use, or setback alone.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Nothing in ordinance to prevent Self Storage units, for example.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
With proper form and placement commercial could be fine




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Showed how without “down zoning” currently permitted intensity of use
    could be accommodated in sympathy with the neighborhood.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Showed how, without “down zoning,” currently permitted intensity of use
    could be accommodated in sympathy with the neighborhood.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Showed how “most hated site” could be repaired over time by incremental
    development guided by FBC




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Showed how “most hated site” could be repaired over time by incremental
     development guided by FBC




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Different development scenarios explored to help community – and owner
    – understand how it might build-out.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Different development scenarios explored to help community – and owner
    – understand how it might build-out.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Different development scenarios explored to help community – and owner
    – understand how it might build-out over time.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Different development scenarios explored to help community – and owner
    – understand how it might build-out.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Different development scenarios explored to help community – and owner
    – understand how it might build-out.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Very simple controls on form could transform this:




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
To this:




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Had immediate effect. Town and local developer teamed up to flesh out a
    master plan.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Had immediate effect. Town and local developer teamed up to flesh out a
    master plan.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Had immediate effect. Town and local developer teamed up to flesh out a
    master plan.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
For key sites demonstrated “risk” posed by current ordinance and
    alternative vision which could be encouraged by FBC




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
For key sites demonstrated “risk” posed by current ordinance and
    alternative vision which could be encouraged by FBC




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Advocated for different “visions” for different “zones”. One size does NOT
    fit all. Not all of village, can or should be residentially scaled.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Needed a “working retail” location convenient to autos, but deferring to
    pedestrians.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Proposal leveraged planned improvements (new post office, funded
    streetscape work, branch bank relocation) to create “real” shopping.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Goals discovered by study, design, and community outreach translated
    back into regulating plan.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
A Single Commercial Downtown Zone redrawn as 3 “T-zones” reflecting
     differing visions for each.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Civic buildings, civic spaces, recommended retail frontage, view
     corridors terminated vistas, street and walkway types all identified.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Model “SmartCode” calibrated for each T-Zone.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Ordinance changes supplemented with Design Guidelines.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
“Soft Ordinance” Serves to guide the willing (95%) without forcing the
          unwilling (5%). “Objective” - wont change with changing personnel.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Adoption within Comprehensive Plan gives it legal standing… of a sort.
     Since most projects require relief, it becomes effective bargaining chip.




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Form Based diagrams can supplement conventional ordinance to great effect.

SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Form Based diagrams can supplement conventional ordinance to great effect.

SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Form Based diagrams can supplement conventional ordinance to great effect.

SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Form Based diagrams can supplement conventional ordinance to great effect.

SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
CONTEXT-BASED ZONING/PLACEMAKING TOOLS




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
Somerville
       by
     Design:

      The
Next Generation
  of Land Use
  Regulation




    Presented by:
George J. Proakis, AICP

 September 20, 2012
Somerville, MA
• 4.5 sq miles

• 70,000+ population

• North of Cambridge, MA

• Densest city in New England

• A city of squares
Questions?
Questions?
. . . And the community is preparing for it . . .
. . . And the community is preparing for it . . .
The Code:
Three Challenges of the SZO
The Code:
                Three Challenges of the SZO
1.   Code structure is unworkable:
     • Language is unreadable and subject to wide interpretation
     • Attempts to describe physical form through words
     • Answers to basic questions are scattered across sections
     • Additional districts are cobbled onto code structure
The Code:
                Three Challenges of the SZO
1.   Code structure is unworkable:
     • Language is unreadable and subject to wide interpretation
     • Attempts to describe physical form through words
     • Answers to basic questions are scattered across sections
     • Additional districts are cobbled onto code structure

2.   RA/RB Districts don’t provide a predictable outcome:
     • Nonconformity is used as a proxy for design review
     • Large by-right lots have no design review
     • Wide ranges of possible outcomes by special permit
     • Larger mixed-income projects require much negotiation
The Code:
                Three Challenges of the SZO
1.   Code structure is unworkable:
     • Language is unreadable and subject to wide interpretation
     • Attempts to describe physical form through words
     • Answers to basic questions are scattered across sections
     • Additional districts are cobbled onto code structure

2.   RA/RB Districts don’t provide a predictable outcome:
     • Nonconformity is used as a proxy for design review
     • Large by-right lots have no design review
     • Wide ranges of possible outcomes by special permit
     • Larger mixed-income projects require much negotiation

3.   Transit station zoning is misapplied on the map
     • Innerbelt and Brickbottom are in old industrial zones
     • Gilman, Magoun and Ball Square have limited options
     • Porter and Davis have select areas that are underzoned
     • New Union Square and Broadway zoning need clarity
The Code:
                 Three Challenges of the SZO
1.   Code structure is unworkable:
     • Language is unreadable and subject to wide interpretation
     • Attempts to describe physical form through words
     • Answers to basic questions are scattered across sections
     • Additional districts are cobbled onto code structure

2.   RA/RB Districts don’t provide a predictable outcome:
     • Nonconformity is used as a proxy for design review
     • Large by-right lots have no design review
     • Wide ranges of possible outcomes by special permit
     • Larger mixed-income projects require much negotiation

3.   Transit station zoning is misapplied on the map
     • Innerbelt and Brickbottom are in old industrial zones
     • Gilman, Magoun and Ball Square have limited options
     • Porter and Davis have select areas that are underzoned
     • New Union Square and Broadway zoning need clarity

4.   Problems #2 and #3 cannot be fixed until we fix #1
The Appliance and The Grid




“If we know what the appliance is . . . .



                                            - Christopher Alexander
The Appliance and The Grid




“If we know what the appliance is . . . .

 We need to find the plugs to connect it to the existing power grids.”

                                                      - Christopher Alexander
The Appliance and The Grid
                                                    •     Board of Aldermen
                                                    •     Zoning Board of Appeals
         Goals of the                               •     Planning Board
       SomerVision Plan                             •     Conservation Commissions
                                                    •     DPW
                                                    •     Fire Department
                                                    •     State Regulators
                                                    •     Etc.




“If we know what the appliance is . . . .

 We need to find the plugs to connect it to the existing power grids.”

                                                        - Christopher Alexander
The Appliance and The Grid
                                                    •     Board of Aldermen
                                     The            •     Zoning Board of Appeals
         Goals of the                               •     Planning Board
                                    Future
       SomerVision Plan                             •     Conservation Commissions
                                  Somerville        •     DPW
                                    Zoning          •     Fire Department
                                  Ordinance         •     State Regulators
                                                    •     Etc.




“If we know what the appliance is . . . .

 We need to find the plugs to connect it to the existing power grids.”

                                                        - Christopher Alexander
The Appliance and The Grid
                               Form Based Codes      •     Board of Aldermen
                                                     •     Zoning Board of Appeals
                               Transfer of           •     Planning Board
         Goals of the          Development
       SomerVision Plan        Rights
                                                     •     Conservation Commissions
                                                     •     DPW
                               Performance           •     Fire Department
                               Zoning                •     State Regulators
                                                     •     Etc.
                               Pre-Permitted Sites

                               Special Districts



“If we know what the appliance is . . . .

 We need to find the plugs to connect it to the existing power grids.”

                                                         - Christopher Alexander
The Appliance and The Grid
                                      The           •     Board of Aldermen
                                     Future         •     Zoning Board of Appeals
         Goals of the              Somerville       •     Planning Board
       SomerVision Plan              Zoning         •     Conservation Commissions
                                   Ordinance        •     DPW
                                                    •     Fire Department
                                  Organized         •     State Regulators
                                  Around a          •     Etc.
                                 FBC strategy



“If we know what the appliance is . . . .

 We need to find the plugs to connect it to the existing power grids.”

                                                        - Christopher Alexander
The Lesson
     of
Organization
The Somerville Zoning Ordinance (SZO):

1.   Built on a conventional code from 1925

2.   Additions have been cobbled on for many years

3.   Definitions in text / regulation in definitions
     (lacks performance standards for specific uses)

4.   Many cross-reference sections

5.   90+% of lots nonconforming – nonconformity used for design review

6.   New additions for Assembly Square, Union Square and Broadway


Like many local codes: The results are good – but the process is not
Conventional Zoning


“To say (conventional zoning) is cookie-
cutter is unfair to the cookie industry . . .

 . . . there is actually some thought to
alternative forms of cookies”

                    - Strong Towns Blog
Zoning Tools:
                 Regulation of Allowed Uses




Paul Crawford, AICP
Zoning Tools:
                 Regulation of Allowed Uses
         19.          Baths, Turkish




Paul Crawford, AICP
Zoning Tools:
                 Regulation of Allowed Uses
         19.          Baths, Turkish
         25.          Boxing arena




Paul Crawford, AICP
Zoning Tools:
                 Regulation of Allowed Uses
         19.          Baths, Turkish
         25.          Boxing arena
         28.          Chinchillas, retail sales




Paul Crawford, AICP
Zoning Tools:
                 Regulation of Allowed Uses
         19.          Baths, Turkish
         25.          Boxing arena
         28.          Chinchillas, retail sales
         41.          Eleemosynary institutions




Paul Crawford, AICP
Zoning Tools:
                 Regulation of Allowed Uses
         19.          Baths, Turkish
         25.          Boxing arena
         28.          Chinchillas, retail sales
         41.          Eleemosynary institutions
         42.          Embalming business




Paul Crawford, AICP
Zoning Tools:
                 Regulation of Allowed Uses
         19.          Baths, Turkish
         25.          Boxing arena
         28.          Chinchillas, retail sales
         41.          Eleemosynary institutions
         42.          Embalming business
         95.          Physical culture institution




Paul Crawford, AICP
Zoning Tools:
                 Regulation of Allowed Uses
         19.          Baths, Turkish
         25.          Boxing arena
         28.          Chinchillas, retail sales
         41.          Eleemosynary institutions
         42.          Embalming business
         95.          Physical culture institution
         109.         Potato chip manufacturing




Paul Crawford, AICP
Zoning Tools:
                 Regulation of Allowed Uses
         19.          Baths, Turkish
         25.          Boxing arena
         28.          Chinchillas, retail sales
         41.          Eleemosynary institutions
         42.          Embalming business
         95.          Physical culture institution
         109.         Potato chip manufacturing
         127.         Tombstones, retail sales




Paul Crawford, AICP
Zoning Tools:
                 Regulation of Allowed Uses
         19.          Baths, Turkish
         25.          Boxing arena
         28.          Chinchillas, retail sales
         41.          Eleemosynary institutions
         42.          Embalming business
         95.          Physical culture institution
         109.         Potato chip manufacturing
         127.         Tombstones, retail sales
         135.         Turkish Baths




Paul Crawford, AICP
Zoning Tools:
       Regulation of Allowed Uses
Somerville: 291 use categories:
7.11.4.e Home Occupation (not including below)
7.11.4.f Office, within a primary residence, of an architect,
    attorney, physician or dentist
7.11.8.6 Photocopying or commercial printing
7.11.8.10 Newspaper distribution agency
7.11.9.5 Store selling or renting goods such as books,
    stationary, drugs, sporting goods including bicycles and
    accessories, jewelry, photographic equipment and
    supplies, flowers, novelties, cards, footwear, apparel,
    fabrics, accessories, and the like that are typically of a size
    a customer can carry by hand
7.11.9.6 Store selling or renting video tapes
7.11.8.8 Store selling hardware, paint, wallpaper, lawn and
    garden supplies
7.11.11.11 Limousine rental and minor servicing
7.11.11.12 Bus and taxi rental
Zoning Tools:
  Setbacks
Zoning Tools:
                       Open Space




Baconsrebellion.com
Zoning Tools:
                Parking Requirements




maps.live.com
Zoning Tools:
Parking Requirements
Zoning Tools:
                 Special Permits
• “designed in a manner that is compatible with the
  existing natural features of the site and is
  compatible with the characteristics of the built and
  unbuilt surrounding areas.”

• “consistent with the general purpose of this
  ordinance”

• “where practical, new or infill building construction
  should share the same orientation to the street as
  is common in the neighborhood”

• “will not create adverse environmental impacts”
Zoning Tools:
        Lots in Two Districts
 Land in a more restrictive zoning district
may supply space for a use permitted in a
less restricted zoning district if the use of
  the land in the more restrictive district
      satisfies space and passive use
     requirements (such as setbacks,
   landscaping or parking) that are not
prohibited in the more restrictive district.
Zoning Tools:
   Lots Abutting Other Districts


   Where a lot in a business or industrial
 district abuts a lot or district line in a RA,
    RB, or RC district, no building in the
   business or industrial district shall be
 erected closer to the residential line than
   one-third (1/3) the height of the said
building, but not less than fifteen (15) feet.
The Form Based Code:
                     Document Structure

Tools of Traditional Zoning:   Tools of the Form-Based Code:
• Regulation of uses           • Regulating plan
• Setbacks                     • Open Space Standards
• Open space                      • Thoroughfare Standards
• Parking requirements            • Public Open Space Standards
• Subdivision standards           • Private Open Space Standards
• Density                      • Functional Design Standards
• Site plan review             • Building Form Standards
• Special permits                 • Site Configuration
• Design guidelines               • Building Configuration
                                  • Building Elements
                                  • Uses
                               • Administrative Process
                               • Architectural standards (optional)
Livermore Development Code: Hybrid Model




Transect Zones have their own development regulation section
Livermore Development Code




The rest of the code is separate
Livermore Development Code




Use specific requirements are in
their own section, not a
footnote or definition
The Form Based Code:
                         Document Structure

Structure of the SZO:            Somerville By Design Code:
•   Definitions                  •   Definitions
•   Process                      •   Process
•   Districts                        •    SP Process
    •    Define some districts       •    Design review process
    •    Standards for others        •    Subdivision process
•   Uses                             •    PUD Process
    •    Table                       •    Linkage and Inclusionary Rules
    •    Footnotes               •   Districts
    •    Clusters                    •    Form Districts
•   Dimensions                            •    Allowed building forms and
    •    Table                                 uses for each district
    •    Footnotes                        •    Parking for each district
•   Landscape                             •    Landscaping for each district
•   Parking                          •    Special Districts
•   PUD                                   •    Copy provisions of ASMD,
•   Linkage                                    Tufts and existing PUDs
•   Inclusionary                 •   Performance standards for specific uses
•   Map                          •   Map / Regulating Plan
The Form Based Code:
                    Document Structure

•   Districts
    • Neighborhood Residential (RA/RB)
    • Urban corridor (RC)
    • Urban Square (future for Davis)
    • Neighborhood Mixed Retail (NB etc.)
    • Corridor Commercial
    • Transit Oriented
    • Brickbottom
    • Reserved Sections for future station areas

•   Special districts
    • ASMD
    • Tufts
    • Approved PUDs
    • Powder house school
The Form Based Code:
                   What doesn’t change?

•   All RA/RB stays in a neighborhood residential district

•   Important procedural and legal language remains

•   Special districts (ASMD, Tufts, approved PUDs) remain as is

•   CCD and TOD districts remain, with graphical standards added

•   Roles of Special Permit Granting Authorities remain
Conserving
Neighborhood
  Character
Zoning tools in Somerville, MA
A conforming house:
A non-conforming house:
The Form Based Code:
                      The RA/RB problem

Structure of the SZO:           Somerville by Design Code:

•   Nonconformity is used as    •   Base home additions on a
    a proxy for design review       pattern book of Somerville
                                    homes
•   Large by-right lots have
    no design review
                                •   Establish streamlined design
•   Wide ranges of possible         review
    outcomes by special
    permit                      •   Reduce total units in mixed-
                                    income projects to match
•   Larger mixed-income             existing neighborhood density,
    projects require much           SomerVision goals, and allow
    negotiation                     buyouts for less than one unit
One District, or Many: The Denver Question
Building Type Codes: Livermore
Building Type Codes: Livermore
Building Type Codes: Woodbury NJ
Building Type Codes: Denver
Building Type Codes: Denver
Streamlining
   Permitting
       For
Transit-Oriented
    Districts
Transit-Oriented Strategies:

•   Assembly Square
    • Existing rules to remain

•   Union Square and Broadway
    • Conventional TOD and Corridor districts

•   Brickbottom
    • Streamlined FBC

•   Innerbelt Industrial Park
    • FBC based planned areas

•   Gilman / Lowell / Ball
    • The ‘Somerville by Design’ charrette
Transit-Oriented Strategies:

•   Assembly Square
    • Existing rules to remain

•   Union Square and Broadway
    • Conventional TOD and Corridor districts

•   Brickbottom
    • Streamlined FBC

•   Innerbelt Industrial Park
    • FBC based planned areas

•   Gilman / Lowell / Ball
    • The ‘Somerville by Design’ charrette
Transit-Oriented Strategies:
        Union Square
Transit-Oriented Strategies:
        Union Square
Transit-Oriented Strategies:
        Union Square
Transit-Oriented Strategies:

•   Assembly Square
    • Existing rules to remain

•   Union Square and Broadway
    • Conventional TOD and Corridor districts

•   Brickbottom
    • Streamlined FBC

•   Innerbelt Industrial Park
    • FBC based planned areas

•   Gilman / Lowell / Ball
    • The ‘Somerville by Design’ charrette
Transit-Oriented Strategies:
         Brickbottom
Transit-Oriented Strategies:
         Brickbottom
Transit-Oriented Strategies:
         Brickbottom
Transit-Oriented Strategies:
         Brickbottom
Transit-Oriented Strategies:
         Brickbottom
Codes for Innovative Districts: Nashville
Codes for Innovative Districts: Nashville
Transit-Oriented Strategies:

•   Assembly Square
    • Existing rules to remain

•   Union Square and Broadway
    • Conventional TOD and Corridor districts

•   Brickbottom
    • Streamlined FBC

•   Innerbelt Industrial Park
    • FBC based planned areas

•   Gilman / Lowell / Ball
    • The ‘Somerville by Design’ charrette
Transit-Oriented Strategies:
          Innerbelt
Transit-Oriented Strategies:
          Innerbelt
Transit-Oriented Strategies:
          Innerbelt
Transit-Oriented Strategies:
          Innerbelt
Transit-Oriented Strategies:
                         Innerbelt

                                     High-value
                                     commercial and
   New connections to                housing
   Washington Station,               development
   Brickbottom




                                       Park creating
                                       distinct sense of
                                       place
Codes for Master Planning: Lee County
Codes for Master Planning: Lee County
Transit-Oriented Strategies:

•   Assembly Square
    • Existing rules to remain

•   Union Square and Broadway
    • Conventional TOD and Corridor districts

•   Brickbottom
    • Streamlined FBC

•   Innerbelt Industrial Park
    • FBC based planned areas

•   Gilman / Lowell / Ball
    • The ‘Somerville by Design’ charrette
Transit-Oriented Strategies:
Gilman Sq / Lowell Street / Ball Sq
Transit-Oriented Strategies:
Gilman Sq / Lowell Street / Ball Sq
Transit-Oriented Strategies:
Gilman Sq / Lowell Street / Ball Sq
Transit-Oriented Strategies:
Gilman Sq / Lowell Street / Ball Sq
Transit-Oriented Strategies:
Gilman Sq / Lowell Street / Ball Sq
Transit-Oriented Strategies:
Gilman Sq / Lowell Street / Ball Sq
Transit-Oriented Strategies:
Gilman Sq / Lowell Street / Ball Sq
Transit-Oriented Strategies:
Gilman Sq / Lowell Street / Ball Sq
The Extended Charrette: Lowell


   Standard Charrette Phases:
     •   Research, Education and Preparation
     •   Charrette
     •   Plan Implementation
The Extended Charrette: Lowell



  NCI Charrette
     • At least four consecutive days
     • Allowing for at least three design feedback loops
     • Open process including all interested parties
     • Creates a feasible product with minimal work
The Extended Charrette: Lowell




•   Lowell Charrette
    • Same preparation and
       implementation steps
    • Four days of design and public
       participation spread over four
       months
    • Feedback loops
The Extended Charrette: Lowell



•   Lowell Charrette
    • Months of outreach before first session
    • Early listening sessions
    • Cross functional collaborative team
    • Feasible outcome that is embedded in the code
    • Design as the basis for the shared vision
    • No opposition to FBC and universal political support for
       the plan
Conclusion
The Form Based Code:
      Benefits of the Somerville by Design Code

•   Establishes Somerville as ‘open for development’ in transit
    areas

•   Conserves the character of core residential neighborhoods

•   Continues our tradition of using best practices in municipal
    government

•   Implements over 100 recommendations of the SomerVision
    plan in a regulatory structure that will produce long-term
    impacts

•   Provides predictable high quality outcomes
The Form Based Code:
               A new solution to the SZO?

Structure of the SZO:     The SZO as a FBC:
• ddd                     • ddd
FORM-BASED CODE APPLICATIONS
                  The Legal Landscape in New England



     Matthew Lawlor, CNU-A

     Robinson & Cole LLP




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE APPLICATIONS
                  The Legal Landscape in New England



 •   Legal authorization of FBCs has not been seriously challenged
 •   REPEAT: Legal authorization of FBCs has not been seriously challenged
 •   Multiple authors (Emerson, Sitkowski, Slone) have confirmed this reading
 •   Enabling statutes are not the problem
 •   Still need to confirm jurisdiction’s case law not a bar…
 •   …And beware of issues of application as follows




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE APPLICATIONS
                  The Legal Landscape in New England


•   First things first
•   Plan and vision before drafting the FBC
•   Otherwise, the FBC has no vision to which it is coding
•   The overall goal: Plan, vision, and code to the maximum extent possible
•   Seek diminishing discretion: Plan for the code, not each individual project.




SNEAPA Conference – September 20, 2012     Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE APPLICATIONS
                  The Legal Landscape in New England


• Specific implementation issues:

     – Appreciate the potential for plan-based inverse condemnation (if you lay down too
       many streets you don’t intend to take) [Tri-Town Example]
     – Watch for regulatory schemes outside of zoning (state-mandated multi-
       family/commercial site plan review, for example) [Dover Example]
     – Sticking within the statutory scheme for zoning and building code review and permit
       issuance (create a new scheme at your own peril) [Lowell Example]




SNEAPA Conference – September 20, 2012         Context-Based Zoning and Other Placemaking Tools
CONTEXT-BASED ZONING/PLACEMAKING TOOLS
                                         Advantages
 • Stronger Connections Between
   Development Plans, The Community’s Vision
   and Land Use Regulations
 • Can be Calibrated to Existing Desirable
   Conditions
 • Predictable Physical Outcomes of
   Development
 • Encourages Diversity
 • Higher Quality Development
 • Effectively Replaces Design Guidelines
 • Creates a Supportive Relationships between
   Private Development and The Public Realm

SNEAPA Conference – September 20, 2012       Context-Based Zoning and Other Placemaking Tools
DISCUSSION



SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
OTHER CASE STUDIES



SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
                      Buzzards Bay Village, Bourne MA
The Process
• Design Charrette and Visioning
  Workshops
• Existing Conditions Analysis
• Downtown Master Plan
• Form-Based Code
• Design Guidelines




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODE/CASE STUDIES
                      Buzzards Bay Village, Bourne MA




                                                           Existing Conditions




                                                     Proposed Under New FBC
SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                    Hamilton Canal District, Lowell MA




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                    Hamilton Canal District, Lowell MA
                         Advantages to the Charrette
                        & Form Based Codes Process

                               Risk Reduction
                                 Site Value
                                 Feasibility
                                Cohesiveness
                                Collaboration
                                  Efficiency
                                   Balance
                                  Certainty
                          Achievement of Objectives
SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                    Hamilton Canal District, Lowell MA




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                    Hamilton Canal District, Lowell MA




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                    Hamilton Canal District, Lowell MA




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                    Hamilton Canal District, Lowell MA




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                    Hamilton Canal District, Lowell MA




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                    Hamilton Canal District, Lowell MA




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                    Hamilton Canal District, Lowell MA




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                     Downtown Core Area, Dover NH


         Code Development Process:
         • Charrette followed by additional public review


         Project Review Process:
         • Varies: most projects require Planning Board Site Plan Review


         Interesting details:
         • Won Plan NH 2010 Merit Award and NH Planners Association
             2009 Project of the Year Award




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                     Downtown Core Area, Dover NH




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                     Downtown Core Area, Dover NH




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                        Downtown Area, Newport, VT

       Code Development Process:
       •    2009 Rural Urban Design Assistance Team (RUDAT) from AIA led the
            initial community discussions about future of downtown
       •    Town planner used local students to catalog existing conditions and
            draft information for standards

       Project Review Process:
       •    Code administrative process still being developed

       Interesting details:
       •    Local planner is seeking to complete the form based code on a
            $15,000 consulting budget
       •    Vermont state government seeking to replicate the model if it is
            successful in Newport

SNEAPA Conference – September 20, 2012     Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                        Downtown Area, Newport, VT




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                        Downtown Area, Newport, VT




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                   Historic Town Center, Simsbury CT

    Site:                                Historic town center & adjacent land

    Size:                                Community of 23,000, 34 sq miles

    Project:                             Town center and new development

    Developed by:                        Consulting team hired by town

    Type of code:                        Mandatory – Street Based
                                         Attached to traditional town code

    Project approval body:               Zoning Commission

    Adopted:                             April 5, 2011

SNEAPA Conference – September 20, 2012        Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                   Historic Town Center, Simsbury CT




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                   Historic Town Center, Simsbury CT




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                   Historic Town Center, Simsbury CT




SNEAPA Conference – September 20, 2012   Context-Based Zoning and Other Placemaking Tools
FORM-BASED CODES/CASE STUDIES
                           TND Plan, Southfield MA
  The Process
  •   BRAC Project Involving 3 Towns
  •   Former Naval Air Station
  •   Master Plan Prepared
  •   Greenfield Development
  •   Regulating Plan and FBC Adopted
  •   Residential Construction Underway




SNEAPA Conference – September 20, 2012    Context-Based Zoning and Other Placemaking Tools

Context Based Zoning

  • 1.
    CONTEXT-BASED ZONING ANDOTHER INNOVATIVE APPROACHES TO PLACEMAKING A Status Report from New England SNEAPA Conference September 20, 2012 SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 2.
    THE WORKSHOP PANEL Ted Brovitz • Howard/Stein-Hudson, Manager of Community Planning and Design • Experience: Urban Planning, Design and Regulations • Recent Projects: W. Springfield Merrick Neighborhood, Amherst Villages FBC, Manchester CT FBC, Buzzards Bay FBC, West Concord Village Center Donald Powers, AIA CNU-A, LEED AP • Principal, Union Studios, Inc. • Experience: Architecture , Urban Design, Planning • Recent Projects: Jamestown, RI , Southfield, MA George Proakis, AICP • Director of Planning, City of Somerville • Experience: Urban Planning , Design and Regulations • Recent Projects: Lowell, MA and CNU FBC Review Committee Matthew Lawlor, CNU-A • Robinson & Cole LLP • Experience: Land Use Lawyer and Urban Planner • Recent Projects: Tri-Town and Lowell, MA SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 3.
    AGENDA AND SESSIONOBJECTIVES • Context-Based Zoning and Placemaking Toolbox • Common Principles and Best Practices • Typical Elements of Context-Based Zoning • Where Form-Based Codes and Other Tools are being Applied in the Region • Advantages & Challenges Going Forward SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 4.
    CONTEXT-BASED ZONING/PLACEMAKING TOOLS SomeCommon Tools • Form-Based Code (Used to Facilitate Other Placemaking Tool) • Traditional Neighborhood Development (TND) • Transit Oriented Development (TOD) • Strip Commercial Corridor Retrofit Planning • Smart Parking Standards • Complete Street Design • Civic Spaces, Livable Streets, the Outdoor Room • Tactical Urbanism SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 5.
    FORM-BASED CODE ANDTND/ The Origins Congress for the New Urbanism (CNU) • Founded in 1993 and dedicated to promoting traditional mixed-use neighborhood development and healthier living conditions. Seaside Florida and Other Planned Development • 1981 Seaside Development Code first modern day application of FBC. Traditional Neighborhood Development (TND) • Late 1980s/early 1990s several cities in SE US adopted FBC variants:: – Traditional Neighborhood Development (TND) ordinances. Mashpee Commons, MA – Early TND – Unified Development Ordinances (UDO) Cavendish Partnership/Cornish Assoc. The SmartCode© • Released by Duany Plater-Zyberk (DPZ) in 2003 • Model transect-based development code applied to all scales of planning • SmartCode Version 9.2 - Open source with new modules From “Greenfields” to Existing Built Environments • Over the past 10 years, FBC has been applied city-wide as well as districts targeted for revitalization and redevelopment. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 6.
    FORM-BASED CODE BASICS/CommonPrinciples Context-Based Zoning • Focus on existing or desired context and spacial patterns of development and the surrounding environment (The Transect). Public-Private Relationships • Address the relationships between buildings and the “public realm” (such as streets, open spaces, and civic buildings and places). Hierarchy of Purpose and Scale • Buildings form, mass and scale • Street types, purpose and treatments • Active civic and open spaces Physical Form vs. Land Use • Focus on positioning of buildings and spaces rather than separation of uses SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 7.
    FORM-BASED CODE BASICS/The Transect • System of ordered human habitats in a range from the most natural to the most urban. • Defined by common physical characteristics of place, scale, density and intensity of land use. • FBC is Transect Based Zoning integrating the elements of existing or intended habitats. From the SmartCode© Duany Plater-Zyberk SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 8.
    FORM-BASED CODE BASICS Differences Between FBC and Conventional Zoning • Integrated (Unified) Development Ordinance vs. separate regulations (zoning, subdivision, site plan) • Uses (Separation vs. Mix of Uses) • Dimensional Standards (Simple numerical vs. calibrated to shape public and private relationships. • Building Placement, Orientation and Frontages • Street Design Standards (to fit the context) • Parking Standards (for shared uses) • Civic and Open Space Standards (for active use) • Design Standards vs. Guidelines TND vs Conventional Development Example - Pittsford, NY SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 9.
    FORM-BASED CODE CALIBRATION Process of Creating Context-Based Zoning Evaluate Existing/Desirable Development Patterns • Key dimensional, design and use characteristics of existing/desirable development patterns • Parking demand, distribution and occupancy trends • Existing street “livability” characteristics • Potential integration of desired civic and open space • Identify performance standards for desired uses and street activities Define and Translate Community Vision • Visual (Image) Preference Surveys • Public Visioning, Scenario Building, and Design Charrettes • Preparing a Strategic Conceptual Development Plan SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 10.
    FORM-BASED CODE CALIBRATION Defining the Land Use Transect SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 11.
    FORM-BASED CODE CALIBRATION Comparing Existing Regulations to Existing/Desired Context SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 12.
    FORM-BASED CODE CALIBRATION Visioning, Scenario-Building and Design Workshops SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 13.
    FORM-BASED CODE CALIBRATION Visual Preference Surveys Purpose • Public direction and preferences • Range of design and development characteristics for a given district Common VPS Categories • Building Design, Density, and Use • Building Frontage and Façade Treatments • Parks, Open Space and Public Amenities • Streetscape and Pedestrian Treatments • Traffic Circulation and Parking SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 14.
    FORM-BASED CODE CALIBRATION Visual Preference Survey Example – Manchester, CT Highest Rated Images - Part 1 - Building Design, Density and Use 1.2 Commercial/Mixed Use Buildings 1.1 Adaptive Building Reuse SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 15.
    FORM-BASED CODE CALIBRATION Visual Preference Survey Example – Manchester, CT Highest Rated Images Part 3 – Parks, Open Space and Amenities 3.1 Parks and Open Space 3.2 Public Art and Focal Points SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 16.
    FORM-BASED CODE CALIBRATION Strategic and Illustrative Development Plans SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 17.
    FORM-BASED CODE ELEMENTS Typical Elements of Form-Based Codes • Regulating Plan (or Zoning District Map) • Building and Lot Types with Character Examples • Frontage Types • Allowable Uses and Functional Standards • Dimensional and Placement Standards • Building Design Standards • Thoroughfare Design Hierarchy • Public and Private Open Space Types • Flexible Parking Standards • Administration and Review Process • Definitions • Optional Components: – Architectural Design Standards – Landscape Design Standards – Signage Standards – Environmental Resource Standards SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 18.
    FORM-BASED CODE ELEMENTS Regulating Plan Common Elements Transects or Zoning Subdistricts Street Types by Location Building/Lot Types Civic and Open Space Types and Location Frontage Zones Ground Floor Limitations SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 19.
    FORM-BASED CODE ELEMENTS Building and Lot Types SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 20.
    FORM-BASED CODE ELEMENTS Frontage Zones and Ground Floor Limitations Example from Broad Street Area FBC, Manchester, CT SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 21.
    FORM-BASED CODE ELEMENTS Complete Street Network and Design Hierarchy SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 22.
    FORM-BASED CODE ELEMENTS Smart Parking Standards Common Requirements • Parking Placement (to side and rear of buildings) • Minimum and Maximum Requirements • Public On-Street/Off-Street Off-Sets • Shared Parking/Access Reduction Factors Share Parking Reduction Table, SmartCode© DPZ • Remote/Satellite Parking Allowances • Public Parking Contribution In- Lieu of On-Site • Landscaping and LID Standards SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 23.
    FORM-BASED CODE ELEMENTS Public and Civic Open Space Types Common Types • Parks and Open Spaces • Greens and Commons • Plazas and Civic Buildings • Playgrounds and Common Gardens • Community Gardens A Public Green, The SmartCode©, DPZ SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 24.
    FORM-BASED CODE ANDTND EXAMPLES Historic Downtowns, Village and Neighborhoods Location Description Status Buzzards Bay, MA FBC for older village center Adopted Simsbury Center, CT FBC for historic downtown Adopted Jamestown, RI FBC for Historic small coastal village Adopted Amherst, MA FBC for two small rural centers Pending Newport, VT FBC for historic village center Adopted Dover, NH FBC for historic downtown core Adopted Damariscotta, ME FBC for historic coastal island community Pending Stratham, NH FBC for historic downtown Area Adopted W. Springfield, MA. FBC for historic Merrick Neighborhood Under Review SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 25.
    FORM-BASED CODE ANDTND EXAMPLES Targeted Redevelopment Areas and Greenfields Targeted Redevelopment Areas Location Description Status North Eastham, MA New village center on major arterial (Rt. 6) Under Review Manchester, CT Strip development redeveloped to mixed use Adopted Hamden, CT Commercial highway corridor overlay Adopted Lowell, MA Older mill redevelopment district Adopted Newport, VT Older village center Adopted Tri-Town Area I-93 Interchange Initiative with 3 towns Under Review Malta, NY Replace strip development with new Town Center Pending Mashpee, MA Mashpee Commons – TND on 1970s strip shopping plaza Phased Greenfields Location Description Status S. Weymouth/Southfield MA Mixed use TND on former Naval Air station Adopted Windsor, CT Great Pond mixed use TND Adopted Londonderry, NH Woodmont Commons TND Under Review SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 26.
    FORM-BASED CODE ANDTND EXAMPLES New FBC and TND is the Works Location Description Status York, ME FBC for corridor redevelopment In process Tiverton, RI FBC for corridor redevelopment In process Dover, NH FBC for corridor redevelopment In process Shelburne, VT FBC for corridor redevelopment In process S. Burlington, VT FBC for new Town Center and corridor In process redevelopment St. Albans, VT FBC for historic downtown In process Claremont, NH FBC for historic downtown In process Goffstown, NH FBC for Pinardville village center In process SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 27.
    FORM-BASED CODE/CASE STUDIES Merrick Neighborhood, W. Springfield MA Traditional Settlement Patterns SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 28.
    FORM-BASED CODE/CASE STUDIES Merrick Neighborhood, W. Springfield MA Historic Mill Neighborhood SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 29.
    FORM-BASED CODE/CASE STUDIES Merrick Neighborhood, W. Springfield MA Existing Land and Building Use SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 30.
    FORM-BASED CODE/CASE STUDIES Merrick Neighborhood, W. Springfield MA Existing Character Examples SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 31.
    FORM-BASED CODE/CASE STUDIES Merrick Neighborhood, W. Springfield MA Current Zoning Compared to Existing Settlement Patterns SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 32.
    FORM-BASED CODE/CASE STUDIES Merrick Neighborhood, W. Springfield MA Development Scenarios Under Current Zoning Residential C Zoning District SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 33.
    FORM-BASED CODE/CASE STUDIES Merrick Neighborhood, W. Springfield MA Development Scenarios Under Current Zoning Residential C Zoning District SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 34.
    FORM-BASED CODE/CASE STUDIES Merrick Neighborhood, W. Springfield MA Development Scenarios Under Current Zoning Neighborhood Business Zoning District SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 35.
    FORM-BASED CODE/CASE STUDIES Merrick Neighborhood, W. Springfield MA Development Scenarios Under Current Zoning Neighborhood Business Zoning District SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 36.
    FORM-BASED CODE/CASE STUDIES Merrick Neighborhood, W. Springfield MA Illustrative Conceptual Master Plans SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 37.
    FORM-BASED CODE/CASE STUDIES Merrick Neighborhood, W. Springfield MA Redevelopment and Reuse Scenarios Under Illustrative Master Plan and New Regulating Plan Existing Apartment Building Cottage Court at Same Density SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 38.
    FORM-BASED CODE/CASE STUDIES Merrick Neighborhood, W. Springfield MA Proposed Regulating Plan Merrick Neighborhood Residential Zone (MNRZ) To replace portions of: • Residence A-1 (RA-1) • Residence B (RB) • Residence C (RC) Merrick Neighborhood Business Zone (MNBZ) To replace portions of: • Neighborhood Business (NB) • Business A (BA) • Business A-1 (BA-1) • Business B (BB) Mixed Use Employment Zone (MUEZ) To replace portions of: • Industrial (I) Merrick Natural and Civic Zone (MNCZ) To replace portions of: • Recreation (REC) SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 39.
    FORM-BASED CODE/CASE STUDIES Merrick Neighborhood, W. Springfield MA Complete Street Design Hierarchy SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 40.
    FORM-BASED CODE/CASE STUDIES Merrick Neighborhood, W. Springfield MA Complete Streets Hierarchy Design and Standards Street and Thoroughfare Types • Neighborhood Business Street • Mixed Use Street • Neighborhood Residential Street A and B • Business Park Street • Access Street and Alley • Multi-Purpose Pathway Design and Development Standards • Description • Zone Applications • Street Design Standards • Movement, Traffic Flow, Design Speed • ROW and Pavement Width • Travel Lane and Parking Lane • Curb Radius and Type • Bike and Pedestrian Facilities • Transit Facilities • Streetscape Characteristics SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 41.
    FORM-BASED CODE/CASE STUDIES Merrick Neighborhood, W. Springfield MA SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 42.
    FORM-BASED CODE/CASE STUDIES Merrick Neighborhood, W. Springfield MA Building and Lot Design Standards Building Types • Detached Home • Cottage Court, Carriage House Unit, • Multi-Family Building • Live/Work Unit and Rowhouse • Multi-Use Building (Small to Large) • Flex Commercial Building • Civic Building and Space Design and Development Standards • Description • Character Examples • Lot Standards (Frontage, Depth Area) • Building Placement on Lot (Setback and BTZ) • Parking Placement on Lot • Open Space Types on Lot • Building and Street Activation Standards SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 43.
    FORM-BASED CODE/CASE STUDIES Merrick Neighborhood, W. Springfield MA Residential Building and Lot Types SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 44.
    FORM-BASED CODE/CASE STUDIES Merrick Neighborhood, W. Springfield MA Residential Building and Lot Types SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 45.
    FORM-BASED CODE/CASE STUDIES Merrick Neighborhood, W. Springfield MA Mixed Use and Commercial Building and Lot Types SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 46.
    FORM-BASED CODE/CASE STUDIES Merrick Neighborhood, W. Springfield MA Mixed Use and Commercial Building and Lot Types SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 47.
    FORM-BASED CODE/CASE STUDIES Merrick Neighborhood, W. Springfield MA Residential, Mixed Use and Commercial Lot Types SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 48.
    FORM-BASED CODE/CASE STUDIES Merrick Neighborhood, W. Springfield MA Open Space Types (Public and Private) 1. Lawn 2. Garden 3. Terrace/Outdoor Dining Area 4. Pocket Park 5. Playground 6. Plaza or Square 7. Park 8. Common or Green 9. Ballfields 10. Community Garden SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 49.
    FORM-BASED CODES/CASE STUDIES Broad Street Redevelopment Area, Manchester CT Existing Conditions Analysis SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 50.
    FORM-BASED CODES/CASE STUDIES Broad Street Redevelopment Area, Manchester CT Conceptual Redevelopment Plan Regulating (Zoning District) Plan SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 51.
    FORM-BASED CODES/CASE STUDIES Broad Street Redevelopment Area, Manchester CT Building Placement/Frontage Types Building and Lot Types SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 52.
    FORM-BASED CODE/CASE STUDIES Broad Street Redevelopment Area, Manchester CT Building and Lot Types SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 53.
    FORM-BASED CODE/CASE STUDIES Broad Street Redevelopment Area, Manchester CT Street Design Types Civic and Open Space Types SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 54.
    FORM-BASED CODE/CASE STUDIES Great Pond TND, Windsor CT 653 Acres Total Site 365 Acres in Open Space 4,010 Residential Units 85,000 SF Neighborhood Comm. 640,00 SF Comm. Office 128,000 SF Civic and Institutional SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 55.
    FORM-BASED CODE/CASE STUDIES Great Pond TND, Windsor CT Regulating Plan SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 56.
    FORM-BASED CODE/CASE STUDIES Great Pond TND, Windsor CT Complete Street Network and Design Hierarchy SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 57.
    FORM-BASED CODE/CASE STUDIES Great Pond TND, Windsor CT Parks, Open Space and Conservation Plan SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 58.
    FORM-BASED CODE/CASE STUDIES Great Pond TND, Windsor CT Phasing Plan – 8 stages over several years SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 59.
    FORM-BASED CODES/CASE STUDIES Village Centers, Amherst, MA Process • Existing Zoning Evaluation • Stakeholder Interviews • Visioning Workshops • Conceptual Master Plans • Preparation of Form-Based Zoning • Integration into Existing Regulations SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 60.
    FORM-BASED CODES/CASE STUDIES Village Centers, Amherst, MA North Amherst Village Center • Graphics prepared by The Cecil Group SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 61.
    FORM-BASED CODES/CASE STUDIES Village Centers, Amherst, MA Amherst Village Center Conceptual Development and Circulation Plans Graphics prepared by The Cecil Group SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 62.
    FORM-BASED CODES/CASE STUDIES Village Centers, Amherst, MA FBC Residential Building Concepts for Amherst Village Center Graphics prepared by The Cecil Group SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 63.
    FORM-BASED CODES/CASE STUDIES Village Centers, Amherst, MA FBC Mixed Use Buildng Concepts for Amherst Village Center Graphics prepared by The Cecil Group SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 64.
    FORM-BASED CODES/CASE STUDIES Village Centers, Amherst, MA FBC for Amherst Village Centers Graphics prepared by The Cecil Group SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 65.
    CONTEXT-BASED ZONING/PLACEMAKING TOOLS The Form-Based Code vs. “Hybrid” Approach Challenges of Blending Conventional Zoning and FBC • Calibration - Meshing New and Existing Development Patterns Accurately. • Zoning Map/Districts vs. Regulating Plan/Transects. • Dimensional Standards vs. Building Form Standards (Minimum and Maximum Requirements). • Strict Use Regulations and Flexible Performance Standards. • Design Guidelines vs. Design Standards. • Incorporating Public Space and Infrastructure Design Standards. • Streamlined Review Process – Facilitating administrative review. • Public Education - Initial Confusion and time needed for understanding. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 66.
    TRADITIONAL NEIGHBORHOOD DEVELOPMENT(TOD) LEED Neighborhood Development Rating System • LEED-ND Version 9.0 Adopted 2009, Updated 2011 • Collaboration of USGBC, CNU and NRDC • Rating system prerequisites/credits address 5 topics: – Smart Location and Linkage (27 possible points) – Neighborhood Pattern and Design (44 possible points) – Green Infrastructure and Buildings (29 possible points) – Innovation and Design Process (6 possible points) – Regional Priority Credit (4 possible points) SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 67.
    TRADITIONAL NEIGHBORHOOD DEVELOPMENT(TOD) LEED Neighborhood Development Rating System Neighborhood Development and Design Criteria (44 possible points) Number Criteria Credits prerequisite 1 Walkable Streets Required prerequisite 2 Compact Development Required prerequisite 3 Connected and open Community Required ¨ Credit 1 Walkable Streets 12 ¨ Credit 2 Compact Development 6 ¨ Credit 3 Mixed-Use Neighborhood Centers 4 ¨ Credit 4 Mixed-income Diverse Communities 7 ¨ Credit 5 Reduced parking footprint 1 ¨ Credit 6 Street Network 2 ¨ Credit 7 Transit facilities 1 ¨ Credit 8 Transportation Demand management 2 ¨ Credit 9 Access to Civic and public Spaces 1 ¨ Credit 10 Access to recreation facilities 1 ¨ Credit 11 Visitability and Universal Design 1 ¨ Credit 12 Community outreach and involvement 2 ¨ Credit 13 Local food production 1 ¨ Credit 14 Tree-Lined and Shaded Streets 2 ¨ Credit 15 Neighborhood Schools 1 SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 68.
    TRADITIONAL NEIGHBORHOOD DEVELOPMENT(TOD) LEED Neighborhood Development Rating System Smart Location and Linkage (27 possible points) Number Criteria Credits prerequisite 1 Smart Location Required prerequisite 2 Imperiled Species and Ecological Communities Required prerequisite 3 Wetland and Water body Conservation Required prerequisite 4 Agricultural Land Conservation Required prerequisite 5 Floodplain Avoidance Required ¨ Credit 1 Preferred Locations 10 ¨ Credit 2 Brownfield redevelopment 2 ¨ Credit 3 Locations with reduced Automobile Dependence 7 ¨ Credit 4 Bicycle Network and Storage 1 ¨ Credit 5 Housing and Jobs proximity 3 ¨ Credit 6 Steep Slope protection 1 ¨ Credit 7 Site Design for habitat or Wetland and Water body Conservation 1 ¨ Credit 8 Restoration of habitat or Wetlands and Water bodies 1 ¨ Credit 9 Long-term Conservation management of habitat or Wetlands 1 and Water bodies SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 69.
    CORRIDOR RETROFIT PLANNINGAND ZONING Changing Patterns of Development Common Characteristics • Expanding the Mix of Uses • Infill Development, Redevelopment, Re-purposing Buildings and Sites (Higher Density) • Improving Connectivity with Surrounding Area • Internal Circulation and Shared Access • Complete Street Design (Improve pedestrian, bicycle and transit facilities) State Highway Poses Challenges to Creating Supportive Public Realm for New • Reduced and Shared Parking Standards Town Center, Route 9, Malta, NY • Integrating Civic and Open Spaces SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 70.
    CORRIDOR RETROFIT PLANNINGAND ZONING Changing Patterns of Development Alternative Development Scenarios SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 71.
    LIVABLE STREETS Common Techniques • Implement a Community Vision • Achieve Traditional Development Patterns • Supportive Public-Private Relationships • Facilitate Diversity and Mixed Uses • Create an “Outdoor Room” and Attractive Street Enclosure Ratio Standard 1:25 Pedestrian Environment (Height to Width) Rochester, NY • Facilitate Intermodal Transportation with “Complete Streets” • Create Vibrant Civic Spaces • Improve Property Values • Create/Enhance a “Sense of Place” The “Outdoor Room” - Hyannis, MA SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 72.
    COMPLETE STREETS Hierarchy and Design Standards SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 73.
    TACTICAL URBANISM Common Tactics • Open Streets and Play Streets • Build a Better Block • Guerilla Gardening • Pop-Up Retail and Cafes Pop Up Cafe • PARK(ing) Day PARKing Day • Food Carts and Trucks • Mobile Venders • Chair Bombing • Pavement to Plazas Mobile Vendors • Street Fairs Solar Powered Kiosk/Pop Up Store • ETC SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 74.
    CONTEXT-BASED ZONING/PLACEMAKING TOOLS SNEAPAConference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 75.
    FORM-BASED CODE Case Studies - Narragansett Avenue, Jamestown, RI Jamestown Vision: Team: DPA – Lead. Cornish Associates, (Buff Chace, Russ Preston) – Financial / Market Analysis Sandy Sorlien-Smart Code Specialist. New Commons- Community Outreach Asked by Town to help preserve the character, scale, walkability, and affordability of the Village through charrette, FBC, and Design Guidelines Restore and protect the character of the village. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 76.
    Step 1: EstablishCommunity Vision – Online Surveys “walking to shops and restaurants and keeping East Ferry waterfront accessible“ “don’t want to loose the small town character” “Affordable housing for those whose families were born here.” “That it is an island with open space, active farms and easy access to water” SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 77.
    Step 1: EstablishCommunity Vision – Dotting Exercises / Visual Preference survey SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 78.
    Community Preference camedown to choice between this: SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 79.
    And This: SNEAPA Conference– September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 80.
    Demonstrated to communitythat development will come and is already happening. (Inventoried current development proposals) Can’t avoid development altogether. Question is what type and form? SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 81.
    Much more potentialfor development than they realized Used simple, rapid visualization techniques. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 82.
    Showed that despitea single “village commercial” zone, character of Narragansett Ave varied greatly from one end to the other. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 83.
    “East Ferry” characterizedby 2 to 3 stories, with retail frontage on the 1st floor SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 84.
    West end ofNarragansett distinctly more residential and loose. No retail frontage. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 85.
    “Four Corners” areamuch more auto- scaled. “Working” retail. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 86.
    Observed and measuredexisting conditions. Presented this back to the community to better understand what they wanted to preserve. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 87.
    Observed and measuredexisting conditions. Presented this back to the community to better understand what they wanted to preserve. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 88.
    Observed and measuredexisting conditions. Presented this back to the community to better understand what they wanted to preserve. • Predominant 2-1/2 story form • Primarily retail or office at first floor • Second and third floor more residential in character • Third floor primarily in dormers SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 89.
    Observed and measuredexisting conditions. Presented this back to the community to better understand what they wanted to preserve. • Lot parking at side or rear • Variety of frontage • Limited front setback SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 90.
    Repeated the exercisefor each distinct area of the village. Made explicit what community understood intuitively. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 91.
    West end ofNarragansett has a different pattern from East end • Predominantly 2 – 2-1/2 story form • Residential character at first floor. •Looser spacing, hedging instead of fencing, etc. •Third floor primarily in dormers SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 92.
    West end ofNarragansett has a different pattern from East end • Driveways predominantly at front or side • Deeper front setbacks • Still maintains strong street edge SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 93.
    “Four Corners” exhibitsa post war, auto-centric pattern. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 94.
    “Four Corners” exhibitsa post war, auto-centric pattern. •Very deep setbacks. •Parking in front •Contemporary architectural styles SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 95.
    STEP 2: Demonstratedhow the current ordinance does not do enough to protect what they have or ensure more of it. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 96.
    Showed that Villagewas vulnerable to development along patterns of stuff they said they didn’t like Present Conditions SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 97.
    Showed that Villagewas vulnerable to development along patterns of stuff they said they didn’t like What if Hurricane of ‘38 struck again?? SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 98.
    CURRENT ZONING ALLOWS(MANDATES!) VERY DIFFERENT KINDS OF DEVELOPMENT Residents were shocked! SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 99.
    For key sitesdemonstrated “risk” posed by current ordinance and alternative vision which could be encouraged by FBC SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 100.
    Residents very anxiousabout future of 1 acre lot, zoned commercial, in residentially scaled end of Narrgansett Ave SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 101.
    Gave specific designproposals to illustrate importance of “form” as opposed to lot coverage, use, or setback alone. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 102.
    Nothing in ordinanceto prevent Self Storage units, for example. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 103.
    With proper formand placement commercial could be fine SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 104.
    Showed how without“down zoning” currently permitted intensity of use could be accommodated in sympathy with the neighborhood. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 105.
    Showed how, without“down zoning,” currently permitted intensity of use could be accommodated in sympathy with the neighborhood. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 106.
    Showed how “mosthated site” could be repaired over time by incremental development guided by FBC SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 107.
    Showed how “mosthated site” could be repaired over time by incremental development guided by FBC SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 108.
    Different development scenariosexplored to help community – and owner – understand how it might build-out. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 109.
    Different development scenariosexplored to help community – and owner – understand how it might build-out. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 110.
    Different development scenariosexplored to help community – and owner – understand how it might build-out over time. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 111.
    Different development scenariosexplored to help community – and owner – understand how it might build-out. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 112.
    Different development scenariosexplored to help community – and owner – understand how it might build-out. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 113.
    Very simple controlson form could transform this: SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 114.
    To this: SNEAPA Conference– September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 115.
    Had immediate effect.Town and local developer teamed up to flesh out a master plan. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 116.
    Had immediate effect.Town and local developer teamed up to flesh out a master plan. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 117.
    Had immediate effect.Town and local developer teamed up to flesh out a master plan. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 118.
    For key sitesdemonstrated “risk” posed by current ordinance and alternative vision which could be encouraged by FBC SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 119.
    For key sitesdemonstrated “risk” posed by current ordinance and alternative vision which could be encouraged by FBC SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 120.
    Advocated for different“visions” for different “zones”. One size does NOT fit all. Not all of village, can or should be residentially scaled. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 121.
    Needed a “workingretail” location convenient to autos, but deferring to pedestrians. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 122.
    Proposal leveraged plannedimprovements (new post office, funded streetscape work, branch bank relocation) to create “real” shopping. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 123.
    Goals discovered bystudy, design, and community outreach translated back into regulating plan. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 124.
    A Single CommercialDowntown Zone redrawn as 3 “T-zones” reflecting differing visions for each. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 125.
    Civic buildings, civicspaces, recommended retail frontage, view corridors terminated vistas, street and walkway types all identified. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 126.
    Model “SmartCode” calibratedfor each T-Zone. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 127.
    Ordinance changes supplementedwith Design Guidelines. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 128.
    “Soft Ordinance” Servesto guide the willing (95%) without forcing the unwilling (5%). “Objective” - wont change with changing personnel. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 129.
    Adoption within ComprehensivePlan gives it legal standing… of a sort. Since most projects require relief, it becomes effective bargaining chip. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 130.
    Form Based diagramscan supplement conventional ordinance to great effect. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 131.
    Form Based diagramscan supplement conventional ordinance to great effect. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 132.
    Form Based diagramscan supplement conventional ordinance to great effect. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 133.
    Form Based diagramscan supplement conventional ordinance to great effect. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 134.
    CONTEXT-BASED ZONING/PLACEMAKING TOOLS SNEAPAConference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 135.
    Somerville by Design: The Next Generation of Land Use Regulation Presented by: George J. Proakis, AICP September 20, 2012
  • 136.
    Somerville, MA • 4.5sq miles • 70,000+ population • North of Cambridge, MA • Densest city in New England • A city of squares
  • 137.
  • 138.
  • 139.
    . . .And the community is preparing for it . . .
  • 140.
    . . .And the community is preparing for it . . .
  • 148.
  • 149.
    The Code: Three Challenges of the SZO 1. Code structure is unworkable: • Language is unreadable and subject to wide interpretation • Attempts to describe physical form through words • Answers to basic questions are scattered across sections • Additional districts are cobbled onto code structure
  • 150.
    The Code: Three Challenges of the SZO 1. Code structure is unworkable: • Language is unreadable and subject to wide interpretation • Attempts to describe physical form through words • Answers to basic questions are scattered across sections • Additional districts are cobbled onto code structure 2. RA/RB Districts don’t provide a predictable outcome: • Nonconformity is used as a proxy for design review • Large by-right lots have no design review • Wide ranges of possible outcomes by special permit • Larger mixed-income projects require much negotiation
  • 151.
    The Code: Three Challenges of the SZO 1. Code structure is unworkable: • Language is unreadable and subject to wide interpretation • Attempts to describe physical form through words • Answers to basic questions are scattered across sections • Additional districts are cobbled onto code structure 2. RA/RB Districts don’t provide a predictable outcome: • Nonconformity is used as a proxy for design review • Large by-right lots have no design review • Wide ranges of possible outcomes by special permit • Larger mixed-income projects require much negotiation 3. Transit station zoning is misapplied on the map • Innerbelt and Brickbottom are in old industrial zones • Gilman, Magoun and Ball Square have limited options • Porter and Davis have select areas that are underzoned • New Union Square and Broadway zoning need clarity
  • 152.
    The Code: Three Challenges of the SZO 1. Code structure is unworkable: • Language is unreadable and subject to wide interpretation • Attempts to describe physical form through words • Answers to basic questions are scattered across sections • Additional districts are cobbled onto code structure 2. RA/RB Districts don’t provide a predictable outcome: • Nonconformity is used as a proxy for design review • Large by-right lots have no design review • Wide ranges of possible outcomes by special permit • Larger mixed-income projects require much negotiation 3. Transit station zoning is misapplied on the map • Innerbelt and Brickbottom are in old industrial zones • Gilman, Magoun and Ball Square have limited options • Porter and Davis have select areas that are underzoned • New Union Square and Broadway zoning need clarity 4. Problems #2 and #3 cannot be fixed until we fix #1
  • 153.
    The Appliance andThe Grid “If we know what the appliance is . . . . - Christopher Alexander
  • 154.
    The Appliance andThe Grid “If we know what the appliance is . . . . We need to find the plugs to connect it to the existing power grids.” - Christopher Alexander
  • 155.
    The Appliance andThe Grid • Board of Aldermen • Zoning Board of Appeals Goals of the • Planning Board SomerVision Plan • Conservation Commissions • DPW • Fire Department • State Regulators • Etc. “If we know what the appliance is . . . . We need to find the plugs to connect it to the existing power grids.” - Christopher Alexander
  • 156.
    The Appliance andThe Grid • Board of Aldermen The • Zoning Board of Appeals Goals of the • Planning Board Future SomerVision Plan • Conservation Commissions Somerville • DPW Zoning • Fire Department Ordinance • State Regulators • Etc. “If we know what the appliance is . . . . We need to find the plugs to connect it to the existing power grids.” - Christopher Alexander
  • 157.
    The Appliance andThe Grid Form Based Codes • Board of Aldermen • Zoning Board of Appeals Transfer of • Planning Board Goals of the Development SomerVision Plan Rights • Conservation Commissions • DPW Performance • Fire Department Zoning • State Regulators • Etc. Pre-Permitted Sites Special Districts “If we know what the appliance is . . . . We need to find the plugs to connect it to the existing power grids.” - Christopher Alexander
  • 158.
    The Appliance andThe Grid The • Board of Aldermen Future • Zoning Board of Appeals Goals of the Somerville • Planning Board SomerVision Plan Zoning • Conservation Commissions Ordinance • DPW • Fire Department Organized • State Regulators Around a • Etc. FBC strategy “If we know what the appliance is . . . . We need to find the plugs to connect it to the existing power grids.” - Christopher Alexander
  • 159.
    The Lesson of Organization
  • 160.
    The Somerville ZoningOrdinance (SZO): 1. Built on a conventional code from 1925 2. Additions have been cobbled on for many years 3. Definitions in text / regulation in definitions (lacks performance standards for specific uses) 4. Many cross-reference sections 5. 90+% of lots nonconforming – nonconformity used for design review 6. New additions for Assembly Square, Union Square and Broadway Like many local codes: The results are good – but the process is not
  • 161.
    Conventional Zoning “To say(conventional zoning) is cookie- cutter is unfair to the cookie industry . . . . . . there is actually some thought to alternative forms of cookies” - Strong Towns Blog
  • 162.
    Zoning Tools: Regulation of Allowed Uses Paul Crawford, AICP
  • 163.
    Zoning Tools: Regulation of Allowed Uses 19. Baths, Turkish Paul Crawford, AICP
  • 164.
    Zoning Tools: Regulation of Allowed Uses 19. Baths, Turkish 25. Boxing arena Paul Crawford, AICP
  • 165.
    Zoning Tools: Regulation of Allowed Uses 19. Baths, Turkish 25. Boxing arena 28. Chinchillas, retail sales Paul Crawford, AICP
  • 166.
    Zoning Tools: Regulation of Allowed Uses 19. Baths, Turkish 25. Boxing arena 28. Chinchillas, retail sales 41. Eleemosynary institutions Paul Crawford, AICP
  • 167.
    Zoning Tools: Regulation of Allowed Uses 19. Baths, Turkish 25. Boxing arena 28. Chinchillas, retail sales 41. Eleemosynary institutions 42. Embalming business Paul Crawford, AICP
  • 168.
    Zoning Tools: Regulation of Allowed Uses 19. Baths, Turkish 25. Boxing arena 28. Chinchillas, retail sales 41. Eleemosynary institutions 42. Embalming business 95. Physical culture institution Paul Crawford, AICP
  • 169.
    Zoning Tools: Regulation of Allowed Uses 19. Baths, Turkish 25. Boxing arena 28. Chinchillas, retail sales 41. Eleemosynary institutions 42. Embalming business 95. Physical culture institution 109. Potato chip manufacturing Paul Crawford, AICP
  • 170.
    Zoning Tools: Regulation of Allowed Uses 19. Baths, Turkish 25. Boxing arena 28. Chinchillas, retail sales 41. Eleemosynary institutions 42. Embalming business 95. Physical culture institution 109. Potato chip manufacturing 127. Tombstones, retail sales Paul Crawford, AICP
  • 171.
    Zoning Tools: Regulation of Allowed Uses 19. Baths, Turkish 25. Boxing arena 28. Chinchillas, retail sales 41. Eleemosynary institutions 42. Embalming business 95. Physical culture institution 109. Potato chip manufacturing 127. Tombstones, retail sales 135. Turkish Baths Paul Crawford, AICP
  • 172.
    Zoning Tools: Regulation of Allowed Uses Somerville: 291 use categories: 7.11.4.e Home Occupation (not including below) 7.11.4.f Office, within a primary residence, of an architect, attorney, physician or dentist 7.11.8.6 Photocopying or commercial printing 7.11.8.10 Newspaper distribution agency 7.11.9.5 Store selling or renting goods such as books, stationary, drugs, sporting goods including bicycles and accessories, jewelry, photographic equipment and supplies, flowers, novelties, cards, footwear, apparel, fabrics, accessories, and the like that are typically of a size a customer can carry by hand 7.11.9.6 Store selling or renting video tapes 7.11.8.8 Store selling hardware, paint, wallpaper, lawn and garden supplies 7.11.11.11 Limousine rental and minor servicing 7.11.11.12 Bus and taxi rental
  • 173.
  • 174.
    Zoning Tools: Open Space Baconsrebellion.com
  • 175.
    Zoning Tools: Parking Requirements maps.live.com
  • 176.
  • 177.
    Zoning Tools: Special Permits • “designed in a manner that is compatible with the existing natural features of the site and is compatible with the characteristics of the built and unbuilt surrounding areas.” • “consistent with the general purpose of this ordinance” • “where practical, new or infill building construction should share the same orientation to the street as is common in the neighborhood” • “will not create adverse environmental impacts”
  • 178.
    Zoning Tools: Lots in Two Districts Land in a more restrictive zoning district may supply space for a use permitted in a less restricted zoning district if the use of the land in the more restrictive district satisfies space and passive use requirements (such as setbacks, landscaping or parking) that are not prohibited in the more restrictive district.
  • 179.
    Zoning Tools: Lots Abutting Other Districts Where a lot in a business or industrial district abuts a lot or district line in a RA, RB, or RC district, no building in the business or industrial district shall be erected closer to the residential line than one-third (1/3) the height of the said building, but not less than fifteen (15) feet.
  • 180.
    The Form BasedCode: Document Structure Tools of Traditional Zoning: Tools of the Form-Based Code: • Regulation of uses • Regulating plan • Setbacks • Open Space Standards • Open space • Thoroughfare Standards • Parking requirements • Public Open Space Standards • Subdivision standards • Private Open Space Standards • Density • Functional Design Standards • Site plan review • Building Form Standards • Special permits • Site Configuration • Design guidelines • Building Configuration • Building Elements • Uses • Administrative Process • Architectural standards (optional)
  • 181.
    Livermore Development Code:Hybrid Model Transect Zones have their own development regulation section
  • 182.
    Livermore Development Code Therest of the code is separate
  • 183.
    Livermore Development Code Usespecific requirements are in their own section, not a footnote or definition
  • 184.
    The Form BasedCode: Document Structure Structure of the SZO: Somerville By Design Code: • Definitions • Definitions • Process • Process • Districts • SP Process • Define some districts • Design review process • Standards for others • Subdivision process • Uses • PUD Process • Table • Linkage and Inclusionary Rules • Footnotes • Districts • Clusters • Form Districts • Dimensions • Allowed building forms and • Table uses for each district • Footnotes • Parking for each district • Landscape • Landscaping for each district • Parking • Special Districts • PUD • Copy provisions of ASMD, • Linkage Tufts and existing PUDs • Inclusionary • Performance standards for specific uses • Map • Map / Regulating Plan
  • 185.
    The Form BasedCode: Document Structure • Districts • Neighborhood Residential (RA/RB) • Urban corridor (RC) • Urban Square (future for Davis) • Neighborhood Mixed Retail (NB etc.) • Corridor Commercial • Transit Oriented • Brickbottom • Reserved Sections for future station areas • Special districts • ASMD • Tufts • Approved PUDs • Powder house school
  • 186.
    The Form BasedCode: What doesn’t change? • All RA/RB stays in a neighborhood residential district • Important procedural and legal language remains • Special districts (ASMD, Tufts, approved PUDs) remain as is • CCD and TOD districts remain, with graphical standards added • Roles of Special Permit Granting Authorities remain
  • 187.
  • 191.
    Zoning tools inSomerville, MA
  • 192.
  • 193.
  • 197.
    The Form BasedCode: The RA/RB problem Structure of the SZO: Somerville by Design Code: • Nonconformity is used as • Base home additions on a a proxy for design review pattern book of Somerville homes • Large by-right lots have no design review • Establish streamlined design • Wide ranges of possible review outcomes by special permit • Reduce total units in mixed- income projects to match • Larger mixed-income existing neighborhood density, projects require much SomerVision goals, and allow negotiation buyouts for less than one unit
  • 204.
    One District, orMany: The Denver Question
  • 205.
  • 206.
  • 207.
  • 208.
  • 209.
  • 210.
    Streamlining Permitting For Transit-Oriented Districts
  • 211.
    Transit-Oriented Strategies: • Assembly Square • Existing rules to remain • Union Square and Broadway • Conventional TOD and Corridor districts • Brickbottom • Streamlined FBC • Innerbelt Industrial Park • FBC based planned areas • Gilman / Lowell / Ball • The ‘Somerville by Design’ charrette
  • 212.
    Transit-Oriented Strategies: • Assembly Square • Existing rules to remain • Union Square and Broadway • Conventional TOD and Corridor districts • Brickbottom • Streamlined FBC • Innerbelt Industrial Park • FBC based planned areas • Gilman / Lowell / Ball • The ‘Somerville by Design’ charrette
  • 213.
  • 214.
  • 215.
  • 216.
    Transit-Oriented Strategies: • Assembly Square • Existing rules to remain • Union Square and Broadway • Conventional TOD and Corridor districts • Brickbottom • Streamlined FBC • Innerbelt Industrial Park • FBC based planned areas • Gilman / Lowell / Ball • The ‘Somerville by Design’ charrette
  • 217.
  • 218.
  • 219.
  • 220.
  • 221.
  • 222.
    Codes for InnovativeDistricts: Nashville
  • 223.
    Codes for InnovativeDistricts: Nashville
  • 224.
    Transit-Oriented Strategies: • Assembly Square • Existing rules to remain • Union Square and Broadway • Conventional TOD and Corridor districts • Brickbottom • Streamlined FBC • Innerbelt Industrial Park • FBC based planned areas • Gilman / Lowell / Ball • The ‘Somerville by Design’ charrette
  • 225.
  • 226.
  • 227.
  • 228.
  • 229.
    Transit-Oriented Strategies: Innerbelt High-value commercial and New connections to housing Washington Station, development Brickbottom Park creating distinct sense of place
  • 230.
    Codes for MasterPlanning: Lee County
  • 231.
    Codes for MasterPlanning: Lee County
  • 232.
    Transit-Oriented Strategies: • Assembly Square • Existing rules to remain • Union Square and Broadway • Conventional TOD and Corridor districts • Brickbottom • Streamlined FBC • Innerbelt Industrial Park • FBC based planned areas • Gilman / Lowell / Ball • The ‘Somerville by Design’ charrette
  • 233.
    Transit-Oriented Strategies: Gilman Sq/ Lowell Street / Ball Sq
  • 234.
    Transit-Oriented Strategies: Gilman Sq/ Lowell Street / Ball Sq
  • 235.
    Transit-Oriented Strategies: Gilman Sq/ Lowell Street / Ball Sq
  • 236.
    Transit-Oriented Strategies: Gilman Sq/ Lowell Street / Ball Sq
  • 237.
    Transit-Oriented Strategies: Gilman Sq/ Lowell Street / Ball Sq
  • 238.
    Transit-Oriented Strategies: Gilman Sq/ Lowell Street / Ball Sq
  • 239.
    Transit-Oriented Strategies: Gilman Sq/ Lowell Street / Ball Sq
  • 240.
    Transit-Oriented Strategies: Gilman Sq/ Lowell Street / Ball Sq
  • 241.
    The Extended Charrette:Lowell Standard Charrette Phases: • Research, Education and Preparation • Charrette • Plan Implementation
  • 242.
    The Extended Charrette:Lowell NCI Charrette • At least four consecutive days • Allowing for at least three design feedback loops • Open process including all interested parties • Creates a feasible product with minimal work
  • 243.
    The Extended Charrette:Lowell • Lowell Charrette • Same preparation and implementation steps • Four days of design and public participation spread over four months • Feedback loops
  • 244.
    The Extended Charrette:Lowell • Lowell Charrette • Months of outreach before first session • Early listening sessions • Cross functional collaborative team • Feasible outcome that is embedded in the code • Design as the basis for the shared vision • No opposition to FBC and universal political support for the plan
  • 245.
  • 246.
    The Form BasedCode: Benefits of the Somerville by Design Code • Establishes Somerville as ‘open for development’ in transit areas • Conserves the character of core residential neighborhoods • Continues our tradition of using best practices in municipal government • Implements over 100 recommendations of the SomerVision plan in a regulatory structure that will produce long-term impacts • Provides predictable high quality outcomes
  • 247.
    The Form BasedCode: A new solution to the SZO? Structure of the SZO: The SZO as a FBC: • ddd • ddd
  • 248.
    FORM-BASED CODE APPLICATIONS The Legal Landscape in New England Matthew Lawlor, CNU-A Robinson & Cole LLP SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 249.
    FORM-BASED CODE APPLICATIONS The Legal Landscape in New England • Legal authorization of FBCs has not been seriously challenged • REPEAT: Legal authorization of FBCs has not been seriously challenged • Multiple authors (Emerson, Sitkowski, Slone) have confirmed this reading • Enabling statutes are not the problem • Still need to confirm jurisdiction’s case law not a bar… • …And beware of issues of application as follows SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 250.
    FORM-BASED CODE APPLICATIONS The Legal Landscape in New England • First things first • Plan and vision before drafting the FBC • Otherwise, the FBC has no vision to which it is coding • The overall goal: Plan, vision, and code to the maximum extent possible • Seek diminishing discretion: Plan for the code, not each individual project. SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 251.
    FORM-BASED CODE APPLICATIONS The Legal Landscape in New England • Specific implementation issues: – Appreciate the potential for plan-based inverse condemnation (if you lay down too many streets you don’t intend to take) [Tri-Town Example] – Watch for regulatory schemes outside of zoning (state-mandated multi- family/commercial site plan review, for example) [Dover Example] – Sticking within the statutory scheme for zoning and building code review and permit issuance (create a new scheme at your own peril) [Lowell Example] SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 252.
    CONTEXT-BASED ZONING/PLACEMAKING TOOLS Advantages • Stronger Connections Between Development Plans, The Community’s Vision and Land Use Regulations • Can be Calibrated to Existing Desirable Conditions • Predictable Physical Outcomes of Development • Encourages Diversity • Higher Quality Development • Effectively Replaces Design Guidelines • Creates a Supportive Relationships between Private Development and The Public Realm SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 253.
    DISCUSSION SNEAPA Conference –September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 254.
    OTHER CASE STUDIES SNEAPAConference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 255.
    FORM-BASED CODE/CASE STUDIES Buzzards Bay Village, Bourne MA The Process • Design Charrette and Visioning Workshops • Existing Conditions Analysis • Downtown Master Plan • Form-Based Code • Design Guidelines SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 256.
    FORM-BASED CODE/CASE STUDIES Buzzards Bay Village, Bourne MA Existing Conditions Proposed Under New FBC SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 257.
    FORM-BASED CODES/CASE STUDIES Hamilton Canal District, Lowell MA SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 258.
    FORM-BASED CODES/CASE STUDIES Hamilton Canal District, Lowell MA Advantages to the Charrette & Form Based Codes Process Risk Reduction Site Value Feasibility Cohesiveness Collaboration Efficiency Balance Certainty Achievement of Objectives SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 259.
    FORM-BASED CODES/CASE STUDIES Hamilton Canal District, Lowell MA SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 260.
    FORM-BASED CODES/CASE STUDIES Hamilton Canal District, Lowell MA SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 261.
    FORM-BASED CODES/CASE STUDIES Hamilton Canal District, Lowell MA SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 262.
    FORM-BASED CODES/CASE STUDIES Hamilton Canal District, Lowell MA SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 263.
    FORM-BASED CODES/CASE STUDIES Hamilton Canal District, Lowell MA SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 264.
    FORM-BASED CODES/CASE STUDIES Hamilton Canal District, Lowell MA SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 265.
    FORM-BASED CODES/CASE STUDIES Hamilton Canal District, Lowell MA SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 266.
    FORM-BASED CODES/CASE STUDIES Downtown Core Area, Dover NH Code Development Process: • Charrette followed by additional public review Project Review Process: • Varies: most projects require Planning Board Site Plan Review Interesting details: • Won Plan NH 2010 Merit Award and NH Planners Association 2009 Project of the Year Award SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 267.
    FORM-BASED CODES/CASE STUDIES Downtown Core Area, Dover NH SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 268.
    FORM-BASED CODES/CASE STUDIES Downtown Core Area, Dover NH SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 269.
    FORM-BASED CODES/CASE STUDIES Downtown Area, Newport, VT Code Development Process: • 2009 Rural Urban Design Assistance Team (RUDAT) from AIA led the initial community discussions about future of downtown • Town planner used local students to catalog existing conditions and draft information for standards Project Review Process: • Code administrative process still being developed Interesting details: • Local planner is seeking to complete the form based code on a $15,000 consulting budget • Vermont state government seeking to replicate the model if it is successful in Newport SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 270.
    FORM-BASED CODES/CASE STUDIES Downtown Area, Newport, VT SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 271.
    FORM-BASED CODES/CASE STUDIES Downtown Area, Newport, VT SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 272.
    FORM-BASED CODES/CASE STUDIES Historic Town Center, Simsbury CT Site: Historic town center & adjacent land Size: Community of 23,000, 34 sq miles Project: Town center and new development Developed by: Consulting team hired by town Type of code: Mandatory – Street Based Attached to traditional town code Project approval body: Zoning Commission Adopted: April 5, 2011 SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 273.
    FORM-BASED CODES/CASE STUDIES Historic Town Center, Simsbury CT SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 274.
    FORM-BASED CODES/CASE STUDIES Historic Town Center, Simsbury CT SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 275.
    FORM-BASED CODES/CASE STUDIES Historic Town Center, Simsbury CT SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools
  • 276.
    FORM-BASED CODES/CASE STUDIES TND Plan, Southfield MA The Process • BRAC Project Involving 3 Towns • Former Naval Air Station • Master Plan Prepared • Greenfield Development • Regulating Plan and FBC Adopted • Residential Construction Underway SNEAPA Conference – September 20, 2012 Context-Based Zoning and Other Placemaking Tools