Construction of a New Railway Line
The construction of a new railway track can be
divided into three stages.
1. Earth work.
2. Plate laying
3. Laying of ballast
The formation may be in an embankment or a
cutting depending upon the general topography of the
area.
 A formation in an embankment is normally
preferred from the point of view of good drainage.
The height of embankment above highest water in
the area should be at least 60 cm.
Earth work
Earth work
Gauge Type of
formation
Width of
Single line
Formation
Double line
B.G Embankment 6.10m 10.82m
Cutting 5.40m 10.21m
M.G Embankment 4.88m 8.84m
Cutting 4.27m 8.23m
Plate laying
The operation of laying out of the rails and sleepers over the
ready formation is known as plate laying.
The point from where the laying of track starts is known as
the base and the point upon which the new track is carried
out is known as the rail head.
Methods of plate laying
1. Tramline method or side method
2. Telescopic method
3. American method
Tram line method or side method:
This method is used for plate laying in flat country
 Used when new track is laid next to the existing
track
 For plate laying of new track, either of the
following two methods may be adopted
 (i)A service road is constructed parallel to the
proposed track and the materials are transported
to the site of the work
(ii)A temporary rail line parallel to the proposed
track and the materials are transported in wagons.
This temporary line is known as tram line
 In this method all the materials are taken from
the central depot in material trains on the
existing track and are spread on the formation of
new track
 After completing spreading, the work of
assembling is started from one end manually
Tram Line Method or Side Method
Telescopic method:
This method is used very widely in India
 The material are transported in material train to
the farthest point of new track and unloaded.
 These materials are then transported to the point
where work is in progress and different
components of track are assembled here.
 In all 5 operations are involved in telescopic
method.
1. Collection and Preparation of material at depot
2. Transportation of materials from depot to work site
3. Unloading of material at the worksite and carrying
them to rail head
4. Fixing the rail to the sleepers and joining the two
rails with fish plate or by welding
5. Packing of track for correct level and alignment
OPERATIONS INVOLVED
American method
This method involves all mechanical work
• This method consists of fixing rails to the sleepers
and lifting the whole unit by heavy cranes.
• First one is linked with the rail head, then the
train moves ahead by one rail length and the same
procedure is repeated.
• This method is un-economical one and is not used
in India
Laying of ballast
The ballast is normally spread on the railway lines after the
embankment has settled well and at least two monsoons have passed
over it.
The work of spreading the ballast is done by means of ballast trains,
which have special hoppers through which the ballast can be
automatically unloaded onto the track.
Alternatively, ballast is loaded in wagons of the train and then
unloaded at the site into a number of heaps at suitable intervals along
the track.
Then packing of ballast is done by the workers by means of shovels.
TRAIN USED FOR LAYING BALLAST
Method of relaying:
• Work of relaying the track is normally divided into the
following stages:
• (i)Preliminary work:
• To prepare schedule of materials per 100m length or
per km of the track.
• The entire quantity is collected at the central store,
from which day to day requirements is drawn
(ii)Laying of the track:
✓ Removal of the fittings.
✓ Removal of rails and sleepers
✓ Placing of new sleepers
✓ Laying of rails
✓ Laying of second rail
✓ Finishing
iii)Construction of the track:
✓ Tightening of the fittings
✓ Distribution of ballast
✓ Further packing of ballast
✓ Return of released material to store
Maintenance of track:
• The railway track requires proper watch and
ward for security reasons
Maintenance of railway track consists of
• (i) Daily maintenance (ii) Periodic Maintenance
• For daily maintenance the track is divided in to
sections of 5 to 8 kms lengths.
• Each section is look after by a gang
The daily maintenance consists of
❖ General inspection of the track
❖ Checking up of all fastenings and fittings
❖ Tightening of bolts wherever required
❖ Reporting by unusual occurrence
❖ The periodic maintenance consists of detailed inspection of the
track to detect defects in the track which may not be detected during
daily maintenance.
❖ The various aspects of periodic maintenance are as below
❖ Maintenance of track alignment
❖ Maintenance of track drainage
❖ Maintenance of track components
❖ Maintenance of level crossing
Maintenance of track materials:
The top surface of the rails should be kept at the same level
Ballast under sleepers should be regularly packed
Defective sleepers should be replaced immediately
Worn-out rails should be replaced
Kink or fracture rails should be replaced
Fastening should be tightened and oiled
Gauge should be checked and corrected
Ensure that both the rails are at same level
Maintain track drainage properly
Oiling and greasing of fishplates regularly
Flanges and check rails should be kept free from dust
Maintenance of Bridges:
Proper embankment should be provided near the bridge
Avoid scouring near abutments and piers
Flood control measures should be taken near the bridges
Riveted joints should be inspected periodically
Bed blocks should be checked regularly
Steel bridges should be painted regularly
Bearings of the girders should be oiled regularly
Masonry works should be inspected regularly
Maintenance of rolling stock:
Lubrication of all reciprocating parts and bearings
Worn out parts should be replaced the rolling stock
It is necessary to clean the different parts every day
All axles which have run 3,22,000Km should be
replaced
A passenger vehicle used for 30years should be
dismantled and re-assembled
The locomotive boilers have to be carefully
maintained and removed every 15 years
Construction of a New  Railway Track

More Related Content

What's hot

Railway engineering
Railway engineeringRailway engineering
Railway engineering
Shanmugaraj M
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
hiranrathva
 
Railway track design ppt 2018
Railway track design ppt 2018Railway track design ppt 2018
Railway track design ppt 2018
ishwar dhakad
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic Introduction
Bathla Tuition Centre
 
PERMANANT WAY
PERMANANT WAYPERMANANT WAY
PERMANANT WAY
Aaquib ansari
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdf
TVijayaGowri
 
3.alignment of railway lines
3.alignment of railway lines3.alignment of railway lines
3.alignment of railway lines
Mani Vel
 
Signals on Railway
Signals on RailwaySignals on Railway
Signals on Railway
Satyapal Singh
 
Earthwork & track formation Railway Engineering
Earthwork & track formation Railway EngineeringEarthwork & track formation Railway Engineering
Earthwork & track formation Railway Engineering
Latif Hyder Wadho
 
Railway Signalling by Aditi Shah
Railway Signalling by Aditi ShahRailway Signalling by Aditi Shah
Railway Signalling by Aditi Shah
Aditi Shah
 
1.railway intro and rails
1.railway intro and rails1.railway intro and rails
1.railway intro and rails
Deven Diran
 
Railway Engineering - Geometric design of track
Railway Engineering - Geometric design of trackRailway Engineering - Geometric design of track
Railway Engineering - Geometric design of track
Mani Vel
 
Presentation on railway construction and maintenance
Presentation on railway construction and maintenancePresentation on railway construction and maintenance
Presentation on railway construction and maintenance
Mohd Bakhsh
 
modern methods of railway track maintanence
modern methods of railway track maintanencemodern methods of railway track maintanence
modern methods of railway track maintanence
krishnacp
 
Highway planning and alignment
Highway planning and alignmentHighway planning and alignment
Bridge Engineering
Bridge EngineeringBridge Engineering
Bridge Engineering
KHUSHBU SHAH
 
Alignment of railway tracks
Alignment of railway tracksAlignment of railway tracks
Alignment of railway tracks
Gowtham G
 
Components of railway track
Components of railway trackComponents of railway track
Components of railway track
gayathrysatheesan1
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
srinivas2036
 
Stations and Yards of Railway
Stations and Yards of RailwayStations and Yards of Railway
Stations and Yards of Railway
Souvik Mondal
 

What's hot (20)

Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Railway track design ppt 2018
Railway track design ppt 2018Railway track design ppt 2018
Railway track design ppt 2018
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic Introduction
 
PERMANANT WAY
PERMANANT WAYPERMANANT WAY
PERMANANT WAY
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdf
 
3.alignment of railway lines
3.alignment of railway lines3.alignment of railway lines
3.alignment of railway lines
 
Signals on Railway
Signals on RailwaySignals on Railway
Signals on Railway
 
Earthwork & track formation Railway Engineering
Earthwork & track formation Railway EngineeringEarthwork & track formation Railway Engineering
Earthwork & track formation Railway Engineering
 
Railway Signalling by Aditi Shah
Railway Signalling by Aditi ShahRailway Signalling by Aditi Shah
Railway Signalling by Aditi Shah
 
1.railway intro and rails
1.railway intro and rails1.railway intro and rails
1.railway intro and rails
 
Railway Engineering - Geometric design of track
Railway Engineering - Geometric design of trackRailway Engineering - Geometric design of track
Railway Engineering - Geometric design of track
 
Presentation on railway construction and maintenance
Presentation on railway construction and maintenancePresentation on railway construction and maintenance
Presentation on railway construction and maintenance
 
modern methods of railway track maintanence
modern methods of railway track maintanencemodern methods of railway track maintanence
modern methods of railway track maintanence
 
Highway planning and alignment
Highway planning and alignmentHighway planning and alignment
Highway planning and alignment
 
Bridge Engineering
Bridge EngineeringBridge Engineering
Bridge Engineering
 
Alignment of railway tracks
Alignment of railway tracksAlignment of railway tracks
Alignment of railway tracks
 
Components of railway track
Components of railway trackComponents of railway track
Components of railway track
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Stations and Yards of Railway
Stations and Yards of RailwayStations and Yards of Railway
Stations and Yards of Railway
 

Similar to Construction of a New Railway Track

RAILWAY TRACK CONSTRUCTION CIVIL 2.pptx
RAILWAY TRACK CONSTRUCTION CIVIL 2.pptxRAILWAY TRACK CONSTRUCTION CIVIL 2.pptx
RAILWAY TRACK CONSTRUCTION CIVIL 2.pptx
ssuserffa4c9
 
Railway Construction and Maintenance RHTA Module 2
Railway Construction and Maintenance RHTA Module 2Railway Construction and Maintenance RHTA Module 2
Railway Construction and Maintenance RHTA Module 2
AJEETH B
 
Precast segmental construction of bridges
Precast segmental construction of bridgesPrecast segmental construction of bridges
Precast segmental construction of bridges
mukul srivastava
 
UNIT 1a.pdf
UNIT 1a.pdfUNIT 1a.pdf
UNIT 1a.pdf
LovelyLavakumarLK
 
Belt conveyor
Belt conveyorBelt conveyor
Belt conveyor
Safdar Ali
 
RAILWAYS,HARBOR, TUNNEL ENGINEERING
RAILWAYS,HARBOR, TUNNEL ENGINEERINGRAILWAYS,HARBOR, TUNNEL ENGINEERING
RAILWAYS,HARBOR, TUNNEL ENGINEERING
bhavin_pindoriya
 
BALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEBALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGE
srinivas cnu
 
Segmental bridge construction
Segmental bridge constructionSegmental bridge construction
Segmental bridge construction
Construction Tech. and Mgmt., VNIT Nagpur
 
Gaurav-Jhalani-Seminar-ppt.pptx
Gaurav-Jhalani-Seminar-ppt.pptxGaurav-Jhalani-Seminar-ppt.pptx
Gaurav-Jhalani-Seminar-ppt.pptx
SanjeevGupta660170
 
Road, Culvert & Bridge Training
Road, Culvert & Bridge TrainingRoad, Culvert & Bridge Training
Road, Culvert & Bridge Training
Abhishek Bharti
 
2.7 BRIDGE LAUNCHING.ppt
2.7 BRIDGE LAUNCHING.ppt2.7 BRIDGE LAUNCHING.ppt
2.7 BRIDGE LAUNCHING.ppt
PrasannaRaniB
 
10-Construction of Sewers AND WATER SUPPLY04.pptx
10-Construction of Sewers AND WATER SUPPLY04.pptx10-Construction of Sewers AND WATER SUPPLY04.pptx
10-Construction of Sewers AND WATER SUPPLY04.pptx
shamshaider10
 
Prefabricated Column
Prefabricated ColumnPrefabricated Column
Prefabricated Column
Anees Khan
 
Module 1 - Jacking techniques.pptx
Module 1 - Jacking techniques.pptxModule 1 - Jacking techniques.pptx
Module 1 - Jacking techniques.pptx
ChinnuNinan
 
Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017
Crosstown TO
 
Western Works - Construction Liaison Committee Meeting - May 2017
Western Works - Construction Liaison Committee Meeting - May 2017Western Works - Construction Liaison Committee Meeting - May 2017
Western Works - Construction Liaison Committee Meeting - May 2017
Crosstown TO
 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling exploration
jamali husain
 
Railway.pdf
Railway.pdfRailway.pdf
Railway.pdf
abhijitsaha99
 
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
Dr. BASWESHWAR JIRWANKAR
 

Similar to Construction of a New Railway Track (20)

RAILWAY TRACK CONSTRUCTION CIVIL 2.pptx
RAILWAY TRACK CONSTRUCTION CIVIL 2.pptxRAILWAY TRACK CONSTRUCTION CIVIL 2.pptx
RAILWAY TRACK CONSTRUCTION CIVIL 2.pptx
 
Railway Construction and Maintenance RHTA Module 2
Railway Construction and Maintenance RHTA Module 2Railway Construction and Maintenance RHTA Module 2
Railway Construction and Maintenance RHTA Module 2
 
Precast segmental construction of bridges
Precast segmental construction of bridgesPrecast segmental construction of bridges
Precast segmental construction of bridges
 
UNIT 1a.pdf
UNIT 1a.pdfUNIT 1a.pdf
UNIT 1a.pdf
 
Belt conveyor
Belt conveyorBelt conveyor
Belt conveyor
 
Belt conveyor
Belt conveyorBelt conveyor
Belt conveyor
 
RAILWAYS,HARBOR, TUNNEL ENGINEERING
RAILWAYS,HARBOR, TUNNEL ENGINEERINGRAILWAYS,HARBOR, TUNNEL ENGINEERING
RAILWAYS,HARBOR, TUNNEL ENGINEERING
 
BALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEBALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGE
 
Segmental bridge construction
Segmental bridge constructionSegmental bridge construction
Segmental bridge construction
 
Gaurav-Jhalani-Seminar-ppt.pptx
Gaurav-Jhalani-Seminar-ppt.pptxGaurav-Jhalani-Seminar-ppt.pptx
Gaurav-Jhalani-Seminar-ppt.pptx
 
Road, Culvert & Bridge Training
Road, Culvert & Bridge TrainingRoad, Culvert & Bridge Training
Road, Culvert & Bridge Training
 
2.7 BRIDGE LAUNCHING.ppt
2.7 BRIDGE LAUNCHING.ppt2.7 BRIDGE LAUNCHING.ppt
2.7 BRIDGE LAUNCHING.ppt
 
10-Construction of Sewers AND WATER SUPPLY04.pptx
10-Construction of Sewers AND WATER SUPPLY04.pptx10-Construction of Sewers AND WATER SUPPLY04.pptx
10-Construction of Sewers AND WATER SUPPLY04.pptx
 
Prefabricated Column
Prefabricated ColumnPrefabricated Column
Prefabricated Column
 
Module 1 - Jacking techniques.pptx
Module 1 - Jacking techniques.pptxModule 1 - Jacking techniques.pptx
Module 1 - Jacking techniques.pptx
 
Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017
 
Western Works - Construction Liaison Committee Meeting - May 2017
Western Works - Construction Liaison Committee Meeting - May 2017Western Works - Construction Liaison Committee Meeting - May 2017
Western Works - Construction Liaison Committee Meeting - May 2017
 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling exploration
 
Railway.pdf
Railway.pdfRailway.pdf
Railway.pdf
 
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
 

More from Arbaz Kazi

Clay Minerology & Plasticity Characteristics of Soil
Clay Minerology & Plasticity Characteristics of SoilClay Minerology & Plasticity Characteristics of Soil
Clay Minerology & Plasticity Characteristics of Soil
Arbaz Kazi
 
Soil Classification & Systems
Soil Classification & SystemsSoil Classification & Systems
Soil Classification & Systems
Arbaz Kazi
 
Soil - Basic Definitions & Relationships
Soil - Basic Definitions & RelationshipsSoil - Basic Definitions & Relationships
Soil - Basic Definitions & Relationships
Arbaz Kazi
 
Permeability of Soil
Permeability of SoilPermeability of Soil
Permeability of Soil
Arbaz Kazi
 
Soil Stabilisation
Soil StabilisationSoil Stabilisation
Soil Stabilisation
Arbaz Kazi
 
Consolidation of Soil
Consolidation of SoilConsolidation of Soil
Consolidation of Soil
Arbaz Kazi
 
Docks, Harbour and Ports
Docks, Harbour and PortsDocks, Harbour and Ports
Docks, Harbour and Ports
Arbaz Kazi
 
Indian Railway Signals & Systems
Indian Railway Signals & SystemsIndian Railway Signals & Systems
Indian Railway Signals & Systems
Arbaz Kazi
 
Stability of Slopes
Stability of Slopes Stability of Slopes
Stability of Slopes
Arbaz Kazi
 
Bearing Capacity of Shallow Foundation
Bearing Capacity of Shallow FoundationBearing Capacity of Shallow Foundation
Bearing Capacity of Shallow Foundation
Arbaz Kazi
 
Shear strength of soil
Shear strength of soilShear strength of soil
Shear strength of soil
Arbaz Kazi
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport Engineering
Arbaz Kazi
 
Redevelopment
RedevelopmentRedevelopment
Redevelopment
Arbaz Kazi
 
Transportation Engineering – An Introduction
Transportation Engineering – An IntroductionTransportation Engineering – An Introduction
Transportation Engineering – An Introduction
Arbaz Kazi
 

More from Arbaz Kazi (14)

Clay Minerology & Plasticity Characteristics of Soil
Clay Minerology & Plasticity Characteristics of SoilClay Minerology & Plasticity Characteristics of Soil
Clay Minerology & Plasticity Characteristics of Soil
 
Soil Classification & Systems
Soil Classification & SystemsSoil Classification & Systems
Soil Classification & Systems
 
Soil - Basic Definitions & Relationships
Soil - Basic Definitions & RelationshipsSoil - Basic Definitions & Relationships
Soil - Basic Definitions & Relationships
 
Permeability of Soil
Permeability of SoilPermeability of Soil
Permeability of Soil
 
Soil Stabilisation
Soil StabilisationSoil Stabilisation
Soil Stabilisation
 
Consolidation of Soil
Consolidation of SoilConsolidation of Soil
Consolidation of Soil
 
Docks, Harbour and Ports
Docks, Harbour and PortsDocks, Harbour and Ports
Docks, Harbour and Ports
 
Indian Railway Signals & Systems
Indian Railway Signals & SystemsIndian Railway Signals & Systems
Indian Railway Signals & Systems
 
Stability of Slopes
Stability of Slopes Stability of Slopes
Stability of Slopes
 
Bearing Capacity of Shallow Foundation
Bearing Capacity of Shallow FoundationBearing Capacity of Shallow Foundation
Bearing Capacity of Shallow Foundation
 
Shear strength of soil
Shear strength of soilShear strength of soil
Shear strength of soil
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport Engineering
 
Redevelopment
RedevelopmentRedevelopment
Redevelopment
 
Transportation Engineering – An Introduction
Transportation Engineering – An IntroductionTransportation Engineering – An Introduction
Transportation Engineering – An Introduction
 

Recently uploaded

Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 

Recently uploaded (20)

Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 

Construction of a New Railway Track

  • 1. CONSTRUCTION OF A RAILWAY TRACK Prepared By: Arbaz Kazi Asst. Professor VCET, Vasai (W)
  • 2. Construction of a New Railway Line The construction of a new railway track can be divided into three stages. 1. Earth work. 2. Plate laying 3. Laying of ballast
  • 3. The formation may be in an embankment or a cutting depending upon the general topography of the area.  A formation in an embankment is normally preferred from the point of view of good drainage. The height of embankment above highest water in the area should be at least 60 cm. Earth work
  • 4. Earth work Gauge Type of formation Width of Single line Formation Double line B.G Embankment 6.10m 10.82m Cutting 5.40m 10.21m M.G Embankment 4.88m 8.84m Cutting 4.27m 8.23m
  • 5. Plate laying The operation of laying out of the rails and sleepers over the ready formation is known as plate laying. The point from where the laying of track starts is known as the base and the point upon which the new track is carried out is known as the rail head. Methods of plate laying 1. Tramline method or side method 2. Telescopic method 3. American method
  • 6. Tram line method or side method: This method is used for plate laying in flat country  Used when new track is laid next to the existing track  For plate laying of new track, either of the following two methods may be adopted  (i)A service road is constructed parallel to the proposed track and the materials are transported to the site of the work
  • 7. (ii)A temporary rail line parallel to the proposed track and the materials are transported in wagons. This temporary line is known as tram line  In this method all the materials are taken from the central depot in material trains on the existing track and are spread on the formation of new track  After completing spreading, the work of assembling is started from one end manually
  • 8. Tram Line Method or Side Method
  • 9. Telescopic method: This method is used very widely in India  The material are transported in material train to the farthest point of new track and unloaded.  These materials are then transported to the point where work is in progress and different components of track are assembled here.  In all 5 operations are involved in telescopic method.
  • 10. 1. Collection and Preparation of material at depot 2. Transportation of materials from depot to work site 3. Unloading of material at the worksite and carrying them to rail head 4. Fixing the rail to the sleepers and joining the two rails with fish plate or by welding 5. Packing of track for correct level and alignment OPERATIONS INVOLVED
  • 11.
  • 12.
  • 13. American method This method involves all mechanical work • This method consists of fixing rails to the sleepers and lifting the whole unit by heavy cranes. • First one is linked with the rail head, then the train moves ahead by one rail length and the same procedure is repeated. • This method is un-economical one and is not used in India
  • 14.
  • 15. Laying of ballast The ballast is normally spread on the railway lines after the embankment has settled well and at least two monsoons have passed over it. The work of spreading the ballast is done by means of ballast trains, which have special hoppers through which the ballast can be automatically unloaded onto the track. Alternatively, ballast is loaded in wagons of the train and then unloaded at the site into a number of heaps at suitable intervals along the track. Then packing of ballast is done by the workers by means of shovels.
  • 16. TRAIN USED FOR LAYING BALLAST
  • 17. Method of relaying: • Work of relaying the track is normally divided into the following stages: • (i)Preliminary work: • To prepare schedule of materials per 100m length or per km of the track. • The entire quantity is collected at the central store, from which day to day requirements is drawn
  • 18. (ii)Laying of the track: ✓ Removal of the fittings. ✓ Removal of rails and sleepers ✓ Placing of new sleepers ✓ Laying of rails ✓ Laying of second rail ✓ Finishing iii)Construction of the track: ✓ Tightening of the fittings ✓ Distribution of ballast ✓ Further packing of ballast ✓ Return of released material to store
  • 19. Maintenance of track: • The railway track requires proper watch and ward for security reasons Maintenance of railway track consists of • (i) Daily maintenance (ii) Periodic Maintenance • For daily maintenance the track is divided in to sections of 5 to 8 kms lengths. • Each section is look after by a gang
  • 20. The daily maintenance consists of ❖ General inspection of the track ❖ Checking up of all fastenings and fittings ❖ Tightening of bolts wherever required ❖ Reporting by unusual occurrence ❖ The periodic maintenance consists of detailed inspection of the track to detect defects in the track which may not be detected during daily maintenance. ❖ The various aspects of periodic maintenance are as below ❖ Maintenance of track alignment ❖ Maintenance of track drainage ❖ Maintenance of track components ❖ Maintenance of level crossing
  • 21. Maintenance of track materials: The top surface of the rails should be kept at the same level Ballast under sleepers should be regularly packed Defective sleepers should be replaced immediately Worn-out rails should be replaced Kink or fracture rails should be replaced Fastening should be tightened and oiled Gauge should be checked and corrected Ensure that both the rails are at same level Maintain track drainage properly Oiling and greasing of fishplates regularly Flanges and check rails should be kept free from dust
  • 22. Maintenance of Bridges: Proper embankment should be provided near the bridge Avoid scouring near abutments and piers Flood control measures should be taken near the bridges Riveted joints should be inspected periodically Bed blocks should be checked regularly Steel bridges should be painted regularly Bearings of the girders should be oiled regularly Masonry works should be inspected regularly
  • 23. Maintenance of rolling stock: Lubrication of all reciprocating parts and bearings Worn out parts should be replaced the rolling stock It is necessary to clean the different parts every day All axles which have run 3,22,000Km should be replaced A passenger vehicle used for 30years should be dismantled and re-assembled The locomotive boilers have to be carefully maintained and removed every 15 years