Experiential Career and College Exploration
(How to Take the Headache out of, and get the most
           benefit from, Student Travel)


  “Travel brings the classroom curriculum alive, inspiring students to learn
  through first-hand, interactive experiences. Travel motivates students to
achieve and improves academic performance. Travel teaches understanding
    of other people, communities and cultures. Travel offers educational
  opportunities for a shrinking globe. Travel helps young people gain self-
  confidence, a sense of independence, and a feeling that they can make a
 difference in the world. A group travel experience is one your participants
                  will remember for the rest of their lives.”
                               www.syta.org
Why this subject? Why us?
Jennifer Blanchard Belk, IIDA, IDEC, LEED AP
    • Assistant Professor of Interior Design and Academic Advisor at Winthrop University
    • NCIDQ Certified Designer & LEED Accredited Professional (Sustainable Design)
    • Masters of Art Education from VCU
    • Has served on admissions, scholarship, and specialization committees. Has served as
         faculty advisor for student organizations including Council of Student Leaders
    • Orientation Faculty Mentor and student leadership selection committees
    • ACAD (freshman success seminar) instructor
    • 6 years experience working closely with incoming students and parents assisting them
         with academic advising, college community assimilation, and exploration of career
         and personal development options
    • Chair of the University College Faculty Conference (representing segments of the
         university such as Honors Programs, Academic Success Center, Gen Ed Program,
         Career Development, International Center & Study Abroad, etc.)
    • Department of Design contact for study abroad students
    • Has planned many highly successful student trips in support of student personal, career,
         and curriculum development; Traveled extensively for business and pleasure!
Jen’s Travels:



                 = Lived
                 = Visited
Why this subject? Why us?
Skylar Spies, Student Member, IIDA
     •Senior at Winthrop University.
     •Serves as a research assistant within the program
           •Narrative Writing and Empathy; 3D modeling on college campuses
     • President of the INDS student organization
     • Dean’s List
     • Life Scholarship and Dean's Meritorious Scholarship Recipient.
     • Internships include:
           • Carolina Business Interiors & ai Design Group
     • Has studied abroad through the university and has traveled extensively
             • Art & Architecture of Greece & Chicago Architectural/Market study
Skylar’s Travels:
                    = Lived

                    = Visited
… and what was the effect of travel?




  In class
                                   Life Long
experiences      Class Travel
                                    Hobbies
 and field       Experiences
                                  and Careers
    trips
… and what was the effect of travel?



Educational      Educational        Life Long
   Travel           Travel           Love of
Experiences      Experiences      Teaching and
as a Student     as a Teacher      Mentoring
Goals and Content:

   • Understand the advantages of student travel and professional/collegiate
     networking opportunities in student career and college preparedness
   • Items to consider when planning a trip
   • Creating student excitement and preparation
   • Advantages of making travel part of the curriculum
   • Outline suggestions for planning timeline
   • Understand the importance of student reflection and follow-up
   • Personal case studies
   • Q&A
Understand the advantages of student travel and professional/collegiate
networking opportunities in student career and college preparedness

Student & Youth group travel is on the rise
    • In a 2005 survey,        of students indicated
       they had taken an overnight group trip
       independent of their family.
    • In a repeat survey in 2007, this number
       increases to 76.1%.

Travel Improves Achievement
    • 86.8% of parents surveyed say that student
        group travel is an essential part of their child's
        education experience.
    • 58.4% have seen a positive change in their
        child's academic performance.

     Source: Student and Youth Travel Research Institute,
     Michigan State University, 2005 and 2007
Travel is a
                         form of
                        learning



 Travel is a
                                               Travel is a
  source of
   career         The World Youth                way of
                      Student &                socializing
development
                 Educational Travel
                states that for young
                     individuals:


                                      Travel is a
         Travel is a
                                       form of
          means of
                                     discovering
            self-
                                        other
        development
                                       cultures
May of 2011, a survey
sampled people between
the ages of 21 and 69
years old.
• 300 people who had
   traveled to a country
   outside the U.S. or
   Canada on a school
   sponsored educational
   tour when they were
   between 12-18
• 300 people who did not
   travel abroad on a
   school sponsored
   educational tour.
Students who went on a
educational tour:
                           www.educational
                           travelweek.com
Be more successful, even in tough economic times




Be more marketable to colleges and employers
    61% agreed that the tour enhanced their resume when applying for college
    54% agreed that the tour enhanced their resume when applying for jobs

Additional findings uncovered that those who participated in an educational tour embraced
more international travel in their jobs, felt part of a global community and considered
themselves good global citizens.
Understand the advantages of student travel and professional/collegiate
networking opportunities in student career and college preparedness


                                                                        What you may be able to see
                                                                       and do on an educational trip
Hands-on trip experiences may         Unique museums and
                                                                       may be something completely
  be the only way to reach         attractions can drive home
                                                                          different than what was
      certain students;                learning objectives
                                                                       accomplished on a sightseeing
                                                                            trip with the family.


                                 If the mission and the purpose
 For some types of trips, you    of the trip is identified and it is      Shared memory-making
   just don’t have the same       the driving factor in selecting        experience is hard to top in
opportunities locally that you    what to see and do, it almost        creating a great bond between
  do in another destination.           always provides new                 students and teachers.
                                   experiences for all students
Advantages for Students….


                                                        Learning
                                                         Styles


            Socialization &                Exposure &
               Bonding                      Curiosity


                              Engagement



            Reinforcement                                          Retention


                               Informal
                               Learning                                        Perspective
Advantages for Teachers….



                                            Enhanced
                                             Sense of
                                           Community

                                                                Teaches
                                                            Professionalism

                                             Creates an
                Break from                Interest in New
                the Routine                 Professions

                                Learn
                              Something
                                New
                Educational
                   and
                 Relaxing
Items to Consider - Reasons for Tour and Types of Experiences
                ….. and how does that effect timeline?

       Specific Cultural Subject/Area of Interest Travel – Exploring a subject or topic:
                 - Does the climate of the area dictate visit dates?
                 - Is there a particular special event being attended?

       College Exploration – Visits to one or more potential colleges or universities:
                - Are you working around college calendars and athletics?
                - Are there particular recruiting events to attend?
                - Is there a particular group of students who might be interested?

       Volunteer Travel – Gaining cultural knowledge while giving of time:
               - Is this in reaction to a need?
               - Would this be combined with another non-profit group?
Items to Consider - Developing your itinerary:

Dates of Trip – December, Spring, Summer, Federal Holiday Weekend?

        •   What dates/bookends are out of your control?
        •   What special destination events dictate travel days?
        •   Are there particular dates you DO NOT want to travel?
        •   Balance of free vs structured activities
Items to Consider - Location and events:

    • Investigate the use of extracurricular groups and special interest classes to assist in
      the research/identification of colleges and professional sites of interest
        • Where does the art club want to go?
        • Would the yearbook staff benefit from a professional workshop with other
           schools attending?
        • Is there a special conference, tournament or trade show being hosted in a
           nearby larger city?

    • Can “piggy-backing” happen to allow for attendance of an annual event with
      natural or built resources nearby? What about college tours?

    • Look into local resources in the geographic areas of the colleges the students have
      interest in … is there any way to ties those visits into one fabulous student trip?
      Let’s see!
A few of the colleges in the Charleston area:
Citadel            College of Charleston
Johnson & Wales Medical College of SC
Trident Tech       The Art Inst of Charleston
Winthrop University:

College of Arts and Sciences
College of Business Administration
Richard W. Riley College of Education
College of Visual and Performing Arts
Visual and Performing Arts in Charlotte:        Education in Charlotte:




Business in Charlotte in Charlotte:        Arts & Sciences in Charlotte:
Items to Consider - Co-sponsors and Chaperones:
All chaperones should have some experience with students either as teachers, school
administrators or some other educational, professional venue.

Initial recruiting should include the following:
    - Experience in working with adolescents
    - Willingness to help plan and facilitate
    - Ability to attend all pre-tour meetings
    - Assist with documentation such as obtaining
        passports and visas
    - Prepared to spend money on items not covered
        in the free spot such as food
    - Ability to chaperone small groups of students
        on flights if the flights are split
    - Following all tour guidelines in respect to
        expectations such as an alcohol policy


                                                         www.studenttraveldirectory.com
Items to Consider - Tour Director vs DIY:   Advantages of DIY
                                            • Customize to your understanding of
Advantages of a Tour Company                  goals and student needs
• Connection with travel association        • No additional costs for traveling with
• Experience with this specific tour          tour director
• Ability to combine with similar groups    • Individual negotiating power with
• Holistic insurance coverage                 separate vendors & take advantage of
• Earlier arrangement of special events       multiple returning customer advantages
                                            • Total autonomy on itinerary &
                                              scheduling
Items to Consider – Funding:

Explore partnership opportunities with
colleges and professional/service
organizations to assist in planning and
funding

Annual events allow for multiple preplanned
activities associated with event:
          Conferences and workshops
          Markets
          Career fairs

Funding options:
         Rotary International and other
         service organizations
         Student Youth Travel Association
         Foundation and “Road Scholarship”
         Conference or event volunteerism
Items to Consider – Budget:
Strategies & Tips:
• Book flight at lowest cost possible using
   government/group discounts!
• Negotiate with hotels for rates and don’t just rely on
   online availability!
• Explore alternate airports even if it means going the
   night before!
• The least expensive ground transportation just might
   be a limo!
• Take advantage of public transportation!
• Group tours means cheaper rates, no lines and no
   random people!
• “Renting” of extra hotel space to appropriate adults!
• Keep slight overage year to year!
• Utilizing historic data & maintain records of estimated
   vs actual costs
• Be as all inclusive as possible and clearly indicate
   what is not included
Items to Consider – Dining:
    •Group reservations?
    •Handling payment?
    •Being authentic!
    •Making students aware of options!
Items to Consider – Hotel:
   •Location, Location, Location!
   •Convenience to public transportation
   •Safety in area and hotel
   •Cancelation and reduction of needed rooms fees
   •Included meals and services
        (transport?)
   •Perks for
        Leaders?




                                                                     SHOPPING!
   •Be authentic!
   •Change it up!                                    NIGHTLIFE!




                                                MARKET!



                                                     ARCHITECTURE!



                                                                     CULTURE!
Items to Consider – Recruitment:

Student enthusiasm for travel – Cater to Humor and Pop Culture!
Student enthusiasm for travel - Accumulate interest info:
      • Get previous student travelers in on the recruiting
      • Hold interest meetings at times of maximum availability for students and parents
      • Make all recruitment and trip info available online via social media (Facebook event
        or LinkedIn Group) or by creating an online web page of tour pictures/comments
      • A school-wide assembly focused on this and other tours
  Once enrolled, if not part of actual class, plan
monthly meetings to allow for students and parent
  to acquire comfort levels, teacher to present
 preparatory information, and students to bond
               with travel-mates
Student preparation for travel:
    Geographic orientation and public transportation:
    • Give students information and training in the
      daily logistics of inner-city travel, traveling
      abroad, way-finding, etc.
    Packing:
    • Provide general packing tips for students as well
       as those specific to the mode of transportation,
       location and climate of trip, types and level of
       professionalism of events attending, etc.

    Safety:
    • Cover general and specific safety tips in writing
       and as in-class discussions assisted by students
       who have traveled before!
Simple ways to help your students and youth get the most out of their trip:

• Think about what you want your students to get out of the trip, and discuss these things
  with your tour operator or travel mentor so they have the same understanding as they
  offer guidance on your itinerary.
• Rely on your tour operator to advise interactive activities during the trip that tie directly to
  your curriculum.
• Prep your students ahead of time. Visiting an art museum in Madrid or Chicago will have
  much more meaning and impact if your students know what they are seeing. Many
  attractions are happy to send you curriculum materials that you can use prior to your visit.
• Bring in experts on subjects that are particularly important. An excellent speaker is easier
  to find than you might think- local colleges, museums, historic sites and societies all have
  experts on a wide range of topics.
                                                                              www.syta.org




        ….if any way possible … MAKE IT A CLASS!!!
A successful course in preparation
for group travel:                                        Ethnic Areas of
Course should facilitate teamwork/camaraderie
                                                            Chicago
among travelers:
• The more time students can spend together             “We all should know that diversity makes for a
                                                        rich tapestry, and we must understand that all
  beforehand, the better.                                the threads of the tapestry are equal in value
                                                                 no matter what their color.”
• Create opportunities for various forms of bonding                                       ~ Maya Angelou
  and teambuilding

Course/Lesson Methodology:
• Multiple/varied group activities (shuffle groups to
  promote mingling within group!)
• Student selected research
• Student led discussions

Utilization of technology
• Multimedia (Video tours, Google Earth, YouTube)
• Student sourced apps for travel locations
Case Study – Chicago Architectural and Market Study:

Students take on an in-depth study of the historic and contemporary architecture of Chicago, the role of the
NeoCON World’s Trade Fair in contemporary interior design, and the design and architectural leaders that
have influenced them both. The class culminates in a 6 day group trip to Chicago and to NeoCON
International Commercial Furnishings Market.

Course Topics:
     •Understanding the location and geography of Chicago
     •Introduction to Chicago History and its effects on future Architecture
     •Chicago Historic and Contemporary Architecture (and the architects and schools of thought behind it)
     •Market History, the NeoCON Merchandise Mart and its influence over design
     •Logistics:
           •Navigating Chicago and the Market
           •Professionalism and Networking
           •Packing for professional travel
           •Safety and travel logistics

Teaching Methods:
     •Class lecture/discussion via PowerPoint, video and visuals (both instructor and student led)
     •Text reading assignments
     •Video and online references
Case Study – Chicago Architectural and Market Study - The Class:

Group/Partner Class Projects
    •Movements of Architecture Represented in Chicago & Chicago Public Art
    •Significant National Firms (represented in Chicago) and their importance in industry
    •Industry and vendor leaders; Best of NeoCON design award winners
    •Additional Area Tourism Opportunities
    •Components: Written reports; Multi-Media / Powerpoint presentations; Handouts for classmates;
    Presentation to and discussion with classmates

Assessment/Test
     •Identification of significant buildings and city zones
     •Essay regarding given building and the school of design
     •Essay regarding significant event in city history and its effect on architecture and development

Market Assignment (Scavenger Hunt)
    •Identification and discussion of stand-out products identified at market as well as influential contacts
    made

Post Market Reflection Paper
     •Reflection on what students learned and how they grew through travel, market, tourism, social
     experiences and how what they did affected their future course and professional work.
Case Study – Chicago Architectural and Market Study - Trip Experiences:

Art/Architecture
     •Tour of Gensler office (LEED Platinum space)
     •Art Institute Museum
     •Architectural Riverboat Tour
     •Frank Lloyd Wright Home and Studio Tour
     •Oak Park Neighborhood Tour

Private Showroom Tours

Additional Market/Conference Experiences
     •Independent Market Time
     •Industry Hospitality Functions
     •IIDA Panel - Career Boot Camp
     •ASID Career Exchange
     •Meet the President’s Day

Independent and/or Travel Related Experiences
     •Free time for independent activities / Tourism/ Museums
     •Group social activities
Case Study – Chicago Architectural and Market Study - Itinerary:
Fri June 8th     Morning:     Travel
                 Afternoon:   Check In; Architectural Boat tour
                 Evening:     Free Time (Blues Fest!)

Sat June 9th     Morning:     Free time (Walking tours, Robie House, etc.)
                 Afternoon:   Free time (Walking tours, Robie House, etc.)
                 Evening:     Navy Pier; Group Dinner

Sun June 10th    Morning:     Frank Lloyd Wright/Oak Park Tours
                 Afternoon:   Free Time / IIDA International Meeting
                 Evening:     Market Tours & Hospitality / Free Time

Mon June 11th    Morning:     Art Institute Museum
                 Afternoon:   NeoCON Market (tours and elective seminars)
                 Evening:     Market Tours & Hospitality / Free Time

Tues June 12th   Morning:     Tour of Design Firm
                 Afternoon:   NeoCON Market (tours and elective seminars)
                 Evening:     Market Tours & Hospitality / Free Time

Wed June 13th    Morning:     Student NeoCON Conference
                 Afternoon:   Check out
                 Evening:     Travel (Market Assignment due)
Case Study – Chicago Architectural and Market Study - Budget:
Student Cost = Approx $825; Included:

•   Hotel cost (4 to a room)
•   Airfare & baggage fees
•   All tours & museum fees
•   Rail costs (week pass)
•   Airport transportation
•   Market/conference
•   Some hospitality (related to conference)
Case Study – Chicago Architectural and Market Study:
STUDENT SATISFACTION/SUCCESS OF COURSE

Overall, student evaluations were very positive. They enjoyed the preparation for as well as
the actual travel experience. The majority felt the exposure to market increased their ability
to be successful on future projects and exposed them to a broad range of commercial
products and manufacturers. They took advantage of more independent networking
opportunities and continued contact with these professionals after the conference. Students
grew from not only the design based activities but also matured from the autonomy of
subway travel and free time they took advantage of.

Students especially enjoyed the group projects, the open discussions, and learning about the
architecture/neighborhoods in order to be able to better navigate and understand the city.
Additionally, meeting more extensively prior to the trip allowed the students to bond more
(students represented different academic years) and the instructor to have time to tailor
certain portions of the experience to individual students.
Case Study – Art and Architecture of Greece:
•   Designed for all students who are excited to travel, want to experience another culture and
          the objects they create
The Class:
•   Investigate the visual art, design and architecture of ancient Greece placing emphasis on
           the relationship of these forms to Greek society, culture and religion
The Trip:
•   Explore ancient sites and museums at the Acropolis in Athens, Delphi, Olympia, Sounion,
          Eleusis and Mycenae as well as the ancient theatre at Epidaurus and the ancient
          graveyard of Kerameikos.
•   Explore contemporary culture through food, Greek dancing, a visit to the remarkable St.
          Paul’s Nunnery and a stop the Peza Olive Oil Cooperation.
•   Go by ferry to the island of Crete, with its ancient royal palace architecture, Roman
          catacombs and wonderful beaches to explore.
Case Study – Art and Architecture of Greece:

The Art of Greece is a rigorously academic course that combines traditional classroom lectures with
a two-week travel component. This format is a way of intellectually and culturally enriching students’
learning experiences. Exposure to different cultures globally brings an appreciation of difference
within our own society, and, ultimately, makes us better citizens, both nationally and globally.
 _______________________________________________________________________________
Case Study – Art and Architecture of Greece – The Class:

7 Session Course:
Season 1     Introduction,    The Minoans
Session 2    Travel report,   The Mycenaeans/Dark Ages
Session 3    Travel report,   Archaic/ 5th Century
Session 4    Travel report,   5th Century/4th Century
Session 5    Travel report,   Hellenistic
Session 6    Travel report,   Mythology Presentations
Session 7    Travel report,   Review for Final Exam, Group Dinner

Assignments:
Travel Report- Travel Topics
Mythology Presentations – Greek God Topics
Research Paper- Greece Site Topics
Final Exam
On Site Presentation based off Research Paper
Case Study – Art and Architecture of Greece – Trip Itinerary:
Day 1. ATHENS ARRIVAL - Welcome Group Dinner in local Greek food restaurant
Day 2. ATHENS - Acropolis and the New Acropolis Museum (the Roman and Greek Agora ) National
Archaeological Museum
Day 3. ATHENS – SOUNION - Temple of Olympian Zeus, Syntagma Square, Aegaleo: Kerameikos
Sounion : Temple of Poseidon, Lavrion: St. Paul’s Nunnery
Day 4. ATHENS – DELPHI - Delphi the site of the Oracle & museum, Group Dinner; Arachova, a
picturesque mountain village
Day 5. DELPHI – OLYMPIA - Nafpaktos, cross over to Rion/Antirion Bridge, town of Olympia:
Archaeological Museum of Olympia, Group Dinner
Day 6. OLYMPIA – NAUPLION - The site of Olympia that the first Olympic Games took place;
Nauplion visit the Site of Tiryns
Day 7. NAUPLION – EPIDAURUS – MYCENAE - Epidaurus, to visit of the famous ancient open-air
theatre. Mycenae, the Citadel, Lions Gate, Tomb of Atreus & museum.
Day 8. NAUPLION – PIRAEUS – HERAKLION - Morning visits & Free time in Nauplion.
Suggestions: Archaeological Museum of Nauplion the Palamidi Castle or Bourtzi island. local winery
(Skouras winery) for wine tasting and tour of the facilities. Return to Athens to visit Eleusis. the port
of Piraeus for overnight ferry to Heraklion, the capital of Crete
Day 9. KNOSSOS – ARCHANES – HERAKLION - Heraklion Archaeological Museum the Knossos
Minoan Palace) Peza Cooperation, a winery and olive oil factory, buy Cretan Olive oil. Picturesque
village of Archanes Group Dinner at “Ladadika” tavern in             Heraklion for traditional specialties.
Day 10. GORTYNA – PHAESTOS – MATALA – CHANIA – ATHENS (visit Gortys and Phaestos)
- The Royal Minoan Summer palace. Matala for lunch and swim opportunity. Flight back to Athens
then USA
Case Study – Art and Architecture of Greece – Reflection:
Here’s what student travelers had to say….

“A great way to prepare for foreign travel”

“First of all, I wanted to thank you for this experience. I can't
say how affected I was by seeing the world from such a
new and different angle. I really have trouble finding the
words. I guess I can only say that I'll be going back one day,
even if I have to go on a super low budget.
Europe got a hold on me, for sure!”

“I appreciated having learned so much about Greece before
going there. There's something else that will be hard to
repeat….singing at Epidaurus was really overwhelming, in a
good way,
so thank you for that!”

“An experience I won't forget! And I mean, ever. EVER.”

“Thanks for showing me the world!! I had an awesome time
-- it was an eye-opening experience.”

“I AM READY TO GO BACK TO GREECE!!!”
Outline suggestions for - Your planning timeline:

12 months prior
• You should have chosen your location by now.
• Start setting departure and return dates for the trip, so people can clear their calendars for
   the date of the trip well before departure.
• Determine who will be your additional chaperones.
• You will begin to contact airlines and hotels and motor coaches now, as they work 11-12
   months in advance.
• Start promoting the tour through email, brochures, posters, social media and other
   outlets.
Outline suggestions for - Your planning timeline:

6-9 months prior
• You should start to see the early participants signing up with deposits paid.
• Create a list of reading materials and study exercises to prepare students during the trip.
• If a passport or visa is required, now is the time to apply for them.

4 months prior
• Continue to promote the trip in newsletters, social media, etc. to keep interest alive for
   those who have already signed up.
• Contact people who have shown interest but not yet committed.

3 months prior
• This is deadline for the final payments for those that have paid their deposits.
• Arrange transportation to and from the airport.
• Students should start picking roommates for the hotels.
Outline suggestions for - Your planning timeline:

1 month prior
• To ensure everyone is ready for departure, schedule a last minute meeting to:
    • Confirm trip details.
    • Go over packing lists.
    • Review all expectations regarding timeliness and student behavior as have students
       sign agreements.
    • Have the students fill our emergency contact cards to keep on file, along with any
       allergy or medical information you should know.
    • Make sure the parents have your information as well of they need to contact you for
       any reason.
Understand the importance of student reflection and follow-up…



                                                         Reflection is an integral part of
           John Dewey (1933) found education         learning from an abroad experience.
            to be deeply rooted in experience,             Reflection is defined as “the
             and that these experiences often            intentional consideration of an
              create controversy that, if not           experience in light of particular
            reflected upon, can be misleading.          learning objectives” (Hatcher &
                                                                  Bringle 1997).



                                    Through adviser-encouraged
                                reflection, the adviser will be aware
                                   of whether or not the learning
                               outcomes were met. Reflection allows
                                  for verbalization of stereotypes,
                                     problems, misconceptions,
                                     challenges, and highlights.


                       http://educationaltourism.org/why-us.html
The Chicago class was a                  I felt like learning about the buildings gave me       After traveling to Chicago, I realize
beneficial and exciting               excellent foundation to use in my navigation of the       my personal comfort level for larger
experience for me. As a result of                                                               cities and my willingness to roam
                                      city. When I first arrived in Chicago, I felt extremely
this class, I walked away from                                                                  them by myself at any time of the day
Chicago with new ideas, new          shocked by the size of the city. No picture could really   has increased significantly. I have
contacts and no regrets. I feel as       do this city justice. However, once I was able to      learned I am attuned to my
though I was able to fully            ground myself and began to remember what I had            surroundings and have a strong sense
experience this city as well as        learned in class, using major buildings and public       of direction in any setting.
conquer Neocon on my first try.           artworks made it easy for me to find my way
This trip has become a                                   throughout Chicago.                    It was also really fun to know the
landmark in my design career                                                                    building names and their history
that I plan to use for a long                                                                   during the Architectural Boat Tour. To
time.                                                                                           me, it was a lot more exciting
                                                                                                knowing the buildings, and being able
With this school-study                                                                          to point them out before the tour
experience, I had the                                                                           guide could even introduce them!
opportunity to travel with my

                                                                             Chicago
design peers. I enjoy traveling                                                                 The most important thing I gained
with my peers; this trip allowed                                                                from the trip, was confidence. I’m
everyone to see each other in a
different context, outside the
                                                                               2012             usually a shy person when it comes to
                                                                                                networking. The preparation I had
classroom. When traveling I                                                                     and knowing what was in store,
believe it is important to                                                                      allowed me to overcome my shyness.
interact with various types of
people; such as, discussing local                                                               With every new travel opportunity,
dining places with locals,                                                                      my personal growth increases. During
making similar and unlikely                                                                     Chicago, my tolerance, human-
connections with locals, acting                                                                 relations and interaction, and sense
like a local to locals.                                                                         of self grew to new levels.
Recognize the benefits of student travel to Counselors,
Teachers, Administration, Students and Parents
From Lisa Woodard, my own teacher and travel mentor:

Benefits of travel:
• Exposure to different cultures, i.e. dress, food, language, behaviors
• Exposure to different environments...many of the students who traveled
  with me had never been outside of the state!
• Appreciation of history

Student interaction:
• Students tend to become a family and watch out for each other
• Students in the same school who have never spoken to each other
  become friends on trips
• Students learn to trust each other

Connections:
There were connections, both personal and curricular, that weren't
"planned“
Q&A!




Handouts to include:   Sample budget and itinerary     Publicity examples
                       Liability /Travel Suggestions   Sample syllabus

Experience and Exploration through Student Travel

  • 1.
    Experiential Career andCollege Exploration (How to Take the Headache out of, and get the most benefit from, Student Travel) “Travel brings the classroom curriculum alive, inspiring students to learn through first-hand, interactive experiences. Travel motivates students to achieve and improves academic performance. Travel teaches understanding of other people, communities and cultures. Travel offers educational opportunities for a shrinking globe. Travel helps young people gain self- confidence, a sense of independence, and a feeling that they can make a difference in the world. A group travel experience is one your participants will remember for the rest of their lives.” www.syta.org
  • 2.
    Why this subject?Why us? Jennifer Blanchard Belk, IIDA, IDEC, LEED AP • Assistant Professor of Interior Design and Academic Advisor at Winthrop University • NCIDQ Certified Designer & LEED Accredited Professional (Sustainable Design) • Masters of Art Education from VCU • Has served on admissions, scholarship, and specialization committees. Has served as faculty advisor for student organizations including Council of Student Leaders • Orientation Faculty Mentor and student leadership selection committees • ACAD (freshman success seminar) instructor • 6 years experience working closely with incoming students and parents assisting them with academic advising, college community assimilation, and exploration of career and personal development options • Chair of the University College Faculty Conference (representing segments of the university such as Honors Programs, Academic Success Center, Gen Ed Program, Career Development, International Center & Study Abroad, etc.) • Department of Design contact for study abroad students • Has planned many highly successful student trips in support of student personal, career, and curriculum development; Traveled extensively for business and pleasure!
  • 3.
    Jen’s Travels: = Lived = Visited
  • 4.
    Why this subject?Why us? Skylar Spies, Student Member, IIDA •Senior at Winthrop University. •Serves as a research assistant within the program •Narrative Writing and Empathy; 3D modeling on college campuses • President of the INDS student organization • Dean’s List • Life Scholarship and Dean's Meritorious Scholarship Recipient. • Internships include: • Carolina Business Interiors & ai Design Group • Has studied abroad through the university and has traveled extensively • Art & Architecture of Greece & Chicago Architectural/Market study
  • 5.
    Skylar’s Travels: = Lived = Visited
  • 6.
    … and whatwas the effect of travel? In class Life Long experiences Class Travel Hobbies and field Experiences and Careers trips
  • 7.
    … and whatwas the effect of travel? Educational Educational Life Long Travel Travel Love of Experiences Experiences Teaching and as a Student as a Teacher Mentoring
  • 8.
    Goals and Content: • Understand the advantages of student travel and professional/collegiate networking opportunities in student career and college preparedness • Items to consider when planning a trip • Creating student excitement and preparation • Advantages of making travel part of the curriculum • Outline suggestions for planning timeline • Understand the importance of student reflection and follow-up • Personal case studies • Q&A
  • 9.
    Understand the advantagesof student travel and professional/collegiate networking opportunities in student career and college preparedness Student & Youth group travel is on the rise • In a 2005 survey, of students indicated they had taken an overnight group trip independent of their family. • In a repeat survey in 2007, this number increases to 76.1%. Travel Improves Achievement • 86.8% of parents surveyed say that student group travel is an essential part of their child's education experience. • 58.4% have seen a positive change in their child's academic performance. Source: Student and Youth Travel Research Institute, Michigan State University, 2005 and 2007
  • 10.
    Travel is a form of learning Travel is a Travel is a source of career The World Youth way of Student & socializing development Educational Travel states that for young individuals: Travel is a Travel is a form of means of discovering self- other development cultures
  • 11.
    May of 2011,a survey sampled people between the ages of 21 and 69 years old. • 300 people who had traveled to a country outside the U.S. or Canada on a school sponsored educational tour when they were between 12-18 • 300 people who did not travel abroad on a school sponsored educational tour. Students who went on a educational tour: www.educational travelweek.com
  • 12.
    Be more successful,even in tough economic times Be more marketable to colleges and employers 61% agreed that the tour enhanced their resume when applying for college 54% agreed that the tour enhanced their resume when applying for jobs Additional findings uncovered that those who participated in an educational tour embraced more international travel in their jobs, felt part of a global community and considered themselves good global citizens.
  • 13.
    Understand the advantagesof student travel and professional/collegiate networking opportunities in student career and college preparedness What you may be able to see and do on an educational trip Hands-on trip experiences may Unique museums and may be something completely be the only way to reach attractions can drive home different than what was certain students; learning objectives accomplished on a sightseeing trip with the family. If the mission and the purpose For some types of trips, you of the trip is identified and it is Shared memory-making just don’t have the same the driving factor in selecting experience is hard to top in opportunities locally that you what to see and do, it almost creating a great bond between do in another destination. always provides new students and teachers. experiences for all students
  • 14.
    Advantages for Students…. Learning Styles Socialization & Exposure & Bonding Curiosity Engagement Reinforcement Retention Informal Learning Perspective
  • 15.
    Advantages for Teachers…. Enhanced Sense of Community Teaches Professionalism Creates an Break from Interest in New the Routine Professions Learn Something New Educational and Relaxing
  • 16.
    Items to Consider- Reasons for Tour and Types of Experiences ….. and how does that effect timeline? Specific Cultural Subject/Area of Interest Travel – Exploring a subject or topic: - Does the climate of the area dictate visit dates? - Is there a particular special event being attended? College Exploration – Visits to one or more potential colleges or universities: - Are you working around college calendars and athletics? - Are there particular recruiting events to attend? - Is there a particular group of students who might be interested? Volunteer Travel – Gaining cultural knowledge while giving of time: - Is this in reaction to a need? - Would this be combined with another non-profit group?
  • 17.
    Items to Consider- Developing your itinerary: Dates of Trip – December, Spring, Summer, Federal Holiday Weekend? • What dates/bookends are out of your control? • What special destination events dictate travel days? • Are there particular dates you DO NOT want to travel? • Balance of free vs structured activities
  • 18.
    Items to Consider- Location and events: • Investigate the use of extracurricular groups and special interest classes to assist in the research/identification of colleges and professional sites of interest • Where does the art club want to go? • Would the yearbook staff benefit from a professional workshop with other schools attending? • Is there a special conference, tournament or trade show being hosted in a nearby larger city? • Can “piggy-backing” happen to allow for attendance of an annual event with natural or built resources nearby? What about college tours? • Look into local resources in the geographic areas of the colleges the students have interest in … is there any way to ties those visits into one fabulous student trip? Let’s see!
  • 19.
    A few ofthe colleges in the Charleston area: Citadel College of Charleston Johnson & Wales Medical College of SC Trident Tech The Art Inst of Charleston
  • 20.
    Winthrop University: College ofArts and Sciences College of Business Administration Richard W. Riley College of Education College of Visual and Performing Arts
  • 21.
    Visual and PerformingArts in Charlotte: Education in Charlotte: Business in Charlotte in Charlotte: Arts & Sciences in Charlotte:
  • 22.
    Items to Consider- Co-sponsors and Chaperones: All chaperones should have some experience with students either as teachers, school administrators or some other educational, professional venue. Initial recruiting should include the following: - Experience in working with adolescents - Willingness to help plan and facilitate - Ability to attend all pre-tour meetings - Assist with documentation such as obtaining passports and visas - Prepared to spend money on items not covered in the free spot such as food - Ability to chaperone small groups of students on flights if the flights are split - Following all tour guidelines in respect to expectations such as an alcohol policy www.studenttraveldirectory.com
  • 23.
    Items to Consider- Tour Director vs DIY: Advantages of DIY • Customize to your understanding of Advantages of a Tour Company goals and student needs • Connection with travel association • No additional costs for traveling with • Experience with this specific tour tour director • Ability to combine with similar groups • Individual negotiating power with • Holistic insurance coverage separate vendors & take advantage of • Earlier arrangement of special events multiple returning customer advantages • Total autonomy on itinerary & scheduling
  • 24.
    Items to Consider– Funding: Explore partnership opportunities with colleges and professional/service organizations to assist in planning and funding Annual events allow for multiple preplanned activities associated with event: Conferences and workshops Markets Career fairs Funding options: Rotary International and other service organizations Student Youth Travel Association Foundation and “Road Scholarship” Conference or event volunteerism
  • 25.
    Items to Consider– Budget: Strategies & Tips: • Book flight at lowest cost possible using government/group discounts! • Negotiate with hotels for rates and don’t just rely on online availability! • Explore alternate airports even if it means going the night before! • The least expensive ground transportation just might be a limo! • Take advantage of public transportation! • Group tours means cheaper rates, no lines and no random people! • “Renting” of extra hotel space to appropriate adults! • Keep slight overage year to year! • Utilizing historic data & maintain records of estimated vs actual costs • Be as all inclusive as possible and clearly indicate what is not included
  • 26.
    Items to Consider– Dining: •Group reservations? •Handling payment? •Being authentic! •Making students aware of options!
  • 27.
    Items to Consider– Hotel: •Location, Location, Location! •Convenience to public transportation •Safety in area and hotel •Cancelation and reduction of needed rooms fees •Included meals and services (transport?) •Perks for Leaders? SHOPPING! •Be authentic! •Change it up! NIGHTLIFE! MARKET! ARCHITECTURE! CULTURE!
  • 28.
    Items to Consider– Recruitment: Student enthusiasm for travel – Cater to Humor and Pop Culture!
  • 29.
    Student enthusiasm fortravel - Accumulate interest info: • Get previous student travelers in on the recruiting • Hold interest meetings at times of maximum availability for students and parents • Make all recruitment and trip info available online via social media (Facebook event or LinkedIn Group) or by creating an online web page of tour pictures/comments • A school-wide assembly focused on this and other tours Once enrolled, if not part of actual class, plan monthly meetings to allow for students and parent to acquire comfort levels, teacher to present preparatory information, and students to bond with travel-mates
  • 30.
    Student preparation fortravel: Geographic orientation and public transportation: • Give students information and training in the daily logistics of inner-city travel, traveling abroad, way-finding, etc. Packing: • Provide general packing tips for students as well as those specific to the mode of transportation, location and climate of trip, types and level of professionalism of events attending, etc. Safety: • Cover general and specific safety tips in writing and as in-class discussions assisted by students who have traveled before!
  • 31.
    Simple ways tohelp your students and youth get the most out of their trip: • Think about what you want your students to get out of the trip, and discuss these things with your tour operator or travel mentor so they have the same understanding as they offer guidance on your itinerary. • Rely on your tour operator to advise interactive activities during the trip that tie directly to your curriculum. • Prep your students ahead of time. Visiting an art museum in Madrid or Chicago will have much more meaning and impact if your students know what they are seeing. Many attractions are happy to send you curriculum materials that you can use prior to your visit. • Bring in experts on subjects that are particularly important. An excellent speaker is easier to find than you might think- local colleges, museums, historic sites and societies all have experts on a wide range of topics. www.syta.org ….if any way possible … MAKE IT A CLASS!!!
  • 32.
    A successful coursein preparation for group travel: Ethnic Areas of Course should facilitate teamwork/camaraderie Chicago among travelers: • The more time students can spend together “We all should know that diversity makes for a rich tapestry, and we must understand that all beforehand, the better. the threads of the tapestry are equal in value no matter what their color.” • Create opportunities for various forms of bonding ~ Maya Angelou and teambuilding Course/Lesson Methodology: • Multiple/varied group activities (shuffle groups to promote mingling within group!) • Student selected research • Student led discussions Utilization of technology • Multimedia (Video tours, Google Earth, YouTube) • Student sourced apps for travel locations
  • 33.
    Case Study –Chicago Architectural and Market Study: Students take on an in-depth study of the historic and contemporary architecture of Chicago, the role of the NeoCON World’s Trade Fair in contemporary interior design, and the design and architectural leaders that have influenced them both. The class culminates in a 6 day group trip to Chicago and to NeoCON International Commercial Furnishings Market. Course Topics: •Understanding the location and geography of Chicago •Introduction to Chicago History and its effects on future Architecture •Chicago Historic and Contemporary Architecture (and the architects and schools of thought behind it) •Market History, the NeoCON Merchandise Mart and its influence over design •Logistics: •Navigating Chicago and the Market •Professionalism and Networking •Packing for professional travel •Safety and travel logistics Teaching Methods: •Class lecture/discussion via PowerPoint, video and visuals (both instructor and student led) •Text reading assignments •Video and online references
  • 34.
    Case Study –Chicago Architectural and Market Study - The Class: Group/Partner Class Projects •Movements of Architecture Represented in Chicago & Chicago Public Art •Significant National Firms (represented in Chicago) and their importance in industry •Industry and vendor leaders; Best of NeoCON design award winners •Additional Area Tourism Opportunities •Components: Written reports; Multi-Media / Powerpoint presentations; Handouts for classmates; Presentation to and discussion with classmates Assessment/Test •Identification of significant buildings and city zones •Essay regarding given building and the school of design •Essay regarding significant event in city history and its effect on architecture and development Market Assignment (Scavenger Hunt) •Identification and discussion of stand-out products identified at market as well as influential contacts made Post Market Reflection Paper •Reflection on what students learned and how they grew through travel, market, tourism, social experiences and how what they did affected their future course and professional work.
  • 35.
    Case Study –Chicago Architectural and Market Study - Trip Experiences: Art/Architecture •Tour of Gensler office (LEED Platinum space) •Art Institute Museum •Architectural Riverboat Tour •Frank Lloyd Wright Home and Studio Tour •Oak Park Neighborhood Tour Private Showroom Tours Additional Market/Conference Experiences •Independent Market Time •Industry Hospitality Functions •IIDA Panel - Career Boot Camp •ASID Career Exchange •Meet the President’s Day Independent and/or Travel Related Experiences •Free time for independent activities / Tourism/ Museums •Group social activities
  • 36.
    Case Study –Chicago Architectural and Market Study - Itinerary: Fri June 8th Morning: Travel Afternoon: Check In; Architectural Boat tour Evening: Free Time (Blues Fest!) Sat June 9th Morning: Free time (Walking tours, Robie House, etc.) Afternoon: Free time (Walking tours, Robie House, etc.) Evening: Navy Pier; Group Dinner Sun June 10th Morning: Frank Lloyd Wright/Oak Park Tours Afternoon: Free Time / IIDA International Meeting Evening: Market Tours & Hospitality / Free Time Mon June 11th Morning: Art Institute Museum Afternoon: NeoCON Market (tours and elective seminars) Evening: Market Tours & Hospitality / Free Time Tues June 12th Morning: Tour of Design Firm Afternoon: NeoCON Market (tours and elective seminars) Evening: Market Tours & Hospitality / Free Time Wed June 13th Morning: Student NeoCON Conference Afternoon: Check out Evening: Travel (Market Assignment due)
  • 37.
    Case Study –Chicago Architectural and Market Study - Budget: Student Cost = Approx $825; Included: • Hotel cost (4 to a room) • Airfare & baggage fees • All tours & museum fees • Rail costs (week pass) • Airport transportation • Market/conference • Some hospitality (related to conference)
  • 38.
    Case Study –Chicago Architectural and Market Study: STUDENT SATISFACTION/SUCCESS OF COURSE Overall, student evaluations were very positive. They enjoyed the preparation for as well as the actual travel experience. The majority felt the exposure to market increased their ability to be successful on future projects and exposed them to a broad range of commercial products and manufacturers. They took advantage of more independent networking opportunities and continued contact with these professionals after the conference. Students grew from not only the design based activities but also matured from the autonomy of subway travel and free time they took advantage of. Students especially enjoyed the group projects, the open discussions, and learning about the architecture/neighborhoods in order to be able to better navigate and understand the city. Additionally, meeting more extensively prior to the trip allowed the students to bond more (students represented different academic years) and the instructor to have time to tailor certain portions of the experience to individual students.
  • 39.
    Case Study –Art and Architecture of Greece: • Designed for all students who are excited to travel, want to experience another culture and the objects they create The Class: • Investigate the visual art, design and architecture of ancient Greece placing emphasis on the relationship of these forms to Greek society, culture and religion The Trip: • Explore ancient sites and museums at the Acropolis in Athens, Delphi, Olympia, Sounion, Eleusis and Mycenae as well as the ancient theatre at Epidaurus and the ancient graveyard of Kerameikos. • Explore contemporary culture through food, Greek dancing, a visit to the remarkable St. Paul’s Nunnery and a stop the Peza Olive Oil Cooperation. • Go by ferry to the island of Crete, with its ancient royal palace architecture, Roman catacombs and wonderful beaches to explore.
  • 40.
    Case Study –Art and Architecture of Greece: The Art of Greece is a rigorously academic course that combines traditional classroom lectures with a two-week travel component. This format is a way of intellectually and culturally enriching students’ learning experiences. Exposure to different cultures globally brings an appreciation of difference within our own society, and, ultimately, makes us better citizens, both nationally and globally. _______________________________________________________________________________
  • 41.
    Case Study –Art and Architecture of Greece – The Class: 7 Session Course: Season 1 Introduction, The Minoans Session 2 Travel report, The Mycenaeans/Dark Ages Session 3 Travel report, Archaic/ 5th Century Session 4 Travel report, 5th Century/4th Century Session 5 Travel report, Hellenistic Session 6 Travel report, Mythology Presentations Session 7 Travel report, Review for Final Exam, Group Dinner Assignments: Travel Report- Travel Topics Mythology Presentations – Greek God Topics Research Paper- Greece Site Topics Final Exam On Site Presentation based off Research Paper
  • 42.
    Case Study –Art and Architecture of Greece – Trip Itinerary: Day 1. ATHENS ARRIVAL - Welcome Group Dinner in local Greek food restaurant Day 2. ATHENS - Acropolis and the New Acropolis Museum (the Roman and Greek Agora ) National Archaeological Museum Day 3. ATHENS – SOUNION - Temple of Olympian Zeus, Syntagma Square, Aegaleo: Kerameikos Sounion : Temple of Poseidon, Lavrion: St. Paul’s Nunnery Day 4. ATHENS – DELPHI - Delphi the site of the Oracle & museum, Group Dinner; Arachova, a picturesque mountain village Day 5. DELPHI – OLYMPIA - Nafpaktos, cross over to Rion/Antirion Bridge, town of Olympia: Archaeological Museum of Olympia, Group Dinner Day 6. OLYMPIA – NAUPLION - The site of Olympia that the first Olympic Games took place; Nauplion visit the Site of Tiryns Day 7. NAUPLION – EPIDAURUS – MYCENAE - Epidaurus, to visit of the famous ancient open-air theatre. Mycenae, the Citadel, Lions Gate, Tomb of Atreus & museum. Day 8. NAUPLION – PIRAEUS – HERAKLION - Morning visits & Free time in Nauplion. Suggestions: Archaeological Museum of Nauplion the Palamidi Castle or Bourtzi island. local winery (Skouras winery) for wine tasting and tour of the facilities. Return to Athens to visit Eleusis. the port of Piraeus for overnight ferry to Heraklion, the capital of Crete Day 9. KNOSSOS – ARCHANES – HERAKLION - Heraklion Archaeological Museum the Knossos Minoan Palace) Peza Cooperation, a winery and olive oil factory, buy Cretan Olive oil. Picturesque village of Archanes Group Dinner at “Ladadika” tavern in Heraklion for traditional specialties. Day 10. GORTYNA – PHAESTOS – MATALA – CHANIA – ATHENS (visit Gortys and Phaestos) - The Royal Minoan Summer palace. Matala for lunch and swim opportunity. Flight back to Athens then USA
  • 43.
    Case Study –Art and Architecture of Greece – Reflection: Here’s what student travelers had to say…. “A great way to prepare for foreign travel” “First of all, I wanted to thank you for this experience. I can't say how affected I was by seeing the world from such a new and different angle. I really have trouble finding the words. I guess I can only say that I'll be going back one day, even if I have to go on a super low budget. Europe got a hold on me, for sure!” “I appreciated having learned so much about Greece before going there. There's something else that will be hard to repeat….singing at Epidaurus was really overwhelming, in a good way, so thank you for that!” “An experience I won't forget! And I mean, ever. EVER.” “Thanks for showing me the world!! I had an awesome time -- it was an eye-opening experience.” “I AM READY TO GO BACK TO GREECE!!!”
  • 44.
    Outline suggestions for- Your planning timeline: 12 months prior • You should have chosen your location by now. • Start setting departure and return dates for the trip, so people can clear their calendars for the date of the trip well before departure. • Determine who will be your additional chaperones. • You will begin to contact airlines and hotels and motor coaches now, as they work 11-12 months in advance. • Start promoting the tour through email, brochures, posters, social media and other outlets.
  • 45.
    Outline suggestions for- Your planning timeline: 6-9 months prior • You should start to see the early participants signing up with deposits paid. • Create a list of reading materials and study exercises to prepare students during the trip. • If a passport or visa is required, now is the time to apply for them. 4 months prior • Continue to promote the trip in newsletters, social media, etc. to keep interest alive for those who have already signed up. • Contact people who have shown interest but not yet committed. 3 months prior • This is deadline for the final payments for those that have paid their deposits. • Arrange transportation to and from the airport. • Students should start picking roommates for the hotels.
  • 46.
    Outline suggestions for- Your planning timeline: 1 month prior • To ensure everyone is ready for departure, schedule a last minute meeting to: • Confirm trip details. • Go over packing lists. • Review all expectations regarding timeliness and student behavior as have students sign agreements. • Have the students fill our emergency contact cards to keep on file, along with any allergy or medical information you should know. • Make sure the parents have your information as well of they need to contact you for any reason.
  • 47.
    Understand the importanceof student reflection and follow-up… Reflection is an integral part of John Dewey (1933) found education learning from an abroad experience. to be deeply rooted in experience, Reflection is defined as “the and that these experiences often intentional consideration of an create controversy that, if not experience in light of particular reflected upon, can be misleading. learning objectives” (Hatcher & Bringle 1997). Through adviser-encouraged reflection, the adviser will be aware of whether or not the learning outcomes were met. Reflection allows for verbalization of stereotypes, problems, misconceptions, challenges, and highlights. http://educationaltourism.org/why-us.html
  • 48.
    The Chicago classwas a I felt like learning about the buildings gave me After traveling to Chicago, I realize beneficial and exciting excellent foundation to use in my navigation of the my personal comfort level for larger experience for me. As a result of cities and my willingness to roam city. When I first arrived in Chicago, I felt extremely this class, I walked away from them by myself at any time of the day Chicago with new ideas, new shocked by the size of the city. No picture could really has increased significantly. I have contacts and no regrets. I feel as do this city justice. However, once I was able to learned I am attuned to my though I was able to fully ground myself and began to remember what I had surroundings and have a strong sense experience this city as well as learned in class, using major buildings and public of direction in any setting. conquer Neocon on my first try. artworks made it easy for me to find my way This trip has become a throughout Chicago. It was also really fun to know the landmark in my design career building names and their history that I plan to use for a long during the Architectural Boat Tour. To time. me, it was a lot more exciting knowing the buildings, and being able With this school-study to point them out before the tour experience, I had the guide could even introduce them! opportunity to travel with my Chicago design peers. I enjoy traveling The most important thing I gained with my peers; this trip allowed from the trip, was confidence. I’m everyone to see each other in a different context, outside the 2012 usually a shy person when it comes to networking. The preparation I had classroom. When traveling I and knowing what was in store, believe it is important to allowed me to overcome my shyness. interact with various types of people; such as, discussing local With every new travel opportunity, dining places with locals, my personal growth increases. During making similar and unlikely Chicago, my tolerance, human- connections with locals, acting relations and interaction, and sense like a local to locals. of self grew to new levels.
  • 49.
    Recognize the benefitsof student travel to Counselors, Teachers, Administration, Students and Parents From Lisa Woodard, my own teacher and travel mentor: Benefits of travel: • Exposure to different cultures, i.e. dress, food, language, behaviors • Exposure to different environments...many of the students who traveled with me had never been outside of the state! • Appreciation of history Student interaction: • Students tend to become a family and watch out for each other • Students in the same school who have never spoken to each other become friends on trips • Students learn to trust each other Connections: There were connections, both personal and curricular, that weren't "planned“
  • 50.
    Q&A! Handouts to include: Sample budget and itinerary Publicity examples Liability /Travel Suggestions Sample syllabus

Editor's Notes

  • #2 JB
  • #3 JB
  • #4 JB
  • #5 SS
  • #6 SS
  • #7 JB
  • #8 JB
  • #9 JB - As educators, we have all heard the excuses for not doing extensive field trips, new course development, student travel and professional involvement. Overworked faculty are typically not paid to undertake additional leadership of extensive student activities. However, with creativity and forward thinking, any faculty member can turn a trip to market or an annual conference into a course for credit and a fulfilling venture for themselves and the students. My intent in this presentation is to walk participants through a suggested step-by-step process for developing, marketing and executing a course and study trip for students.
  • #10 JB
  • #11 SS
  • #12 SS
  • #13 SS
  • #14 SS
  • #15 SS
  • #16 SS
  • #17 JB
  • #18 JB
  • #19 JB
  • #20 SS
  • #21 SS
  • #22 SS
  • #23 JB
  • #24 JB
  • #25 JB
  • #26 JB
  • #27 JB
  • #28 JB
  • #29 SS
  • #30 SS
  • #31 SS
  • #32 JB
  • #33 JB
  • #34 JB
  • #35 JB
  • #36 JB
  • #37 JB
  • #38 JB
  • #39 JB
  • #40 SS
  • #41 SS
  • #42 SS
  • #43 SS
  • #44 SS
  • #45 JB
  • #46 JB
  • #47 JB
  • #48 JB
  • #49 SS
  • #50 The benefits of travel for the students themselves are undeniable. However, such endeavors can reap immense reward for educators. Structured coursework associated with travel can give faculty the financial assistance allowing them to attend conferences and experience new cities. These efforts may also assist in service/teaching requirements for tenure and promotion. Faculty can take advantage of important networking opportunities as well as form deeper and more meaningful connection to students and other faculty members. The course content itself requires minimal faculty preparation and, as with all new courses, it gets easier each time it is taught!