Closing Cockpit

       Presented by
Ganesh Shankar, MBA,CPA
Agenda
• Over view of Closing cockpit
• Comparison of closing cockpit with
  Schedule manager
• Configuration of closing cockpit
• Execution of closing cockpit ( Demo)
• Q&A
Closing Cockpit
• One common status tracking mechanism
• Common templates and guidelines that
  every one can use
• Ability to assign roles and responsibilities
  for each task
• Dependency information related to closing
  process
Availability of Closing Cockpit
• ECC 5.0
• ECC 6.0
• Not available in earlier versions of R/3
• Migration from Schedule Manager to Closing
  Cockpit possible, although there is no SAP
  standard available for such migration
• SAP supports both Schedule Manager and
  Closing Cockpit as of now. Future direction
  towards Closing Cockpit.
Schedule Manager Vs Closing
Cockpit
• Schedule Manager is also available in R/3, while Closing
  Cockpit is available in ERP 2005 and Net Weaver 7.1
  onwards.
• Closing Cockpit is more attuned to the present day ERP
  closing process per se and is an extension of the
  schedule manager
• Closing Cockpit is based on the concept of Central
  Process Scheduler (CPS)
• Closing Cockpit is the latest functionality introduced in
  SAP ERP 2005 and similar to Process Chain in Net
  weaver.
• Schedule Manager is client based, while Closing Cockpit
  can be used across multiple instances.
• Closing Cockpit can also be used for Planning, while
  such facility is not available in SM.
Month-End Closing Processes
• Opening of new posting period by vendor, customer,
  assets and GL.
• Final goods issue
• Final invoice posting
• Depreciation run
• Settlement of assets under construction (AuC) to assets
• Cost assessments and distributions
• Accruals and provisions.
• Salary journals
• Currency Revaluation
• Reconcile ledgers
• Consolidation activities
• Budgetary cycle administration.
Configuring Closing Cockpit:
Process Flow
Components of Closing Cockpit
• Organizational Hierarchies (Company Codes,
  Controlling Area, Operating Concern, etc)
• Task List template (Preconfigured templates
  available)
• Task Lists: Derived from template and extremely
  crucial for successful definition of the month-end
  close.
• Dependencies between the tasks
• Monitor
• Detailed information
5 steps for setting-up Closing
Cockpit
• Conduct Planning and Research
• Create the basic template data
• Build the closing template hierarchy
  structure
• Configure individual tasks
• Change the template to an executable
  task list
Step 1: Conduct Planning and
Research
• Understanding the existing closing process from
  start to end
  –  Tasks to be performed
  –  The order of performing the tasks
  –  Who owns the task
  –  Who executes the task
  –  Who reviews and approves the results after the task
    is completed
  – How long the task takes to complete (run time)
  – The post-close audit requirements
Step 2: Create a basic template
data
• Provides formal structure for the organizational
  hierarchy, closing tasks in the form of lists, and
  ownership of the task by identifying the
  individual task owners.
• Controlling the order of precedence or sequence
  of the individual task execution.
• By configuring the Closing Cockpit template, you
  set up the basic closing model that the system
  copies to a date-specific task list during the
  closing process.
• Configuration T.code: CLOCOC
Step 3. Build the closing template
hierarchy structure
• Starts with the construction of a hierarchy
  of task folders
• Then assign organizational structures to
  the created task folders.
Step 4. Configure individual tasks
• Initial decisions to consider the nature of tasks, who is responsible,
  and what organizational structures the task affects.
• If a task is required that affects all organizational structures within a
  client, you should configure it and attach it to a folder in which
  you’ve assigned all controlling areas.
• Finally, consider those tasks that are relevant only for the individual
  company codes. Configure and assign tasks to the individual folders
  in which you have formally assigned individual company codes.
• The first section of the task configuration screen requires the names
  of the task (text entry), task owner (responsible block), and
  responsible party who executes the actual task.
• Identify the actual type of task. Within this option, you need to set
  individual tasks as actual programs with no variant assigned,
  programs with job variants assigned, transaction codes, memo
  entries, flow definitions, or remote tasks using CPS.
Differences between various task
types
•   Program without variant
•   Program plus a job variant assigned
•   Transaction
•   Remote task using CPS
Step 5. Change the template to an
executable task list
•   Now that you have completed the template you can copy the
    template into an executable form or a date-specific task list.
•   You also need to identify the Closing Type (in this example
    monthly [M]), Posting Period (11), Fiscal Year (2008), task list
    Status (Released), and the person responsible for the task list.
•   After you copy the template to a date-specific task list and set the
    status to Released, it becomes executable and the system
    schedules the individual task to exact calendar days and day-
    specific time frames.
Note
• Although it is possible to set up multiple task lists
  tied to different dates, the status setting controls
  when the task list becomes executable. You can
  only execute the task list after the task list owner
  changes the status to Released. If you choose
  to set up multiple task lists for an entire year,
  you would only set the single task list that you
  would use for a particular month to Released.
  You could review all other date-specific task
  lists, but could not execute them. Other task list
  status settings are: Not Released, Released,
  Active, and Closed.
Differences Between Templates
and Task Lists
• Templates allow for configuration of various tasks but
  cannot execute any task. The task list is not configurable
  but allows for the execution of the various tasks.
• Task lists are copies of single cockpit templates. You
  should configure cockpit templates to allow for repeated
  use, with little or no changes from period to period.
• You configure tasks within the template and cannot
  change them within the task list
• You initially schedule tasks within the template, but you
  can reschedule them within the task list if required
• It is possible to create sequences of date-specific task
  lists by selecting the menu option Create Task Lists.
  This is useful if you wish to create an entire year’s worth
  of task lists at one time.
Notes
• For delivering the Closing Cockpit
  successfully, you need to have a clear
  understanding of the current closing
  routines, the required tasks, who is
  responsible for each task, which tasks
  when executed should affect which level
  of the organization, and finally a clear
  process for review and documentation.

More Related Content

What's hot

2007 how to use sap project system for revenue recognition in professional se...
2007 how to use sap project system for revenue recognition in professional se...2007 how to use sap project system for revenue recognition in professional se...
2007 how to use sap project system for revenue recognition in professional se...
Soumya De
 
About work flow
About work flowAbout work flow
About work flow
Narender Singh
 
Basic Functionality and Integration of PS SAP
Basic Functionality and Integration of PS SAPBasic Functionality and Integration of PS SAP
Basic Functionality and Integration of PS SAP
Noveco Systems Pty.Ltd
 
Sap Bpc and its Benefits
Sap Bpc and its BenefitsSap Bpc and its Benefits
Sap Bpc and its Benefits
joeyparkker
 
04 01 workplace inbox
04 01 workplace inbox04 01 workplace inbox
04 01 workplace inboxtflung
 
Basics of sap
Basics of  sapBasics of  sap
Saphelp crm50 en_43_ec101d15a0025ae10000000a1553f7_content
Saphelp crm50 en_43_ec101d15a0025ae10000000a1553f7_contentSaphelp crm50 en_43_ec101d15a0025ae10000000a1553f7_content
Saphelp crm50 en_43_ec101d15a0025ae10000000a1553f7_content
Santhoshakumar Chelliah
 
Fico interview questions and answers
Fico interview questions and answersFico interview questions and answers
Fico interview questions and answersProcessweaver Hr
 
R12.2.2 oracle projects cost break down structure overview
R12.2.2 oracle projects cost break down structure overviewR12.2.2 oracle projects cost break down structure overview
R12.2.2 oracle projects cost break down structure overview
Matthew Bezuidenhout
 
Ps training mannual ( configuration )
Ps training mannual ( configuration )Ps training mannual ( configuration )
Ps training mannual ( configuration )
Soumya De
 
SAP Overview and Architecture
SAP Overview and ArchitectureSAP Overview and Architecture
SAP Overview and Architecture
Ankit Sharma
 
SAP AC020 - Investment Management
SAP AC020 - Investment ManagementSAP AC020 - Investment Management
SAP AC020 - Investment Management
Vannak9
 
Project system overview
Project system overviewProject system overview
Project system overview
Amlan Sarkar
 
Sap Purchase Order Workflow
Sap Purchase Order WorkflowSap Purchase Order Workflow
Sap Purchase Order Workflow
Arghadip Kar
 
Building Next Generation Apps using DSAM - session at sitHH 2014
Building Next Generation Apps using DSAM - session at sitHH 2014Building Next Generation Apps using DSAM - session at sitHH 2014
Building Next Generation Apps using DSAM - session at sitHH 2014
Tobias Trapp
 
Primavera P6 Tips and Tricks
Primavera P6 Tips and TricksPrimavera P6 Tips and Tricks
Primavera P6 Tips and Tricks
p6academy
 
NAV 2016 Workflow
NAV 2016 WorkflowNAV 2016 Workflow
NAV 2016 Workflow
Roberto Stefanetti
 
How Business processes supported in BPM vs ERP
How Business processes supported in BPM vs ERPHow Business processes supported in BPM vs ERP
How Business processes supported in BPM vs ERP
Logan Vadivelu
 

What's hot (18)

2007 how to use sap project system for revenue recognition in professional se...
2007 how to use sap project system for revenue recognition in professional se...2007 how to use sap project system for revenue recognition in professional se...
2007 how to use sap project system for revenue recognition in professional se...
 
About work flow
About work flowAbout work flow
About work flow
 
Basic Functionality and Integration of PS SAP
Basic Functionality and Integration of PS SAPBasic Functionality and Integration of PS SAP
Basic Functionality and Integration of PS SAP
 
Sap Bpc and its Benefits
Sap Bpc and its BenefitsSap Bpc and its Benefits
Sap Bpc and its Benefits
 
04 01 workplace inbox
04 01 workplace inbox04 01 workplace inbox
04 01 workplace inbox
 
Basics of sap
Basics of  sapBasics of  sap
Basics of sap
 
Saphelp crm50 en_43_ec101d15a0025ae10000000a1553f7_content
Saphelp crm50 en_43_ec101d15a0025ae10000000a1553f7_contentSaphelp crm50 en_43_ec101d15a0025ae10000000a1553f7_content
Saphelp crm50 en_43_ec101d15a0025ae10000000a1553f7_content
 
Fico interview questions and answers
Fico interview questions and answersFico interview questions and answers
Fico interview questions and answers
 
R12.2.2 oracle projects cost break down structure overview
R12.2.2 oracle projects cost break down structure overviewR12.2.2 oracle projects cost break down structure overview
R12.2.2 oracle projects cost break down structure overview
 
Ps training mannual ( configuration )
Ps training mannual ( configuration )Ps training mannual ( configuration )
Ps training mannual ( configuration )
 
SAP Overview and Architecture
SAP Overview and ArchitectureSAP Overview and Architecture
SAP Overview and Architecture
 
SAP AC020 - Investment Management
SAP AC020 - Investment ManagementSAP AC020 - Investment Management
SAP AC020 - Investment Management
 
Project system overview
Project system overviewProject system overview
Project system overview
 
Sap Purchase Order Workflow
Sap Purchase Order WorkflowSap Purchase Order Workflow
Sap Purchase Order Workflow
 
Building Next Generation Apps using DSAM - session at sitHH 2014
Building Next Generation Apps using DSAM - session at sitHH 2014Building Next Generation Apps using DSAM - session at sitHH 2014
Building Next Generation Apps using DSAM - session at sitHH 2014
 
Primavera P6 Tips and Tricks
Primavera P6 Tips and TricksPrimavera P6 Tips and Tricks
Primavera P6 Tips and Tricks
 
NAV 2016 Workflow
NAV 2016 WorkflowNAV 2016 Workflow
NAV 2016 Workflow
 
How Business processes supported in BPM vs ERP
How Business processes supported in BPM vs ERPHow Business processes supported in BPM vs ERP
How Business processes supported in BPM vs ERP
 

Viewers also liked

SAP Financial Closing Cockpit
SAP Financial Closing CockpitSAP Financial Closing Cockpit
SAP Financial Closing Cockpit
Surya Padhi
 
Shell brings Consistency, Efficiency, and Transparency to the Global Financia...
Shell brings Consistency, Efficiency, and Transparency to the Global Financia...Shell brings Consistency, Efficiency, and Transparency to the Global Financia...
Shell brings Consistency, Efficiency, and Transparency to the Global Financia...
SAP Solution Extensions
 
Overcoming the Top 7 Intercompany Accounting Challenges in SAP ERP Financials
Overcoming the Top 7 Intercompany Accounting Challenges in SAP ERP FinancialsOvercoming the Top 7 Intercompany Accounting Challenges in SAP ERP Financials
Overcoming the Top 7 Intercompany Accounting Challenges in SAP ERP Financials
SAPinsider Events
 
SAP Controlling overview
SAP Controlling overviewSAP Controlling overview
SAP Controlling overviewMohamed Hani
 
La Business Intelligence per le PMI - Vantaggi ed un minimo di contesto
La Business Intelligence per le PMI - Vantaggi ed un minimo di contestoLa Business Intelligence per le PMI - Vantaggi ed un minimo di contesto
La Business Intelligence per le PMI - Vantaggi ed un minimo di contesto
Metodo spa
 
00 softing non si può migliorare ciò che non si può misurare
00 softing   non si può migliorare ciò che non si può misurare00 softing   non si può migliorare ciò che non si può misurare
00 softing non si può migliorare ciò che non si può misurare
Softing Consulting srl
 
Financial Closing in SAP S4HANA
Financial Closing in SAP S4HANAFinancial Closing in SAP S4HANA
Financial Closing in SAP S4HANARaj Kumar
 
Finance Migration to SAP S4HANA
Finance Migration to SAP S4HANAFinance Migration to SAP S4HANA
Finance Migration to SAP S4HANARaj Kumar
 
Cockpits
CockpitsCockpits
Cockpit esp
Cockpit espCockpit esp
Cockpit esp
msabry7
 
17 aerodynamic hazards ground effect
17 aerodynamic hazards ground effect17 aerodynamic hazards ground effect
17 aerodynamic hazards ground effectstansellcp
 
SAP Smart Business Cockpit for Suite on HANA (SoH)
SAP Smart Business Cockpit for Suite on HANA (SoH)SAP Smart Business Cockpit for Suite on HANA (SoH)
SAP Smart Business Cockpit for Suite on HANA (SoH)
Raja Gupta
 
Theme 1
Theme 1Theme 1
Theme 1aks29
 
Case study on aero elasticity
Case study on aero elasticityCase study on aero elasticity
Case study on aero elasticity
sanjana_ane
 
SQL Cockpit 3.1 - Overview
SQL Cockpit 3.1 - OverviewSQL Cockpit 3.1 - Overview
SQL Cockpit 3.1 - Overview
Cadaxo GmbH
 
Are Your Account Reconciliations in Good Shape?
Are Your Account Reconciliations in Good Shape?Are Your Account Reconciliations in Good Shape?
Are Your Account Reconciliations in Good Shape?
Justin Johnson
 
Space technology,ch. amarnath ,v class
Space   technology,ch. amarnath ,v classSpace   technology,ch. amarnath ,v class
Space technology,ch. amarnath ,v class
narayanagntebg
 
Increasing the ROI of SAP post-implementation
Increasing the ROI of SAP post-implementationIncreasing the ROI of SAP post-implementation
Increasing the ROI of SAP post-implementation
Raul Morales
 

Viewers also liked (18)

SAP Financial Closing Cockpit
SAP Financial Closing CockpitSAP Financial Closing Cockpit
SAP Financial Closing Cockpit
 
Shell brings Consistency, Efficiency, and Transparency to the Global Financia...
Shell brings Consistency, Efficiency, and Transparency to the Global Financia...Shell brings Consistency, Efficiency, and Transparency to the Global Financia...
Shell brings Consistency, Efficiency, and Transparency to the Global Financia...
 
Overcoming the Top 7 Intercompany Accounting Challenges in SAP ERP Financials
Overcoming the Top 7 Intercompany Accounting Challenges in SAP ERP FinancialsOvercoming the Top 7 Intercompany Accounting Challenges in SAP ERP Financials
Overcoming the Top 7 Intercompany Accounting Challenges in SAP ERP Financials
 
SAP Controlling overview
SAP Controlling overviewSAP Controlling overview
SAP Controlling overview
 
La Business Intelligence per le PMI - Vantaggi ed un minimo di contesto
La Business Intelligence per le PMI - Vantaggi ed un minimo di contestoLa Business Intelligence per le PMI - Vantaggi ed un minimo di contesto
La Business Intelligence per le PMI - Vantaggi ed un minimo di contesto
 
00 softing non si può migliorare ciò che non si può misurare
00 softing   non si può migliorare ciò che non si può misurare00 softing   non si può migliorare ciò che non si può misurare
00 softing non si può migliorare ciò che non si può misurare
 
Financial Closing in SAP S4HANA
Financial Closing in SAP S4HANAFinancial Closing in SAP S4HANA
Financial Closing in SAP S4HANA
 
Finance Migration to SAP S4HANA
Finance Migration to SAP S4HANAFinance Migration to SAP S4HANA
Finance Migration to SAP S4HANA
 
Cockpits
CockpitsCockpits
Cockpits
 
Cockpit esp
Cockpit espCockpit esp
Cockpit esp
 
17 aerodynamic hazards ground effect
17 aerodynamic hazards ground effect17 aerodynamic hazards ground effect
17 aerodynamic hazards ground effect
 
SAP Smart Business Cockpit for Suite on HANA (SoH)
SAP Smart Business Cockpit for Suite on HANA (SoH)SAP Smart Business Cockpit for Suite on HANA (SoH)
SAP Smart Business Cockpit for Suite on HANA (SoH)
 
Theme 1
Theme 1Theme 1
Theme 1
 
Case study on aero elasticity
Case study on aero elasticityCase study on aero elasticity
Case study on aero elasticity
 
SQL Cockpit 3.1 - Overview
SQL Cockpit 3.1 - OverviewSQL Cockpit 3.1 - Overview
SQL Cockpit 3.1 - Overview
 
Are Your Account Reconciliations in Good Shape?
Are Your Account Reconciliations in Good Shape?Are Your Account Reconciliations in Good Shape?
Are Your Account Reconciliations in Good Shape?
 
Space technology,ch. amarnath ,v class
Space   technology,ch. amarnath ,v classSpace   technology,ch. amarnath ,v class
Space technology,ch. amarnath ,v class
 
Increasing the ROI of SAP post-implementation
Increasing the ROI of SAP post-implementationIncreasing the ROI of SAP post-implementation
Increasing the ROI of SAP post-implementation
 

Similar to Closing Cockpit Ver6

TFS session
TFS sessionTFS session
TFS session
HeshamEzzat14
 
Tfs session
Tfs sessionTfs session
Tfs session
HeshamEzzat14
 
08_Workflows.ppt
08_Workflows.ppt08_Workflows.ppt
08_Workflows.ppt
pavankumartummala04
 
DevOps Introduction - Main Concepts Description
DevOps Introduction - Main Concepts DescriptionDevOps Introduction - Main Concepts Description
DevOps Introduction - Main Concepts Description
BrunoOliveira631137
 
11 Trng8_WorkflowAdministration.pdf
11 Trng8_WorkflowAdministration.pdf11 Trng8_WorkflowAdministration.pdf
11 Trng8_WorkflowAdministration.pdf
RatheshPriyanK1
 
SPM_UNIT-2.pptx
SPM_UNIT-2.pptxSPM_UNIT-2.pptx
SPM_UNIT-2.pptx
Sushant895574
 
Chapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterChapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapter
preetidamakale
 
Yom Institute Presentations lecture notes of project management
Yom Institute Presentations lecture notes of project managementYom Institute Presentations lecture notes of project management
Yom Institute Presentations lecture notes of project management
Abebaw31
 
CRITICAL PATH METHOD IN NETWORK.pptx
CRITICAL PATH METHOD IN NETWORK.pptxCRITICAL PATH METHOD IN NETWORK.pptx
CRITICAL PATH METHOD IN NETWORK.pptx
POOJASHREEC1
 
Software development planning and essentials
Software development planning and essentialsSoftware development planning and essentials
Software development planning and essentials
Rajesh P
 
Software development planning and essentials
Software development planning and essentialsSoftware development planning and essentials
Software development planning and essentials
Rajesh P
 
Informatica course content
Informatica course contentInformatica course content
Informatica course content
priyamohan41191
 
Informatica course content
Informatica course contentInformatica course content
Informatica course content
lakshmipriyaaka
 
Informatica course content
Informatica course contentInformatica course content
Informatica course content
rubya90
 
Informatica course content
Informatica course contentInformatica course content
Informatica course content
lakshmipriyaanka
 
Informatica Training in Chennai
Informatica Training in ChennaiInformatica Training in Chennai
Informatica Training in Chennai
THINK IT Training
 
Cmgt 410(new) Inspiring Innovation--tutorialrank.com
Cmgt 410(new) Inspiring Innovation--tutorialrank.comCmgt 410(new) Inspiring Innovation--tutorialrank.com
Cmgt 410(new) Inspiring Innovation--tutorialrank.com
PrescottLunt376
 
Ms.project brochure
Ms.project   brochureMs.project   brochure
Ms.project brochure
Zabeel Institute
 
Beit 381 se lec 11,12 - 41 - 12 mar16 - 3 & 4 of 4 - sdlc incremental and ...
Beit 381 se lec 11,12  -  41 -  12 mar16 - 3 & 4 of 4 - sdlc incremental and ...Beit 381 se lec 11,12  -  41 -  12 mar16 - 3 & 4 of 4 - sdlc incremental and ...
Beit 381 se lec 11,12 - 41 - 12 mar16 - 3 & 4 of 4 - sdlc incremental and ...
babak danyal
 

Similar to Closing Cockpit Ver6 (20)

تحليل النظم
تحليل النظمتحليل النظم
تحليل النظم
 
TFS session
TFS sessionTFS session
TFS session
 
Tfs session
Tfs sessionTfs session
Tfs session
 
08_Workflows.ppt
08_Workflows.ppt08_Workflows.ppt
08_Workflows.ppt
 
DevOps Introduction - Main Concepts Description
DevOps Introduction - Main Concepts DescriptionDevOps Introduction - Main Concepts Description
DevOps Introduction - Main Concepts Description
 
11 Trng8_WorkflowAdministration.pdf
11 Trng8_WorkflowAdministration.pdf11 Trng8_WorkflowAdministration.pdf
11 Trng8_WorkflowAdministration.pdf
 
SPM_UNIT-2.pptx
SPM_UNIT-2.pptxSPM_UNIT-2.pptx
SPM_UNIT-2.pptx
 
Chapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterChapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapter
 
Yom Institute Presentations lecture notes of project management
Yom Institute Presentations lecture notes of project managementYom Institute Presentations lecture notes of project management
Yom Institute Presentations lecture notes of project management
 
CRITICAL PATH METHOD IN NETWORK.pptx
CRITICAL PATH METHOD IN NETWORK.pptxCRITICAL PATH METHOD IN NETWORK.pptx
CRITICAL PATH METHOD IN NETWORK.pptx
 
Software development planning and essentials
Software development planning and essentialsSoftware development planning and essentials
Software development planning and essentials
 
Software development planning and essentials
Software development planning and essentialsSoftware development planning and essentials
Software development planning and essentials
 
Informatica course content
Informatica course contentInformatica course content
Informatica course content
 
Informatica course content
Informatica course contentInformatica course content
Informatica course content
 
Informatica course content
Informatica course contentInformatica course content
Informatica course content
 
Informatica course content
Informatica course contentInformatica course content
Informatica course content
 
Informatica Training in Chennai
Informatica Training in ChennaiInformatica Training in Chennai
Informatica Training in Chennai
 
Cmgt 410(new) Inspiring Innovation--tutorialrank.com
Cmgt 410(new) Inspiring Innovation--tutorialrank.comCmgt 410(new) Inspiring Innovation--tutorialrank.com
Cmgt 410(new) Inspiring Innovation--tutorialrank.com
 
Ms.project brochure
Ms.project   brochureMs.project   brochure
Ms.project brochure
 
Beit 381 se lec 11,12 - 41 - 12 mar16 - 3 & 4 of 4 - sdlc incremental and ...
Beit 381 se lec 11,12  -  41 -  12 mar16 - 3 & 4 of 4 - sdlc incremental and ...Beit 381 se lec 11,12  -  41 -  12 mar16 - 3 & 4 of 4 - sdlc incremental and ...
Beit 381 se lec 11,12 - 41 - 12 mar16 - 3 & 4 of 4 - sdlc incremental and ...
 

Recently uploaded

20240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 202420240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 2024
Matthew Sinclair
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
DanBrown980551
 
GridMate - End to end testing is a critical piece to ensure quality and avoid...
GridMate - End to end testing is a critical piece to ensure quality and avoid...GridMate - End to end testing is a critical piece to ensure quality and avoid...
GridMate - End to end testing is a critical piece to ensure quality and avoid...
ThomasParaiso2
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Albert Hoitingh
 
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Nexer Digital
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
SOFTTECHHUB
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
James Anderson
 
By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024
Pierluigi Pugliese
 
Microsoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdfMicrosoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdf
Uni Systems S.M.S.A.
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
Adtran
 
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex ProofszkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
Alex Pruden
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
danishmna97
 
Free Complete Python - A step towards Data Science
Free Complete Python - A step towards Data ScienceFree Complete Python - A step towards Data Science
Free Complete Python - A step towards Data Science
RinaMondal9
 
Large Language Model (LLM) and it’s Geospatial Applications
Large Language Model (LLM) and it’s Geospatial ApplicationsLarge Language Model (LLM) and it’s Geospatial Applications
Large Language Model (LLM) and it’s Geospatial Applications
Rohit Gautam
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
DianaGray10
 
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
Neo4j
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
Alan Dix
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
Matthew Sinclair
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
Kari Kakkonen
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
DianaGray10
 

Recently uploaded (20)

20240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 202420240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 2024
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
 
GridMate - End to end testing is a critical piece to ensure quality and avoid...
GridMate - End to end testing is a critical piece to ensure quality and avoid...GridMate - End to end testing is a critical piece to ensure quality and avoid...
GridMate - End to end testing is a critical piece to ensure quality and avoid...
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
 
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
 
By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024
 
Microsoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdfMicrosoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdf
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
 
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex ProofszkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
 
Free Complete Python - A step towards Data Science
Free Complete Python - A step towards Data ScienceFree Complete Python - A step towards Data Science
Free Complete Python - A step towards Data Science
 
Large Language Model (LLM) and it’s Geospatial Applications
Large Language Model (LLM) and it’s Geospatial ApplicationsLarge Language Model (LLM) and it’s Geospatial Applications
Large Language Model (LLM) and it’s Geospatial Applications
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
 
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
 

Closing Cockpit Ver6

  • 1. Closing Cockpit Presented by Ganesh Shankar, MBA,CPA
  • 2. Agenda • Over view of Closing cockpit • Comparison of closing cockpit with Schedule manager • Configuration of closing cockpit • Execution of closing cockpit ( Demo) • Q&A
  • 3. Closing Cockpit • One common status tracking mechanism • Common templates and guidelines that every one can use • Ability to assign roles and responsibilities for each task • Dependency information related to closing process
  • 4. Availability of Closing Cockpit • ECC 5.0 • ECC 6.0 • Not available in earlier versions of R/3 • Migration from Schedule Manager to Closing Cockpit possible, although there is no SAP standard available for such migration • SAP supports both Schedule Manager and Closing Cockpit as of now. Future direction towards Closing Cockpit.
  • 5. Schedule Manager Vs Closing Cockpit • Schedule Manager is also available in R/3, while Closing Cockpit is available in ERP 2005 and Net Weaver 7.1 onwards. • Closing Cockpit is more attuned to the present day ERP closing process per se and is an extension of the schedule manager • Closing Cockpit is based on the concept of Central Process Scheduler (CPS) • Closing Cockpit is the latest functionality introduced in SAP ERP 2005 and similar to Process Chain in Net weaver. • Schedule Manager is client based, while Closing Cockpit can be used across multiple instances. • Closing Cockpit can also be used for Planning, while such facility is not available in SM.
  • 6. Month-End Closing Processes • Opening of new posting period by vendor, customer, assets and GL. • Final goods issue • Final invoice posting • Depreciation run • Settlement of assets under construction (AuC) to assets • Cost assessments and distributions • Accruals and provisions. • Salary journals • Currency Revaluation • Reconcile ledgers • Consolidation activities • Budgetary cycle administration.
  • 8. Components of Closing Cockpit • Organizational Hierarchies (Company Codes, Controlling Area, Operating Concern, etc) • Task List template (Preconfigured templates available) • Task Lists: Derived from template and extremely crucial for successful definition of the month-end close. • Dependencies between the tasks • Monitor • Detailed information
  • 9. 5 steps for setting-up Closing Cockpit • Conduct Planning and Research • Create the basic template data • Build the closing template hierarchy structure • Configure individual tasks • Change the template to an executable task list
  • 10. Step 1: Conduct Planning and Research • Understanding the existing closing process from start to end – Tasks to be performed – The order of performing the tasks – Who owns the task – Who executes the task – Who reviews and approves the results after the task is completed – How long the task takes to complete (run time) – The post-close audit requirements
  • 11. Step 2: Create a basic template data • Provides formal structure for the organizational hierarchy, closing tasks in the form of lists, and ownership of the task by identifying the individual task owners. • Controlling the order of precedence or sequence of the individual task execution. • By configuring the Closing Cockpit template, you set up the basic closing model that the system copies to a date-specific task list during the closing process. • Configuration T.code: CLOCOC
  • 12. Step 3. Build the closing template hierarchy structure • Starts with the construction of a hierarchy of task folders • Then assign organizational structures to the created task folders.
  • 13. Step 4. Configure individual tasks • Initial decisions to consider the nature of tasks, who is responsible, and what organizational structures the task affects. • If a task is required that affects all organizational structures within a client, you should configure it and attach it to a folder in which you’ve assigned all controlling areas. • Finally, consider those tasks that are relevant only for the individual company codes. Configure and assign tasks to the individual folders in which you have formally assigned individual company codes. • The first section of the task configuration screen requires the names of the task (text entry), task owner (responsible block), and responsible party who executes the actual task. • Identify the actual type of task. Within this option, you need to set individual tasks as actual programs with no variant assigned, programs with job variants assigned, transaction codes, memo entries, flow definitions, or remote tasks using CPS.
  • 14. Differences between various task types • Program without variant • Program plus a job variant assigned • Transaction • Remote task using CPS
  • 15. Step 5. Change the template to an executable task list • Now that you have completed the template you can copy the template into an executable form or a date-specific task list. • You also need to identify the Closing Type (in this example monthly [M]), Posting Period (11), Fiscal Year (2008), task list Status (Released), and the person responsible for the task list. • After you copy the template to a date-specific task list and set the status to Released, it becomes executable and the system schedules the individual task to exact calendar days and day- specific time frames.
  • 16. Note • Although it is possible to set up multiple task lists tied to different dates, the status setting controls when the task list becomes executable. You can only execute the task list after the task list owner changes the status to Released. If you choose to set up multiple task lists for an entire year, you would only set the single task list that you would use for a particular month to Released. You could review all other date-specific task lists, but could not execute them. Other task list status settings are: Not Released, Released, Active, and Closed.
  • 17. Differences Between Templates and Task Lists • Templates allow for configuration of various tasks but cannot execute any task. The task list is not configurable but allows for the execution of the various tasks. • Task lists are copies of single cockpit templates. You should configure cockpit templates to allow for repeated use, with little or no changes from period to period. • You configure tasks within the template and cannot change them within the task list • You initially schedule tasks within the template, but you can reschedule them within the task list if required • It is possible to create sequences of date-specific task lists by selecting the menu option Create Task Lists. This is useful if you wish to create an entire year’s worth of task lists at one time.
  • 18. Notes • For delivering the Closing Cockpit successfully, you need to have a clear understanding of the current closing routines, the required tasks, who is responsible for each task, which tasks when executed should affect which level of the organization, and finally a clear process for review and documentation.