BASIC
FUNCTIONALITY AND
INTEGRATION OF PS
SAP
Prepared by the Noveco Systems Pty.Ltd
Project System is a highly
integrated module that is
majorly used for
consolidation and reports.
6 Main Steps involved in PS SAP
the project exists only for the
purpose of planning costs at
WBS (work breakdown
structure) level
COSTING
the ones that are customer-
centric
SALES
these are the projects that
receive capital funds from
investment programs
ASSETS
the projects that are focused
purely on material and logistics
MANUFACTURING
projects that do not have a plan
or that don’t receive costs
STATISTICAL
the projects that aim at
managing equipment
MAINTENANCE
FUNCTIONALITY -
PS IS USED FOR
To receive and consolidate the revenue and costs in WBS way
To act as a planning tool for scheduling the project
To act as a demand management
To act as investment and asset management
To work for logistic execution in term of procurement and scheduling
BENEFITS
YOU CAN AVAIL WITH THE PS SAP
Better management of your project
Complete cost and work to complete management
Instant integration with SAP transactions
Forecasting results for result analysis, progress analysis, reports and BI
Period sensitive forecasts
Project cost forecasts
Project variation integration into cost forecasting and budgeting
SAP PS
Contact us
Noveco Systems Pty. Ltd
info@novecosystems.com
https://www.novecosystems.com

Basic Functionality and Integration of PS SAP

  • 1.
    BASIC FUNCTIONALITY AND INTEGRATION OFPS SAP Prepared by the Noveco Systems Pty.Ltd
  • 2.
    Project System isa highly integrated module that is majorly used for consolidation and reports.
  • 3.
    6 Main Stepsinvolved in PS SAP the project exists only for the purpose of planning costs at WBS (work breakdown structure) level COSTING the ones that are customer- centric SALES these are the projects that receive capital funds from investment programs ASSETS the projects that are focused purely on material and logistics MANUFACTURING projects that do not have a plan or that don’t receive costs STATISTICAL the projects that aim at managing equipment MAINTENANCE
  • 4.
    FUNCTIONALITY - PS ISUSED FOR To receive and consolidate the revenue and costs in WBS way To act as a planning tool for scheduling the project To act as a demand management To act as investment and asset management To work for logistic execution in term of procurement and scheduling
  • 5.
    BENEFITS YOU CAN AVAILWITH THE PS SAP Better management of your project Complete cost and work to complete management Instant integration with SAP transactions Forecasting results for result analysis, progress analysis, reports and BI Period sensitive forecasts Project cost forecasts Project variation integration into cost forecasting and budgeting SAP PS
  • 6.
    Contact us Noveco SystemsPty. Ltd info@novecosystems.com https://www.novecosystems.com