Shelley Decommissioning Project Premier Oil Company Overview 
•Independent oil and gas Operating Company with corporate office in London. Established 40 years ago. 
•JV Partners in several UK (Wytch Farm, Scott & Telford, Kyle, Nelson) , Norway (Froy and Bream), West Africa and Pakistan Assets. 
•Operator in oil and gas fields offshore Indonesia and Vietnam. 
•Acquired Oilexco in 2009 - Balmoral and Shelley Operating Assets. 
•Acquired Encore in 2011. 
•Several Operated development projects underway; Solan and Catcher. 
•Several Non Operated development projects underway; Huntington and Greater Rochelle. 
•A growing organisation.
June 2012 | Page 2 
Shelley Decommissioning Project Agenda 
•Shelley Field Overview 
•Project sequence 
•Project equipment re-cycle for re-use, free issue and disposal 
•Project budget & schedule overview 
•Summary
June 2012 | Page 3 
•The Shelley field is located in block 22/2b and 22/3a, in the Central North Sea, approx 192km North East of Peterhead. 
•Originally developed by Oilexco with first oil in August 2009. 
•The estimated total recoverable reserves for the field was 20million barrels of oil. Subsea design life 3 years. 
•Unfortunately due to poor reservoir performance Cessation of Production resulted in July 2010. 
•The field was developed based on a 2 well tie back to the FPSO Sevan Voyageur. 
•Water depth 96m. 
Shelley Decommissioning Project Field Overview
June 2012 | Page 4 
•2 subsea production wellheads, xmas trees and fishing friendly structures. 
•2 dual Electrical Submersible Pumps (Schlumberger). 
•A production manifold and protection structure, containing SCM and 2 off subsea multiphase meters (Framo). 
•2km 8” production flowline trenched and buried including rock dump. 
•2.4km EHCU (OMUK) trenched with natural backfill . 
•Stabilisation mattresses. 
•2 risers from seabed to FPSO. 
•8” production riser (335m). Pliant Wave Distributed Buoyancy type design (22 buoyancy modules). Clump weights on seabed. 
•Dynamic umbilical riser (319m). Position maintained by two clump weights. 
Shelley Decommissioning Project Field Overview 
•A Leased Sevan 300 FPSO vessel with mooring lines and suction anchors. Duty holder Wood Group. 
•Oil export via shuttle tanker.
June 2012 | Page 5 
• A cylindrical vessel with a main hull diameter of 60m and an oil 
storage capacity of 300,000 barrels total fluids. 
• Living quarter (LQ) with a maximum POB of 57. 
• The top of the cargo tanks was the Main Deck. 
• The Process Decks was arranged over two levels. The process 
consisted of two-stage separation and produced water clean-up. 
Oil was routed to the cargo tanks. Gas was routed to fuel and 
flare. Produced water was cleaned-up and discharged to sea. 
• The FPSO was equipped with two offloading stations, one on the 
port side and the other to starboard. 
• The mooring system consisted of twelve anchors and mooring 
lines positioned in three clusters of four around the platform. 
• Each mooring line was fixed to the seabed by a suction anchor, a 
cylindrical steel can 6 or 7m in diameter and 15m long. 
• A design life of 25 years for the vessel hull, topside and related 
systems. 
Shelley Decommissioning Project 
Sevan Voyageur Overview 
Fluid Voyageur 
Total liquid 
[BLPD] 
50,000 
Oil 
[BOPD] 
20,000 
Water 
[BWPD] 
30,000 
Gas 
[mmscfd] 
25
June 2012 | Page 6 
•At Cessation of Production the Sevan Voyageur was depressurised, flushed clean of all hydrocarbons and made safe from production mode, in preparation for relocation. 
•The risers and mooring lines were disconnected and laid on the seabed. 
•The FPSO was towed away. 
•Several dive construction vessels were utilised to support the phased programme of activities. 
•The subsea wells were plugged and abandoned using a semi submersible. 
•The trees and wellheads were recovered and the casing cut below seabed. 
•All equipment recovered to surface was taken ashore for either refurbishment and re-use on other projects or disposal. 
Shelley Decommissioning Project Activities – Sequence of Events
June 2012 | Page 7 
14 Jul 2010 COP (Sevan Marine, WoodGroup and POUK) 
•Depressurise FPSO and prepare for topside flushing. 
17 Jul 2010 - Arrival of DSV Wellservicer (Technip) 
•Commence subsea flushing operations from wells, wellheads, jumpers, manifold and the production pipeline, until residual oil in water less than 30ppm arriving at FPSO. 
•All flushed material pumped to the FPSO for process treatment. Potential existed to transfer to shuttle tanker as part of the last cargo offload. Additional clean up of slops required onshore. 
•Similarly the hydraulic fluid and other chemicals in the umbilical flushed and returned to the FPSO. 
•Isolations in place and umbilical and riser disconnected from the topside system. Pulling heads installed ready to lower the umbilical and riser. 
•Dynamic section of umbilical cut and both risers recovered to the DSV by lowering them from the FPSO. 
•DSV removed the four protection structure legs from the trees to allow access for Sedco 704. 
Shelley Decommissioning Project Sequence of Events – Phase 1
June 2012 | Page 8 
Shelley Decommissioning Project Sequence of Events – Phase 1
June 2012 | Page 9 
Aug 2010 to May 2011 Sevan Marine (Owner Scope) 
•FPSO disconnected from moorings on 22 Aug 2010 and towed to Kristiansand for refurbishment and re-use. 
•Polyester sections of the mooring system recovered shortly after. 
•The anchor chains and suction can were recovered in May 2011 again for potential re-use (Normad Oceanic). 
Shelley Decommissioning Project Sequence of Events – Phase 1
June 2012 | Page 10 
31st Oct 2010 – Arrival of Transocean Sedco 704 
•Commencement of well P&A (22/2b – P1Z & 22/2b-P2S) 
29th Dec 2010 – Skandi Skolten SCV 
•Cut and recovery of Horizontal XMAS trees by NCA 
14th Apr 2011 – Skandi Aker SCV 
•Recovery of wellhead recovery 
Shelley Decommissioning Project Sequence of Events – Well P&A
June 2012 | Page 11 
24th May 2011 – Arrival of DSV Orelia (Technip) 
•Disconnected all control and production jumpers from the production manifold. 
•Recovered the Shelley manifold. 
•Recovered all concrete mattresses from the FPSO end. 
•Cut and recovered the rigid production pipeline at both ends up to rock dump section. 
•Recovered concrete mattresses from the manifold end. 
•A total of 120 concrete mattresses (recovered to project baskets) 
Shelley Decommissioning Project Sequence of Events – Phase 2
June 2012 | Page 12 
13th Jul 2011 – Arrival of DSV Orelia (Technip) 
•Recovered remaining mattresses. 
•Recovered well control jumpers. 
•General debris clearance. 
•Recovery of manifold protection structure. 
13th Aug 2011 – Arrival of Fugro Symphony 
•Recovered static section of umbilical and all the production jumpers. 
•Completion a side scan as-left survey of the Shelley site. 
•Post decom environmental survey to be completed by Q2 2013. 
Shelley Decommissioning Project Sequence of Events – Phase 2
June 2012 | Page 13 
Aug 2011 – Arrival of MV Amythyst Fishing Vessel 
•On behalf of SFF completed seabed trawl and verification sweep. 
Shelley Decommissioning Project Sequence of Events – Phase 2
June 2012 | Page 14 
Shelley Decommissioning Project 
Total credits from refurbishment, recycle and disposal 
Scope Item Comments 
2010 Production Riser Sold to third party for re-use 
2010 Bouyancy Module Sold to third party for re-use 
2010 Clump Weights Sold to third party for re-use 
2010 Ballast Blocks Disposal 
2010 Dynamic section umbilical Disposal 
2011 Manifold Roof Panels Disposal & scrap value 
2011 Umbilical SUTU Disposal & scrap value 
2,011 Ballast Blocks Disposal & scrap value 
2011 General Scrap (Pipe) Disposal & scrap value 
2011 Barracuda Credit Sold to third party for re-use 
2011 Buoy credit Sold to third party for re-use 
2011 Rigging Disposal & scrap value 
2,011 Control jumpers Sold to third party for re-use 
2011 Production Jumpers Sold to third party for re-use 
2,011 Umbilical end fittings In storage 
2011 Trees Sold to third party for re-use 
2011 Protection Structure Disposal & scrap value 
2011 Manifold Sold to third party for re-use 
2011 Static section umbilical Disposal 
2011 SCM Sold to third party for re-use 
2011 Concrete Matts Given to farmer to save disposal costs 
2011 Matt Baskets Sold to third party for re-use 
Total Value £4,636,928
June 2012 | Page 15 
Shelley Decommissioning Project Refurbishment and recycle
June 2012 | Page 16 
Shelley Decommissioning Project Total credits from refurbishment, recycle and disposal 
•Relatively new infrastructure allowed for refurbishment and recycle of 98% of the Shelley infrastructure. 
•2% of infrastructure was not used further ie protection structure and EHCU. 
•An inquiry for purchase of the EHCU was made 1 week prior to planned recovery. Too late for Management of Change process to be put in place in terms of offshore procedures, risk assessments and additional equipment requirements.
June 2012 | Page 17 
Shelley Decommissioning Project Budget & Schedule
June 2012 | Page 18 
•The project was completed with a small integrated team, safely and within the planned schedule and budget. 
•Significant re-cycle and re-use was achieved to support ongoing Operated and Non Operated projects. 
Shelley Decommissioning Project Summary
June 2012 | Page 19 
Voyageur Spirit on route to Huntington
Health and Safety 
Executive 
Health and Safety 
Executive 
Safety in Decommissioning 
Stewart Millar HSE Decommissioning focal-point
Presentation Structure 
•CO-REGULATION set-up 
•Decommissioning Programme - PHASES 
•PLANNING – Dismantlement Safety Case Requirements 
•LESSONS for future safety case submissions – previous assessments / project execution 
•SYSTEMS and FRAMEWORKS for lesson- learning?
Decommissioning CO-REGULATION: 
DECC 
HSE 
MCA 
MoU’s
The Decommissioning Programme 
CESSATION 
OF PRODUCTION 
COMPLETE DISMANTLEMENT Y/N? 
WELL 
ABANDONMENT 
MATERIAL 
CHANGE SC 
DISMANTLEMENT 
SC 
DEROGATION
The ‘Phases of Decommissioning’ and the Safety Case requirements 
•Reg 14.2 Material Change covers: 
–Run-down to CoP 
–Well shut-in 
–Installation hydrocarbon-free (i.e.‘dead’) 
–Partial dismantlement for ‘derogation’ 
•DECC has jurisdiction / HSE safety role 
•Still an installation if any part above sea-level 
•Reg 11 Dismantlement covers final dismantlement
PLANNING: ‘FINAL’ Dismantlement SC Requirements 
•Reg 11 (SCR05) 
•(DECC) Decom Program 
•Safety Case submission (HSE) 
•Schedule 5 contains details of a Reg 11 Safety Case.
DECOMMISSIONING UP-FRONT PLANNING Schedule 5 Requirements: 
•Start & End dates of dismantlement plan 
•Safety Reps consultation re. work plan 
•Max. no. of persons on ‘installation’ during work 
•General duty for protection of these persons from F&E, and provision of ER 
•Toxic gas protection arrangements 
•HOW Installation & plant to be dismantled
Knowledge Capture 
•Capturing lessons learned 
•Culture of collaboration 
•Cost and Availability considerations 
•Metocoean restrictions 
•Co-regulation with ‘Beach’
FURTHER WORK – knowledge capture from previous dismantlements 
•Project Management 
•Human Factors 
•Communication 
•‘Piece Small’ versus Heavy Lift 
•Contractualisation 
•NO ‘ONE SIZE FITS ALL’ APPROACH
Experience-based LEARNING 
•All installations are unique 
•Have some common elements 
•Face some common hazards 
•Need to be mindful of what can go wrong 
•Applying lessons learnt
Working Groups 
•DTLG …Regulators Forum 
•Decom North Sea …Northern Sector UKCS 
•ODFOS … Southern Sector UKCS
Message 
•Schedule 5 (SCR05) provides framework for planning 
•Knowledge capture from previous projects 
•Working groups - Shared database - Communication and Coordination?
Contact Details 
Stewart Millar HSE Structural Specialist Lord Cullen House Fraser Place Aberdeen Email:- Stewart.millar@hse.gsi.gov.uk Tel. 01224 252588 Mob 07768 237142

More Related Content

What's hot

nickel laterite dep phil
nickel laterite dep philnickel laterite dep phil
nickel laterite dep philArjaylyn Babala
 
Reserve Estimation of Initial Oil and Gas by using Volumetric Method in Mann ...
Reserve Estimation of Initial Oil and Gas by using Volumetric Method in Mann ...Reserve Estimation of Initial Oil and Gas by using Volumetric Method in Mann ...
Reserve Estimation of Initial Oil and Gas by using Volumetric Method in Mann ...ijtsrd
 
Offshore oil platform ppt
Offshore oil platform  pptOffshore oil platform  ppt
Offshore oil platform pptsoumikghosh49
 
Oil Production Facilities
Oil Production FacilitiesOil Production Facilities
Oil Production FacilitiesInGu Lee
 
Introduction to offshore structures
Introduction to offshore structuresIntroduction to offshore structures
Introduction to offshore structuresNitish Anand
 
optimisation of depth of opencast coal mine using udec software
optimisation of depth of opencast coal mine using udec softwareoptimisation of depth of opencast coal mine using udec software
optimisation of depth of opencast coal mine using udec softwarejai jain
 
Oil And Gas Processing
Oil And Gas ProcessingOil And Gas Processing
Oil And Gas Processingmubarak2009
 
LOST CIRCULATION - THE BASICS
LOST CIRCULATION - THE BASICSLOST CIRCULATION - THE BASICS
LOST CIRCULATION - THE BASICSMohan Doshi
 
Artificial lift technology
Artificial lift technologyArtificial lift technology
Artificial lift technologyjosepazv
 
Offshore Structures Presentation
Offshore Structures PresentationOffshore Structures Presentation
Offshore Structures Presentationsurya3303
 
Unconventional Petroleum
Unconventional PetroleumUnconventional Petroleum
Unconventional PetroleumM.T.H Group
 
Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4Aijaz Ali Mooro
 
Hydrocarbon reserve estimation project report for Alywn Northfield (East Brent)
Hydrocarbon reserve estimation project report for Alywn Northfield (East Brent)Hydrocarbon reserve estimation project report for Alywn Northfield (East Brent)
Hydrocarbon reserve estimation project report for Alywn Northfield (East Brent)Glory Ibeh
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundSigve Hamilton Aspelund
 
Offshore Support Vessels Design
Offshore Support Vessels DesignOffshore Support Vessels Design
Offshore Support Vessels DesignAhmed Taha
 
Teknik Konstruksi kapal
Teknik Konstruksi kapalTeknik Konstruksi kapal
Teknik Konstruksi kapaltanalialayubi
 

What's hot (20)

nickel laterite dep phil
nickel laterite dep philnickel laterite dep phil
nickel laterite dep phil
 
Reserve Estimation of Initial Oil and Gas by using Volumetric Method in Mann ...
Reserve Estimation of Initial Oil and Gas by using Volumetric Method in Mann ...Reserve Estimation of Initial Oil and Gas by using Volumetric Method in Mann ...
Reserve Estimation of Initial Oil and Gas by using Volumetric Method in Mann ...
 
Lecture 1 Crude Oil Quality
Lecture 1 Crude Oil QualityLecture 1 Crude Oil Quality
Lecture 1 Crude Oil Quality
 
Offshore oil platform ppt
Offshore oil platform  pptOffshore oil platform  ppt
Offshore oil platform ppt
 
Oil Production Facilities
Oil Production FacilitiesOil Production Facilities
Oil Production Facilities
 
Offshore operation
Offshore operationOffshore operation
Offshore operation
 
Introduction to offshore structures
Introduction to offshore structuresIntroduction to offshore structures
Introduction to offshore structures
 
optimisation of depth of opencast coal mine using udec software
optimisation of depth of opencast coal mine using udec softwareoptimisation of depth of opencast coal mine using udec software
optimisation of depth of opencast coal mine using udec software
 
Oil And Gas Processing
Oil And Gas ProcessingOil And Gas Processing
Oil And Gas Processing
 
LOST CIRCULATION - THE BASICS
LOST CIRCULATION - THE BASICSLOST CIRCULATION - THE BASICS
LOST CIRCULATION - THE BASICS
 
Artificial lift technology
Artificial lift technologyArtificial lift technology
Artificial lift technology
 
Offshore Structures Presentation
Offshore Structures PresentationOffshore Structures Presentation
Offshore Structures Presentation
 
Unconventional Petroleum
Unconventional PetroleumUnconventional Petroleum
Unconventional Petroleum
 
Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4
 
Basic Coiled Tubing Ops.pptx
Basic Coiled Tubing Ops.pptxBasic Coiled Tubing Ops.pptx
Basic Coiled Tubing Ops.pptx
 
Hydrocarbon reserve estimation project report for Alywn Northfield (East Brent)
Hydrocarbon reserve estimation project report for Alywn Northfield (East Brent)Hydrocarbon reserve estimation project report for Alywn Northfield (East Brent)
Hydrocarbon reserve estimation project report for Alywn Northfield (East Brent)
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton Aspelund
 
Konstruksi geladak
Konstruksi geladakKonstruksi geladak
Konstruksi geladak
 
Offshore Support Vessels Design
Offshore Support Vessels DesignOffshore Support Vessels Design
Offshore Support Vessels Design
 
Teknik Konstruksi kapal
Teknik Konstruksi kapalTeknik Konstruksi kapal
Teknik Konstruksi kapal
 

Viewers also liked

Oil & Gas Decommissioning
Oil & Gas DecommissioningOil & Gas Decommissioning
Oil & Gas DecommissioningIan Kennedy
 
PE976 Offshore Platform Decommissioning
PE976 Offshore Platform DecommissioningPE976 Offshore Platform Decommissioning
PE976 Offshore Platform DecommissioningpetroEDGE
 
Joining the prison service brief reflections
Joining the prison service brief reflectionsJoining the prison service brief reflections
Joining the prison service brief reflectionsSir Martin Narey
 
Decommissioning & Abandonment For Oil & Gas
Decommissioning & Abandonment For Oil & GasDecommissioning & Abandonment For Oil & Gas
Decommissioning & Abandonment For Oil & Gasprada2000
 
Ignalina NPP Closure And Decommissioning
Ignalina NPP Closure And DecommissioningIgnalina NPP Closure And Decommissioning
Ignalina NPP Closure And DecommissioningOsvaldas Ciuksys
 
Project initiation document
Project initiation documentProject initiation document
Project initiation documentLenka Tomsova
 
Guidelines for small fields development and operations 2015
Guidelines for small fields development and operations 2015Guidelines for small fields development and operations 2015
Guidelines for small fields development and operations 2015Easwaran Kanason
 
Petronas procedures and guidelines for finance
Petronas procedures and guidelines for financePetronas procedures and guidelines for finance
Petronas procedures and guidelines for financeEaswaran Kanason
 
North Sea Decommissioning Market Forecast 2016-2040 Leaflet and Contents
North Sea Decommissioning Market Forecast 2016-2040 Leaflet and ContentsNorth Sea Decommissioning Market Forecast 2016-2040 Leaflet and Contents
North Sea Decommissioning Market Forecast 2016-2040 Leaflet and ContentsDouglas-Westwood
 
Cost Estimating for Offshore Oil & Gas Facility Decommissioning
Cost Estimating for Offshore Oil & Gas Facility DecommissioningCost Estimating for Offshore Oil & Gas Facility Decommissioning
Cost Estimating for Offshore Oil & Gas Facility DecommissioningDonnie Miller
 
Petronas procedures and guidelines for planning and budgeting
Petronas procedures and guidelines for planning and budgetingPetronas procedures and guidelines for planning and budgeting
Petronas procedures and guidelines for planning and budgetingEaswaran Kanason
 
Petronas drilling operations guideline
Petronas drilling operations guidelinePetronas drilling operations guideline
Petronas drilling operations guidelineEaswaran Kanason
 
Plug & Abandonment
Plug & AbandonmentPlug & Abandonment
Plug & AbandonmentStatoil
 
Petronas exploration guidelines
Petronas exploration guidelinesPetronas exploration guidelines
Petronas exploration guidelinesEaswaran Kanason
 
Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Easwaran Kanason
 
International Oil & Gas Executive Development Training
International Oil & Gas Executive Development TrainingInternational Oil & Gas Executive Development Training
International Oil & Gas Executive Development TrainingEaswaran Kanason
 

Viewers also liked (17)

Oil & Gas Decommissioning
Oil & Gas DecommissioningOil & Gas Decommissioning
Oil & Gas Decommissioning
 
PE976 Offshore Platform Decommissioning
PE976 Offshore Platform DecommissioningPE976 Offshore Platform Decommissioning
PE976 Offshore Platform Decommissioning
 
Joining the prison service brief reflections
Joining the prison service brief reflectionsJoining the prison service brief reflections
Joining the prison service brief reflections
 
Decommissioning & Abandonment For Oil & Gas
Decommissioning & Abandonment For Oil & GasDecommissioning & Abandonment For Oil & Gas
Decommissioning & Abandonment For Oil & Gas
 
Ignalina NPP Closure And Decommissioning
Ignalina NPP Closure And DecommissioningIgnalina NPP Closure And Decommissioning
Ignalina NPP Closure And Decommissioning
 
Project initiation document
Project initiation documentProject initiation document
Project initiation document
 
Guidelines for small fields development and operations 2015
Guidelines for small fields development and operations 2015Guidelines for small fields development and operations 2015
Guidelines for small fields development and operations 2015
 
Petronas procedures and guidelines for finance
Petronas procedures and guidelines for financePetronas procedures and guidelines for finance
Petronas procedures and guidelines for finance
 
North Sea Decommissioning Market Forecast 2016-2040 Leaflet and Contents
North Sea Decommissioning Market Forecast 2016-2040 Leaflet and ContentsNorth Sea Decommissioning Market Forecast 2016-2040 Leaflet and Contents
North Sea Decommissioning Market Forecast 2016-2040 Leaflet and Contents
 
Cost Estimating for Offshore Oil & Gas Facility Decommissioning
Cost Estimating for Offshore Oil & Gas Facility DecommissioningCost Estimating for Offshore Oil & Gas Facility Decommissioning
Cost Estimating for Offshore Oil & Gas Facility Decommissioning
 
Petronas procedures and guidelines for planning and budgeting
Petronas procedures and guidelines for planning and budgetingPetronas procedures and guidelines for planning and budgeting
Petronas procedures and guidelines for planning and budgeting
 
Petronas drilling operations guideline
Petronas drilling operations guidelinePetronas drilling operations guideline
Petronas drilling operations guideline
 
Plug & Abandonment
Plug & AbandonmentPlug & Abandonment
Plug & Abandonment
 
OPEC August 2016
OPEC August 2016OPEC August 2016
OPEC August 2016
 
Petronas exploration guidelines
Petronas exploration guidelinesPetronas exploration guidelines
Petronas exploration guidelines
 
Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)
 
International Oil & Gas Executive Development Training
International Oil & Gas Executive Development TrainingInternational Oil & Gas Executive Development Training
International Oil & Gas Executive Development Training
 

Similar to Premier Oil - Decommissioning Oil Projects In The North Sea Case Study

Intertidal habitat creation as compensation for the impacts of dredging assoc...
Intertidal habitat creation as compensation for the impacts of dredging assoc...Intertidal habitat creation as compensation for the impacts of dredging assoc...
Intertidal habitat creation as compensation for the impacts of dredging assoc...Tristan Wiggill
 
2013 06 bristol deep sea container terminal - jerry stanford
2013   06 bristol deep sea container terminal - jerry stanford2013   06 bristol deep sea container terminal - jerry stanford
2013 06 bristol deep sea container terminal - jerry stanfordSevernEstuary
 
Pa resources q2 2013 final_14 aug 2013
Pa resources q2 2013 final_14 aug 2013Pa resources q2 2013 final_14 aug 2013
Pa resources q2 2013 final_14 aug 2013PA Resources AB
 
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaMine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaStephen McKnight
 
Benjamin Asante, Snr. Procurement Officer at GNPC - The jubilee field a world...
Benjamin Asante, Snr. Procurement Officer at GNPC - The jubilee field a world...Benjamin Asante, Snr. Procurement Officer at GNPC - The jubilee field a world...
Benjamin Asante, Snr. Procurement Officer at GNPC - The jubilee field a world...Global Business Events
 
JAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyJAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyMike Bisland
 
UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15ADAM DUKE
 
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaMichaelUberti
 
Cronulla wastewater treatment plant
Cronulla wastewater treatment plantCronulla wastewater treatment plant
Cronulla wastewater treatment plantRick Nabett
 
120420 Aph Cv
120420 Aph Cv120420 Aph Cv
120420 Aph Cveboroil
 
Canatuan story-presentation-april-21-2015
Canatuan story-presentation-april-21-2015Canatuan story-presentation-april-21-2015
Canatuan story-presentation-april-21-2015TVI_Pacific
 
Canatuan Story Presentation
Canatuan Story PresentationCanatuan Story Presentation
Canatuan Story PresentationTVI_Pacific
 
Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015TVI_Pacific
 
Canatuan story presentation november 16 2015
Canatuan story presentation november 16 2015Canatuan story presentation november 16 2015
Canatuan story presentation november 16 2015TVI_Pacific
 
Ogintro 110517110816-phpapp01
Ogintro 110517110816-phpapp01Ogintro 110517110816-phpapp01
Ogintro 110517110816-phpapp01Ranbir Nandan
 
Graduation Project Book 2020
Graduation Project Book 2020Graduation Project Book 2020
Graduation Project Book 2020Mahmoud Morsy
 

Similar to Premier Oil - Decommissioning Oil Projects In The North Sea Case Study (20)

Intertidal habitat creation as compensation for the impacts of dredging assoc...
Intertidal habitat creation as compensation for the impacts of dredging assoc...Intertidal habitat creation as compensation for the impacts of dredging assoc...
Intertidal habitat creation as compensation for the impacts of dredging assoc...
 
2013 06 bristol deep sea container terminal - jerry stanford
2013   06 bristol deep sea container terminal - jerry stanford2013   06 bristol deep sea container terminal - jerry stanford
2013 06 bristol deep sea container terminal - jerry stanford
 
Pa resources q2 2013 final_14 aug 2013
Pa resources q2 2013 final_14 aug 2013Pa resources q2 2013 final_14 aug 2013
Pa resources q2 2013 final_14 aug 2013
 
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaMine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
 
IRON SAND
IRON SANDIRON SAND
IRON SAND
 
Benjamin Asante, Snr. Procurement Officer at GNPC - The jubilee field a world...
Benjamin Asante, Snr. Procurement Officer at GNPC - The jubilee field a world...Benjamin Asante, Snr. Procurement Officer at GNPC - The jubilee field a world...
Benjamin Asante, Snr. Procurement Officer at GNPC - The jubilee field a world...
 
JAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyJAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE Navy
 
UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15
 
Premier oil13a pres
Premier oil13a presPremier oil13a pres
Premier oil13a pres
 
Swansea lagoon presentation by ioan jenkins
Swansea lagoon presentation by ioan jenkinsSwansea lagoon presentation by ioan jenkins
Swansea lagoon presentation by ioan jenkins
 
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey Australia
 
Cronulla wastewater treatment plant
Cronulla wastewater treatment plantCronulla wastewater treatment plant
Cronulla wastewater treatment plant
 
120420 Aph Cv
120420 Aph Cv120420 Aph Cv
120420 Aph Cv
 
Canatuan story-presentation-april-21-2015
Canatuan story-presentation-april-21-2015Canatuan story-presentation-april-21-2015
Canatuan story-presentation-april-21-2015
 
Canatuan Story Presentation
Canatuan Story PresentationCanatuan Story Presentation
Canatuan Story Presentation
 
Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015
 
Canatuan story presentation november 16 2015
Canatuan story presentation november 16 2015Canatuan story presentation november 16 2015
Canatuan story presentation november 16 2015
 
Ogintro 110517110816-phpapp01
Ogintro 110517110816-phpapp01Ogintro 110517110816-phpapp01
Ogintro 110517110816-phpapp01
 
Graduation Project Book 2020
Graduation Project Book 2020Graduation Project Book 2020
Graduation Project Book 2020
 
Sakhalin II OPF Project
Sakhalin II OPF ProjectSakhalin II OPF Project
Sakhalin II OPF Project
 

More from Thorne & Derrick International

Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...Thorne & Derrick International
 
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptTHORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptThorne & Derrick International
 
The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018Thorne & Derrick International
 
3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick InternationalThorne & Derrick International
 
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-AThorne & Derrick International
 
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...Thorne & Derrick International
 
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Thorne & Derrick International
 
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RowePepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RoweThorne & Derrick International
 
Ultrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandUltrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandThorne & Derrick International
 
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DSIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DThorne & Derrick International
 
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...Thorne & Derrick International
 
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetFiloform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetThorne & Derrick International
 

More from Thorne & Derrick International (20)

Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...
 
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptTHORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
 
The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018
 
3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International
 
CATU Electrical Safety Catalogue
CATU Electrical Safety CatalogueCATU Electrical Safety Catalogue
CATU Electrical Safety Catalogue
 
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
 
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
 
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
 
Roxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional DrawingRoxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional Drawing
 
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RowePepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
 
T&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive AtmospheresT&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive Atmospheres
 
Ultrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandUltrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification Demand
 
Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016
 
Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016
 
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DSIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
 
Ripley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation ToolsRipley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation Tools
 
RIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas DetectorRIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas Detector
 
Itron Fact Sheet
Itron Fact SheetItron Fact Sheet
Itron Fact Sheet
 
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
 
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetFiloform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
 

Recently uploaded

Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 

Recently uploaded (20)

Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 

Premier Oil - Decommissioning Oil Projects In The North Sea Case Study

  • 2. June 2012 | Page 1 Shelley Decommissioning Project Premier Oil Company Overview •Independent oil and gas Operating Company with corporate office in London. Established 40 years ago. •JV Partners in several UK (Wytch Farm, Scott & Telford, Kyle, Nelson) , Norway (Froy and Bream), West Africa and Pakistan Assets. •Operator in oil and gas fields offshore Indonesia and Vietnam. •Acquired Oilexco in 2009 - Balmoral and Shelley Operating Assets. •Acquired Encore in 2011. •Several Operated development projects underway; Solan and Catcher. •Several Non Operated development projects underway; Huntington and Greater Rochelle. •A growing organisation.
  • 3. June 2012 | Page 2 Shelley Decommissioning Project Agenda •Shelley Field Overview •Project sequence •Project equipment re-cycle for re-use, free issue and disposal •Project budget & schedule overview •Summary
  • 4. June 2012 | Page 3 •The Shelley field is located in block 22/2b and 22/3a, in the Central North Sea, approx 192km North East of Peterhead. •Originally developed by Oilexco with first oil in August 2009. •The estimated total recoverable reserves for the field was 20million barrels of oil. Subsea design life 3 years. •Unfortunately due to poor reservoir performance Cessation of Production resulted in July 2010. •The field was developed based on a 2 well tie back to the FPSO Sevan Voyageur. •Water depth 96m. Shelley Decommissioning Project Field Overview
  • 5. June 2012 | Page 4 •2 subsea production wellheads, xmas trees and fishing friendly structures. •2 dual Electrical Submersible Pumps (Schlumberger). •A production manifold and protection structure, containing SCM and 2 off subsea multiphase meters (Framo). •2km 8” production flowline trenched and buried including rock dump. •2.4km EHCU (OMUK) trenched with natural backfill . •Stabilisation mattresses. •2 risers from seabed to FPSO. •8” production riser (335m). Pliant Wave Distributed Buoyancy type design (22 buoyancy modules). Clump weights on seabed. •Dynamic umbilical riser (319m). Position maintained by two clump weights. Shelley Decommissioning Project Field Overview •A Leased Sevan 300 FPSO vessel with mooring lines and suction anchors. Duty holder Wood Group. •Oil export via shuttle tanker.
  • 6. June 2012 | Page 5 • A cylindrical vessel with a main hull diameter of 60m and an oil storage capacity of 300,000 barrels total fluids. • Living quarter (LQ) with a maximum POB of 57. • The top of the cargo tanks was the Main Deck. • The Process Decks was arranged over two levels. The process consisted of two-stage separation and produced water clean-up. Oil was routed to the cargo tanks. Gas was routed to fuel and flare. Produced water was cleaned-up and discharged to sea. • The FPSO was equipped with two offloading stations, one on the port side and the other to starboard. • The mooring system consisted of twelve anchors and mooring lines positioned in three clusters of four around the platform. • Each mooring line was fixed to the seabed by a suction anchor, a cylindrical steel can 6 or 7m in diameter and 15m long. • A design life of 25 years for the vessel hull, topside and related systems. Shelley Decommissioning Project Sevan Voyageur Overview Fluid Voyageur Total liquid [BLPD] 50,000 Oil [BOPD] 20,000 Water [BWPD] 30,000 Gas [mmscfd] 25
  • 7. June 2012 | Page 6 •At Cessation of Production the Sevan Voyageur was depressurised, flushed clean of all hydrocarbons and made safe from production mode, in preparation for relocation. •The risers and mooring lines were disconnected and laid on the seabed. •The FPSO was towed away. •Several dive construction vessels were utilised to support the phased programme of activities. •The subsea wells were plugged and abandoned using a semi submersible. •The trees and wellheads were recovered and the casing cut below seabed. •All equipment recovered to surface was taken ashore for either refurbishment and re-use on other projects or disposal. Shelley Decommissioning Project Activities – Sequence of Events
  • 8. June 2012 | Page 7 14 Jul 2010 COP (Sevan Marine, WoodGroup and POUK) •Depressurise FPSO and prepare for topside flushing. 17 Jul 2010 - Arrival of DSV Wellservicer (Technip) •Commence subsea flushing operations from wells, wellheads, jumpers, manifold and the production pipeline, until residual oil in water less than 30ppm arriving at FPSO. •All flushed material pumped to the FPSO for process treatment. Potential existed to transfer to shuttle tanker as part of the last cargo offload. Additional clean up of slops required onshore. •Similarly the hydraulic fluid and other chemicals in the umbilical flushed and returned to the FPSO. •Isolations in place and umbilical and riser disconnected from the topside system. Pulling heads installed ready to lower the umbilical and riser. •Dynamic section of umbilical cut and both risers recovered to the DSV by lowering them from the FPSO. •DSV removed the four protection structure legs from the trees to allow access for Sedco 704. Shelley Decommissioning Project Sequence of Events – Phase 1
  • 9. June 2012 | Page 8 Shelley Decommissioning Project Sequence of Events – Phase 1
  • 10. June 2012 | Page 9 Aug 2010 to May 2011 Sevan Marine (Owner Scope) •FPSO disconnected from moorings on 22 Aug 2010 and towed to Kristiansand for refurbishment and re-use. •Polyester sections of the mooring system recovered shortly after. •The anchor chains and suction can were recovered in May 2011 again for potential re-use (Normad Oceanic). Shelley Decommissioning Project Sequence of Events – Phase 1
  • 11. June 2012 | Page 10 31st Oct 2010 – Arrival of Transocean Sedco 704 •Commencement of well P&A (22/2b – P1Z & 22/2b-P2S) 29th Dec 2010 – Skandi Skolten SCV •Cut and recovery of Horizontal XMAS trees by NCA 14th Apr 2011 – Skandi Aker SCV •Recovery of wellhead recovery Shelley Decommissioning Project Sequence of Events – Well P&A
  • 12. June 2012 | Page 11 24th May 2011 – Arrival of DSV Orelia (Technip) •Disconnected all control and production jumpers from the production manifold. •Recovered the Shelley manifold. •Recovered all concrete mattresses from the FPSO end. •Cut and recovered the rigid production pipeline at both ends up to rock dump section. •Recovered concrete mattresses from the manifold end. •A total of 120 concrete mattresses (recovered to project baskets) Shelley Decommissioning Project Sequence of Events – Phase 2
  • 13. June 2012 | Page 12 13th Jul 2011 – Arrival of DSV Orelia (Technip) •Recovered remaining mattresses. •Recovered well control jumpers. •General debris clearance. •Recovery of manifold protection structure. 13th Aug 2011 – Arrival of Fugro Symphony •Recovered static section of umbilical and all the production jumpers. •Completion a side scan as-left survey of the Shelley site. •Post decom environmental survey to be completed by Q2 2013. Shelley Decommissioning Project Sequence of Events – Phase 2
  • 14. June 2012 | Page 13 Aug 2011 – Arrival of MV Amythyst Fishing Vessel •On behalf of SFF completed seabed trawl and verification sweep. Shelley Decommissioning Project Sequence of Events – Phase 2
  • 15. June 2012 | Page 14 Shelley Decommissioning Project Total credits from refurbishment, recycle and disposal Scope Item Comments 2010 Production Riser Sold to third party for re-use 2010 Bouyancy Module Sold to third party for re-use 2010 Clump Weights Sold to third party for re-use 2010 Ballast Blocks Disposal 2010 Dynamic section umbilical Disposal 2011 Manifold Roof Panels Disposal & scrap value 2011 Umbilical SUTU Disposal & scrap value 2,011 Ballast Blocks Disposal & scrap value 2011 General Scrap (Pipe) Disposal & scrap value 2011 Barracuda Credit Sold to third party for re-use 2011 Buoy credit Sold to third party for re-use 2011 Rigging Disposal & scrap value 2,011 Control jumpers Sold to third party for re-use 2011 Production Jumpers Sold to third party for re-use 2,011 Umbilical end fittings In storage 2011 Trees Sold to third party for re-use 2011 Protection Structure Disposal & scrap value 2011 Manifold Sold to third party for re-use 2011 Static section umbilical Disposal 2011 SCM Sold to third party for re-use 2011 Concrete Matts Given to farmer to save disposal costs 2011 Matt Baskets Sold to third party for re-use Total Value £4,636,928
  • 16. June 2012 | Page 15 Shelley Decommissioning Project Refurbishment and recycle
  • 17. June 2012 | Page 16 Shelley Decommissioning Project Total credits from refurbishment, recycle and disposal •Relatively new infrastructure allowed for refurbishment and recycle of 98% of the Shelley infrastructure. •2% of infrastructure was not used further ie protection structure and EHCU. •An inquiry for purchase of the EHCU was made 1 week prior to planned recovery. Too late for Management of Change process to be put in place in terms of offshore procedures, risk assessments and additional equipment requirements.
  • 18. June 2012 | Page 17 Shelley Decommissioning Project Budget & Schedule
  • 19. June 2012 | Page 18 •The project was completed with a small integrated team, safely and within the planned schedule and budget. •Significant re-cycle and re-use was achieved to support ongoing Operated and Non Operated projects. Shelley Decommissioning Project Summary
  • 20. June 2012 | Page 19 Voyageur Spirit on route to Huntington
  • 21. Health and Safety Executive Health and Safety Executive Safety in Decommissioning Stewart Millar HSE Decommissioning focal-point
  • 22. Presentation Structure •CO-REGULATION set-up •Decommissioning Programme - PHASES •PLANNING – Dismantlement Safety Case Requirements •LESSONS for future safety case submissions – previous assessments / project execution •SYSTEMS and FRAMEWORKS for lesson- learning?
  • 24. The Decommissioning Programme CESSATION OF PRODUCTION COMPLETE DISMANTLEMENT Y/N? WELL ABANDONMENT MATERIAL CHANGE SC DISMANTLEMENT SC DEROGATION
  • 25. The ‘Phases of Decommissioning’ and the Safety Case requirements •Reg 14.2 Material Change covers: –Run-down to CoP –Well shut-in –Installation hydrocarbon-free (i.e.‘dead’) –Partial dismantlement for ‘derogation’ •DECC has jurisdiction / HSE safety role •Still an installation if any part above sea-level •Reg 11 Dismantlement covers final dismantlement
  • 26. PLANNING: ‘FINAL’ Dismantlement SC Requirements •Reg 11 (SCR05) •(DECC) Decom Program •Safety Case submission (HSE) •Schedule 5 contains details of a Reg 11 Safety Case.
  • 27. DECOMMISSIONING UP-FRONT PLANNING Schedule 5 Requirements: •Start & End dates of dismantlement plan •Safety Reps consultation re. work plan •Max. no. of persons on ‘installation’ during work •General duty for protection of these persons from F&E, and provision of ER •Toxic gas protection arrangements •HOW Installation & plant to be dismantled
  • 28. Knowledge Capture •Capturing lessons learned •Culture of collaboration •Cost and Availability considerations •Metocoean restrictions •Co-regulation with ‘Beach’
  • 29. FURTHER WORK – knowledge capture from previous dismantlements •Project Management •Human Factors •Communication •‘Piece Small’ versus Heavy Lift •Contractualisation •NO ‘ONE SIZE FITS ALL’ APPROACH
  • 30. Experience-based LEARNING •All installations are unique •Have some common elements •Face some common hazards •Need to be mindful of what can go wrong •Applying lessons learnt
  • 31. Working Groups •DTLG …Regulators Forum •Decom North Sea …Northern Sector UKCS •ODFOS … Southern Sector UKCS
  • 32. Message •Schedule 5 (SCR05) provides framework for planning •Knowledge capture from previous projects •Working groups - Shared database - Communication and Coordination?