1. CURRICULUM VITAE
CB TESTING & INSPECTION LIMITED
Ndt inspector/Welding inspector/Specialist steelwork inspector/ surveyor
M0BILE 07771776833
PERSONAL
Surname: BRYAN
Forenames: Christopher Paul
Address 3 Cypress Close Caerleon, Newport, and Gwent, NP18 3RN
Email Christopher.bryan@talktalk.net
Date of Birth: 29 June 1959
Nationality: British
EDUCATION
Frederick Nattrass Secondary Modern, Stockton on Tees
GCSE ‘O’ Level - Maths, English, Geography
QUALIFICATIONS AND TRAINING
1997 CSWIP 3.2 Level 3 Senior Welding Inspector – TWI Portalbot
1980 PCN Level 2 Ultrasonic Plate, PCN 3.2 pipe, 3.8 nozzles, PCN 3.9 node, PCN
Level 2 Critical defect sizing, MPI PCN Level 2, Dye pen PCN Level 2,
1982 ERS Rad Asst radiography course Stockton & Billingham College
RSA computer and information technology stage one and two, Internet technologies
STAGE 1 ECITB Safety Passport, CSCS Safety Passport, ECITB Confined space
OFFSHORE OPTICO minimum safety training (MIST)
OFFSHORE OPTICO basic offshore induction emergency training (BOSIET)
OFFSHORE Norwegian approved escape chute
EMPLOYMENT HISTORY
Nov 2014 Bechtel Cavendish Nuclear
Client Inspector under contract to Sellafield LTD on the Pile Fuel Retrieval Project
performing witness inspections, Document Reviews, Activity Surveilance,
Hold Points, Reviewing LTQR Package as work Progress, Material Certification,
Approval of WPS, Monitor Nde, Checking Weld Logs, Dimensional Activity
April 2014-Sept 2014 Oceaneering
Contracted to Doosan Babcock
Working at West Burton and Eggborough Power Stations auditing inspection
personnel involved on the Secondary Superheaters and ecconomiser inlet and outlet
high pressure vessels and headers, also auditing UT Inspection of austenitic stainless
CMV Welds up to and inclusive of heavy wall thickness off 50mm – 68mm due to
possible stress corrosion (S.C.C) and involved with the evaluation of defects
August 2013 – April 2014 Harland & Wolff Belfast
E.ON Climate & Renewables Gateway Off Shore Wind Farm
Senior welding inspector involved in the monitoring of the welding and construction
off the offshore substation inclusive of the MSF and topside Jacket to pile
connections, Jacket topside, cable deck lay down areas, Topside supports, Lattice
structures installations, monitoring all welding consumables and welding technique
used during welding of austenitic stainless steel welds which was crucial to eliminate
the welds corroding more than the parent materials
Project Kvaerner Cluster Pile Jackets & Flotation Tanks for client Martin Linge
Senior welding Inspector duties include monitoring welder performance and welder
activities and that all procedures are being followed issuing any non-conformance
2. when required and taking corrective action carrying out internal audits checking
material certificates vender certificates, calibration records, drawings and inspection
test reports
April 2013-August 2013 Rowecord Engineering
QC Inspector at Dover Harbour Authority and working as a add HOK client inspector
when required for MC Squared Stockton on Tees
OCT 2012- April 2013 Hays Engineering
Performing welding inspection and Utrasonic inspection of heavy wall thickness
welds during the construction of the Limeburner substation and monitoring of
welders, checking weld parameters and collating reports
FEB 2012-Oct 2012 Fulkrum Technical Resources
Client inspector for Technip Houston at Arc Energy Resources responsible for
witnessing and monitoring all daily activities inclusive of report writing and Liaison
with Arc project management on behalf of Technip, activities included Witnessing
welding procedures, material test certificates, welder consumables, Vender Quality
test plans, Pre Fabrication, auditing nde reports, monitoring Inspection stages,
Positive material identification
Project Description
MWCC Marine Well containment
For the purpose of rapid response to subsea uncontrolled hydrocarbon Leak. To
develop maintain and operate a containment system in the case of a subsea Well
Blow-out. The primary objective of the system is to fully contain the oil with no flow
to the sea.
AUG 2011-FEB 2012 Rowecord Engineering
Carrying out Welding Insp duties on the Olympic Stadium project responsible for
organising all NDT activities, reporting and submitting all reports and documentation
To clients, Welder approval records, involved in the site quality plan, material
deliveries, visual and dimensional checks, coordinating welder activities.
JUNE 2011-AUG 2011 Mactech Insp Ltd
Keppel Verolme Holland subcontracted to MME Inspection
Performing Inspection Duties using all disciplines on the Maersk Resilient and
Reacher Drilling platforms during refit of spudcan jack houses on all legs inclusive
ultrasonic testing of austenitic stainless steels with heavy wall thickness in excess of
45mm material grades 301-304
Oct 2010- MAY 2011 BPS Inspection services
Employment at Mabey Bridge Chepstow, performing Welding Inspection of Bridge
Fabrications inclusive of bridge girders and box sections during fabrication using all
disciplines and monitoring of welders checking weld parameters and collating reports
March 2010-Oct 2010 Rowcord
Working on the Bovis Salford Quay footbridge project involved with all inspection
duties and vending insp operations for client Bovis involved with site quality plans
Monitoring site progress and reporting back to client. Using all ndt disciplines
Sept 2008/March 2010 Rowecord Newport
Carrying out Welding Insp duties on the Portalbot Gas Holder project responsible for
organising all NDT activities, reporting and submitting all reports and documentation
To clients, Welder approval records, involved in the site quality plan, material
deliveries, visual and dimensional checks, coordinating welder activities.
3. 6/08-9/08 Sandberg Bristol
Working for the South West Gas utilities carrying out Inspection surveys, monitoring
and observation off existing vessels and using all NDT disciplines compiling reports
for client.
4/08-6/08 Macktek Denmark
Subcontracted to NSK Nordisk Sveqse involved in all Inspection duties on
fabrications associated with Monapiles wind farms
8/07- 4/08 Fairfield Mabey Chepstow
Welding Insp off Box bridge girders during fabrication. Monitoring of welders
checking weld parameters and collating reports.
5/06 – 8//07 NRL
Employed as a client Inspector with National Grid Transco. Involved with all aspects of weld
Inspection duties, being fully conversant with all WPS. Involved with Front and Back end
Welding checking all parameters, and surveillance duties. Also involved with fabrication
Tie-ins. Monitoring Lower/Lay activities and surround and backfill work. Responsible for
organizing NDT activities and collating all daily reports and being responsible to the SPI
1/06 - 5/06 Bristol Highways Agency
Working for Welding Inspection Services for the Highways Agency on the Avonmouth
Bridge Project. Performing a welding inspection survey of all box sections and reporting back
to the Highways department.
9/05 - 1/06 BPS Adeney LLanvaches Rowecord Eng
Subcontracted to Rowecord Eng on the Carmarthen Footbridge Project using all disciplines.
UT and MPI off all flg to web plates, Upper Bridge Frame, Ramp Decking, and UT of end
Beam Butt welds, and Cantilever and all Cruciform joints
5/05-9/05 MB Inspection Grangemouth Lindsey Oil Refinery
Engaged on the Lindsey Oil Refinery complex using all disciplines involved with the
inspection of Vessels and associated pipework
1/05-5/05 Mactech Inspection, Whitley Bay Holland
Working on various contracts in Holland related to the Oil and Gas industry on and off-Shore.
2004-1/05 BPS Inspection Mabey Johnson/Fairfield Mabey
Involved with Bridge Fabrication at Mabey Johnson and Fairfield Mabey Performing welding
inspection and Ultrasonic Examination duties inclusive of reporting and reject/accept criteria.
Also seconded to the Philippines as and when required.
4/96-2004 CEC TIME Stockton on Tees
Highways Agency working on the M5 widening project on the Avonmouth Bridge
Monitoring and control of Innershield and MMA Welding. Witness Welding procedures and
tests to AWS-D11 82, EN288 & 287. Auditing of Welding parameters to relevant procedures.
Visual, MPI & Ultrasonic inspection of original & new steelwork
6/95-4/96 OIS Stockton on Tees Heysham Nuclear Power Station.
Employed on the Main Steam Superheater Replacement Headers and associated Pipework,
Seconded to Dungeness A&B Nuclear Power Station’s performing entries into C4, C2 Areas
Ultrasonic Inspection of Boiler and Bellows and Gas duct valves.
1994-95 RTD UK/CEC TIME Holland
Contracted out to Grootont in Holland at Swindrect working on the Troy, Froy, and Congo
Modules performing all Insp and NDT duties. Also working for CEC TIME on the Stenna
Amoco project.
1993-94 Power & Nuclear Stockton
Faslane/Torness/Morcome Bay/Sizewell, Working on the Faslane Nuclear Submarine Base
Inspection of Reactor inlet/outlet Tubes. Seconded to Torness Nuclear Power station and
4. British gas Morecombe Bay also Sizewell Nuclear Power Station using Automatic Ultrasonic
Scanning and all other NDT disciplines.
1992/93 Solus Schall
Offshore at Abu Dhabi on the Adma Opco Projects.
1991-92 Holland
Engaged on a Petro Chemical Complex in Holland. Thereafter seconded to Sellafield,
Performing UT of Stainless Steel small Bore pipe work.
1990-91 Cooperheat South Africa
Working in South Africa on the Mossel Bay Oil Refinery utilizing all disciplines.
1988-90 CEC Redpath Offshore
Performing Inspection Duties on the Faslane Shiplift Project. Also engaged on the
Ravenspurn North Development.
1987-88 Unit Inspectorate, Hartlepool Steelworks
Engaged on the Shell Expro Project within the confines of Hartlepool Steelworks performing
MPI & UT of welds associated with tubular steel cans
1986-87 NDT Medway
Dungeness Nuclear A&B Power Station.
1983-86 Eurospection
Seconded to various Locations in Holland and Belgium
1971-1983 British Steel
Served 5 yr Apprenticeship as a fitter and turner and continued until l became involved with
the inspection industry.
5. 3 Cypress Close
Cearleon
Newport
Gwent
Dear Sir/Madam
My present contract will soon be finished and l am currently available for work. Please find
my CV attached for your perusal. If you require further information please do not hesitate to
contact me.
Thank you
C Bryan
6. 3 Cypress Close
Cearleon
Newport
Gwent
Dear Sir/Madam
My present contract will soon be finished and l am currently available for work. Please find
my CV attached for your perusal. If you require further information please do not hesitate to
contact me.
Thank you
C Bryan