CURRICULUM VITAE – Adrian Lusher
Lead Field Welding Engineer
NAME Adrian LUSHER
ADDRESS 12 Kincraig Drive, Inverness, Scotland UK IV2 6DQ
TELEPHONE +44 1463771691
MOBILE 07597584574
E MAIL adrianlusher@gmail.com
PASSPORT 10 YEAR BRITISH
NATIONALITY BRITISH
DRIVING LICENCE FULL BRITISH
Education 1965-1969 Alderman Catleugh Secondary School. Kings Lynn Norfolk
Achieved CSE certificates in Maths, English ,History, Metalwork
1969-1974 Norfolk College of Arts and Technology Kings Lynn, Norfolk.
Attended Part time during my apprenticeship and achieved
City and Guilds Fabrication & Welding Engineering
BRIEF HISTORY
o Time served welder with 30 years experience in the Oil and Gas Industry.
o When on the tools I was a coded pipe and structural welder using MMA, MIG, TIG, FCAW, SAW, and experience in
S.T.T processes.
o I have had several years experience in supervision of Welders and Fabricators.
o I am a qualified Inspector and have held Supervisory and Field Engineering positions.
o Employed as a Lead Field Welding Engineer by Bechtel several projects.
o During my duties as inspector or supervision I have been responsible in audits and audit reviews of contractors and
sub-contractors including:
o Review, approval of contractors and sub-contractors quality plans and procedures, welding procedure specifications,
N.D.T procedures and testing procedures.
o Organizing and executing welder testing programs, and labour recruitment.
o I have taken active participation in daily progress meetings, planning meetings and pre-contract awards meetings with
regards to quality and welding.
o I am able to use my initiative and can work with minimum supervision.
o I am a team player, committed, reliable and safety conscious
o I have experience in construction of offshore hook-ups, L.N.G plants, Ethylene plants, pipelines, power stations and oil
& gas terminals
o I have work experience in fabrication yards, workshops, offshore platforms, derrick and lay barges, desert and swamp
lands, Brown and Greenfield Sites
o I have sound knowledge of relevant ASME, ANSI, AWS, API, Australian and British Codes and Standards
o I always embrace the safety culture of the organisation I am working in as this in the oil & gas industry has now
become a major part of the projects.
QUALIFICATIONS
APPRENTICESHIP
o 4 Years time served Welder coded to ASME 1X 6G.
o City and Guilds Fabrication & Welding Engineering.
o 30 years of being in the Oil Gas Construction Industry
o Common Sense
CV 2015 Adrian Lusher 1/3
CURRENT APPROVALS
o CSWIP
o Bechtel ASNT LEVEL 2 NDT
CSWP Welding Inspector 3.1
RT & Visual
Feb 14 – Present:
Bechtel Australia,
Lead Field Welding Engineer
Wheatstone LNG Project, Onslow W.A
Responsible for implementing the Project Welding Program
Overseeing Sub-Contractors welding activities and approving their Welding and NDE procedures and applicable welding
documents
K.V. Joint Venture
Gorgon Project Barrow Island
Employer Clough PTY
Welding Inspector carrying out Surveillance on Contractors Welding activities
Feb 13 – Mar 14:
K.V. Joint Venture
Gorgon Project Barrow Island
Employer Clough PTY
Welding Inspector carrying out Surveillance on Contractors Welding activities
Nov11 – Feb 13
Bechtel Australia,
Lead Field Welding Engineer
APLNG Project Curtis Island Gladstone
Responsible for implementing the Project Welding Program
Overseeing Sub-Contractors welding activities and approving their Welding procedures and applicable welding documents
Aug 11 – Nov 11
S.L.C Australia, Employer Leighton PTY
QC Coordinator
Gorgon Jetty Project Barrow Island
CV 2015 Adrian Lusher 2/3
July 09 – Aug 11
AnLNG (Chevron) (SWIFT Oil & GAS)
Soyo Angola
Welding/Piping Inspector
Working as part of the P.M.T Team responsible for overseeing the welding and piping installation of the main contractor and
their Subcontractors
Overseeing the welding of 2X LNG concrete, 9% Nickel Inner shell LNG Tanks
Propane and Butane Tanks
APRIL 2010
Transferred into the P.M.T QA Department in the position as QA Engineer
Duties included:
Performing audits on Contractor and Contractors Sub-Contractors
Reviewing P.M.T Technical Queries and N.C.R, s, for content and discussing any possible changes before sending to
contractor.
Writing new P.M.T quality surveillance checklist and revising existing ones when required
Maintaining traceability logs for technical Queries and N.C.R’s
Training of New P.M.T inspectors ensuring that they understand P.M.T quality function on the project with regards to
surveillance checklist, why they have to be completed and the function they serve.
Assist the P.M.T site quality Manager in producing Quality Trend reports on Contractors quality performance.
July 06 – July 09
Bechtel International – OGD111
Lead Field Welding Engineer
Responsible for overseeing the welding activities of Sub contractors during construction of OGD111
Project includes 1x 20” Gas Line 1x24”” Gas Line both 120Km.
Tanks and Spheres
Process Pipe work.
4 Subcontractors executing the work
Review of weld and NDT Procedures,
Implementation of B31.3 Code Case 181 for using AUT UT in lieu of radiography
Implementation of S.T.T Welding of Cryogenic Services without back purge
Review Sub Contractors Welding documentation to Client Standards and National codes
Raising design Changes regarding welding issues and discussing with Client.
Senior QC Engineer
Promoted to this position to cover the QC activities and establish proper implementation of the control processes within the
site inspection activities for civil, mechanical, and electrical and instrumentation as stipulated in the Project Quality Plan.
Monitoring and coordinating site surveillance, programs, ITP, s and Contractors quality plans and procedures.
Visits to sub-contractors as required
Coordinate with Third Party Company.
Attend Quality, Construction Team internal and external meetings in regards to fabrication quality
Oct 05 – Dec 05
Chevron Texaco - Nigeria.
Inspector/Construction Rep
Installation of Swamp Flow line (Short Term Contract)
Feb 05 – Oct 05: Bechtel International - Equatorial Guinea
Field Welding Engineer
Responsible for overseeing the welding activities of C.B. & I who constructed 2 x
9% Nickel L.N.G. Storage Tanks
Oct 02 – Feb 05: Chevron Texaco - Nigeria
Construction Rep / Inspector
Responsible for overseeing work carried out by indigenous companies.
CV 2015 Adrian Lusher 3/3
Areas of work include Delta Region Swamps- Repair and Installation of Flow lines.
Lagos & Port Harcourt, Jacket and Topside Construction
May 98 – Oct 02: Bechtel International -
Kazakhstan/Saudi Arabia/India/
Abu Dhabi/Tunisia
Field Welding Engineer
Role included being responsible for setting up and implementing the companies Welding Program.
Liaisons with Clients and Subcontractors over welding and Q/C Issues
Organising welder testing and hiring program
Purchasing of welding equipment
Feb 97- April 98 A.R.A.M.C.O. - Saudi Arabia
QC/Welding Inspector
Construction of new G.S.O.P’s and Pipelines in the Shaybah Desert.
Monitoring of Contractors field welding activities
Reviewing Contractors I.T.P’s
Checking systems for completion prior to Hydro testing
Witnessing Hydro and Valve testing
Reviewing final documentation
Mar 95- Feb 97 A.M.E.C. - Gt Yarmouth
Senior QC Welding Inspector
Construction of offshore hook-ups in North Sea
Monitoring Field welding activities
Reviewing procedures and I.T.P’s
Checking systems for completion prior to hydro testing
Reviewing and signing final documentation.
Feb 86- Feb 95 A.O.C. - Aberdeen
Construction of hook-ups in North Sea
Coded Pipe Welding
Supervising Welders
Monitoring field-welding activities
Reviewing procedures and I.T.P’s
Checking systems for completion prior to Hydro testing
Reviewing and signing final documentation.
CV 2015 Adrian Lusher 4/3
CV 2015 Adrian Lusher 5/3
CV 2015 Adrian Lusher 5/3

More Related Content

What's hot

What's hot (20)

SUNDAR CV.
SUNDAR CV.SUNDAR CV.
SUNDAR CV.
 
CV
CVCV
CV
 
Resume - NATARAJAN SIVASUBRAMANI
Resume - NATARAJAN  SIVASUBRAMANIResume - NATARAJAN  SIVASUBRAMANI
Resume - NATARAJAN SIVASUBRAMANI
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
 
Resume New updated August
Resume New updated August Resume New updated August
Resume New updated August
 
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -CvWael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
Wael El Ahmadi 2016 - Sr. Construction Engineer - Mechanical -Cv
 
CV Pete Mcelwee 2016
CV Pete Mcelwee 2016CV Pete Mcelwee 2016
CV Pete Mcelwee 2016
 
EPGCONresume2015
EPGCONresume2015EPGCONresume2015
EPGCONresume2015
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
QA_QC_CIVIL_INSPECTOR_
QA_QC_CIVIL_INSPECTOR_QA_QC_CIVIL_INSPECTOR_
QA_QC_CIVIL_INSPECTOR_
 
Curriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPINGCurriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPING
 
Copy (2) of Jana CV - Copy.doc( rev6)_1
Copy (2) of Jana CV - Copy.doc( rev6)_1Copy (2) of Jana CV - Copy.doc( rev6)_1
Copy (2) of Jana CV - Copy.doc( rev6)_1
 
Resume
ResumeResume
Resume
 
CV copy-2
CV copy-2CV copy-2
CV copy-2
 
Rajeshwaran - Resume
Rajeshwaran - ResumeRajeshwaran - Resume
Rajeshwaran - Resume
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 
JG-CV-JAN15
JG-CV-JAN15JG-CV-JAN15
JG-CV-JAN15
 
QA QC CIVIL
QA QC CIVILQA QC CIVIL
QA QC CIVIL
 
AKSHAY BOGS CV
AKSHAY BOGS CVAKSHAY BOGS CV
AKSHAY BOGS CV
 
cv_overview
cv_overviewcv_overview
cv_overview
 

Similar to A.Lusher C.V (20)

Roy McCullough CV Feb 2015
Roy McCullough CV Feb 2015Roy McCullough CV Feb 2015
Roy McCullough CV Feb 2015
 
C.V_Inspection_2017
C.V_Inspection_2017C.V_Inspection_2017
C.V_Inspection_2017
 
CV CANADA OCT 2016
CV CANADA OCT 2016CV CANADA OCT 2016
CV CANADA OCT 2016
 
CV CANADA JULY 2016
CV CANADA JULY 2016CV CANADA JULY 2016
CV CANADA JULY 2016
 
CB CV 2015
CB CV 2015CB CV 2015
CB CV 2015
 
Rengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15doneRengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15done
 
navjay
navjaynavjay
navjay
 
Jeff Cartwright CV May 2016
Jeff Cartwright CV May 2016Jeff Cartwright CV May 2016
Jeff Cartwright CV May 2016
 
PALANIIAPPAN CV (1)
PALANIIAPPAN CV (1)PALANIIAPPAN CV (1)
PALANIIAPPAN CV (1)
 
cv march 2014
cv march 2014cv march 2014
cv march 2014
 
Mark Smith-CV 1(1)2016WORD
Mark Smith-CV 1(1)2016WORDMark Smith-CV 1(1)2016WORD
Mark Smith-CV 1(1)2016WORD
 
QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
 
kiruba new resume
kiruba new resumekiruba new resume
kiruba new resume
 
Sunil-CV-Latest
Sunil-CV-LatestSunil-CV-Latest
Sunil-CV-Latest
 
sunil k v document.DOCX
sunil k v document.DOCXsunil k v document.DOCX
sunil k v document.DOCX
 
Rengaraj n c vdone
Rengaraj  n c vdoneRengaraj  n c vdone
Rengaraj n c vdone
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control Engineer
 
Resume- Tiwari
Resume- TiwariResume- Tiwari
Resume- Tiwari
 
William Grant c.v Jan 2016
William Grant c.v Jan 2016William Grant c.v Jan 2016
William Grant c.v Jan 2016
 

A.Lusher C.V

  • 1. CURRICULUM VITAE – Adrian Lusher Lead Field Welding Engineer NAME Adrian LUSHER ADDRESS 12 Kincraig Drive, Inverness, Scotland UK IV2 6DQ TELEPHONE +44 1463771691 MOBILE 07597584574 E MAIL adrianlusher@gmail.com PASSPORT 10 YEAR BRITISH NATIONALITY BRITISH DRIVING LICENCE FULL BRITISH Education 1965-1969 Alderman Catleugh Secondary School. Kings Lynn Norfolk Achieved CSE certificates in Maths, English ,History, Metalwork 1969-1974 Norfolk College of Arts and Technology Kings Lynn, Norfolk. Attended Part time during my apprenticeship and achieved City and Guilds Fabrication & Welding Engineering BRIEF HISTORY o Time served welder with 30 years experience in the Oil and Gas Industry. o When on the tools I was a coded pipe and structural welder using MMA, MIG, TIG, FCAW, SAW, and experience in S.T.T processes. o I have had several years experience in supervision of Welders and Fabricators. o I am a qualified Inspector and have held Supervisory and Field Engineering positions. o Employed as a Lead Field Welding Engineer by Bechtel several projects. o During my duties as inspector or supervision I have been responsible in audits and audit reviews of contractors and sub-contractors including: o Review, approval of contractors and sub-contractors quality plans and procedures, welding procedure specifications, N.D.T procedures and testing procedures. o Organizing and executing welder testing programs, and labour recruitment. o I have taken active participation in daily progress meetings, planning meetings and pre-contract awards meetings with regards to quality and welding. o I am able to use my initiative and can work with minimum supervision. o I am a team player, committed, reliable and safety conscious o I have experience in construction of offshore hook-ups, L.N.G plants, Ethylene plants, pipelines, power stations and oil & gas terminals o I have work experience in fabrication yards, workshops, offshore platforms, derrick and lay barges, desert and swamp lands, Brown and Greenfield Sites o I have sound knowledge of relevant ASME, ANSI, AWS, API, Australian and British Codes and Standards o I always embrace the safety culture of the organisation I am working in as this in the oil & gas industry has now become a major part of the projects. QUALIFICATIONS APPRENTICESHIP o 4 Years time served Welder coded to ASME 1X 6G. o City and Guilds Fabrication & Welding Engineering. o 30 years of being in the Oil Gas Construction Industry o Common Sense CV 2015 Adrian Lusher 1/3
  • 2. CURRENT APPROVALS o CSWIP o Bechtel ASNT LEVEL 2 NDT CSWP Welding Inspector 3.1 RT & Visual Feb 14 – Present: Bechtel Australia, Lead Field Welding Engineer Wheatstone LNG Project, Onslow W.A Responsible for implementing the Project Welding Program Overseeing Sub-Contractors welding activities and approving their Welding and NDE procedures and applicable welding documents K.V. Joint Venture Gorgon Project Barrow Island Employer Clough PTY Welding Inspector carrying out Surveillance on Contractors Welding activities Feb 13 – Mar 14: K.V. Joint Venture Gorgon Project Barrow Island Employer Clough PTY Welding Inspector carrying out Surveillance on Contractors Welding activities Nov11 – Feb 13 Bechtel Australia, Lead Field Welding Engineer APLNG Project Curtis Island Gladstone Responsible for implementing the Project Welding Program Overseeing Sub-Contractors welding activities and approving their Welding procedures and applicable welding documents Aug 11 – Nov 11 S.L.C Australia, Employer Leighton PTY QC Coordinator Gorgon Jetty Project Barrow Island CV 2015 Adrian Lusher 2/3
  • 3. July 09 – Aug 11 AnLNG (Chevron) (SWIFT Oil & GAS) Soyo Angola Welding/Piping Inspector Working as part of the P.M.T Team responsible for overseeing the welding and piping installation of the main contractor and their Subcontractors Overseeing the welding of 2X LNG concrete, 9% Nickel Inner shell LNG Tanks Propane and Butane Tanks APRIL 2010 Transferred into the P.M.T QA Department in the position as QA Engineer Duties included: Performing audits on Contractor and Contractors Sub-Contractors Reviewing P.M.T Technical Queries and N.C.R, s, for content and discussing any possible changes before sending to contractor. Writing new P.M.T quality surveillance checklist and revising existing ones when required Maintaining traceability logs for technical Queries and N.C.R’s Training of New P.M.T inspectors ensuring that they understand P.M.T quality function on the project with regards to surveillance checklist, why they have to be completed and the function they serve. Assist the P.M.T site quality Manager in producing Quality Trend reports on Contractors quality performance. July 06 – July 09 Bechtel International – OGD111 Lead Field Welding Engineer Responsible for overseeing the welding activities of Sub contractors during construction of OGD111 Project includes 1x 20” Gas Line 1x24”” Gas Line both 120Km. Tanks and Spheres Process Pipe work. 4 Subcontractors executing the work Review of weld and NDT Procedures, Implementation of B31.3 Code Case 181 for using AUT UT in lieu of radiography Implementation of S.T.T Welding of Cryogenic Services without back purge Review Sub Contractors Welding documentation to Client Standards and National codes Raising design Changes regarding welding issues and discussing with Client. Senior QC Engineer Promoted to this position to cover the QC activities and establish proper implementation of the control processes within the site inspection activities for civil, mechanical, and electrical and instrumentation as stipulated in the Project Quality Plan. Monitoring and coordinating site surveillance, programs, ITP, s and Contractors quality plans and procedures. Visits to sub-contractors as required Coordinate with Third Party Company. Attend Quality, Construction Team internal and external meetings in regards to fabrication quality Oct 05 – Dec 05 Chevron Texaco - Nigeria. Inspector/Construction Rep Installation of Swamp Flow line (Short Term Contract) Feb 05 – Oct 05: Bechtel International - Equatorial Guinea Field Welding Engineer Responsible for overseeing the welding activities of C.B. & I who constructed 2 x 9% Nickel L.N.G. Storage Tanks Oct 02 – Feb 05: Chevron Texaco - Nigeria Construction Rep / Inspector Responsible for overseeing work carried out by indigenous companies. CV 2015 Adrian Lusher 3/3
  • 4. Areas of work include Delta Region Swamps- Repair and Installation of Flow lines. Lagos & Port Harcourt, Jacket and Topside Construction May 98 – Oct 02: Bechtel International - Kazakhstan/Saudi Arabia/India/ Abu Dhabi/Tunisia Field Welding Engineer Role included being responsible for setting up and implementing the companies Welding Program. Liaisons with Clients and Subcontractors over welding and Q/C Issues Organising welder testing and hiring program Purchasing of welding equipment Feb 97- April 98 A.R.A.M.C.O. - Saudi Arabia QC/Welding Inspector Construction of new G.S.O.P’s and Pipelines in the Shaybah Desert. Monitoring of Contractors field welding activities Reviewing Contractors I.T.P’s Checking systems for completion prior to Hydro testing Witnessing Hydro and Valve testing Reviewing final documentation Mar 95- Feb 97 A.M.E.C. - Gt Yarmouth Senior QC Welding Inspector Construction of offshore hook-ups in North Sea Monitoring Field welding activities Reviewing procedures and I.T.P’s Checking systems for completion prior to hydro testing Reviewing and signing final documentation. Feb 86- Feb 95 A.O.C. - Aberdeen Construction of hook-ups in North Sea Coded Pipe Welding Supervising Welders Monitoring field-welding activities Reviewing procedures and I.T.P’s Checking systems for completion prior to Hydro testing Reviewing and signing final documentation. CV 2015 Adrian Lusher 4/3
  • 5. CV 2015 Adrian Lusher 5/3
  • 6. CV 2015 Adrian Lusher 5/3