End User Training Manual
for
SAP PM – Plant Maintenance
Process Name: Calibration process
Process No: TRF/EPM/2.0
Control Copy No: TRF/EPM/2.0/
%& ' %
Doc Version Description Prepared by Date Reviewed by Approved by
00 Original Palani Dorai 18.12.2009 Sudhir kumar
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 2 of 41
Introduction
Enterprise Plant Maintenance process in TRF has the following business processes.
$ $ ( $
Preventive Maintenance process
Equipment Calibration processes
! ! Unplanned / Breakdown Maintenance processes
" " External services processes
# # Reconditioning / Shutdown processes.
For each of the above processes, there are separate End User Training Manuals are
available
This document covers sl. No. 2. Of the above list, that is Calibration Process .
This End User Training manual on Calibration Process consists of the following
sequence of sub-processes
1. Task List availability check - Transaction code IA02
2. Change Maintenance Plan - Transaction code IP02
3. Scheduling of Maintenance Plan - Transaction code IP30
4. Scheduling overview - Transaction code IP24
5. Order details - Transaction code IW32
6. Inspection lot Selection – Transaction code QA32
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 3 of 41
1. Task List availability check - Transaction code IA02
Procedural Steps
Purpose
• Task List availability check
Transaction Code
IA02
Navigation: SAP Easy Access > Logistics > Plant maintenance > Preventive
Maintenance > Work Scheduling > Task Lists > For Equipment > IA02 (Change)
Procedure
Enter the Transaction code IA02 in the command field as shown in the screen
below
Or go as per the navigation shown below and click IA02 - Change
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 4 of 41
Press <Enter> or click on the check mark icon in the top left side corner of the
Screen, the following screen will appear
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 5 of 41
In the above screen, click on the drop down icon at the end of the Equipment field, the
following screen appears.
Click this
icon
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 6 of 41
Check mark the Equip task list, and click on the Maintenance Strategy field, a drop down
icon appears at the end of the field,
Click on this drop down icon, the following screen appears,
Check mark this
radio button
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 7 of 41
Double click on the Maintenance Strategy = Q,, it will get populated on the Maintenance
Strategy field as shown in screen,
Check mark the check box of Equipment task List field (see screen below)
Click on the execute button, the following screen appears, in that drop down list
select the required task list as shown in the screen below.
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 8 of 41
Click the check mark icon at the top of the screen, the following screen appears.
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 9 of 41
Click on the Header push button, the following screen appears
Click on the Operation push button, the following screen appears
Key in the description of the Operation
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 10 of 41
And click the maintenance plan icon at the bottom of the screen, the
following screen appears.
Check mark on the check Box of the “1Y’ field, as shown in the screen below
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 11 of 41
Select the operation line as shown below,
And click on the Inspection Characteristics icon, which is positioned at the
bottom of the screen, the following screen is shown
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 12 of 41
In the above screen, values for the following fields are to be keyed in
Sampling
Procedure in
the Inspection
Characteristic
Target Value for
a Quantitative
Characteristic
Master
Inspection
Characteristic
Upper Specification
Limit
Lower Specification
Limit
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 13 of 41
Once they are keyed-in, r
repeat the same for all the values to be checked,
and the screen will look as shown below.
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 14 of 41
Click the save icon to save the screen, and return back to the Home Screen or
SAP Easy Access screen.
End of document on T-code IA02
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 15 of 41
2. Change Maintenance Plan - Transaction code IP02
Procedural Steps
Purpose
• Change Maintenance Plan
Transaction Code
IP02
Navigation: SAP Easy Access > Logistics > Plant maintenance > Preventive
Maintenance > Maintenance Planning > Maintenance Plans > IP02 (Change)
Procedure
Enter the Transaction code IP02 in the command field as shown in the screen
below
Or go as per the navigation shown below and click IP02 - Change
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 16 of 41
Press <Enter> or click on the check mark icon in the top left side corner of the
Screen, the following screen will appear
Click on this
drop down icon
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 17 of 41
Click on the drop down icon of the Maintenance Plan field (as shown in the above screen),
the following screen appears, key-in “Q” (Strategy for Calibration Equip) in the
Maintenance Strategy field
And click on the execute button, the following screen appears displaying all the
maintenance plans.
Select a maintenance plan, for example, Maintenance Plan = 3 (refer screen
below) is selected,
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 18 of 41
Double click on the selected line to get it populated on the screen.
Click on the check mark icon, the following screen appears.
Assign a task list, as shown below
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 19 of 41
Click on the tab in the above screen, the
following screen appears
The value of the scheduling period is entered as 365 ,730 etc., days.
Note down the details of
the task list assigned
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 20 of 41
Click the save button to save the screen, and return back to the Home Screen
or SAP Easy Access screen.
End of document of T-code IP02
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 21 of 41
3. Scheduling of Maintenance Plan - Transaction code IP30
Procedural Steps
Purpose
• Scheduling for Maintenance Plans > Deadline Monitoring
Transaction Code
IP30
Navigation: SAP Easy Access > Logistics > Plant maintenance > Preventive
Maintenance > Maintenance Planning > Scheduling for Maintenance Plans > IP30
(Deadline Monitoring)
Procedure
Enter the Transaction code IP30 in the command field as shown in the screen
below
Or go as per the navigation shown below and click IP30 – Deadline Monitoring
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 22 of 41
Press <Enter> or click on the check mark icon in the top left side corner of the
Screen, the following screen will appear
Key-in the data (in our example, Maintenance Plan = 3) in the Maintenance Plan field
(refer screen below)
Click execute button to generate the maintenance order
And also the report as shown below
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 23 of 41
Return back to the Home Screen or SAP Easy Access screen.
End of document of T-code IP30
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 24 of 41
4. Scheduling overview - Transaction code IP24
Procedural Steps
Purpose
• Creation of Scheduling overview ( List display )
Transaction Code
IP24
Navigation: SAP Easy Access > Logistics > Plant maintenance > Preventive
Maintenance > Maintenance Planning > Scheduling for Maintenance Plans >
Scheduling Overview > IP24 (List Display)
Procedure
Enter the Transaction code IP24 in the command field as shown in the screen
below
Or go as per the navigation shown below and click IP24 – Scheduling Overview
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 25 of 41
Press <Enter> or click on the check mark icon in the top left side corner of the
Screen, the following screen will appears.
In that screen Key-in the data (in our example, Maintenance Plan = 3) in the
Maintenance Plan field (refer screen below)
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 26 of 41
Click execute button the following screen appears, showing the Order NO.
Note down the Order No. i.e. 4500000. We would be using this order no in our further
transaction screens.
Return back to the Home Screen or SAP Easy Access screen.
End of document of T-code IP24
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 27 of 41
5. Order details - Transaction code IW32
Procedural Steps
Purpose
• To change the details of the order
Transaction Code
IW32
Navigation: SAP Easy Access > Logistics > Plant maintenance > Maintenance
Processing > Order > IW32 (Change)
Procedure
Enter the Transaction code IW32 in the command field as shown in the screen
below
Or go as per the navigation shown below and click IW32 – Change Order
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 28 of 41
Press <Enter> or click on the check mark icon in the top left side corner of the
Screen, the following screen will appears.
Key-in the order Number in the Order field, in our example the order number to
be keyed-in is 4500000 (refer screen below)
Click the check mark icon, the following screen appears
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 29 of 41
From the above screen, note down the Equipment Number, in this example, the
equipment number in the above screen is equal to 40000
Click on the Inspection Lot icon, the following screen appears.
In that screen note down the Inspection Lot Number. In our example it
equal to 140000000000
Return back to the Home Screen or SAP Easy Access screen.
End of document of T-code IP24
Inspection
Lot icon
Equipment
Number
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 30 of 41
6. Inspection Lot Selection - Transaction code QA32
Procedural Steps
Purpose
• Inspection Lot result recording
Transaction Code
QA32
Procedure
Enter the Transaction code QA32 in the command field as shown in the screen
below
Press <Enter> or click on the check mark icon in the top left side corner of the
Screen, the following screen will appears.
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 31 of 41
Spaces fill the Lot Created On field (refer screen below)
And
Under the List settings, Select the radio button of “Select only inspection
lots without a usage decision” (refer screen below).
And
Click on the Insp. Lot origin field, a drop down icon appears, and click on this drop down icon
A pop up window will appear showing all the “Inspection Lot Origin” details..
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 32 of 41
Select and double click on 14, to get it populated on the screen. (refer screen below)
Click the execute button, the following screen appears.
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 33 of 41
Select a line, (just click on the ), Note down the start date of this line, that is 20.01.2010
And click on the results push button, the following screen appears
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 34 of 41
Change the next calib date to the noted down date in the previous screen (that is to
20.01.2010)
And just click on the drop down icon of the equipment field
The screen will look as below
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 35 of 41
Click on the check mark icon to get the following screen
Key-in the inspected results as shown below and press the enter key, the following screen
appears.
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 36 of 41
If the Result value is within the specifications, we get right check mark and the cursor moves
to the next line
Some times instead on entering value, 3,800 (minimum value) by mistake the value might
have been entered as 3,700
In order to correct the value, select the line,
and click on the put in process icon, the following screen appears
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 37 of 41
And correct the value, and press enter key. (refer screen below)
In the same way, key-in all the result values as shown below
Click the save button, the following pop up screen appears.
Click the check mark button of the pop up window,
The system will return back to the following screen showing the message at the status line.
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 38 of 41
In the same way go to the screen and chick on the usage decision
push button for the same inspection lot
The following screen appears
Click on the drop down icon of the UD Code field, the following drop down list appears
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 39 of 41
In the above screen, expand 14, and select “ A can be used”
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 40 of 41
and select “A can be used”. It will get populated in the screen as shown below
Click the save button, a pop up window appears , click the check mark button the
following screen appears.
Project: MISSION SURE
TRF/EPM/2.0 !!" #$!!
Page 41 of 41
Check for message at the status line.(refer screen below)
Return back to the SAP Easy Access or Home Screen
End of document on transaction QA32
End of Training Manual on Calibration process,
Document No: TRF/EPM/2.0 !!" #$!!

More Related Content

What's hot

Sap pm-master-data
Sap pm-master-dataSap pm-master-data
Sap pm-master-data
Marco Antônio Claret Teixeira
 
SAP PM Training Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.infoSAP PM Training Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.info
sapdocs. info
 
SAP PM Master Data Training Guide
SAP PM Master Data Training GuideSAP PM Master Data Training Guide
SAP PM Master Data Training Guide
sapdocs. info
 
Sap plant maintenance
Sap plant maintenanceSap plant maintenance
Sap plant maintenance
expertisesignin1
 
Ps sap-pm maintenance-planning
Ps sap-pm maintenance-planningPs sap-pm maintenance-planning
Ps sap-pm maintenance-planning
Mansour Hineidi
 
SAP PM Plant Maintenance Overview
SAP PM Plant Maintenance OverviewSAP PM Plant Maintenance Overview
SAP PM Plant Maintenance Overview
Ronaldo Abdon
 
SapPreventive Maintenance
SapPreventive Maintenance SapPreventive Maintenance
SapPreventive Maintenance
Mohamed Saad Gelbana
 
58709771-PM-Module-PPT.ppt
58709771-PM-Module-PPT.ppt58709771-PM-Module-PPT.ppt
58709771-PM-Module-PPT.ppt
Mallikarjunac10
 
SAP PM Plant Maintenance Training
SAP PM Plant Maintenance Training SAP PM Plant Maintenance Training
SAP PM Plant Maintenance Training
Senthil kumar
 
SAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCESAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCEPANKAJ TIKEKAR
 
Pm key user presentation- Harith senarath/Janaka Pathmendra
Pm   key user presentation- Harith senarath/Janaka PathmendraPm   key user presentation- Harith senarath/Janaka Pathmendra
Pm key user presentation- Harith senarath/Janaka PathmendraJanaka Pathmendra
 
SAP CBM
SAP CBMSAP CBM
SAP CBM
vvnalla
 
Cs inhouse subcontracting process
Cs inhouse subcontracting processCs inhouse subcontracting process
Cs inhouse subcontracting process
Ramani Thinakaran
 
External refurbishment process
External refurbishment processExternal refurbishment process
External refurbishment process
maroonx
 
SAP Sales Order Processing With Customer Reservations
SAP Sales Order Processing With Customer ReservationsSAP Sales Order Processing With Customer Reservations
SAP Sales Order Processing With Customer Reservations
Vijay Pisipaty
 
using maintenance_strategy_plans
 using maintenance_strategy_plans using maintenance_strategy_plans
using maintenance_strategy_plans
Mohamed Saad Gelbana
 
SAP EAM Maintenance organisation structure
SAP EAM Maintenance organisation structureSAP EAM Maintenance organisation structure
SAP EAM Maintenance organisation structure
IITian Academy
 

What's hot (20)

Sap pm-master-data
Sap pm-master-dataSap pm-master-data
Sap pm-master-data
 
SAP PM Training Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.infoSAP PM Training Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.info
 
SAP Flexible Planning
SAP Flexible PlanningSAP Flexible Planning
SAP Flexible Planning
 
SAP PM Master Data Training Guide
SAP PM Master Data Training GuideSAP PM Master Data Training Guide
SAP PM Master Data Training Guide
 
Sap plant maintenance
Sap plant maintenanceSap plant maintenance
Sap plant maintenance
 
Ps sap-pm maintenance-planning
Ps sap-pm maintenance-planningPs sap-pm maintenance-planning
Ps sap-pm maintenance-planning
 
SAP PM Plant Maintenance Overview
SAP PM Plant Maintenance OverviewSAP PM Plant Maintenance Overview
SAP PM Plant Maintenance Overview
 
SapPreventive Maintenance
SapPreventive Maintenance SapPreventive Maintenance
SapPreventive Maintenance
 
SAP PM: Test Equipment Management/Calibration process
SAP PM: Test Equipment Management/Calibration processSAP PM: Test Equipment Management/Calibration process
SAP PM: Test Equipment Management/Calibration process
 
58709771-PM-Module-PPT.ppt
58709771-PM-Module-PPT.ppt58709771-PM-Module-PPT.ppt
58709771-PM-Module-PPT.ppt
 
SAP PM Plant Maintenance Training
SAP PM Plant Maintenance Training SAP PM Plant Maintenance Training
SAP PM Plant Maintenance Training
 
SAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCESAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCE
 
Pm key user presentation- Harith senarath/Janaka Pathmendra
Pm   key user presentation- Harith senarath/Janaka PathmendraPm   key user presentation- Harith senarath/Janaka Pathmendra
Pm key user presentation- Harith senarath/Janaka Pathmendra
 
SAP CBM
SAP CBMSAP CBM
SAP CBM
 
Cs inhouse subcontracting process
Cs inhouse subcontracting processCs inhouse subcontracting process
Cs inhouse subcontracting process
 
Sap plant maintenance
Sap plant maintenanceSap plant maintenance
Sap plant maintenance
 
External refurbishment process
External refurbishment processExternal refurbishment process
External refurbishment process
 
SAP Sales Order Processing With Customer Reservations
SAP Sales Order Processing With Customer ReservationsSAP Sales Order Processing With Customer Reservations
SAP Sales Order Processing With Customer Reservations
 
using maintenance_strategy_plans
 using maintenance_strategy_plans using maintenance_strategy_plans
using maintenance_strategy_plans
 
SAP EAM Maintenance organisation structure
SAP EAM Maintenance organisation structureSAP EAM Maintenance organisation structure
SAP EAM Maintenance organisation structure
 

Viewers also liked

Sidhant Heble Resume_2_8_16
Sidhant Heble Resume_2_8_16Sidhant Heble Resume_2_8_16
Sidhant Heble Resume_2_8_16Sidhant Heble
 
Prezi
PreziPrezi
How influential can be peer pressure on teens
How influential can be peer pressure on teensHow influential can be peer pressure on teens
How influential can be peer pressure on teensALEX CUESTA SALAZAR
 
U dvou dědků Strašnice.
U dvou dědků Strašnice. U dvou dědků Strašnice.
U dvou dědků Strašnice. Vexl
 
You and i are the same !
You and i are the same !You and i are the same !
You and i are the same !
Mariandreina Mendoza
 
Ingles22
Ingles22Ingles22
Ingles22
patty3107
 
Accessibility
AccessibilityAccessibility
Accessibility
Philip Arnold
 
Happy 17th Anniversary
Happy 17th AnniversaryHappy 17th Anniversary
Happy 17th Anniversaryelizabether1
 
Journey toward Learning Society: Possibilities and challenges of Viet Nam Li...
Journey toward Learning Society: Possibilities and challenges of Viet Nam Li...Journey toward Learning Society: Possibilities and challenges of Viet Nam Li...
Journey toward Learning Society: Possibilities and challenges of Viet Nam Li...
Zakir Hossain/ICS, Zurich
 
Forrester Wave Human Resource Management Systems Q1 2012 1
Forrester Wave Human Resource Management Systems Q1 2012 1Forrester Wave Human Resource Management Systems Q1 2012 1
Forrester Wave Human Resource Management Systems Q1 2012 1tporter_64
 
Cisco labs practical5
Cisco labs practical5Cisco labs practical5
Cisco labs practical5Tai Lam
 
Training certificates
Training certificatesTraining certificates
Training certificates
Kayci Barnett
 
Hroi linked in
Hroi linked inHroi linked in
Hroi linked in
apoorva0707
 
Sumapps
SumappsSumapps
Estratto Rapporto di Ricerca 2012 - Risultati generali
Estratto Rapporto di Ricerca 2012 - Risultati generaliEstratto Rapporto di Ricerca 2012 - Risultati generali
Estratto Rapporto di Ricerca 2012 - Risultati generali
Osservatorio Fedeltà Università di Parma
 

Viewers also liked (20)

CV_Sandeep Anugade
CV_Sandeep AnugadeCV_Sandeep Anugade
CV_Sandeep Anugade
 
Sidhant Heble Resume_2_8_16
Sidhant Heble Resume_2_8_16Sidhant Heble Resume_2_8_16
Sidhant Heble Resume_2_8_16
 
Prezi
PreziPrezi
Prezi
 
How influential can be peer pressure on teens
How influential can be peer pressure on teensHow influential can be peer pressure on teens
How influential can be peer pressure on teens
 
U dvou dědků Strašnice.
U dvou dědků Strašnice. U dvou dědků Strašnice.
U dvou dědků Strašnice.
 
We werken eraan
We werken eraanWe werken eraan
We werken eraan
 
Kpop
KpopKpop
Kpop
 
You and i are the same !
You and i are the same !You and i are the same !
You and i are the same !
 
Ingles22
Ingles22Ingles22
Ingles22
 
Accessibility
AccessibilityAccessibility
Accessibility
 
Happy 17th Anniversary
Happy 17th AnniversaryHappy 17th Anniversary
Happy 17th Anniversary
 
Journey toward Learning Society: Possibilities and challenges of Viet Nam Li...
Journey toward Learning Society: Possibilities and challenges of Viet Nam Li...Journey toward Learning Society: Possibilities and challenges of Viet Nam Li...
Journey toward Learning Society: Possibilities and challenges of Viet Nam Li...
 
Forrester Wave Human Resource Management Systems Q1 2012 1
Forrester Wave Human Resource Management Systems Q1 2012 1Forrester Wave Human Resource Management Systems Q1 2012 1
Forrester Wave Human Resource Management Systems Q1 2012 1
 
Cisco labs practical5
Cisco labs practical5Cisco labs practical5
Cisco labs practical5
 
Training certificates
Training certificatesTraining certificates
Training certificates
 
Hroi linked in
Hroi linked inHroi linked in
Hroi linked in
 
Best workout dvds
Best workout dvdsBest workout dvds
Best workout dvds
 
Sumapps
SumappsSumapps
Sumapps
 
Estratto Rapporto di Ricerca 2012 - Risultati generali
Estratto Rapporto di Ricerca 2012 - Risultati generaliEstratto Rapporto di Ricerca 2012 - Risultati generali
Estratto Rapporto di Ricerca 2012 - Risultati generali
 
Javelin stampman1 0
Javelin stampman1 0Javelin stampman1 0
Javelin stampman1 0
 

Similar to Calibration process

Change transport system in SAP
Change transport system in SAP Change transport system in SAP
Change transport system in SAP
chinu141
 
Change and Transport System (CTS) in SAP
Change and Transport System (CTS) in SAPChange and Transport System (CTS) in SAP
Change and Transport System (CTS) in SAP
Kunal Chadha
 
ProTrack CMMS Overview
ProTrack CMMS OverviewProTrack CMMS Overview
ProTrack CMMS Overview
netsecrets
 
ck40 n-edit-costing-run-instruction
ck40 n-edit-costing-run-instructionck40 n-edit-costing-run-instruction
ck40 n-edit-costing-run-instruction
Pepa Pencheva
 
Step bystep abap_changinga_singlerecord
Step bystep abap_changinga_singlerecordStep bystep abap_changinga_singlerecord
Step bystep abap_changinga_singlerecordMilind Patil
 
Step bystep abap_changinga_singlerecord
Step bystep abap_changinga_singlerecordStep bystep abap_changinga_singlerecord
Step bystep abap_changinga_singlerecordMilind Patil
 
Getting started-guides-english
Getting started-guides-englishGetting started-guides-english
Getting started-guides-english
GauravShetty42
 
User exit training
User exit trainingUser exit training
User exit trainingJen Ringel
 
Process Instrument Explorer Installation Instructions
Process Instrument Explorer Installation InstructionsProcess Instrument Explorer Installation Instructions
Process Instrument Explorer Installation Instructions
noblex1
 
Step bystep abap_field help or documentation
Step bystep abap_field help or documentationStep bystep abap_field help or documentation
Step bystep abap_field help or documentationMilind Patil
 
Step bystep abap_fieldhelpordocumentation
Step bystep abap_fieldhelpordocumentationStep bystep abap_fieldhelpordocumentation
Step bystep abap_fieldhelpordocumentationMilind Patil
 
Lsmw for master data upload simple explanation
Lsmw for master data upload simple explanationLsmw for master data upload simple explanation
Lsmw for master data upload simple explanation
Manoj Kumar
 
how to use Creator c500 bmw honda scanner
how to use Creator c500 bmw honda scannerhow to use Creator c500 bmw honda scanner
how to use Creator c500 bmw honda scanner
Enzo C
 
SAP HANA Product Costing / Cost center accounting
SAP HANA Product Costing / Cost center accountingSAP HANA Product Costing / Cost center accounting
SAP HANA Product Costing / Cost center accounting
Dhaval Gala
 
Benefits RegisterInstructionsProbability = How likely is this eve.docx
Benefits RegisterInstructionsProbability = How likely is this eve.docxBenefits RegisterInstructionsProbability = How likely is this eve.docx
Benefits RegisterInstructionsProbability = How likely is this eve.docx
jasoninnes20
 
Plc fatek
Plc fatekPlc fatek
Gsm dt reports making tutorial
Gsm dt reports making tutorialGsm dt reports making tutorial
Gsm dt reports making tutorial
INAYAT ULHAQ
 

Similar to Calibration process (20)

Change transport system in SAP
Change transport system in SAP Change transport system in SAP
Change transport system in SAP
 
Change and Transport System (CTS) in SAP
Change and Transport System (CTS) in SAPChange and Transport System (CTS) in SAP
Change and Transport System (CTS) in SAP
 
ProTrack CMMS Overview
ProTrack CMMS OverviewProTrack CMMS Overview
ProTrack CMMS Overview
 
ck40 n-edit-costing-run-instruction
ck40 n-edit-costing-run-instructionck40 n-edit-costing-run-instruction
ck40 n-edit-costing-run-instruction
 
Step bystep abap_changinga_singlerecord
Step bystep abap_changinga_singlerecordStep bystep abap_changinga_singlerecord
Step bystep abap_changinga_singlerecord
 
Step bystep abap_changinga_singlerecord
Step bystep abap_changinga_singlerecordStep bystep abap_changinga_singlerecord
Step bystep abap_changinga_singlerecord
 
Getting started-guides-english
Getting started-guides-englishGetting started-guides-english
Getting started-guides-english
 
User exit training
User exit trainingUser exit training
User exit training
 
Process Instrument Explorer Installation Instructions
Process Instrument Explorer Installation InstructionsProcess Instrument Explorer Installation Instructions
Process Instrument Explorer Installation Instructions
 
Step bystep abap_field help or documentation
Step bystep abap_field help or documentationStep bystep abap_field help or documentation
Step bystep abap_field help or documentation
 
Step bystep abap_fieldhelpordocumentation
Step bystep abap_fieldhelpordocumentationStep bystep abap_fieldhelpordocumentation
Step bystep abap_fieldhelpordocumentation
 
DESIGN ACON
DESIGN ACONDESIGN ACON
DESIGN ACON
 
Lsmw for master data upload simple explanation
Lsmw for master data upload simple explanationLsmw for master data upload simple explanation
Lsmw for master data upload simple explanation
 
how to use Creator c500 bmw honda scanner
how to use Creator c500 bmw honda scannerhow to use Creator c500 bmw honda scanner
how to use Creator c500 bmw honda scanner
 
SAP HANA Product Costing / Cost center accounting
SAP HANA Product Costing / Cost center accountingSAP HANA Product Costing / Cost center accounting
SAP HANA Product Costing / Cost center accounting
 
Benefits RegisterInstructionsProbability = How likely is this eve.docx
Benefits RegisterInstructionsProbability = How likely is this eve.docxBenefits RegisterInstructionsProbability = How likely is this eve.docx
Benefits RegisterInstructionsProbability = How likely is this eve.docx
 
SWSample
SWSampleSWSample
SWSample
 
SWSample
SWSampleSWSample
SWSample
 
Plc fatek
Plc fatekPlc fatek
Plc fatek
 
Gsm dt reports making tutorial
Gsm dt reports making tutorialGsm dt reports making tutorial
Gsm dt reports making tutorial
 

Recently uploaded

Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 

Recently uploaded (20)

Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 

Calibration process

  • 1. TRF/EPM/2.0 !!" #$!! End User Training Manual for SAP PM – Plant Maintenance Process Name: Calibration process Process No: TRF/EPM/2.0 Control Copy No: TRF/EPM/2.0/ %& ' % Doc Version Description Prepared by Date Reviewed by Approved by 00 Original Palani Dorai 18.12.2009 Sudhir kumar
  • 2. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 2 of 41 Introduction Enterprise Plant Maintenance process in TRF has the following business processes. $ $ ( $ Preventive Maintenance process Equipment Calibration processes ! ! Unplanned / Breakdown Maintenance processes " " External services processes # # Reconditioning / Shutdown processes. For each of the above processes, there are separate End User Training Manuals are available This document covers sl. No. 2. Of the above list, that is Calibration Process . This End User Training manual on Calibration Process consists of the following sequence of sub-processes 1. Task List availability check - Transaction code IA02 2. Change Maintenance Plan - Transaction code IP02 3. Scheduling of Maintenance Plan - Transaction code IP30 4. Scheduling overview - Transaction code IP24 5. Order details - Transaction code IW32 6. Inspection lot Selection – Transaction code QA32
  • 3. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 3 of 41 1. Task List availability check - Transaction code IA02 Procedural Steps Purpose • Task List availability check Transaction Code IA02 Navigation: SAP Easy Access > Logistics > Plant maintenance > Preventive Maintenance > Work Scheduling > Task Lists > For Equipment > IA02 (Change) Procedure Enter the Transaction code IA02 in the command field as shown in the screen below Or go as per the navigation shown below and click IA02 - Change
  • 4. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 4 of 41 Press <Enter> or click on the check mark icon in the top left side corner of the Screen, the following screen will appear
  • 5. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 5 of 41 In the above screen, click on the drop down icon at the end of the Equipment field, the following screen appears. Click this icon
  • 6. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 6 of 41 Check mark the Equip task list, and click on the Maintenance Strategy field, a drop down icon appears at the end of the field, Click on this drop down icon, the following screen appears, Check mark this radio button
  • 7. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 7 of 41 Double click on the Maintenance Strategy = Q,, it will get populated on the Maintenance Strategy field as shown in screen, Check mark the check box of Equipment task List field (see screen below) Click on the execute button, the following screen appears, in that drop down list select the required task list as shown in the screen below.
  • 8. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 8 of 41 Click the check mark icon at the top of the screen, the following screen appears.
  • 9. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 9 of 41 Click on the Header push button, the following screen appears Click on the Operation push button, the following screen appears Key in the description of the Operation
  • 10. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 10 of 41 And click the maintenance plan icon at the bottom of the screen, the following screen appears. Check mark on the check Box of the “1Y’ field, as shown in the screen below
  • 11. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 11 of 41 Select the operation line as shown below, And click on the Inspection Characteristics icon, which is positioned at the bottom of the screen, the following screen is shown
  • 12. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 12 of 41 In the above screen, values for the following fields are to be keyed in Sampling Procedure in the Inspection Characteristic Target Value for a Quantitative Characteristic Master Inspection Characteristic Upper Specification Limit Lower Specification Limit
  • 13. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 13 of 41 Once they are keyed-in, r repeat the same for all the values to be checked, and the screen will look as shown below.
  • 14. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 14 of 41 Click the save icon to save the screen, and return back to the Home Screen or SAP Easy Access screen. End of document on T-code IA02
  • 15. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 15 of 41 2. Change Maintenance Plan - Transaction code IP02 Procedural Steps Purpose • Change Maintenance Plan Transaction Code IP02 Navigation: SAP Easy Access > Logistics > Plant maintenance > Preventive Maintenance > Maintenance Planning > Maintenance Plans > IP02 (Change) Procedure Enter the Transaction code IP02 in the command field as shown in the screen below Or go as per the navigation shown below and click IP02 - Change
  • 16. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 16 of 41 Press <Enter> or click on the check mark icon in the top left side corner of the Screen, the following screen will appear Click on this drop down icon
  • 17. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 17 of 41 Click on the drop down icon of the Maintenance Plan field (as shown in the above screen), the following screen appears, key-in “Q” (Strategy for Calibration Equip) in the Maintenance Strategy field And click on the execute button, the following screen appears displaying all the maintenance plans. Select a maintenance plan, for example, Maintenance Plan = 3 (refer screen below) is selected,
  • 18. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 18 of 41 Double click on the selected line to get it populated on the screen. Click on the check mark icon, the following screen appears. Assign a task list, as shown below
  • 19. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 19 of 41 Click on the tab in the above screen, the following screen appears The value of the scheduling period is entered as 365 ,730 etc., days. Note down the details of the task list assigned
  • 20. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 20 of 41 Click the save button to save the screen, and return back to the Home Screen or SAP Easy Access screen. End of document of T-code IP02
  • 21. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 21 of 41 3. Scheduling of Maintenance Plan - Transaction code IP30 Procedural Steps Purpose • Scheduling for Maintenance Plans > Deadline Monitoring Transaction Code IP30 Navigation: SAP Easy Access > Logistics > Plant maintenance > Preventive Maintenance > Maintenance Planning > Scheduling for Maintenance Plans > IP30 (Deadline Monitoring) Procedure Enter the Transaction code IP30 in the command field as shown in the screen below Or go as per the navigation shown below and click IP30 – Deadline Monitoring
  • 22. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 22 of 41 Press <Enter> or click on the check mark icon in the top left side corner of the Screen, the following screen will appear Key-in the data (in our example, Maintenance Plan = 3) in the Maintenance Plan field (refer screen below) Click execute button to generate the maintenance order And also the report as shown below
  • 23. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 23 of 41 Return back to the Home Screen or SAP Easy Access screen. End of document of T-code IP30
  • 24. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 24 of 41 4. Scheduling overview - Transaction code IP24 Procedural Steps Purpose • Creation of Scheduling overview ( List display ) Transaction Code IP24 Navigation: SAP Easy Access > Logistics > Plant maintenance > Preventive Maintenance > Maintenance Planning > Scheduling for Maintenance Plans > Scheduling Overview > IP24 (List Display) Procedure Enter the Transaction code IP24 in the command field as shown in the screen below Or go as per the navigation shown below and click IP24 – Scheduling Overview
  • 25. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 25 of 41 Press <Enter> or click on the check mark icon in the top left side corner of the Screen, the following screen will appears. In that screen Key-in the data (in our example, Maintenance Plan = 3) in the Maintenance Plan field (refer screen below)
  • 26. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 26 of 41 Click execute button the following screen appears, showing the Order NO. Note down the Order No. i.e. 4500000. We would be using this order no in our further transaction screens. Return back to the Home Screen or SAP Easy Access screen. End of document of T-code IP24
  • 27. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 27 of 41 5. Order details - Transaction code IW32 Procedural Steps Purpose • To change the details of the order Transaction Code IW32 Navigation: SAP Easy Access > Logistics > Plant maintenance > Maintenance Processing > Order > IW32 (Change) Procedure Enter the Transaction code IW32 in the command field as shown in the screen below Or go as per the navigation shown below and click IW32 – Change Order
  • 28. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 28 of 41 Press <Enter> or click on the check mark icon in the top left side corner of the Screen, the following screen will appears. Key-in the order Number in the Order field, in our example the order number to be keyed-in is 4500000 (refer screen below) Click the check mark icon, the following screen appears
  • 29. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 29 of 41 From the above screen, note down the Equipment Number, in this example, the equipment number in the above screen is equal to 40000 Click on the Inspection Lot icon, the following screen appears. In that screen note down the Inspection Lot Number. In our example it equal to 140000000000 Return back to the Home Screen or SAP Easy Access screen. End of document of T-code IP24 Inspection Lot icon Equipment Number
  • 30. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 30 of 41 6. Inspection Lot Selection - Transaction code QA32 Procedural Steps Purpose • Inspection Lot result recording Transaction Code QA32 Procedure Enter the Transaction code QA32 in the command field as shown in the screen below Press <Enter> or click on the check mark icon in the top left side corner of the Screen, the following screen will appears.
  • 31. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 31 of 41 Spaces fill the Lot Created On field (refer screen below) And Under the List settings, Select the radio button of “Select only inspection lots without a usage decision” (refer screen below). And Click on the Insp. Lot origin field, a drop down icon appears, and click on this drop down icon A pop up window will appear showing all the “Inspection Lot Origin” details..
  • 32. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 32 of 41 Select and double click on 14, to get it populated on the screen. (refer screen below) Click the execute button, the following screen appears.
  • 33. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 33 of 41 Select a line, (just click on the ), Note down the start date of this line, that is 20.01.2010 And click on the results push button, the following screen appears
  • 34. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 34 of 41 Change the next calib date to the noted down date in the previous screen (that is to 20.01.2010) And just click on the drop down icon of the equipment field The screen will look as below
  • 35. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 35 of 41 Click on the check mark icon to get the following screen Key-in the inspected results as shown below and press the enter key, the following screen appears.
  • 36. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 36 of 41 If the Result value is within the specifications, we get right check mark and the cursor moves to the next line Some times instead on entering value, 3,800 (minimum value) by mistake the value might have been entered as 3,700 In order to correct the value, select the line, and click on the put in process icon, the following screen appears
  • 37. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 37 of 41 And correct the value, and press enter key. (refer screen below) In the same way, key-in all the result values as shown below Click the save button, the following pop up screen appears. Click the check mark button of the pop up window, The system will return back to the following screen showing the message at the status line.
  • 38. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 38 of 41 In the same way go to the screen and chick on the usage decision push button for the same inspection lot The following screen appears Click on the drop down icon of the UD Code field, the following drop down list appears
  • 39. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 39 of 41 In the above screen, expand 14, and select “ A can be used”
  • 40. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 40 of 41 and select “A can be used”. It will get populated in the screen as shown below Click the save button, a pop up window appears , click the check mark button the following screen appears.
  • 41. Project: MISSION SURE TRF/EPM/2.0 !!" #$!! Page 41 of 41 Check for message at the status line.(refer screen below) Return back to the SAP Easy Access or Home Screen End of document on transaction QA32 End of Training Manual on Calibration process, Document No: TRF/EPM/2.0 !!" #$!!