SlideShare a Scribd company logo
1 of 44
Presentation By:
Mr. Subhrajyoti Bhattacharjee
B.E., P.G.D.M., PMP®, Certified SAP PM Solution
Consultant
SAP Plant Maintenance
Brief Background of Presenter
 Subhra works as SAP Systems Analyst at Iluka
Resources Limited, Perth, Western Australia
 He has a Net experience of around 7.8 years with around
6 years of SAP Consulting Experience in SAP PM & CS,
MM modules. He has also has standard configuration
knowledge of SAP PS, DMS and integration aspects of
other SAP modules & applications
 He has worked in multiple SAP Implementation, Upgrade,
Support & Audit assignments in Australia, USA, India and
Middle East and is an ex-employee of PwC India Ltd,
T.C.S. Limited
 He also possesses Core Industry experience of 1.8 years
in Maintenance & Inbound Logistics
ERP Systems: An Overview
Plant Maintenance: An Overview
Organizational Structure
Master Data in SAP PM
Maintenance Processing: Objects
Maintenance Processing: Scenarios
Advanced scenarios, Interfaces & Reports
Organization
Government
& Authorities
Customers
Environment
Vendors
Organizational ERP
System
Purchasin
g
Sales &
Distributio
n
Projects
Government &
Authorities
Productio
n
Planning
Vendors
Customers
External
Environment
Finance &
Controllin
g
HR &
Payroll
Maintena
nce
ERP Systems: An Overview
Plant Maintenance: An Overview
Organizational Structure
Master Data in SAP PM
Maintenance Processing: Objects
Maintenance Processing: Scenarios
Advanced scenarios, Interfaces & Reports
 Maintenance is a Support Function within an Organization and Maintenance
costs generally constitute a part of Production overhead costs except when
Maintenance is carried out on Customer Assets to earn revenue.
 Primary Objective of Maintenance is to maintain a high level of Availability,
preventing degeneration and maintaining optimal utilization life of an
Organization’s Physical Assets.
 Physical Assets primarily comprise:
 Fixed assets such as Plant & Machinery, Buildings & Properties, Vehicles and
so on. Usually such assets have a Long useful life (usually > 1 year) over which
they are depreciated
 Operating Assets which may not be treated as Assets in Financial Module nor
depreciated, but having a long term utilization
 High valued current assets such as High valued spares/operating
supplies/machine parts which are subject to Refurbishments with their condition
based values maintained accurately
 Key Performance objectives in Maintenance include
 Maintaining a high level of OEE (Overall Equipment Effectiveness)
Maintaining and Optimal balance between Cost of Breakdown vs. Cost of
Prevention
Utilizing concepts such as TPM, RCM etc. to contribute in Lowering Operating
costs and minimize adverse effects on Equipment ,Operating resources and
ERP Systems: An Overview
Plant Maintenance: An Overview
Organizational Structure
Master Data in SAP PM
Maintenance Processing: Objects
Maintenance Processing: Scenarios
Advanced scenarios, Interfaces & Reports
Company
Code
Maintenance
Planning
Plant
Maintenance
Plant
Maintenance
Plant
Maintenance
Planning
Plant
Maintenance
Plant
Centralized
Planning
De-centralized
Planning
ERP Systems: An Overview
Plant Maintenance: An Overview
Organizational Structure
Master Data in SAP PM
Maintenance Processing: Objects
Maintenance Processing: Scenarios
Advanced scenarios, Interfaces & Reports
SAP
PM:
Master
Data
Technical
Objects
Planning
Objects
Others
Work
Centres
Capacity
information
includes:
Unit of capacity
Start/End times
Utilizations
Shift schedules
etc.
Capacity
PM Work Centre
Category “0005”
Comprises:
Basic data,
Default values,
Capacity view,
Scheduling view,
HR
Assignments,
Costing view
Work
Centre
Work
Centre
Hierarch
y
Work Centre Hierarchy is a
Grouping of Work centres
comprising Maintenance Task
Force
Capacity Functionalities
Capacity
Leveling
Capacity
Planning
Load
Monitoring
FunctionalLocations
Equipment
SubEquipment
EquipmentBillofMaterial
Componentmaterialparts
Serial Number
Material No
Structured into Hierarchical
Levels using Structure
Indicators
Plan
Task List
Maintenance item
Bottom up
planning
Top Down
planning
Plans
• Single cycle Plans
• Strategy Based Plans
• Counter Based Plans (Single/Multi Counter)
Task Lists
• General Task Lists
• Functional Location Task Lists
• Equipment Task Lists
Items
• Standard items
• Strategy based items
Permits
Class/
Characteristi
cs
Measuring
Points/Counters
Other Master
Data
ERP Systems: An Overview
Plant Maintenance: An Overview
Organizational Structure
Master Data in SAP PM
Maintenance Processing: Objects
Maintenance Processing: Scenarios
Advanced scenarios, Interfaces & Reports
Maintenance Notifications vs. Maintenance
Orders
 Maintenance
Notifications are
Reporting objects to
record:
 Maintenance requirement
 Cause, Object Impacted,
Tasks due & Activities
Performed
 Types: Maintenance
Request, Malfunction
(Breakdown) Report,
Activity Report, Service
Notifications
 Maintenance Notifications
generally do not record
 Maintenance Orders
are a complete record
of:
 Operations performed
 Components used
(Stock/Non stock)
 Services hired
 Time and costs posted
 Settlements executed
 Types: Breakdown
Orders, Planned
Orders, Predictive
Orders, Calibrations
Orders, Refurbishment
Orders, Capital Work
ERP Systems: An Overview
Plant Maintenance: An Overview
Organizational Structure
Master Data in SAP PM
Maintenance Processing: Objects
Maintenance Processing: Scenarios
Advanced scenarios, Interfaces & Reports
Order (Type
PM01) created
Convert to PM
Order?
Assigned permits if
any are issued by
relevant personnel
Is stock part
available?
Purchase
requisition created
(MM side)
Approved purchase
requisitions converted to
Purchase order
Yes
YesNo
Notification user
status changed to
ALWD and
notification
released
PM Oredr
Planning done
(Operation,
Components,
Service, Permits)
Order user status
changed to PLND
and order released
No
Stock part
Y
Issue stock part to Reservation No
assigned to PM Order
Master Data
Functional
Location
Equipment
Material
(Stock parts)
Permits (If
applicable)
Activity
Type
Equipment breaks
down
Shoppapers
printedfrom
PMorder
No
In SAP
Outside SAP
Service
Master record
Work center
(PM & PP)
Maintenance
Notification (Type
“M2”) created
Existing Notification
(Report IW29)?
No
Production personnel
follows up on work done
against existing
Notification
Yes
Yes
Is Stock part
planned?
No
Goods receipt to Storage
location
Is Non – stock
part planned?
Is Extenal
service
planned?
Purchase
requisition
created within
PM order
Yes
Approved
purchase
requisitions
converted to
Purchase order
Goods receipt against PO
posts costs to associated
PM order
Purchase
requisition
created within
PM order
Approved
purchase
requisitions
converted to
Purchase order
Service acceptance
throughService entry
sheet against Service PO
posts costs to associated
PM order
Is Maintenance
work completed?
User status of
Maintenance order
changed to MTCO –
Completed by
Maintenance
Yes
Is further planning
required?
Yes
No
Production
personnel to
confirm Order
completion by
changing user
status to PRCO
Time confirmation
for Manhours with
suitable Activity
Type
Settlement rule defined in
order & Order Technically
completed with details of
Malfunction end date/time
Order settled to relevant
settlement receiver (Cost
Center)
Further work done is
recorded in
Notification&
Notification Tasks
Technically completed
No
SAP Notification mail to
designated Person
responsible in
Notification header
SAP Notification mail to
initiator of work
Scheduling overview
report generated by
maintenance
personnel on a
periodic basis
Assigned permits if
any are issued by
relevant personnel
Is stock part
available?
Purchase
requisition created
(MM side)
Approved purchase
requisitions converted to
Purchase order YesNo
Preventive
Maintenance order
(Type”PM02")
generated
Orders generated
for the periodare
planned further
(Operation,
Components,
Service, Permits)
Order user status
changed to PLND
and order released
No
Stock part
Y
Issue stock part to Reservation No
assigned to PM Order
Master Data
Functional
Location
Equipment
Material
(Stock parts)
Permits (If
applicable)
Activity
Type
Yes
Shoppapers
printedfrom
PMorder
No
In SAP
Outside SAP
Maintenance
Task List
Work center
(PM & PP)
Is next call object –
Maintenance Order
due?
Yes
Is Stock part
planned?
No
Goods receipt to Storage
location
Is Non – stock
part planned?
Is Extenal
service
planned?
Purchase
requisition
created within
PM order
Yes
Approved
purchase
requisitions
converted to
Purchase order
Goods receipt against PO
posts costs to associated
PM order
Purchase
requisition
created within
PM order
Approved
purchase
requisitions
converted to
Purchase order
Service acceptance
throughService entry
sheet against Service PO
posts costs to associated
PM order
Is Maintenance
work completed?
User status of
Maintenance order
changed to MTCO –
Completed by
Maintenance
Yes
Is further planning
required?
Yes
No
Production
personnel to
confirm Order
completion by
changing user
status to PRCO
Time confirmation
for Manhours with
suitable Activity
Type
Settlement rule defined in
order & Order Technically
completed with details of
Start/end date/time
Order settled to relevant
settlement receiver (Cost
Center)
Service
Master record
Maintenance
Plan
Counter (For
counter based
plans)
Maintenance Task
List created
Maintenance Plan
created (Single
cycle/Strategy
based/Counter
based)
Maintenance plan
scheduled
(Background job/
Manual)
Measurement
document posting
for Counter Based
plans
Planned Due
dates for order
creation are set in
system
Scheduling overview
report generated by
maintenance
personnel on a
periodic basis
Is stock part
available?
Purchase
requisition created
(MM side)
Approved purchase
requisitions converted to
Purchase order YesNo
Preventive
Maintenance order
(Type”PM02")
generated
Calibration Orders auto
generated and released
(Operation,
Components, Service,
Permits)
No
Stock part
Y
Issue stock part to Reservation No
assigned to PM Order
Master Data
Functional
Location
Equipment
Material
(Stock parts)
Permits (If
applicable)
Activity
Type
Yes
Shoppapers
printedfrom
PMorder
No
In SAP
Outside SAP
Maintenance
Task List
Work center
(PM & PP)
Is next call object –
Maintenance Order
due?
Yes
Is Stock part
planned?
No
Goods receipt to Storage
location
Is Non – stock
part planned?
Is Extenal
service
planned?
Purchase
requisition
created within
PM order
Yes
Approved
purchase
requisitions
converted to
Purchase order
Goods receipt against PO
posts costs to associated
PM order
Purchase
requisition
created within
PM order
Approved
purchase
requisitions
converted to
Purchase order
Service acceptance
throughService entry
sheet against Service PO
posts costs to associated
PM order
Is Maintenance
work completed?
Yes
Is further planning
required?
Yes
No
Time confirmation
for Internal
Manhours with
suitable Activity
Type
Settlement rule set in
Calibration order
Service
Master record
Maintenance
Plan
Counter (For
counter based
plans)
Maintenance Task
List created
(Inspection point
300, MIC’s
entered)
Maintenance Plan
created (Single
cycle/Strategy
based/Counter
based)
Maintenance plan
scheduled
(Background job/
Manual)
Measurement
document posting
for Counter Based
plans
Planned Due
dates for order
creation are set in
system
Quality Inspection Lot
Generated
Result recording done
against Inspection Lot, Order
Technically completed
Order settled to relevant
settlement receiver (Quality
Cost Center)
Order (Type
PM01) created
Convert to PM
Order?
Assigned permits if
any are issued by
relevant personnel
Is stock part
available?
Purchase
requisition created
(MM side)
Approved purchase
requisitions converted to
Purchase order
Yes
YesNo
Notification user
status changed to
ALWD and
notification
released
PM Oredr
Planning done
(Operation,
Components,
Service, Permits)
Order user status
changed to PLND
and order released
No
Stock part
Y
Issue stock part to Reservation No
assigned to PM Order
Master Data
Functional
Location
Equipment
Material
(Stock parts)
Permits (If
applicable)
Activity
Type
Scope for correction/
predictive maintenance
identified by Operator/
Maintenance person
Shoppapers
printedfrom
PMorder
No
In SAP
Outside SAP
Service
Master record
Work center
(PM & PP)
Maintenance
Notification (Type
“M1” Maintenance
request) created
Existing Notification
(Report IW29)?
No
Requestor checks on work
progress
Yes
Yes
Is Stock part
planned?
No
Goods receipt to Storage
location
Is Non – stock
part planned?
Is Extenal
service
planned?
Purchase
requisition
created within
PM order
Yes
Approved
purchase
requisitions
converted to
Purchase order
Goods receipt against PO
posts costs to associated
PM order
Purchase
requisition
created within
PM order
Approved
purchase
requisitions
converted to
Purchase order
Service acceptance
throughService entry
sheet against Service PO
posts costs to associated
PM order
Is Maintenance
work completed?
User status of
Maintenance order
changed to MTCO –
Completed by
Maintenance
Yes
Is further planning
required?
Yes
No
Production
personnel to
confirm Order
completion by
changing user
status to PRCO
Time confirmation
for Manhours with
suitable Activity
Type
Settlement rule defined in
order & Order Technically
completed with details of
Start/ end date/time
Order settled to relevant
settlement receiver (Cost
Center)
SAP Notification mail to
initiator of work
Work detailed in
Notification and Tasks
Technically completed
SAP Notification mail to
designated Person
responsible in
Notification header
No
Capital work Order (Type
“PM06”) created – with
relevant Maintenance
Activity type assigned
Assigned permits if
any are issued by
relevant personnel
Is stock part
available?
Purchase
requisition created
(MM side)
Approved purchase
requisitions converted to
Purchase order YesNo
Order Planning
done (Operation,
Components,
Service, Permits),
Settlement rule
defined
Capital order
released
No
Stock part
Y
Issue stock part to Reservation No
assigned to PM Order
Master Data
Functional
Location
Asset Master –
AuC/FxA (As
relevant)
Material
(Stock parts)
Permits (If
applicable)
Activity
Type
Shoppapers
printedfrom
PMorder
No
In SAP
Outside SAP
Service
Master record
Work center
(PM & PP)
Yes
Is Stock part
planned?
No
Goods receipt to Storage
location
Is Non – stock
part planned?
Is Extenal
service
planned?
Purchase
requisition
created within
PM order
Yes
Approved
purchase
requisitions
converted to
Purchase order
Goods receipt against PO
posts costs to associated
PM order
Purchase
requisition
created within
PM order
Approved
purchase
requisitions
converted to
Purchase order
Yes
Service acceptance
throughService entry
sheet against Service PO
posts costs to associated
PM order
Is Maintenance
work completed?
Yes
Is further planning
required?
Yes
No
Time confirmation
for Manhours with
suitable Activity
Type
Periodic settlement
executed to relevant
receiver (AuC/FxA)
Asset under
construction created
by Business SAP
Finance Team
Maintenance Team
intimated on the AuC
Number
Capital work –
New asset build up
or Enhancement
New Asset buildup
Existing Equipment No (with
assigned Fixed asset) would
be identified
Asset Enhancement
Functional Location (for asset
build up created) as reference
Technical object
Equipment
(Associated to
FxA)
On completion of work Order
Technically completed with
necessary details
In case of Asset buildup work,
Finance finally settles AuC to
a FxA ( created)
Maintenance Team
intimated on the FxA
Number
Functional Location Structure
completed with assigned
Equipment tagged to FxA
number
Refurbishment order type
“PM04" created for Material
No, to convert from C3 -
Damaged to C2 -
Refurbished state
Purchase
requisition created
(MM side)
Approved purchase
requisitions converted to
Purchase order Yes
Order Planning done
(Operation – Internal or
External Services, Additional
Components if any),
Settlement rule defined
No
Stock part
Y
Issue stock part to Reservation No
assigned to PM Order
Master Data
Serial
Number
Equipment
Activity
Type
Shoppapers
printedfrom
PMorder
No
In SAP
Outside SAP
Service
Master record
PM Work center
(For Internal
Refurbishment)
Additional
Stock parts
required/
planned?
No
Goods receipt to Storage
location
Is Non – stock
part planned?
Is Extenal
Refurbishment
service
planned?
Purchase
requisition
created within
PM order
Yes
Approved
purchase
requisitions
converted to
Purchase order
Goods receipt against PO
posts costs to associated
PM order
Purchase
requisition
created within
PM order
Approved
purchase
requisitions
converted to
Purchase order
Service acceptance
throughService entry
sheet against Service PO
posts costs to associated
PM order
Is Maintenance
work completed?
Yes
Is further planning
required?
Yes
No
Time confirmation
for Manhours with
suitable Activity
Type – In case of
internal manhour
consumed
Goods receipt of
Refurbished part (val. Type
“C2") to store
Need for Refurbishment
identified
Asset No
(Tagged to
Equipment ID)
On completion of work Order
Technically completed with
necessary details
Settlement executed to settle
order costs (As per business
requirement to FxA)
Ref. Material (with
valuation types
C1, C2, C3)
Batch Numbers for C1,
C2, C3 states of Ref
material
Damaged Material part
(valuation type C3) issued to
reservation no. in order
Order releasedAvailable in
stock?
No
Yes
ERP Systems: An Overview
Plant Maintenance: An Overview
Organizational Structure
Master Data in SAP PM
Maintenance Processing: Objects
Maintenance Processing: Scenarios
Integrations, Advanced scenarios, Interfaces & Reports
Equipment
Functional
Location
Fixed
Asset
BOM SparesPP Work
Center -
Machine
Plant Maintenance
Financial
Accounting
PM Work
Center
Order
Header
Operation
- Internal
Compone
nt
Operation
– Services
Shutdown
Notification
Maintenance
Plan
Costs
Material Master
Service Master
Material Management
Controlling
Activity
Types
Sender Cost
Center
Receiver
Cost Center
QM Master
Equipments
Employe
e
Planned
Rates /hr
G/L
Account
 PM - Customer Service Scenarios
 PM - Work Clearance Management
 PM – Fleet Management
 PM – Mobile Asset Management
 ** PM – Project Oriented Maintenance
** PM – Linear Asset Management
 ** PM – Rotables Subcontracting
 ** PM – Inspection Rounds
 ** PM – Take over- Hand over of Equipments
** Functionalities available only in ECC 6.0 and in specific EHP versions
SAP Plant Maintenance
SCADA
SAP MI
SAP
BW
Others
Maintenance Cost Analysis Report
Wave- I
Wave- II
Man hour Utilization Report
Wave- I
Wave- II
Downtime Analysis Report
Wave- I
Wave- II
MTTR/MTBF Report
Wave- I
Wave- II
Cause and Effect Analysis Report
Wave- I
Wave- II
Preventive Schedule Overview Report
Wave- I
Wave- II
Material Goods Movement/Consumption Report
Wave- I
Wave- II
Thank you !!

More Related Content

What's hot

SAP PM Plant Maintenance Overview
SAP PM Plant Maintenance OverviewSAP PM Plant Maintenance Overview
SAP PM Plant Maintenance OverviewRonaldo Abdon
 
SAP EAM/PM Organization Structure
SAP EAM/PM Organization StructureSAP EAM/PM Organization Structure
SAP EAM/PM Organization StructureIITian Academy
 
SAP PM Master Data Training Guide
SAP PM Master Data Training GuideSAP PM Master Data Training Guide
SAP PM Master Data Training Guidesapdocs. info
 
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.infoSAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.infosapdocs. info
 
SAP PM Training Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.infoSAP PM Training Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.infosapdocs. info
 
SAP Plant Maintenance Training Material | www.sapdocs.info
SAP Plant Maintenance Training Material | www.sapdocs.infoSAP Plant Maintenance Training Material | www.sapdocs.info
SAP Plant Maintenance Training Material | www.sapdocs.infosapdocs. info
 
Pm key user presentation- Harith senarath/Janaka Pathmendra
Pm   key user presentation- Harith senarath/Janaka PathmendraPm   key user presentation- Harith senarath/Janaka Pathmendra
Pm key user presentation- Harith senarath/Janaka PathmendraJanaka Pathmendra
 
Ps sap-pm maintenance-planning
Ps sap-pm maintenance-planningPs sap-pm maintenance-planning
Ps sap-pm maintenance-planningMansour Hineidi
 
Lam config-131007234330-phpapp01
Lam config-131007234330-phpapp01Lam config-131007234330-phpapp01
Lam config-131007234330-phpapp01MaheshMamidi3
 
SAP PM - WCM: Enhanced Model - Entire process flow with SAP screenshots
SAP PM - WCM: Enhanced Model - Entire process flow with SAP screenshotsSAP PM - WCM: Enhanced Model - Entire process flow with SAP screenshots
SAP PM - WCM: Enhanced Model - Entire process flow with SAP screenshotsSubhrajyoti (Subhra) Bhattacharjee
 
SAP EAM Maintenance organisation structure
SAP EAM Maintenance organisation structureSAP EAM Maintenance organisation structure
SAP EAM Maintenance organisation structureIITian Academy
 
Wcm overview
Wcm overviewWcm overview
Wcm overviewamit1858
 
Pool asset management
Pool asset managementPool asset management
Pool asset managementRavi Kumar
 
Sap enterprise asset_management
Sap enterprise asset_managementSap enterprise asset_management
Sap enterprise asset_managementkamalKRahangdale
 
External refurbishment process
External refurbishment processExternal refurbishment process
External refurbishment processmaroonx
 

What's hot (20)

SAP PM Plant Maintenance Overview
SAP PM Plant Maintenance OverviewSAP PM Plant Maintenance Overview
SAP PM Plant Maintenance Overview
 
SAP EAM/PM Organization Structure
SAP EAM/PM Organization StructureSAP EAM/PM Organization Structure
SAP EAM/PM Organization Structure
 
SAP PM
SAP PMSAP PM
SAP PM
 
SAP PM Master Data Training Guide
SAP PM Master Data Training GuideSAP PM Master Data Training Guide
SAP PM Master Data Training Guide
 
Work clearance management config and steps
Work clearance management   config and stepsWork clearance management   config and steps
Work clearance management config and steps
 
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.infoSAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
 
SAP PM Training Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.infoSAP PM Training Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.info
 
Fleet(2)
Fleet(2)Fleet(2)
Fleet(2)
 
SAP PM: Inspection Rounds & Operation Account Assignment
SAP PM: Inspection Rounds & Operation Account AssignmentSAP PM: Inspection Rounds & Operation Account Assignment
SAP PM: Inspection Rounds & Operation Account Assignment
 
SAP PM: Test Equipment Management/Calibration process
SAP PM: Test Equipment Management/Calibration processSAP PM: Test Equipment Management/Calibration process
SAP PM: Test Equipment Management/Calibration process
 
SAP Plant Maintenance Training Material | www.sapdocs.info
SAP Plant Maintenance Training Material | www.sapdocs.infoSAP Plant Maintenance Training Material | www.sapdocs.info
SAP Plant Maintenance Training Material | www.sapdocs.info
 
Pm key user presentation- Harith senarath/Janaka Pathmendra
Pm   key user presentation- Harith senarath/Janaka PathmendraPm   key user presentation- Harith senarath/Janaka Pathmendra
Pm key user presentation- Harith senarath/Janaka Pathmendra
 
Ps sap-pm maintenance-planning
Ps sap-pm maintenance-planningPs sap-pm maintenance-planning
Ps sap-pm maintenance-planning
 
Lam config-131007234330-phpapp01
Lam config-131007234330-phpapp01Lam config-131007234330-phpapp01
Lam config-131007234330-phpapp01
 
SAP PM - WCM: Enhanced Model - Entire process flow with SAP screenshots
SAP PM - WCM: Enhanced Model - Entire process flow with SAP screenshotsSAP PM - WCM: Enhanced Model - Entire process flow with SAP screenshots
SAP PM - WCM: Enhanced Model - Entire process flow with SAP screenshots
 
SAP EAM Maintenance organisation structure
SAP EAM Maintenance organisation structureSAP EAM Maintenance organisation structure
SAP EAM Maintenance organisation structure
 
Wcm overview
Wcm overviewWcm overview
Wcm overview
 
Pool asset management
Pool asset managementPool asset management
Pool asset management
 
Sap enterprise asset_management
Sap enterprise asset_managementSap enterprise asset_management
Sap enterprise asset_management
 
External refurbishment process
External refurbishment processExternal refurbishment process
External refurbishment process
 

Similar to Sap plant maintenance

ERP Training
ERP TrainingERP Training
ERP TrainingSoumya De
 
On-Demand: Is It Right For Your Company?
On-Demand: Is It Right For Your Company?On-Demand: Is It Right For Your Company?
On-Demand: Is It Right For Your Company?Callidus Software
 
Sap Approach
Sap ApproachSap Approach
Sap ApproachJacques
 
Plant Maintenance Overview.pptx
Plant Maintenance Overview.pptxPlant Maintenance Overview.pptx
Plant Maintenance Overview.pptxpraveenRapeti3
 
Final UP Mandi Automation Presentation
Final UP Mandi Automation PresentationFinal UP Mandi Automation Presentation
Final UP Mandi Automation Presentationashish singh
 
SAP Roadmap in Essar Offshore Subsea Ltd.
SAP Roadmap in Essar Offshore Subsea Ltd.SAP Roadmap in Essar Offshore Subsea Ltd.
SAP Roadmap in Essar Offshore Subsea Ltd.Pankaj K Sinha
 
John Resume latest
John Resume latestJohn Resume latest
John Resume latestJohn Jubilee
 
Erp Solutions(2)
Erp Solutions(2)Erp Solutions(2)
Erp Solutions(2)shalmolo
 
Fei It Alignement With With Business V2
Fei It Alignement With With Business V2Fei It Alignement With With Business V2
Fei It Alignement With With Business V2Dr.Adel Ghannam
 
What makes FirstCall unique? How do we INCREASE YOUR PROFITS?
What makes FirstCall unique? How do we INCREASE YOUR PROFITS?What makes FirstCall unique? How do we INCREASE YOUR PROFITS?
What makes FirstCall unique? How do we INCREASE YOUR PROFITS?Dennis Sands
 
SAP Logistics - CS - Standard Process & Configuration document
SAP Logistics - CS - Standard Process & Configuration documentSAP Logistics - CS - Standard Process & Configuration document
SAP Logistics - CS - Standard Process & Configuration documentSubhrajyoti (Subhra) Bhattacharjee
 
Biz Talk in Business
Biz Talk in BusinessBiz Talk in Business
Biz Talk in Businesskalllol
 

Similar to Sap plant maintenance (20)

ERP Training
ERP TrainingERP Training
ERP Training
 
BIS11 ERP
BIS11 ERPBIS11 ERP
BIS11 ERP
 
On-Demand: Is It Right For Your Company?
On-Demand: Is It Right For Your Company?On-Demand: Is It Right For Your Company?
On-Demand: Is It Right For Your Company?
 
Sap Approach
Sap ApproachSap Approach
Sap Approach
 
ERP
ERPERP
ERP
 
xdoc.pl_meb.pdf
xdoc.pl_meb.pdfxdoc.pl_meb.pdf
xdoc.pl_meb.pdf
 
Erp1
Erp1Erp1
Erp1
 
Plant Maintenance Overview.pptx
Plant Maintenance Overview.pptxPlant Maintenance Overview.pptx
Plant Maintenance Overview.pptx
 
Final UP Mandi Automation Presentation
Final UP Mandi Automation PresentationFinal UP Mandi Automation Presentation
Final UP Mandi Automation Presentation
 
SAP Roadmap in Essar Offshore Subsea Ltd.
SAP Roadmap in Essar Offshore Subsea Ltd.SAP Roadmap in Essar Offshore Subsea Ltd.
SAP Roadmap in Essar Offshore Subsea Ltd.
 
John Resume latest
John Resume latestJohn Resume latest
John Resume latest
 
Erp Solutions(2)
Erp Solutions(2)Erp Solutions(2)
Erp Solutions(2)
 
Fei It Alignement With With Business V2
Fei It Alignement With With Business V2Fei It Alignement With With Business V2
Fei It Alignement With With Business V2
 
karthikeyan_profile-Project ManagerV12
karthikeyan_profile-Project ManagerV12karthikeyan_profile-Project ManagerV12
karthikeyan_profile-Project ManagerV12
 
karthikeyan_profile-Project Manager
karthikeyan_profile-Project Managerkarthikeyan_profile-Project Manager
karthikeyan_profile-Project Manager
 
testing
testingtesting
testing
 
What makes FirstCall unique? How do we INCREASE YOUR PROFITS?
What makes FirstCall unique? How do we INCREASE YOUR PROFITS?What makes FirstCall unique? How do we INCREASE YOUR PROFITS?
What makes FirstCall unique? How do we INCREASE YOUR PROFITS?
 
SAP Logistics - CS - Standard Process & Configuration document
SAP Logistics - CS - Standard Process & Configuration documentSAP Logistics - CS - Standard Process & Configuration document
SAP Logistics - CS - Standard Process & Configuration document
 
Biz Talk in Business
Biz Talk in BusinessBiz Talk in Business
Biz Talk in Business
 
Softweb Tea ERP presentation
Softweb Tea ERP presentationSoftweb Tea ERP presentation
Softweb Tea ERP presentation
 

Recently uploaded

_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 

Recently uploaded (20)

TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 

Sap plant maintenance

  • 1. Presentation By: Mr. Subhrajyoti Bhattacharjee B.E., P.G.D.M., PMP®, Certified SAP PM Solution Consultant SAP Plant Maintenance
  • 2. Brief Background of Presenter  Subhra works as SAP Systems Analyst at Iluka Resources Limited, Perth, Western Australia  He has a Net experience of around 7.8 years with around 6 years of SAP Consulting Experience in SAP PM & CS, MM modules. He has also has standard configuration knowledge of SAP PS, DMS and integration aspects of other SAP modules & applications  He has worked in multiple SAP Implementation, Upgrade, Support & Audit assignments in Australia, USA, India and Middle East and is an ex-employee of PwC India Ltd, T.C.S. Limited  He also possesses Core Industry experience of 1.8 years in Maintenance & Inbound Logistics
  • 3. ERP Systems: An Overview Plant Maintenance: An Overview Organizational Structure Master Data in SAP PM Maintenance Processing: Objects Maintenance Processing: Scenarios Advanced scenarios, Interfaces & Reports
  • 5. Organizational ERP System Purchasin g Sales & Distributio n Projects Government & Authorities Productio n Planning Vendors Customers External Environment Finance & Controllin g HR & Payroll Maintena nce
  • 6. ERP Systems: An Overview Plant Maintenance: An Overview Organizational Structure Master Data in SAP PM Maintenance Processing: Objects Maintenance Processing: Scenarios Advanced scenarios, Interfaces & Reports
  • 7.  Maintenance is a Support Function within an Organization and Maintenance costs generally constitute a part of Production overhead costs except when Maintenance is carried out on Customer Assets to earn revenue.  Primary Objective of Maintenance is to maintain a high level of Availability, preventing degeneration and maintaining optimal utilization life of an Organization’s Physical Assets.  Physical Assets primarily comprise:  Fixed assets such as Plant & Machinery, Buildings & Properties, Vehicles and so on. Usually such assets have a Long useful life (usually > 1 year) over which they are depreciated  Operating Assets which may not be treated as Assets in Financial Module nor depreciated, but having a long term utilization  High valued current assets such as High valued spares/operating supplies/machine parts which are subject to Refurbishments with their condition based values maintained accurately  Key Performance objectives in Maintenance include  Maintaining a high level of OEE (Overall Equipment Effectiveness) Maintaining and Optimal balance between Cost of Breakdown vs. Cost of Prevention Utilizing concepts such as TPM, RCM etc. to contribute in Lowering Operating costs and minimize adverse effects on Equipment ,Operating resources and
  • 8. ERP Systems: An Overview Plant Maintenance: An Overview Organizational Structure Master Data in SAP PM Maintenance Processing: Objects Maintenance Processing: Scenarios Advanced scenarios, Interfaces & Reports
  • 10. ERP Systems: An Overview Plant Maintenance: An Overview Organizational Structure Master Data in SAP PM Maintenance Processing: Objects Maintenance Processing: Scenarios Advanced scenarios, Interfaces & Reports
  • 12. Capacity information includes: Unit of capacity Start/End times Utilizations Shift schedules etc. Capacity PM Work Centre Category “0005” Comprises: Basic data, Default values, Capacity view, Scheduling view, HR Assignments, Costing view Work Centre Work Centre Hierarch y Work Centre Hierarchy is a Grouping of Work centres comprising Maintenance Task Force
  • 13.
  • 16.
  • 17. Plan Task List Maintenance item Bottom up planning Top Down planning
  • 18. Plans • Single cycle Plans • Strategy Based Plans • Counter Based Plans (Single/Multi Counter) Task Lists • General Task Lists • Functional Location Task Lists • Equipment Task Lists Items • Standard items • Strategy based items
  • 20. ERP Systems: An Overview Plant Maintenance: An Overview Organizational Structure Master Data in SAP PM Maintenance Processing: Objects Maintenance Processing: Scenarios Advanced scenarios, Interfaces & Reports
  • 21. Maintenance Notifications vs. Maintenance Orders  Maintenance Notifications are Reporting objects to record:  Maintenance requirement  Cause, Object Impacted, Tasks due & Activities Performed  Types: Maintenance Request, Malfunction (Breakdown) Report, Activity Report, Service Notifications  Maintenance Notifications generally do not record  Maintenance Orders are a complete record of:  Operations performed  Components used (Stock/Non stock)  Services hired  Time and costs posted  Settlements executed  Types: Breakdown Orders, Planned Orders, Predictive Orders, Calibrations Orders, Refurbishment Orders, Capital Work
  • 22.
  • 23.
  • 24. ERP Systems: An Overview Plant Maintenance: An Overview Organizational Structure Master Data in SAP PM Maintenance Processing: Objects Maintenance Processing: Scenarios Advanced scenarios, Interfaces & Reports
  • 25.
  • 26. Order (Type PM01) created Convert to PM Order? Assigned permits if any are issued by relevant personnel Is stock part available? Purchase requisition created (MM side) Approved purchase requisitions converted to Purchase order Yes YesNo Notification user status changed to ALWD and notification released PM Oredr Planning done (Operation, Components, Service, Permits) Order user status changed to PLND and order released No Stock part Y Issue stock part to Reservation No assigned to PM Order Master Data Functional Location Equipment Material (Stock parts) Permits (If applicable) Activity Type Equipment breaks down Shoppapers printedfrom PMorder No In SAP Outside SAP Service Master record Work center (PM & PP) Maintenance Notification (Type “M2”) created Existing Notification (Report IW29)? No Production personnel follows up on work done against existing Notification Yes Yes Is Stock part planned? No Goods receipt to Storage location Is Non – stock part planned? Is Extenal service planned? Purchase requisition created within PM order Yes Approved purchase requisitions converted to Purchase order Goods receipt against PO posts costs to associated PM order Purchase requisition created within PM order Approved purchase requisitions converted to Purchase order Service acceptance throughService entry sheet against Service PO posts costs to associated PM order Is Maintenance work completed? User status of Maintenance order changed to MTCO – Completed by Maintenance Yes Is further planning required? Yes No Production personnel to confirm Order completion by changing user status to PRCO Time confirmation for Manhours with suitable Activity Type Settlement rule defined in order & Order Technically completed with details of Malfunction end date/time Order settled to relevant settlement receiver (Cost Center) Further work done is recorded in Notification& Notification Tasks Technically completed No SAP Notification mail to designated Person responsible in Notification header SAP Notification mail to initiator of work
  • 27. Scheduling overview report generated by maintenance personnel on a periodic basis Assigned permits if any are issued by relevant personnel Is stock part available? Purchase requisition created (MM side) Approved purchase requisitions converted to Purchase order YesNo Preventive Maintenance order (Type”PM02") generated Orders generated for the periodare planned further (Operation, Components, Service, Permits) Order user status changed to PLND and order released No Stock part Y Issue stock part to Reservation No assigned to PM Order Master Data Functional Location Equipment Material (Stock parts) Permits (If applicable) Activity Type Yes Shoppapers printedfrom PMorder No In SAP Outside SAP Maintenance Task List Work center (PM & PP) Is next call object – Maintenance Order due? Yes Is Stock part planned? No Goods receipt to Storage location Is Non – stock part planned? Is Extenal service planned? Purchase requisition created within PM order Yes Approved purchase requisitions converted to Purchase order Goods receipt against PO posts costs to associated PM order Purchase requisition created within PM order Approved purchase requisitions converted to Purchase order Service acceptance throughService entry sheet against Service PO posts costs to associated PM order Is Maintenance work completed? User status of Maintenance order changed to MTCO – Completed by Maintenance Yes Is further planning required? Yes No Production personnel to confirm Order completion by changing user status to PRCO Time confirmation for Manhours with suitable Activity Type Settlement rule defined in order & Order Technically completed with details of Start/end date/time Order settled to relevant settlement receiver (Cost Center) Service Master record Maintenance Plan Counter (For counter based plans) Maintenance Task List created Maintenance Plan created (Single cycle/Strategy based/Counter based) Maintenance plan scheduled (Background job/ Manual) Measurement document posting for Counter Based plans Planned Due dates for order creation are set in system
  • 28. Scheduling overview report generated by maintenance personnel on a periodic basis Is stock part available? Purchase requisition created (MM side) Approved purchase requisitions converted to Purchase order YesNo Preventive Maintenance order (Type”PM02") generated Calibration Orders auto generated and released (Operation, Components, Service, Permits) No Stock part Y Issue stock part to Reservation No assigned to PM Order Master Data Functional Location Equipment Material (Stock parts) Permits (If applicable) Activity Type Yes Shoppapers printedfrom PMorder No In SAP Outside SAP Maintenance Task List Work center (PM & PP) Is next call object – Maintenance Order due? Yes Is Stock part planned? No Goods receipt to Storage location Is Non – stock part planned? Is Extenal service planned? Purchase requisition created within PM order Yes Approved purchase requisitions converted to Purchase order Goods receipt against PO posts costs to associated PM order Purchase requisition created within PM order Approved purchase requisitions converted to Purchase order Service acceptance throughService entry sheet against Service PO posts costs to associated PM order Is Maintenance work completed? Yes Is further planning required? Yes No Time confirmation for Internal Manhours with suitable Activity Type Settlement rule set in Calibration order Service Master record Maintenance Plan Counter (For counter based plans) Maintenance Task List created (Inspection point 300, MIC’s entered) Maintenance Plan created (Single cycle/Strategy based/Counter based) Maintenance plan scheduled (Background job/ Manual) Measurement document posting for Counter Based plans Planned Due dates for order creation are set in system Quality Inspection Lot Generated Result recording done against Inspection Lot, Order Technically completed Order settled to relevant settlement receiver (Quality Cost Center)
  • 29. Order (Type PM01) created Convert to PM Order? Assigned permits if any are issued by relevant personnel Is stock part available? Purchase requisition created (MM side) Approved purchase requisitions converted to Purchase order Yes YesNo Notification user status changed to ALWD and notification released PM Oredr Planning done (Operation, Components, Service, Permits) Order user status changed to PLND and order released No Stock part Y Issue stock part to Reservation No assigned to PM Order Master Data Functional Location Equipment Material (Stock parts) Permits (If applicable) Activity Type Scope for correction/ predictive maintenance identified by Operator/ Maintenance person Shoppapers printedfrom PMorder No In SAP Outside SAP Service Master record Work center (PM & PP) Maintenance Notification (Type “M1” Maintenance request) created Existing Notification (Report IW29)? No Requestor checks on work progress Yes Yes Is Stock part planned? No Goods receipt to Storage location Is Non – stock part planned? Is Extenal service planned? Purchase requisition created within PM order Yes Approved purchase requisitions converted to Purchase order Goods receipt against PO posts costs to associated PM order Purchase requisition created within PM order Approved purchase requisitions converted to Purchase order Service acceptance throughService entry sheet against Service PO posts costs to associated PM order Is Maintenance work completed? User status of Maintenance order changed to MTCO – Completed by Maintenance Yes Is further planning required? Yes No Production personnel to confirm Order completion by changing user status to PRCO Time confirmation for Manhours with suitable Activity Type Settlement rule defined in order & Order Technically completed with details of Start/ end date/time Order settled to relevant settlement receiver (Cost Center) SAP Notification mail to initiator of work Work detailed in Notification and Tasks Technically completed SAP Notification mail to designated Person responsible in Notification header No
  • 30. Capital work Order (Type “PM06”) created – with relevant Maintenance Activity type assigned Assigned permits if any are issued by relevant personnel Is stock part available? Purchase requisition created (MM side) Approved purchase requisitions converted to Purchase order YesNo Order Planning done (Operation, Components, Service, Permits), Settlement rule defined Capital order released No Stock part Y Issue stock part to Reservation No assigned to PM Order Master Data Functional Location Asset Master – AuC/FxA (As relevant) Material (Stock parts) Permits (If applicable) Activity Type Shoppapers printedfrom PMorder No In SAP Outside SAP Service Master record Work center (PM & PP) Yes Is Stock part planned? No Goods receipt to Storage location Is Non – stock part planned? Is Extenal service planned? Purchase requisition created within PM order Yes Approved purchase requisitions converted to Purchase order Goods receipt against PO posts costs to associated PM order Purchase requisition created within PM order Approved purchase requisitions converted to Purchase order Yes Service acceptance throughService entry sheet against Service PO posts costs to associated PM order Is Maintenance work completed? Yes Is further planning required? Yes No Time confirmation for Manhours with suitable Activity Type Periodic settlement executed to relevant receiver (AuC/FxA) Asset under construction created by Business SAP Finance Team Maintenance Team intimated on the AuC Number Capital work – New asset build up or Enhancement New Asset buildup Existing Equipment No (with assigned Fixed asset) would be identified Asset Enhancement Functional Location (for asset build up created) as reference Technical object Equipment (Associated to FxA) On completion of work Order Technically completed with necessary details In case of Asset buildup work, Finance finally settles AuC to a FxA ( created) Maintenance Team intimated on the FxA Number Functional Location Structure completed with assigned Equipment tagged to FxA number
  • 31. Refurbishment order type “PM04" created for Material No, to convert from C3 - Damaged to C2 - Refurbished state Purchase requisition created (MM side) Approved purchase requisitions converted to Purchase order Yes Order Planning done (Operation – Internal or External Services, Additional Components if any), Settlement rule defined No Stock part Y Issue stock part to Reservation No assigned to PM Order Master Data Serial Number Equipment Activity Type Shoppapers printedfrom PMorder No In SAP Outside SAP Service Master record PM Work center (For Internal Refurbishment) Additional Stock parts required/ planned? No Goods receipt to Storage location Is Non – stock part planned? Is Extenal Refurbishment service planned? Purchase requisition created within PM order Yes Approved purchase requisitions converted to Purchase order Goods receipt against PO posts costs to associated PM order Purchase requisition created within PM order Approved purchase requisitions converted to Purchase order Service acceptance throughService entry sheet against Service PO posts costs to associated PM order Is Maintenance work completed? Yes Is further planning required? Yes No Time confirmation for Manhours with suitable Activity Type – In case of internal manhour consumed Goods receipt of Refurbished part (val. Type “C2") to store Need for Refurbishment identified Asset No (Tagged to Equipment ID) On completion of work Order Technically completed with necessary details Settlement executed to settle order costs (As per business requirement to FxA) Ref. Material (with valuation types C1, C2, C3) Batch Numbers for C1, C2, C3 states of Ref material Damaged Material part (valuation type C3) issued to reservation no. in order Order releasedAvailable in stock? No Yes
  • 32. ERP Systems: An Overview Plant Maintenance: An Overview Organizational Structure Master Data in SAP PM Maintenance Processing: Objects Maintenance Processing: Scenarios Integrations, Advanced scenarios, Interfaces & Reports
  • 33. Equipment Functional Location Fixed Asset BOM SparesPP Work Center - Machine Plant Maintenance Financial Accounting PM Work Center Order Header Operation - Internal Compone nt Operation – Services Shutdown Notification Maintenance Plan Costs Material Master Service Master Material Management Controlling Activity Types Sender Cost Center Receiver Cost Center QM Master Equipments Employe e Planned Rates /hr G/L Account
  • 34.  PM - Customer Service Scenarios  PM - Work Clearance Management  PM – Fleet Management  PM – Mobile Asset Management  ** PM – Project Oriented Maintenance ** PM – Linear Asset Management  ** PM – Rotables Subcontracting  ** PM – Inspection Rounds  ** PM – Take over- Hand over of Equipments ** Functionalities available only in ECC 6.0 and in specific EHP versions
  • 36.
  • 37. Maintenance Cost Analysis Report Wave- I Wave- II
  • 38. Man hour Utilization Report Wave- I Wave- II
  • 41. Cause and Effect Analysis Report Wave- I Wave- II
  • 42. Preventive Schedule Overview Report Wave- I Wave- II
  • 43. Material Goods Movement/Consumption Report Wave- I Wave- II