The document provides an overview of SAP Plant Maintenance (SAP PM) including:
1) It discusses the organizational structure for maintenance planning including centralized vs decentralized structures.
2) It outlines the key master data used in SAP PM such as technical objects, work centers, maintenance plans, and tasks lists.
3) It describes some of the main maintenance processing scenarios in SAP PM like maintenance notifications, maintenance orders, and preventative maintenance planning.
SAP EAM/PM Organization structure including Maintenance Plant,planning plant, location etc. For details pl. visit
https://www.iitianacademy.com/?eb_course=sap-isu-ami
SAP Expertise Online
Mail id : sapexpertiseonline@gmail.com
Skype Name : himbuj
sapexpertiseonline
Yahoo Id : sapexpertiseonline@ yahoo.com
Phones : +91 9885766653
+91 9948625298
SAP PM stands for SAP plant maintenance. In a business administration process maintenance is a support function and often it works as an integral part of production or as customer asset for earning revenue. As an essential to business administration, SAP PM certified professionals usually enjoy a lucrative career with high pay-package. Global Online Trainings offers quality online SAP PM Training for the people eager to pursue this course for exploring their career worldwide.
SAP EAM/PM Organization structure including Maintenance Plant,planning plant, location etc. For details pl. visit
https://www.iitianacademy.com/?eb_course=sap-isu-ami
SAP Expertise Online
Mail id : sapexpertiseonline@gmail.com
Skype Name : himbuj
sapexpertiseonline
Yahoo Id : sapexpertiseonline@ yahoo.com
Phones : +91 9885766653
+91 9948625298
SAP PM stands for SAP plant maintenance. In a business administration process maintenance is a support function and often it works as an integral part of production or as customer asset for earning revenue. As an essential to business administration, SAP PM certified professionals usually enjoy a lucrative career with high pay-package. Global Online Trainings offers quality online SAP PM Training for the people eager to pursue this course for exploring their career worldwide.
SAP PM Training Manual - www.sapdocs.infosapdocs. info
SAP PM - Step by step training manual for beginners
Please visit http://sapdocs.info/sap/plant-maintenance/sap-pm-training-manual/ to download file for free
SAP Plant Maintenance Training Material | www.sapdocs.infosapdocs. info
Download free SAP Plant Maintenance end-user training material from http://sapdocs.info/sap/plant-maintenance/download-free-sap-ecc-6-pm-training-material-pdf/
Sap S4 HANA PM Online training +918660816919Senthil kumar
I am a SAP S4 HANA Plant Maintenance Lead consultant of 10 yrs of experience and Providing online training for 9 yrs.
Handling Freelancing projects in SAP S4 HANA PM
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.infosapdocs. info
Visit http://sapdocs.info/sap/plant-maintenance/sap-ecc-6-0-pm-configuration-manual-step-by-step/ to download for free.
Step by step SAP PM guide with screenshots & IMG menu paths..
Contains most of the standard SAP CS process, related data objects, configuration aspects in Logistics modules SD, PM, and integration touchpoints with FI-CO.
SAP PM Training Manual - www.sapdocs.infosapdocs. info
SAP PM - Step by step training manual for beginners
Please visit http://sapdocs.info/sap/plant-maintenance/sap-pm-training-manual/ to download file for free
SAP Plant Maintenance Training Material | www.sapdocs.infosapdocs. info
Download free SAP Plant Maintenance end-user training material from http://sapdocs.info/sap/plant-maintenance/download-free-sap-ecc-6-pm-training-material-pdf/
Sap S4 HANA PM Online training +918660816919Senthil kumar
I am a SAP S4 HANA Plant Maintenance Lead consultant of 10 yrs of experience and Providing online training for 9 yrs.
Handling Freelancing projects in SAP S4 HANA PM
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.infosapdocs. info
Visit http://sapdocs.info/sap/plant-maintenance/sap-ecc-6-0-pm-configuration-manual-step-by-step/ to download for free.
Step by step SAP PM guide with screenshots & IMG menu paths..
Contains most of the standard SAP CS process, related data objects, configuration aspects in Logistics modules SD, PM, and integration touchpoints with FI-CO.
The Business Value of Business IntelligenceSenturus
Learn about various BI architectures and approaches, as well as a comparison of different vendors’ BI offerings. See a demonstration of OLAP cube building. View the video recording and download this deck: http://www.senturus.com/resources/the-business-value-of-business-intelligence/
Senturus, a business analytics consulting firm, has a resource library with hundreds of free recorded webinars, trainings, demos and unbiased product reviews. Take a look and share them with your colleagues and friends: http://www.senturus.com/resources/.
These presentations are created by Tushar B Kute to teach the subject 'Management Information System' subject of TEIT of University of Pune.
http://www.tusharkute.com
GraphRAG is All You need? LLM & Knowledge GraphGuy Korland
Guy Korland, CEO and Co-founder of FalkorDB, will review two articles on the integration of language models with knowledge graphs.
1. Unifying Large Language Models and Knowledge Graphs: A Roadmap.
https://arxiv.org/abs/2306.08302
2. Microsoft Research's GraphRAG paper and a review paper on various uses of knowledge graphs:
https://www.microsoft.com/en-us/research/blog/graphrag-unlocking-llm-discovery-on-narrative-private-data/
Transcript: Selling digital books in 2024: Insights from industry leaders - T...BookNet Canada
The publishing industry has been selling digital audiobooks and ebooks for over a decade and has found its groove. What’s changed? What has stayed the same? Where do we go from here? Join a group of leading sales peers from across the industry for a conversation about the lessons learned since the popularization of digital books, best practices, digital book supply chain management, and more.
Link to video recording: https://bnctechforum.ca/sessions/selling-digital-books-in-2024-insights-from-industry-leaders/
Presented by BookNet Canada on May 28, 2024, with support from the Department of Canadian Heritage.
Accelerate your Kubernetes clusters with Varnish CachingThijs Feryn
A presentation about the usage and availability of Varnish on Kubernetes. This talk explores the capabilities of Varnish caching and shows how to use the Varnish Helm chart to deploy it to Kubernetes.
This presentation was delivered at K8SUG Singapore. See https://feryn.eu/presentations/accelerate-your-kubernetes-clusters-with-varnish-caching-k8sug-singapore-28-2024 for more details.
DevOps and Testing slides at DASA ConnectKari Kakkonen
My and Rik Marselis slides at 30.5.2024 DASA Connect conference. We discuss about what is testing, then what is agile testing and finally what is Testing in DevOps. Finally we had lovely workshop with the participants trying to find out different ways to think about quality and testing in different parts of the DevOps infinity loop.
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualityInflectra
In this insightful webinar, Inflectra explores how artificial intelligence (AI) is transforming software development and testing. Discover how AI-powered tools are revolutionizing every stage of the software development lifecycle (SDLC), from design and prototyping to testing, deployment, and monitoring.
Learn about:
• The Future of Testing: How AI is shifting testing towards verification, analysis, and higher-level skills, while reducing repetitive tasks.
• Test Automation: How AI-powered test case generation, optimization, and self-healing tests are making testing more efficient and effective.
• Visual Testing: Explore the emerging capabilities of AI in visual testing and how it's set to revolutionize UI verification.
• Inflectra's AI Solutions: See demonstrations of Inflectra's cutting-edge AI tools like the ChatGPT plugin and Azure Open AI platform, designed to streamline your testing process.
Whether you're a developer, tester, or QA professional, this webinar will give you valuable insights into how AI is shaping the future of software delivery.
Key Trends Shaping the Future of Infrastructure.pdfCheryl Hung
Keynote at DIGIT West Expo, Glasgow on 29 May 2024.
Cheryl Hung, ochery.com
Sr Director, Infrastructure Ecosystem, Arm.
The key trends across hardware, cloud and open-source; exploring how these areas are likely to mature and develop over the short and long-term, and then considering how organisations can position themselves to adapt and thrive.
Let's dive deeper into the world of ODC! Ricardo Alves (OutSystems) will join us to tell all about the new Data Fabric. After that, Sezen de Bruijn (OutSystems) will get into the details on how to best design a sturdy architecture within ODC.
Essentials of Automations: Optimizing FME Workflows with ParametersSafe Software
Are you looking to streamline your workflows and boost your projects’ efficiency? Do you find yourself searching for ways to add flexibility and control over your FME workflows? If so, you’re in the right place.
Join us for an insightful dive into the world of FME parameters, a critical element in optimizing workflow efficiency. This webinar marks the beginning of our three-part “Essentials of Automation” series. This first webinar is designed to equip you with the knowledge and skills to utilize parameters effectively: enhancing the flexibility, maintainability, and user control of your FME projects.
Here’s what you’ll gain:
- Essentials of FME Parameters: Understand the pivotal role of parameters, including Reader/Writer, Transformer, User, and FME Flow categories. Discover how they are the key to unlocking automation and optimization within your workflows.
- Practical Applications in FME Form: Delve into key user parameter types including choice, connections, and file URLs. Allow users to control how a workflow runs, making your workflows more reusable. Learn to import values and deliver the best user experience for your workflows while enhancing accuracy.
- Optimization Strategies in FME Flow: Explore the creation and strategic deployment of parameters in FME Flow, including the use of deployment and geometry parameters, to maximize workflow efficiency.
- Pro Tips for Success: Gain insights on parameterizing connections and leveraging new features like Conditional Visibility for clarity and simplicity.
We’ll wrap up with a glimpse into future webinars, followed by a Q&A session to address your specific questions surrounding this topic.
Don’t miss this opportunity to elevate your FME expertise and drive your projects to new heights of efficiency.
Search and Society: Reimagining Information Access for Radical FuturesBhaskar Mitra
The field of Information retrieval (IR) is currently undergoing a transformative shift, at least partly due to the emerging applications of generative AI to information access. In this talk, we will deliberate on the sociotechnical implications of generative AI for information access. We will argue that there is both a critical necessity and an exciting opportunity for the IR community to re-center our research agendas on societal needs while dismantling the artificial separation between the work on fairness, accountability, transparency, and ethics in IR and the rest of IR research. Instead of adopting a reactionary strategy of trying to mitigate potential social harms from emerging technologies, the community should aim to proactively set the research agenda for the kinds of systems we should build inspired by diverse explicitly stated sociotechnical imaginaries. The sociotechnical imaginaries that underpin the design and development of information access technologies needs to be explicitly articulated, and we need to develop theories of change in context of these diverse perspectives. Our guiding future imaginaries must be informed by other academic fields, such as democratic theory and critical theory, and should be co-developed with social science scholars, legal scholars, civil rights and social justice activists, and artists, among others.
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Sap plant maintenance
1. SAP Plant Maintenance
Presentation By:
Mr. Subhrajyoti Bhattacharjee
B.E., P.G.D.M., PMP®, Certified SAP PM Solution
Consultant
2. Brief Background of Presenter
Subhra works as SAP Systems Analyst at Iluka
Resources Limited, Perth, Western Australia
He has a Net experience of around 7.8 years with around
6 years of SAP Consulting Experience in SAP PM &
CS, MM modules. He has also has standard configuration
knowledge of SAP PS, DMS and integration aspects of
other SAP modules & applications
He has worked in multiple SAP
Implementation, Upgrade, Support & Audit assignments in
Australia, USA, India and Middle East and is an ex-
employee of PwC India Ltd, T.C.S. Limited
He also possesses Core Industry experience of 1.8 years
in Maintenance & Inbound Logistics
3. ERP Systems: An Overview
Plant Maintenance: An Overview
Organizational Structure
Master Data in SAP PM
Maintenance Processing: Objects
Maintenance Processing: Scenarios
Advanced scenarios, Interfaces & Reports
4. Government
& Authorities
Vendors Organization Customers
Environment
5. External
Vendors
Environment
Organizational ERP
System
Finance &
Controllin
g
Purchasin
Projects
g
Productio
n
Planning
HR &
Payroll
Sales &
Distributio
Maintena n
nce
Government & Customers
Authorities
6. ERP Systems: An Overview
Plant Maintenance: An Overview
Organizational Structure
Master Data in SAP PM
Maintenance Processing: Objects
Maintenance Processing: Scenarios
Advanced scenarios, Interfaces & Reports
7. Maintenance is a Support Function within an Organization and Maintenance
costs generally constitute a part of Production overhead costs except when
Maintenance is carried out on Customer Assets to earn revenue.
Primary Objective of Maintenance is to maintain a high level of
Availability, preventing degeneration and maintaining optimal utilization life of an
Organization’s Physical Assets.
Physical Assets primarily comprise:
Fixed assets such as Plant & Machinery, Buildings & Properties, Vehicles and
so on. Usually such assets have a Long useful life (usually > 1 year) over which
they are depreciated
Operating Assets which may not be treated as Assets in Financial Module nor
depreciated, but having a long term utilization
High valued current assets such as High valued spares/operating
supplies/machine parts which are subject to Refurbishments with their condition
based values maintained accurately
Key Performance objectives in Maintenance include
Maintaining a high level of OEE (Overall Equipment Effectiveness)
Maintaining and Optimal balance between Cost of Breakdown vs. Cost of
Prevention
Utilizing concepts such as TPM, RCM etc. to contribute in Lowering Operating
costs and minimize adverse effects on Equipment ,Operating resources and
8. ERP Systems: An Overview
Plant Maintenance: An Overview
Organizational Structure
Master Data in SAP PM
Maintenance Processing: Objects
Maintenance Processing: Scenarios
Advanced scenarios, Interfaces & Reports
10. ERP Systems: An Overview
Plant Maintenance: An Overview
Organizational Structure
Master Data in SAP PM
Maintenance Processing: Objects
Maintenance Processing: Scenarios
Advanced scenarios, Interfaces & Reports
11. Technical
Objects
SAP
Work PM: Planning
Centres Master Objects
Data
Others
12. Work
Centre Work Centre Hierarchy is a
Hierarch Grouping of Work centres
y comprising Maintenance Task
Force
Work
Capacity
Centre
Capacity
information
includes: PM Work Centre
Category “0005”
Comprises: Basic
data, Default
values, Capacity
Unit of capacity view, Scheduling
Start/End times view, HR
Assignments, Costing
Utilizations view
Shift schedules etc.
15. Functional Locations Structured into Hierarchical
Levels using Structure
Indicators
Equipment Serial Number
Sub Equipment Material No
Equipment Bill of Material
Component material parts
16.
17. Plan
Top Down Bottom up
planning planning
Task List
Maintenance item
18. • Single cycle Plans
• Strategy Based Plans
Plans • Counter Based Plans (Single/Multi Counter)
• General Task Lists
• Functional Location Task Lists
Task Lists • Equipment Task Lists
• Standard items
• Strategy based items
Items
19. Other Master
Data
Measuring
Points/Counters
Class/
Characteristi
cs
Permits
20. ERP Systems: An Overview
Plant Maintenance: An Overview
Organizational Structure
Master Data in SAP PM
Maintenance Processing: Objects
Maintenance Processing: Scenarios
Advanced scenarios, Interfaces & Reports
21. Maintenance Notifications vs. Maintenance
Orders
Maintenance Maintenance Orders
Notifications are are a complete record
Reporting objects to of:
record: Operations performed
Maintenance requirement Components used
Cause, Object (Stock/Non stock)
Impacted, Tasks due & Services hired
Activities Performed Time and costs posted
Types: Maintenance
Settlements executed
Request, Malfunction
(Breakdown) Types: Breakdown
Report, Activity Orders, Planned
Report, Service Orders, Predictive
Notifications Orders, Calibrations
Orders, Refurbishment
Maintenance Notifications
Orders, Capital Work
22.
23.
24. ERP Systems: An Overview
Plant Maintenance: An Overview
Organizational Structure
Master Data in SAP PM
Maintenance Processing: Objects
Maintenance Processing: Scenarios
Advanced scenarios, Interfaces & Reports
25.
26. Master Data
Functional Material Work center
Equipment
Location (Stock parts) (PM & PP)
Production personnel Permits (If Activity Service
follows up on work done
against existing
applicable) Type Master record
Notification
Yes
Further work done is
recorded in
SAP Notification mail to
Existing Notification Notification&
initiator of work
(Report IW29)? Notification Tasks
Technically completed
No
No
SAP Notification mail to Notification user PM Oredr
Maintenance designated Person status changed to Planning done
Equipment breaks Convert to PM Order (Type
Notification (Type responsible in Yes ALWD and (Operation,
down Order? PM01) created
“M2”) created Notification header notification Components,
released Service, Permits)
Shop papers
printed from
PM order
Goods receipt to Storage Issue stock part to Reservation No
location assigned to PM Order
Stock part Yes
Approved purchase Purchase
requisitions converted to requisition created Order user status Assigned permits if
Is stock part Is Stock part
Purchase order (MM side) No Yes changed to PLND any are issued by
available? planned?
and order released relevant personnel
No
Approved
purchase Purchase
Goods receipt against PO requisition
requisitions Is Non – stock
posts costs to associated converted to created within Yes
part planned?
PM order Purchase order PM order
Y
Order settled to relevant No Yes
settlement receiver (Cost
Center)
Approved
Service acceptance Purchase
purchase
throughService entry requisition Is Extenal Is further planning
requisitions
sheet against Service PO created within service required?
converted to
posts costs to associated PM order planned?
Purchase order
PM order
No
Production
Settlement rule defined in User status of
personnel to Time confirmation
order & Order Technically Maintenance order
confirm Order for Manhours with Is Maintenance
completed with details of changed to MTCO – Yes No
completion by suitable Activity work completed?
Malfunction end date/time Completed by
changing user Type
status to PRCO
Maintenance In SAP
Outside SAP
27. Master Data
Functional Material Work center Service
Equipment
Location (Stock parts) (PM & PP) Master record
Counter (For
Permits (If Activity Maintenance Maintenance
counter based
applicable) Type Task List Plan
plans)
Measurement Planned Due
document posting dates for order
for Counter Based creation are set in
plans system
Orders generated
Maintenance Plan Scheduling overview for the periodare
Maintenance plan Is next call object – Preventive
created (Single report generated by planned further
Maintenance Task
cycle/Strategy
scheduled Maintenance Order Yes Maintenance order maintenance
List created (Background job/ due? (Type”PM02") (Operation,
based/Counter personnel on a Components,
Manual) generated
based) periodic basis Service, Permits)
Shop papers
printed from
PM order
Goods receipt to Storage Issue stock part to Reservation No
location assigned to PM Order
Stock part Yes
Approved purchase Purchase
requisitions converted to requisition created Order user status Assigned permits if
Is stock part Is Stock part
Purchase order (MM side) No Yes changed to PLND any are issued by
available? planned?
and order released relevant personnel
No
Approved
Purchase
purchase
Goods receipt against PO requisition
requisitions Is Non – stock
posts costs to associated created within Yes
converted to part planned?
PM order PM order
Purchase order
Y
Order settled to relevant No Yes
settlement receiver (Cost
Center) Approved
Service acceptance purchase Purchase
throughService entry requisitions requisition Is Extenal Is further planning
sheet against Service PO converted to created within service required?
posts costs to associated Purchase order PM order planned?
PM order
No
Production
Settlement rule defined in User status of
personnel to Time confirmation
order & Order Technically Maintenance order
confirm Order for Manhours with Is Maintenance
completed with details of changed to MTCO – Yes No
completion by suitable Activity work completed?
Start/end date/time Completed by
changing user Type
status to PRCO
Maintenance In SAP
Outside SAP
28. Master Data
Functional Material Work center Service
Equipment
Location (Stock parts) (PM & PP) Master record
Counter (For
Permits (If Activity Maintenance Maintenance
counter based
applicable) Type Task List Plan
plans)
Measurement Planned Due
document posting dates for order
for Counter Based creation are set in
plans system
Maintenance Task Maintenance Plan Scheduling overview Calibration Orders auto
Maintenance plan Is next call object – Preventive
List created created (Single report generated by generated and released
(Inspection point cycle/Strategy
scheduled Maintenance Order Yes Maintenance order maintenance (Operation,
(Background job/ due? (Type”PM02")
300, MIC’s based/Counter personnel on a Components, Service,
Manual) generated
entered) based) periodic basis Permits)
Goods receipt to Storage Issue stock part to Reservation No
location assigned to PM Order
Stock part Yes
Shop papers
printed from
PM order
Approved purchase Purchase
requisitions converted to requisition created Quality Inspection Lot
Is stock part Is Stock part
Purchase order (MM side) No Yes Generated
available? planned?
Order settled to relevant No
settlement receiver (Quality
Cost Center) Approved
Purchase
purchase
Goods receipt against PO requisition
requisitions Is Non – stock
posts costs to associated created within Yes
converted to part planned?
PM order PM order
Purchase order
Y
No Yes
Result recording done Approved
against Inspection Lot, Order Service acceptance purchase Purchase
Technically completed throughService entry requisitions requisition Is Extenal Is further planning
sheet against Service PO converted to created within service required?
posts costs to associated Purchase order PM order planned?
PM order
No
Time confirmation
for Internal
Settlement rule set in Is Maintenance
Manhours with Yes No
Calibration order work completed?
suitable Activity
Type In SAP
Outside SAP
29. Master Data
Functional Material Work center
Equipment
Location (Stock parts) (PM & PP)
Permits (If Activity Service
Requestor checks on work
progress
applicable) Type Master record
Yes
Work detailed in
SAP Notification mail to
Notification and Tasks
Existing Notification initiator of work
Technically completed
(Report IW29)?
No
No
Notification user PM Oredr
Scope for correction/ Maintenance SAP Notification mail to
status changed to Planning done
predictive maintenance Notification (Type designated Person Convert to PM Order (Type
Yes ALWD and (Operation,
identified by Operator/ “M1” Maintenance responsible in Order? PM01) created
notification Components,
Maintenance person request) created Notification header
released Service, Permits)
Shop papers
printed from
PM order
Goods receipt to Storage Issue stock part to Reservation No
location assigned to PM Order
Stock part Yes
Approved purchase Purchase
requisitions converted to requisition created Order user status Assigned permits if
Is stock part Is Stock part
Purchase order (MM side) No Yes changed to PLND any are issued by
available? planned?
and order released relevant personnel
No
Approved
Purchase
purchase
Goods receipt against PO requisition
requisitions Is Non – stock
posts costs to associated created within Yes
converted to part planned?
PM order PM order
Purchase order
Y
Order settled to relevant No Yes
settlement receiver (Cost
Center)
Approved
Service acceptance purchase Purchase
throughService entry requisitions requisition Is Extenal Is further planning
sheet against Service PO converted to created within service required?
posts costs to associated Purchase order PM order planned?
PM order
No
Production
Settlement rule defined in User status of
personnel to Time confirmation
order & Order Technically Maintenance order
confirm Order for Manhours with Is Maintenance
completed with details of changed to MTCO – Yes No
completion by suitable Activity work completed?
Start/ end date/time Completed by
changing user Type
status to PRCO
Maintenance In SAP
Outside SAP
30. Master Data
Asset Master –
Functional Material Work center
AuC/FxA (As
Location (Stock parts) (PM & PP)
relevant)
Permits (If Activity Service Equipment
applicable) Type Master record (Associated to
FxA)
Asset under Maintenance Team Functional Location (for asset
construction created intimated on the AuC build up created) as reference
New Asset buildup
by Business SAP Number Technical object
Finance Team
Capital work –
New asset build up
or Enhancement
Order Planning
Capital work Order (Type done (Operation,
Existing Equipment No (with
“PM06”) created – with Components,
Asset Enhancement assigned Fixed asset) would
relevant Maintenance Service, Permits),
be identified
Activity type assigned Settlement rule
defined
Shop papers
printed from
PM order
Goods receipt to Storage Issue stock part to Reservation No
location assigned to PM Order
Yes
Stock part
Functional Location Structure Approved purchase Purchase
requisitions converted to requisition created Is stock part Assigned permits if
completed with assigned No Is Stock part Capital order
Purchase order (MM side) available? Yes any are issued by
Equipment tagged to FxA planned? released
relevant personnel
number
No
Approved
Purchase
purchase
Maintenance Team Goods receipt against PO requisition
intimated on the FxA
requisitions Is Non – stock
posts costs to associated created within Yes
converted to part planned?
Number PM order PM order
Purchase order
Y
No Yes
Approved
Service acceptance Purchase
In case of Asset buildup work, purchase
throughService entry requisition Is Extenal Is further planning
Finance finally settles AuC to requisitions
sheet against Service PO created within Yes service required?
a FxA ( created) converted to
posts costs to associated PM order planned?
Purchase order
PM order
No
Time confirmation
On completion of work Order Periodic settlement
for Manhours with Is Maintenance
Technically completed with executed to relevant Yes No
suitable Activity work completed?
necessary details receiver (AuC/FxA)
Type
In SAP
Outside SAP
31. Master Data
Ref. Material (with PM Work center
valuation types Serial
Equipment (For Internal
C1, C2, C3) Number Refurbishment)
Batch Numbers for C1, Asset No
Service Activity
C2, C3 states of Ref (Tagged to
material Master record Type
Equipment ID)
Refurbishment order type Order Planning done
“PM04" created for Material (Operation – Internal or
Need for Refurbishment
No, to convert from C3 - External Services, Additional
identified
Damaged to C2 - Components if any),
Refurbished state Settlement rule defined
Shop papers
printed from
PM order
Goods receipt to Storage Issue stock part to Reservation No
location assigned to PM Order
Stock part Yes
Approved purchase Purchase Additional
requisitions converted to requisition created Damaged Material part
Available in Stock parts Order released
Purchase order (MM side) No Yes (valuation type C3) issued to
stock? required/
reservation no. in order
planned?
No
Approved
Purchase
purchase
Goods receipt against PO requisition
requisitions Is Non – stock
posts costs to associated created within Yes
converted to part planned?
PM order PM order
Purchase order
Y
No Yes
Approved
Service acceptance Purchase
Settlement executed to settle purchase Is Extenal
throughService entry requisition Is further planning
order costs (As per business requisitions Refurbishment
sheet against Service PO created within required?
requirement to FxA) converted to service
posts costs to associated PM order
Purchase order planned?
PM order
No
Time confirmation
for Manhours with
On completion of work Order Goods receipt of
suitable Activity Is Maintenance
Technically completed with Refurbished part (val. Type Yes No
Type – In case of work completed?
necessary details “C2") to store
internal manhour
consumed
In SAP
Outside SAP
32. ERP Systems: An Overview
Plant Maintenance: An Overview
Organizational Structure
Master Data in SAP PM
Maintenance Processing: Objects
Maintenance Processing: Scenarios
Integrations, Advanced scenarios, Interfaces & Reports
33. Plant Maintenance Controlling
QM Master Employe
Equipments e
Sender Cost Activity
Functional Planned
Notification PM Work Center Types
Location Rates /hr
Financial Center
Accounting Receiver
Cost Center
Maintenance Order
G/L Fixed Equipment Plan Header
Account Asset Material Management
Operation
- Internal
Shutdown Operation
– Services Service Master
PP Work BOM Spares Compone
Center - nt
Machine Material Master
Costs
34. PM - Customer Service Scenarios
PM - Work Clearance Management
PM – Fleet Management
PM – Mobile Asset Management
** PM – Project Oriented Maintenance
** PM – Linear Asset Management
** PM – Rotables Subcontracting
** PM – Inspection Rounds
** PM – Take over- Hand over of Equipments
** Functionalities available only in ECC 6.0 and in specific EHP versions
35. SCADA SAP
BW
SAP Plant Maintenance
Others
SAP MI