 Overview of BRT Options
 Peer Examples
 Opportunities for BRT in St. Louis
 How could BRT create a more livable St.
  Louis region?
   Can offer significant travel time savings
   Provides better service & attracts ridership
   Promotes economic development
   Capital cost is more affordable than fixed-
    guideway transit
    › Facilitates more even distribution of transit
      resources
    › Shorter implementation time
   Facilitates integration of modes and utilizes
    existing infrastructure
 Many different levels of application of
  BRT features
 Sensitive to context, available budget,
  political support
 Time savings features are critical
    › Signal prioritization
    › Dedicated running way
    › Dedicated lanes, ramps, etc.
Source:
  GAO
   Most projects operate in mixed traffic for
    50% or more of project
    › Primarily arterial streets
    › Dedicated running ways in corridors with
      very heavy congestion (example: Cleveland
      Euclid Corridor, New York M15 corridor)
    › Significant travel time savings achieved
      without dedicated running ways with
      relatively light congestion (example: Kansas
      City Troost corridor)
                                                 Source: GAO
   Help shape identity of BRT, portray premium service
   Amenities include (in descending order of popularity)
    ›   Route maps & schedules
    ›   Seating
    ›   Weather protection
    ›   Level boarding
    ›   Safety improvements
    ›   Greater curb width/raised curb
    ›   Next bus displays
    ›   Public art/landscaping
    ›   Bicycle parking
    ›   Physically separated passing lane
    ›   Station located in median
    ›   Park-ride
   Important choice for project
    › Impacts ridership capacity, environmental
      friendliness, passenger comfort, overall image
   All low-floor vehicles
   Almost always lower emission; most common
    propulsion source is hybrid diesel electric
   Doors often on both sides or three-door
    boarding
   Easy wheelchair boarding capabilities to
    reduce loading time
   Docking/narrow lane guidance systems
    › Mechanical, magnetic or optical

                                                       Source: GAO
 Most projects allow onboard fare
  validation (same as typical bus service)
  (ex: Seattle, Kansas City, New York)
 Some projects offer off-board fare
  payment and proof-of-payment (ex: Salt
  Lake City, Cleveland, Eugene (OR),
  Reno)
    › May contribute to customers’ perception as
      high-quality service
    › Can generate travel time savings

                                             Source: GAO
   Technology used to achieve travel time
    savings and increase ridership through
    superior passenger information
    › Also improves operational efficiency, quality of
      service and safety
   Most common features:
    › Traffic signal priority
       Extended greens
       Queue jumping
    › Vehicle tracking systems (monitor spacing and
      ensure connections)
   All BRT systems include
    some branding &
    marketing to promote
    service
     › Strong branding
        important to shaping the
        identity of the line or
        system and attracting
        riders
     › Uniquely branded
        vehicles and stations
     › Many systems emphasize
        speed: “Max”;
        “Velociraptor”; “SWIFT”;
        “RAPID”
     › GCRTA sold naming
        rights for Health Line

                                   Source: GAO & UTA
Source: Parsons Brinkerhoff
Community Transit (Everett, WA) SWIFT

                       SR 99 – Everett
                       Station to Aurora
                       Village Transit
                       Center
                       16.7 miles
                       5 jurisdictions
                       28 stations
                          14 northbound
                          14 southbound
Swift Project
   Initial project cost – approximately $31.3 million
    for 16.7 miles
    • Approx cost per mile = $1.87 million
    • Almost half the cost is for the new vehicles
    • Project was $3.4 million under budget
   Project was fully funded by Federal & State
    grants; partnerships; and local revenues
   Also obtained multiple Grants and partnership
    funds for the 1st 3 years of Operating funds
Swift Timeline
      Only 4 years from
      Board Resolution to
      implementation!
    Bus and paratransit system
     › 7.7 million boardings in FY11
     › $32M operating budget

     › Introduced BRT as a business strategy
     Improve service
     Increase productivity
     Reduce operating cost (supplement with CMAQ)

     › BRT intended to make RTC more sustainable
     Provide a “greener” travel option to more people
     Promote economic development
Develop express and
 short haul feeder
 service
Operate a higher level
 of service
10-minute headways
 between 5:30 AM and
 8:00 PM.
New 30-minute local
 service, CONNECT
Feed RAPID express
Provide 24-hour service
Save $5.0M annually in
 local sales tax funds to
 offset remaining
City of Reno Master Plan
Elements
          Transit Oriented
Developments / Regional
          Centers
       UNR Regional Center Plan

        South Virginia Street TOD

       Downtown Reno
       Regional Center Plan
       Convention Center/Meadowood
       Regional Center Plan

       Reno City Limits

        Virginia Street
    Operational challenges overcome
     Productivity and ridership increased
    Stations reinforce supportive land uses and
     compliment TOD efforts of the City of Reno
    Cost cutting measures have helped but
     revenue is still going down
    CMAQ funding helped bridge the deepest part
     of the Great Recession; yet funding challenges
     still exist
   Why highway corridors?
    › Location and trip patterns of people and jobs
    › Existing service not competitive
    › Inter-agency and inter-modal collaboration
      opportunities
     Highway corridor constraints
    › Economic development is limited along entire
      corridor; node-based focus
    › Long routes make dedicated right of way cost
      prohibitive
    › Connections to bus and bike/ped modes
      difficult
    › Connectivity to local transit is key, may require
      transfer
   Alternatives Analysis study initiated
    September 2012
    › Metro; EWGWCOG; MoDOT; St. Louis
        County; City of St. Louis
     12-month study will identify two most
      competitive corridors
     Complete AA for two corridors,
      focusing on cost-effective modes
     Conclude with locally preferred
      alternative for two projects
 Grand Avenue is a densely developed
  corridor and supports Metro’s busiest bus
  route
 Service problems include low travel
  speed and too little capacity
 Existing land use, ongoing development
  and recent investments
    › Enhanced transit service would leverage
     those investments
 Short-term solution to capacity issues will
  likely be larger vehicles
 Pursuing feasibility study that would
  define a BRT project on Grand
    › Technology, service plan, running way,
        stations, etc.
       Strong leadership, regional consensus
        and federal funding are a must
   Regional consensus about project
    priorities
   Transit-supportive land use
   Public buy-in
   Cost-effective projects
   Federal funding
   Leadership
    › Projects must have champions to succeed!
 Plan for implementing a system of
  enhanced service
 Regional consensus & public support
 Detailed project definition
    › Will include Downtown St. Louis component
     Transit-supportive zoning & land use
       Federal funding

       An effective, sustainable multi-modal
        transportation system

More Related Content

What's hot

RV 2014: Complete Streets- From Policy to Implementation by James Cromar and ...
RV 2014: Complete Streets- From Policy to Implementation by James Cromar and ...RV 2014: Complete Streets- From Policy to Implementation by James Cromar and ...
RV 2014: Complete Streets- From Policy to Implementation by James Cromar and ...Rail~Volution
 
RBRC Presentation oct 18_11_langley chamber final
RBRC Presentation  oct 18_11_langley chamber finalRBRC Presentation  oct 18_11_langley chamber final
RBRC Presentation oct 18_11_langley chamber finalRobertsBankRailCorridor
 
RV 2014: Implementing Equitable TOD: Improving Lives by Rose Gray
RV 2014: Implementing Equitable TOD: Improving Lives by Rose GrayRV 2014: Implementing Equitable TOD: Improving Lives by Rose Gray
RV 2014: Implementing Equitable TOD: Improving Lives by Rose GrayRail~Volution
 
Transit-Oriented Communities for South of Fraser
Transit-Oriented Communities for South of FraserTransit-Oriented Communities for South of Fraser
Transit-Oriented Communities for South of FraserSouth Fraser Blog
 
Employment TOD: The Other E in ETOD by Alden S. Raine, PhD
Employment TOD: The Other E in ETOD by Alden S. Raine, PhDEmployment TOD: The Other E in ETOD by Alden S. Raine, PhD
Employment TOD: The Other E in ETOD by Alden S. Raine, PhDRail~Volution
 
Webinar: The flexibility of the bus is both a strength and a weakness in prov...
Webinar: The flexibility of the bus is both a strength and a weakness in prov...Webinar: The flexibility of the bus is both a strength and a weakness in prov...
Webinar: The flexibility of the bus is both a strength and a weakness in prov...BRTCoE
 
RV 2015: Advocacy and Coalition Building: Fighting Transit Opposition by Mega...
RV 2015: Advocacy and Coalition Building: Fighting Transit Opposition by Mega...RV 2015: Advocacy and Coalition Building: Fighting Transit Opposition by Mega...
RV 2015: Advocacy and Coalition Building: Fighting Transit Opposition by Mega...Rail~Volution
 
Moud tod policy 29_sept 2013_secy_ud
Moud tod policy 29_sept 2013_secy_udMoud tod policy 29_sept 2013_secy_ud
Moud tod policy 29_sept 2013_secy_udUttipec Dda
 
Rtp for reporter
Rtp for reporterRtp for reporter
Rtp for reportercccjclinton
 
VTA's Next Network: Your Transit Choices
VTA's Next Network: Your Transit ChoicesVTA's Next Network: Your Transit Choices
VTA's Next Network: Your Transit ChoicesSCVTA
 
New Developments in Transit Oriented Development
New Developments in Transit Oriented DevelopmentNew Developments in Transit Oriented Development
New Developments in Transit Oriented DevelopmentVirtual ULI
 
Webinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and ElsewhereWebinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and ElsewhereBRTCoE
 

What's hot (20)

RV 2014: Complete Streets- From Policy to Implementation by James Cromar and ...
RV 2014: Complete Streets- From Policy to Implementation by James Cromar and ...RV 2014: Complete Streets- From Policy to Implementation by James Cromar and ...
RV 2014: Complete Streets- From Policy to Implementation by James Cromar and ...
 
GoTriangle Update on DOLRT Project
GoTriangle Update on DOLRT ProjectGoTriangle Update on DOLRT Project
GoTriangle Update on DOLRT Project
 
Elgin Smi2
Elgin Smi2Elgin Smi2
Elgin Smi2
 
Update from Regional Transportation Alliance
Update from Regional Transportation AllianceUpdate from Regional Transportation Alliance
Update from Regional Transportation Alliance
 
RBRC Presentation oct 18_11_langley chamber final
RBRC Presentation  oct 18_11_langley chamber finalRBRC Presentation  oct 18_11_langley chamber final
RBRC Presentation oct 18_11_langley chamber final
 
RV 2014: Implementing Equitable TOD: Improving Lives by Rose Gray
RV 2014: Implementing Equitable TOD: Improving Lives by Rose GrayRV 2014: Implementing Equitable TOD: Improving Lives by Rose Gray
RV 2014: Implementing Equitable TOD: Improving Lives by Rose Gray
 
Transit-Oriented Communities for South of Fraser
Transit-Oriented Communities for South of FraserTransit-Oriented Communities for South of Fraser
Transit-Oriented Communities for South of Fraser
 
SMART Plan DTPW Corridor Estimates
SMART Plan DTPW Corridor EstimatesSMART Plan DTPW Corridor Estimates
SMART Plan DTPW Corridor Estimates
 
Employment TOD: The Other E in ETOD by Alden S. Raine, PhD
Employment TOD: The Other E in ETOD by Alden S. Raine, PhDEmployment TOD: The Other E in ETOD by Alden S. Raine, PhD
Employment TOD: The Other E in ETOD by Alden S. Raine, PhD
 
Webinar: The flexibility of the bus is both a strength and a weakness in prov...
Webinar: The flexibility of the bus is both a strength and a weakness in prov...Webinar: The flexibility of the bus is both a strength and a weakness in prov...
Webinar: The flexibility of the bus is both a strength and a weakness in prov...
 
RV 2015: Advocacy and Coalition Building: Fighting Transit Opposition by Mega...
RV 2015: Advocacy and Coalition Building: Fighting Transit Opposition by Mega...RV 2015: Advocacy and Coalition Building: Fighting Transit Opposition by Mega...
RV 2015: Advocacy and Coalition Building: Fighting Transit Opposition by Mega...
 
Grid Un-Locked - Week 4
Grid Un-Locked - Week 4Grid Un-Locked - Week 4
Grid Un-Locked - Week 4
 
Cultivating great transit related communities final
Cultivating great transit related communities finalCultivating great transit related communities final
Cultivating great transit related communities final
 
Moud tod policy 29_sept 2013_secy_ud
Moud tod policy 29_sept 2013_secy_udMoud tod policy 29_sept 2013_secy_ud
Moud tod policy 29_sept 2013_secy_ud
 
GATrailSummitPrez
GATrailSummitPrezGATrailSummitPrez
GATrailSummitPrez
 
Rtp for reporter
Rtp for reporterRtp for reporter
Rtp for reporter
 
VTA's Next Network: Your Transit Choices
VTA's Next Network: Your Transit ChoicesVTA's Next Network: Your Transit Choices
VTA's Next Network: Your Transit Choices
 
New Developments in Transit Oriented Development
New Developments in Transit Oriented DevelopmentNew Developments in Transit Oriented Development
New Developments in Transit Oriented Development
 
Central West Focus Area Update for EDPP
Central West Focus Area Update for EDPPCentral West Focus Area Update for EDPP
Central West Focus Area Update for EDPP
 
Webinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and ElsewhereWebinar: Some Observations on BRT in North America… and Elsewhere
Webinar: Some Observations on BRT in North America… and Elsewhere
 

Similar to Building a Better Metro: Possibilities for BRT

Public Transit 101 - Making Transit the Better Way
Public Transit 101 - Making Transit the Better WayPublic Transit 101 - Making Transit the Better Way
Public Transit 101 - Making Transit the Better WayMaytree
 
Traffic Congestion
Traffic CongestionTraffic Congestion
Traffic CongestionZaid Kayani
 
Ghana Priorities: Urban Transportation
Ghana Priorities: Urban TransportationGhana Priorities: Urban Transportation
Ghana Priorities: Urban TransportationCopenhagen_Consensus
 
Chattanooga Passenger Rail Public Meeting 10/22/15
Chattanooga Passenger Rail Public Meeting 10/22/15  Chattanooga Passenger Rail Public Meeting 10/22/15
Chattanooga Passenger Rail Public Meeting 10/22/15 Tyler Yount
 
role of tdm in urban deveopment
role of tdm in urban deveopment role of tdm in urban deveopment
role of tdm in urban deveopment ICLEI
 
COTA NextGen-Phase II Public Forum
COTA NextGen-Phase II Public ForumCOTA NextGen-Phase II Public Forum
COTA NextGen-Phase II Public ForumCOTA BUS
 
TDM and Transportation Infrastructure: An Essential Part of Any Master Plan
TDM and Transportation Infrastructure: An Essential Part of Any Master PlanTDM and Transportation Infrastructure: An Essential Part of Any Master Plan
TDM and Transportation Infrastructure: An Essential Part of Any Master PlanHarvard Campus Services
 
Sss14duke BT Innovate Research Design
Sss14duke BT Innovate Research DesignSss14duke BT Innovate Research Design
Sss14duke BT Innovate Research DesignJustin Hayward
 
Venice US41 ByPass Alternatives
Venice US41 ByPass  AlternativesVenice US41 ByPass  Alternatives
Venice US41 ByPass AlternativesTHECITYALLIANCE
 
Atlanta Transportation Plan
Atlanta Transportation PlanAtlanta Transportation Plan
Atlanta Transportation PlanTom Wyatt, IOM
 
Mountain View AGT
Mountain View AGTMountain View AGT
Mountain View AGTAdina Levin
 
Microtransit Overview: A Research Perspective
Microtransit Overview: A Research PerspectiveMicrotransit Overview: A Research Perspective
Microtransit Overview: A Research PerspectiveRPO America
 
Funding options presentation
Funding options presentationFunding options presentation
Funding options presentationoneregionforward
 
COTA NE AA Public Meeting Presentation
COTA NE AA Public Meeting PresentationCOTA NE AA Public Meeting Presentation
COTA NE AA Public Meeting PresentationCOTA BUS
 

Similar to Building a Better Metro: Possibilities for BRT (20)

Cleveland Peer Exchange - Euclid Corridor Transformation
Cleveland Peer Exchange - Euclid Corridor TransformationCleveland Peer Exchange - Euclid Corridor Transformation
Cleveland Peer Exchange - Euclid Corridor Transformation
 
Public Transit 101 - Making Transit the Better Way
Public Transit 101 - Making Transit the Better WayPublic Transit 101 - Making Transit the Better Way
Public Transit 101 - Making Transit the Better Way
 
Traffic Congestion
Traffic CongestionTraffic Congestion
Traffic Congestion
 
DTPW's Rapid Transit Corridors Conceptual Financial Plan Proposal
DTPW's Rapid Transit Corridors Conceptual Financial Plan ProposalDTPW's Rapid Transit Corridors Conceptual Financial Plan Proposal
DTPW's Rapid Transit Corridors Conceptual Financial Plan Proposal
 
Ghana Priorities: Urban Transportation
Ghana Priorities: Urban TransportationGhana Priorities: Urban Transportation
Ghana Priorities: Urban Transportation
 
Chattanooga Passenger Rail Public Meeting 10/22/15
Chattanooga Passenger Rail Public Meeting 10/22/15  Chattanooga Passenger Rail Public Meeting 10/22/15
Chattanooga Passenger Rail Public Meeting 10/22/15
 
role of tdm in urban deveopment
role of tdm in urban deveopment role of tdm in urban deveopment
role of tdm in urban deveopment
 
Caltrans District 7 Connected Corridors Pilot on I-210
Caltrans District 7 Connected Corridors Pilot on I-210Caltrans District 7 Connected Corridors Pilot on I-210
Caltrans District 7 Connected Corridors Pilot on I-210
 
BRT Workshop - Intro
BRT Workshop - IntroBRT Workshop - Intro
BRT Workshop - Intro
 
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
Boosting Active Transportation at the Regional Level: Setting and Meeting Per...
 
COTA NextGen-Phase II Public Forum
COTA NextGen-Phase II Public ForumCOTA NextGen-Phase II Public Forum
COTA NextGen-Phase II Public Forum
 
TDM and Transportation Infrastructure: An Essential Part of Any Master Plan
TDM and Transportation Infrastructure: An Essential Part of Any Master PlanTDM and Transportation Infrastructure: An Essential Part of Any Master Plan
TDM and Transportation Infrastructure: An Essential Part of Any Master Plan
 
Sss14duke BT Innovate Research Design
Sss14duke BT Innovate Research DesignSss14duke BT Innovate Research Design
Sss14duke BT Innovate Research Design
 
Venice US41 ByPass Alternatives
Venice US41 ByPass  AlternativesVenice US41 ByPass  Alternatives
Venice US41 ByPass Alternatives
 
Atlanta Transportation Plan
Atlanta Transportation PlanAtlanta Transportation Plan
Atlanta Transportation Plan
 
Maximizing Biking and Walking Access to Transit
Maximizing Biking and Walking Access to TransitMaximizing Biking and Walking Access to Transit
Maximizing Biking and Walking Access to Transit
 
Mountain View AGT
Mountain View AGTMountain View AGT
Mountain View AGT
 
Microtransit Overview: A Research Perspective
Microtransit Overview: A Research PerspectiveMicrotransit Overview: A Research Perspective
Microtransit Overview: A Research Perspective
 
Funding options presentation
Funding options presentationFunding options presentation
Funding options presentation
 
COTA NE AA Public Meeting Presentation
COTA NE AA Public Meeting PresentationCOTA NE AA Public Meeting Presentation
COTA NE AA Public Meeting Presentation
 

More from Trailnet

Livable Streets Design
Livable Streets Design Livable Streets Design
Livable Streets Design Trailnet
 
Missouri Livable Streets Training - Boonslick Regional Planning Commission
Missouri Livable Streets Training - Boonslick Regional Planning CommissionMissouri Livable Streets Training - Boonslick Regional Planning Commission
Missouri Livable Streets Training - Boonslick Regional Planning CommissionTrailnet
 
Arch Women: A Pedal-Powered Movement - Trailnet Introduction
Arch Women: A Pedal-Powered Movement - Trailnet IntroductionArch Women: A Pedal-Powered Movement - Trailnet Introduction
Arch Women: A Pedal-Powered Movement - Trailnet IntroductionTrailnet
 
Street Harrassment on Bike, Foot, and Transit - Leah Patriarco
Street Harrassment on Bike, Foot, and Transit - Leah PatriarcoStreet Harrassment on Bike, Foot, and Transit - Leah Patriarco
Street Harrassment on Bike, Foot, and Transit - Leah PatriarcoTrailnet
 
GirlTrek/SheCycles - Faye Paige Edwards
GirlTrek/SheCycles - Faye Paige EdwardsGirlTrek/SheCycles - Faye Paige Edwards
GirlTrek/SheCycles - Faye Paige EdwardsTrailnet
 
The Monthly Cycle - Courtney Cushard
The Monthly Cycle - Courtney CushardThe Monthly Cycle - Courtney Cushard
The Monthly Cycle - Courtney CushardTrailnet
 
Trailnet Improving the Pedestrian Experience
Trailnet Improving the Pedestrian ExperienceTrailnet Improving the Pedestrian Experience
Trailnet Improving the Pedestrian ExperienceTrailnet
 
Park.presentation
Park.presentationPark.presentation
Park.presentationTrailnet
 
Effland.presentation
Effland.presentationEffland.presentation
Effland.presentationTrailnet
 
Cooper.ann arbor
Cooper.ann arborCooper.ann arbor
Cooper.ann arborTrailnet
 
The Minneapolis Bicycle Story David Peterson
The Minneapolis Bicycle Story David PetersonThe Minneapolis Bicycle Story David Peterson
The Minneapolis Bicycle Story David PetersonTrailnet
 
Indianapolis Modus Operandi Andy Lutz
Indianapolis Modus Operandi Andy LutzIndianapolis Modus Operandi Andy Lutz
Indianapolis Modus Operandi Andy LutzTrailnet
 
Indianapolis Best Practices Andy Lutz
Indianapolis Best Practices Andy LutzIndianapolis Best Practices Andy Lutz
Indianapolis Best Practices Andy LutzTrailnet
 
The State of Biking in St. Louis Rhonda Smythe
The State of Biking in St. Louis Rhonda SmytheThe State of Biking in St. Louis Rhonda Smythe
The State of Biking in St. Louis Rhonda SmytheTrailnet
 
State of Biking Todd Waelterman
State of Biking Todd WaeltermanState of Biking Todd Waelterman
State of Biking Todd WaeltermanTrailnet
 
Big Healthy Trees
Big Healthy TreesBig Healthy Trees
Big Healthy TreesTrailnet
 
Gateway Greening
Gateway GreeningGateway Greening
Gateway GreeningTrailnet
 
Pruitt Igoe Now
Pruitt Igoe NowPruitt Igoe Now
Pruitt Igoe NowTrailnet
 
Perennial transforming Objects Lives Communities
Perennial transforming Objects Lives CommunitiesPerennial transforming Objects Lives Communities
Perennial transforming Objects Lives CommunitiesTrailnet
 
Participatory Budgeting in New York City
Participatory Budgeting in New York CityParticipatory Budgeting in New York City
Participatory Budgeting in New York CityTrailnet
 

More from Trailnet (20)

Livable Streets Design
Livable Streets Design Livable Streets Design
Livable Streets Design
 
Missouri Livable Streets Training - Boonslick Regional Planning Commission
Missouri Livable Streets Training - Boonslick Regional Planning CommissionMissouri Livable Streets Training - Boonslick Regional Planning Commission
Missouri Livable Streets Training - Boonslick Regional Planning Commission
 
Arch Women: A Pedal-Powered Movement - Trailnet Introduction
Arch Women: A Pedal-Powered Movement - Trailnet IntroductionArch Women: A Pedal-Powered Movement - Trailnet Introduction
Arch Women: A Pedal-Powered Movement - Trailnet Introduction
 
Street Harrassment on Bike, Foot, and Transit - Leah Patriarco
Street Harrassment on Bike, Foot, and Transit - Leah PatriarcoStreet Harrassment on Bike, Foot, and Transit - Leah Patriarco
Street Harrassment on Bike, Foot, and Transit - Leah Patriarco
 
GirlTrek/SheCycles - Faye Paige Edwards
GirlTrek/SheCycles - Faye Paige EdwardsGirlTrek/SheCycles - Faye Paige Edwards
GirlTrek/SheCycles - Faye Paige Edwards
 
The Monthly Cycle - Courtney Cushard
The Monthly Cycle - Courtney CushardThe Monthly Cycle - Courtney Cushard
The Monthly Cycle - Courtney Cushard
 
Trailnet Improving the Pedestrian Experience
Trailnet Improving the Pedestrian ExperienceTrailnet Improving the Pedestrian Experience
Trailnet Improving the Pedestrian Experience
 
Park.presentation
Park.presentationPark.presentation
Park.presentation
 
Effland.presentation
Effland.presentationEffland.presentation
Effland.presentation
 
Cooper.ann arbor
Cooper.ann arborCooper.ann arbor
Cooper.ann arbor
 
The Minneapolis Bicycle Story David Peterson
The Minneapolis Bicycle Story David PetersonThe Minneapolis Bicycle Story David Peterson
The Minneapolis Bicycle Story David Peterson
 
Indianapolis Modus Operandi Andy Lutz
Indianapolis Modus Operandi Andy LutzIndianapolis Modus Operandi Andy Lutz
Indianapolis Modus Operandi Andy Lutz
 
Indianapolis Best Practices Andy Lutz
Indianapolis Best Practices Andy LutzIndianapolis Best Practices Andy Lutz
Indianapolis Best Practices Andy Lutz
 
The State of Biking in St. Louis Rhonda Smythe
The State of Biking in St. Louis Rhonda SmytheThe State of Biking in St. Louis Rhonda Smythe
The State of Biking in St. Louis Rhonda Smythe
 
State of Biking Todd Waelterman
State of Biking Todd WaeltermanState of Biking Todd Waelterman
State of Biking Todd Waelterman
 
Big Healthy Trees
Big Healthy TreesBig Healthy Trees
Big Healthy Trees
 
Gateway Greening
Gateway GreeningGateway Greening
Gateway Greening
 
Pruitt Igoe Now
Pruitt Igoe NowPruitt Igoe Now
Pruitt Igoe Now
 
Perennial transforming Objects Lives Communities
Perennial transforming Objects Lives CommunitiesPerennial transforming Objects Lives Communities
Perennial transforming Objects Lives Communities
 
Participatory Budgeting in New York City
Participatory Budgeting in New York CityParticipatory Budgeting in New York City
Participatory Budgeting in New York City
 

Building a Better Metro: Possibilities for BRT

  • 1.
  • 2.  Overview of BRT Options  Peer Examples  Opportunities for BRT in St. Louis  How could BRT create a more livable St. Louis region?
  • 3. Can offer significant travel time savings  Provides better service & attracts ridership  Promotes economic development  Capital cost is more affordable than fixed- guideway transit › Facilitates more even distribution of transit resources › Shorter implementation time  Facilitates integration of modes and utilizes existing infrastructure
  • 4.  Many different levels of application of BRT features  Sensitive to context, available budget, political support  Time savings features are critical › Signal prioritization › Dedicated running way › Dedicated lanes, ramps, etc.
  • 6. Most projects operate in mixed traffic for 50% or more of project › Primarily arterial streets › Dedicated running ways in corridors with very heavy congestion (example: Cleveland Euclid Corridor, New York M15 corridor) › Significant travel time savings achieved without dedicated running ways with relatively light congestion (example: Kansas City Troost corridor) Source: GAO
  • 7. Help shape identity of BRT, portray premium service  Amenities include (in descending order of popularity) › Route maps & schedules › Seating › Weather protection › Level boarding › Safety improvements › Greater curb width/raised curb › Next bus displays › Public art/landscaping › Bicycle parking › Physically separated passing lane › Station located in median › Park-ride
  • 8. Important choice for project › Impacts ridership capacity, environmental friendliness, passenger comfort, overall image  All low-floor vehicles  Almost always lower emission; most common propulsion source is hybrid diesel electric  Doors often on both sides or three-door boarding  Easy wheelchair boarding capabilities to reduce loading time  Docking/narrow lane guidance systems › Mechanical, magnetic or optical Source: GAO
  • 9.  Most projects allow onboard fare validation (same as typical bus service) (ex: Seattle, Kansas City, New York)  Some projects offer off-board fare payment and proof-of-payment (ex: Salt Lake City, Cleveland, Eugene (OR), Reno) › May contribute to customers’ perception as high-quality service › Can generate travel time savings Source: GAO
  • 10. Technology used to achieve travel time savings and increase ridership through superior passenger information › Also improves operational efficiency, quality of service and safety  Most common features: › Traffic signal priority  Extended greens  Queue jumping › Vehicle tracking systems (monitor spacing and ensure connections)
  • 11. All BRT systems include some branding & marketing to promote service › Strong branding important to shaping the identity of the line or system and attracting riders › Uniquely branded vehicles and stations › Many systems emphasize speed: “Max”; “Velociraptor”; “SWIFT”; “RAPID” › GCRTA sold naming rights for Health Line Source: GAO & UTA
  • 13.
  • 14.
  • 15. Community Transit (Everett, WA) SWIFT SR 99 – Everett Station to Aurora Village Transit Center 16.7 miles 5 jurisdictions 28 stations 14 northbound 14 southbound
  • 16. Swift Project  Initial project cost – approximately $31.3 million for 16.7 miles • Approx cost per mile = $1.87 million • Almost half the cost is for the new vehicles • Project was $3.4 million under budget  Project was fully funded by Federal & State grants; partnerships; and local revenues  Also obtained multiple Grants and partnership funds for the 1st 3 years of Operating funds
  • 17. Swift Timeline Only 4 years from Board Resolution to implementation!
  • 18. Bus and paratransit system › 7.7 million boardings in FY11 › $32M operating budget › Introduced BRT as a business strategy  Improve service  Increase productivity  Reduce operating cost (supplement with CMAQ) › BRT intended to make RTC more sustainable  Provide a “greener” travel option to more people  Promote economic development
  • 19. Develop express and short haul feeder service Operate a higher level of service 10-minute headways between 5:30 AM and 8:00 PM. New 30-minute local service, CONNECT Feed RAPID express Provide 24-hour service Save $5.0M annually in local sales tax funds to offset remaining
  • 20. City of Reno Master Plan Elements Transit Oriented Developments / Regional Centers UNR Regional Center Plan South Virginia Street TOD Downtown Reno Regional Center Plan Convention Center/Meadowood Regional Center Plan Reno City Limits Virginia Street
  • 21. Operational challenges overcome  Productivity and ridership increased  Stations reinforce supportive land uses and compliment TOD efforts of the City of Reno  Cost cutting measures have helped but revenue is still going down  CMAQ funding helped bridge the deepest part of the Great Recession; yet funding challenges still exist
  • 22.
  • 23. Why highway corridors? › Location and trip patterns of people and jobs › Existing service not competitive › Inter-agency and inter-modal collaboration opportunities  Highway corridor constraints › Economic development is limited along entire corridor; node-based focus › Long routes make dedicated right of way cost prohibitive › Connections to bus and bike/ped modes difficult › Connectivity to local transit is key, may require transfer
  • 24. Alternatives Analysis study initiated September 2012 › Metro; EWGWCOG; MoDOT; St. Louis County; City of St. Louis  12-month study will identify two most competitive corridors  Complete AA for two corridors, focusing on cost-effective modes  Conclude with locally preferred alternative for two projects
  • 25.  Grand Avenue is a densely developed corridor and supports Metro’s busiest bus route  Service problems include low travel speed and too little capacity  Existing land use, ongoing development and recent investments › Enhanced transit service would leverage those investments
  • 26.  Short-term solution to capacity issues will likely be larger vehicles  Pursuing feasibility study that would define a BRT project on Grand › Technology, service plan, running way, stations, etc.  Strong leadership, regional consensus and federal funding are a must
  • 27. Regional consensus about project priorities  Transit-supportive land use  Public buy-in  Cost-effective projects  Federal funding  Leadership › Projects must have champions to succeed!
  • 28.  Plan for implementing a system of enhanced service  Regional consensus & public support  Detailed project definition › Will include Downtown St. Louis component  Transit-supportive zoning & land use  Federal funding  An effective, sustainable multi-modal transportation system

Editor's Notes

  1. Today I would like to introduce you to what will be our region’s Long-Range Transit Plan, Moving Transit Forward. First, I’d like to talk with you a little about where the Metro Transit System is today.
  2. 14 of 20 projects in GAO study allow onboard fare validation
  3. Swift runs through the cities of Everett, Lynnwood, Edmonds, Shoreline, and unincorporated Snohomish County as well as through the State DOT right of way. Partnership between Everett Transit and Community Transit was critical to our success Unique partnership Agreement with Everett Transit Everett – biggest city in the county – is not in our service area. Everett Transit runs only within Everett City limits and having a Partnership with ET was critical to our success Northern terminus - Everett Station - connections to other Community Transit routes, Everett Transit, Sound Transit, Island and Skagit Transit, Greyhound, Amtrak and Sounder Commuter rail. Southern terminus - Aurora village - connections can be made between Community Transit and King County metro. Stations are spaced approximately 1 mile apart Local service continues in the corridor (101, 7 & 9)
  4. $31.3 million $3.4 million under budget. Variety of federal and state grants, partnership funds, and local revenue streams Federal funds limited to only in the vehicles. Successful in securing grants and partnerships to fund the operations through 2012.
  5. Key dates Board Resolution 20-05 adopted on December 1, 2005 Everett Partnership Agreement signed on December 5, 2007 Service began on November 30, 2009 – only 4 short years from when it began. Swift proves that BRT is a mode that can be successfully implemented quickly and with a high level of quality.