SlideShare a Scribd company logo
1 of 31
Surveying
Course: B.Sc. Agricultural
Subject :Fundamental of Soil, Water and Conservation engineering
Unit: 1
ā€¢ Surveying:
It is the art of determining the relative positions of different
object on the surface of the earth by measuring the horizontal
distance between them and by preparing a map to any suitable
scale. Thus, in this process, the measurements are taken only
in the horizontal plane.
ā€¢ Leveling:
Leveling is the art of determining the relative vertical distance
of different points on the surface of earth. Hence, in leveling,
the measurements are taken only in the vertical plane.
Objects of surveying:
ā€¢ The primary object of survey is the
preparation of plan estate or buildings roads,
railways, pipelines, canals, etc. Or to measure
area of field, state, nation.
ā€¢ Object of geodetic surveying is to determine
precise positions on the surface of the earth
of widely distant points.
ā€¢ Types of Surveying [Classification]:
ā€¢ Primary Classification or Primary Division :
Plane surveying and
Geodetic surveying
ā€¢ Plane Surveying :
The shape of the earth is spherical. Thus the surface
is obviously curved. But in plane surveying the
curvature of earth is not taken into account. This is
because plane surveying is carried out over a small
area, so the surface of the earth is considered as a
plane. The degree of accuracy required in this type of
surveying is completely low. Plane surveying is done
on an area of less than 250 km2.
ā€¢ Geodetic surveying :
ā€¢ In geodetic surveying the curvature of the earth is
taken into consideration. It is extended over a
large area greater than 250 km2.
ā€¢ The line joining any two points considered as a
curved line. Very refined methods and
instruments are used in this type of surveying. In
this method very high precision or accuracy is
required.
ā€¢ Secondary classification:
Survey can be classified on different bases.
ā€¢ 1. Based on instrument:
- Chain Survey
- Compass survey
- Plane Table survey
- Theodolite survey
- Tacheometric Survey
- Photographic survey
ā€¢ 2. Based on methods:
- Triangulation Survey
- Traverse Survey
ā€¢ 3. Based on Objects:
- Geological survey
- Mine survey
- Archeological Survey
- Military survey
ā€¢ 4. Based on nature of field
- Land Survey
- Marine survey
- Astronomical survey
ā€¢ Again Land Survey is classified into following Classes:
ā€¢ 1. Topographical Survey
To determine natural features of a country such as valleys,
rivers and artificial features such as road, railways, etc.
ā€¢ 2. Cadastral Survey:
To determine boundaries of field, estate
ā€¢ 3. City survey:
To locate premises, streets, water supply and drainage
systems
ā€¢ 4. Engineering survey:
To collect detailed data for the design for of projects involving
roads, railways, etc Engineering surveys are sub divided into:
1. Reconnaissance Survey
2. Preliminary Survey
3. Location Survey
Equipment used in Surveying
1. Chain
The chain is composed of 100 or 150 pieces
of galvanized mild steel wire 4mm in
diameter called links.
The end of each link are bent into a loop and
connected together by means of three oval
rings.
The ends of the chain are provided with brass
handles for dragging the chain on the ground.
The length of link is the distance between the
centers of the two consecutive middle rings.
The end links includes the handles.
Metallic tags or indicators are fixed at
various distinctive of the chain to facilitate
quick reading.
1
a. Metric surveying chains:
The chains are made in lengths of 20 and
30 meters.
To enable the reading of factious of a
chain, tallies (tags) are fixed at every five
meter length and small brass rings are
provided at every meter length.
To facilitate holding of the arrows in
position with the handle, a groove is cut on
the out side surface of the handle.
The handle joints are flexible.
The tallies used for marking the distances
in a metric chain are marked with letters
ā€˜Meā€™ and ā€˜mā€™.
2
b. Steel Band Chain:
It consists of a ribbon of steel with bras
handle at each end. It is 20 or 30 fit long and
16 mm wide. It is wound on an open steel
cross or on the metal reel in a closed case.
The graduations are etched as meters
decimeters, centimeters on one side and 0.2
m links on the other. Brass tallies are fixed at
every 5 m length of the band.
c. Gunterā€™s Chain:
It is 66 fit long and is divided into 100 links.
Each link is 0.66 ft long. It is very convenient
for measuring distance in miles and furlongs.
Also for measuring area and when the units
of area is an acre
3
4
d. Revenue Chain
It is commonly used for measuring
fields in cadastral survey. It is 33 ft
long and divided into 16 links. Each
link is 2.0625 ft long.
e. Engineerā€™s chain:
It is 100 ft long and it is divided
into 100 links. Each link is 1 ft in a
length. Used in all Engineering
surveys.
5
2. Arrows (chain pins):
They are also called as marking or
chaining pins and are used to mark
the end of chain during the process
of chaining.
They are made up of good quality
hardened and tempered steel wire of
4 mm in diameter. The arrows are
made 400 mm in length.
They are pointed at one end of
inserting in to the ground. The other
end is in to a ring. 6
3. Tapes:
a. Cloth or Linen Tape
Used for taking subsidiary measurements, such
as offset. It is very light and handy. It is easily
affected by damp. If wet it shrinks. It stretches
easily and likely to twist.
b. Metric Woven Metallic Tape:
They are available in 2, 10, 30, and 50 meters.
The tape is made of yarn and metal wire. A metal
ring is attached to the outer end of tapes. The
length of the tape includes the metal ring. At
every centimeter a black line 8 to 10 mm in
height is drown. Every 5 centimeters is marked
with an arrow in black. Every decimeter and
meter is marked with a back line extending over
the full width of the tape/ the graduation marks at
every decimeter and meter are numbered with
black and red figures, respectively.
7
8
c. Metric Steel Tape:
Tape is available in 1, 2, 10, 30,
and 50 meters. The tape is of steel
or stainless steel. The outer end is
provided with a ring. The length
of the tape includes the metal ring.
The tape is marked with a line at
every five millimeters,
centimeters, decimeters, and
meter.
Every decimeter and meter shall
be marked with Hindu Arabic
numerals in bold. When the
button release devised is pressed,
the tape automatically rewind in
to the case.
9
10
d. Invar Tape:
For highest precision work the invar tape in
used. It is made of an alloy of steel and
nickel (36%).
It is 6 mm wide and may be obtained in
length of 30m and 100m. It is not calibrated
through its length but has terminal lines.
Each terminal division has ten 1 mm
division. It is very expensive.
e. Synthetic Tape:
The tapes are manufactured of glass fiber
having PVC coating. They are graduated
every 10 mm and figured every 100 mm.
Meter, figures are shown in red. They are
convenient for measuring shorts lengths.
11
12
13
Instruments for marking stations:
1. Wooden Pegs:
These are used to mark the positions. They are
made of hard timber and tapered at one end.
They are usually, 2.5 cm square and 15 cm long.
But in soft ground 40 to 60 cm long and 4 to 5
cm square is suitable.
They should be driven in the ground with about
4 cm lengths, projecting above the ground.
2. Ranging rods:
Used for making the positions of stations and for
ranging.
They are made of seasoned timber of teak, blue
pine, deodar. They are circular or octagonal in
cross section of 3 cm diameter. Lower shoe is 15
cm long.
They are made in two sizes as 2 meters and 3
meters and are divided in to equal parts each 0.2
m long.
They are painted alternatively black and white
or red and white. Now a day instead of timber,
mild steel hallo pipes are used.
Range
pole
14
3. Ranging Poles
Similar to the ranging rods but are
heavier, they vary in length from 4 m
to 6 m or more. Used in the case of
very long lines.
4. Offset Rod
Similar to the ranging rod, they are
usually 3 m long and is divided into
parts each 0.2 m length. Top is an
provided with an open ring for
puling or pushing the chain through a
hedge. It has two short narrow
vertical slots. It is used for aligning
short offsets.
Offset RodRanging Poles
15 16
5. Laths
Useful for ranging long lines, also used over
uneven ground where the ranging rod is not visible
due to obstructions, they are light, cheap, being
white; they are easily visible at a great distance.
Unusually 1.0 m long
6. Whites
When the ranging rod is not available or
insufficient, whites are used. These are thin strip of
bamboo and 40 cm to 1 m in length. One end is
sharp and the other end is split for inserting pieces
of white papers. They are also useful for
temporary marking of counter points.
7. Plumb Bob
The plumb bob is required when measuring the
distance along slopes in order to transfer points to
the ground. It is also used for testing the verticality
of ranging poles.
17
18
Uses of Surveying:
ā€¢ To prepare a topographical map this shows the hills, valley, rivers, villages,
town, etc, of a country.
ā€¢ To prepare a cadastral map showing the boundaries of fields houses, and other
properties.
ā€¢ To prepare an engineering map to show details like roads, railways, canals, etc.
ā€¢ To prepare military map showing roads and railways, communication with
different parts of country.
ā€¢ To prepare contour map and to determine capacity of a reservoirs and ton find
the best possible route for roads, railways etc.
ā€¢ To prepare archeological map including places where ancient relics exist.
ā€¢ To prepare a geological map showing areas including underground resources.
Chain Survey
ā€¢ Chain survey is the simplest method of surveying. In
this survey only measurements are taken in the field,
and the rest work, such as plotting calculation etc. are
done in the office.
ā€¢ This is most suitable adapted to small plane areas with
very few details. If carefully done, it gives quite
accurate results.
ā€¢ The necessary requirements for field work are chain,
tape, ranging rod, arrows and some time cross staff.
Survey Station:
Survey stations are of two kinds
- Main Stations
- Subsidiary or tie
Main Stations:
Main stations are the end of the lines, which command the boundaries of the survey,
and the lines joining the main stations re called the main survey line or the chain
lines.
Subsidiary or the tie stations:
Subsidiary or the tie stations are the point selected on the main survey lines, where
it is necessary to locate the interior detail such as fences, hedges, building etc.
19
Base Lines:
It is main and longest line, which passes approximately through the centre
of the field. All the other measurements to show the details of the work are
taken with respect of this line.
Check Line:
A check line also termed as a proof line is a line joining the apex of a
triangle to some fixed points on any two sides of a triangle. A check line is
measured to check the accuracy of the framework. The length of a check
line, as measured on the ground should agree with its length on the plan.
20
Offsets
ā€¢ These are the lateral measurements from the
base line to fix the positions of the different
objects of the work with respect to base
line. These are generally set at right angle
offsets. It can also be drawn with the help
of a tape. There are two kinds of offsets:
ā€¢ 1) Perpendicular offsets
The measurements are taken at right angle
to the survey line called perpendicular or
right angled offsets.
ā€¢ 2) Oblique offsets.
The measurements which are not made at
right angles to the survey line are called
oblique offsets or tie line offsets. 21
Procedure in chain survey
1. Reconnaissance:
The preliminary inspection of the area to be surveyed is called
reconnaissance. The surveyor inspects the area to be surveyed, survey or
prepares index sketch or key plan.
2. Marking Station:
Surveyor fixes up the required no stations at places from where maximum
possible stations are possible.
3. Then he selects the way for passing the main line, which should be
horizontal and clean as possible and should pass approximately through the
centre of work.
4. Then ranging roads are fixed on the stations.
5. After fixing the stations, chaining could be started.
6. Make ranging wherever necessary.
7. Measure the change and offset.
8. Enter in the field the book.
Cross Staff Survey
ā€¢ This type of survey is undertaken to locate boundaries of a field or a field
or plat and determinations of its area.
ā€¢ Principle:
The principle of the survey is to divide the given area in to no of right
angled triangles and trapezoids and to calculate and plot the areas of
triangles and trapezoids.
ā€¢ Instruments/Material Required:
Two Chains, arrows taps, ranging rods, cross-staff and drawing material
Procedure
Two chains are usually provided one for measuring distance along the
chain line and other for measuring the offsets.
The cross staff is used to set out the perpendicular directions for offsets.
In this survey, the base line runs through the center of the area, so that the
offsets are left or right side of base line are fairly equal.
To check accuracy length of the boundary lines may also be measured.
After the field work is over, the survey is plotted to a suitable scale.
Calculations of Field Area:
ā€¢ By this method of survey, the field
as divided in to right angled
triangles and trapezoids are
calculated as under:
ā€¢ Area of right -angled triangle = Ā½
base x Height.
ā€¢ Area of trapezoid= sum of parallel
sides/2 x Height.
22
Reference/Sources
1.https://lh3.ggpht.com/eN01oZR9PxNPxpsDcr9gUZdGSUdrKiuiSM6uTY64ECJcAz1TzwZ03Up9CNHifvn5U6bl=s85
2.https://lh3.ggpht.com/9tUsVmdka8MeE5TQBNnJxhCik9XqSmuy2OwXq4ySVbnZbDufCvWRltLY_uJ_DuJwhm45=s95
3.https://lh4.ggpht.com/0afGESSNNYsmMmMv0loH0lVDvvyLKk9TetlZYwohJQn1inU_MrNSTxooTwcJC8rNizo2QYw=s118
4.https://lh5.ggpht.com/xGo7qFS_xe99jBmWfVyx4wpDYVFSaK7aFT8dG1bwuk8lt404M3kHteFbBg2jprX8BPg7dtg=s109
5. https://lh6.ggpht.com/KZR-0kE9ynzZpTPcZ5Tm1Gf7-5LkWs_YvUWe4csapsMxIdK9J-wUg9FX2zNAZR6ErIFmpA=s113
6. https://lh6.ggpht.com/5_1Oqvwfg6P1u0HrPM-NSwMwfkklQsJ-vK8KJHA_sH03MToBGrpOyD_2sFBy1Es5DkfxSgM=s85
7. https://lh5.ggpht.com/eSch4M7mxb7IG-7aSArIvAfjonkDzrpMUAXVF1QcNUsKpCjsAYu6RNxJMTePz2JMaq_7bQ=s127
8.https://lh3.ggpht.com/89hYheAiDqv0qR7mfGLsk39eZzDX0bI_iEpAdcNL9tBRA_UMv-kEZBKGXrS8u6jVvX2K=s85
9. https://lh4.ggpht.com/RBK5wB-
8WfdHm4QEo1MFeIVzD9MNYB8pzuYsTwBIk1tRroqGncPaFUpbyHPRCjCzk7oWOA=s85
10. https://lh6.ggpht.com/3KB089IL-sNL7vByq4yw01aSe_b83wIvGMbEOiCZS9V0QvEXdfdpP-
kYEQD2S5QZSXMVug=s170
11. https://lh3.ggpht.com/au8-70sN4qC4zzR2pN9V31mPy7eDOCCziYpJXOYfr9IbvGQzGVs2M1XZlIb8HlvYkndtSw=s109
12. https://lh4.ggpht.com/Xlzt0Gnb7IYSfJuLlZHImrdKbKRw0U9unqb5A9qIPmy1AgqiHz-Y4DaKIsleCRQBO4pM_0Q=s100
13. https://lh5.ggpht.com/SmNyiqF7EFp5UpA8cq3rXsCFTy9iNz0vmT8lutb_UW2d1RJ67cOBMlhjroTxwUjfkrCXQQ=s156
14. https://lh4.ggpht.com/9IdAjwfXk5NXO3Mxzja-cOF80Bm3iY2XKJLsCRSHXwiFW1dpW6UKSFqrxw0lMJh-AYVuMg=s85
15. https://lh6.ggpht.com/FwoZ0gcetDtRPRqJZ9CXjK9cLGT10P8ccMlyRJ2L2TDvMnY672beNQ6SbW4r3f3lMPnhPw=s85
16. https://lh5.ggpht.com/tAjBWoJITFJ-gbI5exI2y8hZyRm5b134OgcujZma6suoHSTU3k0GgnHtgtZtMdAIv-MZvg=s85
17. https://lh5.ggpht.com/WBZVAKVq183n8jC93lbQK4fHri3MFKte-6KjuFPG930ZcF7UIxj5xNWTRighBR_QPgucRA=s85
18. https://lh5.ggpht.com/C7x33N0T2jtep5hKLMR7rGHFjKkC6Dt9Lj15E6Jvv15zya6RV7qeety4PByksrOh9ezP5A=s85
19. https://lh4.ggpht.com/zgg7DK37XvrSyZHSCelix_FWW661DAKjqw00hLjIPiW2716qEEumiOCKu3T1A_Izkj-w=s170
20. https://lh4.ggpht.com/4RiRKWY8MxCZl4h5bQRcZ_vnruopNr86yq6bFcUDlDdcCalFVVwKlSKUF3r0GN4PMrhu=s102
21.https://lh4.ggpht.com/RIurXcgclWcPIZOjkudo-DoJw78NxwiLM8ZhQxITEks9JvB3xlIPJRq4IXk8COeXA8J5tAc=s85
22. https://lh5.ggpht.com/tb3-E1StbD-UA2xhajIhLxI5IjjJZUodP6VHGkdFOjMkb9_ChG3svh8IjFirbPRF-Gf6=s85
Text book and web sources
- www.agriinfo.in
- ecourses.iasri.res.in
- Soil erosion and Conservation by R. P. Tripathi
and H. P. Singh
B.sc. agri i foswce unit 1 surveying

More Related Content

What's hot

Chain survey_Surveying, Civil Engineering
Chain survey_Surveying, Civil EngineeringChain survey_Surveying, Civil Engineering
Chain survey_Surveying, Civil EngineeringA Makwana
Ā 
Surveying and scale_Surveying, Civil Engineering
Surveying and scale_Surveying, Civil EngineeringSurveying and scale_Surveying, Civil Engineering
Surveying and scale_Surveying, Civil EngineeringA Makwana
Ā 
Linear measurement
Linear measurementLinear measurement
Linear measurementKHUSHBU SHAH
Ā 
Chain surveying.1
Chain surveying.1Chain surveying.1
Chain surveying.1Decentumang
Ā 
SURVEYING UNIT-1 31033
SURVEYING UNIT-1 31033SURVEYING UNIT-1 31033
SURVEYING UNIT-1 31033MOHANAHARIHARAN R
Ā 
Surveying part 1 unit 1 and 2
Surveying part 1 unit 1 and 2Surveying part 1 unit 1 and 2
Surveying part 1 unit 1 and 2Warish Khan
Ā 
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSSURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSVISHNU VIJAYAN
Ā 
Introduction on instruments used for chaining
Introduction on instruments used for chainingIntroduction on instruments used for chaining
Introduction on instruments used for chainingMujeeb Muji
Ā 
Avinesh surveying lab manuals
Avinesh surveying lab manualsAvinesh surveying lab manuals
Avinesh surveying lab manualsavineshgautam
Ā 
chain surveying
chain surveyingchain surveying
chain surveyingSelf-employed
Ā 
Instruments used in surveying
Instruments used in surveyingInstruments used in surveying
Instruments used in surveyingMir Zafarullah
Ā 
Survey instruments and lab equipments
Survey instruments and lab equipmentsSurvey instruments and lab equipments
Survey instruments and lab equipmentssaibabatraders
Ā 

What's hot (20)

Chain survey_Surveying, Civil Engineering
Chain survey_Surveying, Civil EngineeringChain survey_Surveying, Civil Engineering
Chain survey_Surveying, Civil Engineering
Ā 
Surveying and scale_Surveying, Civil Engineering
Surveying and scale_Surveying, Civil EngineeringSurveying and scale_Surveying, Civil Engineering
Surveying and scale_Surveying, Civil Engineering
Ā 
Linear measurement
Linear measurementLinear measurement
Linear measurement
Ā 
Linear measurement for surveying by chaining
Linear measurement for surveying by chainingLinear measurement for surveying by chaining
Linear measurement for surveying by chaining
Ā 
Chain surveying.1
Chain surveying.1Chain surveying.1
Chain surveying.1
Ā 
SURVEYING UNIT-1 31033
SURVEYING UNIT-1 31033SURVEYING UNIT-1 31033
SURVEYING UNIT-1 31033
Ā 
Module-I SURVEYING-I [BTCVC304]
Module-I SURVEYING-I [BTCVC304]Module-I SURVEYING-I [BTCVC304]
Module-I SURVEYING-I [BTCVC304]
Ā 
Chapter 1
Chapter 1Chapter 1
Chapter 1
Ā 
Surveying part 1 unit 1 and 2
Surveying part 1 unit 1 and 2Surveying part 1 unit 1 and 2
Surveying part 1 unit 1 and 2
Ā 
Angular measurement
Angular measurementAngular measurement
Angular measurement
Ā 
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSSURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
Ā 
Introduction on instruments used for chaining
Introduction on instruments used for chainingIntroduction on instruments used for chaining
Introduction on instruments used for chaining
Ā 
Linear measurement
Linear measurement Linear measurement
Linear measurement
Ā 
Avinesh surveying lab manuals
Avinesh surveying lab manualsAvinesh surveying lab manuals
Avinesh surveying lab manuals
Ā 
Surveying ch-two
Surveying ch-twoSurveying ch-two
Surveying ch-two
Ā 
Basic Civil and Mechanical Engineering
Basic Civil and Mechanical EngineeringBasic Civil and Mechanical Engineering
Basic Civil and Mechanical Engineering
Ā 
chain surveying
chain surveyingchain surveying
chain surveying
Ā 
Linear measurement
Linear measurementLinear measurement
Linear measurement
Ā 
Instruments used in surveying
Instruments used in surveyingInstruments used in surveying
Instruments used in surveying
Ā 
Survey instruments and lab equipments
Survey instruments and lab equipmentsSurvey instruments and lab equipments
Survey instruments and lab equipments
Ā 

Viewers also liked

Linear measurements
Linear measurementsLinear measurements
Linear measurementsNaman Dave
Ā 
LINEAR and ANGULAR Measurement
LINEAR and ANGULAR MeasurementLINEAR and ANGULAR Measurement
LINEAR and ANGULAR MeasurementDhruv Parekh
Ā 
Presentation of surveying
Presentation of surveyingPresentation of surveying
Presentation of surveyingShaker Ullah
Ā 
B.sc. agri i foswce unit 1 surveying
B.sc. agri i foswce unit 1 surveyingB.sc. agri i foswce unit 1 surveying
B.sc. agri i foswce unit 1 surveyingRai University
Ā 
30838893 chain-survey
30838893 chain-survey30838893 chain-survey
30838893 chain-surveyBalaji Ksrcivil
Ā 
PROBLEMS ON BEARINGS
PROBLEMS ON BEARINGSPROBLEMS ON BEARINGS
PROBLEMS ON BEARINGSPralhad Kore
Ā 
Suveying Chain Method
Suveying Chain MethodSuveying Chain Method
Suveying Chain Methodstooty s
Ā 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in SurveyingRAHUL SINHA
Ā 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & RangingRakesh Verma
Ā 
WHAT IS FLOOR AREA RATIO (FAR)?
WHAT IS FLOOR AREA RATIO (FAR)?WHAT IS FLOOR AREA RATIO (FAR)?
WHAT IS FLOOR AREA RATIO (FAR)?Bangalore Property
Ā 
Leveling, Instruments of Leveling, Bearings (Surveying, ECE)
Leveling, Instruments of Leveling, Bearings (Surveying, ECE) Leveling, Instruments of Leveling, Bearings (Surveying, ECE)
Leveling, Instruments of Leveling, Bearings (Surveying, ECE) Kaushal Mehta
Ā 
Survey i book
Survey i bookSurvey i book
Survey i book4fmath55
Ā 
Compass & Bearings
Compass & BearingsCompass & Bearings
Compass & Bearingssmsknight
Ā 
Neighbourhood planning - learning from the pioneers
Neighbourhood planning - learning from the pioneersNeighbourhood planning - learning from the pioneers
Neighbourhood planning - learning from the pioneersLocality
Ā 
Introduction to surveying
Introduction to surveyingIntroduction to surveying
Introduction to surveyingBlue Darlene Palma
Ā 

Viewers also liked (20)

Linear Measurements
Linear MeasurementsLinear Measurements
Linear Measurements
Ā 
Linear measurements
Linear measurementsLinear measurements
Linear measurements
Ā 
LINEAR and ANGULAR Measurement
LINEAR and ANGULAR MeasurementLINEAR and ANGULAR Measurement
LINEAR and ANGULAR Measurement
Ā 
Presentation of surveying
Presentation of surveyingPresentation of surveying
Presentation of surveying
Ā 
B.sc. agri i foswce unit 1 surveying
B.sc. agri i foswce unit 1 surveyingB.sc. agri i foswce unit 1 surveying
B.sc. agri i foswce unit 1 surveying
Ā 
Compass Surveying
Compass Surveying Compass Surveying
Compass Surveying
Ā 
30838893 chain-survey
30838893 chain-survey30838893 chain-survey
30838893 chain-survey
Ā 
Surveying
Surveying Surveying
Surveying
Ā 
Chain surveying
Chain surveyingChain surveying
Chain surveying
Ā 
PROBLEMS ON BEARINGS
PROBLEMS ON BEARINGSPROBLEMS ON BEARINGS
PROBLEMS ON BEARINGS
Ā 
Suveying Chain Method
Suveying Chain MethodSuveying Chain Method
Suveying Chain Method
Ā 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
Ā 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging
Ā 
Linear measurement
Linear measurementLinear measurement
Linear measurement
Ā 
WHAT IS FLOOR AREA RATIO (FAR)?
WHAT IS FLOOR AREA RATIO (FAR)?WHAT IS FLOOR AREA RATIO (FAR)?
WHAT IS FLOOR AREA RATIO (FAR)?
Ā 
Leveling, Instruments of Leveling, Bearings (Surveying, ECE)
Leveling, Instruments of Leveling, Bearings (Surveying, ECE) Leveling, Instruments of Leveling, Bearings (Surveying, ECE)
Leveling, Instruments of Leveling, Bearings (Surveying, ECE)
Ā 
Survey i book
Survey i bookSurvey i book
Survey i book
Ā 
Compass & Bearings
Compass & BearingsCompass & Bearings
Compass & Bearings
Ā 
Neighbourhood planning - learning from the pioneers
Neighbourhood planning - learning from the pioneersNeighbourhood planning - learning from the pioneers
Neighbourhood planning - learning from the pioneers
Ā 
Introduction to surveying
Introduction to surveyingIntroduction to surveying
Introduction to surveying
Ā 

Similar to B.sc. agri i foswce unit 1 surveying

Surveying and levelling in agricultural land area calculation and leveling.pdf
Surveying and levelling in agricultural land area calculation and leveling.pdfSurveying and levelling in agricultural land area calculation and leveling.pdf
Surveying and levelling in agricultural land area calculation and leveling.pdfsdfghj21
Ā 
handbook of civil engineering
handbook of civil engineeringhandbook of civil engineering
handbook of civil engineeringAshok Narisetti
Ā 
Surveying and levelling
Surveying and levelling Surveying and levelling
Surveying and levelling Er. Akash Gupta
Ā 
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYINGDEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYINGKamal B
Ā 
Diploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aDiploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aRai University
Ā 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levellingKishanKelothu
Ā 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levellingParimal Jha
Ā 
LINEAR MEASUREMENT techniques in civil engineering
LINEAR MEASUREMENT techniques  in civil engineeringLINEAR MEASUREMENT techniques  in civil engineering
LINEAR MEASUREMENT techniques in civil engineeringUjasPandya2
Ā 
site analysis and planning
site analysis and planningsite analysis and planning
site analysis and planningshami udeen
Ā 
1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptxJanak82
Ā 
Introduction to surveying, ranging and chaining
Introduction to surveying, ranging and chainingIntroduction to surveying, ranging and chaining
Introduction to surveying, ranging and chainingShital Navghare
Ā 
surveying 1 pdf
surveying 1 pdfsurveying 1 pdf
surveying 1 pdfshivamg92
Ā 
Element Of Civil Engineering Of GTU.
Element Of Civil Engineering Of GTU.Element Of Civil Engineering Of GTU.
Element Of Civil Engineering Of GTU.darshanchaudhari
Ā 
Surveying - II
Surveying - IISurveying - II
Surveying - IIOpenmaps
Ā 
Distance Measurement & Chain Surveying
Distance Measurement & Chain SurveyingDistance Measurement & Chain Surveying
Distance Measurement & Chain SurveyingBahzad5
Ā 

Similar to B.sc. agri i foswce unit 1 surveying (20)

Surveying and levelling in agricultural land area calculation and leveling.pdf
Surveying and levelling in agricultural land area calculation and leveling.pdfSurveying and levelling in agricultural land area calculation and leveling.pdf
Surveying and levelling in agricultural land area calculation and leveling.pdf
Ā 
Surveying
SurveyingSurveying
Surveying
Ā 
handbook of civil engineering
handbook of civil engineeringhandbook of civil engineering
handbook of civil engineering
Ā 
Surveying and levelling
Surveying and levelling Surveying and levelling
Surveying and levelling
Ā 
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYINGDEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
Ā 
surveying and geomatics
surveying and geomaticssurveying and geomatics
surveying and geomatics
Ā 
Diploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aDiploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying a
Ā 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
Ā 
Surveying i
Surveying iSurveying i
Surveying i
Ā 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
Ā 
LINEAR MEASUREMENT techniques in civil engineering
LINEAR MEASUREMENT techniques  in civil engineeringLINEAR MEASUREMENT techniques  in civil engineering
LINEAR MEASUREMENT techniques in civil engineering
Ā 
site analysis and planning
site analysis and planningsite analysis and planning
site analysis and planning
Ā 
1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx
Ā 
Basic civil
Basic civilBasic civil
Basic civil
Ā 
Introduction to surveying, ranging and chaining
Introduction to surveying, ranging and chainingIntroduction to surveying, ranging and chaining
Introduction to surveying, ranging and chaining
Ā 
surveying 1 pdf
surveying 1 pdfsurveying 1 pdf
surveying 1 pdf
Ā 
Surveying
SurveyingSurveying
Surveying
Ā 
Element Of Civil Engineering Of GTU.
Element Of Civil Engineering Of GTU.Element Of Civil Engineering Of GTU.
Element Of Civil Engineering Of GTU.
Ā 
Surveying - II
Surveying - IISurveying - II
Surveying - II
Ā 
Distance Measurement & Chain Surveying
Distance Measurement & Chain SurveyingDistance Measurement & Chain Surveying
Distance Measurement & Chain Surveying
Ā 

More from Rai University

Brochure Rai University
Brochure Rai University Brochure Rai University
Brochure Rai University Rai University
Ā 
Mm unit 2 point 1
Mm unit 2 point 1Mm unit 2 point 1
Mm unit 2 point 1Rai University
Ā 
Bdft ii, tmt, unit-iii, dyeing & types of dyeing,
Bdft ii, tmt, unit-iii,  dyeing & types of dyeing,Bdft ii, tmt, unit-iii,  dyeing & types of dyeing,
Bdft ii, tmt, unit-iii, dyeing & types of dyeing,Rai University
Ā 
Bsc agri 2 pae u-4.4 publicrevenue-presentation-130208082149-phpapp02
Bsc agri  2 pae  u-4.4 publicrevenue-presentation-130208082149-phpapp02Bsc agri  2 pae  u-4.4 publicrevenue-presentation-130208082149-phpapp02
Bsc agri 2 pae u-4.4 publicrevenue-presentation-130208082149-phpapp02Rai University
Ā 
Bsc agri 2 pae u-4.3 public expenditure
Bsc agri  2 pae  u-4.3 public expenditureBsc agri  2 pae  u-4.3 public expenditure
Bsc agri 2 pae u-4.3 public expenditureRai University
Ā 
Bsc agri 2 pae u-4.2 public finance
Bsc agri  2 pae  u-4.2 public financeBsc agri  2 pae  u-4.2 public finance
Bsc agri 2 pae u-4.2 public financeRai University
Ā 
Bsc agri 2 pae u-4.1 introduction
Bsc agri  2 pae  u-4.1 introductionBsc agri  2 pae  u-4.1 introduction
Bsc agri 2 pae u-4.1 introductionRai University
Ā 
Bsc agri 2 pae u-3.3 inflation
Bsc agri  2 pae  u-3.3  inflationBsc agri  2 pae  u-3.3  inflation
Bsc agri 2 pae u-3.3 inflationRai University
Ā 
Bsc agri 2 pae u-3.2 introduction to macro economics
Bsc agri  2 pae  u-3.2 introduction to macro economicsBsc agri  2 pae  u-3.2 introduction to macro economics
Bsc agri 2 pae u-3.2 introduction to macro economicsRai University
Ā 
Bsc agri 2 pae u-3.1 marketstructure
Bsc agri  2 pae  u-3.1 marketstructureBsc agri  2 pae  u-3.1 marketstructure
Bsc agri 2 pae u-3.1 marketstructureRai University
Ā 
Bsc agri 2 pae u-3 perfect-competition
Bsc agri  2 pae  u-3 perfect-competitionBsc agri  2 pae  u-3 perfect-competition
Bsc agri 2 pae u-3 perfect-competitionRai University
Ā 

More from Rai University (20)

Brochure Rai University
Brochure Rai University Brochure Rai University
Brochure Rai University
Ā 
Mm unit 4point2
Mm unit 4point2Mm unit 4point2
Mm unit 4point2
Ā 
Mm unit 4point1
Mm unit 4point1Mm unit 4point1
Mm unit 4point1
Ā 
Mm unit 4point3
Mm unit 4point3Mm unit 4point3
Mm unit 4point3
Ā 
Mm unit 3point2
Mm unit 3point2Mm unit 3point2
Mm unit 3point2
Ā 
Mm unit 3point1
Mm unit 3point1Mm unit 3point1
Mm unit 3point1
Ā 
Mm unit 2point2
Mm unit 2point2Mm unit 2point2
Mm unit 2point2
Ā 
Mm unit 2 point 1
Mm unit 2 point 1Mm unit 2 point 1
Mm unit 2 point 1
Ā 
Mm unit 1point3
Mm unit 1point3Mm unit 1point3
Mm unit 1point3
Ā 
Mm unit 1point2
Mm unit 1point2Mm unit 1point2
Mm unit 1point2
Ā 
Mm unit 1point1
Mm unit 1point1Mm unit 1point1
Mm unit 1point1
Ā 
Bdft ii, tmt, unit-iii, dyeing & types of dyeing,
Bdft ii, tmt, unit-iii,  dyeing & types of dyeing,Bdft ii, tmt, unit-iii,  dyeing & types of dyeing,
Bdft ii, tmt, unit-iii, dyeing & types of dyeing,
Ā 
Bsc agri 2 pae u-4.4 publicrevenue-presentation-130208082149-phpapp02
Bsc agri  2 pae  u-4.4 publicrevenue-presentation-130208082149-phpapp02Bsc agri  2 pae  u-4.4 publicrevenue-presentation-130208082149-phpapp02
Bsc agri 2 pae u-4.4 publicrevenue-presentation-130208082149-phpapp02
Ā 
Bsc agri 2 pae u-4.3 public expenditure
Bsc agri  2 pae  u-4.3 public expenditureBsc agri  2 pae  u-4.3 public expenditure
Bsc agri 2 pae u-4.3 public expenditure
Ā 
Bsc agri 2 pae u-4.2 public finance
Bsc agri  2 pae  u-4.2 public financeBsc agri  2 pae  u-4.2 public finance
Bsc agri 2 pae u-4.2 public finance
Ā 
Bsc agri 2 pae u-4.1 introduction
Bsc agri  2 pae  u-4.1 introductionBsc agri  2 pae  u-4.1 introduction
Bsc agri 2 pae u-4.1 introduction
Ā 
Bsc agri 2 pae u-3.3 inflation
Bsc agri  2 pae  u-3.3  inflationBsc agri  2 pae  u-3.3  inflation
Bsc agri 2 pae u-3.3 inflation
Ā 
Bsc agri 2 pae u-3.2 introduction to macro economics
Bsc agri  2 pae  u-3.2 introduction to macro economicsBsc agri  2 pae  u-3.2 introduction to macro economics
Bsc agri 2 pae u-3.2 introduction to macro economics
Ā 
Bsc agri 2 pae u-3.1 marketstructure
Bsc agri  2 pae  u-3.1 marketstructureBsc agri  2 pae  u-3.1 marketstructure
Bsc agri 2 pae u-3.1 marketstructure
Ā 
Bsc agri 2 pae u-3 perfect-competition
Bsc agri  2 pae  u-3 perfect-competitionBsc agri  2 pae  u-3 perfect-competition
Bsc agri 2 pae u-3 perfect-competition
Ā 

Recently uploaded

Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
Ā 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
Ā 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
Ā 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
Ā 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
Ā 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
Ā 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
Ā 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
Ā 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
Ā 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
Ā 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
Ā 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
Ā 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
Ā 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
Ā 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
Ā 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
Ā 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
Ā 

Recently uploaded (20)

Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
Ā 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
Ā 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
Ā 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
Ā 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
Ā 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
Ā 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Ā 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
Ā 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
Ā 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
Ā 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Ā 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Ā 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
Ā 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
Ā 
Model Call Girl in Tilak Nagar Delhi reach out to us at šŸ”9953056974šŸ”
Model Call Girl in Tilak Nagar Delhi reach out to us at šŸ”9953056974šŸ”Model Call Girl in Tilak Nagar Delhi reach out to us at šŸ”9953056974šŸ”
Model Call Girl in Tilak Nagar Delhi reach out to us at šŸ”9953056974šŸ”
Ā 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
Ā 
CĆ³digo Creativo y Arte de Software | Unidad 1
CĆ³digo Creativo y Arte de Software | Unidad 1CĆ³digo Creativo y Arte de Software | Unidad 1
CĆ³digo Creativo y Arte de Software | Unidad 1
Ā 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Ā 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
Ā 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
Ā 

B.sc. agri i foswce unit 1 surveying

  • 1. Surveying Course: B.Sc. Agricultural Subject :Fundamental of Soil, Water and Conservation engineering Unit: 1
  • 2. ā€¢ Surveying: It is the art of determining the relative positions of different object on the surface of the earth by measuring the horizontal distance between them and by preparing a map to any suitable scale. Thus, in this process, the measurements are taken only in the horizontal plane. ā€¢ Leveling: Leveling is the art of determining the relative vertical distance of different points on the surface of earth. Hence, in leveling, the measurements are taken only in the vertical plane.
  • 3. Objects of surveying: ā€¢ The primary object of survey is the preparation of plan estate or buildings roads, railways, pipelines, canals, etc. Or to measure area of field, state, nation. ā€¢ Object of geodetic surveying is to determine precise positions on the surface of the earth of widely distant points.
  • 4. ā€¢ Types of Surveying [Classification]: ā€¢ Primary Classification or Primary Division : Plane surveying and Geodetic surveying ā€¢ Plane Surveying : The shape of the earth is spherical. Thus the surface is obviously curved. But in plane surveying the curvature of earth is not taken into account. This is because plane surveying is carried out over a small area, so the surface of the earth is considered as a plane. The degree of accuracy required in this type of surveying is completely low. Plane surveying is done on an area of less than 250 km2.
  • 5. ā€¢ Geodetic surveying : ā€¢ In geodetic surveying the curvature of the earth is taken into consideration. It is extended over a large area greater than 250 km2. ā€¢ The line joining any two points considered as a curved line. Very refined methods and instruments are used in this type of surveying. In this method very high precision or accuracy is required.
  • 6. ā€¢ Secondary classification: Survey can be classified on different bases. ā€¢ 1. Based on instrument: - Chain Survey - Compass survey - Plane Table survey - Theodolite survey - Tacheometric Survey - Photographic survey
  • 7. ā€¢ 2. Based on methods: - Triangulation Survey - Traverse Survey ā€¢ 3. Based on Objects: - Geological survey - Mine survey - Archeological Survey - Military survey ā€¢ 4. Based on nature of field - Land Survey - Marine survey - Astronomical survey
  • 8. ā€¢ Again Land Survey is classified into following Classes: ā€¢ 1. Topographical Survey To determine natural features of a country such as valleys, rivers and artificial features such as road, railways, etc. ā€¢ 2. Cadastral Survey: To determine boundaries of field, estate ā€¢ 3. City survey: To locate premises, streets, water supply and drainage systems ā€¢ 4. Engineering survey: To collect detailed data for the design for of projects involving roads, railways, etc Engineering surveys are sub divided into: 1. Reconnaissance Survey 2. Preliminary Survey 3. Location Survey
  • 9. Equipment used in Surveying 1. Chain The chain is composed of 100 or 150 pieces of galvanized mild steel wire 4mm in diameter called links. The end of each link are bent into a loop and connected together by means of three oval rings. The ends of the chain are provided with brass handles for dragging the chain on the ground. The length of link is the distance between the centers of the two consecutive middle rings. The end links includes the handles. Metallic tags or indicators are fixed at various distinctive of the chain to facilitate quick reading. 1
  • 10. a. Metric surveying chains: The chains are made in lengths of 20 and 30 meters. To enable the reading of factious of a chain, tallies (tags) are fixed at every five meter length and small brass rings are provided at every meter length. To facilitate holding of the arrows in position with the handle, a groove is cut on the out side surface of the handle. The handle joints are flexible. The tallies used for marking the distances in a metric chain are marked with letters ā€˜Meā€™ and ā€˜mā€™. 2
  • 11. b. Steel Band Chain: It consists of a ribbon of steel with bras handle at each end. It is 20 or 30 fit long and 16 mm wide. It is wound on an open steel cross or on the metal reel in a closed case. The graduations are etched as meters decimeters, centimeters on one side and 0.2 m links on the other. Brass tallies are fixed at every 5 m length of the band. c. Gunterā€™s Chain: It is 66 fit long and is divided into 100 links. Each link is 0.66 ft long. It is very convenient for measuring distance in miles and furlongs. Also for measuring area and when the units of area is an acre 3 4
  • 12. d. Revenue Chain It is commonly used for measuring fields in cadastral survey. It is 33 ft long and divided into 16 links. Each link is 2.0625 ft long. e. Engineerā€™s chain: It is 100 ft long and it is divided into 100 links. Each link is 1 ft in a length. Used in all Engineering surveys. 5
  • 13. 2. Arrows (chain pins): They are also called as marking or chaining pins and are used to mark the end of chain during the process of chaining. They are made up of good quality hardened and tempered steel wire of 4 mm in diameter. The arrows are made 400 mm in length. They are pointed at one end of inserting in to the ground. The other end is in to a ring. 6
  • 14. 3. Tapes: a. Cloth or Linen Tape Used for taking subsidiary measurements, such as offset. It is very light and handy. It is easily affected by damp. If wet it shrinks. It stretches easily and likely to twist. b. Metric Woven Metallic Tape: They are available in 2, 10, 30, and 50 meters. The tape is made of yarn and metal wire. A metal ring is attached to the outer end of tapes. The length of the tape includes the metal ring. At every centimeter a black line 8 to 10 mm in height is drown. Every 5 centimeters is marked with an arrow in black. Every decimeter and meter is marked with a back line extending over the full width of the tape/ the graduation marks at every decimeter and meter are numbered with black and red figures, respectively. 7 8
  • 15. c. Metric Steel Tape: Tape is available in 1, 2, 10, 30, and 50 meters. The tape is of steel or stainless steel. The outer end is provided with a ring. The length of the tape includes the metal ring. The tape is marked with a line at every five millimeters, centimeters, decimeters, and meter. Every decimeter and meter shall be marked with Hindu Arabic numerals in bold. When the button release devised is pressed, the tape automatically rewind in to the case. 9 10
  • 16. d. Invar Tape: For highest precision work the invar tape in used. It is made of an alloy of steel and nickel (36%). It is 6 mm wide and may be obtained in length of 30m and 100m. It is not calibrated through its length but has terminal lines. Each terminal division has ten 1 mm division. It is very expensive. e. Synthetic Tape: The tapes are manufactured of glass fiber having PVC coating. They are graduated every 10 mm and figured every 100 mm. Meter, figures are shown in red. They are convenient for measuring shorts lengths. 11 12 13
  • 17. Instruments for marking stations: 1. Wooden Pegs: These are used to mark the positions. They are made of hard timber and tapered at one end. They are usually, 2.5 cm square and 15 cm long. But in soft ground 40 to 60 cm long and 4 to 5 cm square is suitable. They should be driven in the ground with about 4 cm lengths, projecting above the ground. 2. Ranging rods: Used for making the positions of stations and for ranging. They are made of seasoned timber of teak, blue pine, deodar. They are circular or octagonal in cross section of 3 cm diameter. Lower shoe is 15 cm long. They are made in two sizes as 2 meters and 3 meters and are divided in to equal parts each 0.2 m long. They are painted alternatively black and white or red and white. Now a day instead of timber, mild steel hallo pipes are used. Range pole 14
  • 18. 3. Ranging Poles Similar to the ranging rods but are heavier, they vary in length from 4 m to 6 m or more. Used in the case of very long lines. 4. Offset Rod Similar to the ranging rod, they are usually 3 m long and is divided into parts each 0.2 m length. Top is an provided with an open ring for puling or pushing the chain through a hedge. It has two short narrow vertical slots. It is used for aligning short offsets. Offset RodRanging Poles 15 16
  • 19. 5. Laths Useful for ranging long lines, also used over uneven ground where the ranging rod is not visible due to obstructions, they are light, cheap, being white; they are easily visible at a great distance. Unusually 1.0 m long 6. Whites When the ranging rod is not available or insufficient, whites are used. These are thin strip of bamboo and 40 cm to 1 m in length. One end is sharp and the other end is split for inserting pieces of white papers. They are also useful for temporary marking of counter points. 7. Plumb Bob The plumb bob is required when measuring the distance along slopes in order to transfer points to the ground. It is also used for testing the verticality of ranging poles. 17 18
  • 20. Uses of Surveying: ā€¢ To prepare a topographical map this shows the hills, valley, rivers, villages, town, etc, of a country. ā€¢ To prepare a cadastral map showing the boundaries of fields houses, and other properties. ā€¢ To prepare an engineering map to show details like roads, railways, canals, etc. ā€¢ To prepare military map showing roads and railways, communication with different parts of country. ā€¢ To prepare contour map and to determine capacity of a reservoirs and ton find the best possible route for roads, railways etc. ā€¢ To prepare archeological map including places where ancient relics exist. ā€¢ To prepare a geological map showing areas including underground resources.
  • 21. Chain Survey ā€¢ Chain survey is the simplest method of surveying. In this survey only measurements are taken in the field, and the rest work, such as plotting calculation etc. are done in the office. ā€¢ This is most suitable adapted to small plane areas with very few details. If carefully done, it gives quite accurate results. ā€¢ The necessary requirements for field work are chain, tape, ranging rod, arrows and some time cross staff.
  • 22. Survey Station: Survey stations are of two kinds - Main Stations - Subsidiary or tie Main Stations: Main stations are the end of the lines, which command the boundaries of the survey, and the lines joining the main stations re called the main survey line or the chain lines. Subsidiary or the tie stations: Subsidiary or the tie stations are the point selected on the main survey lines, where it is necessary to locate the interior detail such as fences, hedges, building etc. 19
  • 23. Base Lines: It is main and longest line, which passes approximately through the centre of the field. All the other measurements to show the details of the work are taken with respect of this line. Check Line: A check line also termed as a proof line is a line joining the apex of a triangle to some fixed points on any two sides of a triangle. A check line is measured to check the accuracy of the framework. The length of a check line, as measured on the ground should agree with its length on the plan. 20
  • 24. Offsets ā€¢ These are the lateral measurements from the base line to fix the positions of the different objects of the work with respect to base line. These are generally set at right angle offsets. It can also be drawn with the help of a tape. There are two kinds of offsets: ā€¢ 1) Perpendicular offsets The measurements are taken at right angle to the survey line called perpendicular or right angled offsets. ā€¢ 2) Oblique offsets. The measurements which are not made at right angles to the survey line are called oblique offsets or tie line offsets. 21
  • 25. Procedure in chain survey 1. Reconnaissance: The preliminary inspection of the area to be surveyed is called reconnaissance. The surveyor inspects the area to be surveyed, survey or prepares index sketch or key plan. 2. Marking Station: Surveyor fixes up the required no stations at places from where maximum possible stations are possible. 3. Then he selects the way for passing the main line, which should be horizontal and clean as possible and should pass approximately through the centre of work. 4. Then ranging roads are fixed on the stations. 5. After fixing the stations, chaining could be started. 6. Make ranging wherever necessary. 7. Measure the change and offset. 8. Enter in the field the book.
  • 26. Cross Staff Survey ā€¢ This type of survey is undertaken to locate boundaries of a field or a field or plat and determinations of its area. ā€¢ Principle: The principle of the survey is to divide the given area in to no of right angled triangles and trapezoids and to calculate and plot the areas of triangles and trapezoids. ā€¢ Instruments/Material Required: Two Chains, arrows taps, ranging rods, cross-staff and drawing material
  • 27. Procedure Two chains are usually provided one for measuring distance along the chain line and other for measuring the offsets. The cross staff is used to set out the perpendicular directions for offsets. In this survey, the base line runs through the center of the area, so that the offsets are left or right side of base line are fairly equal. To check accuracy length of the boundary lines may also be measured. After the field work is over, the survey is plotted to a suitable scale.
  • 28. Calculations of Field Area: ā€¢ By this method of survey, the field as divided in to right angled triangles and trapezoids are calculated as under: ā€¢ Area of right -angled triangle = Ā½ base x Height. ā€¢ Area of trapezoid= sum of parallel sides/2 x Height. 22
  • 29. Reference/Sources 1.https://lh3.ggpht.com/eN01oZR9PxNPxpsDcr9gUZdGSUdrKiuiSM6uTY64ECJcAz1TzwZ03Up9CNHifvn5U6bl=s85 2.https://lh3.ggpht.com/9tUsVmdka8MeE5TQBNnJxhCik9XqSmuy2OwXq4ySVbnZbDufCvWRltLY_uJ_DuJwhm45=s95 3.https://lh4.ggpht.com/0afGESSNNYsmMmMv0loH0lVDvvyLKk9TetlZYwohJQn1inU_MrNSTxooTwcJC8rNizo2QYw=s118 4.https://lh5.ggpht.com/xGo7qFS_xe99jBmWfVyx4wpDYVFSaK7aFT8dG1bwuk8lt404M3kHteFbBg2jprX8BPg7dtg=s109 5. https://lh6.ggpht.com/KZR-0kE9ynzZpTPcZ5Tm1Gf7-5LkWs_YvUWe4csapsMxIdK9J-wUg9FX2zNAZR6ErIFmpA=s113 6. https://lh6.ggpht.com/5_1Oqvwfg6P1u0HrPM-NSwMwfkklQsJ-vK8KJHA_sH03MToBGrpOyD_2sFBy1Es5DkfxSgM=s85 7. https://lh5.ggpht.com/eSch4M7mxb7IG-7aSArIvAfjonkDzrpMUAXVF1QcNUsKpCjsAYu6RNxJMTePz2JMaq_7bQ=s127 8.https://lh3.ggpht.com/89hYheAiDqv0qR7mfGLsk39eZzDX0bI_iEpAdcNL9tBRA_UMv-kEZBKGXrS8u6jVvX2K=s85 9. https://lh4.ggpht.com/RBK5wB- 8WfdHm4QEo1MFeIVzD9MNYB8pzuYsTwBIk1tRroqGncPaFUpbyHPRCjCzk7oWOA=s85 10. https://lh6.ggpht.com/3KB089IL-sNL7vByq4yw01aSe_b83wIvGMbEOiCZS9V0QvEXdfdpP- kYEQD2S5QZSXMVug=s170 11. https://lh3.ggpht.com/au8-70sN4qC4zzR2pN9V31mPy7eDOCCziYpJXOYfr9IbvGQzGVs2M1XZlIb8HlvYkndtSw=s109 12. https://lh4.ggpht.com/Xlzt0Gnb7IYSfJuLlZHImrdKbKRw0U9unqb5A9qIPmy1AgqiHz-Y4DaKIsleCRQBO4pM_0Q=s100 13. https://lh5.ggpht.com/SmNyiqF7EFp5UpA8cq3rXsCFTy9iNz0vmT8lutb_UW2d1RJ67cOBMlhjroTxwUjfkrCXQQ=s156 14. https://lh4.ggpht.com/9IdAjwfXk5NXO3Mxzja-cOF80Bm3iY2XKJLsCRSHXwiFW1dpW6UKSFqrxw0lMJh-AYVuMg=s85 15. https://lh6.ggpht.com/FwoZ0gcetDtRPRqJZ9CXjK9cLGT10P8ccMlyRJ2L2TDvMnY672beNQ6SbW4r3f3lMPnhPw=s85 16. https://lh5.ggpht.com/tAjBWoJITFJ-gbI5exI2y8hZyRm5b134OgcujZma6suoHSTU3k0GgnHtgtZtMdAIv-MZvg=s85 17. https://lh5.ggpht.com/WBZVAKVq183n8jC93lbQK4fHri3MFKte-6KjuFPG930ZcF7UIxj5xNWTRighBR_QPgucRA=s85 18. https://lh5.ggpht.com/C7x33N0T2jtep5hKLMR7rGHFjKkC6Dt9Lj15E6Jvv15zya6RV7qeety4PByksrOh9ezP5A=s85 19. https://lh4.ggpht.com/zgg7DK37XvrSyZHSCelix_FWW661DAKjqw00hLjIPiW2716qEEumiOCKu3T1A_Izkj-w=s170 20. https://lh4.ggpht.com/4RiRKWY8MxCZl4h5bQRcZ_vnruopNr86yq6bFcUDlDdcCalFVVwKlSKUF3r0GN4PMrhu=s102 21.https://lh4.ggpht.com/RIurXcgclWcPIZOjkudo-DoJw78NxwiLM8ZhQxITEks9JvB3xlIPJRq4IXk8COeXA8J5tAc=s85 22. https://lh5.ggpht.com/tb3-E1StbD-UA2xhajIhLxI5IjjJZUodP6VHGkdFOjMkb9_ChG3svh8IjFirbPRF-Gf6=s85
  • 30. Text book and web sources - www.agriinfo.in - ecourses.iasri.res.in - Soil erosion and Conservation by R. P. Tripathi and H. P. Singh