This document is a project report submitted by Anurag Kumar Jha to the Department of Mining Engineering at Indian Institute of Engineering Science and Technology, Shibpur in partial fulfillment of the requirements for a dual Bachelor of Technology and Master of Technology degree in Mining Engineering. The project distinguishes and compares mine performance using conveyor belt and haulage systems for transportation. It covers different types of haulage systems used in underground mines like rope haulage, conveyor systems, transport arrangements, direct rope haulage, endless haulage, main and tail rope haulage, gravity haulage and safety devices. It also discusses factors for selecting belt conveyors and their design, including loop take up arrangements for tensioning. The document
rock excavation, different open cast or open pit excavation machinery, application, limitations, highwall miner, bucket wheel excavatorr, bucket chain excavator, shovels
rock excavation, different open cast or open pit excavation machinery, application, limitations, highwall miner, bucket wheel excavatorr, bucket chain excavator, shovels
TRANSPOTATION SYSTEM
. C o n f i d e n t i a l TRANSPORT SYSTEM The main methods of transport are as follows: A. Rope Haulage 1. Direct rope haulage
. C o n f i d e n t i a l ROPE HAULAGE
. C o n f i d e n t i a l Direct Rope Haulage Simplest system
The basic principle of BG method is to be extract thick coal seams by drilling and blasting of roof and sides of gallery, which are driven at the bottom at the bottom of the seam at regular intervals.
Blasting gallery method is the appropriate method for the extraction of thick seam.
BLASTING OF RING HOLES PRODUCTION PER RING BLAST EXPLAINED
In this pdf one can get the different types of equipment used in surface mines which is very important from the examination point of view. important regulations are also included in this .
TRANSPOTATION SYSTEM
. C o n f i d e n t i a l TRANSPORT SYSTEM The main methods of transport are as follows: A. Rope Haulage 1. Direct rope haulage
. C o n f i d e n t i a l ROPE HAULAGE
. C o n f i d e n t i a l Direct Rope Haulage Simplest system
The basic principle of BG method is to be extract thick coal seams by drilling and blasting of roof and sides of gallery, which are driven at the bottom at the bottom of the seam at regular intervals.
Blasting gallery method is the appropriate method for the extraction of thick seam.
BLASTING OF RING HOLES PRODUCTION PER RING BLAST EXPLAINED
In this pdf one can get the different types of equipment used in surface mines which is very important from the examination point of view. important regulations are also included in this .
diesel locomotive works training report by somesh dwivedisomesh dwivedi
4week summer training report on D.L.W. Varanasi by Somesh Dwivedi.
on the topics 1.-Heavy Weld Shop(HWS)
2.- Heavy Machine Shop(HMS)
3. Light Machine Shop(LMS)
4. Truck Machine Shop(TMS)
this report is helpful for highway work or road construction, its also useful for pavement works or pavement design. this report told about bitumen road work construction, in this report cement used for work in side of road.its helpful for those civil engineers who want to submit there training report or seminar report.
practical training taken at loco workshop ajmer.
where diesel locomotive engines are came to repair or service.
and wagon are re-painted or repair and service.
there were also assembling a breaking system with respect to bogie,
wheels of bogie are also tested and service in workshop.
Optimization of productivity with surface miner using conveyor loading and tr...eSAT Journals
Abstract This paper aims at optimizing the productivity at the surface miner’s face with conveyor loading and dump-truck dispatch system to minimize the down times of surface miner as well as trucks. The surface miner was working in opencut method in a limestone mine located in the Southern part of India. Time study was carried out during three working shifts (each of eight-hour duration) for productivity analysis. A model has been developed and simulated in MATLAB for the productivity of surface miner considering the impact of two major parameters – number of trucks and available face length. The number of trucks for optimum production was found to be five. However, the 5% and 95% confidence interval for the number of trucks was 2.3 and 7.4 respectively for the case study face. It was also observed that the face of 330 m length was sufficient for the surface miner to work efficiently. Index Terms: Opencast mine, Surface miner, Mining machinery, Truck dispatch system, Productivity analysis
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology.
Similar to Belt conveyor and Haulage system in the mine (20)
it is a mining method by which we can extract the coal of highwall, when the open cast reaches to its limiting point, by the help of this method we can extract the locked up coal.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
1. DISTINGUISH THE MINE PERFORMANCE BY CONVEYOR
BELT AND HAULAGE SYSTEM OF TRANSPORTATION
A mini project
Submitted in partial fulfilment of requirements for award of
Bachelor of Technology and in
Mining Engineering
By
Anurag Kumar Jha
Exam Roll no.-511214025
SESSION 2015-2016
DEPARTMENT OF MINING ENGINEEING
INDIAN INSTITUTE OF ENGINEERING SCIENCE AND TECHNOLOGY, SHIBPUR
HOWRAH-711103
2. Section 1.01 Department of Mining Engineering
INDIAN INSTITUTE OF ENGINEERING SCIENCE AND
TECHNOLOGY, SHIBPUR
(An Institute of National Importance)
ii
CERTIFICATE
This is to certify that the dissertation titled “DISTINGUISH THE MINE
PERFORMANCE BY CONVEYOR BELT AND HAULAGE SYSTEM OF
TRANSPORTATION ” being submitted by Anurag Kumar Jha (Roll No.-511214025) to the
Department of Mining Engineering, Indian Institute of Engineering and Science Technology,
Shibpur, in partial fulfilment of requirements for award of dual degree of Bachelor of
Technology and Master of Technology in Mining Engineering is a record of bona fide work
carried out by him under my supervision and guidance.
To the best of my knowledge, the matter embodied in this document has not been submitted
anywhere else for award of any other degree or diploma.
Date. ___________________________________
(<Dr. N. C. DEY>)
Associate/ Assistant/ Professor in Mining
Engineering
3. iii
Acknowledgements
We are thankful to Dr. N. C. DEY, Professor, Department of Mining Engineering IIEST,
SHIBPUR for his constant supervision, guidance, motivation and support at every stage of
this project work.
We would also like to convey our sincere gratitude and indebtness to the faculty and staff
members of Department of Mining Engineering, IIEST, Shibpur, for their help at different
times.
We would also like to extend our sincere thanks to Dr. Indarnath Sinha, Dr. Pratik Dutta, for
their help in providing the necessary information for the dissertation work.
Last but not the least, our sincere thanks to all our friends who have extended all sorts of help
for completion of this work.
(Anurag kumar jha)
IV Sem Dual (BTech-Mtech) Degree
Programme in Mining Engineering
Indian Institute of Engineering
Science and Technology, Shibpur
Howrah-- 711103
4. iv
Table of Contents
DISTINGUISH THE MINE PERFORMANCE BY CONVEYOR BELT AND HAULAGE
SYSTEM OF TRANSPORTATION.........................................................................................1
CERTIFICATE..........................................................................................................................ii
Acknowledgements.................................................................................................................. iii
Table of Contents......................................................................................................................iv
Abstract.....................................................................................................................................vi
List of Figures..........................................................................................................................vii
List of Tables ......................................................................................................................... viii
Abbreviations and Acronyms Used ..........................................................................................ix
Chapter-1 Introduction...............................................................................................................1
Chapter-2 Transport System In Underground Mines.................................................................3
2.1 Teansport System.................................................................................................................3
2.1.1 Rope Haulage................................................................................................................3
2.1.2 CONVEYOR SYSTEM OF HAULAGE ................................................................................3
2.2 Underground Transport Arrangement..................................................................................3
2.3 Direct Rope Haulage............................................................................................................3
2.3.1 Direct Rope Double Drum Balanced Haulage..............................................................4
3.4 End Less Haulage ................................................................................................................5
3.5 Main and Tail rope haulage .................................................................................................7
3.6 Tail rope haulage..................................................................................................................8
3.7 Gravity haulage or self acting incline ..................................................................................8
3.8 Safety Devices in Haulage...................................................................................................8
3.9 Belt conveyor.......................................................................................................................8
3.9.1 Selection of belt conveyor ............................................................................................9
5. v
3.9.2 Factors For Designing Of Belt Conveyor ...................................................................10
3.9.3 Loop Take Up Arrangement Of Tensioning Device For Belt Conveyor....................10
Chapter-4 Observations ...........................................................................................................12
Chapter-5 Conclusions.............................................................................................................14
References................................................................................................................................15
Appendices.................................................................................................................................1
6. vi
Abstract
Transportation system is a measure part of mining activity at any type of mining method.
Selection of proper type of transportation system in any coal mines gives better production
efficiency as well as better productivity. It may reduce the labour charge and requirement of
man. It can also increase the production per shift.
Selection of transportation system is mainly depends upon the requirement of coal, condition
of coal seam, condition of roof and floor of gallery, depth of seam, man power,
mechanization of mines and mining method also.
7. vii
List of Figures
Sl No. Name Page
1 Track layout of direct rope
haulage
14
2 Endless rope haulage 15
3 Main and tail rope haulage 16
4 Layout of face gate and trunk
conveyor in coal mine
18
10. 1
Chapter-1
Introduction
Transport development followed two distinct routes in each of the major functions namely
the movement of ore /coal, persons, material and equipment. Ore/coal transport has either
been by locomotive hauled mine cars belt conveyor or rubber tired trucks. The transport of
persons materials and equipment has either been by rail mounted tracks systems or trackless
systems/movable vechicles. Each system described above is still widely popular for those
various specific region.
The consideration of transport system for ore and coal, persons, materials, and equipment and
major factors in the decision to use drifts and or shafts for a mine
12. 3
Chapter-2
Transport System In Underground Mines
2.1 Teansport System
2.1.1 Rope Haulage
i) Direct rope haulage
(1) Tail rope haulage
ii) Endless rope haulage
(1) Over-rope
(2) Under-rope
iii) Main and tail rope haulage
iv) Gravity haulage
2.1.2 CONVEYOR SYSTEM OF HAULAGE
i) Belt conveyor
ii) Cable belt conveyor
iii) Chain conveyor
(1) Scraper chain conveyor
(2) Armoured chain conveyor
(3) Gate end loader
(4) Mobile stage loader
(5) Pick-aback conveyor
iv) Plate conveyor
v) Disc conveyor
2.2 Underground Transport Arrangement
It is divided into following category
1) Main haulage
The main haulage arrangement is that which operates between winding shaft/incline
and the main underground loading points. At the main loading point, the loads are
collected from one, two or more districts.
2) Gathering haulages
The gathering haulage arrangement is that which operates between the working faces
and the main loading points
3) Secondry haulage
In a large mine, where the working faces are far from the main loading point, an
intermediate transport arrangement operates and it is known as secondary haulage
2.3 Direct Rope Haulage
It is a simplest system employing in the mine ,consists of one pulling rope and one
haulage drum for hauling minerals in tubs ir mine cars up a gradient which is generally
stipper than 1 in 10. The haulage engine is situated at the top of an incline roadway and
13. 4
the train of tubsis attached to one end of the rope, the end being fixed to the haulage
drum.
The empty tubs attached to the end of the haulage rope travel on the down gradient by
their own weight and do not require power from the haulage engine. The drum shafts is
therefore provided with a jow clutch to disengage it from the engine. A slip ring motor
with drum controller is used.
Advantage
(1) The rope speed is generally 8-12 km/h and the system can operate
between any point of the haulage plane and the haulage engine
(2) It can, therefore, cope with the haulage requirements of an advancing
working face.
(3) Only one haulage track is required
(4) The system can also serve branch roads if the gradient is suitable for
down-the-gradient movement of empties by gravity. For this reason, the
branch road deviating at an angle of not more than 400
off the main road is
convenient
Disadvantage
(1) High peak power demand as load starts its journey up the gradient
(2) Severe braking duty on the downward run.
(3) High haulage speed demanding high standard of track maintenance
(4) Not suitable for mild inclination of roads.
(5) A derailment is associated with heavy damage because of high speed
2.3.1 Direct Rope Double Drum Balanced Haulage
It is a modification of direct rope haulage, two drums are provided so that when a train of full
tubs is being hauled out bye, a set of empty tubs is lowered inbye. Both the drums are fitted
with clutches and are mounted on the same shaft, weight of the rope and the tubs are balanced
and only the unbalanced load for the engine is mineral. This results in a reduced peak power
demand and easer breaking , the system gives higher output in each trip of the rope brings the
loads and there is regular delivery of the loaded tubs.
The system requires wider roads for the haulage.
14. 5
2.1 Track Layout Of Direct Rope Haulage
(E-track of empties and F-track of loaded)
3.4 End Less Haulage
In this system there are two parallel tracks side by side. One for loaded tubs and the
another for empty tubs and the endless rope passing from driving drum locared at
outbye end of the haulage road to the inbye end and back again via a tension bogey.
The tubs loaded as well as empties are attached to the rope with regular interval with
the help of clips so that the entire rope length has tubs on it at intervals. Only one end
of the tub is attached to the rope at a time. But where lashing chain is used for
attachment the normal practice is to attach a set of tubs and the attachment or
detachment is performed by stopping the rope if however clips are used for single tubs
they can be attached or detached when the rope is in motion. The gradient of haulage
road is mild and rarely exceeds 1 in 6. The rope speed ranges between 3 km/h and 7
km/h and the haulage is slow moving. The rope moves in one direction only.
15. 6
2.2 End Less Rope Haulage
There are two types of endless rope haulage.
1. Over rope type
In over rope type the haulage rope passes over the tub or set a tubs.
2. Under rope type
In under rope type it passes beneath the tub or set of tubs.
Advantage
i) Because of slow speed, less wear and tear.
ii) Accident from derailed tubs does not cause much damage due to slow speed.
iii) Motor of less power required.
iv) It does not place heavy demand on the power supply.
Disadvantage
i) It requires wide road for two tracks.
ii) It is not suitable for sleep gradient
iii) Load on the rope is larger and a rope of larger cross-section is required.
iv) Large no of tubs and clips are required as rolling stock.
v) If a break-down of any tub occurs the whole system comes to a standstill.
16. 7
vi) It can not serve a main road and a branch road simultaneously unless elaborate
arrangements are made to course the rope to the branch line with the help of
deflection pulleys.
3.5 Main and Tail rope haulage
In main and tail rope haulage, the hauling engine is provided with two separate drums
one for the main rope, which haul the full train out and one for the tail which haul for
the empty train in. When one drum is in gear, the other revolves freely on the shaft
but controlled when necessary, by the brake to keep the rope taut. The main rope is
approximately equal to the length of the plane and the tail ropes twice this length. In
this type of haulage only one track is required and it is suitable for undulating
roadways where it is impossible and undesirable to maintain the double track required
for endless rope haulage. It can readily negotiate curves and it is convenient for
working branches. It operates at fairlyhigh speeds and with long trains and if a
derailment occurs,the resulting damage and delay likely to be considerable.
2.3 Main And Tail Rope Haulage
Advantage
i) This system of haulage is suitable for undulating roadways, where it is impossible
or undesirable to maintain the double track .
ii) Unlike endless rope haulage, this system requires one track.
iii) Less maintenance cost for one track compare to two tracks.
iv) Can readily negotiate curve.
17. 8
v) It is convenient for working branches.
vi) It operates at fairly high speed.
Disadvantage
i) As it operates at fairly high speed, more wear and tear.
ii) Derailment can cause more harms to man and machine.
iii) Long length of rope is required causing more cost of maintenance.
iv) It became very difficult to manage the system properly.
3.6 Tail rope haulage
It is situated at the lower level and the empties are hauled up the sloping track. The
haulage rope passes to the train of empty tubs via a deflection pulley located at the top
of the roadway. The loads travel by gravity down the gradient but as the rope is
attached to them; their descent is controlled by the haulage driver.
3.7 Gravity haulage or self acting incline
It is located at the top of the inclined roadway and is employed to lower by gravity the
loads attached to one end of the rope which passes round the vertical jig pulley. Only
single track is required for the operation but at the mid way of the road where the
loads and empties meet, double track or a bye-pass is essential. This haulage operates
without any motor or external source of power and consists of a cast iron pulley of 1.3
m to 2 m diameter having a brake path on the side and a strap brake.
3.8 Safety Devices in Haulage
i) Stop blocks
ii) Buffers
iii) Back catches
iv) Pointer plates
v) Drop war wick
vi) Age croft device
vii)Back stays
viii) Runway switches
ix) Jazz rails
x) Retarders
xi) Approach warning device
3.9 Belt conveyor
The belt conveyor is basically an endless belt in a straight line stretched between two
drums, one driving the system and the other acting as a return drum. In coal mines and
other mines of stratified deposits, where the underground mineral if won by longwall
method, the transport media which often consists of conveyor.
18. 9
2.4 Layout Of Face, Gate And Trunk Conveyors In A Coal Mine
The system of transport by belt conveyor consists of the following:-
i) A flat endless belt which moves continuously and carries at its top
surface the material to be conveyed.
ii) The idlers which support the belt.
iii) The structure of channel iron on which the idlers are mounted.
iv) The tensioning arrangement for keeping the belt in proper tension.
v) The drums at the discharge and tail end over which the belt passes.
vi) The drive head which comprises the electric motor, coupling, gearing
and snub pulleys.
3.5(b)-Arrangement of a belt conveyor
3.9.1 Selection of belt conveyor
19. 10
There are following factors that decide the selection of belt conveyor
(a) Amount of material to be conveyed
(b) Continuity of operation needed
(c) Size of lumps
(d) Distance of transportation
(e) Environmental allowance
(f) Gradient
(g) Method of coal winning, i.e. Longwall or Bord and Pillar
(h) Capital Available
Advantages:-
(a) A continuous supply of material
(b) Low operating cost than road transportation system
(c) High rate and speed of supply
(d) Bunding can be done to get fair grade
(e) More efficiency and low cost
Limitations of belt conveyor:-
There are following limitation of belt conveyor-
(a) It cannot be used for long distances
(b) It requires high one time capital investment
(c) It cannot handle the Lumps of big size
(d) Place should be dry enough where it will installed and air velocity should
not be high
(e) It cannot be operates at high inclinations
3.9.2 Factors For Designing Of Belt Conveyor
i) The average tonnage (t/h), peak rate (t/min) and frequency of peak rates.
ii) Characteristics of the material i.e.
Density
Maximum lump size
Nature of material- dry, wet, sticky, dusty
Chemical action on belt
iii) Graphical layout of conveyor profile and motive power available (i.e.
electric motor).
iv) Operating conditions - hours of working, climatic conditions etc.
v) Suitability of a belt conveyor & width and speed of belt.
vi) Belt shape
vii)Power and layout required
3.9.3 Loop Take Up Arrangement Of Tensioning Device For Belt Conveyor
Tensioning of the belt is necessary to prevent excessive sagging of the belt or
belt in good contact with the driving drum. There are following arrangement
for the tensioning of the belt-
20. 11
(i) Automatic take ups
(ii) Gravity take ups
(iii)Take up pulley with counter weight
(iv)Counter weighted loop take
(v) Counterweighted wheel mounted tail end pulley
(vi)Power take ups
(vii) Electric motorized winch and load cell loop take up
(viii) Electric motorized winch and load cell loop take up
(ix)Hydraulically loop takes up
(x) Rigid or manual take ups
(xi)Screw take up
(xii) Jack take up
(xiii) Winch take up
21. 12
Chapter-4
Observations
The study of many overland conveyor (OLC) vs. truck haulage reveal some basic and new
facts:
1) Belt conveyor is more time and effort saving so it saves the costs. However , it is
inconvenient to move, which the advantage of trucks.
2) The problem with haulage no matter the tonnage class size is that they are only fifty
percent efficiency.
3) Conveyors have a very high cost per foot of installation in thousands of dollars per
foot and they requires replacement idlers belting, motor, pulleys, gear boxes, chain
drives, high or medium voltage electricity to power them, emergency stop systems
from end to end and labor to main tail them as well as labor to install conveyor
extensions.
A conveying system of any ype requires primary and secondary crossing system and
or conveyor belt feeder/breakers to load them as well. Adding more to the purchase
cost operational cost.
4) Penalizing the conveyor with ore size reduction is also a fallacy. The rock is going to
be crushed in any case in order to processed. One can argue about crusher
maintenance in remote areas. Still these facts are assessed during the feasibility
phase.
5) Breakeven point for OLC is a transport circuit that must convey 2 million tons per
annum over more than one kilo meter or the total multiplier of tons and kilo meters.
This is further dependent on local fuel costs and terrain difficulty. Some countries
subsidize their diesel fuel that artificially lowers the truck penalty that is now
changing.
6) Conveyors can often be routed in a more direct path than the road haulage thereby
reducing the kilo meter penalty. The path may include bridges over rivers, roads,
railroads, etc.
7) Conveyors can negotiate rough terrain to 18 degrees or more making for shorter
paths or that would require tunnel by trucks.
8) Conveyors are more efficient with fuel usage than trucks especially with the payload
of an empty truck return haul.
9) Conveyor designs have become more efficient with new rubber compounds and new
design methods that lower rolling energy by 50% or more than many suppliers of
rubbers from 5 years ago. Trucks have not seen such improvements in rolling losses.
A case in point is the Curragh 20km single flight overland that transports 2500 t/h. It
is light and fast (7.5 m/s). It is very light for the tons conveyed due to efficient use of
sheet metal components for is idler and belt support and wind shielding. IN 2007, it
was the fastest operating belt conveyor in Australia. Speed lowers the conveyor
system width which is the most capital intensive parameter. Some have disparaged the
22. 13
design and been wrong in their assessment. It's 5 m carry side and 10 m return idler
spacing is proven to be appropriate when the plant has been properly operated.
10) New research into more efficient belt conveyor operations is proving that
further cost effective gains are possible compared to trucks and trains. More
difficult terrain, stronger belts, lower belt strength as measured by the necessary
Safety Factor, lower rolling resistance designs, and lower metal mass per km all
point to ongoing improvements over truck and trains.
11) New conveyor configurations can be found with better trough shapes, pipe, and
semi pipe designs are now a reality where high lifts and sharp curvatures are
required that add to belt conveyor transport efficiency.
12) studies of +100km conveyors does demonstrate the ability for long and efficient
transport compared with train haulage. Risk analysis then becomes an important
factor in the “what if “scenarios.
23. 14
Chapter-5
Conclusions
There are various advantage and disadvantage of both of the method of transportation of
material. But we can chose any one by our requirement because where belt conveyor has lot
of maintenance and installing cost but it will give us lot of production who save our time and
labour cost where as if we can not interested in the huge production than truck haulage best
option but we should try belt conveyor with advanced technology who will give us
production in long distance. It will save the effort and other labour work. If we want to
supply the material in long path way than haulage is more efficient belt conveyor is not
sufficient. And if we want to handle big size lump conveyor is not adequate for it. Belt
conveyor can not operate at high inclination and the place should be enough clean and dry.
Land and weather are good grounds for eliminating either choice. The question should be
"Do you want the stuff or not?" If the answer is yes then the economics is out of the window.
You have to have it so be prepared to pay for it. Trucks need good dry ground to travel and
plenty of it. Conveyors also need an acceptable right of way and can only negotiate a route
within set limits. Truck CAPEX is not so small andthe OPEX is higher than for conveyors,
provided you don't slit a
belt into 2.