Beethoven's Fifth Symphony Essay
Beethoven's Fifth Symphony
If you are part of society, I think it is safe to make the assumption you are familiar with and have
heard Symphony No. five by Beethoven. Whether it was a theme in movie or part of an
advertisement on TV, it captured your attention and added emotion and excitement to the particular
segment that it coincided with. Total unification and the pervasive use of a single motif combine to
make the Fifth Symphony, which had one of the longest gestation periods of any Beethoven work,
the first in which all movements are shown plainly to be part of a cyclic design. The famous motif
which dominates the first movement in the form also makes significant appearances that are
dramatic entrances in the other...show more content...
Instead of having the tonic minor govern the entire recapitulation in the first movement, he brings
back the second subject in the tonic major, as a simple transposition rather than the fundamental
recasting. (In this respect the movement anticipates the Romantic concept of thematic integrity and
by, extension, the idea of the theme as the focal point of a composition.)
The fifth Symphony in C minor is rightly considered the paradigm of Beethoven's symphonies; the
various alternatives to sonata form, explored in the piano works, are put to one side here in favor of
the more rigorous example of Mozart, which is, however, raised to a superbly spectacular
level.(Pestelli p.236) According to Pestelli, No other piece had ever organized the principles of
contrast with such integration of metrical structure and thematic invention as does the first
movement; the grand balancing of blocks of sound comes, as everyone knows, from a proverbial
four–note idea, an idea unusable by others, and in that sense a asocial , rather like the opening of
Coriolan(1807), the overture for Collin's tragedy, with it's powerful swelling unisons that explode
into chords.(236) This explains the why Beethoven's opening to Symphony No. five is so powerful
and dominating to the listener's ear. His use of only four notes to introduce his symphony is an
original one, giving it extreme distinction from any other composer's work of the Classical
Get more content on HelpWriting.net
Ludwig Van Beethoven Essay
German composer and pianist, Ludwig van Beethoven, was born December 1770 and spent most
of his life in Vienna, Austria. His first teacher was his alcoholic father, who worked as a musician
at the Court of Bonn. Teaching him day and night, Ludwig suffered from his father's harsh and
erratic behavior. For a time, he and his father played at the Church. As his father's alcoholism
increased, Ludwig became the main musician. Beethoven's talents were discovered at an early age,
and he was sent to Vienna to study under different teachers including Mozart and Hayden. There,
Beethoven quickly adopted a reputation of a great piano player, a child prodigy. He gave his first
public performance at the age of eight and published his first...show more content...
Music was his life and he was deeply depressed and angry at the thought of being deaf. He even
became suicidal. His relationship to his music was very serious, and though he continued to
compose music, he never performed again following a failure to perform his Piano Concerto No.
5 "Emperor" in 1811. Following many personal crises in his life, Beethoven's music reflected his
mood. His masterpieces depicted struggle followed by triumph. Later, his worked was influence
by the ideals of Enlightenment, leading him to dedicate the symphony "Erotica" to Napoleon.
The symphony "Ode to Joy" was believed to be about the brotherhood of humanity. His works are
admired for intellectual depth, intense expression, and experimental forms. He is considered one
of the greatest minds of humanity. His ambitious works made him prominent in the transition
between eras of Classical and Romantic music. Music had driven Beethoven's life from a small
child to an adult. It helped him overcome an alcoholic father, his mother's death, failed love, and
provided a means of support for his family. It carried him through personal crises including the
loss of his hearing and won him critical acclaim in social circles. His life ended in 1826 following
complications of a cold and chronic health problems. He used his music to preach through art and
has remained a model to later composers in the use of classical principles of
Get more content on HelpWriting.net
Beethoven Essay
Introduction
Like many people of this time period Beethoven was affected by the French Revolution, the
enlightenment and romantic periods; in 1789 the French Revolution was raging and people were
dying. The French general Napoleon defeated France's enemies and inspired Beethoven with ideas
of freedom and equality. It was because those inspirations that Beethoven was going to dedicated his
Third Symphony, Erocia which means heroic to him, that was until Napoleon decided to declared
himself emperor, which made him so angry that he viciously scratched out the dedication. (Alvarez
2006–2007)
He was also influence by nature and especially the country side. This is evident by his sixth
Symphony, Pastoral which means simple country, below...show more content...
The middle period is thought to begin shortly after his personal crisis brought about by his
recognition of his deafness. This period include large–scale works that express heroism and struggle.
The late period is thought to begin around 1815. This period is characterized by the intellectual
depth, formal innovation, intensity and high personal expression. (Ludwig van Beethoven 2011)
Early Years
Born December 16, 1770; although there is some debate about his actual date of birth, but according
to traditions of that time period children were christened within 24–hours of their birth and Ludwig
van Beethoven was christened on December 17, 1770 at the Parish of St. Regius. He was born to
Johann and Magdalena Keverich van Beethoven of Flemish descent at 515 Bonngasse, Bonn
Germany.
Eyewitness said that Johann was and ill–tempered man who would beat music lessons into his young
son. There is speculation that he would force the young Ludwig to play the violin for his father's
drunken friends. Johann was a particular fan of the bottle too. Even though he was very fond of
his mother, she too had an alcoholic problem due in part to the loss of several children. Of the
seven children, only three of the children survived, Ludwig, Johann, and Karl. Eventually, she was
placed with nuns to live out days. Young Ludwig is said to have a fairly
Get more content on HelpWriting.net
Essay on Ludwig Van Beethoven
When you look at the world and all the people on it as a whole, you see that there are very few
influential people whose actions or opinions strongly influence the course of events. Ludwig Van
Beethoven, a German musician, is one of those very few. He was an extraordinary musician that
lived through hardship and had the horrific fate of deafness, any musician's worst nightmare.
Beethoven left a wall standing in history that captured the art of sounds and worked it beyond
imagination into music so fragile and pure yet onerous, unable to be matched by any succeeding
composer. His determination to push music forward, go beyond the thinkable, and make it his own,
has made a huge impact on all music forever going forward.
Beethoven had a...show more content...
Instead, he worked with HAYDN and J. G. Albrechtsberger. Soon Beethoven would begin to make
his mark as a pianist and as a "daring and unorthodox composer."(Literary Reference Center)
When Beethoven was 28, in 1798, he began seeing signs of deafness; this progressively got
worse. "He struggled against the gradual loss of his hearing. For a musician, there is nothing
more tragic. A deaf musician is like a painter without fingers, a soccer player without feet.
Beethoven could not hear the sound of musical instruments or the pitch of a single note. Although
his fate challenged him, miraculously, his best works were completed after he went
deaf."(History Reference Center) Although it may seem like Beethoven was barely hazed by his
deafness, it actually brought him great stress. Beethoven steadily started drawing away from
people and close friends; as the lack of hearing grew he got really frustrated at times. He got to
where he stopped caring about his appearance, left his hair tangled and uncombed, clothes tattered
and rumpled. He became really bitter and unpleasant to be around; if one of his maids brought him
soup he didn't like, he would just smash the bowl on the ground. Beethoven was alone in the world,
and that is why towards the end of his life his music was even more emotional and expressive.
Ludwig Van Beethovenwas a very prolific composer and had a vast
Get more content on HelpWriting.net
Composer Report: Ludwig Van Beethoven Essay
Composer report: Ludwig van Beethoven
On 17 December 1770, Ludwig van Beethoven was born. He was an amazing and great classical
musical composer. He is known for being the most famous composer of the classical and romantic
periods of music. According to the "Enjoyment of Music" manual, Beethoven was born in Bohn,
Germany. His father, with his grandfather, was the two singers at the court of a local prince,
Friedrich Max. (Forney and Machlis 197).
Beethoven began to take an interest in music from an early age. Johann, his father taught him day
and night playing music. Unfortunately, Johann had a problem with alcohol and become alcoholic.
Johann, who noticed the talent of his son and realized how he was good. Viewing it as Beethoven
...show more content...
Beethoven returned to Vienna in 1972 to continue his musical education. Beethoven never returned
to his hometown and stayed in Vienna for a while. The in Vienna, Beethoven had valuable lessons
from Wolfgang Amadeus Mozart, Joseph Hayden, Johann Georg Albrechtsberger, Antonio Salieri,
and Aloys Forster. Each of them had taught Beethoven something special. Beethoven quickly
adopted a reputation as a great pianist, a child prodigy. Everyone in the music industry has learned to
admire Beethoven and his talent.
After many personal crises in his life, Beethoven's music reflects his mood. His masterpiece
represented struggle followed by triumph. Later, his influence has been worked by the ideals of
the Enlightenment, which led him to dedicate the symphony "Erotica" Napoleon. Symphony "Ode
to Joy" was estimated at about the brotherhood of humanity. His works are admired for their
intellectual depth, intense expression, and experimental forms. It is considered one of the greatest
minds of humanity. His work was ambitious head of the transition between eras of classical and
romantic music led Beethoven's life of a child to an adult. A overcame alcoholic father; the death
of his mother did not, and has provided a way to support his family. He carried through personal
crises, including the loss of his hearing and earned him critical acclaim in social circles. His
Get more content on HelpWriting.net
Ludwig van Beethoven Essay
Some of the most well known composers came to be in the in the classical music period. Ludwig
van Beethoven was one of the composers, along with other greats of the time like Haydn and
Mozart, which helped to create a new type of music. This new music had full rich sounds created by
the new construction of the symphony orchestra. Ludwig van Beethoven was born in the town of
Bonn, Germany on December 16 of 1770. Bonn is located in western Germany on the Rhine River.
Beethoven showed an affinity for music at an early age. His father, Johann, taught Ludwig to play
the piano as well as the violin. Johann did this in hopes that his son would become a prodigy, and
then reach fame like Wolfgang A. Mozart. Unfortunately though Beethoven...show more content...
Regrettably, though in the late 1790s Beethoven began to lose his hearing. Then at the start of
the 1800s Beethoven changed the way he created music and his personality because of the
increasing deafness. Prior to the increasing loss of hearing Beethoven had been full of pride and
independent, though a little odd. When his hearing started to go he changed, he became more
apprehensive and ill tempered. Despite becoming absolutely deaf by the end of his life
Beethoven's works were still brilliant. It was on March 26, 1827 when Beethoven died, the cause
was a simple cold that turned into pneumonia and then later dropsy. Beethoven's works are
classified into three periods. Beethoven's first period took place between the 1780s to
approximately 1800. The works produced during this period show the Beethoven was just
beginning his musical journey. The pieces created are similar to ones created by Haydn, Mozart,
Bach, and Neefe. Christian Neefe was one of Beethoven's instructors from Bonn. Despite the fact
that Beethoven modeled his early works after others they still showed his personality in the way they
were written and in their robust melodies. In Beethoven's second period he generated many of his
most famous works. This period lasted from about 1800 to 1820. It was in this time span that
Beethoven wrote symphonies three through eight, two piano concertos, one violin
Get more content on HelpWriting.net
Essay on Beethoven
Ludwig van Beethoven was born in Bonn, Germany, in 1770. He came from a family of
musicians. His father and grandfather worked for the Electors of Cologne. The grandfather,
Lodewyk van Beethoven came from Mechelen, Belgium and joined the court orchestra in Bonn as
a bass player. He eventually became the conductor. His son Johann was a professional tenor at the
court in Bonn and also played piano and violin. As Beethoven began to exhibited his outstanding
musical talent at a young age, his father pushed for him to become a child prodigy. Johann gradually
gave up when Beethoven 's recitals were only marginally successful. Beethoven's mother then died
when he was in his late teens. His mother's death drove his father to become an abusive...show more
content...
" By this time Beethoven was ready for the almightiest risk of his life" ( Simpson 55). He was at
the stage in his life where he knew what risks he could and could not take. For years Beethoven had
contemplated setting Schiller's Ode to Joy, but when he decided to make this the setting to the final
movement to his ninth symphony he was very uncertain as to how to introduce the voice. " ... there
are reports of him striding up and down his room trying to solve this problem" ( Pike 70). Although
some of the ideas used in the Ninth Symphony appear in sketches of 1817–18, Beethoven only
began concentrated work on the score in 1822. It occupied him throughout 1823, and he completed
it in February 1824. The first performance took place at the Karntnerthor Theater in Vienna on May
7, 1824. Beethoven stood there completely deaf beating time and turning pages of his score, but the
real conduction was done by Michael Umlauf. The orchestra leader was Schuppanigh. The
dedication was to King Frederick William III of Prussia.( Steinberg 47–48)The first vocal soloists to
perform this were Henriette Sontag (soprano), Karoline Ungersabatier ( alto), Anton Haizinger (
tenor), and Joseph Seipelt (bass). Only two rehearsals were gad been possible for the performance
with mixed critical success. The symphony's required orchestration includes: two flutes and piccolo,
two oboes, two clarinets, two bassoons and contrabassoon, four horns, two trumpets, three
trombones, timpani, triangle,
Get more content on HelpWriting.net
Ludwig van Beethoven was an extraordinary music composer, especially considering he was deaf
most of his life and career. He was born in Germany on December 16, 1770. Many obstacles were
hurled at him, but he triumphed over them, and even deafness didn't stop him from composing some
of the worlds greatest, and most recognized music compositions (Rosenwald 167). His life, music,
and his musical styles and techniques all contribute to his life story. Beethoven was born in Bonn
Germany. At 14, he held the occupation of a court organist. Sadly, his father was a drunken singer,
and barely supported his family. Consequently, the money Beethoven earned assisted his family. In
1778, he traveled to Vienna and met Wolfgang A. Mozart who instantly
...show more content...
Soon, he had to give up concert work and devote his time composing, struggling at the same time
against ill health, poverty, and growing deafness. By 1819, his deafness affected him so
significantly, that he was able to communicate only by writing (Rosenwald 167). However, in the
isolation of deafness, Beethoven created some of the most distinguished works of music (Rosenwald
167). Beethoven admitted, "I would have ended my life–it was only my music that held me back."
With this victory over despair, there was an important change in his musical style (Kamien 150).
For Beethoven, music was a moral force, a higher revelation than all wisdom and philosophy, not a
mere entertainment. He had a demand for perfection, and that meant long, hard work. Occasionally,
he worked for years on a single symphony in addition to writing other compositions (Kamien 151).
His works are generally divided into three periods. The early period, up to 1802, middle, 1803–1814,
and late, 1815–1827. His early period greatly shows the influence of other composers, whereas his
middle and late times unmistakably show Beethoven's personal style (Kamien 153). Mostly,
Beethoven used classical techniques and forms. However, he gave them new intensity and power.
He bridged the classical and romantic eras (Kamien 151). His works differentiate themselves through
his formation of protracted, large architectonic structures illustrated by the vast enhancement of
musical material, motifs, and themes, usually by
Get more content on HelpWriting.net
Beethoven Accomplishments
Ludwig van Beethoven was born in 1770 in Bonn, Germany. He was raised in a family of
musicians, and his father sang and taught him how to play instruments. He is one of many talented
and admirable composers that are to be regarded when deciding who was the greatest composer in
European history. When considering the greatest composer, it would have to be someone who had
originality, natural talent, and someone who put their all into their music. Beethoven possessed all
of these qualities, and is more than fitting for the title. Although he suffered from depression and
was quite closed off, Beethoven is the greatest composer in European history because he developed
his own style with his music, he had a natural gift, and he was very passionate....show more content...
In the Encyclopedia of World Biography, it says, "(he) showed signs of unusual originality and
power". This quote expresses how he demonstrated skill at composing and was able to give his
music "power" from a very young age. When he was only four years old, Beethoven's father taught
him to play both violin and clavier, and by the time he was eleven years old, he had composed three
sonatas for the piano. According to "Ludwig van Beethoven", "Ludwig van Beethoven's contributions
to the world of music and composition make him stand undeniably among the most renowned and
influential masters" (DISCovering Biography). This text is a great example of how Beethoven was
incredibly influential in the musical community, and by accomplishing so much at such a young age
he must have had a natural talent. In the book, Beethoven: Anguish and Triumph, it says, "others
were inspired to feats of generosity for this brilliant but oblivious student" (Swafford, 57).
Beethoven's teachers realized that he was going to become very successful, and he that possessed a
natural gift. In retrospect, Beethoven had an inborn talent for understanding music and composing
Get more content on HelpWriting.net
Ludwig Van Beethoven Essay
The composer of some of the most influential pieces of music ever
written, Ludwig van Beethoven created a bridge between the 18th–century
classical period and the new beginnings of Romanticism. His greatest
breakthroughs in composition came in his instrumental work, including
his symphonies. Unlike his predecessor Wolfgang Amadeus Mozart, for whom
writing music seemed to come easily, Beethoven always struggled to
perfect his work.
Ludwig van Beethoven was born in Bonn, Germany, and was baptized on
Dec. 17, 1770. (There is no record of his birth date.) His father and
grandfather worked as court musicians in Bonn. Ludwig's father, a
singer, gave him his early musical training. Although he had only meager...show more content...
By 1802
Beethoven was convinced that the condition not only was permanent, but
was getting progressively worse. He spent that summer in the country and
wrote what has become known as the "Heiligenstadt Testament." In the
document, apparently intended for his two brothers, Beethoven expressed
his humiliation and despair. For the rest of his life he searched for a
cure, but by 1819 his deafness had become total. Afterward, in order to
have conversations with his friends, Beethoven had them write down their
questions and replied orally.
Beethoven never married. Though he had many friends, he seemed to be
a lonely man. He continued to appear in public but spent more and more
of his time working on his compositions. He lived in various villages
near Vienna and took long walks carrying sketchbooks in which he would
write down his musical ideas. Scholars who have studied these
sketchbooks have discovered the agonizingly long process that the
composer went through in order to perfect his melodies, harmonies, and
instrumentations.
Three Periods of Work
Most critics divide Beethoven's work into three general periods,
omitting the earliest years of his apprenticeship in Bonn. Although some
pieces do not fit exactly into the scheme, these divisions can be used
to categorize the composer's work.
The first period, from 1794 to about 1800, consists of music whose
most salient
Get more content on HelpWriting.net
Beethoven Essay
The rise of Ludwig van Beethoven into the rank of history's greatest composers was paralleled by
and in some ways a consequence of his own personal tragedy and despair.
Beethoven's family was of the Flemish origin. His mother, Maria Magdalena, died after a long
illness when Beethoven was only 17. He was not the only child in this family though. He had 2
brothers and 1 sister, both to which were disorganized and unruly. His family was always in constant
need of funds.
Beethoven showed his extraordinary musical talent at an early age. His father hoped he could
induce his child's development and make him more like Mozart, and possibly bring in some money
for the family which was desperately in need.
As a child, Beethoven never was too...show more content...
He began to study with other teachers and soon became very popular in Vienna. Some were pleased
with his performances, but others were embarrassed by his arrogance and bad manners.
In the late 1790's, Beethoven discovered an increasing buzzing and humming in his ears and it sent
him into panic, searching for a cure. In 1802, he wrote a letter to his brother describing his
anguish. He asked his brother to read the letter at the funeral. His suffering had a brief respite when
he soon fell in love with a young countess, and dedicated a song to her called "Moonlight Sonata".
Even after this, she did not marry Beethoven.
By October 1802, he had written the Heiligenstadt Testament confessing his deafness, and suicidal
considerations.
By about 1800, Beethoven was mastering the Viennese High–Classic style. Although Mozart had
first perfected the style, Beethoven did extend it to some degree. Having displayed a wide range of
his piano writing, he was also beginning to forge a new voice for the violin.
Beethoven's deafness landed him into a major cycle of depression. In his Testament, he reveals his
malaise that was sending him to the edge of despair. He speaks of suicide in the same breath as a
reluctance to die. Having searched vainly for a
Get more content on HelpWriting.net
Beethoven Research Paper
“...to the cast majority of people suffering is still one of the fundamental characteristics
of life, and it is their realization that an experience of suffering, pure and profound, enters as an
integral part into
Beethoven’s greatest work, that helps to give that work its unique place in the minds
and hearts of men.';(Marek, 634) These words of compassion come from J. W. N. Sullivan during
Ludwig van Beethoven’s funeral. They express the regret and sense of loss felt by
people all over the world as they caught news of his end. Beethoven was and is a cornerstone for
music of all kinds in that he combined new color, imagination, structure and expression to further
capitulate the evolution of this great form...show more content...
Chapter 2: His life and works.
Ludwig van Beethoven was born in the second half of the 18th century when the age of curiosity was
prominent. Society at the time was beginning to question many old beliefs, customs, and religions.
There were advances in astronomy, geography and chemistry, proving that the world was ready for a
revolution of innovation and excitement.
Beethoven was born on December 17, 1770 in Bonn, Germany. Bonn was a pleasant city. It was
very old and very rich in tradition. Its location was on the western bank of the Rhine River which
offered protection form intruders.(Marek, 26–7) It was a close knit community and there was a good
balance between business and recreation. It may be safe to say that some of
Beethoven’s compassion was sparked by his environment of fertile resources that the
town of Bonn provided.
“The boy was looking out of the window, his hands cradled in his hands. His mien was
werious, his glance rigid. Cacilia Fischer came along the courtyard and saw him. ‘How
are you, Ludwig?’ she shouted up to him.
No answer. She said, ‘Well, no answer in an
Get more content on HelpWriting.net
Essay on Beethoven
Beethoven He was born in the German town of Bonn on the 16th of December 1770. His
grandfather Ludwig and his father Johann were both musicians. Johann was to act as little
Ludwig's first music teacher, but Ludwig soon changed to the court organist C. G. Neefe. Passing
eleven years of age, Ludwig deputized for Neefe, and at twelve had his first music published. He
then stayed as Neefe's assistant until 1787, when at seventeen, he took off for Vienna. Even though
Vienna was to be his home for the rest of his life, this first visit was short. On hearing that his
mother was dying, he quickly returned to Bonn. Five years later he finally moved to Vienna to live
and work. After arriving in 1792 he studied composition and counterpoint...show more content...
This strive culminated in the second symphony from 1801–1802. This is also the time when the
middle period starts. From now up until 1813, Beethoven develops and enhances the high classical
style into a more dynamic and individualistic style. It is now that he writes symphonies Nr. 3 – 8,
piano consert Nr. 5 and a lot of chamber music. But as he learns to control his craft and develop
the music into new undiscovered grounds, he also suffers from reminders of the pains of real
life. He has early in life discovered that his hearing wasn't what it should be, and the disorder gets
worse as time goes by. It gets to the point where Beethoven is thinking of ending his life as he sees
no way out of his despair. That fact is documented in the letter he wrote to his brothers in 1802,
the so called . This hearing disorder seems to have affected his social life to a great extent. He
became difficult to handle in social interactions and could suddenly burst into outbreaks of anger
and show bad temper where he usually insulted someone. If that is the reason for his troubles with
women, or if their is something traumatic hidden in his childhood, I don't know, but the fact is that
he never got involved with a woman in a normal relation. Beethoven seems to have been attracted to
women he couldn't get, or at least was hard to get. An example is Antoine Brentano, with whom he
had a relationship, but who broke up with him to marry a friend. It is
Get more content on HelpWriting.net
The Talent Of Beethoven By Ludwig Van Beethoven
Many of my family members along with some family friends suffer from an extreme lack of
hearing just like one of the greatest composers of all time, Ludwig van Beethoven. However, my
family members and family friends are not musicians. The talent of Beethoven is very inspiring
for not only the deaf, but for other people as well. He created most of his music while suffering
from hearing loss which seems to be quite impossible, but somehow he managed to do it. Though
his music is without a doubt unbelievably good, his compositions were always based on a negative
tone. Was his tone always negative because he lived an angry life coping with his deafness? This is
a question many of his audience and fans have wondered and asked themselves. With research, the
answer has become quite clear.
On December 16, 1770, Ludwig van Beethoven was born in Bonn, Germany. His family originated
from Brabant, in Belgium. His father was a musician at the court of Bonn. Unfortunately, he had a
definite weakness for alcohol. His mother was a singer and was always described as a gentle,
retiring woman that always welcomed people with a warm heart. Beethoven referred to her as his
"best friend"; the one he trusted and believed in. The Beethoven family consisted of seven children,
but only the three boys survived, Ludwig being the oldest. When Beethoven was sixteen years old,
his forty–one–year–old mother passed away. She had a terrible disease known as Tuberculosis,
which is an infectious bacterial
Get more content on HelpWriting.net
Beethoven Essay
Beethoven
Ludwig van Beethoven was, and remains today, an influential figure in the history of classical
music. Perhaps no other composer in history wrote music of such inspiring power and
expressiveness. His influence on the last 150 years of music is unequalled.
Beethoven was born in Bonn, Germany in 1770. His father, a music enthusiast, dreamed of molding
his son into the next Mozart. Beethoven never showed the impressive characteristics of Mozart, but
he was unusually talented, learning the piano, organ and violin at a very early age. At 14, he was
already skilled enough on the organ to receive a professional appointment (Beethoven). He held
positions as an assistant organist in the electoral chapel where he obtained his first...show more
content...
The early piano sonatas of Beethoven deserve special mention. Although his first published
examples of concertos and trios and the first two symphonies are beneath the masterpieces of
Mozart and Haydn, the piano sonatas bear an unmistakably Beethovian stamp: grandiose in scope
and length, and innovative in their range of expression. The sonatas were able to move expression
from terrible rage to peals of laughter to deep depression so suddenly. Capturing this unpredictable
style in his music, a new freedom of expression which broke the bounds of Classical ideals, was to
position Beethoven as a disturbed man in the minds of some of his contemporaries. Furthermore, he
was to be seen as the father of Romanticism and the single most important innovator of music in the
minds of those after him. (Bookspan 27).
Before Beethoven struck the new note of romance in music, songwriters generally used one of two
patterns for their songs: (1) the simple folk–song pattern in which the same melody is repeated for
each stanza of the poem, and which is called a strophic song; or (2) the elaborate pattern of arias in
the Italian style of singing which is full of runs and trills (McGehee 406).
Beethoven has traditionally been referred to as music's "bridge to romanticism," and his major
works consist of 9 symphonies, 7
Get more content on HelpWriting.net
Research Paper : Ludwig Van Beethoven
Research Paper: Ludwig van Beethoven
Beethoven is perhaps the most famous musician of all time. His influence on later composers was
extremely huge, to the extent where many composers were intimidated by his music. Ludwig van
Beethoven was born in 1770 into a family of musicians. His father and grandfather were both
musicians at the court of Elector in the German town of Bonn. His grandfather was very respected,
but his dad not so much given that he was an alcoholic. At a young age, Beethoven was put in charge
of his family's finances and started a job at the court. He composed music and helped look after the
instrumentation. Around the same time, he began to write music. In 1790, an important visitor
passed through Bonn: this was Franz Joseph Haydn. He was on his way to London for a visit when
he stopped to meet Beethoven and agreed to take him on as a student when he came back from
London to Vienna. In 1792, Beethoven moved to Vienna to study with Hayden. Apparently, it did
not go as planned. Hayden was old fashion and a little overbearing, while Beethoven was rebellious
and headstrong. Beethoven found support among the rich arts who lived in Vienna. Prince
Lichnowsky gave him board and lodging at his place for in return, Beethoven would compose music
and preform at evening parties.
It took Beethoven about three months for him to settle into his new life in Vienna. His lessons with
Hayden lasted for over a year, and were finished one they left London. During his first
Get more content on HelpWriting.net
Beethoven Biography Essay
Many questions go around about what day Ludwig Van Beethoven was born. Most do not know
and most likely will not ever know. They say that he was born a day or two before he was
baptized on December 17th, 1770. That was the beginning of one of the greatest musicians alive.
Ludwig had two younger brothers that had survived into adulthood. One was named Casper and the
other was named after their father Johann. His mother was a woman who stuck to her morals and
his father was a man who was a court singer, but he was more known for being an alcoholic than a
musician. This is one of the reasons Beethoven was closer with his mother rather than his father.
Also, Beethoven's grandfather was a well–known musician which was "a source of endless pride"
...show more content...
His father, Johann, taught him how to play instruments day in and day out. When March 28th
1778 rolled around, Beethoven performed for the first time in front of a crowd in Cologne. At
that time Beethoven was seven and a half years old, but his father said he was six years old. This
always made Beethoven think he was younger than he actually was. Beethoven's father could
only teach him so much, though, so he went to go be taught by a professional musician named
Gottlob Neefe. Neefe noticed how talented Beethoven was, so he decided to not only teach him
about music but about the works of philosophers as well. As Beethoven grew, he created pieces of
music that became very popular. His first piece, published before the age of twelve, was Nine
Variations of C Minor. After that piece came out, his teacher wrote in a magazine article about
him saying he's to be, "The next Mozart if he keeps his work up." Prince Maximillian Franz, who
was the prince of Austria at the time, knew about Beethoven's music and decided to send him to
Vienna to go meet Mozart in 1787 so he could further his music education. When Beethoven and
Mozart met, Mozart was said to have spoken,"Do not forget his name! It will be spoken often!".
Sadly, whilst Beethoven was in Vienna, he received a letter saying that his mother was dying. She
was the only person Beethoven had a strong relationship with. She passed away on July 17th,
Get more content on HelpWriting.net
Beethoven, Symphony No 3 ( Eroica )
Beethoven, Symphony No. 3 (Eroica) Ludwig van Beethoven was one of the greatest composers
and a musical genius. Beethoven was born on December 16, 1770 in Bonn, Germany and died on
March 26, 1827 in Vienna, Austria. Beethoven came from a family of musicians just like many
other great composers before him had. At the age of only 11 Beethoven began serving as an
assistant to the court organist and had several published piano compositions at the age of 12. At the
age of 18, he became the legal guardian of both of his younger brothers, after the death of his
mother and dismissal of his father from the court choir because of alcoholism. By this team
Beethoven was also a court organist, violinist and responsible for composing and performing....show
more content...
Works that he created after this time showcased heroism. Beethoven was a self–educated man who
enjoyed reading the likes of Shakespeare and other famous poets. He had many love interests in his
life, but was never able to sustain a long–term relationship. The Immortal Beloved was a passionate
love letter that he wrote to a women. He only referred to her as the "immortal beloved" and did
not use a name. It was said to have been written about Viennese aristocrat Antonie Brentano and
was never sent out, but found in a drawer after his death. Beethoven had reached complete
deafness in the 1810's. At this time he piano playing and conducting were deteriorating. At the
age of 44 he was no longer able to play in public, but insisted on conducting still. Often times the
performances were chaotic and he was hard to comprehend by musicians. He had a custody battle
for his nephew Karl, in which he won. This caused disaster as Beethoven craved attention and
companionship. After 1818, Beethoven conducted some of his greatest works even though he was
completely deaf. Beethoven's music was influenced by Haydn and Mozart although he had his own
unique style. He was one of the greatest composers ever and had to overcome his complete
deafness and suffering to put out these great works. One of Beethoven's famous works was his
Symphony No. 3 (Eroica). It was known as Eroica or "heroic" in Italian. This work was written
immediately following the Heiligenstadt Testament. It
Get more content on HelpWriting.net
Beethoven Research Paper Outline
Who is Beethoven? He is not the big dog that people have seen in movies. He is "Ludwig Van
Beethoven and he is a famous pianos and composer." (Biography par.1) I know most people might
know him by his name but there's a lot of thing people don't know. Who is Beethoven, where he
from is, why is he famous, what he all compose, and why he compose what he did?
Get more content on HelpWriting.net
A Short Research Paper On Ludwig Van Beethoven
A Short Research Paper on LUDWIG VAN BEETHOVEN MUS 1030 Walters State Community
College Robbie Poteete, Instructor NIC NIX APRIL 22, 2016 Although there have been many
famous composers over the years, probably none are as well–known as Ludwig van Beethoven.
Regardless of one's particular preference of musical style, almost everyone can quickly recognize
Fur Elise, Moonlight Sonata, Ode to Joy, or Symphony 5. Beethoven "was born during the age of
the Enlightenment, came to maturity during a period of political and social revolutions, and died
as the Romantic era was in full flower" (Benton & DiYanni, 443). He was "regarded as the bridge
figure to the Romantic period" (Chiego, 307). Although there has been confusion about the actual
date of Beethoven's birth, it has been widely accepted that his birthday was December 16, 1770,
and his date of baptism is December 17, 1770. He was born in Bonn, Germany to a musician
father, Johann van Beethoven, who was an alcoholic. His mother was the warm and loving parent
named Magdalena Keverich van Beethoven, and Beethoven was very close to her. Even though
Johann and Mary had seven children, only three boys survived, and Ludwig was the oldest. Born
into the musical profession, and as the eldest child, Ludwig's father was extremely controlling
towards him. Johann saw "signs of talent for the piano" in Beethoven, and "tried to make him a
child prodigy like Mozart, but did not succeed" (Knapp, 2016). The family was
Get more content on HelpWriting.net

Beethoven Essay

  • 1.
    Beethoven's Fifth SymphonyEssay Beethoven's Fifth Symphony If you are part of society, I think it is safe to make the assumption you are familiar with and have heard Symphony No. five by Beethoven. Whether it was a theme in movie or part of an advertisement on TV, it captured your attention and added emotion and excitement to the particular segment that it coincided with. Total unification and the pervasive use of a single motif combine to make the Fifth Symphony, which had one of the longest gestation periods of any Beethoven work, the first in which all movements are shown plainly to be part of a cyclic design. The famous motif which dominates the first movement in the form also makes significant appearances that are dramatic entrances in the other...show more content... Instead of having the tonic minor govern the entire recapitulation in the first movement, he brings back the second subject in the tonic major, as a simple transposition rather than the fundamental recasting. (In this respect the movement anticipates the Romantic concept of thematic integrity and by, extension, the idea of the theme as the focal point of a composition.) The fifth Symphony in C minor is rightly considered the paradigm of Beethoven's symphonies; the various alternatives to sonata form, explored in the piano works, are put to one side here in favor of the more rigorous example of Mozart, which is, however, raised to a superbly spectacular level.(Pestelli p.236) According to Pestelli, No other piece had ever organized the principles of contrast with such integration of metrical structure and thematic invention as does the first movement; the grand balancing of blocks of sound comes, as everyone knows, from a proverbial four–note idea, an idea unusable by others, and in that sense a asocial , rather like the opening of Coriolan(1807), the overture for Collin's tragedy, with it's powerful swelling unisons that explode into chords.(236) This explains the why Beethoven's opening to Symphony No. five is so powerful and dominating to the listener's ear. His use of only four notes to introduce his symphony is an original one, giving it extreme distinction from any other composer's work of the Classical Get more content on HelpWriting.net
  • 2.
    Ludwig Van BeethovenEssay German composer and pianist, Ludwig van Beethoven, was born December 1770 and spent most of his life in Vienna, Austria. His first teacher was his alcoholic father, who worked as a musician at the Court of Bonn. Teaching him day and night, Ludwig suffered from his father's harsh and erratic behavior. For a time, he and his father played at the Church. As his father's alcoholism increased, Ludwig became the main musician. Beethoven's talents were discovered at an early age, and he was sent to Vienna to study under different teachers including Mozart and Hayden. There, Beethoven quickly adopted a reputation of a great piano player, a child prodigy. He gave his first public performance at the age of eight and published his first...show more content... Music was his life and he was deeply depressed and angry at the thought of being deaf. He even became suicidal. His relationship to his music was very serious, and though he continued to compose music, he never performed again following a failure to perform his Piano Concerto No. 5 "Emperor" in 1811. Following many personal crises in his life, Beethoven's music reflected his mood. His masterpieces depicted struggle followed by triumph. Later, his worked was influence by the ideals of Enlightenment, leading him to dedicate the symphony "Erotica" to Napoleon. The symphony "Ode to Joy" was believed to be about the brotherhood of humanity. His works are admired for intellectual depth, intense expression, and experimental forms. He is considered one of the greatest minds of humanity. His ambitious works made him prominent in the transition between eras of Classical and Romantic music. Music had driven Beethoven's life from a small child to an adult. It helped him overcome an alcoholic father, his mother's death, failed love, and provided a means of support for his family. It carried him through personal crises including the loss of his hearing and won him critical acclaim in social circles. His life ended in 1826 following complications of a cold and chronic health problems. He used his music to preach through art and has remained a model to later composers in the use of classical principles of Get more content on HelpWriting.net
  • 3.
    Beethoven Essay Introduction Like manypeople of this time period Beethoven was affected by the French Revolution, the enlightenment and romantic periods; in 1789 the French Revolution was raging and people were dying. The French general Napoleon defeated France's enemies and inspired Beethoven with ideas of freedom and equality. It was because those inspirations that Beethoven was going to dedicated his Third Symphony, Erocia which means heroic to him, that was until Napoleon decided to declared himself emperor, which made him so angry that he viciously scratched out the dedication. (Alvarez 2006–2007) He was also influence by nature and especially the country side. This is evident by his sixth Symphony, Pastoral which means simple country, below...show more content... The middle period is thought to begin shortly after his personal crisis brought about by his recognition of his deafness. This period include large–scale works that express heroism and struggle. The late period is thought to begin around 1815. This period is characterized by the intellectual depth, formal innovation, intensity and high personal expression. (Ludwig van Beethoven 2011) Early Years Born December 16, 1770; although there is some debate about his actual date of birth, but according to traditions of that time period children were christened within 24–hours of their birth and Ludwig van Beethoven was christened on December 17, 1770 at the Parish of St. Regius. He was born to Johann and Magdalena Keverich van Beethoven of Flemish descent at 515 Bonngasse, Bonn Germany. Eyewitness said that Johann was and ill–tempered man who would beat music lessons into his young son. There is speculation that he would force the young Ludwig to play the violin for his father's drunken friends. Johann was a particular fan of the bottle too. Even though he was very fond of his mother, she too had an alcoholic problem due in part to the loss of several children. Of the seven children, only three of the children survived, Ludwig, Johann, and Karl. Eventually, she was placed with nuns to live out days. Young Ludwig is said to have a fairly Get more content on HelpWriting.net
  • 4.
    Essay on LudwigVan Beethoven When you look at the world and all the people on it as a whole, you see that there are very few influential people whose actions or opinions strongly influence the course of events. Ludwig Van Beethoven, a German musician, is one of those very few. He was an extraordinary musician that lived through hardship and had the horrific fate of deafness, any musician's worst nightmare. Beethoven left a wall standing in history that captured the art of sounds and worked it beyond imagination into music so fragile and pure yet onerous, unable to be matched by any succeeding composer. His determination to push music forward, go beyond the thinkable, and make it his own, has made a huge impact on all music forever going forward. Beethoven had a...show more content... Instead, he worked with HAYDN and J. G. Albrechtsberger. Soon Beethoven would begin to make his mark as a pianist and as a "daring and unorthodox composer."(Literary Reference Center) When Beethoven was 28, in 1798, he began seeing signs of deafness; this progressively got worse. "He struggled against the gradual loss of his hearing. For a musician, there is nothing more tragic. A deaf musician is like a painter without fingers, a soccer player without feet. Beethoven could not hear the sound of musical instruments or the pitch of a single note. Although his fate challenged him, miraculously, his best works were completed after he went deaf."(History Reference Center) Although it may seem like Beethoven was barely hazed by his deafness, it actually brought him great stress. Beethoven steadily started drawing away from people and close friends; as the lack of hearing grew he got really frustrated at times. He got to where he stopped caring about his appearance, left his hair tangled and uncombed, clothes tattered and rumpled. He became really bitter and unpleasant to be around; if one of his maids brought him soup he didn't like, he would just smash the bowl on the ground. Beethoven was alone in the world, and that is why towards the end of his life his music was even more emotional and expressive. Ludwig Van Beethovenwas a very prolific composer and had a vast Get more content on HelpWriting.net
  • 5.
    Composer Report: LudwigVan Beethoven Essay Composer report: Ludwig van Beethoven On 17 December 1770, Ludwig van Beethoven was born. He was an amazing and great classical musical composer. He is known for being the most famous composer of the classical and romantic periods of music. According to the "Enjoyment of Music" manual, Beethoven was born in Bohn, Germany. His father, with his grandfather, was the two singers at the court of a local prince, Friedrich Max. (Forney and Machlis 197). Beethoven began to take an interest in music from an early age. Johann, his father taught him day and night playing music. Unfortunately, Johann had a problem with alcohol and become alcoholic. Johann, who noticed the talent of his son and realized how he was good. Viewing it as Beethoven ...show more content... Beethoven returned to Vienna in 1972 to continue his musical education. Beethoven never returned to his hometown and stayed in Vienna for a while. The in Vienna, Beethoven had valuable lessons from Wolfgang Amadeus Mozart, Joseph Hayden, Johann Georg Albrechtsberger, Antonio Salieri, and Aloys Forster. Each of them had taught Beethoven something special. Beethoven quickly adopted a reputation as a great pianist, a child prodigy. Everyone in the music industry has learned to admire Beethoven and his talent. After many personal crises in his life, Beethoven's music reflects his mood. His masterpiece represented struggle followed by triumph. Later, his influence has been worked by the ideals of the Enlightenment, which led him to dedicate the symphony "Erotica" Napoleon. Symphony "Ode to Joy" was estimated at about the brotherhood of humanity. His works are admired for their intellectual depth, intense expression, and experimental forms. It is considered one of the greatest minds of humanity. His work was ambitious head of the transition between eras of classical and romantic music led Beethoven's life of a child to an adult. A overcame alcoholic father; the death of his mother did not, and has provided a way to support his family. He carried through personal crises, including the loss of his hearing and earned him critical acclaim in social circles. His Get more content on HelpWriting.net
  • 6.
    Ludwig van BeethovenEssay Some of the most well known composers came to be in the in the classical music period. Ludwig van Beethoven was one of the composers, along with other greats of the time like Haydn and Mozart, which helped to create a new type of music. This new music had full rich sounds created by the new construction of the symphony orchestra. Ludwig van Beethoven was born in the town of Bonn, Germany on December 16 of 1770. Bonn is located in western Germany on the Rhine River. Beethoven showed an affinity for music at an early age. His father, Johann, taught Ludwig to play the piano as well as the violin. Johann did this in hopes that his son would become a prodigy, and then reach fame like Wolfgang A. Mozart. Unfortunately though Beethoven...show more content... Regrettably, though in the late 1790s Beethoven began to lose his hearing. Then at the start of the 1800s Beethoven changed the way he created music and his personality because of the increasing deafness. Prior to the increasing loss of hearing Beethoven had been full of pride and independent, though a little odd. When his hearing started to go he changed, he became more apprehensive and ill tempered. Despite becoming absolutely deaf by the end of his life Beethoven's works were still brilliant. It was on March 26, 1827 when Beethoven died, the cause was a simple cold that turned into pneumonia and then later dropsy. Beethoven's works are classified into three periods. Beethoven's first period took place between the 1780s to approximately 1800. The works produced during this period show the Beethoven was just beginning his musical journey. The pieces created are similar to ones created by Haydn, Mozart, Bach, and Neefe. Christian Neefe was one of Beethoven's instructors from Bonn. Despite the fact that Beethoven modeled his early works after others they still showed his personality in the way they were written and in their robust melodies. In Beethoven's second period he generated many of his most famous works. This period lasted from about 1800 to 1820. It was in this time span that Beethoven wrote symphonies three through eight, two piano concertos, one violin Get more content on HelpWriting.net
  • 7.
    Essay on Beethoven Ludwigvan Beethoven was born in Bonn, Germany, in 1770. He came from a family of musicians. His father and grandfather worked for the Electors of Cologne. The grandfather, Lodewyk van Beethoven came from Mechelen, Belgium and joined the court orchestra in Bonn as a bass player. He eventually became the conductor. His son Johann was a professional tenor at the court in Bonn and also played piano and violin. As Beethoven began to exhibited his outstanding musical talent at a young age, his father pushed for him to become a child prodigy. Johann gradually gave up when Beethoven 's recitals were only marginally successful. Beethoven's mother then died when he was in his late teens. His mother's death drove his father to become an abusive...show more content... " By this time Beethoven was ready for the almightiest risk of his life" ( Simpson 55). He was at the stage in his life where he knew what risks he could and could not take. For years Beethoven had contemplated setting Schiller's Ode to Joy, but when he decided to make this the setting to the final movement to his ninth symphony he was very uncertain as to how to introduce the voice. " ... there are reports of him striding up and down his room trying to solve this problem" ( Pike 70). Although some of the ideas used in the Ninth Symphony appear in sketches of 1817–18, Beethoven only began concentrated work on the score in 1822. It occupied him throughout 1823, and he completed it in February 1824. The first performance took place at the Karntnerthor Theater in Vienna on May 7, 1824. Beethoven stood there completely deaf beating time and turning pages of his score, but the real conduction was done by Michael Umlauf. The orchestra leader was Schuppanigh. The dedication was to King Frederick William III of Prussia.( Steinberg 47–48)The first vocal soloists to perform this were Henriette Sontag (soprano), Karoline Ungersabatier ( alto), Anton Haizinger ( tenor), and Joseph Seipelt (bass). Only two rehearsals were gad been possible for the performance with mixed critical success. The symphony's required orchestration includes: two flutes and piccolo, two oboes, two clarinets, two bassoons and contrabassoon, four horns, two trumpets, three trombones, timpani, triangle, Get more content on HelpWriting.net
  • 8.
    Ludwig van Beethovenwas an extraordinary music composer, especially considering he was deaf most of his life and career. He was born in Germany on December 16, 1770. Many obstacles were hurled at him, but he triumphed over them, and even deafness didn't stop him from composing some of the worlds greatest, and most recognized music compositions (Rosenwald 167). His life, music, and his musical styles and techniques all contribute to his life story. Beethoven was born in Bonn Germany. At 14, he held the occupation of a court organist. Sadly, his father was a drunken singer, and barely supported his family. Consequently, the money Beethoven earned assisted his family. In 1778, he traveled to Vienna and met Wolfgang A. Mozart who instantly ...show more content... Soon, he had to give up concert work and devote his time composing, struggling at the same time against ill health, poverty, and growing deafness. By 1819, his deafness affected him so significantly, that he was able to communicate only by writing (Rosenwald 167). However, in the isolation of deafness, Beethoven created some of the most distinguished works of music (Rosenwald 167). Beethoven admitted, "I would have ended my life–it was only my music that held me back." With this victory over despair, there was an important change in his musical style (Kamien 150). For Beethoven, music was a moral force, a higher revelation than all wisdom and philosophy, not a mere entertainment. He had a demand for perfection, and that meant long, hard work. Occasionally, he worked for years on a single symphony in addition to writing other compositions (Kamien 151). His works are generally divided into three periods. The early period, up to 1802, middle, 1803–1814, and late, 1815–1827. His early period greatly shows the influence of other composers, whereas his middle and late times unmistakably show Beethoven's personal style (Kamien 153). Mostly, Beethoven used classical techniques and forms. However, he gave them new intensity and power. He bridged the classical and romantic eras (Kamien 151). His works differentiate themselves through his formation of protracted, large architectonic structures illustrated by the vast enhancement of musical material, motifs, and themes, usually by Get more content on HelpWriting.net
  • 9.
    Beethoven Accomplishments Ludwig vanBeethoven was born in 1770 in Bonn, Germany. He was raised in a family of musicians, and his father sang and taught him how to play instruments. He is one of many talented and admirable composers that are to be regarded when deciding who was the greatest composer in European history. When considering the greatest composer, it would have to be someone who had originality, natural talent, and someone who put their all into their music. Beethoven possessed all of these qualities, and is more than fitting for the title. Although he suffered from depression and was quite closed off, Beethoven is the greatest composer in European history because he developed his own style with his music, he had a natural gift, and he was very passionate....show more content... In the Encyclopedia of World Biography, it says, "(he) showed signs of unusual originality and power". This quote expresses how he demonstrated skill at composing and was able to give his music "power" from a very young age. When he was only four years old, Beethoven's father taught him to play both violin and clavier, and by the time he was eleven years old, he had composed three sonatas for the piano. According to "Ludwig van Beethoven", "Ludwig van Beethoven's contributions to the world of music and composition make him stand undeniably among the most renowned and influential masters" (DISCovering Biography). This text is a great example of how Beethoven was incredibly influential in the musical community, and by accomplishing so much at such a young age he must have had a natural talent. In the book, Beethoven: Anguish and Triumph, it says, "others were inspired to feats of generosity for this brilliant but oblivious student" (Swafford, 57). Beethoven's teachers realized that he was going to become very successful, and he that possessed a natural gift. In retrospect, Beethoven had an inborn talent for understanding music and composing Get more content on HelpWriting.net
  • 10.
    Ludwig Van BeethovenEssay The composer of some of the most influential pieces of music ever written, Ludwig van Beethoven created a bridge between the 18th–century classical period and the new beginnings of Romanticism. His greatest breakthroughs in composition came in his instrumental work, including his symphonies. Unlike his predecessor Wolfgang Amadeus Mozart, for whom writing music seemed to come easily, Beethoven always struggled to perfect his work. Ludwig van Beethoven was born in Bonn, Germany, and was baptized on Dec. 17, 1770. (There is no record of his birth date.) His father and grandfather worked as court musicians in Bonn. Ludwig's father, a singer, gave him his early musical training. Although he had only meager...show more content... By 1802 Beethoven was convinced that the condition not only was permanent, but was getting progressively worse. He spent that summer in the country and wrote what has become known as the "Heiligenstadt Testament." In the document, apparently intended for his two brothers, Beethoven expressed his humiliation and despair. For the rest of his life he searched for a cure, but by 1819 his deafness had become total. Afterward, in order to have conversations with his friends, Beethoven had them write down their questions and replied orally. Beethoven never married. Though he had many friends, he seemed to be
  • 11.
    a lonely man.He continued to appear in public but spent more and more of his time working on his compositions. He lived in various villages near Vienna and took long walks carrying sketchbooks in which he would write down his musical ideas. Scholars who have studied these sketchbooks have discovered the agonizingly long process that the composer went through in order to perfect his melodies, harmonies, and instrumentations. Three Periods of Work Most critics divide Beethoven's work into three general periods, omitting the earliest years of his apprenticeship in Bonn. Although some pieces do not fit exactly into the scheme, these divisions can be used to categorize the composer's work. The first period, from 1794 to about 1800, consists of music whose most salient Get more content on HelpWriting.net
  • 12.
    Beethoven Essay The riseof Ludwig van Beethoven into the rank of history's greatest composers was paralleled by and in some ways a consequence of his own personal tragedy and despair. Beethoven's family was of the Flemish origin. His mother, Maria Magdalena, died after a long illness when Beethoven was only 17. He was not the only child in this family though. He had 2 brothers and 1 sister, both to which were disorganized and unruly. His family was always in constant need of funds. Beethoven showed his extraordinary musical talent at an early age. His father hoped he could induce his child's development and make him more like Mozart, and possibly bring in some money for the family which was desperately in need. As a child, Beethoven never was too...show more content... He began to study with other teachers and soon became very popular in Vienna. Some were pleased with his performances, but others were embarrassed by his arrogance and bad manners. In the late 1790's, Beethoven discovered an increasing buzzing and humming in his ears and it sent him into panic, searching for a cure. In 1802, he wrote a letter to his brother describing his anguish. He asked his brother to read the letter at the funeral. His suffering had a brief respite when he soon fell in love with a young countess, and dedicated a song to her called "Moonlight Sonata". Even after this, she did not marry Beethoven. By October 1802, he had written the Heiligenstadt Testament confessing his deafness, and suicidal considerations. By about 1800, Beethoven was mastering the Viennese High–Classic style. Although Mozart had first perfected the style, Beethoven did extend it to some degree. Having displayed a wide range of his piano writing, he was also beginning to forge a new voice for the violin. Beethoven's deafness landed him into a major cycle of depression. In his Testament, he reveals his malaise that was sending him to the edge of despair. He speaks of suicide in the same breath as a reluctance to die. Having searched vainly for a Get more content on HelpWriting.net
  • 13.
    Beethoven Research Paper “...tothe cast majority of people suffering is still one of the fundamental characteristics of life, and it is their realization that an experience of suffering, pure and profound, enters as an integral part into Beethoven’s greatest work, that helps to give that work its unique place in the minds and hearts of men.';(Marek, 634) These words of compassion come from J. W. N. Sullivan during Ludwig van Beethoven’s funeral. They express the regret and sense of loss felt by people all over the world as they caught news of his end. Beethoven was and is a cornerstone for music of all kinds in that he combined new color, imagination, structure and expression to further capitulate the evolution of this great form...show more content... Chapter 2: His life and works. Ludwig van Beethoven was born in the second half of the 18th century when the age of curiosity was prominent. Society at the time was beginning to question many old beliefs, customs, and religions. There were advances in astronomy, geography and chemistry, proving that the world was ready for a revolution of innovation and excitement. Beethoven was born on December 17, 1770 in Bonn, Germany. Bonn was a pleasant city. It was very old and very rich in tradition. Its location was on the western bank of the Rhine River which offered protection form intruders.(Marek, 26–7) It was a close knit community and there was a good balance between business and recreation. It may be safe to say that some of Beethoven’s compassion was sparked by his environment of fertile resources that the town of Bonn provided. “The boy was looking out of the window, his hands cradled in his hands. His mien was werious, his glance rigid. Cacilia Fischer came along the courtyard and saw him. ‘How are you, Ludwig?’ she shouted up to him. No answer. She said, ‘Well, no answer in an Get more content on HelpWriting.net
  • 14.
    Essay on Beethoven BeethovenHe was born in the German town of Bonn on the 16th of December 1770. His grandfather Ludwig and his father Johann were both musicians. Johann was to act as little Ludwig's first music teacher, but Ludwig soon changed to the court organist C. G. Neefe. Passing eleven years of age, Ludwig deputized for Neefe, and at twelve had his first music published. He then stayed as Neefe's assistant until 1787, when at seventeen, he took off for Vienna. Even though Vienna was to be his home for the rest of his life, this first visit was short. On hearing that his mother was dying, he quickly returned to Bonn. Five years later he finally moved to Vienna to live and work. After arriving in 1792 he studied composition and counterpoint...show more content... This strive culminated in the second symphony from 1801–1802. This is also the time when the middle period starts. From now up until 1813, Beethoven develops and enhances the high classical style into a more dynamic and individualistic style. It is now that he writes symphonies Nr. 3 – 8, piano consert Nr. 5 and a lot of chamber music. But as he learns to control his craft and develop the music into new undiscovered grounds, he also suffers from reminders of the pains of real life. He has early in life discovered that his hearing wasn't what it should be, and the disorder gets worse as time goes by. It gets to the point where Beethoven is thinking of ending his life as he sees no way out of his despair. That fact is documented in the letter he wrote to his brothers in 1802, the so called . This hearing disorder seems to have affected his social life to a great extent. He became difficult to handle in social interactions and could suddenly burst into outbreaks of anger and show bad temper where he usually insulted someone. If that is the reason for his troubles with women, or if their is something traumatic hidden in his childhood, I don't know, but the fact is that he never got involved with a woman in a normal relation. Beethoven seems to have been attracted to women he couldn't get, or at least was hard to get. An example is Antoine Brentano, with whom he had a relationship, but who broke up with him to marry a friend. It is Get more content on HelpWriting.net
  • 15.
    The Talent OfBeethoven By Ludwig Van Beethoven Many of my family members along with some family friends suffer from an extreme lack of hearing just like one of the greatest composers of all time, Ludwig van Beethoven. However, my family members and family friends are not musicians. The talent of Beethoven is very inspiring for not only the deaf, but for other people as well. He created most of his music while suffering from hearing loss which seems to be quite impossible, but somehow he managed to do it. Though his music is without a doubt unbelievably good, his compositions were always based on a negative tone. Was his tone always negative because he lived an angry life coping with his deafness? This is a question many of his audience and fans have wondered and asked themselves. With research, the answer has become quite clear. On December 16, 1770, Ludwig van Beethoven was born in Bonn, Germany. His family originated from Brabant, in Belgium. His father was a musician at the court of Bonn. Unfortunately, he had a definite weakness for alcohol. His mother was a singer and was always described as a gentle, retiring woman that always welcomed people with a warm heart. Beethoven referred to her as his "best friend"; the one he trusted and believed in. The Beethoven family consisted of seven children, but only the three boys survived, Ludwig being the oldest. When Beethoven was sixteen years old, his forty–one–year–old mother passed away. She had a terrible disease known as Tuberculosis, which is an infectious bacterial Get more content on HelpWriting.net
  • 16.
    Beethoven Essay Beethoven Ludwig vanBeethoven was, and remains today, an influential figure in the history of classical music. Perhaps no other composer in history wrote music of such inspiring power and expressiveness. His influence on the last 150 years of music is unequalled. Beethoven was born in Bonn, Germany in 1770. His father, a music enthusiast, dreamed of molding his son into the next Mozart. Beethoven never showed the impressive characteristics of Mozart, but he was unusually talented, learning the piano, organ and violin at a very early age. At 14, he was already skilled enough on the organ to receive a professional appointment (Beethoven). He held positions as an assistant organist in the electoral chapel where he obtained his first...show more content... The early piano sonatas of Beethoven deserve special mention. Although his first published examples of concertos and trios and the first two symphonies are beneath the masterpieces of Mozart and Haydn, the piano sonatas bear an unmistakably Beethovian stamp: grandiose in scope and length, and innovative in their range of expression. The sonatas were able to move expression from terrible rage to peals of laughter to deep depression so suddenly. Capturing this unpredictable style in his music, a new freedom of expression which broke the bounds of Classical ideals, was to position Beethoven as a disturbed man in the minds of some of his contemporaries. Furthermore, he was to be seen as the father of Romanticism and the single most important innovator of music in the minds of those after him. (Bookspan 27). Before Beethoven struck the new note of romance in music, songwriters generally used one of two patterns for their songs: (1) the simple folk–song pattern in which the same melody is repeated for each stanza of the poem, and which is called a strophic song; or (2) the elaborate pattern of arias in the Italian style of singing which is full of runs and trills (McGehee 406). Beethoven has traditionally been referred to as music's "bridge to romanticism," and his major works consist of 9 symphonies, 7 Get more content on HelpWriting.net
  • 17.
    Research Paper :Ludwig Van Beethoven Research Paper: Ludwig van Beethoven Beethoven is perhaps the most famous musician of all time. His influence on later composers was extremely huge, to the extent where many composers were intimidated by his music. Ludwig van Beethoven was born in 1770 into a family of musicians. His father and grandfather were both musicians at the court of Elector in the German town of Bonn. His grandfather was very respected, but his dad not so much given that he was an alcoholic. At a young age, Beethoven was put in charge of his family's finances and started a job at the court. He composed music and helped look after the instrumentation. Around the same time, he began to write music. In 1790, an important visitor passed through Bonn: this was Franz Joseph Haydn. He was on his way to London for a visit when he stopped to meet Beethoven and agreed to take him on as a student when he came back from London to Vienna. In 1792, Beethoven moved to Vienna to study with Hayden. Apparently, it did not go as planned. Hayden was old fashion and a little overbearing, while Beethoven was rebellious and headstrong. Beethoven found support among the rich arts who lived in Vienna. Prince Lichnowsky gave him board and lodging at his place for in return, Beethoven would compose music and preform at evening parties. It took Beethoven about three months for him to settle into his new life in Vienna. His lessons with Hayden lasted for over a year, and were finished one they left London. During his first Get more content on HelpWriting.net
  • 18.
    Beethoven Biography Essay Manyquestions go around about what day Ludwig Van Beethoven was born. Most do not know and most likely will not ever know. They say that he was born a day or two before he was baptized on December 17th, 1770. That was the beginning of one of the greatest musicians alive. Ludwig had two younger brothers that had survived into adulthood. One was named Casper and the other was named after their father Johann. His mother was a woman who stuck to her morals and his father was a man who was a court singer, but he was more known for being an alcoholic than a musician. This is one of the reasons Beethoven was closer with his mother rather than his father. Also, Beethoven's grandfather was a well–known musician which was "a source of endless pride" ...show more content... His father, Johann, taught him how to play instruments day in and day out. When March 28th 1778 rolled around, Beethoven performed for the first time in front of a crowd in Cologne. At that time Beethoven was seven and a half years old, but his father said he was six years old. This always made Beethoven think he was younger than he actually was. Beethoven's father could only teach him so much, though, so he went to go be taught by a professional musician named Gottlob Neefe. Neefe noticed how talented Beethoven was, so he decided to not only teach him about music but about the works of philosophers as well. As Beethoven grew, he created pieces of music that became very popular. His first piece, published before the age of twelve, was Nine Variations of C Minor. After that piece came out, his teacher wrote in a magazine article about him saying he's to be, "The next Mozart if he keeps his work up." Prince Maximillian Franz, who was the prince of Austria at the time, knew about Beethoven's music and decided to send him to Vienna to go meet Mozart in 1787 so he could further his music education. When Beethoven and Mozart met, Mozart was said to have spoken,"Do not forget his name! It will be spoken often!". Sadly, whilst Beethoven was in Vienna, he received a letter saying that his mother was dying. She was the only person Beethoven had a strong relationship with. She passed away on July 17th, Get more content on HelpWriting.net
  • 19.
    Beethoven, Symphony No3 ( Eroica ) Beethoven, Symphony No. 3 (Eroica) Ludwig van Beethoven was one of the greatest composers and a musical genius. Beethoven was born on December 16, 1770 in Bonn, Germany and died on March 26, 1827 in Vienna, Austria. Beethoven came from a family of musicians just like many other great composers before him had. At the age of only 11 Beethoven began serving as an assistant to the court organist and had several published piano compositions at the age of 12. At the age of 18, he became the legal guardian of both of his younger brothers, after the death of his mother and dismissal of his father from the court choir because of alcoholism. By this team Beethoven was also a court organist, violinist and responsible for composing and performing....show more content... Works that he created after this time showcased heroism. Beethoven was a self–educated man who enjoyed reading the likes of Shakespeare and other famous poets. He had many love interests in his life, but was never able to sustain a long–term relationship. The Immortal Beloved was a passionate love letter that he wrote to a women. He only referred to her as the "immortal beloved" and did not use a name. It was said to have been written about Viennese aristocrat Antonie Brentano and was never sent out, but found in a drawer after his death. Beethoven had reached complete deafness in the 1810's. At this time he piano playing and conducting were deteriorating. At the age of 44 he was no longer able to play in public, but insisted on conducting still. Often times the performances were chaotic and he was hard to comprehend by musicians. He had a custody battle for his nephew Karl, in which he won. This caused disaster as Beethoven craved attention and companionship. After 1818, Beethoven conducted some of his greatest works even though he was completely deaf. Beethoven's music was influenced by Haydn and Mozart although he had his own unique style. He was one of the greatest composers ever and had to overcome his complete deafness and suffering to put out these great works. One of Beethoven's famous works was his Symphony No. 3 (Eroica). It was known as Eroica or "heroic" in Italian. This work was written immediately following the Heiligenstadt Testament. It Get more content on HelpWriting.net
  • 20.
    Beethoven Research PaperOutline Who is Beethoven? He is not the big dog that people have seen in movies. He is "Ludwig Van Beethoven and he is a famous pianos and composer." (Biography par.1) I know most people might know him by his name but there's a lot of thing people don't know. Who is Beethoven, where he from is, why is he famous, what he all compose, and why he compose what he did? Get more content on HelpWriting.net
  • 21.
    A Short ResearchPaper On Ludwig Van Beethoven A Short Research Paper on LUDWIG VAN BEETHOVEN MUS 1030 Walters State Community College Robbie Poteete, Instructor NIC NIX APRIL 22, 2016 Although there have been many famous composers over the years, probably none are as well–known as Ludwig van Beethoven. Regardless of one's particular preference of musical style, almost everyone can quickly recognize Fur Elise, Moonlight Sonata, Ode to Joy, or Symphony 5. Beethoven "was born during the age of the Enlightenment, came to maturity during a period of political and social revolutions, and died as the Romantic era was in full flower" (Benton & DiYanni, 443). He was "regarded as the bridge figure to the Romantic period" (Chiego, 307). Although there has been confusion about the actual date of Beethoven's birth, it has been widely accepted that his birthday was December 16, 1770, and his date of baptism is December 17, 1770. He was born in Bonn, Germany to a musician father, Johann van Beethoven, who was an alcoholic. His mother was the warm and loving parent named Magdalena Keverich van Beethoven, and Beethoven was very close to her. Even though Johann and Mary had seven children, only three boys survived, and Ludwig was the oldest. Born into the musical profession, and as the eldest child, Ludwig's father was extremely controlling towards him. Johann saw "signs of talent for the piano" in Beethoven, and "tried to make him a child prodigy like Mozart, but did not succeed" (Knapp, 2016). The family was Get more content on HelpWriting.net