GRADE A OFFICE BUILDING IN KUALA LUMPUR
PRELIMINARY COST APPRAISAL NO. 1
GFA (m2
) CFA (m2
)
Office 62,288 73,182
Commercial 7,300 8,585
Basement Car Parks for Office Use 4,665 incl
Basement Car Parks for Commercial Use 555 incl
Additional 70 Car Parking Lots for Public Use 1,050 1,050
Plot A2 F&B Kiosk 100 100
Pedestrian Access 602 602
Total 76,560 83,519
Items Unit Qty Rate RM RM
1 Plot A1 - Office
a) Grade A Office CFA (m
2
) 68,517 4,200 287,770,000
b) Basement Car Parks (311 lots @ 15m2 per lot) CFA (m2
) 4,665 1,753 8,180,000
c) Associated External Works (allowance) item 10.0% 29,600,000
Sub-total (For Plot A1 - Office) GFA (ft2
) 670,468 486 325,550,000
2 Plot A1 - Retail
a) Retail CFA (m
2
) 8,030 3,138 25,190,000
b) Basement Car Parks (37 lots @ 15m2 per lot) CFA (m
2
) 555 1,753 970,000
c) Associated External Works (allowance) item 10.0% 2,520,000
Sub-total (For Plot A1 - Retail) GFA (ft
2
) 78,577 365 28,680,000
3 Plot A2 (At-Grade Open Space)
a) F&B - Food court (Single-Storey Structure) (GFA=100m2) CFA (m2
) 100 1,823 180,000
b) Softscape with Lush Landscaping & Hardscape (inlcuded park furniture, water feature, signage) m2
1,356 150 200,000 TCOT Clause 4.20
Sub-total (For Plot A2 At-Grade Open Space) GFA(ft
2
) 1,076 353 380,000
4 Cost Associated to Land Parcel (Allowance)
a) m2 2,500 1,000 2,500,000 TCOT Clause 4.7
b) Pedestrian Network m
2 834 1,744 1,450,000
c) At-Grade Pedestrian Network m
2 865 1,220 1,060,000
e) Additional 70 Car Parking Spaces for Public Use (70 lots @ 15m2
per lot) CFA (m
2
) 1,050 1,753 1,840,000 TCOT Clause 4.27.2
f) Night Lighting item 500,000 TCOT Clause 4.28
g) Road Improvement Works item 200,000
h) Demolition Works
i) Demolish former Telok Ayer Performing Arts Centre (182 Cecil Street) and all the annex
buildings within Plot A1 and A2
item 330,000 TCOT Clause 4.31.1(a)
ii) Demolish existing surface car park and kerbside car and motorcycle parking lots along Telok
Ayer Street
item 55,000 TCOT Clause 4.31.1(b)
i) m2 126 9,225 1,160,000 TCOT Clause 4.32.2
5 Others (Allowance)
a) Utilities Detection Works item 45,000
b) Site Survey/Investigation item 80,000
c) Geotechnical Investigation Works item 220,000
d) Hoarding and Signboard item 120,000
e) Cadastral Survey (Plot A1, A2 & A3) (Allowance) item 50,000
f) Utilities Connection Charges item 120,000
g) Services Diversion - As per Tender Documents excluding GST)
- Electricity (Clause 4.2.1) item 120,000
h) Traffic Impact Assessment item 50,000
i) item 150,000
Sub-total (For Cost Associated to Land Parcel (Item 4 & 5)) GFA (ft2
) 824,092 12 10,050,000
6 Green Building Index Requirements
a) Green Building Index Platinum (allowance of 10% of total building work) item 10% 35,460,000
Sub-total (For Green Mark Platinum Requirements) GFA (ft2
) 824,092 43 35,460,000
400,120,000
GFA (m2
) 76,560 5,226
GFA (ft
2
) 824,092 486
7 Contingencies (Allowance at 5% of Item 1 to 6 above) item 5% 20,010,000
420,130,000
GFA (m
2
) 76,560 5,488
GFA (ft
2
) 824,092 510
8 Cost Escalation (Assuming tender to be called in one year's time) item 5% 21,010,000
441,140,000
GFA (m
2
) 76,560 5,762
GFA (ft
2
) 824,092 535
Cost per sq ft of GFA (823,785ft
2
)
Protection of Existing Roadside Trees
Greenery Replacement and Landscaping (Assume Sky Terraces/Roof Gardens, etc. (Single
Storey Volume))
Total for Item 1 to 6 (Excluding Contingencies & Cost Escalations)
Cost per sq m of GFA (76,560m
2
)
Min. 7.0m wide Covered Linkway to Connect the Proposed Development to the Existing Bus
Shelter Along Cecil Street (Approx. 18m length)
Cost per sq m of GFA (76,560m2
)
Total for Item 1 to 7 (Including Contingencies but Excluding Cost Escalations)
Cost per sq m of GFA (76,560m
2
)
Cost per sq ft of GFA (823,785ft
2
)
Cost per sq ft of GFA (823,785ft2
)
Total for Item 1 to 8 (Including Contingencies & Cost Escalation)
GRADE A OFFICE BUILDING IN KUALA LUMPUR
PRELIMINARY COST APPRAISAL NO. 1
PARAMETERS / ASSUMPTIONS
(1) Site Area : 7,783.2 m2
Plot A1 (Main Parcel) : 5,990.8 m2
Plot A2 (Open Space) : 1,612.4 m2
Plot A3 (Subterranean space below Telok Ayer Street) : 180.0 m2
(2) Max. Plot Ratio : -
(3) Max. Permissible Gross Floor Area : 77,162.0 m2 or 830,572 ft2
(4) GFA Breakdown
Plot A1
Office (___% of GFA) : 62,288.0 m2 or 670,468 ft2
Retail (___% of GFA) : 7,300.0 m2 or 78,577 ft2
Plot A2
F&B 100.0 m2 or 1,076 ft2
(5) Basement Car Parks
Office
No. of Lots : 311 lots (Assume 15 m2 per lot)
Car Park Areas : 4,665 m2 (if no drawing is available)
Commercial
No. of Lots : 37 lots (Assume 15 m2 per lot)
Car Park Areas : 555 m2 (if no drawing is available)
Additional 70 lots (Commercial)
No. of Lots : 70 lots (Assume 15 m2 per lot)
Car Park Areas : 1,050 m2 (if no drawing is available)
Total Car Park Area 6,270 m2 *lot area includes allowances for circulation
(6) Office
No. of Blocks / Storey : 25
Construction Floor Area
Office GFA : 62,288 m2
Add Lift Shaft (10% of GFA) : 6,229 m2
Basement Car Parks : 4,665 m2
Total CFA : 73,182 m2
(7) Commerical
No. of Blocks / Storey : 4
Construction Floor Area
Commercial GFA : 7,300 m2
Add Lift Shaft (10% of GFA) : 730 m2
Basement Car Parks : 555 m2
Total CFA : 8,585 m2
(8) Construction Floor Area
Office : 73,182 m2
Commercial : 8,585 m2
Total CFA : 81,767 m2
Tower 26 floors
Deduction for
walkway Office Retail Carpark
Floor Type of use Floor number Gross floor area/floor (GFA) GFA GFA GFA
G Retail 1 2,500 0.00 - 2,500.00 -
1st Office 1 2,500 212.00 2,288.00 - -
2nd to 25th Office 24 2,500 0.00 60,000.00 - -
TOTAL GFA (Tower) 62,288.00 2,500.00 -
Mall 4 floors
Deduction for
walkway Office Retail Carpark
Floor Type of use Floor number Gross floor area/floor (GFA) GFA GFA GFA
G Retail 1 1,200 0.00 - 1,200.00 -
1st - 3rd Retail 3 1,200 0.00 - 3,600.00 -
TOTAL GFA (Mall) - 4,800.00 -
Basement 1 floor
Deduction for
walkway Office Retail Carpark
Floor Type of use Floor number Gross floor area/floor (GFA) GFA GFA GFA
LG Carpark 1 7,000 390.00 - - 6,610.00
Ramps & M&E Services Carpark 1 340.00 - - (340.00) (6,610-6,270) m3
TOTAL GFA (Carpark) - - 6,270.00
Pedestrian
walkway 1 floor
Walkway Office Retail Carpark
Floor Type of use Floor number Gross floor area/floor (GFA) GFA GFA GFA
Underground (P1-P2) Walkway 1 390 390.00 - - -
1st (P1) Walkway 1 212 212.00
TOTAL GFA (Pedestrian walkway) 602.00 - - -
Plot A2 Open Space Walkway Office Retail Carpark
GRAND TOTAL 100.00 602.00 62,288.00 7,300.00 6,270.00
61,730.00 *required =>
TOTAL DEVELOPMENT GFA 76,560.00
77,162.00 *required =<

More Related Content

What's hot

1 schmanuf
1 schmanuf1 schmanuf
1 schmanuf
ry_moore
 
2015_01_17 EKO2 Workshop Presentation 13th January 2015 Rev.07b
2015_01_17 EKO2 Workshop Presentation 13th January 2015 Rev.07b2015_01_17 EKO2 Workshop Presentation 13th January 2015 Rev.07b
2015_01_17 EKO2 Workshop Presentation 13th January 2015 Rev.07b
yasser abouzeid,MD,CCE
 
#13 costs and pricing strategy
#13 costs and pricing strategy#13 costs and pricing strategy
#13 costs and pricing strategy
ali_1989
 
income and poverty handout
income and poverty handoutincome and poverty handout
income and poverty handout
Kirkwood Donavin
 

What's hot (16)

Shri Lakshmi Narasimhar Foundries Private Limited, Coimbatore, Machine and Au...
Shri Lakshmi Narasimhar Foundries Private Limited, Coimbatore, Machine and Au...Shri Lakshmi Narasimhar Foundries Private Limited, Coimbatore, Machine and Au...
Shri Lakshmi Narasimhar Foundries Private Limited, Coimbatore, Machine and Au...
 
Ebitda bridge and variance analysis
Ebitda bridge and variance analysisEbitda bridge and variance analysis
Ebitda bridge and variance analysis
 
resume 2016-June
resume 2016-Juneresume 2016-June
resume 2016-June
 
1 schmanuf
1 schmanuf1 schmanuf
1 schmanuf
 
Sleepy Hollow
Sleepy HollowSleepy Hollow
Sleepy Hollow
 
Alfa Peb Ltd
Alfa Peb Ltd Alfa Peb Ltd
Alfa Peb Ltd
 
Jaime de Rábago · PRECAST CONCRETE WIND TOWERS AND OFFSHORE FOUNDATIONS: A HU...
Jaime de Rábago · PRECAST CONCRETE WIND TOWERS AND OFFSHORE FOUNDATIONS: A HU...Jaime de Rábago · PRECAST CONCRETE WIND TOWERS AND OFFSHORE FOUNDATIONS: A HU...
Jaime de Rábago · PRECAST CONCRETE WIND TOWERS AND OFFSHORE FOUNDATIONS: A HU...
 
1
11
1
 
AF Resume Feb 2015
AF Resume Feb 2015AF Resume Feb 2015
AF Resume Feb 2015
 
Code Blue SV/Rodriguez Lopez Partnership
Code Blue SV/Rodriguez Lopez PartnershipCode Blue SV/Rodriguez Lopez Partnership
Code Blue SV/Rodriguez Lopez Partnership
 
Design of an industrial park
Design of an industrial parkDesign of an industrial park
Design of an industrial park
 
Cement pavers
Cement paversCement pavers
Cement pavers
 
2015_01_17 EKO2 Workshop Presentation 13th January 2015 Rev.07b
2015_01_17 EKO2 Workshop Presentation 13th January 2015 Rev.07b2015_01_17 EKO2 Workshop Presentation 13th January 2015 Rev.07b
2015_01_17 EKO2 Workshop Presentation 13th January 2015 Rev.07b
 
#13 costs and pricing strategy
#13 costs and pricing strategy#13 costs and pricing strategy
#13 costs and pricing strategy
 
income and poverty handout
income and poverty handoutincome and poverty handout
income and poverty handout
 
Mendiola: Machining services supplier
Mendiola: Machining services supplierMendiola: Machining services supplier
Mendiola: Machining services supplier
 

Similar to BE COST APPRAISAL

Be presentation rev
Be presentation revBe presentation rev
Be presentation rev
Yong Sy
 
Aum new facility application 20110413
Aum new facility application 20110413Aum new facility application 20110413
Aum new facility application 20110413
haithamo
 
198-200 THE ENTRANCE ERINA s
198-200 THE ENTRANCE ERINA s198-200 THE ENTRANCE ERINA s
198-200 THE ENTRANCE ERINA s
Mike Darwich
 

Similar to BE COST APPRAISAL (20)

BE Cost Plan
BE Cost Plan BE Cost Plan
BE Cost Plan
 
Be presentation rev
Be presentation revBe presentation rev
Be presentation rev
 
BE presentation slides
BE presentation slidesBE presentation slides
BE presentation slides
 
Be assignment-presentation 0
Be assignment-presentation 0Be assignment-presentation 0
Be assignment-presentation 0
 
FINAL VOLUME 2 20.12
FINAL VOLUME 2 20.12FINAL VOLUME 2 20.12
FINAL VOLUME 2 20.12
 
Be presentation slides
Be presentation slidesBe presentation slides
Be presentation slides
 
Aum new facility application 20110413
Aum new facility application 20110413Aum new facility application 20110413
Aum new facility application 20110413
 
De assignment
De assignmentDe assignment
De assignment
 
Abu dhabi project - Real Estate
Abu dhabi project - Real Estate Abu dhabi project - Real Estate
Abu dhabi project - Real Estate
 
The watergate confidential
The watergate confidentialThe watergate confidential
The watergate confidential
 
198-200 THE ENTRANCE ERINA s
198-200 THE ENTRANCE ERINA s198-200 THE ENTRANCE ERINA s
198-200 THE ENTRANCE ERINA s
 
ECA form
ECA formECA form
ECA form
 
DownloadPfdFile.aspx.pdf
DownloadPfdFile.aspx.pdfDownloadPfdFile.aspx.pdf
DownloadPfdFile.aspx.pdf
 
Career Portfolio Jae Yoon Kim
Career Portfolio Jae Yoon KimCareer Portfolio Jae Yoon Kim
Career Portfolio Jae Yoon Kim
 
E Brochure ATS Destinaire Sector 1 Noida Extension - Greenery Around You
E Brochure ATS Destinaire Sector 1 Noida Extension - Greenery Around YouE Brochure ATS Destinaire Sector 1 Noida Extension - Greenery Around You
E Brochure ATS Destinaire Sector 1 Noida Extension - Greenery Around You
 
element
elementelement
element
 
Funicular railways Proposal ppt
Funicular railways Proposal pptFunicular railways Proposal ppt
Funicular railways Proposal ppt
 
Assignment - Preliminary Cost Appraisal (Presentation Slide)
Assignment - Preliminary Cost Appraisal (Presentation Slide)Assignment - Preliminary Cost Appraisal (Presentation Slide)
Assignment - Preliminary Cost Appraisal (Presentation Slide)
 
Changshu Edz Presentation
Changshu Edz PresentationChangshu Edz Presentation
Changshu Edz Presentation
 
Aernnova capability presentation 2020
Aernnova capability presentation 2020Aernnova capability presentation 2020
Aernnova capability presentation 2020
 

More from Pang Khai Shuen

Value Management Assignment (Report)
Value Management Assignment (Report)Value Management Assignment (Report)
Value Management Assignment (Report)
Pang Khai Shuen
 
Value Management Assignment (Slides)
Value Management Assignment (Slides)Value Management Assignment (Slides)
Value Management Assignment (Slides)
Pang Khai Shuen
 
BE benchmark project cost allocation
BE benchmark project cost allocationBE benchmark project cost allocation
BE benchmark project cost allocation
Pang Khai Shuen
 
BE Assignment brief aug 17
BE Assignment brief aug 17BE Assignment brief aug 17
BE Assignment brief aug 17
Pang Khai Shuen
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
Pang Khai Shuen
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
Pang Khai Shuen
 

More from Pang Khai Shuen (20)

Value Management Assignment (Report)
Value Management Assignment (Report)Value Management Assignment (Report)
Value Management Assignment (Report)
 
Value Management Assignment (Slides)
Value Management Assignment (Slides)Value Management Assignment (Slides)
Value Management Assignment (Slides)
 
Project Management and Development Economics Project (Slides)
Project Management and Development Economics Project (Slides)Project Management and Development Economics Project (Slides)
Project Management and Development Economics Project (Slides)
 
Project Management and Development Economics Project (DE)
Project Management and Development Economics Project (DE)Project Management and Development Economics Project (DE)
Project Management and Development Economics Project (DE)
 
Project Management and Development Economics Project (PM)
Project Management and Development Economics Project (PM)Project Management and Development Economics Project (PM)
Project Management and Development Economics Project (PM)
 
Construction Law Assignment BQS Taylor's University
Construction Law Assignment BQS Taylor's UniversityConstruction Law Assignment BQS Taylor's University
Construction Law Assignment BQS Taylor's University
 
Construction Law - Remedies for Breach of Contract
Construction Law - Remedies for Breach of ContractConstruction Law - Remedies for Breach of Contract
Construction Law - Remedies for Breach of Contract
 
BE Slides updated
 BE Slides updated BE Slides updated
BE Slides updated
 
BE Presentation Slides
BE Presentation SlidesBE Presentation Slides
BE Presentation Slides
 
BE benchmark project cost allocation
BE benchmark project cost allocationBE benchmark project cost allocation
BE benchmark project cost allocation
 
BE Compiled
BE Compiled BE Compiled
BE Compiled
 
BE Assignment brief aug 17
BE Assignment brief aug 17BE Assignment brief aug 17
BE Assignment brief aug 17
 
CSI Personal reflective journal
CSI Personal reflective journalCSI Personal reflective journal
CSI Personal reflective journal
 
pp2 Final account-1
pp2 Final account-1pp2 Final account-1
pp2 Final account-1
 
Pp2 coursework 2 BRIEF 201708
Pp2 coursework 2  BRIEF  201708Pp2 coursework 2  BRIEF  201708
Pp2 coursework 2 BRIEF 201708
 
PP2 COMPILCATION
PP2 COMPILCATIONPP2 COMPILCATION
PP2 COMPILCATION
 
M4 presentation slides
M4 presentation slidesM4 presentation slides
M4 presentation slides
 
PP1 - Presentation Slides
PP1 - Presentation Slides PP1 - Presentation Slides
PP1 - Presentation Slides
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
 

Recently uploaded

Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Po-Chuan Chen
 
Industrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportIndustrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training Report
Avinash Rai
 

Recently uploaded (20)

Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
Advances in production technology of Grapes.pdf
Advances in production technology of Grapes.pdfAdvances in production technology of Grapes.pdf
Advances in production technology of Grapes.pdf
 
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & EngineeringBasic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
 
Forest and Wildlife Resources Class 10 Free Study Material PDF
Forest and Wildlife Resources Class 10 Free Study Material PDFForest and Wildlife Resources Class 10 Free Study Material PDF
Forest and Wildlife Resources Class 10 Free Study Material PDF
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
 
Solid waste management & Types of Basic civil Engineering notes by DJ Sir.pptx
Solid waste management & Types of Basic civil Engineering notes by DJ Sir.pptxSolid waste management & Types of Basic civil Engineering notes by DJ Sir.pptx
Solid waste management & Types of Basic civil Engineering notes by DJ Sir.pptx
 
[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online Presentation[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online Presentation
 
Operations Management - Book1.p - Dr. Abdulfatah A. Salem
Operations Management - Book1.p  - Dr. Abdulfatah A. SalemOperations Management - Book1.p  - Dr. Abdulfatah A. Salem
Operations Management - Book1.p - Dr. Abdulfatah A. Salem
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
 
Mattingly "AI & Prompt Design: Limitations and Solutions with LLMs"
Mattingly "AI & Prompt Design: Limitations and Solutions with LLMs"Mattingly "AI & Prompt Design: Limitations and Solutions with LLMs"
Mattingly "AI & Prompt Design: Limitations and Solutions with LLMs"
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
 
Industrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportIndustrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training Report
 
B.ed spl. HI pdusu exam paper-2023-24.pdf
B.ed spl. HI pdusu exam paper-2023-24.pdfB.ed spl. HI pdusu exam paper-2023-24.pdf
B.ed spl. HI pdusu exam paper-2023-24.pdf
 

BE COST APPRAISAL

  • 1. GRADE A OFFICE BUILDING IN KUALA LUMPUR PRELIMINARY COST APPRAISAL NO. 1 GFA (m2 ) CFA (m2 ) Office 62,288 73,182 Commercial 7,300 8,585 Basement Car Parks for Office Use 4,665 incl Basement Car Parks for Commercial Use 555 incl Additional 70 Car Parking Lots for Public Use 1,050 1,050 Plot A2 F&B Kiosk 100 100 Pedestrian Access 602 602 Total 76,560 83,519 Items Unit Qty Rate RM RM 1 Plot A1 - Office a) Grade A Office CFA (m 2 ) 68,517 4,200 287,770,000 b) Basement Car Parks (311 lots @ 15m2 per lot) CFA (m2 ) 4,665 1,753 8,180,000 c) Associated External Works (allowance) item 10.0% 29,600,000 Sub-total (For Plot A1 - Office) GFA (ft2 ) 670,468 486 325,550,000 2 Plot A1 - Retail a) Retail CFA (m 2 ) 8,030 3,138 25,190,000 b) Basement Car Parks (37 lots @ 15m2 per lot) CFA (m 2 ) 555 1,753 970,000 c) Associated External Works (allowance) item 10.0% 2,520,000 Sub-total (For Plot A1 - Retail) GFA (ft 2 ) 78,577 365 28,680,000 3 Plot A2 (At-Grade Open Space) a) F&B - Food court (Single-Storey Structure) (GFA=100m2) CFA (m2 ) 100 1,823 180,000 b) Softscape with Lush Landscaping & Hardscape (inlcuded park furniture, water feature, signage) m2 1,356 150 200,000 TCOT Clause 4.20 Sub-total (For Plot A2 At-Grade Open Space) GFA(ft 2 ) 1,076 353 380,000 4 Cost Associated to Land Parcel (Allowance) a) m2 2,500 1,000 2,500,000 TCOT Clause 4.7 b) Pedestrian Network m 2 834 1,744 1,450,000 c) At-Grade Pedestrian Network m 2 865 1,220 1,060,000 e) Additional 70 Car Parking Spaces for Public Use (70 lots @ 15m2 per lot) CFA (m 2 ) 1,050 1,753 1,840,000 TCOT Clause 4.27.2 f) Night Lighting item 500,000 TCOT Clause 4.28 g) Road Improvement Works item 200,000 h) Demolition Works i) Demolish former Telok Ayer Performing Arts Centre (182 Cecil Street) and all the annex buildings within Plot A1 and A2 item 330,000 TCOT Clause 4.31.1(a) ii) Demolish existing surface car park and kerbside car and motorcycle parking lots along Telok Ayer Street item 55,000 TCOT Clause 4.31.1(b) i) m2 126 9,225 1,160,000 TCOT Clause 4.32.2 5 Others (Allowance) a) Utilities Detection Works item 45,000 b) Site Survey/Investigation item 80,000 c) Geotechnical Investigation Works item 220,000 d) Hoarding and Signboard item 120,000 e) Cadastral Survey (Plot A1, A2 & A3) (Allowance) item 50,000 f) Utilities Connection Charges item 120,000 g) Services Diversion - As per Tender Documents excluding GST) - Electricity (Clause 4.2.1) item 120,000 h) Traffic Impact Assessment item 50,000 i) item 150,000 Sub-total (For Cost Associated to Land Parcel (Item 4 & 5)) GFA (ft2 ) 824,092 12 10,050,000 6 Green Building Index Requirements a) Green Building Index Platinum (allowance of 10% of total building work) item 10% 35,460,000 Sub-total (For Green Mark Platinum Requirements) GFA (ft2 ) 824,092 43 35,460,000 400,120,000 GFA (m2 ) 76,560 5,226 GFA (ft 2 ) 824,092 486 7 Contingencies (Allowance at 5% of Item 1 to 6 above) item 5% 20,010,000 420,130,000 GFA (m 2 ) 76,560 5,488 GFA (ft 2 ) 824,092 510 8 Cost Escalation (Assuming tender to be called in one year's time) item 5% 21,010,000 441,140,000 GFA (m 2 ) 76,560 5,762 GFA (ft 2 ) 824,092 535 Cost per sq ft of GFA (823,785ft 2 ) Protection of Existing Roadside Trees Greenery Replacement and Landscaping (Assume Sky Terraces/Roof Gardens, etc. (Single Storey Volume)) Total for Item 1 to 6 (Excluding Contingencies & Cost Escalations) Cost per sq m of GFA (76,560m 2 ) Min. 7.0m wide Covered Linkway to Connect the Proposed Development to the Existing Bus Shelter Along Cecil Street (Approx. 18m length) Cost per sq m of GFA (76,560m2 ) Total for Item 1 to 7 (Including Contingencies but Excluding Cost Escalations) Cost per sq m of GFA (76,560m 2 ) Cost per sq ft of GFA (823,785ft 2 ) Cost per sq ft of GFA (823,785ft2 ) Total for Item 1 to 8 (Including Contingencies & Cost Escalation)
  • 2. GRADE A OFFICE BUILDING IN KUALA LUMPUR PRELIMINARY COST APPRAISAL NO. 1 PARAMETERS / ASSUMPTIONS (1) Site Area : 7,783.2 m2 Plot A1 (Main Parcel) : 5,990.8 m2 Plot A2 (Open Space) : 1,612.4 m2 Plot A3 (Subterranean space below Telok Ayer Street) : 180.0 m2 (2) Max. Plot Ratio : - (3) Max. Permissible Gross Floor Area : 77,162.0 m2 or 830,572 ft2 (4) GFA Breakdown Plot A1 Office (___% of GFA) : 62,288.0 m2 or 670,468 ft2 Retail (___% of GFA) : 7,300.0 m2 or 78,577 ft2 Plot A2 F&B 100.0 m2 or 1,076 ft2 (5) Basement Car Parks Office No. of Lots : 311 lots (Assume 15 m2 per lot) Car Park Areas : 4,665 m2 (if no drawing is available) Commercial No. of Lots : 37 lots (Assume 15 m2 per lot) Car Park Areas : 555 m2 (if no drawing is available) Additional 70 lots (Commercial) No. of Lots : 70 lots (Assume 15 m2 per lot) Car Park Areas : 1,050 m2 (if no drawing is available) Total Car Park Area 6,270 m2 *lot area includes allowances for circulation (6) Office No. of Blocks / Storey : 25 Construction Floor Area Office GFA : 62,288 m2 Add Lift Shaft (10% of GFA) : 6,229 m2 Basement Car Parks : 4,665 m2 Total CFA : 73,182 m2 (7) Commerical No. of Blocks / Storey : 4 Construction Floor Area Commercial GFA : 7,300 m2 Add Lift Shaft (10% of GFA) : 730 m2 Basement Car Parks : 555 m2 Total CFA : 8,585 m2 (8) Construction Floor Area Office : 73,182 m2 Commercial : 8,585 m2 Total CFA : 81,767 m2
  • 3. Tower 26 floors Deduction for walkway Office Retail Carpark Floor Type of use Floor number Gross floor area/floor (GFA) GFA GFA GFA G Retail 1 2,500 0.00 - 2,500.00 - 1st Office 1 2,500 212.00 2,288.00 - - 2nd to 25th Office 24 2,500 0.00 60,000.00 - - TOTAL GFA (Tower) 62,288.00 2,500.00 - Mall 4 floors Deduction for walkway Office Retail Carpark Floor Type of use Floor number Gross floor area/floor (GFA) GFA GFA GFA G Retail 1 1,200 0.00 - 1,200.00 - 1st - 3rd Retail 3 1,200 0.00 - 3,600.00 - TOTAL GFA (Mall) - 4,800.00 - Basement 1 floor Deduction for walkway Office Retail Carpark Floor Type of use Floor number Gross floor area/floor (GFA) GFA GFA GFA LG Carpark 1 7,000 390.00 - - 6,610.00 Ramps & M&E Services Carpark 1 340.00 - - (340.00) (6,610-6,270) m3 TOTAL GFA (Carpark) - - 6,270.00 Pedestrian walkway 1 floor Walkway Office Retail Carpark Floor Type of use Floor number Gross floor area/floor (GFA) GFA GFA GFA Underground (P1-P2) Walkway 1 390 390.00 - - - 1st (P1) Walkway 1 212 212.00 TOTAL GFA (Pedestrian walkway) 602.00 - - - Plot A2 Open Space Walkway Office Retail Carpark GRAND TOTAL 100.00 602.00 62,288.00 7,300.00 6,270.00 61,730.00 *required => TOTAL DEVELOPMENT GFA 76,560.00 77,162.00 *required =<