PLOTA1
Main Building Office
- Approx. 100m high office
tower, 26 floors
-Total GFA – 62,228m2
PLOTA1
Retail Block
- Approx. 20m high, 4 floors
-Total GFA – 4,800m2
PLOTA2
Cafeteria
Total GFA – 100m2
PLOTA1 to A2
Basement
Total GFA –6,270m2
PLOTA1 to A3
Underground PedestrianWalkway
6m wide, 139m long
Covered PedestrianWalkway
Around Office & Retail Blocks
3.6m & 5.0m wide, 215m long
Gross Floor Area
Element Office Retail Carpark Walkways TOTAL
GFA (m2) 62,288 7,300 6,270 602 76,460
Percentage (%) 81 9 9 1 100
Breakdown
Elemental Breakdown
Office Retail Carpark Walkways
81%
1%
9%
9%
GREEN FEATURES &
INITIATIVES
ENERGY EFFICIENCY
• High-performance double
glazed windows & louvres
• Solar photovoltaic panels
• Energy Measurement System
• Energy-efficient lighting
WATER EFFICIENCY
• Rainwater Harvesting
ENVIRONMENTAL PROTECTION
• Fair face concrete
• Low volatile organic compound
paint
• Minimize waste
INDOOR ENVIRONMENTAL
QUALITY
• Efficient air-conditioning system
• CO2 sensor, auto condenser
tube cleaning system, heat
recovery wheel
SUSTAINABLE SITE PLANNING
• Open space
• Green vehicle priority
• PublicTransport Access
• Roof Garden
Benchmark
Project
• 32-storey office tower
• 9-storey carpark
• 1 level basement
• GradeA office building
• GBI certified
• Approx. RM 300 million
Cost Appraisal
No. Item GFA (m2) Rate (RM/m2) Total (RM)
1 A1-Office 62,288 5,227 325,550,000
2 A1-Retail 7,300 3,929 28,680,000
3 A2-Open Space 100 3,800 380,000
SubTotal (No.1 – 3) 69,688 5,089 354,610,000
4 Costs Associated with Land Parcel 76,560 131 10,050,000
5 GBI Requirements (10% of No.1 -3) 76,560 463 35,460,000
SubTotal (No.1 – 5) 76,560 5,226 400,120,000
6 Contingencies (5% of No.1 - 5) - - 20,010,000
SubTotal (No.1 – 6) 76,560 5,488 420,130,000
7 Cost Escalation (5% of No. 1 – 6) - - 21,010,000
GrandTotal 76,560 5,762 441,140,000
Conclusion
Total GFA 76,560 m2
GBI Rating Platinum
Total Cost RM 441,140,000

More Related Content

More from Pang Khai Shuen

More from Pang Khai Shuen (17)

BE COST APPRAISAL
BE COST APPRAISALBE COST APPRAISAL
BE COST APPRAISAL
 
BE benchmark project cost allocation
BE benchmark project cost allocationBE benchmark project cost allocation
BE benchmark project cost allocation
 
BE Compiled
BE Compiled BE Compiled
BE Compiled
 
BE Assignment brief aug 17
BE Assignment brief aug 17BE Assignment brief aug 17
BE Assignment brief aug 17
 
CSI Personal reflective journal
CSI Personal reflective journalCSI Personal reflective journal
CSI Personal reflective journal
 
pp2 Final account-1
pp2 Final account-1pp2 Final account-1
pp2 Final account-1
 
Pp2 coursework 2 BRIEF 201708
Pp2 coursework 2  BRIEF  201708Pp2 coursework 2  BRIEF  201708
Pp2 coursework 2 BRIEF 201708
 
PP2 COMPILCATION
PP2 COMPILCATIONPP2 COMPILCATION
PP2 COMPILCATION
 
M4 presentation slides
M4 presentation slidesM4 presentation slides
M4 presentation slides
 
PP1 - Presentation Slides
PP1 - Presentation Slides PP1 - Presentation Slides
PP1 - Presentation Slides
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
 
Estimating Presentation Slides - To Client
Estimating Presentation Slides - To ClientEstimating Presentation Slides - To Client
Estimating Presentation Slides - To Client
 
Elemental Cost Analysis
Elemental Cost AnalysisElemental Cost Analysis
Elemental Cost Analysis
 
Procurement Strategies: A Seminar
Procurement Strategies: A SeminarProcurement Strategies: A Seminar
Procurement Strategies: A Seminar
 
Software Application in Quantity Surveying - Slides
Software Application in Quantity Surveying - SlidesSoftware Application in Quantity Surveying - Slides
Software Application in Quantity Surveying - Slides
 
Software Application in Quantity Surveying - Report
Software Application in Quantity Surveying - ReportSoftware Application in Quantity Surveying - Report
Software Application in Quantity Surveying - Report
 

Recently uploaded

The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
Accounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdfAccounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdf
YibeltalNibretu
 

Recently uploaded (20)

UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
Salient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptxSalient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptx
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
 
Basic_QTL_Marker-assisted_Selection_Sourabh.ppt
Basic_QTL_Marker-assisted_Selection_Sourabh.pptBasic_QTL_Marker-assisted_Selection_Sourabh.ppt
Basic_QTL_Marker-assisted_Selection_Sourabh.ppt
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
 
Accounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdfAccounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdf
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
 
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
 
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdfINU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
 

BE Slides updated

  • 1. BUILDING ECONOMICS GROUP ASSIGNMENT Liu Wei Qian 0322969 Maybelle Wang Sze Kher 0327553 Mok Po Yi 0318207 Ng Seng He 0323037 Pan Lek Vun 0323164 Pang Khai Shuen 0318423 Sherlyn Ang Tse Yun 0317977 Siong Jia Yii 0318239
  • 2. PLOTA1 Main Building Office - Approx. 100m high office tower, 26 floors -Total GFA – 62,228m2
  • 3. PLOTA1 Retail Block - Approx. 20m high, 4 floors -Total GFA – 4,800m2 PLOTA2 Cafeteria Total GFA – 100m2
  • 4. PLOTA1 to A2 Basement Total GFA –6,270m2 PLOTA1 to A3 Underground PedestrianWalkway 6m wide, 139m long
  • 5. Covered PedestrianWalkway Around Office & Retail Blocks 3.6m & 5.0m wide, 215m long
  • 6. Gross Floor Area Element Office Retail Carpark Walkways TOTAL GFA (m2) 62,288 7,300 6,270 602 76,460 Percentage (%) 81 9 9 1 100 Breakdown Elemental Breakdown Office Retail Carpark Walkways 81% 1% 9% 9%
  • 7. GREEN FEATURES & INITIATIVES ENERGY EFFICIENCY • High-performance double glazed windows & louvres • Solar photovoltaic panels • Energy Measurement System • Energy-efficient lighting WATER EFFICIENCY • Rainwater Harvesting ENVIRONMENTAL PROTECTION • Fair face concrete • Low volatile organic compound paint • Minimize waste INDOOR ENVIRONMENTAL QUALITY • Efficient air-conditioning system • CO2 sensor, auto condenser tube cleaning system, heat recovery wheel SUSTAINABLE SITE PLANNING • Open space • Green vehicle priority • PublicTransport Access • Roof Garden
  • 8. Benchmark Project • 32-storey office tower • 9-storey carpark • 1 level basement • GradeA office building • GBI certified • Approx. RM 300 million
  • 9. Cost Appraisal No. Item GFA (m2) Rate (RM/m2) Total (RM) 1 A1-Office 62,288 5,227 325,550,000 2 A1-Retail 7,300 3,929 28,680,000 3 A2-Open Space 100 3,800 380,000 SubTotal (No.1 – 3) 69,688 5,089 354,610,000 4 Costs Associated with Land Parcel 76,560 131 10,050,000 5 GBI Requirements (10% of No.1 -3) 76,560 463 35,460,000 SubTotal (No.1 – 5) 76,560 5,226 400,120,000 6 Contingencies (5% of No.1 - 5) - - 20,010,000 SubTotal (No.1 – 6) 76,560 5,488 420,130,000 7 Cost Escalation (5% of No. 1 – 6) - - 21,010,000 GrandTotal 76,560 5,762 441,140,000
  • 10. Conclusion Total GFA 76,560 m2 GBI Rating Platinum Total Cost RM 441,140,000