INTRODUCTION
I am a qualified Civil Engineer with more than Forty Years of experience in Engineering of Building
Construction and Infrastructure projects in Construction Sectors. II aamm ffuullllyy ccoonnvveerrssaanntt wwiitthh aallll tthhee
aassppeeccttss ooff CCiivviill EEnnggiinneeeerriinngg CCoonnssttrruuccttiioonn ffoolllloowweedd bbyy LLooccaall AAuutthhoorriittiieess aanndd CCoorrppoorraattiioonnss ssuucchh aass,,
TTRRAAKKHHEEEESS,, DDEEWWAA,, FFEEWWAA,, NNAAKKHHEEEELL,, TTRRAANNSSCCOO eettcc,, HHaavvee ggoooodd kknnoowwlleeddggee wwiitthh BBSS,,
AASSTTMM SSttaannddaarrddss, ACI, EN, CSI, ASSHTO , API, A A I, BOMI, and CESEM-3&4. LLooccaall SSttaannddaarrddss aanndd
FFIIDDIICC CCoonnddiittiioonnss ooff CCoonnttrraacctt.. WWoorrkkeedd aatt UUAAEE :: AAbbuu DDhhaabbii ,, AAllaaiinn ,, BBeeddii ZZaayyeedd ,, AAll--RRwwaaiissee ,, AAll--
ssiillaa’’ ,, AAll--MMaarrffaa’’ ,, DDeellmmaa IIssllaanndd,, DDuubbaaii,, SShhaarrjjaahh ..
NATIONALITY Palestinian
EDUCATION Bachelor of Science in Civil Engineering (Sept 1965 to Jul 1970)
Faculty of Engineering, Cairo University, Egypt
PROFESSIONAL AFFLIATIONS
 United Arab Emirates, Society of Engineers ( www.soeuae.com)
 Jordan Engineers Association. ( www.jea.org.jo )
SOFTWARE SKILLS
 Auto Cad ( Advance Level ).
 Structural Design using: STAAD PRO, GTSTRUDL, SAP2000, PROKON, SAFE.
 Microsoft Office ( Project, Word, Excel, Power Point ), Computer literacy.
 PRIMAVERA 6 Planning and Scheduling.
 Technical Document Register ( TDR ).
 General Arrangement Drawings Preparation.
 Internet ( Advanced Level ).
BEHAVIORAL COMPETENCIES
 Have Integrity, flexible and proactive.
 Demonstrate ability to act independently as a part of a team.
 Good report writing skills, experience of making presentations to and attending the meetings with the clients.
 Good team player, able to communicate effectively with colleagues and co-operative.
 Drive continuously to develop technical and behavioral skills.
 Hear from other colleagues and effectively discuss to reach the right decision.
PROFESSIONAL BACKGOUND
Shadid Engineering Consultants, Dubai, ( Oct.2014 till date )
(www.shadid-sec.com
Material Civil Engineer.
 Review and Approve Material Submittals.
 Receive Testing Requests as in approved ITP , lead testing procedures and provide necessary remarks.
 Check and Inspect storage areas to make sure that all materials are stored as per specification.
 Check storage areas for safety and security and material protection from adverse weather conditions.
 Check material sources and place of manufactures if necessary to assure compliance with approved
submittal.
 Check materials in storage areas and before installations if they comply with approved submittals.
 Audit the test results and make comments if the material is achieving the correct criteria and limits of
properties as specified.
 Check materials on site when required in interim payment and confirm the quantity claimed. .
 Issue instructions to Contractor in case of rejection or Non Conformance Reports.
 Monitor MIR submitted by Contractor on delivery and follow up and issue NCR if not complied with
specifications or approved Material Submittal.
 Check for Authorities Regulations, Requirements to be adhered to in case of any materials are subject to
be approved from :TRAKHEES , JAFZA , DEWA , DIC , DU. DM
 Attend for factory inspection where required by and the Contract Documents.
 Coordinate the preparation of Purchase Requisitions for the procurement of equipment and materials.
 Ensure materials are obtained within scheduled timeframes and budgeted costs.

PROJECTS / TASKS UNDERPROGRESS
 Alfurjan Villas Jebel Ali Dubai Package 4 &6
Torishima Alain (Water Pump Station) Al-Ain – UAE. Jun. 2010 to Oct. 2011
( www.torishima.co.jp )
Coordination Manager. (Jun. 2010 to Oct. 2011)
 Coordinating whole project design between designer engineer and the Client.
 Coordinating drawing preparation and review structural design of project elements.
 Attend weekly meeting with staff for work done and forecasted.
 Attend monthly meeting with Client, Subcontractors, and Designer.
 Following the design criteria step by step and submitting for approval from Client for infrastructures and
other project elements.
 In addition, review and approve material submittals from sub-contractors and submit to Client for final
approval via Consultant.
 Interact with other discipline managers and engineers on a regular basis.
 Supervise the review of design calculations, ensure vendor equipment specifications meet with Client
equipment specifications and are within budgeted costs.
PROJECTS / TASKS COMPLETED
 Construction of Pump House for 9 Units Pumps , Electrical Building, Utility Building, Pipelines , Valves
Chambers, Compressors Foundation, Water Quality Control Buildings, Drainage and Roads ( Turn Key
Project Design & Construction and Commissioning ). At Al – Ain UAE.
Shadid Engineering Consultants, Dubai, Sept. 2008 to Jun. 2010
(www.shadid-sec.com)
Material Civil Engineer. ( Sept. 2008 to Jun. 2010 )
 Review and Approve Material Submittals.
 Receive Testing Requests as in approved ITP , lead testing procedures and provide necessary remarks.
 Check and Inspect storage areas to make sure that all materials are stored as per specification.
 Check storage areas for safety and security and material protection from adverse weather conditions.
 Check material sources and place of manufactures if necessary to assure compliance with approved
submittal.
 Check materials in storage areas and before installations if they comply with approved submittals.
 Audit the test results and make comments if the material is achieving the correct criteria and limits of
properties as specified.
 Check materials on site when required in interim payment and confirm the quantity claimed. .
 Issue instructions to Contractor in case of rejection or Non Conformance Reports.
 Monitor MIR submitted by Contractor on delivery and follow up and issue NCR if not complied with
specifications or approved Material Submittal.
 Check for Authorities Regulations, Requirements to be adhered to in case of any materials are subject to
be approved from :TRAKHEES , JAFZA , DEWA , DIC , DU. DM
 Attend for factory inspection where required by and the Contract Documents.
 Coordinate the preparation of Purchase Requisitions for the procurement of equipment and materials.
 Ensure materials are obtained within scheduled timeframes and budgeted costs.
PROJECTS / TASKS COMPLETED
 Alfurjan Villas Jebel Ali Dubai Package 1&2
Contracting Works and Maintenance ( Own Activities ) Dec. 2007 to Aug. 2008
Civil Maintenance Engineer ( Dec. 2007 to Aug. 2008 )
 Maintenance for old high rise Buildings, MEP maintenance and additional Buildings construction.
PROJECTS / TASKS COMPLETED
 High rise Buildings and Villas maintenance and additional works. Ajman , Dubai
ACE International Dubai - UAE. Jun. 2006 toNov. 2007
( www.ace-intl.com )
Resident Engineer. (Jun. 2006 to Nov. 2007)
 Review and approve Material Submittals, Documents Submittals, Working Shop Drawing Submittals, R.F.I
and I.R Submittals, Soil Report Submittal, Progress Report Submittals, Test Inspection Report.
 Review and approve Materials delivery on site.
 Review and Approval of Method Statements for different activities.
 Inspection Testing Plan checking.
 Review Interim Payments, Variations, materials on site quality and quantity.
 Review and approve program for time schedules submitted by the main Contractor.
 Review Claims for time extension or additional works.
 Interact with Quality Assurance for quality issues strictly ensure compliance with Company’s ISO Quality
procedures.
 Organize the preparation of topographic layouts, earthworks, execution drawings, boreholes locations,
fencing, paved roads and drainage, underground piping and foundations, substation layouts, machinery
shelters, service platforms, pipe racks, pump foundations, vessel and vessel platform foundations, columns
and other civil/structural drawings.
 Review contract requirements for project execution, organize the preparation of the Technical Document
Register ( TDR ), identify requirements and scope of work; review specifications, Plot plans, General
Arrangement ( GA ) drawings, Review Philosophies, Area Classification Drawings.
 All Close Out activities, As Built Drawings, Testing and & Commissioning, submittal completion, NOCs
status finalizing, Completion Certificates, and recommendation letters.
PROJECTS / TASKS COMPLETED
 Package # 12 of Internatinal City at Al- Warsan Dubai consisting of 38 residential multistory
buildings consisting of residential apartments.
ShadidEngineeringConsultants Abu Dhabi – UAE. Aug.2001toMay2006
(www.shadid-sec.com)
ProjectManager (Aug.2001toMay2006)
 Quality Assurance and Quality Control Systems for work and materials.
 Supervising Static Load Pile Tests & Integrity piles tests and micro piles construction and tests.
 Projects Planning / Control for Construction Supervision.
 Preparation and Presentation Weekly and Monthly Reports to Project Management.
 Chairing Weekly Progress Meetings with the Department Engineer in charge.
 Implementation and Monitoring the Project Management.
 Managing and Monitoring Construction Works Programs and Maintenance with Contractor.
 Managing and Leading the Working Team in site.
 Review and Approval of Method Statements for different activities.
 Review Quantity Calculation for work done as a re-measuring contract with given unit prices.
 Doing all correspondence to the Contractor like site instructions and NCRs.
 Inspection materials delivered to site before installation and arrangement for material tests in PWD Labs.
 Attend Technical Meetings invited by Public Work Department relating to the project.
 Participate in discussing solutions for technical problems together with PWD and submitting reports.
PROJECTS / TASKS COMPLETED
 80 Nos. - Two Storied Villas Rehabilitation at New Shahama ( 40 Km from Abu Dhabi ).
Quinger & Memar Consultants ADH– UAE. Jul. 1999 toAug. 2001
Project Manager. ( Jul. 1999 to Aug. 2001 )
 Quality Assurance and Quality Control Systems for works, equipments and materials.
 Projects Planning / Control for Construction Supervision.
 Preparation and Presentation Weekly and Monthly Reports.
 Chairing Weekly Progress Meetings with the Department Engineer in charge.
 Implementation and Monitoring the Project Management.
 Review and Monitoring Construction Works Programs.
 Review of Materials submittals to meet specification requirements before submitting to the
department for final approval.
 Review of Shop Drawings, and final As - Built Drawings.
 Handing over the Project and follow up snag list.
PROJECTS / TASKS COMPLETED
 40 Nos. - Two Storied Villas. At Al-Ain Al – Yahar
Planning Department AbuDhabi – UAE. Jun. 1990 toJun. 1999
(www.ded.abudhabi.ae)
Senior Civil Engineer. ( Jun. 1990 to Jun. 1999 )
 Assessment and Evaluation of Consultant Firms Documents and Experience for Registration in the
Department issuing Registration Certificates.
 Construction Contractors Classification in Different Fields according to their experience and projects done,
issuing Classification Certificates.
 Right Selection of Competent Professional Consultant to quote for Government Listed Projects for Design
and or Supervision depending on their experience and projects done.
PROJECTS / TASKS COMPLETED
 Suggestions in regulations for consultant registry in Planning Department Abu Dhabi.
 Improvement to the registration system and modification to some items.
Al - Musalla Contracting & Building Maintenance Dubai – UAE. Mar. 1989 to Apr. 1990
General Maintenance Engineer. ( Mar. 1989 to Apr. 1990 )
 General maintenance for Buildings and Villas, yearly based contracts.
 Construction of additional works inside Villas, Demolishing and Reconstructing.
 Quantity Surveying and Cost Evaluation for items of relevant works.
 Pricing for small projects ( maintenance or additional works ).
PROJECTS / TASKS COMPLETED
 Construction of Additional Rooms and Facilities inside existing villas Dubai.
 General Maintenance for High Rise Residential Buildings & Villas and Apartments Dubai.
MetalcoAl- Ain – UAE. Sep. 1986 to Feb. 1989
Project Manager. ( Sep. 1986 to Feb. 1989 )
 Construction of Steel Roof Trusses with Sandwich Aluminum
Profiles, of 30 ms span triangular N - Truss, with decorative
Burma Teak wood false ceiling with Central A/C.
 Rehabilitation of Facility Units inside the 2nd Regiment Alain.
 Renew of the Water Nets inside.
 Construction of the Boundary Wall around the Regiment.
 Sidewalks Paving interlocking tiles work and Landscaping.
 Leading construction superintendence team.
 Contract administration control for this Lump Sum Contract.
 Controlling the Contractor Detailed Time Schedules.
 Material submittals approvals from Defense Al- Ain , delivery control, installation inspection, testing and
commissioning.
 Project Quality Management.
 Preparing the Interim Payments.
 Project Closeout with Authorities ( Defense Abu Dhabi ).
 Implementing the Q.A system on sites.
 Establishing the project Quality Control Plans.
 Preparing Claims for Variation. ( Additions and Omissions ) for approval.
PROJECTS / TASKS COMPLETED
 Multipurpose Project for Defense. EC / 738. Al – Ain
Arab Experts Consultant Dubai / AbuDhabi – UAE. Mar. 1983 to Aug. 1986
Resident Engineer. ( Mar. 1983 to Aug. 1986 )
 Controlling the contractor detailed time schedules.
 Material approvals, delivery control, installation inspection.
 Testing & Commissioning.
 Project quality Management.
 Review and Approval of Method Statements for different activities.
 Project closeout and handing over.
 Structural Design of the Al- Ittihad Magazine Press Abu Dhabi affiliating with WS Atkins & Partners
Overseas.
PROJECTS / TASKS COMPLETED
 Al- Marfaa Low Cost House Villas 40 nos. ( Supervision ).
 Al- Marfaa Municipality Building. (Supervision).
 Bedi Zayed Municipality Buildings-Drainage Labor Accommodations- ( Supervision ).
 Delma Island Municipality Buildings- Shops & Residential Apartments - ( Supervision ).
 Abu Dhabi for Al- Ittihad Magazine Press. ( Structural Design Support & Supervision )-sharing with
WS Atkins & Partners Overseas Structural Design.
Dar Al - HandasahConsultants, Yemen. Aug. 1977 toAug. 1982
Project Manager. ( Aug. 1977 to Aug. 1982 )
 Leading a team of Engineers, site inspectors and land surveyors.
 Supervising the construction of the Power House , Fish Meal Plant, and water tanks .
 Material approvals, delivery control, installation inspection.
 Review of Steel Bars Schedule for R.C Bridges.
 Review and Approval of Method Statements for different activities.
 Checking Inspection & Test Plan control.
 Shop & As Built Drawings Review.
 Following up snag list.
 Prerequisites for Project Handing Over.
PROJECTS / TASKS COMPLETED
 Water Supply Network Sana’a Yemen. ( Cost Plus Contract )
 Irrigation Project Aden Abyan Ja’ar including regulators, bridge crossing, channels and reclamation.
 Fishmeal Plant Almukalla Yemen .
 Fishing Marina Almukalla Yemen for Fish Meal Plant.
 Power Plant Almukalla Yemen 3 Deutz Units .
General Company for Educational Buildings Tripoli - Libya Oct. 1976 toJuly 1977
Site Civil Engineer. ( Oct. 1976 to July 1977 )
 Construction of Two typical Institutes of 4 stories with Student accommodation.
 Sub - Contractors Control & liaison for miscellaneous items of works.
 Material Delivery to site & submittal to Ministry Engineer for approval. , Site Control, Safety &
Security Control.
 Preparing the Program Construction Schedule ( Bar Chart Schedule ).
 Preparing Method Statements for Civil Works and submitting to the Client.
 Preparing the Monthly Progress Report.
 Preparing Interim Payments for Works.
 Finishing outstanding works up to handing over.
 Testing & Commissioning for purpose of Handing over.
PROJECTS / TASKS COMPLETED
 Two similar Educational Institutes at Al - zawiah & Tajoura-Libya.
Tarhuna Municipality Tarhuna – Libya. May 1973 to Sep. 1976
Civil Municipal Engineer. ( May 1973 to Sep. 1976 )
 Design & Supervising the Construction of the Road Works including R. C Bridges and crossing
valleys, Asphalt Pavements. Street Lighting , Public Garden , Water Pipelines Supply for Surrounding
Villages , A small Market , Separate shops , Solid waste Disposal with 70 ton weigh - bridge .
 Engineering Supervision for Tarhuna City Drainage System & Sewage Treatment Plant designed by
Ministry of Infrastructures Tripoli , Three Islamic Butcheries , The New Municipality Building of 3
stories , Water Supply Pump Stations in the adjacent Villages of Tarhuna City , Elevated R.C Water
Tank 200 Cubic Meters .
Al Ma’adi General Enterprise TradingCompany Cairo - Egypt July 1970 toApr. 1973
Site Civil Engineer. ( July 1970 to Apr. 1973 )
 Supervising the construction of Civil Works with other Civil Engineers.
 Sub - Contractors control.
 Construction Program Preparation ( Bar Chart ).
 Controlling materials delivered to site and choosing the appropriate storage areas.
 Quality Control, Test & Inspection Plan & Site Safety.
 Attend R.C cube tests.
 Preparing Interim Payments.
PROJECTS / TASKS COMPLETED
 Residential Buildings Construction Al – Maadi Egypt.
 Relevant Infrastructure for this project ( Roads , Drainage , Domestic Connections, Water Main Supply …etc . ).

More Related Content

What's hot (17)

Updated CV
Updated CVUpdated CV
Updated CV
 
Anil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_MechAnil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_Mech
 
Raguram palnichamy jun 2019
Raguram palnichamy jun 2019Raguram palnichamy jun 2019
Raguram palnichamy jun 2019
 
CV@JOMY NEW
CV@JOMY NEWCV@JOMY NEW
CV@JOMY NEW
 
CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)
 
Profile -Gaurav Pant
Profile  -Gaurav PantProfile  -Gaurav Pant
Profile -Gaurav Pant
 
Resume_Supply chain Specialist
Resume_Supply chain SpecialistResume_Supply chain Specialist
Resume_Supply chain Specialist
 
Resume
ResumeResume
Resume
 
CV of Mohammed Uzair
CV of Mohammed UzairCV of Mohammed Uzair
CV of Mohammed Uzair
 
RAVI CV (1)
RAVI CV (1)RAVI CV (1)
RAVI CV (1)
 
Rakesh CV (4)
Rakesh CV (4)Rakesh CV (4)
Rakesh CV (4)
 
OMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cvOMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cv
 
mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.
 
Bilal updated cv
Bilal updated cvBilal updated cv
Bilal updated cv
 
Jiju new cv
Jiju new cvJiju new cv
Jiju new cv
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
 

Viewers also liked

Selected Work [Model Making]
Selected Work [Model Making]Selected Work [Model Making]
Selected Work [Model Making]
Paul Smith
 
IERC a patent for Global Earth Warming Mitigation
IERC a patent for Global Earth Warming MitigationIERC a patent for Global Earth Warming Mitigation
IERC a patent for Global Earth Warming Mitigation
Prof.Dr. Gamil Radwan
 
Xilinx Training in Phagwara Jalandhar
Xilinx Training in Phagwara JalandharXilinx Training in Phagwara Jalandhar
Xilinx Training in Phagwara Jalandhar
E2Matrix
 

Viewers also liked (12)

RaissAbinCV2
RaissAbinCV2RaissAbinCV2
RaissAbinCV2
 
Selected Work [Model Making]
Selected Work [Model Making]Selected Work [Model Making]
Selected Work [Model Making]
 
diploma_college
diploma_collegediploma_college
diploma_college
 
Naeleen's vaginal cleanse
Naeleen's vaginal cleanseNaeleen's vaginal cleanse
Naeleen's vaginal cleanse
 
diploma_master
diploma_masterdiploma_master
diploma_master
 
IERC a patent for Global Earth Warming Mitigation
IERC a patent for Global Earth Warming MitigationIERC a patent for Global Earth Warming Mitigation
IERC a patent for Global Earth Warming Mitigation
 
Estatuto servidor do maranhão
Estatuto servidor do maranhãoEstatuto servidor do maranhão
Estatuto servidor do maranhão
 
COMMUNIQUE DE PRESSE | Ambassade des Etats-Unis d’Amérique Bureau des Affair...
COMMUNIQUE DE PRESSE |  Ambassade des Etats-Unis d’Amérique Bureau des Affair...COMMUNIQUE DE PRESSE |  Ambassade des Etats-Unis d’Amérique Bureau des Affair...
COMMUNIQUE DE PRESSE | Ambassade des Etats-Unis d’Amérique Bureau des Affair...
 
[Baby marketees] Redo Big case - group 1
[Baby marketees] Redo Big case  - group 1[Baby marketees] Redo Big case  - group 1
[Baby marketees] Redo Big case - group 1
 
12 seven characteristics of living organism.yr7
12 seven characteristics of living organism.yr712 seven characteristics of living organism.yr7
12 seven characteristics of living organism.yr7
 
P.p.t for electricity and magnetism
P.p.t for electricity and magnetismP.p.t for electricity and magnetism
P.p.t for electricity and magnetism
 
Xilinx Training in Phagwara Jalandhar
Xilinx Training in Phagwara JalandharXilinx Training in Phagwara Jalandhar
Xilinx Training in Phagwara Jalandhar
 

Similar to LastNew CV

Similar to LastNew CV (20)

Khaled Hubaisheh Resume
Khaled Hubaisheh ResumeKhaled Hubaisheh Resume
Khaled Hubaisheh Resume
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
Jayson Oraa QAQC CV
Jayson Oraa QAQC CVJayson Oraa QAQC CV
Jayson Oraa QAQC CV
 
Project Manager CV -Rev
Project Manager CV -RevProject Manager CV -Rev
Project Manager CV -Rev
 
Josefino Waje cv 2
Josefino Waje cv 2Josefino Waje cv 2
Josefino Waje cv 2
 
MUHAMMAD ZEESHAN
MUHAMMAD ZEESHANMUHAMMAD ZEESHAN
MUHAMMAD ZEESHAN
 
CV Updated 2
CV Updated 2CV Updated 2
CV Updated 2
 
CV of Mohammad Khalid Perwez.
CV of Mohammad Khalid Perwez.CV of Mohammad Khalid Perwez.
CV of Mohammad Khalid Perwez.
 
Kaleemullah. cv
Kaleemullah. cvKaleemullah. cv
Kaleemullah. cv
 
Hafiz- resume
Hafiz- resumeHafiz- resume
Hafiz- resume
 
Azhar civil engr(cv)
Azhar civil engr(cv)Azhar civil engr(cv)
Azhar civil engr(cv)
 
25383_KHALED GHADBAN_SITE ENGINEER_302
25383_KHALED GHADBAN_SITE ENGINEER_30225383_KHALED GHADBAN_SITE ENGINEER_302
25383_KHALED GHADBAN_SITE ENGINEER_302
 
Updated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHUpdated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKH
 
Application and CV 2016 Latest 8-23-2016
Application and CV  2016 Latest 8-23-2016Application and CV  2016 Latest 8-23-2016
Application and CV 2016 Latest 8-23-2016
 
Sachin parab
Sachin parabSachin parab
Sachin parab
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
 
Engr. Sikandar_resume
Engr. Sikandar_resumeEngr. Sikandar_resume
Engr. Sikandar_resume
 
C.V. of Mohamed Sherif Hegazi
C.V. of Mohamed Sherif HegaziC.V. of Mohamed Sherif Hegazi
C.V. of Mohamed Sherif Hegazi
 
ARLIE LLUNAR-Projects Presentations
ARLIE LLUNAR-Projects PresentationsARLIE LLUNAR-Projects Presentations
ARLIE LLUNAR-Projects Presentations
 

LastNew CV

  • 1. MUSTAFA AHMED ALI INTRODUCTION I am a qualified Civil Engineer with more than Forty Years of experience in Engineering of Building Construction and Infrastructure projects in Construction Sectors. II aamm ffuullllyy ccoonnvveerrssaanntt wwiitthh aallll tthhee aassppeeccttss ooff CCiivviill EEnnggiinneeeerriinngg CCoonnssttrruuccttiioonn ffoolllloowweedd bbyy LLooccaall AAuutthhoorriittiieess aanndd CCoorrppoorraattiioonnss ssuucchh aass,, TTRRAAKKHHEEEESS,, DDEEWWAA,, FFEEWWAA,, NNAAKKHHEEEELL,, TTRRAANNSSCCOO eettcc,, HHaavvee ggoooodd kknnoowwlleeddggee wwiitthh BBSS,, AASSTTMM SSttaannddaarrddss, ACI, EN, CSI, ASSHTO , API, A A I, BOMI, and CESEM-3&4. LLooccaall SSttaannddaarrddss aanndd FFIIDDIICC CCoonnddiittiioonnss ooff CCoonnttrraacctt.. WWoorrkkeedd aatt UUAAEE :: AAbbuu DDhhaabbii ,, AAllaaiinn ,, BBeeddii ZZaayyeedd ,, AAll--RRwwaaiissee ,, AAll-- ssiillaa’’ ,, AAll--MMaarrffaa’’ ,, DDeellmmaa IIssllaanndd,, DDuubbaaii,, SShhaarrjjaahh .. NATIONALITY Palestinian EDUCATION Bachelor of Science in Civil Engineering (Sept 1965 to Jul 1970) Faculty of Engineering, Cairo University, Egypt PROFESSIONAL AFFLIATIONS  United Arab Emirates, Society of Engineers ( www.soeuae.com)  Jordan Engineers Association. ( www.jea.org.jo ) SOFTWARE SKILLS  Auto Cad ( Advance Level ).  Structural Design using: STAAD PRO, GTSTRUDL, SAP2000, PROKON, SAFE.  Microsoft Office ( Project, Word, Excel, Power Point ), Computer literacy.  PRIMAVERA 6 Planning and Scheduling.  Technical Document Register ( TDR ).  General Arrangement Drawings Preparation.  Internet ( Advanced Level ). BEHAVIORAL COMPETENCIES
  • 2.  Have Integrity, flexible and proactive.  Demonstrate ability to act independently as a part of a team.  Good report writing skills, experience of making presentations to and attending the meetings with the clients.  Good team player, able to communicate effectively with colleagues and co-operative.  Drive continuously to develop technical and behavioral skills.  Hear from other colleagues and effectively discuss to reach the right decision. PROFESSIONAL BACKGOUND Shadid Engineering Consultants, Dubai, ( Oct.2014 till date ) (www.shadid-sec.com Material Civil Engineer.  Review and Approve Material Submittals.  Receive Testing Requests as in approved ITP , lead testing procedures and provide necessary remarks.  Check and Inspect storage areas to make sure that all materials are stored as per specification.  Check storage areas for safety and security and material protection from adverse weather conditions.  Check material sources and place of manufactures if necessary to assure compliance with approved submittal.  Check materials in storage areas and before installations if they comply with approved submittals.  Audit the test results and make comments if the material is achieving the correct criteria and limits of properties as specified.  Check materials on site when required in interim payment and confirm the quantity claimed. .  Issue instructions to Contractor in case of rejection or Non Conformance Reports.  Monitor MIR submitted by Contractor on delivery and follow up and issue NCR if not complied with specifications or approved Material Submittal.  Check for Authorities Regulations, Requirements to be adhered to in case of any materials are subject to be approved from :TRAKHEES , JAFZA , DEWA , DIC , DU. DM  Attend for factory inspection where required by and the Contract Documents.  Coordinate the preparation of Purchase Requisitions for the procurement of equipment and materials.  Ensure materials are obtained within scheduled timeframes and budgeted costs.  PROJECTS / TASKS UNDERPROGRESS  Alfurjan Villas Jebel Ali Dubai Package 4 &6 Torishima Alain (Water Pump Station) Al-Ain – UAE. Jun. 2010 to Oct. 2011 ( www.torishima.co.jp ) Coordination Manager. (Jun. 2010 to Oct. 2011)  Coordinating whole project design between designer engineer and the Client.  Coordinating drawing preparation and review structural design of project elements.  Attend weekly meeting with staff for work done and forecasted.  Attend monthly meeting with Client, Subcontractors, and Designer.
  • 3.  Following the design criteria step by step and submitting for approval from Client for infrastructures and other project elements.  In addition, review and approve material submittals from sub-contractors and submit to Client for final approval via Consultant.  Interact with other discipline managers and engineers on a regular basis.  Supervise the review of design calculations, ensure vendor equipment specifications meet with Client equipment specifications and are within budgeted costs. PROJECTS / TASKS COMPLETED  Construction of Pump House for 9 Units Pumps , Electrical Building, Utility Building, Pipelines , Valves Chambers, Compressors Foundation, Water Quality Control Buildings, Drainage and Roads ( Turn Key Project Design & Construction and Commissioning ). At Al – Ain UAE. Shadid Engineering Consultants, Dubai, Sept. 2008 to Jun. 2010 (www.shadid-sec.com) Material Civil Engineer. ( Sept. 2008 to Jun. 2010 )  Review and Approve Material Submittals.  Receive Testing Requests as in approved ITP , lead testing procedures and provide necessary remarks.  Check and Inspect storage areas to make sure that all materials are stored as per specification.  Check storage areas for safety and security and material protection from adverse weather conditions.  Check material sources and place of manufactures if necessary to assure compliance with approved submittal.  Check materials in storage areas and before installations if they comply with approved submittals.  Audit the test results and make comments if the material is achieving the correct criteria and limits of properties as specified.  Check materials on site when required in interim payment and confirm the quantity claimed. .  Issue instructions to Contractor in case of rejection or Non Conformance Reports.  Monitor MIR submitted by Contractor on delivery and follow up and issue NCR if not complied with specifications or approved Material Submittal.  Check for Authorities Regulations, Requirements to be adhered to in case of any materials are subject to be approved from :TRAKHEES , JAFZA , DEWA , DIC , DU. DM  Attend for factory inspection where required by and the Contract Documents.  Coordinate the preparation of Purchase Requisitions for the procurement of equipment and materials.  Ensure materials are obtained within scheduled timeframes and budgeted costs. PROJECTS / TASKS COMPLETED  Alfurjan Villas Jebel Ali Dubai Package 1&2 Contracting Works and Maintenance ( Own Activities ) Dec. 2007 to Aug. 2008 Civil Maintenance Engineer ( Dec. 2007 to Aug. 2008 )
  • 4.  Maintenance for old high rise Buildings, MEP maintenance and additional Buildings construction. PROJECTS / TASKS COMPLETED  High rise Buildings and Villas maintenance and additional works. Ajman , Dubai ACE International Dubai - UAE. Jun. 2006 toNov. 2007 ( www.ace-intl.com ) Resident Engineer. (Jun. 2006 to Nov. 2007)  Review and approve Material Submittals, Documents Submittals, Working Shop Drawing Submittals, R.F.I and I.R Submittals, Soil Report Submittal, Progress Report Submittals, Test Inspection Report.  Review and approve Materials delivery on site.  Review and Approval of Method Statements for different activities.  Inspection Testing Plan checking.  Review Interim Payments, Variations, materials on site quality and quantity.  Review and approve program for time schedules submitted by the main Contractor.  Review Claims for time extension or additional works.  Interact with Quality Assurance for quality issues strictly ensure compliance with Company’s ISO Quality procedures.  Organize the preparation of topographic layouts, earthworks, execution drawings, boreholes locations, fencing, paved roads and drainage, underground piping and foundations, substation layouts, machinery shelters, service platforms, pipe racks, pump foundations, vessel and vessel platform foundations, columns and other civil/structural drawings.  Review contract requirements for project execution, organize the preparation of the Technical Document Register ( TDR ), identify requirements and scope of work; review specifications, Plot plans, General Arrangement ( GA ) drawings, Review Philosophies, Area Classification Drawings.  All Close Out activities, As Built Drawings, Testing and & Commissioning, submittal completion, NOCs status finalizing, Completion Certificates, and recommendation letters. PROJECTS / TASKS COMPLETED  Package # 12 of Internatinal City at Al- Warsan Dubai consisting of 38 residential multistory buildings consisting of residential apartments. ShadidEngineeringConsultants Abu Dhabi – UAE. Aug.2001toMay2006 (www.shadid-sec.com) ProjectManager (Aug.2001toMay2006)  Quality Assurance and Quality Control Systems for work and materials.  Supervising Static Load Pile Tests & Integrity piles tests and micro piles construction and tests.  Projects Planning / Control for Construction Supervision.  Preparation and Presentation Weekly and Monthly Reports to Project Management.
  • 5.  Chairing Weekly Progress Meetings with the Department Engineer in charge.  Implementation and Monitoring the Project Management.  Managing and Monitoring Construction Works Programs and Maintenance with Contractor.  Managing and Leading the Working Team in site.  Review and Approval of Method Statements for different activities.  Review Quantity Calculation for work done as a re-measuring contract with given unit prices.  Doing all correspondence to the Contractor like site instructions and NCRs.  Inspection materials delivered to site before installation and arrangement for material tests in PWD Labs.  Attend Technical Meetings invited by Public Work Department relating to the project.  Participate in discussing solutions for technical problems together with PWD and submitting reports. PROJECTS / TASKS COMPLETED  80 Nos. - Two Storied Villas Rehabilitation at New Shahama ( 40 Km from Abu Dhabi ). Quinger & Memar Consultants ADH– UAE. Jul. 1999 toAug. 2001 Project Manager. ( Jul. 1999 to Aug. 2001 )  Quality Assurance and Quality Control Systems for works, equipments and materials.  Projects Planning / Control for Construction Supervision.  Preparation and Presentation Weekly and Monthly Reports.  Chairing Weekly Progress Meetings with the Department Engineer in charge.  Implementation and Monitoring the Project Management.  Review and Monitoring Construction Works Programs.  Review of Materials submittals to meet specification requirements before submitting to the department for final approval.  Review of Shop Drawings, and final As - Built Drawings.  Handing over the Project and follow up snag list. PROJECTS / TASKS COMPLETED  40 Nos. - Two Storied Villas. At Al-Ain Al – Yahar Planning Department AbuDhabi – UAE. Jun. 1990 toJun. 1999 (www.ded.abudhabi.ae) Senior Civil Engineer. ( Jun. 1990 to Jun. 1999 )  Assessment and Evaluation of Consultant Firms Documents and Experience for Registration in the Department issuing Registration Certificates.  Construction Contractors Classification in Different Fields according to their experience and projects done, issuing Classification Certificates.
  • 6.  Right Selection of Competent Professional Consultant to quote for Government Listed Projects for Design and or Supervision depending on their experience and projects done. PROJECTS / TASKS COMPLETED  Suggestions in regulations for consultant registry in Planning Department Abu Dhabi.  Improvement to the registration system and modification to some items. Al - Musalla Contracting & Building Maintenance Dubai – UAE. Mar. 1989 to Apr. 1990 General Maintenance Engineer. ( Mar. 1989 to Apr. 1990 )  General maintenance for Buildings and Villas, yearly based contracts.  Construction of additional works inside Villas, Demolishing and Reconstructing.  Quantity Surveying and Cost Evaluation for items of relevant works.  Pricing for small projects ( maintenance or additional works ). PROJECTS / TASKS COMPLETED  Construction of Additional Rooms and Facilities inside existing villas Dubai.  General Maintenance for High Rise Residential Buildings & Villas and Apartments Dubai. MetalcoAl- Ain – UAE. Sep. 1986 to Feb. 1989 Project Manager. ( Sep. 1986 to Feb. 1989 )  Construction of Steel Roof Trusses with Sandwich Aluminum Profiles, of 30 ms span triangular N - Truss, with decorative Burma Teak wood false ceiling with Central A/C.  Rehabilitation of Facility Units inside the 2nd Regiment Alain.  Renew of the Water Nets inside.  Construction of the Boundary Wall around the Regiment.  Sidewalks Paving interlocking tiles work and Landscaping.  Leading construction superintendence team.  Contract administration control for this Lump Sum Contract.  Controlling the Contractor Detailed Time Schedules.  Material submittals approvals from Defense Al- Ain , delivery control, installation inspection, testing and commissioning.  Project Quality Management.  Preparing the Interim Payments.  Project Closeout with Authorities ( Defense Abu Dhabi ).  Implementing the Q.A system on sites.  Establishing the project Quality Control Plans.  Preparing Claims for Variation. ( Additions and Omissions ) for approval. PROJECTS / TASKS COMPLETED
  • 7.  Multipurpose Project for Defense. EC / 738. Al – Ain Arab Experts Consultant Dubai / AbuDhabi – UAE. Mar. 1983 to Aug. 1986 Resident Engineer. ( Mar. 1983 to Aug. 1986 )  Controlling the contractor detailed time schedules.  Material approvals, delivery control, installation inspection.  Testing & Commissioning.  Project quality Management.  Review and Approval of Method Statements for different activities.  Project closeout and handing over.  Structural Design of the Al- Ittihad Magazine Press Abu Dhabi affiliating with WS Atkins & Partners Overseas. PROJECTS / TASKS COMPLETED  Al- Marfaa Low Cost House Villas 40 nos. ( Supervision ).  Al- Marfaa Municipality Building. (Supervision).  Bedi Zayed Municipality Buildings-Drainage Labor Accommodations- ( Supervision ).  Delma Island Municipality Buildings- Shops & Residential Apartments - ( Supervision ).  Abu Dhabi for Al- Ittihad Magazine Press. ( Structural Design Support & Supervision )-sharing with WS Atkins & Partners Overseas Structural Design. Dar Al - HandasahConsultants, Yemen. Aug. 1977 toAug. 1982 Project Manager. ( Aug. 1977 to Aug. 1982 )  Leading a team of Engineers, site inspectors and land surveyors.  Supervising the construction of the Power House , Fish Meal Plant, and water tanks .  Material approvals, delivery control, installation inspection.  Review of Steel Bars Schedule for R.C Bridges.  Review and Approval of Method Statements for different activities.  Checking Inspection & Test Plan control.  Shop & As Built Drawings Review.  Following up snag list.  Prerequisites for Project Handing Over. PROJECTS / TASKS COMPLETED  Water Supply Network Sana’a Yemen. ( Cost Plus Contract )
  • 8.  Irrigation Project Aden Abyan Ja’ar including regulators, bridge crossing, channels and reclamation.  Fishmeal Plant Almukalla Yemen .  Fishing Marina Almukalla Yemen for Fish Meal Plant.  Power Plant Almukalla Yemen 3 Deutz Units . General Company for Educational Buildings Tripoli - Libya Oct. 1976 toJuly 1977 Site Civil Engineer. ( Oct. 1976 to July 1977 )  Construction of Two typical Institutes of 4 stories with Student accommodation.  Sub - Contractors Control & liaison for miscellaneous items of works.  Material Delivery to site & submittal to Ministry Engineer for approval. , Site Control, Safety & Security Control.  Preparing the Program Construction Schedule ( Bar Chart Schedule ).  Preparing Method Statements for Civil Works and submitting to the Client.  Preparing the Monthly Progress Report.  Preparing Interim Payments for Works.  Finishing outstanding works up to handing over.  Testing & Commissioning for purpose of Handing over. PROJECTS / TASKS COMPLETED  Two similar Educational Institutes at Al - zawiah & Tajoura-Libya. Tarhuna Municipality Tarhuna – Libya. May 1973 to Sep. 1976 Civil Municipal Engineer. ( May 1973 to Sep. 1976 )  Design & Supervising the Construction of the Road Works including R. C Bridges and crossing valleys, Asphalt Pavements. Street Lighting , Public Garden , Water Pipelines Supply for Surrounding Villages , A small Market , Separate shops , Solid waste Disposal with 70 ton weigh - bridge .  Engineering Supervision for Tarhuna City Drainage System & Sewage Treatment Plant designed by Ministry of Infrastructures Tripoli , Three Islamic Butcheries , The New Municipality Building of 3 stories , Water Supply Pump Stations in the adjacent Villages of Tarhuna City , Elevated R.C Water Tank 200 Cubic Meters . Al Ma’adi General Enterprise TradingCompany Cairo - Egypt July 1970 toApr. 1973 Site Civil Engineer. ( July 1970 to Apr. 1973 )  Supervising the construction of Civil Works with other Civil Engineers.  Sub - Contractors control.
  • 9.  Construction Program Preparation ( Bar Chart ).  Controlling materials delivered to site and choosing the appropriate storage areas.  Quality Control, Test & Inspection Plan & Site Safety.  Attend R.C cube tests.  Preparing Interim Payments. PROJECTS / TASKS COMPLETED  Residential Buildings Construction Al – Maadi Egypt.  Relevant Infrastructure for this project ( Roads , Drainage , Domestic Connections, Water Main Supply …etc . ).