1. Scope
2. Health Hazards and Safety Measures
3. Codes and Standards
4. General requirements
5. Site Preparation
6. Materials
7. Mode of Application and Rate of Application
8. Treatment for Masonry Foundations & Basement
9. Treatment for RCC Foundation & Basement
10.Junction of Walls and Floors
11.Precautions During and After Treatment
12.Mode of Measurement
List of Contents
1. All chemical used for anti-termite treatment are poisonous and hazardous
to health.
2. Keep the containers closed and secured.
3. Wear protective clothing while handling the chemicals.
4. Avoid flames in the vicinity during mixing.
5. Never allow treatment chemicals to contaminate sources of drinking water.
6. Follow instructions provided by the manufacturer in the MSDS ( Material
Safety Data Sheet ).
7. In case of poisoning take remedial measures according to the MSDS
provided by the manufacturer and as per IS 4015.
2. Health Hazards and Safety Measures
Anti-Termite Treatment
1. Scope
How to Carry out of Pre-Constructional Anti-Termite
Chemical Treatment for the Building.

3. IS 6313 Part 3 – Treatment for Existing Buildings
2. IS 6313 Part 2 – Pre-Constructional Anti-Termite Measures in Buildings
1. IS 6313 Part 1 – Constructional Measures
IS 6313 - Code of practice for anti-termite measures in buildings.
3. Codes & Standards
Anti-Termite Treatment
This Presentation is Specific to IS 6313 Part 2

4. Submit Material Specification and MSDS to EIC before start of work
3. Follow Indian Standard Safety Code and Site Specific Safety rules
2. Anti-termite treatment should be carried out in the early stages of
construction of buildings:- Start from substructure and up to plinth
level.
1. Anti-termite treatment is a specialist job: Use only specialized
agencies for carrying out anti-termite treatment preferably a member
of Indian Pest Control Association.
4. General Requirements
Anti-Termite Treatment
1. Remove all organic matter, construction debris, rubbish etc.
2. Water logged foundations shall be treated after drying when the soil is
absorbent.
3. For low penetration and slopping sites, surface to be scarified 75mm
depth.
4. Complete all cutting, excavation, leveling & grading before starting
treatment .
5. Site Preparation
Anti-Termite Treatment
1. Chloropyriphos 20% EC bearing ISI certification .
2. Dilute 1 part of Chloropyriphos 20% EC with 19 part of water to get 1%
emulsion.
3. Indian pest control association approved chemical shall be used.
4. Contractor shall submit purchase vouchers to EIC for verification.
6. Materials
Anti-Termite Treatment
1. Chemical emulsion should be applied uniformly by sprayers.
2. Specified rates should be applied at each stages of treatment.
3. Pressure pumps and sprayers of adequate capacity shall be used for proper
penetration of chemical.
7. Mode of Application and Rate of Application
Anti-Termite Treatment

1. Foundations shall be completely
enveloped with chemical barrier.
2. Treatment shall be from sub
structure to plinth surface
3. Apply emulsion @ 5 Ltrs/ Sqm
for normal load bearing
structures
4. Vertical surfaces @ 7.50
Ltrs/Sqm.
Legend
A - Bottom and sides of trench
B - Backfill in immediate contact
with foundation wall
C - Junction of wall and floor
D- External perimeter of building
8. Treatment for Masonry Foundations & Basement
Anti-Termite Treatment
7.50
Ltrs/Sqm
5
Ltrs/Sqm

Treatment in Foundation Trenches:
 In case of normal wall load bearing structures, columns
pits, wall trenches and basement, the treatment shall be at 5
litres/sqm. or surface area of the bottom and sides to a
height of at least 300mm.
 After the foundation work, the sides shall be treated at 7.5
litres/sqm. of vertical surface of substructure on each side.
 After the earth filling is done, treatment shall be done by
rodding the earth at 150mm centres close to wall surface
and spraying the chemical with the above dose i.e. 7.5
litres/sqm.
 In case of framed structure, the treatment shall start at a
depth of 500mm below ground level. From this depth the
backfill around the columns, beams and R.C.C. basement
walls shall be treated at 7.5 litres / sqm. of the vertical and
at 5 litres / sqm. for the horizontal surface at the bottom in
the trenches / pits.

9. Treatment for RCC Foundations & Basement
1. Treatment shall start at a depth of 500
mm below the ground level/FML.
2. Apply emulsion for vertical surfaces @
7.50 Ltrs/Sqm.
Legend
A - Min 500 mm below ground level/FML
B - Plinth Filling
D- FML to Grade Beam top
E - FFL to Plinth beam top
NGL - Natural Ground Level
FML - Formation Level
500 mm
below
NGL/FML
7.50
Ltrs/Sqm
Anti-Termite Treatment

11. Junction of the Wall and Floors
Anti-Termite Treatment
1. Continuity of vertical chemical barrier on inner wall surface from ground level
to finished floor level is required.
2. Treatment shall be carried out by
i. Placing a channel of 30x30 mm at all junctions of wall and columns with
floor before sub grade is laid.
ii. Make holes using 12 mm dia rod@ 150mm c/c and breakup the earth up
to ground level.
iii. Pour chemical emulsion into the holes @ 7.5 Lit/Sqm.
iv. Tamp back the soil into the channel and consolidate the earth.

1. Care to ensure that the chemical barrier is
complete and continuous.
2. The treatment shall not be carried out
when it is raining or when the soil is wet.
3. Treated soil surface shall not be
disturbed.
4. Take immediate steps to restore the
continuity and completeness of the barrier
system if treated soil gets disturbed.
18. Precautions During and After Treatment
Anti-Termite Treatment
SPRAYING EQUIPMENT
•A pressure pump shall be used to carry out spraying operations to facilitate proper
penetration of chemical into the earth.
The chemicals, concentration and dosage for horizontal and vertical surfaces are based
on the IS code of practice for Anti-termite measures in Buildings. IS 6313 (Part-II).
PRECAUTIONS DURING MONSOON
•No spraying shall be carried out when it rains. Treatment should be repeated in plinth
areas if it rains immediately after a spraying operation and before the emulsion has
soaked into the soil.

1. Measurement shall be made in Sq.mtr on the basis of plinth area of the
building.
20. Mode of Measurement
Anti-Termite Treatment
1. Rate includes the cost of materials, labour and all tools, plants, sprayers
and safety equipments required for complete operation.

More Related Content

What's hot

28 edge protection to open edges, shafts and risers risk assessment templates
28 edge protection to open edges, shafts and risers risk assessment templates28 edge protection to open edges, shafts and risers risk assessment templates
28 edge protection to open edges, shafts and risers risk assessment templates
Dwarika Bhushan Sharma
 
Aramco safety interview Questions .pdf
Aramco safety interview Questions .pdfAramco safety interview Questions .pdf
Aramco safety interview Questions .pdf
jnanamaya Basu
 
December -15 Daily Observation Report
December -15 Daily Observation ReportDecember -15 Daily Observation Report
December -15 Daily Observation Report
Mohammed Mubasheeruddin
 
072 Method Statement
072 Method Statement072 Method Statement
072 Method Statement
Dr Fereidoun Dejahang
 
Report on excavation
Report on excavationReport on excavation
Report on excavation
Er.Amrut Shipekar
 
Safety during construction
Safety during construction Safety during construction
Safety during construction
BHAGWAN PRASAD
 
Duties lifting supervisors
Duties lifting supervisorsDuties lifting supervisors
Duties lifting supervisors
HASNIZAM BIN MD SAAD
 
Factories and Machinery Act (BOWEC)
Factories and Machinery Act (BOWEC)Factories and Machinery Act (BOWEC)
Factories and Machinery Act (BOWEC)
Abirami V Veeramani
 
bar bending safety precautions.pdf
bar bending safety precautions.pdfbar bending safety precautions.pdf
bar bending safety precautions.pdf
construction
 
Anti termite treatment in foundation
Anti termite treatment in foundationAnti termite treatment in foundation
Amn safety induction j 175 - staff rev 4 - s 14
Amn safety induction  j 175 - staff rev 4 - s 14Amn safety induction  j 175 - staff rev 4 - s 14
Amn safety induction j 175 - staff rev 4 - s 14
Mumtaz A. Khan CMIOSH, IDipNEBOSH
 
Erection method statement
Erection method statementErection method statement
Erection method statement
kanalbiru
 
10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates
Dwarika Bhushan Sharma
 
METHOD STATEMENT
METHOD STATEMENTMETHOD STATEMENT
METHOD STATEMENT
Welekemah Bindah
 
11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates
Dwarika Bhushan Sharma
 
Method of Statement - Pavement works
Method of Statement - Pavement worksMethod of Statement - Pavement works
Method of Statement - Pavement works
Mohd Nizam Mohd Zan
 
Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.
maqsood1459
 
Method statement for expansion joint
Method statement for expansion jointMethod statement for expansion joint
Method statement for expansion joint
akash yadav
 
Construction safety
Construction  safetyConstruction  safety
Construction safety
Ranty Poddar
 
Excavation safety
Excavation safetyExcavation safety
Excavation safety
Osho Shemil Baba
 

What's hot (20)

28 edge protection to open edges, shafts and risers risk assessment templates
28 edge protection to open edges, shafts and risers risk assessment templates28 edge protection to open edges, shafts and risers risk assessment templates
28 edge protection to open edges, shafts and risers risk assessment templates
 
Aramco safety interview Questions .pdf
Aramco safety interview Questions .pdfAramco safety interview Questions .pdf
Aramco safety interview Questions .pdf
 
December -15 Daily Observation Report
December -15 Daily Observation ReportDecember -15 Daily Observation Report
December -15 Daily Observation Report
 
072 Method Statement
072 Method Statement072 Method Statement
072 Method Statement
 
Report on excavation
Report on excavationReport on excavation
Report on excavation
 
Safety during construction
Safety during construction Safety during construction
Safety during construction
 
Duties lifting supervisors
Duties lifting supervisorsDuties lifting supervisors
Duties lifting supervisors
 
Factories and Machinery Act (BOWEC)
Factories and Machinery Act (BOWEC)Factories and Machinery Act (BOWEC)
Factories and Machinery Act (BOWEC)
 
bar bending safety precautions.pdf
bar bending safety precautions.pdfbar bending safety precautions.pdf
bar bending safety precautions.pdf
 
Anti termite treatment in foundation
Anti termite treatment in foundationAnti termite treatment in foundation
Anti termite treatment in foundation
 
Amn safety induction j 175 - staff rev 4 - s 14
Amn safety induction  j 175 - staff rev 4 - s 14Amn safety induction  j 175 - staff rev 4 - s 14
Amn safety induction j 175 - staff rev 4 - s 14
 
Erection method statement
Erection method statementErection method statement
Erection method statement
 
10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates
 
METHOD STATEMENT
METHOD STATEMENTMETHOD STATEMENT
METHOD STATEMENT
 
11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates11 piling operations with rebar cage installation risk assessment templates
11 piling operations with rebar cage installation risk assessment templates
 
Method of Statement - Pavement works
Method of Statement - Pavement worksMethod of Statement - Pavement works
Method of Statement - Pavement works
 
Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.
 
Method statement for expansion joint
Method statement for expansion jointMethod statement for expansion joint
Method statement for expansion joint
 
Construction safety
Construction  safetyConstruction  safety
Construction safety
 
Excavation safety
Excavation safetyExcavation safety
Excavation safety
 

Similar to Anti termite treatment

03 anti-termite treatment
03 anti-termite treatment03 anti-termite treatment
03 anti-termite treatment
Design Construction
 
Anti termite
Anti termiteAnti termite
Anti termite
Ninie KelanThai
 
Control on termites (white ants)in buildings
Control on termites (white ants)in buildingsControl on termites (white ants)in buildings
Control on termites (white ants)in buildings
GOVERNMENT ENGINEERING COLLAGE DAHOD
 
TERMITES CONTROL SERVICES IN KENYA
TERMITES CONTROL SERVICES IN KENYATERMITES CONTROL SERVICES IN KENYA
TERMITES CONTROL SERVICES IN KENYA
https://www.jopestkil.com/
 
Special Treatments for Building construction
Special Treatments for Building construction Special Treatments for Building construction
Special Treatments for Building construction
Er.Karan Chauhan
 
Special Treatments required for building construction
Special Treatments required for building constructionSpecial Treatments required for building construction
Special Treatments required for building construction
UjasPandya2
 
CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...
CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...
CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...
musadoto
 
Enlio Sports Flooring installation
Enlio Sports Flooring installationEnlio Sports Flooring installation
Enlio Sports Flooring installation
Feng Jack
 
ioc_2
ioc_2ioc_2
Pamphlet on Anti Termite Treatment.pdf
Pamphlet on Anti Termite Treatment.pdfPamphlet on Anti Termite Treatment.pdf
Pamphlet on Anti Termite Treatment.pdf
panchalt755
 
A Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment BuildingA Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment Building
IRJET Journal
 
Introduction to linings
Introduction to liningsIntroduction to linings
Introduction to linings
International Paint
 
RIW Cementflex Datasheet
RIW Cementflex DatasheetRIW Cementflex Datasheet
RIW Cementflex Datasheet
RIW Ltd
 
Column & beam
Column & beamColumn & beam
Column & beam
Minh Bui Si
 
Epoxy Flooring Procedure
Epoxy Flooring ProcedureEpoxy Flooring Procedure
Epoxy Flooring Procedure
Kalpesh Satpute
 
Epoxy Flooring
Epoxy FlooringEpoxy Flooring
Epoxy Flooring
Kalpesh Satpute
 
Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...
Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...
Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...
Kiran Shinde
 
sample.pptx
sample.pptxsample.pptx
sample.pptx
HirenThakkar31
 
Method statement honycomb repairing
Method statement  honycomb repairingMethod statement  honycomb repairing
Method statement honycomb repairing
Bharatha Rathnayke
 
GOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptxGOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptx
HirenThakkar31
 

Similar to Anti termite treatment (20)

03 anti-termite treatment
03 anti-termite treatment03 anti-termite treatment
03 anti-termite treatment
 
Anti termite
Anti termiteAnti termite
Anti termite
 
Control on termites (white ants)in buildings
Control on termites (white ants)in buildingsControl on termites (white ants)in buildings
Control on termites (white ants)in buildings
 
TERMITES CONTROL SERVICES IN KENYA
TERMITES CONTROL SERVICES IN KENYATERMITES CONTROL SERVICES IN KENYA
TERMITES CONTROL SERVICES IN KENYA
 
Special Treatments for Building construction
Special Treatments for Building construction Special Treatments for Building construction
Special Treatments for Building construction
 
Special Treatments required for building construction
Special Treatments required for building constructionSpecial Treatments required for building construction
Special Treatments required for building construction
 
CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...
CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...
CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...
 
Enlio Sports Flooring installation
Enlio Sports Flooring installationEnlio Sports Flooring installation
Enlio Sports Flooring installation
 
ioc_2
ioc_2ioc_2
ioc_2
 
Pamphlet on Anti Termite Treatment.pdf
Pamphlet on Anti Termite Treatment.pdfPamphlet on Anti Termite Treatment.pdf
Pamphlet on Anti Termite Treatment.pdf
 
A Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment BuildingA Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment Building
 
Introduction to linings
Introduction to liningsIntroduction to linings
Introduction to linings
 
RIW Cementflex Datasheet
RIW Cementflex DatasheetRIW Cementflex Datasheet
RIW Cementflex Datasheet
 
Column & beam
Column & beamColumn & beam
Column & beam
 
Epoxy Flooring Procedure
Epoxy Flooring ProcedureEpoxy Flooring Procedure
Epoxy Flooring Procedure
 
Epoxy Flooring
Epoxy FlooringEpoxy Flooring
Epoxy Flooring
 
Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...
Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...
Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...
 
sample.pptx
sample.pptxsample.pptx
sample.pptx
 
Method statement honycomb repairing
Method statement  honycomb repairingMethod statement  honycomb repairing
Method statement honycomb repairing
 
GOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptxGOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptx
 

Recently uploaded

Presentation on Food Delivery Systems
Presentation on Food Delivery SystemsPresentation on Food Delivery Systems
Presentation on Food Delivery Systems
Abdullah Al Noman
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
paraasingh12 #V08
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
PreethaV16
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
nedcocy
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
aryanpankaj78
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
harshapolam10
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
Pallavi Sharma
 
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Levelised Cost of Hydrogen  (LCOH) Calculator ManualLevelised Cost of Hydrogen  (LCOH) Calculator Manual
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Massimo Talia
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
Kamal Acharya
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
MadhavJungKarki
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
Kamal Acharya
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
upoux
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
upoux
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
Indrajeet sahu
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Balvir Singh
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 

Recently uploaded (20)

Presentation on Food Delivery Systems
Presentation on Food Delivery SystemsPresentation on Food Delivery Systems
Presentation on Food Delivery Systems
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
 
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Levelised Cost of Hydrogen  (LCOH) Calculator ManualLevelised Cost of Hydrogen  (LCOH) Calculator Manual
Levelised Cost of Hydrogen (LCOH) Calculator Manual
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 

Anti termite treatment

  • 2.  Anti-Termite Treatment 1. Scope 2. Health Hazards and Safety Measures 3. Codes and Standards 4. General requirements 5. Site Preparation 6. Materials 7. Mode of Application and Rate of Application 8. Treatment for Masonry Foundations & Basement 9. Treatment for RCC Foundation & Basement 10.Junction of Walls and Floors 11.Precautions During and After Treatment 12.Mode of Measurement List of Contents
  • 3. 1. All chemical used for anti-termite treatment are poisonous and hazardous to health. 2. Keep the containers closed and secured. 3. Wear protective clothing while handling the chemicals. 4. Avoid flames in the vicinity during mixing. 5. Never allow treatment chemicals to contaminate sources of drinking water. 6. Follow instructions provided by the manufacturer in the MSDS ( Material Safety Data Sheet ). 7. In case of poisoning take remedial measures according to the MSDS provided by the manufacturer and as per IS 4015. 2. Health Hazards and Safety Measures Anti-Termite Treatment 1. Scope How to Carry out of Pre-Constructional Anti-Termite Chemical Treatment for the Building.
  • 4.  3. IS 6313 Part 3 – Treatment for Existing Buildings 2. IS 6313 Part 2 – Pre-Constructional Anti-Termite Measures in Buildings 1. IS 6313 Part 1 – Constructional Measures IS 6313 - Code of practice for anti-termite measures in buildings. 3. Codes & Standards Anti-Termite Treatment This Presentation is Specific to IS 6313 Part 2
  • 5.  4. Submit Material Specification and MSDS to EIC before start of work 3. Follow Indian Standard Safety Code and Site Specific Safety rules 2. Anti-termite treatment should be carried out in the early stages of construction of buildings:- Start from substructure and up to plinth level. 1. Anti-termite treatment is a specialist job: Use only specialized agencies for carrying out anti-termite treatment preferably a member of Indian Pest Control Association. 4. General Requirements Anti-Termite Treatment
  • 6. 1. Remove all organic matter, construction debris, rubbish etc. 2. Water logged foundations shall be treated after drying when the soil is absorbent. 3. For low penetration and slopping sites, surface to be scarified 75mm depth. 4. Complete all cutting, excavation, leveling & grading before starting treatment . 5. Site Preparation Anti-Termite Treatment
  • 7. 1. Chloropyriphos 20% EC bearing ISI certification . 2. Dilute 1 part of Chloropyriphos 20% EC with 19 part of water to get 1% emulsion. 3. Indian pest control association approved chemical shall be used. 4. Contractor shall submit purchase vouchers to EIC for verification. 6. Materials Anti-Termite Treatment
  • 8. 1. Chemical emulsion should be applied uniformly by sprayers. 2. Specified rates should be applied at each stages of treatment. 3. Pressure pumps and sprayers of adequate capacity shall be used for proper penetration of chemical. 7. Mode of Application and Rate of Application Anti-Termite Treatment
  • 9.  1. Foundations shall be completely enveloped with chemical barrier. 2. Treatment shall be from sub structure to plinth surface 3. Apply emulsion @ 5 Ltrs/ Sqm for normal load bearing structures 4. Vertical surfaces @ 7.50 Ltrs/Sqm. Legend A - Bottom and sides of trench B - Backfill in immediate contact with foundation wall C - Junction of wall and floor D- External perimeter of building 8. Treatment for Masonry Foundations & Basement Anti-Termite Treatment 7.50 Ltrs/Sqm 5 Ltrs/Sqm
  • 10.  Treatment in Foundation Trenches:  In case of normal wall load bearing structures, columns pits, wall trenches and basement, the treatment shall be at 5 litres/sqm. or surface area of the bottom and sides to a height of at least 300mm.  After the foundation work, the sides shall be treated at 7.5 litres/sqm. of vertical surface of substructure on each side.  After the earth filling is done, treatment shall be done by rodding the earth at 150mm centres close to wall surface and spraying the chemical with the above dose i.e. 7.5 litres/sqm.  In case of framed structure, the treatment shall start at a depth of 500mm below ground level. From this depth the backfill around the columns, beams and R.C.C. basement walls shall be treated at 7.5 litres / sqm. of the vertical and at 5 litres / sqm. for the horizontal surface at the bottom in the trenches / pits.
  • 11.  9. Treatment for RCC Foundations & Basement 1. Treatment shall start at a depth of 500 mm below the ground level/FML. 2. Apply emulsion for vertical surfaces @ 7.50 Ltrs/Sqm. Legend A - Min 500 mm below ground level/FML B - Plinth Filling D- FML to Grade Beam top E - FFL to Plinth beam top NGL - Natural Ground Level FML - Formation Level 500 mm below NGL/FML 7.50 Ltrs/Sqm Anti-Termite Treatment
  • 12.  11. Junction of the Wall and Floors Anti-Termite Treatment 1. Continuity of vertical chemical barrier on inner wall surface from ground level to finished floor level is required. 2. Treatment shall be carried out by i. Placing a channel of 30x30 mm at all junctions of wall and columns with floor before sub grade is laid. ii. Make holes using 12 mm dia rod@ 150mm c/c and breakup the earth up to ground level. iii. Pour chemical emulsion into the holes @ 7.5 Lit/Sqm. iv. Tamp back the soil into the channel and consolidate the earth.
  • 13.  1. Care to ensure that the chemical barrier is complete and continuous. 2. The treatment shall not be carried out when it is raining or when the soil is wet. 3. Treated soil surface shall not be disturbed. 4. Take immediate steps to restore the continuity and completeness of the barrier system if treated soil gets disturbed. 18. Precautions During and After Treatment Anti-Termite Treatment SPRAYING EQUIPMENT •A pressure pump shall be used to carry out spraying operations to facilitate proper penetration of chemical into the earth. The chemicals, concentration and dosage for horizontal and vertical surfaces are based on the IS code of practice for Anti-termite measures in Buildings. IS 6313 (Part-II). PRECAUTIONS DURING MONSOON •No spraying shall be carried out when it rains. Treatment should be repeated in plinth areas if it rains immediately after a spraying operation and before the emulsion has soaked into the soil.