Anomaly Detection using
Deep Auto-Encoders
GIANMARIO SPACAGNA
DATA SCIENCE MILAN - 18/05/2017
What you will (briefly) learn
▶ What is an anomaly (and an outlier)
▶ Popular techniques used in shallow machine
learning
▶ Why deep learning can make the difference
▶ Anomaly detection using deep auto—
encoders
▶ H2O overview
▶ ECG pulse detection PoC example
1. Machine Learning – An
Introduction
2. Neural Networks
3. Deep Learning
Fundamentals
4. Unsupervised Feature
Learning
5. Image Recognition
6. Recurrent Neural Networks
and Languages Models
7. Deep Learning for Board
Games
8. Deep Learning for
Computer Games
9. Anomaly Detection
10.Building a Production-ready
Intrusion Detection System
Why this use case?
▶ Anomaly detection is crucial to many business
applications
▶ Smart feature representation => better anomaly detection
▶ Deep Learning works very well on learning relationships in
the underlying raw data
(will see how…)
Outlier vs Anomaly
“An outlier is a legitimate data point that’s far
away from the mean or median in a distribution. It
may be unusual, like a 9.6-second 100-meter dash,
but still within the realm of reality. An anomaly is an
illegitimate data point that’s generated by a
different process than whatever generated the
rest of the data.”
Ravi Parikh
http://data.heapanalytics.com/garbage-in-garbage-out-how-anomalies-
can-wreck-your-data
Data modeling
▶ Point anomaly
(e.g. black sheep)
■ Contextual
anomaly
(e.g. selling ice-
creams in
January)
■ Collective
anomaly
(e.g. sequence of
suspected credit
card activities)
Detection modeling (and its
limitations)
▶ Supervised (classification)
▶ Data skewness, lack of
counter examples
▶ Unsupervised (clustering)
▶ Curse of dimensionality
▶ Semi-supervised
(novelty detection)
▶ Require a “normal” training
dataset
Real world applications
▶ Manufacturing => hardware faults
▶ Law-enforcement => reveal criminal activities
▶ Network system => detect intrusions or anomalous
behaviors
▶ Internet Security => malware detection
▶ Financial services => frauds
▶ Marketing / business strategy => spotting profitable
customers
▶ Healthcare => Medical diagnosis
What’s the challenge?
“Coming up with features is difficult, time-
consuming, requires expert knowledge.
When working applications of learning, we
spend a lot of time tuning features.“
Andrew Ng, Machine Learning and AI via Brain simulations, Stanford
University
Hierarchical Feature Learning
NVIDIA Deep Learning Course: Class #1 – Introduction to Deep Learning
https://www.youtube.com/watch?v=6eBpjEdgSm0
Structural representation
Advanced Topics, http://slideplayer.com/slide/3471890/
Signal propagation
Schematic diagram of back-propagation neural networks with two hidden layers.
Factor selection for delay analysis using Knowledge Discovery in Databases
Auto-encoders
• Signal propagation output: approximate an identity function
• Error back propagation: Mean Squared Error MSE (*)
between the original datum and the reconstructed one
(*) in case of numerical data
Novelty detection using auto-encoders
1. Identify a training dataset of what is considered “normal”
2. Learn what “normal” means, aka. learn the structures of normal
behavior
3. Try to reconstruct never-seen points re-using the same structure, if the
error is high means the point deviates from the normal distribution
TRAIN
Auto-
Encoder
RECONSTRUCT Low
error
RECONSTRUCT High
error
Features compression
■ Use just the encoder to compress data
into a reduced dimensional space then
use traditional unsupervised learning
Tom Mitchell’s example of an auto-encoder:
You can represent any combination of the 8 binary inputs using only 3 decimal
values
PoC examples
▶ ECG Anomaly Pulse Detection
▶ MNIST Anomaly Digit Recognition
(Optional)
▶ Jupyter notebooks available on
https://github.com/packtmayur/Python-
Deep-Learning/tree/master/chapter_9
Summary
▶ We listed a few real-world applications of anomaly
detection
▶ We covered some of the most popular techniques in
the literature with their limitations
▶ We proposed an overview of how deep neural
networks work and why they are great for learning
smart feature representations
▶ We proposed 2 semi-supervised approaches using
deep auto-encoders:
▶ Novel detection
▶ Feature compression
Going deeper
▶ Advanced modeling:
▶ Denoising auto-encoders
▶ Contractive auto-encoders
▶ Sparse auto-encoders
▶ Variational auto-encoders (for better novelty detection)
▶ Stacked auto-encoders (for better feature compression)
▶ Building a production-ready intrusion detection system:
▶ Validating and testing with labels and in absence of ground truth
▶ Evaluation KPIs for anomaly detection
▶ A/B(C/D) testing
E-book discount
▶ Use the code KVGRSF30
and get 30% discount on e-
book
▶ Only valid for 500 uses
until 31st October, 2017
▶ https://www.packtpub.com/b
ig-data-and-business-
intelligence/python-deep-
learning
"Data scientists realize that their best days
coincide with discovery of truly odd features in
the data."
Haystacks and Needles: Anomaly Detection By:
Gerhard Pilcher & Kenny Darrell, Data Mining
Analyst, Elder Research, Inc.
Deep Neural networks

Anomaly Detection using Deep Auto-Encoders | Gianmario Spacagna

  • 1.
    Anomaly Detection using DeepAuto-Encoders GIANMARIO SPACAGNA DATA SCIENCE MILAN - 18/05/2017
  • 2.
    What you will(briefly) learn ▶ What is an anomaly (and an outlier) ▶ Popular techniques used in shallow machine learning ▶ Why deep learning can make the difference ▶ Anomaly detection using deep auto— encoders ▶ H2O overview ▶ ECG pulse detection PoC example
  • 3.
    1. Machine Learning– An Introduction 2. Neural Networks 3. Deep Learning Fundamentals 4. Unsupervised Feature Learning 5. Image Recognition 6. Recurrent Neural Networks and Languages Models 7. Deep Learning for Board Games 8. Deep Learning for Computer Games 9. Anomaly Detection 10.Building a Production-ready Intrusion Detection System
  • 4.
    Why this usecase? ▶ Anomaly detection is crucial to many business applications ▶ Smart feature representation => better anomaly detection ▶ Deep Learning works very well on learning relationships in the underlying raw data (will see how…)
  • 5.
    Outlier vs Anomaly “Anoutlier is a legitimate data point that’s far away from the mean or median in a distribution. It may be unusual, like a 9.6-second 100-meter dash, but still within the realm of reality. An anomaly is an illegitimate data point that’s generated by a different process than whatever generated the rest of the data.” Ravi Parikh http://data.heapanalytics.com/garbage-in-garbage-out-how-anomalies- can-wreck-your-data
  • 6.
    Data modeling ▶ Pointanomaly (e.g. black sheep) ■ Contextual anomaly (e.g. selling ice- creams in January) ■ Collective anomaly (e.g. sequence of suspected credit card activities)
  • 7.
    Detection modeling (andits limitations) ▶ Supervised (classification) ▶ Data skewness, lack of counter examples ▶ Unsupervised (clustering) ▶ Curse of dimensionality ▶ Semi-supervised (novelty detection) ▶ Require a “normal” training dataset
  • 8.
    Real world applications ▶Manufacturing => hardware faults ▶ Law-enforcement => reveal criminal activities ▶ Network system => detect intrusions or anomalous behaviors ▶ Internet Security => malware detection ▶ Financial services => frauds ▶ Marketing / business strategy => spotting profitable customers ▶ Healthcare => Medical diagnosis
  • 9.
    What’s the challenge? “Comingup with features is difficult, time- consuming, requires expert knowledge. When working applications of learning, we spend a lot of time tuning features.“ Andrew Ng, Machine Learning and AI via Brain simulations, Stanford University
  • 10.
    Hierarchical Feature Learning NVIDIADeep Learning Course: Class #1 – Introduction to Deep Learning https://www.youtube.com/watch?v=6eBpjEdgSm0
  • 11.
    Structural representation Advanced Topics,http://slideplayer.com/slide/3471890/
  • 12.
    Signal propagation Schematic diagramof back-propagation neural networks with two hidden layers. Factor selection for delay analysis using Knowledge Discovery in Databases
  • 13.
    Auto-encoders • Signal propagationoutput: approximate an identity function • Error back propagation: Mean Squared Error MSE (*) between the original datum and the reconstructed one (*) in case of numerical data
  • 14.
    Novelty detection usingauto-encoders 1. Identify a training dataset of what is considered “normal” 2. Learn what “normal” means, aka. learn the structures of normal behavior 3. Try to reconstruct never-seen points re-using the same structure, if the error is high means the point deviates from the normal distribution TRAIN Auto- Encoder RECONSTRUCT Low error RECONSTRUCT High error
  • 15.
    Features compression ■ Usejust the encoder to compress data into a reduced dimensional space then use traditional unsupervised learning Tom Mitchell’s example of an auto-encoder: You can represent any combination of the 8 binary inputs using only 3 decimal values
  • 17.
    PoC examples ▶ ECGAnomaly Pulse Detection ▶ MNIST Anomaly Digit Recognition (Optional) ▶ Jupyter notebooks available on https://github.com/packtmayur/Python- Deep-Learning/tree/master/chapter_9
  • 18.
    Summary ▶ We listeda few real-world applications of anomaly detection ▶ We covered some of the most popular techniques in the literature with their limitations ▶ We proposed an overview of how deep neural networks work and why they are great for learning smart feature representations ▶ We proposed 2 semi-supervised approaches using deep auto-encoders: ▶ Novel detection ▶ Feature compression
  • 19.
    Going deeper ▶ Advancedmodeling: ▶ Denoising auto-encoders ▶ Contractive auto-encoders ▶ Sparse auto-encoders ▶ Variational auto-encoders (for better novelty detection) ▶ Stacked auto-encoders (for better feature compression) ▶ Building a production-ready intrusion detection system: ▶ Validating and testing with labels and in absence of ground truth ▶ Evaluation KPIs for anomaly detection ▶ A/B(C/D) testing
  • 20.
    E-book discount ▶ Usethe code KVGRSF30 and get 30% discount on e- book ▶ Only valid for 500 uses until 31st October, 2017 ▶ https://www.packtpub.com/b ig-data-and-business- intelligence/python-deep- learning
  • 21.
    "Data scientists realizethat their best days coincide with discovery of truly odd features in the data." Haystacks and Needles: Anomaly Detection By: Gerhard Pilcher & Kenny Darrell, Data Mining Analyst, Elder Research, Inc.
  • 22.