SlideShare a Scribd company logo
1 of 5
Detailed Curriculum Vitae- Andrew Carige - 2016
1
Andrew Carige
Logistics Manager
Contact
M: 0447 691 937
E: acarige@laingorourke.com.au
E2: andrew.carige1@gmail.com
Qualifications
 Diploma in Applied Science (Architectural
Drafting)
 IIF
 MSIC CARD
 CAD
 Ideas (3d Modelling)
 Working At Heights
 Apply First Aid
 Cert IV In Front Line Management
 P6
Andrew has over 17 years in construction management, with an impressive
track record in key roles on complex multi-disciplinary engineering projects.
His experience on high-profile projects across the globe has seen him rise
to the top of his field, honing a range of skills which have proven invaluable
in successful project delivery.
With a natural flair for planning and scheduling, and the ability to manage
multiple, often conflicting priorities, it is not surprising that Andrew has been
allocated the role of Logistics Manager on a range of high-value complex
projects.
An undeniable ability for innovative thinking combined with exceptional
logistical skills has enabled him to facilitate ‘lean’ programs which deliver
optimal time and cost objectives. At the same time, his programs are
founded on proven staging and construction methodology with safety of
personnel and workplace underpinning all activities.
Building on previous successes, Andrew is currently managing all Logistics
packages on the Ichthys LNG Onshore Project, Cryogenic Tanks Package,
Darwin NT. His innate ability to identify and mitigate constraints has proven
to be a major benefit for the project’s tight schedule.
Andrew’s skills were previously demonstrated on the Heathrow Terminal 5
development, where his collaborative approach was central to continual
product and supply chain development. His innovative approach and
knowledge of appropriate construction methodologies, facilitated ‘Just In
Time’ delivery processes to be successfully implemented, enabling works to
consistently continue ahead of schedule.
These demonstrated skills have wide-spread application in a range of areas
where planning, logical thinking and effective management of people and
timelines are essential.
Core Competencies:
 Effective management of
multiple, often conflicting
priorities
 Planning and scheduling
 Contract management
and negotiation
 Innovative thinking
 Building and managing an
effective team
 Ability to co-ordinate a
diverse range of activities,
and to deadlines
 Detailed programming of
complex projects
 Construction Planning
and Methodologies
 Highly developed
problem-solving skills with
ability to contribute to
best-for-project or best-
for-business solutions.
Project Experience
ICHTHYS LNG ONSHORE PROJECT CRYOGENIC TANKS PACKAGE, DARWIN NT
Logistics Manager, 2013 – present
Estimated Project Value: AUD$750m
The Tanks Package consists of a network of four cryogenic tanks for the $34bn Ichthys LNG project at
Blaydin Point. The equipment includes two full containment LNG tanks with 9% nickel steel inner tanks and
Detailed Curriculum Vitae- Andrew Carige - 2016
2
pre-stressed concrete outer tanks, each with a capacity of 165,000m³. In addition, we are delivering a
85,000m³ full containment propane tank and a 60,000m³ full containment butane tank.
The project is also one of the most highly valued natural resource development projects in Australia in
relation to promoting exports.
Responsibilities Achievements
 Initial Site set up and Site planning to ensure
laydown and construction zones are maintained
allowing permanent works to progress aligned with
schedule
 Procurement and letting of Break Bulk / Heavy
Haulage Package for all out of gauge cargo / other
associated Logistics packages / plant / equipment
and consumables
 Detailed planning / scheduling and execution for all
Modules Freight Forwarded in through the onsite
Material Off Loading Facility (MOF) and the Material
Off Loading Facility Transitional Pontoon (MOFTP)
 Assisting Joint Venture Partner KHI with compliance
for all of Customs & Department of Agriculture (DA)
policies and procedures to ensure all materials pass
through East Arm Wharf and Site MOF / MOFTP in
a timely manner
 Material tracking and preservation through to
handover to construction teams
 Site phasing and management of 20,000m2
constantly moving laydowns aligned with
construction milestone dates
 Interface with sub-contractors, Project Management
(JKC) and Client (INPEX) site wide for internal
manpower, plant, material movement and
management
 Training and VOC compliance for Logistics &
Ground Works Crews
 Planning / development of all materials supply chain
processes for LNG & LPG Tanks throughout all
construction of structures / roof assembly /
construction leading up to air raise and fit out of
inner tanks
 Successful management and co-ordination
of freight forwarding of 13,000t of rebar from
Italy and Thailand to East Arm Warf to site
 Successful management and co-ordination
of freight forwarding of 96,000 freight /
tonnes of carbon steel & 9% NI plate,
structural steel / SS & carbon steel spools &
piping along Instrumentation and
mechanical elements through East Arm
Wharf along with 65,000 freight tonnes of
prefabricated roof platform modules through
the MOF & MOFTP on site
 Site visits to Batam Profab Yards to
implement DA policies and procedure along
with improving material tracking
methodologies
 Lessons learned documented and
implemented throughout Project improving
efficiencies during all stages of Supply
Chain Management
ICHTHYS LNG ONSHORE PROJECT ACCOMMODATION VILLAGE, DARWIN NT
Logistics Manager, 2012 – 2013
Estimated Project Value: AUD$350m
The accommodation village forms part of the onshore facilities to provide quality accommodation for direct
personnel during the construction period. The village was designed to contain 3500 accommodation units.
External services such as recreation, dining and kitchen facilities have also been constructed to support the
full contingency of workers onsite at any one time.
Responsibilities Achievements
 Reviewing and change management implementation
 Set up and installation of temp facilities / offices, site
services and welfare
 Reviewing / suggesting changes to consultant’s
design for more efficient constructability
methodologies and implementation on site
 Managing production control, regarding resources,
 Successful management and co-ordination
of freight forwarding of material from within
Australia and World-wide for 965 4xRoom
Accommodation Cabins plus a number of
Laundry and Toilet Blocks
 All goods cleared with documentation fully
compliant with all Customs and (DAFF) /
Detailed Curriculum Vitae- Andrew Carige - 2016
3
plant and equipment allocation
 Resource loading of construction activities to
achieve target milestones
 Planning and set up of Logistics Temp Welfare
Facilities to allow efficient Construction Staging of
Accommodation Units ensuring they were functional
and approved by authorities in time for occupancy
 Preservation of all modules throughout storage
phasing and post installation
 Defects management and snagging.
(DA) policies and procedures
 Accommodation Units delivered and
installed on time and under budget
CAIRNS BASE HOSPITAL BLOCK E, CAIRNS QLD
Logistics Manager / Construction Manager, 2010 – 2011
Estimated Project Value: AUD$49.3m
The construction of this project comprised of an eight storey combined health service facility, along with a
public and staff car park, as part of the overall Cairns Base Hospital redevelopment.
Responsibilities Achievements
 Managing production control, regarding resources,
plant and equipment allocation
 Site set up and supply chain management
 Design co-ordination with the Architect to ensure
suitable details were developed for all packages
 Package Manager for all finishing trades, along with
site-wide logistics and supply chain management for
the entire project.
 Successful management and co-ordination
of a difficult façade install whilst maintaining
traffic flow on a busy inner city intersection
 Achieving staged Government approvals in
timely manner for all fit out and finishing
packages
 Reviewing / implementing changes to
consultant’s design for constructability and
coordination on site with parking perimeter
guide rails the most significant
AL RAHA BEACH, ABU DHABI (UAE)
Head of Logistics, 2009 – 2010
Estimated Project Value: US$22.5b
The scope of works included construction, operation and maintenance of centrally required welfare
facilities, with a main project office, logistics office, clinic, induction facility, administration office and training
facility. It comprises nine precincts with a total area of 5,729,973m2, site length 10.48km with one entire
side of site waterfront with a width of 786m.
Andrew led a team of Logistics Managers and Commercial Managers as part of a Central Logistics Team.
His team was both proactive and flexible, successfully implementing creative solutions for efficient running /
management of overall facilities and services. Their solutions enabled all construction works to proceed
smoothly and safely with minimum impact on the surrounding areas at Al Raha Beach.
Responsibilities Achievements
 Commercial management of over 20 cost portfolios
totalling US $35.5m
 Strategic site-wide logistics planning, allowing all
permanent works to proceed unhindered.
 Waste management and recycling.
 Forward planning of logistical needs to best serve
the development / ALDAR and not just individual
projects
 Manpower transport, operating 243 mixed buses for
the transporting of staff and operatives
 Assisted the MEP Utilities team in
conducting reviews / recommendations for
mutual benefit of temporary Utilities and
Services development wide including co-
ordination with Authorities
 Successful management of Interactive
traffic simulation and analysis to allow
continuous traffic flow throughout the entire
project with approximately 6,000 vehicle
movements per day managed
Detailed Curriculum Vitae- Andrew Carige - 2016
4
ATLANTIS THE PALM, DUBAI (UAE)
Logistics Manager, 2005 – 2008
Estimated Project Value: US$2.6b
Packages included: Material Management, Manpower Transport, Labour Camp - Welfare Facilities, Temp
Utilities: Water/Sewage/Power/Lighting, Telecommunications, Waste Disposal, Security, On-site Fuel
Storage, Medical Facilities, Crane-age / Hoist Facilities, and (Furniture, Fixtures and Equipment)
Installation.
Andrew managed site-wide logistics packages, commercially and on-site worth US $110m with total project
contract value US $2.6b.
Responsibilities Achievements
 Managing /coordinating and developing scopes of
work in accordance with regional laws/regulations
for tendering and awarding all site-wide logistics
packages
 Creating innovative techniques to
manage/coordinate all interface with contractors,
Project Leaders and Site Supervisors with regard to
all logistical tasks
 Managing and coordinating the first 500,000m3 of
backfill and compaction on Atlantis Site
 Team-building/goal-setting/motivating and time
management for the Logistics Team to get the task
at hand done efficiently, quickly and safely
 Designing, detailing, building, maintaining and
overseeing the day to day operations of the 8,500
bed camp
 Managing and coordinating the installation of all
(Furniture, Fixtures & Equipment) in public areas /
Royal Towers Hotel guest rooms and handover to
operations through to guest occupation
 Successfully managing the Material Management
(World Wide Freight Forwarding) package that was
procured to allow a “Just in Time” delivery
philosophy to be implemented for all materials.
 Successful management and co-ordination
of the execution / liaison for handover of all
areas for underground services, pool
construction, external buildings and
landscaping on the entire 60 acre site whilst
maintaining effective movement of materials
in and around Hotel, Conference Centre,
Retail Village and Water Park without
disruption to construction works
 Managing Design and Government
Approvals along with Construction
Management of the onsite 8500 Bed
Workers Village
HEATHROW TERMINAL 5, LONDON UK
Logistics Engineer/Rebar Pre-Assembly Team Manager, 2003 – 2005
Estimated Project Value: GBP£5.56b
Works at Terminal 5 comprised the construction of a sophisticated transport interchange, to create one of
the most advanced integrated passenger terminals in the world, capable of handling up to 30 million
passengers a year. The project involved main line rail connections, underground lines, a network of new
roads, retail and airport facilities.
Responsibilities Achievements
 Managing and coordinating the rebar prefabrication
team of 30-50 men producing 350t of prefab rebar
steel per week
 Coordinating and process-mapping the prefab and
delivery of 2,200t T5 second phase piling program
 Successful management and co-ordination
to deliver up to 200t pre-fabricated rebar
cages “Just In Time” in one day to under
hook on site throughout multiple
constructions zones
Detailed Curriculum Vitae- Andrew Carige - 2016
5
for “Just In Time” delivery with total value of £5.5m
 Coordinating, process-mapping and implementing
strategies for production and delivery of all cut and
bent loose steel, with emphasis on product
development / valued engineering techniques with
senior engineers and project engineers
 Managing day to day industrial relations, IIF
(Incident and Injury Free) implementation,
redundancy process
 Liaison with subcontractors, client (BAA), project
engineers and design team for continual product /
supply chain development which ensured cost
effective delivery of materials.
Work History
Relevant Project Experience
Dates, Position, Company Description
Laing O’Rourke
Various roles
2001 – present
Andrew has spent his career in a variety of roles with Laing O’Rourke,
commencing in 2001. He has been a highly regarded employee, with his
work history including:
 2009 – to present: various project roles as outlined above
 2008 – 2009: Logistics / Planning / Process Design for Laing O’Rourke
UAE, as described below
 2003 – 2008: various project roles as outlined above
 2001 – 2003: Project Engineer with Laing O’Rourke UK, as described
below.
During his career with Laing O’Rourke, Andrew has lived and worked in the
United Kingdom, United Arab Emirates and Australia adding further depth to
his experience
Logistics / Planning /
Process Design, (2008-
2009)
Laing O’Rourke. Business-
Wide, Dubai (UAE)
Andrew was closely involved in detailed planning at tendering stages, pre-
construction, contractor procurement, and development of offsite / on site
processes for execution of works. His role included managing a transfer of
knowledge through lean processes and efficiencies, allowing implementation
through all prefabrication, modular manufacturing and assembly stages of
pre-construction and throughout Project Delivery
Project Engineer
(2001 – 2005)
Laing O’Rourke, Mallings
Products / StrongForce
Engineering (UK)
Various duties including:
 Project management of precast products through the factory process
through to site delivery and installation
 Product design and development engineering details which improved
factory productivity and site build ability
 Coordinating meetings between Clients, Architects, Subcontractors and
Project Leaders, focusing on solutions in order to finish projects on time
and under budget.
 Design and layout of post tension plans and detail
 Site project management and installation of post tensioning anchors and
strand including stressing

More Related Content

What's hot

Ian Gough - CV Sept 16
Ian Gough -  CV Sept 16Ian Gough -  CV Sept 16
Ian Gough - CV Sept 16
Ian Gough
 
CV Johan Fourie - 01 June 2016
CV Johan Fourie  - 01 June 2016CV Johan Fourie  - 01 June 2016
CV Johan Fourie - 01 June 2016
Johan Fourie
 
Gana Khaidav -May-2015
Gana Khaidav -May-2015Gana Khaidav -May-2015
Gana Khaidav -May-2015
Gana Khaidav
 
CV Rob Ferguson - June 2016
CV Rob Ferguson - June 2016CV Rob Ferguson - June 2016
CV Rob Ferguson - June 2016
Robin Ferguson
 
cv BJB Feb2015
cv BJB Feb2015cv BJB Feb2015
cv BJB Feb2015
Bazza B
 
LinkedIn_RS_Cv_20150417_v2
LinkedIn_RS_Cv_20150417_v2LinkedIn_RS_Cv_20150417_v2
LinkedIn_RS_Cv_20150417_v2
Robert Sleeman
 
Karl Luke's Resume Doc
Karl Luke's Resume DocKarl Luke's Resume Doc
Karl Luke's Resume Doc
karl luke
 

What's hot (19)

Rohit Resume
Rohit ResumeRohit Resume
Rohit Resume
 
Project Management Planning & Control Assignment 2
Project Management Planning & Control Assignment 2Project Management Planning & Control Assignment 2
Project Management Planning & Control Assignment 2
 
Jack Oldrin RS2
Jack Oldrin RS2Jack Oldrin RS2
Jack Oldrin RS2
 
Construction Oil and Gas Forum Jan 2015 Abu Dhabi Brochure
Construction Oil and Gas Forum Jan 2015 Abu Dhabi BrochureConstruction Oil and Gas Forum Jan 2015 Abu Dhabi Brochure
Construction Oil and Gas Forum Jan 2015 Abu Dhabi Brochure
 
Ian Gough - CV Sept 16
Ian Gough -  CV Sept 16Ian Gough -  CV Sept 16
Ian Gough - CV Sept 16
 
Offshore Energy Limited - Project lifting management and support services pre...
Offshore Energy Limited - Project lifting management and support services pre...Offshore Energy Limited - Project lifting management and support services pre...
Offshore Energy Limited - Project lifting management and support services pre...
 
CV Johan Fourie - 01 June 2016
CV Johan Fourie  - 01 June 2016CV Johan Fourie  - 01 June 2016
CV Johan Fourie - 01 June 2016
 
My Resume
My ResumeMy Resume
My Resume
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
Gana Khaidav -May-2015
Gana Khaidav -May-2015Gana Khaidav -May-2015
Gana Khaidav -May-2015
 
Resume
ResumeResume
Resume
 
Completed Projects PPI Deep Foundations
Completed Projects PPI Deep FoundationsCompleted Projects PPI Deep Foundations
Completed Projects PPI Deep Foundations
 
CV Rob Ferguson - June 2016
CV Rob Ferguson - June 2016CV Rob Ferguson - June 2016
CV Rob Ferguson - June 2016
 
Punch List Coordinator - (ICAPS Specialist) Onshore/Offshore
Punch List Coordinator - (ICAPS Specialist)  Onshore/OffshorePunch List Coordinator - (ICAPS Specialist)  Onshore/Offshore
Punch List Coordinator - (ICAPS Specialist) Onshore/Offshore
 
cv BJB Feb2015
cv BJB Feb2015cv BJB Feb2015
cv BJB Feb2015
 
David johnson logistics 2016..cv..
David johnson logistics 2016..cv..David johnson logistics 2016..cv..
David johnson logistics 2016..cv..
 
LinkedIn_RS_Cv_20150417_v2
LinkedIn_RS_Cv_20150417_v2LinkedIn_RS_Cv_20150417_v2
LinkedIn_RS_Cv_20150417_v2
 
Karl Luke's Resume Doc
Karl Luke's Resume DocKarl Luke's Resume Doc
Karl Luke's Resume Doc
 
Arun Resume .
Arun Resume .Arun Resume .
Arun Resume .
 

Viewers also liked

Andrew Kiggen Resume
Andrew Kiggen ResumeAndrew Kiggen Resume
Andrew Kiggen Resume
Andrew Kiggen
 
anorexiaybulimiaresumen
anorexiaybulimiaresumenanorexiaybulimiaresumen
anorexiaybulimiaresumen
paulacabaleiro
 
Anuj_Resume_final
Anuj_Resume_finalAnuj_Resume_final
Anuj_Resume_final
Anuj Malik
 
Andrew Reichel Resume_
Andrew Reichel Resume_Andrew Reichel Resume_
Andrew Reichel Resume_
Andrew Reichel
 
ArielleHallResume(Updated)
ArielleHallResume(Updated)ArielleHallResume(Updated)
ArielleHallResume(Updated)
Arielle Hall
 
ANTHONY L. GILL Resume (1)
ANTHONY L. GILL Resume (1)ANTHONY L. GILL Resume (1)
ANTHONY L. GILL Resume (1)
Anthony L. Gill
 
Andrea Weiss Resume2
Andrea Weiss Resume2Andrea Weiss Resume2
Andrea Weiss Resume2
Andrea Weiss
 
Anexo 3(semana santa) (resumen)
Anexo 3(semana santa) (resumen)Anexo 3(semana santa) (resumen)
Anexo 3(semana santa) (resumen)
FANNYBV
 
Anel I. Flores Resume Art Educ Adv
Anel I. Flores Resume Art Educ AdvAnel I. Flores Resume Art Educ Adv
Anel I. Flores Resume Art Educ Adv
Anel Flores
 
Amber Ernst - Resume - Communications&Management
Amber Ernst - Resume - Communications&ManagementAmber Ernst - Resume - Communications&Management
Amber Ernst - Resume - Communications&Management
Amber Ernst
 
Anmol Khera -Resume
Anmol Khera -ResumeAnmol Khera -Resume
Anmol Khera -Resume
Anmol Khera
 
Anthony Cabus Resume
Anthony Cabus ResumeAnthony Cabus Resume
Anthony Cabus Resume
Anthony Cabus
 
Anh phan resume
Anh phan   resumeAnh phan   resume
Anh phan resume
Phan Tom
 

Viewers also liked (20)

Ann-Marie Pope Resume
Ann-Marie Pope ResumeAnn-Marie Pope Resume
Ann-Marie Pope Resume
 
Andrew Kiggen Resume
Andrew Kiggen ResumeAndrew Kiggen Resume
Andrew Kiggen Resume
 
anorexiaybulimiaresumen
anorexiaybulimiaresumenanorexiaybulimiaresumen
anorexiaybulimiaresumen
 
Anuj_Resume_final
Anuj_Resume_finalAnuj_Resume_final
Anuj_Resume_final
 
Antibioticoterapia resumen
Antibioticoterapia resumenAntibioticoterapia resumen
Antibioticoterapia resumen
 
Andrew Reichel Resume_
Andrew Reichel Resume_Andrew Reichel Resume_
Andrew Reichel Resume_
 
Anil (RESUME)-1
Anil (RESUME)-1Anil (RESUME)-1
Anil (RESUME)-1
 
ArielleHallResume(Updated)
ArielleHallResume(Updated)ArielleHallResume(Updated)
ArielleHallResume(Updated)
 
AmandaRogersResume
AmandaRogersResumeAmandaRogersResume
AmandaRogersResume
 
ANTHONY L. GILL Resume (1)
ANTHONY L. GILL Resume (1)ANTHONY L. GILL Resume (1)
ANTHONY L. GILL Resume (1)
 
Are you Confused on your Resume?
Are you Confused on your Resume?Are you Confused on your Resume?
Are you Confused on your Resume?
 
Andrea Weiss Resume2
Andrea Weiss Resume2Andrea Weiss Resume2
Andrea Weiss Resume2
 
Anton stepanenko resume
Anton stepanenko resumeAnton stepanenko resume
Anton stepanenko resume
 
Anexo 3(semana santa) (resumen)
Anexo 3(semana santa) (resumen)Anexo 3(semana santa) (resumen)
Anexo 3(semana santa) (resumen)
 
Anel I. Flores Resume Art Educ Adv
Anel I. Flores Resume Art Educ AdvAnel I. Flores Resume Art Educ Adv
Anel I. Flores Resume Art Educ Adv
 
Amber Ernst - Resume - Communications&Management
Amber Ernst - Resume - Communications&ManagementAmber Ernst - Resume - Communications&Management
Amber Ernst - Resume - Communications&Management
 
Anmol Khera -Resume
Anmol Khera -ResumeAnmol Khera -Resume
Anmol Khera -Resume
 
Anatomy of a winning resume seminar
Anatomy of a winning resume seminarAnatomy of a winning resume seminar
Anatomy of a winning resume seminar
 
Anthony Cabus Resume
Anthony Cabus ResumeAnthony Cabus Resume
Anthony Cabus Resume
 
Anh phan resume
Anh phan   resumeAnh phan   resume
Anh phan resume
 

Similar to Andrew Carige_Resume_Detailed Version 25-02-16

Similar to Andrew Carige_Resume_Detailed Version 25-02-16 (20)

CV
CVCV
CV
 
Gareth_Lloyd_CV_v8
Gareth_Lloyd_CV_v8Gareth_Lloyd_CV_v8
Gareth_Lloyd_CV_v8
 
Resume - Kevin Horn 5 Oct 2016
Resume - Kevin Horn 5 Oct 2016Resume - Kevin Horn 5 Oct 2016
Resume - Kevin Horn 5 Oct 2016
 
Chris Bergin - Short Resume - August 2016
Chris Bergin - Short Resume - August 2016Chris Bergin - Short Resume - August 2016
Chris Bergin - Short Resume - August 2016
 
Proven project management.docx
Proven project management.docxProven project management.docx
Proven project management.docx
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
TDCCV 2016
TDCCV 2016TDCCV 2016
TDCCV 2016
 
Geraldine_Goh-CV
Geraldine_Goh-CVGeraldine_Goh-CV
Geraldine_Goh-CV
 
Resume ng ji xian jason
Resume ng ji xian jasonResume ng ji xian jason
Resume ng ji xian jason
 
CV Ashfaq Sept. 2015 -BLDGS, INFRA STRS.
CV  Ashfaq Sept. 2015 -BLDGS, INFRA STRS.CV  Ashfaq Sept. 2015 -BLDGS, INFRA STRS.
CV Ashfaq Sept. 2015 -BLDGS, INFRA STRS.
 
Sats Ganesh_
Sats Ganesh_Sats Ganesh_
Sats Ganesh_
 
CV_PhilMorris_2015
CV_PhilMorris_2015CV_PhilMorris_2015
CV_PhilMorris_2015
 
CV_Ken Loh_external
CV_Ken Loh_externalCV_Ken Loh_external
CV_Ken Loh_external
 
RONALD CV 17.11.2015
RONALD CV 17.11.2015RONALD CV 17.11.2015
RONALD CV 17.11.2015
 
CV
CVCV
CV
 
CV Jadid iPms
CV Jadid  iPms CV Jadid  iPms
CV Jadid iPms
 
Resume of kerry polkinghorne 22.07.15
Resume of kerry polkinghorne 22.07.15Resume of kerry polkinghorne 22.07.15
Resume of kerry polkinghorne 22.07.15
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction Superintendent
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum Vitae
 

Andrew Carige_Resume_Detailed Version 25-02-16

  • 1. Detailed Curriculum Vitae- Andrew Carige - 2016 1 Andrew Carige Logistics Manager Contact M: 0447 691 937 E: acarige@laingorourke.com.au E2: andrew.carige1@gmail.com Qualifications  Diploma in Applied Science (Architectural Drafting)  IIF  MSIC CARD  CAD  Ideas (3d Modelling)  Working At Heights  Apply First Aid  Cert IV In Front Line Management  P6 Andrew has over 17 years in construction management, with an impressive track record in key roles on complex multi-disciplinary engineering projects. His experience on high-profile projects across the globe has seen him rise to the top of his field, honing a range of skills which have proven invaluable in successful project delivery. With a natural flair for planning and scheduling, and the ability to manage multiple, often conflicting priorities, it is not surprising that Andrew has been allocated the role of Logistics Manager on a range of high-value complex projects. An undeniable ability for innovative thinking combined with exceptional logistical skills has enabled him to facilitate ‘lean’ programs which deliver optimal time and cost objectives. At the same time, his programs are founded on proven staging and construction methodology with safety of personnel and workplace underpinning all activities. Building on previous successes, Andrew is currently managing all Logistics packages on the Ichthys LNG Onshore Project, Cryogenic Tanks Package, Darwin NT. His innate ability to identify and mitigate constraints has proven to be a major benefit for the project’s tight schedule. Andrew’s skills were previously demonstrated on the Heathrow Terminal 5 development, where his collaborative approach was central to continual product and supply chain development. His innovative approach and knowledge of appropriate construction methodologies, facilitated ‘Just In Time’ delivery processes to be successfully implemented, enabling works to consistently continue ahead of schedule. These demonstrated skills have wide-spread application in a range of areas where planning, logical thinking and effective management of people and timelines are essential. Core Competencies:  Effective management of multiple, often conflicting priorities  Planning and scheduling  Contract management and negotiation  Innovative thinking  Building and managing an effective team  Ability to co-ordinate a diverse range of activities, and to deadlines  Detailed programming of complex projects  Construction Planning and Methodologies  Highly developed problem-solving skills with ability to contribute to best-for-project or best- for-business solutions. Project Experience ICHTHYS LNG ONSHORE PROJECT CRYOGENIC TANKS PACKAGE, DARWIN NT Logistics Manager, 2013 – present Estimated Project Value: AUD$750m The Tanks Package consists of a network of four cryogenic tanks for the $34bn Ichthys LNG project at Blaydin Point. The equipment includes two full containment LNG tanks with 9% nickel steel inner tanks and
  • 2. Detailed Curriculum Vitae- Andrew Carige - 2016 2 pre-stressed concrete outer tanks, each with a capacity of 165,000m³. In addition, we are delivering a 85,000m³ full containment propane tank and a 60,000m³ full containment butane tank. The project is also one of the most highly valued natural resource development projects in Australia in relation to promoting exports. Responsibilities Achievements  Initial Site set up and Site planning to ensure laydown and construction zones are maintained allowing permanent works to progress aligned with schedule  Procurement and letting of Break Bulk / Heavy Haulage Package for all out of gauge cargo / other associated Logistics packages / plant / equipment and consumables  Detailed planning / scheduling and execution for all Modules Freight Forwarded in through the onsite Material Off Loading Facility (MOF) and the Material Off Loading Facility Transitional Pontoon (MOFTP)  Assisting Joint Venture Partner KHI with compliance for all of Customs & Department of Agriculture (DA) policies and procedures to ensure all materials pass through East Arm Wharf and Site MOF / MOFTP in a timely manner  Material tracking and preservation through to handover to construction teams  Site phasing and management of 20,000m2 constantly moving laydowns aligned with construction milestone dates  Interface with sub-contractors, Project Management (JKC) and Client (INPEX) site wide for internal manpower, plant, material movement and management  Training and VOC compliance for Logistics & Ground Works Crews  Planning / development of all materials supply chain processes for LNG & LPG Tanks throughout all construction of structures / roof assembly / construction leading up to air raise and fit out of inner tanks  Successful management and co-ordination of freight forwarding of 13,000t of rebar from Italy and Thailand to East Arm Warf to site  Successful management and co-ordination of freight forwarding of 96,000 freight / tonnes of carbon steel & 9% NI plate, structural steel / SS & carbon steel spools & piping along Instrumentation and mechanical elements through East Arm Wharf along with 65,000 freight tonnes of prefabricated roof platform modules through the MOF & MOFTP on site  Site visits to Batam Profab Yards to implement DA policies and procedure along with improving material tracking methodologies  Lessons learned documented and implemented throughout Project improving efficiencies during all stages of Supply Chain Management ICHTHYS LNG ONSHORE PROJECT ACCOMMODATION VILLAGE, DARWIN NT Logistics Manager, 2012 – 2013 Estimated Project Value: AUD$350m The accommodation village forms part of the onshore facilities to provide quality accommodation for direct personnel during the construction period. The village was designed to contain 3500 accommodation units. External services such as recreation, dining and kitchen facilities have also been constructed to support the full contingency of workers onsite at any one time. Responsibilities Achievements  Reviewing and change management implementation  Set up and installation of temp facilities / offices, site services and welfare  Reviewing / suggesting changes to consultant’s design for more efficient constructability methodologies and implementation on site  Managing production control, regarding resources,  Successful management and co-ordination of freight forwarding of material from within Australia and World-wide for 965 4xRoom Accommodation Cabins plus a number of Laundry and Toilet Blocks  All goods cleared with documentation fully compliant with all Customs and (DAFF) /
  • 3. Detailed Curriculum Vitae- Andrew Carige - 2016 3 plant and equipment allocation  Resource loading of construction activities to achieve target milestones  Planning and set up of Logistics Temp Welfare Facilities to allow efficient Construction Staging of Accommodation Units ensuring they were functional and approved by authorities in time for occupancy  Preservation of all modules throughout storage phasing and post installation  Defects management and snagging. (DA) policies and procedures  Accommodation Units delivered and installed on time and under budget CAIRNS BASE HOSPITAL BLOCK E, CAIRNS QLD Logistics Manager / Construction Manager, 2010 – 2011 Estimated Project Value: AUD$49.3m The construction of this project comprised of an eight storey combined health service facility, along with a public and staff car park, as part of the overall Cairns Base Hospital redevelopment. Responsibilities Achievements  Managing production control, regarding resources, plant and equipment allocation  Site set up and supply chain management  Design co-ordination with the Architect to ensure suitable details were developed for all packages  Package Manager for all finishing trades, along with site-wide logistics and supply chain management for the entire project.  Successful management and co-ordination of a difficult façade install whilst maintaining traffic flow on a busy inner city intersection  Achieving staged Government approvals in timely manner for all fit out and finishing packages  Reviewing / implementing changes to consultant’s design for constructability and coordination on site with parking perimeter guide rails the most significant AL RAHA BEACH, ABU DHABI (UAE) Head of Logistics, 2009 – 2010 Estimated Project Value: US$22.5b The scope of works included construction, operation and maintenance of centrally required welfare facilities, with a main project office, logistics office, clinic, induction facility, administration office and training facility. It comprises nine precincts with a total area of 5,729,973m2, site length 10.48km with one entire side of site waterfront with a width of 786m. Andrew led a team of Logistics Managers and Commercial Managers as part of a Central Logistics Team. His team was both proactive and flexible, successfully implementing creative solutions for efficient running / management of overall facilities and services. Their solutions enabled all construction works to proceed smoothly and safely with minimum impact on the surrounding areas at Al Raha Beach. Responsibilities Achievements  Commercial management of over 20 cost portfolios totalling US $35.5m  Strategic site-wide logistics planning, allowing all permanent works to proceed unhindered.  Waste management and recycling.  Forward planning of logistical needs to best serve the development / ALDAR and not just individual projects  Manpower transport, operating 243 mixed buses for the transporting of staff and operatives  Assisted the MEP Utilities team in conducting reviews / recommendations for mutual benefit of temporary Utilities and Services development wide including co- ordination with Authorities  Successful management of Interactive traffic simulation and analysis to allow continuous traffic flow throughout the entire project with approximately 6,000 vehicle movements per day managed
  • 4. Detailed Curriculum Vitae- Andrew Carige - 2016 4 ATLANTIS THE PALM, DUBAI (UAE) Logistics Manager, 2005 – 2008 Estimated Project Value: US$2.6b Packages included: Material Management, Manpower Transport, Labour Camp - Welfare Facilities, Temp Utilities: Water/Sewage/Power/Lighting, Telecommunications, Waste Disposal, Security, On-site Fuel Storage, Medical Facilities, Crane-age / Hoist Facilities, and (Furniture, Fixtures and Equipment) Installation. Andrew managed site-wide logistics packages, commercially and on-site worth US $110m with total project contract value US $2.6b. Responsibilities Achievements  Managing /coordinating and developing scopes of work in accordance with regional laws/regulations for tendering and awarding all site-wide logistics packages  Creating innovative techniques to manage/coordinate all interface with contractors, Project Leaders and Site Supervisors with regard to all logistical tasks  Managing and coordinating the first 500,000m3 of backfill and compaction on Atlantis Site  Team-building/goal-setting/motivating and time management for the Logistics Team to get the task at hand done efficiently, quickly and safely  Designing, detailing, building, maintaining and overseeing the day to day operations of the 8,500 bed camp  Managing and coordinating the installation of all (Furniture, Fixtures & Equipment) in public areas / Royal Towers Hotel guest rooms and handover to operations through to guest occupation  Successfully managing the Material Management (World Wide Freight Forwarding) package that was procured to allow a “Just in Time” delivery philosophy to be implemented for all materials.  Successful management and co-ordination of the execution / liaison for handover of all areas for underground services, pool construction, external buildings and landscaping on the entire 60 acre site whilst maintaining effective movement of materials in and around Hotel, Conference Centre, Retail Village and Water Park without disruption to construction works  Managing Design and Government Approvals along with Construction Management of the onsite 8500 Bed Workers Village HEATHROW TERMINAL 5, LONDON UK Logistics Engineer/Rebar Pre-Assembly Team Manager, 2003 – 2005 Estimated Project Value: GBP£5.56b Works at Terminal 5 comprised the construction of a sophisticated transport interchange, to create one of the most advanced integrated passenger terminals in the world, capable of handling up to 30 million passengers a year. The project involved main line rail connections, underground lines, a network of new roads, retail and airport facilities. Responsibilities Achievements  Managing and coordinating the rebar prefabrication team of 30-50 men producing 350t of prefab rebar steel per week  Coordinating and process-mapping the prefab and delivery of 2,200t T5 second phase piling program  Successful management and co-ordination to deliver up to 200t pre-fabricated rebar cages “Just In Time” in one day to under hook on site throughout multiple constructions zones
  • 5. Detailed Curriculum Vitae- Andrew Carige - 2016 5 for “Just In Time” delivery with total value of £5.5m  Coordinating, process-mapping and implementing strategies for production and delivery of all cut and bent loose steel, with emphasis on product development / valued engineering techniques with senior engineers and project engineers  Managing day to day industrial relations, IIF (Incident and Injury Free) implementation, redundancy process  Liaison with subcontractors, client (BAA), project engineers and design team for continual product / supply chain development which ensured cost effective delivery of materials. Work History Relevant Project Experience Dates, Position, Company Description Laing O’Rourke Various roles 2001 – present Andrew has spent his career in a variety of roles with Laing O’Rourke, commencing in 2001. He has been a highly regarded employee, with his work history including:  2009 – to present: various project roles as outlined above  2008 – 2009: Logistics / Planning / Process Design for Laing O’Rourke UAE, as described below  2003 – 2008: various project roles as outlined above  2001 – 2003: Project Engineer with Laing O’Rourke UK, as described below. During his career with Laing O’Rourke, Andrew has lived and worked in the United Kingdom, United Arab Emirates and Australia adding further depth to his experience Logistics / Planning / Process Design, (2008- 2009) Laing O’Rourke. Business- Wide, Dubai (UAE) Andrew was closely involved in detailed planning at tendering stages, pre- construction, contractor procurement, and development of offsite / on site processes for execution of works. His role included managing a transfer of knowledge through lean processes and efficiencies, allowing implementation through all prefabrication, modular manufacturing and assembly stages of pre-construction and throughout Project Delivery Project Engineer (2001 – 2005) Laing O’Rourke, Mallings Products / StrongForce Engineering (UK) Various duties including:  Project management of precast products through the factory process through to site delivery and installation  Product design and development engineering details which improved factory productivity and site build ability  Coordinating meetings between Clients, Architects, Subcontractors and Project Leaders, focusing on solutions in order to finish projects on time and under budget.  Design and layout of post tension plans and detail  Site project management and installation of post tensioning anchors and strand including stressing