1. 1
MOHAMMAD ASHFAQUE
Mobile:+974-33296099 (inactive) Mobile (India) : 0091-8424872709,
0091-9987275106 (Home) Skype ID:ashfaquequreshi31
E-Mail:sohasana.qureshi@gmail.com
Seeking senior level assignments in Project Management / Construction supervision with an
organization of high repute
An Overview
An astute professional with nearly 29 years of cross-cultural experience in Project Management,
Supervision of Works and Construction Management. Currently served DORSCH QATAR (GERMANY
CO.) as Senior Resident Engineer. Adept in planning, executing and spearheading Engineering
Projects- BUILDINGS, STRUCTURES, INFRA STRUCTURE, water/ Sewer, roads and bridges Projects.
Strongexposure inmethodengineering /methodstatement,development and resource planning. Flair
for adopting modern construction methodologies/ techniques in compliance with quality standards.
Adept in overseeing quality operations, optimizing the cost, increasing efficiency, imparting new
technologiesandimprovingoverall productquality.Multitasking professional, adept at working in high
pressure environmentswithstrictdeadlinesandmultiple deliverables.Demonstrated success at people
management, relationship building, cross functional coordination and operations management.
Core Competencies
Project Management: Finalising requirements and specifications in consultation & interaction with
Architects/Collaborators/ Promoters. Anchor on-site construction activities to ensure completion of
project within the time & cost parameters and effective resource utilization to maximize the output.
Participating in project meetings for evaluating project progress and providing technical inputs.
Contracts Administration & Management: Evaluating, executing contracting works and coordination
among consultants, contractors and clients. Preparation of the tender specifications, finalization of
requirements, Liaising with consultants on determining the technical and contractual matters.
2. 2
Resolving contractual matters / disputes raised at end of Projects through relevant records as per the
contract. Extension of time claims by contractors are addressed as per ground realities and as per
contract agreement.
Site supervision& Construction Management: Supervisingall constructionactivitiesincludingproviding
technical inputs for methodologies of construction & coordination with site management activities.
Overseeing a team of Engineers for various types of job and resolving bottlenecks. Maintaining the
qualityof all workson the Projectas perthe approvedQualityPlan.Ensure implementationof approved
Health, safety and environment program.
Techno Commercial Operations Preparing technical & commercial offers/ proposals, along with
handlingtender/contracts / billing formalities & related documentation. Interfacing between client’s
business / technical teams and internal projects team, for facilitating technical interfacing for
requirement capturing, building out specifications and scoping of projects.
EDUCATION : B.Sc. Engineering(Civil) fromAligarhUniversity,India, in 1986.
CHARTERED ENGINEER(IEI) - M 1491177 , INDIA
MEMBER SOCIETY OF ENGINEERS, DUBAI (UAE) 27752
MEMBER SOCIETY OF ENGINEERS,KUWAIT 15846
SOUND CONTRACT ADMINISTRATION (CERTIFICATE),BY DR. SAM, DUBAI
Period,
Organization &
Title/ Position
Country , Client, Project and Scope ActivitiesPerformed
20 March 2015
to Present
Project
Manager
(Construction)
AFTAB CONSTRUCTIONS:
Projects:
1) Aftab Classic, Bhandi wali ,
SV road , Jogeshwari west,
MUMBAI.
Total build up Area: 120,000 Sq ft
Ground +8 typical floors (2nd floor
commercial + 6 residential), MEP
works and finishing works,
Cost : 192 Cr. IRs.
2) Aftab Heights , Jogeshwari
(w), Hill road, MUMBAI
Total build up Area -58000 sq.ft,
Ground +8 floor , 3 wings, one
ground floor 3500 sq ft commercial
+ 8 floor residential, MEP works
and finishing works.
ProjectManager:
Represents the interests of the
client during construction execution.
Negotiates changes to the scope of
work. Responsible for following up on
instructions and commitments
associated with the project.
Participatesinnegotiationswith
regulatory agencies and in public
meetingsinsupportof clients'interests.
Oversees establishment of
Project Execution Plan, Health and
Safety Plan, Quality Assurance/ Quality
Control Plan, and other documents
required from the construction
contractor.
Monitors the execution of the
technical, financial and administrative
functions of the construction contract.
3. 3
Cost: 145 Cr. I. Rs. Assigns responsibility for
executing project plans to key
subordinatesaftercareful assessmentof
how to utilize their qualifications and
strengths. Provides input to
performance reviews and development
plans for subordinates.
Identifies the needs for
specialist resources to create project
teams capable of completing effective,
quality work.
Works with the client, the
contractor, project managers, project
engineers, and discipline leads to
coordinate budgets, schedules, and
plans for the various elements of a
project.
Promotes technical and
commercial excellence on the project
throughapplicationof QualityAssurance
processes. Monitors and reports on the
progress of all project activity including
significant milestones, and any
conditions, which would affect project
cost or schedule.
Establishes weekly meeting to
review project status and formulate
action items.
Performs other responsibilities
associated with this position as may be
appropriate.
Guide and influence the team's
resources in order to maximize
efficiency, client support and on-time
delivery of tasks.
Build/Improvethe relationshipwiththe
Clientbypresentingacontinuousand
consistentbehaviortowards
professionalism, technical expertiseand
excellence.
30-06-2014 to
8-3-2015
DORSCH
QATAR
(Construction
Supervision
DOHA-QATAR
LREDC
LUSAIL DEVELOPMENT PROJECT-
CP07A-1A
As SeniorResidentEngineer,
Reported to the Client, the
Construction Director (company) and
supported by the Senior Engineers,
Assistant Resident Engineers, Site
Engineers and Inspectors.
4. 4
Consultant)
Senior
Resident
Engineer
WATERFRONT COMMERCIAL / SEEF
LUSAIL INFRASTRUCTURE WORKS -
SOUTH
SCOPE:
Construction of Road A1
and trough structure, and Junction
#9 BRIDGE and Paragola structure,
Construction of Asphalt
Roads and Pedestrian Pavement,
Supply /installation of
traffic gantries and signals,
Supply/installation of road way
lighting, Road signage including
direction signs and support
structures.
Construction / installation
of Potable water, Storm water,
Irrigation water, Foul water
network and Pumping stations,
Electrical Substations
COST: QR 369 millions
Be responsible for ensuring that
the section of works are constructed in
accordance with the contract
requirements.
Ensure, Contractor prepare/
submit (without) delay the Program,
PQP, HSE Plan and these are
reviewed/commented/finalized as per
the contract documents for
implementation.
Check contractor's submissions
and shop drawings.
Respond to the contractor's
request for information.
Liaise with the Material
Engineer on required testing and the
testresultsall sectionsof the works,and
ensure/monitorthe quality of works for
compliance with contract documents
(approveddrawings/specification/PQP).
Liaise with the clients PMC, /
and other authorities, contractors or
consultants who interface with the
project.
Bring and share international
Health & Safety best practices.
Monitor site safety and liaise
with the Safety Engineer.
Attend progress meetings and
give technical input as required.
Organize, coordinate and
communicate for various meetings -
Technical meetings, Quality meetings,
HSE meetings, Coordination meetings,
internal meetings and ensure
attendance by all the concerned and
preparation/distribution of MOMs.
Prepare and present progress
reports.
Keep comprehensive records of
worksdone and labor and plant returns.
Cost control and commercial
management with assistance from the
QSs Liaise with the planning engineers
to monitor progress and notify the PMC
of any potential delays.
Ability to lead; be resilient and
have a "can do" attitude whilst working
5. 5
under pressure.
Observe Middle Eastexperience
and an understanding of multicultural
working.
Ensure the system of
Construction Supervision meet the
consultancy contract.
01-02-2013 to
29-6-2014
Meinhardt
(Singa pore)
Pte.Ltd,DUBAI
(CONSULTANT)
Project
Manager /Sr.
Resident
Engineer
DUBAI (UAE)
DEWA (DUBAI ELECTRICITY AND
WATER AUTHORITY)
Scope:
1) Construction of
maintenance workshop, Lessaily
Office buildings (Gr+4
storey)
Cost: 35 million Dhms
(2) Two(2) Ground Reservoirs
each of 60 Million Gallons.
Pre stressed/Pre Cast
Hollow Core Slabs Roof and Beams.
Yard piping for inlet/outlet
water mains 1200 mm dia GRE Pipe
line,
Operation control building,
Office building,
Accommodation building
and
chlorine dioxide facility
building,
Associated MEP works (fire
water line/system, A/C system and
plumbing works) ,
Finishing works (Tiling,
Cladding, False ceiling and Paint
works)
Drainage works,
Electrical substation
building, Power supply , emergency
Power Supply, security fencing,
As SRE/PM,
Reportedtothe Client,the Construction
Director (company) and supported by
the SeniorEngineers,AssistantResident
Engineers, Site Engineers and
Inspectors.
Be responsible for ensuring that
the section of works are constructed in
accordance with the contract
requirements.
Ensure, Contractor prepare/
submit (without) delay the Program,
PQP, HSE Plan and these are
reviewed/commented/finalized as per
the contract documents for
implementation.
Check contractor's submissions
and shop drawings.
Respond to the contractor's
request for information.
Liaise with the Material
Engineer on required testing and the
testresultsall sectionsof the works,and
ensure/monitorthe quality of works for
compliance with contract documents
(approveddrawings/specification/PQP).
Liaise with the clients PMC, /
and other authorities, contractors or
consultants who interface with the
project.
Bring and share international
Health & Safety best practices.
Monitor site safety and liaise
with the Safety Engineer.
Attend progress meetings and
give technical input as required.
Organize, coordinate and
communicate for various meetings -
6. 6
SCADA System, CCTV Surveillance,
Internal roads, Foot path
and Landscape works,
The total quantity of RCC
(Grade 35/Grade 50) , is over
200,000 Cu.M. and 27,000 Tones of
reinforcement.
COST: UAE Dhms 250 million
Technical meetings, Quality meetings,
HSE meetings, Coordination meetings,
internal meetings and ensure
attendance by all the concerned and
preparation/distribution of MOMs.
Prepare and present progress
reports.
Keep comprehensive records of
worksdone and labor and plant returns.
Cost control and commercial
management with assistance from the
QSs Liaise with the planning engineers
to monitor progress and notify the PMC
of any potential delays.
Ability to lead; be resilient and
have a "can do" attitude whilst working
under pressure.
Observe Middle Eastexperience
and an understanding of multicultural
working.
Ensure the systemof Construction
Supervisionmeetthe consultancy
contract.
November
2010 to 31 -01-
2013
NJS
Consultants
DUBAI
Sr. Resident
Engineer
Dubai (UAE)
DEWA (DUBAI ELECTRICITY AND
WATER AUTHORITY)
Scope:
(1) DEWA Staff Housing complex
(Gr+5 storey) 60 DUs. , near
international city, Dubai
Associated MEP works (fire
water line/system, A/C system and
plumbing works) ,
Finishing works (Tiling,
Cladding, False ceiling and Paint
works)
Internal roads/drainage
works
Landscape works
Cost: 110 million Dhms
As SRE,
Reported to the Client, the
Construction Director (company) and
supported by the Senior Engineers,
Assistant Resident Engineers, Site
Engineers and Inspectors.
Be responsible for ensuring that
the section of works are constructed in
accordance with the contract
requirements.
Ensure, Contractor prepare/
submit (without) delay the Program,
PQP, HSE Plan and these are
reviewed/commented/finalized as per
the contract documents for
implementation.
Check contractor's submissions
and shop drawings.
Respond to the contractor's
request for information.
Liaise with the Material
7. 7
(2) Construction of DEWA
stores (Huge stores- For
Pipes/Fittings/Specials)
Large Shades
Office building
Mosque- 700 sq mtrs
Parking
Internal roads/drainage
Associated MEP works and
finishing works.
Cost:170 million Dhms
Engineer on required testing and the
testresultsall sectionsof the works,and
ensure/monitorthe quality of works for
compliance with contract documents
(approveddrawings/specification/PQP).
Liaise with the clients PMC, /
and other authorities, contractors or
consultants who interface with the
project.
Bring and share international
Health & Safety best practices.
Monitor site safety and liaise
with the Safety Engineer.
Attend progress meetings and
give technical input as required.
Organize, coordinate and
communicate for various meetings -
Technical meetings, Quality meetings,
HSE meetings, Coordination meetings,
internal meetings and ensure
attendance by all the concerned and
preparation/distribution of MOMs.
Prepare and present progress
reports.
Keep comprehensive records of
worksdone and labor and plant returns.
Cost control and commercial
management with assistance from the
QSs Liaise with the planning engineers
to monitor progress and notify the PMC
of any potential delays.
Ability to lead; be resilient and
have a "can do" attitude whilst working
under pressure.
Observe Middle Eastexperience
and an understanding of multicultural
working.
Ensure the systemof Construction
Supervisionmeetthe consultancy
contract.
July 2008 to
Nov 2010
NJS
Consultants
DUBAI
DUBAI (UAE)
DEWA (DUBAI ELECTRICITY AND
WATER AUTHORITY)
Office Complex (DEWA HQ), Al-
Reported to the Client, the
Construction Director (company) and
supported by the Senior Engineers,
Assistant Resident Engineers, Site
Engineers and Inspectors.
Be responsible for ensuring that
the section of works are constructed in
8. 8
Sr Resident
Engineer
Qouz, Dubai
Scope:
The project involved the
construction of
Various offices for senior
staff
Meeting rooms
Large Hall ( offices for
assisting staff)
Prayer hall
Canteen
Entrance Lobby
Associated MEP works (fire
water line/system, A/C system and
plumbing works) ,
Finishing works (Tiling,
Cladding, False ceiling and Paint
works)
Interior decoration, Fit out,
drainage works,
Electrical substation
building, Power supply , emergency
Power Supply, security fencing,
Main SCADA System building, CCTV
Surveillance,
Internal roads, Foot path
and Landscape works,
COST: UAE Dhms 510 million
accordance with the contract
requirements.
Ensure, Contractor prepare/
submit (without) delay the Program,
PQP, HSE Plan and these are
reviewed/commented/finalized as per
the contract documents for
implementation.
Check contractor's submissions
and shop drawings.
Respond to the contractor's
request for information.
Liaise with the Material
Engineer on required testing and the
testresultsall sectionsof the works,and
ensure/monitorthe quality of works for
compliance with contract documents
(approveddrawings/specification/PQP).
Liaise with the clients PMC, /
and other authorities, contractors or
consultants who interface with the
project.
Bring and share international
Health & Safety best practices.
Monitor site safety and liaise
with the Safety Engineer.
Attend progress meetings and
give technical input as required.
Organize, coordinate and
communicate for various meetings -
Technical meetings, Quality meetings,
HSE meetings, Coordination meetings,
internal meetings and ensure
attendance by all the concerned and
preparation/distribution of MOMs.
Prepare and present progress
reports.
Keep comprehensive records of
worksdone and labor and plant returns.
Cost control and commercial
management with assistance from the
QSs Liaise with the planning engineers
to monitor progress and notify the PMC
of any potential delays.
Ability to lead; be resilient and
have a "can do" attitude whilst working
under pressure.
Observe Middle Eastexperience
9. 9
and an understanding of multicultural
working.
Ensure the systemof Construction
Supervisionmeetthe consultancy
contract.
November
2006 to June
2008
NJS
Consultants
OMAN
Resident
Engineer
OMAN
PAEW ( PUBLIC AUTHORITY OF
ELECTRICITY AND WATER )
SCOPE: Staff Housing (Residential)
Complex and associated
roads/drainage, Muscat
The project included;
The construction of Housing
Complex (Ground +two) - 102 units
and, associated finishing works
(Insulation, Tiling, Cladding, False
ceiling, MEP works and Paint
works)
Internal roads/drainage and
landscape works.
Over Head Tank – 2000
cu.m capacity
Cost: 31 million OR
As ResidentEngineer,
Spearhead the construction
supervision as per contract and
specifications through a team of
Engineers, Inspectors and Surveyors.
Monitoring and reporting to
Client (PAEW) on the contractor’s
activities on site with respect to
technical and contractual compliance.
Ensuring adherence to Project
Health and Safety Plan; taking
appropriate actions with regards to
health and safety issues.
Advising the Engineer (PAEW)
on technical / contractual issues.
Reviewing & comment and
forwardto clientfor approval - the shop
drawings, materials & equipment,
mockups & samples and other
engineering submissions.
Ensure withassistance of quality
engineer that all test are carried out for
materialsused, by thirdparty (approved
lab.) for compliance with standards/
specification and reports are submitted
to the client after my review /
comments.
Ensure adherence to Project
approved Quality Plan.
Reviewingandrecommendingon
contractor’smonthlypayment
applications.
October 2004 –
November
2006
Dutco Balfour
Beatty LLC,
DUBAI (UAE)
Scope: (1)
The project involved the
construction of Run way and
various buildings:
Handledthe followingtasksasDy.
PROJECTMANAGER,
Leading a team of managers,
Engineers, Foreman and other skilled
Staff and reporting to Project Manager.
Developing&implementing the
10. 10
DUBAI
(Construction)
Dy. Project
Manager
Accommodation building,
Office building
Mosque,
Generator House,
Sub-Station,
Associated finishing works
(Tiling,Cladding, False ceiling and
Paint works).
R.O. Plant and Pump
Rooms, Water Line, Fuel Line and
Paved & Unpaved Roads at Yasat
Ali Island.
Cost: 126 million Dhms
(2) The project involved casting
concrete piles / steel Piles in Dubai
Festival City in groups of different
diameters and depth.
construction schedule with respect to
mile stones and completion date.
Arranging all resources;
overseeing the implementation of
document control procedure.
Attend /advise site progress
meetings with client / consultant.
Conducting the internal
meetings with construction managers /
site engineers, review of daily progress
and resolvingthe site problems/ issues.
Advise P.M. and follow up with
company’s senior management for
procurement of material, equipment /
machineries and man power and
optimize their uses and ensure cost
saving.
Draft/prepare all
correspondence with Client, Consultant
and sub contractors.
Regular review of Project
resources and ensure cost saving and
completionof worksasper program and
avoid possible delays.
Preparation of shop drawings /
structural shop drawings; designing
calculations in site design cell with
assistance of design engineer for
approval by the Consultant and Client.
Reportingonthe progressof the
work to client / consultant as per the
contract on weekly / monthly basis.
SignificantContributions,
Playedapivotal role in ensuring
that the correct quantity of materials &
manpower are delivered in time.
Monitored the performance of
the team on a daily basis.
Developed long term & short
term programs on the project in order
to minimize the wastage of time and
resources with assistance from the
Planning Engineer.
August 2002 – Scope:
As ProjectManager, I had to;
Represent the interests of the
11. 11
September
2004
A. Bin Jarallah
Contracting Co.
Riyadh (KSA),
Project
Manager
(1) Construction of Garages
equipped with electro mechanical
systems ( Military Vehicles),
Office building
Canteen
Mosque
Cost- 112 million SR.
(2) Dualization of Riyadh –
Khamis Mushyat Road Section
(18,19) is approximately 48 KMS. It
is addition of two lanes complete
with all road signs, road furniture
and commissioning. The terrain is
hilly and crosses many wadis
(streams) including many bridges.
Cost; 151 million SR
client during construction execution.
Negotiates changes to the scope of
work. Responsible for following up on
instructions and commitments
associated with the project.
Participate in negotiations with
regulatory agencies and in public
meetingsinsupportof clients'interests.
Oversee establishment of
Project Execution Plan, Health and
Safety Plan, Quality Assurance/ Quality
Control Plan, and other documents
required from the construction
contractor.
Monitor the execution of the
technical, financial and administrative
functions of the construction contract.
Assign responsibility for
executing project plans to key
subordinatesaftercareful assessmentof
how to utilize their qualifications and
strengths. Provides input to
performance reviews and development
plans for subordinates.
Identify the needsfor specialist
resources to create project teams
capable of completing effective, quality
work.
Work with the client, the
contractor, project managers, project
engineers, and discipline leads to
coordinate budgets, schedules, and
plans for the various elements of a
project.
Promote technical and
commercial excellence on the project
throughapplicationof QualityAssurance
processes. Monitors and reports on the
progress of all project activity including
significant milestones, and any
conditions, which would affect project
cost or schedule.
Establish weekly meeting to
review project status and formulate
action items.
Performs other responsibilities
associated with this position as may be
12. 12
appropriate.
Guide and influence the team's
resources in order to maximize
efficiency, client support and on-time
delivery of tasks.
September
1998 – March
2002
Mushrif
Trading &
Contracting Co.
W.L.L., Kuwait
Deputy Project
Manager
Construction of SEWAGE
TREATMENT PLANT, UMM Al
HAYMAN, KUWAIT
Scope:
The construction of sewage
treatment plant consisted of;
Reinforced concrete (grade 35)
structures
Head works,
oxidation ditches – 4 nos
Clarifiers – 4 nos
Effluent tanks- 4 nos
Pumping stations,
Sludge drying beds) ,
Sewerage lines (large dia),
All associated mechanical /
electrical equipments /
instrumentation works for plant
operation.
BUILDINGS AND LANDSCAPE
WORKS
Office building
Accommodation building
Operation & Control
building
Parking
Mosque
Associated MEP works (fire
water line/system, A/C system and
plumbing works) ,
Finishing works (Tiling,
Cladding, False ceiling and Paint
works)
Cost: 13.5 million KD
Actedas deputyof PM , I had to
Oversee establishment of
Project Execution Plan, Health and
Safety Plan, Quality Assurance/ Quality
Control Plan, and other documents
required from the construction
contractor.
Monitor the execution of the
technical, financial and administrative
functions of the construction contract.
Assign responsibility for
executing project plans to key
subordinatesaftercareful assessmentof
how to utilize their qualifications and
strengths. Provides input to
performance reviews and development
plans for subordinates.
Identify the needsfor specialist
resources to create project teams
capable of completing effective, quality
work.
Work with the client, the
contractor, project managers, project
engineers, and discipline leads to
coordinate budgets, schedules, and
plans for the various elements of a
project.
Promote technical and
commercial excellence on the project
throughapplicationof QualityAssurance
processes. Monitors and reports on the
progress of all project activity including
significant milestones, and any
conditions, which would affect project
cost or schedule.
Establish weekly meeting to
review project status and formulate
action items.
Performs other responsibilities
associated with this position as may be
13. 13
appropriate.
Guide and influence the team's
resources in order to maximize
efficiency, client support and on-time
delivery of tasks.
December
1995 – July
1998
RAK Arabia Co.
for
international
Construction,
KSA
Sr.
Construction
Manager
KSA
I have done various SAUDI
ARAMCO Projects that include ;
(1) Office buildings,
Canteen,
Parking,
Mosque,
Refinery extension ( steel
structure) and
Pipe lines and road
construction at RAS TANURA
REFINERY and BERRY GAS PLANT.
Cost: 110 Million SR
(2) Construction of foundation
comprising group of steel piles and
construction of pile caps.
Cost: 82 million SR
(3) Construction of
maintenance work shop for Saudi
Aramco, RAHIMA
Cost: 11 million SR
Follow up construction Program ,
Handled the following tasks:
carry on various Construction
such as pile driving, construction of pile
caps and works for road construction
(earth works, retaining walls,
construction of roads, signal system,
road markings, parking lots as per
approved construction drawings /
specification/contract.
With assistance of design
engineer, Preparing shop drawings /
structural shop drawings and material
submittalsforapprovalfromconsultants
/ client.
Ensure all lab test for
construction materials for buildings /
roadsand site investigation by approved
agency take place as per program and
submit reports.
Creating monthly progress
reports to be submitted to the
consultants/client.
Leading team of
Engineers/Foremen and skilled staff.
Coordinating with different
departments to follow the construction
schedule.
Advising the Project Manager
for deployment of manpower,
equipment and machinery.
Attending the Progress
meetings.
Rendering assistance to the site
design cell
Oct’83 - Dec’95
Water Supply
& Sewage
I have done various Projects in
NEW DELHI that include,
Water treatment Plant,
Reservoirs construction, water lines
Jul’82 – Oct’83
Site Engineer
Oct’83 – Jul’88
Design/ Planning
14. 14
Disposal
Undertaking
(Municipal
Corporation of
Delhi) Delhi,
India
(Client)
and pumping Stations,
Housing Complex( Ground
+3 storey) and Road construction (
total app. 50 kms that includes
earth works , retaining walls, small
bridges over open drainage, and
utilities )
And associated MEP works,
LANDSCAPE WORKS in
various parts of New Delhi .
Engineer
Jul’88 – Dec’95 Sr.
Civil Engineer/ Civil
Engineer (Construction)
Training / Seminar Attended
Safety Training in Saudi Aramco and with U.S. Commission in U.A.E.
Seminars on Buildings, structures, water Supply Projects and infrastructures.
Training and lectures by Dr SAMon Sound contract Administration in Dubai, UAE.
IT Skills, Contact information
Well versedwithMSOffice, MS Project and Auto CAD 2013.
Contact information:
00918424872709
Email address:
sohasana.qureshi@gmail.com
Skype ID: ashfaquequreshi31
Personal Dossier
Date of Birth : 25th
January 1960
PermanentAddress : 503, Mashayakhtower,Chincholi bunderroad,Malad(w),Mumbai-400064,
INDIA
Nationality : Indian
Marital Status : Married
No.of Dependants : 3
PassportDetails : No. K0883395; ValidUp to: 2024,
DrivingLicense : HoldingDubai(UAE),Oman,QatarandIndianDrivingLicenses
LanguagesKnown : English,BasicArabic, Hindi andUrdu