PROFESSIONAL RESUME
NAME: GRAHAM COX
DATE OF BIRTH: 3 APRIL 1955
NATIONALITY: BRITISH
HIGHER EDUCATION BSc (Hons) Eng Management
AND QUALIFICATIONS: ONC Fab/Welding Technology
POSITION. DEVELOPMENT/PROJECT MANAGER
SUMMARY:
I am a demonstrably effective manager with a “hands-on” style who enjoys delivering results. An
effective organiser and team player with good business, commercial and technical skills. I have good
communication and leadership skills and am able to build effective and successful working relationships
with the team.
My experience has been gained across the spectrum of the Oil and Gas industry with a range of small to
medium sized E&P companies as well as Engineering Contractors. It encompasses oil and gas field
business opportunity development and technical development through all phases from Appraise to
Execute with readiness and hand over to operations. I have a sound understanding of subsurface
requirements, a wide range of facilities multi-discipline engineering and risk management skills, am
technically strong with experienced in onshore and offshore manned and unmanned projects in UK. I
have also many years experience in providing development solutions in the UK SNS and internationally
having worked in Australia on the development of Yolla project, the Meditteranian for Perenco in North
Sinai region based in Cairo and British Gas in Tunisia based in Sfax as well as the Dutch sector of the
North Sea. Additionally I have assisted independent start up companies in the UK and Romania in terms
of identifying business opportunities and providing help to raise equity.
My field development experience has covered full development from Appraise phases to Execution for
SNS projects such as Horne and Wren for Tullow Oil, Grove for Newfield Petroleum, Clipper South and
Breagh for Fairfield Energy/RWE. I have also led many development appraise, select and define phase
studies for numerous other SNS fields again both in UK and Dutch waters. In short I can cover most
things from license round commitments through to project management of all phases for field execution
and start up preparation and handover to operations.
In summary I have worked directly for the following operating companies in the UK and overseas.
Hansa Hydrocarbons.
Fairfield Energy.
RWE Dea (UK)
XTO Energy.
Perenco.
Newfield Petroleum
Hunt Petroleum.
Tullow Oil.
Gaz de France.
CalEnergy.
Elf Petroland.
Texaco.
Arco British.
Placid.
GC – CV June 2015
2
Detailed Work Experience to date.
Mature Fields 1. June 2015 – present.
Provide asset technical due diligence support in relation to UK North Sea acquisition package. Advise
new buyer on asset integrity and export issues.
Hansa Hydrocarbons Ltd. London. March – April 2015.
The task was to support the company in both business growth and asset development. The scope
included offtake route studies and appraise type screening with supporting phased CAPEX and OPEX to
enable economics to be produced for opportunities within the UK North Sea area.
Fairfield Energy. Development Manager. September 2012 – April 2015.
Responsible for development of a UK Southern North Sea asset package, also supporting a further
acquisition programme and license round asset applications. Reporting directly to the overall Operations
Manager – Andrew Hockey.
Geographical areas cover the UK and Dutch sectors of the SNS as well as the Irish Sea.
A summary of some of my day to day responsibilities are:-
• overall and project specific planning,
• resource and budget preparation,
• procedural preparation
• set up and management of operational control methods such as Gate Control System
• implementation and overseeing any third party studies,
• internal peer reviews,
• regulatory interfaces such as DECC and HSE.
Dacia Oil and Gas. Bucharest Romania. Adhoc through 2012.
I assisted the Romanian start up company in seeking and assessing in country oil and gas opportunities.
The task was to support the company in entering the E&P market in Romania through acquisition or
license application. My scope was to provide business and technical support to their small team.
RWE DEA UK Ltd. Development Group Engineering Manager. July 2009 - August 2012.
Engineering manager for both the Clipper South and Breagh projects reporting to the RWE Development
Manager Mark Hughes.
My responsibilities to both projects included management of the RWE team of discipline engineers and
selected contractors through the select, define and execution phases. Steering both projects through
technical, safety and schedule risk assessments. During the execution phases for both projects I was
placed by RWE in the Dutch construction yards as the company representative and engineering
manager.
A summary of my responsibilities were:-
- management of the RWE inhouse engineering team and all third party contractors,
- project execution planning
- preparation and management of budgets, field development plan, design safety case and
operating safety cases and all clarifications,
- preparation of scopes of work, CRINE based contract preparation and procurement activities for
all phases,
- coordination and input to governmental approvals
- reporting to management and where necessary technical review of engineering and design
attendance at hazops etc,
- plus interfacing with the host platform operator and interfacing with other groups such as drilling
and operations.
- Preparation for platform handover and interfacing with production manager.
Kinesis Resources Ltd. Consultant Oil and Gas Adviser. November 2009 to April 2010.
Providing adhoc business and technical consultancy services to a privately owned E&P start up
Company. Provide evaluation and business strategy development for acquisition opportunities in
Mediteranean areas.
Fairfield Energy Ltd. Engineering Manager – Clipper South Development Project.
GC – CV June 2015
3
March 2008 – July 2009.
Engineering Manager for the Clipper South Development. A tight rotliegend gas field development
consisting of multiple wells each with multiple fracs. I was responsible for the delivery of the Clipper
South platform, pipelines and associated Host facility modifications. This includes the development of
the platform operating philosophy and setting well intervention requirements ensuring adequate platform
facilities to support a 15 year field life. I led the project technical and safety team through conceptual and
FEED phases in preparation for the execution phase of the project. This included interfacing with
subsurface and drilling groups in order to build an operating model to suit the life of the field facilities. It
included continuous economic and technical evaluation, preparation of execution plans and strategies,
preparation of the ES and FDP, consents and approvals plans and engineering contractor control.
XTO Energy - Fortworth Texas. Consultant Development Engineer. November 2008 to March
2008.
Providing ad-hoc/part time support to XTO’s UK operation in support of their acquisition program by
providing technical and economic field development solutions for opportunities in the UK and Dutch
sectors of the North Sea. Areas include high CO2 content gas fields and tight gas reservoirs.
Rill Energy Ltd. Consultant Oil and Gas Adviser. November 2007 to January 2008.
Providing adhoc business and technical consultancy services to a privately owned E&P start up
Company helping with the identification, evaluation and execution planning of acquisition opportunities in
UK and NW Europe.
Hunt Petroleum. Consultant Development Engineer. January 2007 – November 2007.
Adhoc support to Hunt Petroleum in support of their acquisition program by providing field development
technical and commercial evaluations. This was achieved by carrying out feasibility screening studies
which would provide technical and schedule requirements, with supporting CAPEX, OPEX, DRILLEX and
abandonment cost estimates. Geographical areas covered the UK and Dutch sectors of the SNS as well
as the Irish Sea.
Genesis Oil and Gas. Project Manager. British Gas Tunisia Miska Platform Debottlenecking
Project. April 2007 – December 2007. (Consultant)
Project Manager for Glycol dehydration and coalescer replacement packages. My responsibilities were
to lead a focused team in delivering a solution to change out these facilities to budget and schedule.
This included the coordination of multi-discipline engineering, design, procurement and construction
activities both in London and Tunisia for replacement equipment packages, preparation of construction
feasibility studies, capex and schedule to ensure the work can be carried out within an allocated
shutdown period.
Tullow Oil UK Ltd. Development Engineer/Project Manager. August 2001 – April 2005
Reporting directly to the Operations and Technical director Paul McDade, as an integral part of
development and operations team my duties duties included the following:
- Horne and Wren development engineer and platform facilities company representative for the
EPIC contract. I was responsible for the development of the facilities concept and involved
throughout the project execution managing the day to day detail engineering of the platform,
design aspects and construction as well as interfacing with drilling, operations and pipelines.
- Gwain SE Project Manager. Subsea step out. Interfacing as a partner with the field operator.
- Orwell field. Interface with the Operator for the day to day operations and reporting of Orwell
field production. Preparation of operational procedures and MAPD as well as operator budget
review and approval. Continuous reporting to Tullow management and partners.
- To support non operated fields I was involved in Inspection and maintenance budget preparation,
procedural preparation and scope implementation, supervision of marine supervision for diving
operations.
- Prospect development. Continuous screening studies of export and facilities development
options, well design and life of field capex and opex to support a developing business portfolio.
- completion of engineering conceptual studies.
- project planning, scope of work preparation, issue and control of contractor engineering
organisations.
- asset decommissioning studies and appraisal.
GC – CV June 2015
4
Gaz de France Britain Ltd. Development Engineer. December 2002 – February 2003.
After the acquisition of Cal Energy by GDF Britain I spent 4 months on a part time basis preparing CRINE
based contracts and tendering packages to support the engineering and construction development of a
SNS gas field. Contracts included drilling rig, casing and tubing, surveys and sub sea facilities.
CalEnergy Gas (UK) Limited. Development Engineer. April 1999 – December 2002.
My core duties where to support the business development group by carrying out feasibility and
screening studies in strategically targeted areas world wide. This would involve carrying out technical
development studies and provide supporting development schedules and cost models in detailed reports
to support a developing acquisition programme. I was also tasked with initiating certain projects by
carrying out contractor screening studies, preparation of tender documents for studies and engineering
services, as well as developing and providing methods of operational improvement to existing assets to
reduce opex spend. This has included developments in UK SNS gas basin onshore Poland and offshore
Australia in the Bass Basin.
ABB LUMMUS GLOBAL. PROPOSALS MANAGER. JUNE 1997 - April 1999
I joined the ABB LG London team as Proposals Manager. Responsibilities were to guide and expedite a
Proposals team ensuring that Proposals assigned to me were responded to in a manner that reflects
complete compliance and addresses all required responses in areas such as commercial, contractual,
schedule, manpower and total technical ability issues as per the scope of work, preparation of
execution/method statements for the work. Responsible for kick off initiation, setting Proposal budget
and progress.
Seconded to ABBLG BV Netherlands in 1998 as Project/Proposals Manager for a newly formed Business
Development group called ‘Sub Sahara’ Africa. My duties are to execute proposals in response to EPIC
or EPCOM enquiries for prospects in Nigeria. I am responsible for development of proposal win
strategies and formulation of execution methods that may include partnering and selection of Sub
Contractors, writing of execution plans and method statements, expediting and controlling input from
third parties and coordination in house with a multi discipline engineering team up to proposal issue.
SINGLE BUOY MOORINGS, MONACO. PROJECT ENGINEER. MARCH 1997 - JUNE1997
FPSO conversion for Japan Vietnam Petroleum Company. During this period was responsible for main
contract review, preparation of sub-contracts and scopes of work relating to Turret fabrication,
modifications to FPSO and Topsides Process Packages. Preparation of the schedule for the execution
of the EPCOM work.
ABB LUMMUS GLOBAL, LEIDEN. PROJECT ENGINEER. MAY 1996 - FEBRUARY 1997
Onshore Den Helder Condensate System Extension to develop and provide facilities that caters for the
forecasted increase in condensate production. My responsibilities were to lead a Multi-discipline detail
design time, carry out the construction interface and construction support.
Elf Petroland, K6 Offshore Compression. Detail Design.
Responsible for the co-ordination, Project Administration, Budget Control, Progress reporting for a multi-
discipline engineering and design team. The scope of work was to engineer the installation of a new
Compression Module with modification to all associated existing offshore equipment as required, prepare
a detailed ITT Package and issue it for bid purposes. The ITT package included detailed task sheets
describing fully the construction and installation activities for the work. Further preparation of a detailed
Capex and Opex cost estimate and schedule was produced for a 6 year Platform Inspection by Certifying
Authorities.
ABB LUMMUS GLOBAL LIMITED, ABERDEEN. PROJECT MANAGER. SEPTEMBER 1994 - 1996
General duties included project management, conceptual development, supported by preparation of cost
details, technical specifications, execution and method statements, proposals for topsides, FPSO, subsea
design, EPIC, Operating and Maintenance contracts for the following:
• Shell S.F.U. Integrated Services Contract
• Conoco UK, Southern Sector Cost Challenge
• Texaco Houston, Galata Project, Bulgaria
• Total, Hunter Field Development
• BP, Schiehallion Field Development
• Chevron UK, Alba Southern Development
GC – CV June 2015
5
Texaco, Erskine. Equipment Supply. Project Manager.
Seconded to ABB Vetco Gray as Project Manager for the supply of high temperature, high
pressure wellheads and Xmas trees.
Responsibilities included project commercial coordination aspects and project budgetary control,
the technical coordination for engineering, design and manufacture inclusive of planning and
scheduling, procurement activities, progress reporting to ABB Vetco Gray, Manager of Projects
and Texaco.
• Texaco, Tartan A. Safety Items. Project Manager.
Preparation of Engineering Handover packages relating to outstanding safety case action items.
Responsible for supervision of planning and scheduling, project budget control, progress
reporting and third party interface.
Chevron Alba. Mechanical Engineer/Engineering Manager
Conceptual Studies, Phase 2 Stage 2. Conceptual Engineering/Design.
Preparation of phased cost estimate for subsea and topsides scope. Preparation of ITT
packages construction and installation scope of work relating to water injection subsea facilities.
Responsible for conceptual engineering, design coordination, costing and phased planning of
Alba Northern retrofit for piping, structural, mechanical, electrical and instrument disciplines.
Further duties included project deliverable control progress reporting and Engineering Budget
Control.
ABB GLOBAL ENGINEERING,LEIDEN, Netherlands. PROJECT MANAGER. JANUARY 1993 JULY
1994 - Elf KF5A & KF5CC Construction/Installation Hook-Up Preparation
Responsible for completion of tail end construction activities. Preparation for offshore platform hook-up.
Co-ordination of subcontractor and technical queries. Writing up of Construction and Installation system
procedures and detail for the execution of the offshore scope of work.
Amerada - Fife FPSO Project. Conceptual Engineering and Design.
Responsible for technical co-ordination of multi-discipline engineering and design team for first
phase of modification to a floating vessel for crude oil production storage and offloading. Duties
included discipline man-hour control and progress reporting.
The scope was for FPSO conceptual design and layout of various topsides process and
mechanical packages.
ARCO BRITISH LIMITED. SENIOR PROJECT ENGINEER FACILITIES. FEBRUARY 1991 -
DECEMBER 1992
Orwell Field Development Project.
Client representative responsible for the technical co-ordination of multi-discipline engineering
and design team. The scope was inclusive of all engineering, fabrication and construction
phases for upgrade to an existing offshore topsides facilities, due to increased production from a
new subsea development.
I was responsible for the approval and execution of modifications to topsides reception facilities
for the addition of gas/condensate processing equipment, piping, structural
fabrication/construction, associated with an additional modularised gas compressor. Day-to-day
duties included interfacing with project management team, offshore operations department, the
engineering contractor, the fabrication and construction contractor and suppliers of major
equipment items for progress control, man-hour approval and reporting expenditure.
MARCH 1989 - FEBRUARY 1991 PROJECT ENGINEER GLOBAL ENGINEERING BV LEIDEN
HOLLAND
Shell Gabon. Project Manager.
Seconded to Shell Gabon to manage a small engineering and construction team at the Gamba
and Rabi terminals for various work orders at both terminals. Engineering and design work
carried out in the Leiden office.
GC – CV June 2015
6
NAM L5-FA-1. Detail Engineering and Design
Responsible for the technical co-ordination of a multi-discipline project team related to the
topside detail design of an offshore platform comprising all process and utilities systems and
equipment.
Duties include engineering, procurement and detail design co-ordination, project monitoring and
progress reporting.
AS Norske Shell - Draugen Field. EPIC Contract. PROJECT MANAGER
Project co-ordination of all commercial and technical activities related to the detail design
fabrication and construction for piping, mechanical, structural, instrumentation, electrical and
purchasing/procurement of 4 off gas compressor skids for the above offshore project.
Placid L-11A (88) Well Protector Production Platform. PROJECT ENGINEER
Detail Design.
Second phase detail engineering. Duties include Project co-ordination of piping and structural
details design for process & utilities piping, equipment and pipe supports.
Amoco Montrose Living Quarters Module. PROJECT ENGINEER
Project co-ordination of electrical and instrumentation detail design for a replacement Living
Quarters Module.
BP Q8A Gas Compression Package. EPIC Contract. PROJECT MANAGER
Duties include project co-ordination of all commercial and technical activities related to a detail
design and construction for all disciplines of an onshore Gas Compression unit. Responsible for
budgetary control and progress reporting.
MARCH 1988 - DECEMBER 1988 PROJECT ENGINEER. A HAK NEDERLAND BV - HOLLAND.
Fabrication, Construction and Installation Contract.
Coordination of all technical and engineering activities related to the project. The scope was for
construction and installation of NAM K15 block platform modifications. Preparation, co-ordination of
planning activities. Coordination between onshore prefab and offshore installation activities. Preparation
of engineering query forms and submissions to client. Preparation, checking of all technical reports and
calculations affecting the work.
Last page.
GC – CV June 2015
6
NAM L5-FA-1. Detail Engineering and Design
Responsible for the technical co-ordination of a multi-discipline project team related to the
topside detail design of an offshore platform comprising all process and utilities systems and
equipment.
Duties include engineering, procurement and detail design co-ordination, project monitoring and
progress reporting.
AS Norske Shell - Draugen Field. EPIC Contract. PROJECT MANAGER
Project co-ordination of all commercial and technical activities related to the detail design
fabrication and construction for piping, mechanical, structural, instrumentation, electrical and
purchasing/procurement of 4 off gas compressor skids for the above offshore project.
Placid L-11A (88) Well Protector Production Platform. PROJECT ENGINEER
Detail Design.
Second phase detail engineering. Duties include Project co-ordination of piping and structural
details design for process & utilities piping, equipment and pipe supports.
Amoco Montrose Living Quarters Module. PROJECT ENGINEER
Project co-ordination of electrical and instrumentation detail design for a replacement Living
Quarters Module.
BP Q8A Gas Compression Package. EPIC Contract. PROJECT MANAGER
Duties include project co-ordination of all commercial and technical activities related to a detail
design and construction for all disciplines of an onshore Gas Compression unit. Responsible for
budgetary control and progress reporting.
MARCH 1988 - DECEMBER 1988 PROJECT ENGINEER. A HAK NEDERLAND BV - HOLLAND.
Fabrication, Construction and Installation Contract.
Coordination of all technical and engineering activities related to the project. The scope was for
construction and installation of NAM K15 block platform modifications. Preparation, co-ordination of
planning activities. Coordination between onshore prefab and offshore installation activities. Preparation
of engineering query forms and submissions to client. Preparation, checking of all technical reports and
calculations affecting the work.
Last page.
GC – CV June 2015

More Related Content

What's hot (19)

Mike Johnson (JEAJ) amend [57398]
Mike Johnson (JEAJ) amend [57398]Mike Johnson (JEAJ) amend [57398]
Mike Johnson (JEAJ) amend [57398]
 
Revamp of gas development project
Revamp of gas development projectRevamp of gas development project
Revamp of gas development project
 
CV_Chatchawal_Yodpol_16-03-2016
CV_Chatchawal_Yodpol_16-03-2016CV_Chatchawal_Yodpol_16-03-2016
CV_Chatchawal_Yodpol_16-03-2016
 
Construction Oil and Gas Forum Jan 2015 Abu Dhabi Brochure
Construction Oil and Gas Forum Jan 2015 Abu Dhabi BrochureConstruction Oil and Gas Forum Jan 2015 Abu Dhabi Brochure
Construction Oil and Gas Forum Jan 2015 Abu Dhabi Brochure
 
April2015
April2015April2015
April2015
 
Kal resume
Kal resumeKal resume
Kal resume
 
Cv jason dixon dated 20160124
Cv jason dixon dated 20160124Cv jason dixon dated 20160124
Cv jason dixon dated 20160124
 
Ian Entwistle CV
Ian Entwistle CVIan Entwistle CV
Ian Entwistle CV
 
brochure-oil-gas_en
brochure-oil-gas_enbrochure-oil-gas_en
brochure-oil-gas_en
 
Clough CH-IV Brochure
Clough CH-IV BrochureClough CH-IV Brochure
Clough CH-IV Brochure
 
Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014
 
DT CV
DT CVDT CV
DT CV
 
WHYTE-Jan2016 Final
WHYTE-Jan2016 FinalWHYTE-Jan2016 Final
WHYTE-Jan2016 Final
 
Presentation DOBE 2016
Presentation DOBE 2016Presentation DOBE 2016
Presentation DOBE 2016
 
Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13
 
Ben Mullins Resume
Ben Mullins ResumeBen Mullins Resume
Ben Mullins Resume
 
Psm rubyricks oil and gas event and conferences
Psm rubyricks oil and gas event and conferencesPsm rubyricks oil and gas event and conferences
Psm rubyricks oil and gas event and conferences
 
MY C.V final 2000
MY C.V final 2000MY C.V final 2000
MY C.V final 2000
 
NauticAWT Brochure
NauticAWT BrochureNauticAWT Brochure
NauticAWT Brochure
 

Viewers also liked

Production of Chips of Porang (Amorphophallus Oncophyllus) by Slicing Machin...
Production of Chips of Porang  (Amorphophallus Oncophyllus) by Slicing Machin...Production of Chips of Porang  (Amorphophallus Oncophyllus) by Slicing Machin...
Production of Chips of Porang (Amorphophallus Oncophyllus) by Slicing Machin...AM Publications
 
Medical records coordinator performance appraisal
Medical records coordinator performance appraisalMedical records coordinator performance appraisal
Medical records coordinator performance appraisalEmmanuelPetit678
 
Cosmic Adventure - Episode 001
Cosmic Adventure - Episode 001Cosmic Adventure - Episode 001
Cosmic Adventure - Episode 001Stephen Kwong
 
Future of Corporate Communications: Cutting Through the Noise: Report
Future of Corporate Communications: Cutting Through the Noise: ReportFuture of Corporate Communications: Cutting Through the Noise: Report
Future of Corporate Communications: Cutting Through the Noise: ReportBrunswick Insight
 
M3 16marks
M3 16marksM3 16marks
M3 16marksvembbu
 
AAAD [01] Introduction
AAAD [01] IntroductionAAAD [01] Introduction
AAAD [01] IntroductionStephen Kwong
 
Pm [05] Circular Motion Kinematics
Pm [05] Circular Motion KinematicsPm [05] Circular Motion Kinematics
Pm [05] Circular Motion KinematicsStephen Kwong
 
Improving layout and workload of manufacturing system using Delmia Quest simu...
Improving layout and workload of manufacturing system using Delmia Quest simu...Improving layout and workload of manufacturing system using Delmia Quest simu...
Improving layout and workload of manufacturing system using Delmia Quest simu...AM Publications
 
Survey on Load Rebalancing for Distributed File System in Cloud
Survey on Load Rebalancing for Distributed File System in CloudSurvey on Load Rebalancing for Distributed File System in Cloud
Survey on Load Rebalancing for Distributed File System in CloudAM Publications
 
Homemade Skin Care - Moisturizer, Facial Scrub, Orange Peel Mask
Homemade Skin Care - Moisturizer, Facial Scrub, Orange Peel MaskHomemade Skin Care - Moisturizer, Facial Scrub, Orange Peel Mask
Homemade Skin Care - Moisturizer, Facial Scrub, Orange Peel Maskaromatictariff544
 
Pospischil2014b_EUPVSEC_2CV.4.12
Pospischil2014b_EUPVSEC_2CV.4.12Pospischil2014b_EUPVSEC_2CV.4.12
Pospischil2014b_EUPVSEC_2CV.4.12Angel Ivan Padilla
 
BNPPRE Guide to Investing in Dublin 2013
BNPPRE Guide to Investing in Dublin 2013BNPPRE Guide to Investing in Dublin 2013
BNPPRE Guide to Investing in Dublin 2013Peter Flanagan
 

Viewers also liked (17)

Production of Chips of Porang (Amorphophallus Oncophyllus) by Slicing Machin...
Production of Chips of Porang  (Amorphophallus Oncophyllus) by Slicing Machin...Production of Chips of Porang  (Amorphophallus Oncophyllus) by Slicing Machin...
Production of Chips of Porang (Amorphophallus Oncophyllus) by Slicing Machin...
 
Medical records coordinator performance appraisal
Medical records coordinator performance appraisalMedical records coordinator performance appraisal
Medical records coordinator performance appraisal
 
Cosmic Adventure - Episode 001
Cosmic Adventure - Episode 001Cosmic Adventure - Episode 001
Cosmic Adventure - Episode 001
 
Pedal on the Pier
Pedal on the PierPedal on the Pier
Pedal on the Pier
 
Resume
ResumeResume
Resume
 
Future of Corporate Communications: Cutting Through the Noise: Report
Future of Corporate Communications: Cutting Through the Noise: ReportFuture of Corporate Communications: Cutting Through the Noise: Report
Future of Corporate Communications: Cutting Through the Noise: Report
 
M3 16marks
M3 16marksM3 16marks
M3 16marks
 
Conflict management
Conflict managementConflict management
Conflict management
 
AAAD [01] Introduction
AAAD [01] IntroductionAAAD [01] Introduction
AAAD [01] Introduction
 
Pm [05] Circular Motion Kinematics
Pm [05] Circular Motion KinematicsPm [05] Circular Motion Kinematics
Pm [05] Circular Motion Kinematics
 
Improving layout and workload of manufacturing system using Delmia Quest simu...
Improving layout and workload of manufacturing system using Delmia Quest simu...Improving layout and workload of manufacturing system using Delmia Quest simu...
Improving layout and workload of manufacturing system using Delmia Quest simu...
 
Survey on Load Rebalancing for Distributed File System in Cloud
Survey on Load Rebalancing for Distributed File System in CloudSurvey on Load Rebalancing for Distributed File System in Cloud
Survey on Load Rebalancing for Distributed File System in Cloud
 
Homemade Skin Care - Moisturizer, Facial Scrub, Orange Peel Mask
Homemade Skin Care - Moisturizer, Facial Scrub, Orange Peel MaskHomemade Skin Care - Moisturizer, Facial Scrub, Orange Peel Mask
Homemade Skin Care - Moisturizer, Facial Scrub, Orange Peel Mask
 
Fisiologia
FisiologiaFisiologia
Fisiologia
 
Sleep better, feel better
Sleep better, feel betterSleep better, feel better
Sleep better, feel better
 
Pospischil2014b_EUPVSEC_2CV.4.12
Pospischil2014b_EUPVSEC_2CV.4.12Pospischil2014b_EUPVSEC_2CV.4.12
Pospischil2014b_EUPVSEC_2CV.4.12
 
BNPPRE Guide to Investing in Dublin 2013
BNPPRE Guide to Investing in Dublin 2013BNPPRE Guide to Investing in Dublin 2013
BNPPRE Guide to Investing in Dublin 2013
 

Similar to GC - CV June

Similar to GC - CV June (20)

MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
Maurice Ullman CV M
Maurice Ullman CV MMaurice Ullman CV M
Maurice Ullman CV M
 
Jonathan Betts CV 2015
Jonathan Betts CV 2015Jonathan Betts CV 2015
Jonathan Betts CV 2015
 
PAUL FOTHERGILL CV
PAUL FOTHERGILL CVPAUL FOTHERGILL CV
PAUL FOTHERGILL CV
 
Psm Cv Presentation 3 2012
Psm Cv Presentation 3  2012Psm Cv Presentation 3  2012
Psm Cv Presentation 3 2012
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
 
Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
 
cv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentcv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachment
 
CeeVee-13th January 2017_update
CeeVee-13th January 2017_updateCeeVee-13th January 2017_update
CeeVee-13th January 2017_update
 
Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15
 
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
 
RESUME-RDP
RESUME-RDPRESUME-RDP
RESUME-RDP
 
RESUME-RDP
RESUME-RDPRESUME-RDP
RESUME-RDP
 
CeeVee-10th January 2017_update
CeeVee-10th January 2017_updateCeeVee-10th January 2017_update
CeeVee-10th January 2017_update
 
Rohit Resume
Rohit ResumeRohit Resume
Rohit Resume
 
Final Mukesh Resume
Final Mukesh Resume Final Mukesh Resume
Final Mukesh Resume
 
RONALD CV 17.11.2015
RONALD CV 17.11.2015RONALD CV 17.11.2015
RONALD CV 17.11.2015
 
Tony_Van_Grembergen
Tony_Van_GrembergenTony_Van_Grembergen
Tony_Van_Grembergen
 
Michael said CV
Michael said CVMichael said CV
Michael said CV
 

GC - CV June

  • 1. 1 PROFESSIONAL RESUME NAME: GRAHAM COX DATE OF BIRTH: 3 APRIL 1955 NATIONALITY: BRITISH HIGHER EDUCATION BSc (Hons) Eng Management AND QUALIFICATIONS: ONC Fab/Welding Technology POSITION. DEVELOPMENT/PROJECT MANAGER SUMMARY: I am a demonstrably effective manager with a “hands-on” style who enjoys delivering results. An effective organiser and team player with good business, commercial and technical skills. I have good communication and leadership skills and am able to build effective and successful working relationships with the team. My experience has been gained across the spectrum of the Oil and Gas industry with a range of small to medium sized E&P companies as well as Engineering Contractors. It encompasses oil and gas field business opportunity development and technical development through all phases from Appraise to Execute with readiness and hand over to operations. I have a sound understanding of subsurface requirements, a wide range of facilities multi-discipline engineering and risk management skills, am technically strong with experienced in onshore and offshore manned and unmanned projects in UK. I have also many years experience in providing development solutions in the UK SNS and internationally having worked in Australia on the development of Yolla project, the Meditteranian for Perenco in North Sinai region based in Cairo and British Gas in Tunisia based in Sfax as well as the Dutch sector of the North Sea. Additionally I have assisted independent start up companies in the UK and Romania in terms of identifying business opportunities and providing help to raise equity. My field development experience has covered full development from Appraise phases to Execution for SNS projects such as Horne and Wren for Tullow Oil, Grove for Newfield Petroleum, Clipper South and Breagh for Fairfield Energy/RWE. I have also led many development appraise, select and define phase studies for numerous other SNS fields again both in UK and Dutch waters. In short I can cover most things from license round commitments through to project management of all phases for field execution and start up preparation and handover to operations. In summary I have worked directly for the following operating companies in the UK and overseas. Hansa Hydrocarbons. Fairfield Energy. RWE Dea (UK) XTO Energy. Perenco. Newfield Petroleum Hunt Petroleum. Tullow Oil. Gaz de France. CalEnergy. Elf Petroland. Texaco. Arco British. Placid. GC – CV June 2015
  • 2. 2 Detailed Work Experience to date. Mature Fields 1. June 2015 – present. Provide asset technical due diligence support in relation to UK North Sea acquisition package. Advise new buyer on asset integrity and export issues. Hansa Hydrocarbons Ltd. London. March – April 2015. The task was to support the company in both business growth and asset development. The scope included offtake route studies and appraise type screening with supporting phased CAPEX and OPEX to enable economics to be produced for opportunities within the UK North Sea area. Fairfield Energy. Development Manager. September 2012 – April 2015. Responsible for development of a UK Southern North Sea asset package, also supporting a further acquisition programme and license round asset applications. Reporting directly to the overall Operations Manager – Andrew Hockey. Geographical areas cover the UK and Dutch sectors of the SNS as well as the Irish Sea. A summary of some of my day to day responsibilities are:- • overall and project specific planning, • resource and budget preparation, • procedural preparation • set up and management of operational control methods such as Gate Control System • implementation and overseeing any third party studies, • internal peer reviews, • regulatory interfaces such as DECC and HSE. Dacia Oil and Gas. Bucharest Romania. Adhoc through 2012. I assisted the Romanian start up company in seeking and assessing in country oil and gas opportunities. The task was to support the company in entering the E&P market in Romania through acquisition or license application. My scope was to provide business and technical support to their small team. RWE DEA UK Ltd. Development Group Engineering Manager. July 2009 - August 2012. Engineering manager for both the Clipper South and Breagh projects reporting to the RWE Development Manager Mark Hughes. My responsibilities to both projects included management of the RWE team of discipline engineers and selected contractors through the select, define and execution phases. Steering both projects through technical, safety and schedule risk assessments. During the execution phases for both projects I was placed by RWE in the Dutch construction yards as the company representative and engineering manager. A summary of my responsibilities were:- - management of the RWE inhouse engineering team and all third party contractors, - project execution planning - preparation and management of budgets, field development plan, design safety case and operating safety cases and all clarifications, - preparation of scopes of work, CRINE based contract preparation and procurement activities for all phases, - coordination and input to governmental approvals - reporting to management and where necessary technical review of engineering and design attendance at hazops etc, - plus interfacing with the host platform operator and interfacing with other groups such as drilling and operations. - Preparation for platform handover and interfacing with production manager. Kinesis Resources Ltd. Consultant Oil and Gas Adviser. November 2009 to April 2010. Providing adhoc business and technical consultancy services to a privately owned E&P start up Company. Provide evaluation and business strategy development for acquisition opportunities in Mediteranean areas. Fairfield Energy Ltd. Engineering Manager – Clipper South Development Project. GC – CV June 2015
  • 3. 3 March 2008 – July 2009. Engineering Manager for the Clipper South Development. A tight rotliegend gas field development consisting of multiple wells each with multiple fracs. I was responsible for the delivery of the Clipper South platform, pipelines and associated Host facility modifications. This includes the development of the platform operating philosophy and setting well intervention requirements ensuring adequate platform facilities to support a 15 year field life. I led the project technical and safety team through conceptual and FEED phases in preparation for the execution phase of the project. This included interfacing with subsurface and drilling groups in order to build an operating model to suit the life of the field facilities. It included continuous economic and technical evaluation, preparation of execution plans and strategies, preparation of the ES and FDP, consents and approvals plans and engineering contractor control. XTO Energy - Fortworth Texas. Consultant Development Engineer. November 2008 to March 2008. Providing ad-hoc/part time support to XTO’s UK operation in support of their acquisition program by providing technical and economic field development solutions for opportunities in the UK and Dutch sectors of the North Sea. Areas include high CO2 content gas fields and tight gas reservoirs. Rill Energy Ltd. Consultant Oil and Gas Adviser. November 2007 to January 2008. Providing adhoc business and technical consultancy services to a privately owned E&P start up Company helping with the identification, evaluation and execution planning of acquisition opportunities in UK and NW Europe. Hunt Petroleum. Consultant Development Engineer. January 2007 – November 2007. Adhoc support to Hunt Petroleum in support of their acquisition program by providing field development technical and commercial evaluations. This was achieved by carrying out feasibility screening studies which would provide technical and schedule requirements, with supporting CAPEX, OPEX, DRILLEX and abandonment cost estimates. Geographical areas covered the UK and Dutch sectors of the SNS as well as the Irish Sea. Genesis Oil and Gas. Project Manager. British Gas Tunisia Miska Platform Debottlenecking Project. April 2007 – December 2007. (Consultant) Project Manager for Glycol dehydration and coalescer replacement packages. My responsibilities were to lead a focused team in delivering a solution to change out these facilities to budget and schedule. This included the coordination of multi-discipline engineering, design, procurement and construction activities both in London and Tunisia for replacement equipment packages, preparation of construction feasibility studies, capex and schedule to ensure the work can be carried out within an allocated shutdown period. Tullow Oil UK Ltd. Development Engineer/Project Manager. August 2001 – April 2005 Reporting directly to the Operations and Technical director Paul McDade, as an integral part of development and operations team my duties duties included the following: - Horne and Wren development engineer and platform facilities company representative for the EPIC contract. I was responsible for the development of the facilities concept and involved throughout the project execution managing the day to day detail engineering of the platform, design aspects and construction as well as interfacing with drilling, operations and pipelines. - Gwain SE Project Manager. Subsea step out. Interfacing as a partner with the field operator. - Orwell field. Interface with the Operator for the day to day operations and reporting of Orwell field production. Preparation of operational procedures and MAPD as well as operator budget review and approval. Continuous reporting to Tullow management and partners. - To support non operated fields I was involved in Inspection and maintenance budget preparation, procedural preparation and scope implementation, supervision of marine supervision for diving operations. - Prospect development. Continuous screening studies of export and facilities development options, well design and life of field capex and opex to support a developing business portfolio. - completion of engineering conceptual studies. - project planning, scope of work preparation, issue and control of contractor engineering organisations. - asset decommissioning studies and appraisal. GC – CV June 2015
  • 4. 4 Gaz de France Britain Ltd. Development Engineer. December 2002 – February 2003. After the acquisition of Cal Energy by GDF Britain I spent 4 months on a part time basis preparing CRINE based contracts and tendering packages to support the engineering and construction development of a SNS gas field. Contracts included drilling rig, casing and tubing, surveys and sub sea facilities. CalEnergy Gas (UK) Limited. Development Engineer. April 1999 – December 2002. My core duties where to support the business development group by carrying out feasibility and screening studies in strategically targeted areas world wide. This would involve carrying out technical development studies and provide supporting development schedules and cost models in detailed reports to support a developing acquisition programme. I was also tasked with initiating certain projects by carrying out contractor screening studies, preparation of tender documents for studies and engineering services, as well as developing and providing methods of operational improvement to existing assets to reduce opex spend. This has included developments in UK SNS gas basin onshore Poland and offshore Australia in the Bass Basin. ABB LUMMUS GLOBAL. PROPOSALS MANAGER. JUNE 1997 - April 1999 I joined the ABB LG London team as Proposals Manager. Responsibilities were to guide and expedite a Proposals team ensuring that Proposals assigned to me were responded to in a manner that reflects complete compliance and addresses all required responses in areas such as commercial, contractual, schedule, manpower and total technical ability issues as per the scope of work, preparation of execution/method statements for the work. Responsible for kick off initiation, setting Proposal budget and progress. Seconded to ABBLG BV Netherlands in 1998 as Project/Proposals Manager for a newly formed Business Development group called ‘Sub Sahara’ Africa. My duties are to execute proposals in response to EPIC or EPCOM enquiries for prospects in Nigeria. I am responsible for development of proposal win strategies and formulation of execution methods that may include partnering and selection of Sub Contractors, writing of execution plans and method statements, expediting and controlling input from third parties and coordination in house with a multi discipline engineering team up to proposal issue. SINGLE BUOY MOORINGS, MONACO. PROJECT ENGINEER. MARCH 1997 - JUNE1997 FPSO conversion for Japan Vietnam Petroleum Company. During this period was responsible for main contract review, preparation of sub-contracts and scopes of work relating to Turret fabrication, modifications to FPSO and Topsides Process Packages. Preparation of the schedule for the execution of the EPCOM work. ABB LUMMUS GLOBAL, LEIDEN. PROJECT ENGINEER. MAY 1996 - FEBRUARY 1997 Onshore Den Helder Condensate System Extension to develop and provide facilities that caters for the forecasted increase in condensate production. My responsibilities were to lead a Multi-discipline detail design time, carry out the construction interface and construction support. Elf Petroland, K6 Offshore Compression. Detail Design. Responsible for the co-ordination, Project Administration, Budget Control, Progress reporting for a multi- discipline engineering and design team. The scope of work was to engineer the installation of a new Compression Module with modification to all associated existing offshore equipment as required, prepare a detailed ITT Package and issue it for bid purposes. The ITT package included detailed task sheets describing fully the construction and installation activities for the work. Further preparation of a detailed Capex and Opex cost estimate and schedule was produced for a 6 year Platform Inspection by Certifying Authorities. ABB LUMMUS GLOBAL LIMITED, ABERDEEN. PROJECT MANAGER. SEPTEMBER 1994 - 1996 General duties included project management, conceptual development, supported by preparation of cost details, technical specifications, execution and method statements, proposals for topsides, FPSO, subsea design, EPIC, Operating and Maintenance contracts for the following: • Shell S.F.U. Integrated Services Contract • Conoco UK, Southern Sector Cost Challenge • Texaco Houston, Galata Project, Bulgaria • Total, Hunter Field Development • BP, Schiehallion Field Development • Chevron UK, Alba Southern Development GC – CV June 2015
  • 5. 5 Texaco, Erskine. Equipment Supply. Project Manager. Seconded to ABB Vetco Gray as Project Manager for the supply of high temperature, high pressure wellheads and Xmas trees. Responsibilities included project commercial coordination aspects and project budgetary control, the technical coordination for engineering, design and manufacture inclusive of planning and scheduling, procurement activities, progress reporting to ABB Vetco Gray, Manager of Projects and Texaco. • Texaco, Tartan A. Safety Items. Project Manager. Preparation of Engineering Handover packages relating to outstanding safety case action items. Responsible for supervision of planning and scheduling, project budget control, progress reporting and third party interface. Chevron Alba. Mechanical Engineer/Engineering Manager Conceptual Studies, Phase 2 Stage 2. Conceptual Engineering/Design. Preparation of phased cost estimate for subsea and topsides scope. Preparation of ITT packages construction and installation scope of work relating to water injection subsea facilities. Responsible for conceptual engineering, design coordination, costing and phased planning of Alba Northern retrofit for piping, structural, mechanical, electrical and instrument disciplines. Further duties included project deliverable control progress reporting and Engineering Budget Control. ABB GLOBAL ENGINEERING,LEIDEN, Netherlands. PROJECT MANAGER. JANUARY 1993 JULY 1994 - Elf KF5A & KF5CC Construction/Installation Hook-Up Preparation Responsible for completion of tail end construction activities. Preparation for offshore platform hook-up. Co-ordination of subcontractor and technical queries. Writing up of Construction and Installation system procedures and detail for the execution of the offshore scope of work. Amerada - Fife FPSO Project. Conceptual Engineering and Design. Responsible for technical co-ordination of multi-discipline engineering and design team for first phase of modification to a floating vessel for crude oil production storage and offloading. Duties included discipline man-hour control and progress reporting. The scope was for FPSO conceptual design and layout of various topsides process and mechanical packages. ARCO BRITISH LIMITED. SENIOR PROJECT ENGINEER FACILITIES. FEBRUARY 1991 - DECEMBER 1992 Orwell Field Development Project. Client representative responsible for the technical co-ordination of multi-discipline engineering and design team. The scope was inclusive of all engineering, fabrication and construction phases for upgrade to an existing offshore topsides facilities, due to increased production from a new subsea development. I was responsible for the approval and execution of modifications to topsides reception facilities for the addition of gas/condensate processing equipment, piping, structural fabrication/construction, associated with an additional modularised gas compressor. Day-to-day duties included interfacing with project management team, offshore operations department, the engineering contractor, the fabrication and construction contractor and suppliers of major equipment items for progress control, man-hour approval and reporting expenditure. MARCH 1989 - FEBRUARY 1991 PROJECT ENGINEER GLOBAL ENGINEERING BV LEIDEN HOLLAND Shell Gabon. Project Manager. Seconded to Shell Gabon to manage a small engineering and construction team at the Gamba and Rabi terminals for various work orders at both terminals. Engineering and design work carried out in the Leiden office. GC – CV June 2015
  • 6. 6 NAM L5-FA-1. Detail Engineering and Design Responsible for the technical co-ordination of a multi-discipline project team related to the topside detail design of an offshore platform comprising all process and utilities systems and equipment. Duties include engineering, procurement and detail design co-ordination, project monitoring and progress reporting. AS Norske Shell - Draugen Field. EPIC Contract. PROJECT MANAGER Project co-ordination of all commercial and technical activities related to the detail design fabrication and construction for piping, mechanical, structural, instrumentation, electrical and purchasing/procurement of 4 off gas compressor skids for the above offshore project. Placid L-11A (88) Well Protector Production Platform. PROJECT ENGINEER Detail Design. Second phase detail engineering. Duties include Project co-ordination of piping and structural details design for process & utilities piping, equipment and pipe supports. Amoco Montrose Living Quarters Module. PROJECT ENGINEER Project co-ordination of electrical and instrumentation detail design for a replacement Living Quarters Module. BP Q8A Gas Compression Package. EPIC Contract. PROJECT MANAGER Duties include project co-ordination of all commercial and technical activities related to a detail design and construction for all disciplines of an onshore Gas Compression unit. Responsible for budgetary control and progress reporting. MARCH 1988 - DECEMBER 1988 PROJECT ENGINEER. A HAK NEDERLAND BV - HOLLAND. Fabrication, Construction and Installation Contract. Coordination of all technical and engineering activities related to the project. The scope was for construction and installation of NAM K15 block platform modifications. Preparation, co-ordination of planning activities. Coordination between onshore prefab and offshore installation activities. Preparation of engineering query forms and submissions to client. Preparation, checking of all technical reports and calculations affecting the work. Last page. GC – CV June 2015
  • 7. 6 NAM L5-FA-1. Detail Engineering and Design Responsible for the technical co-ordination of a multi-discipline project team related to the topside detail design of an offshore platform comprising all process and utilities systems and equipment. Duties include engineering, procurement and detail design co-ordination, project monitoring and progress reporting. AS Norske Shell - Draugen Field. EPIC Contract. PROJECT MANAGER Project co-ordination of all commercial and technical activities related to the detail design fabrication and construction for piping, mechanical, structural, instrumentation, electrical and purchasing/procurement of 4 off gas compressor skids for the above offshore project. Placid L-11A (88) Well Protector Production Platform. PROJECT ENGINEER Detail Design. Second phase detail engineering. Duties include Project co-ordination of piping and structural details design for process & utilities piping, equipment and pipe supports. Amoco Montrose Living Quarters Module. PROJECT ENGINEER Project co-ordination of electrical and instrumentation detail design for a replacement Living Quarters Module. BP Q8A Gas Compression Package. EPIC Contract. PROJECT MANAGER Duties include project co-ordination of all commercial and technical activities related to a detail design and construction for all disciplines of an onshore Gas Compression unit. Responsible for budgetary control and progress reporting. MARCH 1988 - DECEMBER 1988 PROJECT ENGINEER. A HAK NEDERLAND BV - HOLLAND. Fabrication, Construction and Installation Contract. Coordination of all technical and engineering activities related to the project. The scope was for construction and installation of NAM K15 block platform modifications. Preparation, co-ordination of planning activities. Coordination between onshore prefab and offshore installation activities. Preparation of engineering query forms and submissions to client. Preparation, checking of all technical reports and calculations affecting the work. Last page. GC – CV June 2015