SlideShare a Scribd company logo
1 of 6
JADE D. GO
MATERIALSUPERVISOR
Phone : +966508096539 (KSA)
+639174404958 (PHIL)
E-mai l : go_ jade2000@yahoo.com
Jade.go@daewooenc.com
Objective
To utilize and enhance my knowledge, skills and abilities in the best possible way for achieving
the company’s goal and at the same time my career’s growth.
Education
January 2000 to March 2004 - Bachelor ofScience in Commerce major in
Management
Western Leyte College
Ormoc City, Leyte
Philippines
June 1998 to October 1999 - Computer Programming Engineering (CPE)
Cebu Institute of Technology
Cebu City
Philippines
WorkExperience
1. Position : Material Supervisor (Piping)
Duration : September 19, 2015 - September 18, 2016
Company : DAEWOO E&C
Location : JAZAN,Kingdom of Saudi Arabia
Project : JAZAN Refinery and Terminal
Epc-12, Naphtha Processing and Aromatic Package
Job Description : *Coordinates with logistic department and prepare shipping forecast
To ensure the preparation of material storage and preservation
*Responsible for the receiving and offloading of material deliveries
*Responsible for the physical inspection of all received materials as per
Vendors packing list, Inspection Release Certificate (IRC), and Material Test
Certificate (MTC)
*Ensure all materials received are stored in compliance with Saudi Aramco
Material handling and preservation procedure.
*Prepares Material Receiving Inspection Report (MRIR) and submit to CMS
Operators for the preparation of RIR for QC inspection.
*Coordinates with Field Engineering and QC regarding technical issues
*Prepares Engineering Inspection Request (EIR) for all Damage and Offspec.
Materials.
*Prepares Overage, Shortage and Damage report (OS and D)
*Prepares Material Exception Report (MER) materials
*Responsible for the rectification of all re-supplied and for repair MER
materials
*Assist Qc and Field Engineering (FE) during material inspection
*Assist Aramco Project Inspection Division (PID) during final inspection
*Supervise material controllers and storekeepers in warehouse stocking and
issuance.
*Responsible in monitoring Construction Material Request (CMR)
*Responsible in receiving all returned scrap, damaged and over issued
materials.
*Ensure all damaged and offspec. materials are put to quarantine
*Ensure the maintenance and preservation of all materials received
*Ensure the proper housekeeping of JGC/Daewoo Warehouses and Laydown
Yard
*Updates daily issuance log sheet
*Updates CMR monitoring log sheet
*Responsible for the documentation of receiving inspection reports and
Issued/Closed CMR’s
2. Position : Material Controller - J-509 ( Piping, Mechanical, Electrical, Temporary
Facility Materials and Consumables)
Duration : June 8, 2013 - October 7, 2014
Company : Gulf Consolidated Contractors Company (GCC)
Location : Khurais, Kingdom of Saudi Arabia
Project : Install East West Sales Gas Pipeline Extension (SRG-2 Extension)
Saudi Aramco Pipeline Project
BI-10-01768, Contract No. 6600030221
Job Description : *Prepare site requisition for Project materials, Temporary Facility
Materials, Tools and Consumables.
*Coordinates with Procurement,Purchasing Department and
Main Warehouse regarding material purchase order and
availability
*Coordinates with transport department for scheduling and off
Loading of the material delivery
*Ensure proper material preservation as per Aramco Approved Project
Material Management Plan
*Updates in SAP system the Goods Received(GR) and Goods Issue(GI)
*Prepare daily Material Issuance and Receiving Report
*Ensure delivered materials have complete documents(Test
Certificates) in preparation for QC inspection.
*Ensure delivered material match with the purchase order
*Checking of materials received for a possible damages or
discrepancy
*Update and log all inward and outward material movement
*Expedites materials from Aramco Warehouses and Laydown
Yard
*Update Stock/bin card
*Monitor of Fixed assets and tools issuance
*Maintaining good housekeeping of warehouse and
laydown yard
3. Position : Material Controller – J-506 ( Piping, Mechanical, Electrical, Temporary
Facility Materials and Consumables)
Duration : April 9, 2011 - June 7, 2013
Company : Gulf Consolidated Contractors Company (GCC)
Location : Jubail City, Kingdom of Saudi Arabia
Project : Khursaniyah to Ras Al-Khair Saudi Aramco Pipeline Project
BI-10-01067, Contract No. 6600026281
Job Description : *Prepare site requisition for Project materials, Temporary Facility
Materials, Tools and Consumables.
*Coordinates with Procurement,Purchasing Department and
Main Warehouse regarding material purchase order and
availability
*Coordinates with transport department for scheduling and off
Loading of the material delivery
*Ensure proper material preservation as per Aramco Approved Project
Material Management Plan
*Updates in SAP system the Goods Received(GR) and Goods Issue(GI)
*Prepare daily Material Issuance and Receiving Report
*Ensure delivered materials have complete documents(Test
Certificates) in preparation for QC inspection.
*Ensure delivered material match with the purchase order
*Checking of materials received for a possible damages or
discrepancy
*Update and log all inward and outward material movement
*Expedites materials from Aramco Warehouses and Laydown
Yard
*Update Stock/bin card
*Monitor of Fixed assets and tools issuance
*Maintaining good housekeeping of warehouse and
laydown yard.
4. Position : Material Controller ( Piping )
Duration : August 8, 2008 - January 8, 2011
Company : Qatar Kentz (Supplied to Kellogg Brown and Root/KBR)
Location : RasLaffan Industrial City, Qatar
Project : Qatar PearlShell Gas to Liquid Project
Job Description : *Ensure the accurate control of all inward and outward material
Movement
*Ensure delivered materials match the purchase order and vendor
Delivery note
*Ensure the quarantine of all non-usable deliveries
*Ensure to update the logs: Material receipt and Issuance report
*Coordinates with Transportation and equipment department
for loading and off- loading materials
*Provides/maintain proper stocking, staging and preservation of
materials
*Updates stock /Bin card to maintain the accuracy of actual
Inventory of stocks
*Maintain proper housekeeping KBR warehouse and laydown
yard
*Responsible for the proper stocking of hazardous materials
and chemicals to avoid incidents
*Take part in the issuance of materials
*Receives and checks incoming deliveries
*Prepare daily material receiving and issuance report
Trainings and Seminars
Occupational Safety and Health Administration - Conducted at Samurai Al-Shaiki Hotel, Jubail City
( OSHA) Card # 34-600696862 Kingdom Of Saudi Arabia.
20-January-2013
Fire Watch Training - Conducted at Fire Direct Fire Fighting Training
Centre
Certificate # 0409 Dammam, Kingdom Of Saudi Arabia
26-February-2012
Basic Fire Fighting Training - Conducted at Arabian Safety Training Centre
Certificate # A00000903 Kingdom Of Saudi Arabia
02-February-2012
Material Handling - Conducted at Gulf Consolidated Contractors
In-house Safety Training Course Company Training Centre, Dammam, Saudi Arabia
20-June-2011
Fall Protection - Conducted at Gulf Consolidated Contractors
In-house Safety Training Course Company Training Centre, Dammam, Saudi Arabia
20-June-2011
Hazardous Material Handling - Conducted at Gulf Consolidated Contractors
In-house Safety Training Course Company Training Centre, Dammam, Saudi Arabia
20-June-2011
Lockout and Use of Hold Tags - Conducted at Gulf Consolidated Contractors
In-house Safety Training Course Company Training Centre, Dammam, Saudi Arabia
20-June-2011
Work Permit System - Conducted at Gulf Consolidated Contractors
In-house Safety Training Course Company Training Centre, Dammam, Saudi Arabia
21-June-2011
Working with Hand Tools and Power Tools - Conducted at Gulf Consolidated Contractors
In-house Safety Training Course Company Training Centre, Dammam, Saudi Arabia
21-June-2011
Personal Protective Equipment - Conducted at Gulf Consolidated Contractors
In-house Safety Training Course Company Training Centre, Dammam, Saudi Arabia
21-June-2011
Non-Destructive Testing - Conducted at Gulf Consolidated Contractors
In-house Safety Training Course Company Training Centre, Dammam, Saudi Arabia
23-June-2011
Incident Reporting and Invistigation - Conducted at Gulf Consolidated Contractors
In-house Safety Training Course Company Training Centre, Dammam, Saudi Arabia
23-June-2011
Emergency Reporting and Response - Conducted at Gulf Consolidated Contractors
In-house Safety Training Course Company Training Centre, Dammam, Saudi Arabia
23-June-2011
Cranes and Lifting Equipment - Conducted at Gulf Consolidated Contractors
In-house Safety Training Course Company Training Centre, Dammam, Saudi Arabia
23-June-2011
Emergency Response - Conducted at Pearl Village Training Centre
CBT Course RasLaffan, Qatar
04-May-2009
Working at Height - Conducted at Pearl Village
CBT Course RasLaffan, Qatar
02-May-2009
Hand Safety and Manual Handling - Conducted at Pearl Village
CBT Course RasLaffan, Qata r
27-April-2009
Confined Space Entry - Conducted at Pearl Village Training Centre
CBT Course RasLaffan, Qatar
25-April-2009
Lifting and Rigging Awareness - Conducted at Pearl Village Training Centre
CBT Course RasLaffan, Qatar
22-April-2009
Hazard Identification - Conducted at Pearl Village Training Centre
CBT Course RasLaffan, Qatar
20-April-2009
Train the Trainer - Conducted at Pearl Village Trainig Centre
CBT Course RasLaffan, Qatar
01-November-2008
Supervisor Skills - Conducted at Pearl Village Training Centre
RasLaffan, Qatar
Personal Data
Age : 35
Date of Birth : April 2, 1981
Gender : Male
Civil Status : Married
Height : 167.14cm
Weight : 75.8kg
Nationality : Filipino
Religion : Christian
Address : Isabel, Leyte, Philippines
Languages Spoken : *English
*Tagalog
Available Documents
Passport : EC4985712
Saudi Aramco ID : 8022760
References:
Shinji Sukegawa - Materia Manager
JGC/Daewoo Joint Venture
Epc-12, Naphtha Processing and Aromatic Package
Jazan Refinery and Terminal Project
Kingdom of Saudi Arabia
Tel. No.: +639771895428
E-mail Add: sukegawa.shinji@jgc.com
Nadeem Esmaeel - Project Manager - J-509
Gulf Consolidated Contractors Co.
Khurais, Kingdom of Saudi Arabia
ARAMCO BI-10-01768, Contract No. 6600030221
Tel. No.: +966-568-129-990
E-mail Add: nesmaeel@gccksa.com
Balmukund Shukla - Project Manager - J-506
Gulf Consolidated Contractors Co.
Khursaniah , Kingdom of Saudi Arabia
BI-10-01067, Contract No. 6600026281
Tel. No.: +966-562-199-056
E-mail Add: bshukla@gccksa.com
Jack Fenimore - Material Management Manager
Kellogg Brown and Root (KBR)
Shell PearlGas to Liquid Project
E-mail Add: jack.fenimore@kbr.com

More Related Content

What's hot (20)

Scott, Gary 20150415
Scott, Gary 20150415Scott, Gary 20150415
Scott, Gary 20150415
 
cv hashim.NOV2016
cv hashim.NOV2016cv hashim.NOV2016
cv hashim.NOV2016
 
Saifulrizan Annuar CV UPDATED.
Saifulrizan Annuar CV UPDATED.Saifulrizan Annuar CV UPDATED.
Saifulrizan Annuar CV UPDATED.
 
William Ho Resume Wizar1
William Ho Resume Wizar1William Ho Resume Wizar1
William Ho Resume Wizar1
 
CV_Y S RATHORE UPDATED
CV_Y S RATHORE UPDATEDCV_Y S RATHORE UPDATED
CV_Y S RATHORE UPDATED
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)
 
CV Abd. Hadi Ahmad
CV Abd. Hadi AhmadCV Abd. Hadi Ahmad
CV Abd. Hadi Ahmad
 
Resume othman sulaiman
Resume othman sulaimanResume othman sulaiman
Resume othman sulaiman
 
Resume Shakil Ahmed Jul-2016
Resume Shakil Ahmed Jul-2016Resume Shakil Ahmed Jul-2016
Resume Shakil Ahmed Jul-2016
 
CV Farid
CV FaridCV Farid
CV Farid
 
Paolo CV Jan 2016
Paolo CV Jan 2016Paolo CV Jan 2016
Paolo CV Jan 2016
 
CV 2016
CV 2016CV 2016
CV 2016
 
CV Ole Dolven
CV Ole DolvenCV Ole Dolven
CV Ole Dolven
 
Nadeem kumar cv
Nadeem kumar cvNadeem kumar cv
Nadeem kumar cv
 
CV Muhammad Afi Hassan 2015
CV Muhammad Afi Hassan 2015CV Muhammad Afi Hassan 2015
CV Muhammad Afi Hassan 2015
 
CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515new
 
Adnan cv
Adnan cvAdnan cv
Adnan cv
 
Career protofolio & Proven track record
Career protofolio & Proven track recordCareer protofolio & Proven track record
Career protofolio & Proven track record
 
David_Wanless_CV
David_Wanless_CVDavid_Wanless_CV
David_Wanless_CV
 
Stephen Drayton
Stephen DraytonStephen Drayton
Stephen Drayton
 

Viewers also liked

Product Life Cycle (Managing Products and Brands)
Product Life Cycle (Managing Products and Brands)Product Life Cycle (Managing Products and Brands)
Product Life Cycle (Managing Products and Brands)Chelbert Yuto
 
PLC analysis of Nokia and Samsung
PLC analysis of Nokia and SamsungPLC analysis of Nokia and Samsung
PLC analysis of Nokia and SamsungMehul Rasadiya
 
product life cycle and marketing strategies
product life cycle and marketing strategiesproduct life cycle and marketing strategies
product life cycle and marketing strategiesDashrath Rajpurohit
 
case study on product life cycle of pepsi
case study on product life cycle of pepsicase study on product life cycle of pepsi
case study on product life cycle of pepsianishaa95
 
Nokia product life cycle
Nokia product life cycleNokia product life cycle
Nokia product life cycleTasheen Sheikh
 
Product life cycle of nokia mobiles
Product life cycle of nokia mobilesProduct life cycle of nokia mobiles
Product life cycle of nokia mobilesTanmoy Roy
 
1. maggi the-product-life-cycle
1. maggi the-product-life-cycle1. maggi the-product-life-cycle
1. maggi the-product-life-cycleSwati Sharma
 

Viewers also liked (12)

Product Life Cycle (Managing Products and Brands)
Product Life Cycle (Managing Products and Brands)Product Life Cycle (Managing Products and Brands)
Product Life Cycle (Managing Products and Brands)
 
Product Life Cycle
Product Life CycleProduct Life Cycle
Product Life Cycle
 
Fashion
FashionFashion
Fashion
 
PLC analysis of Nokia and Samsung
PLC analysis of Nokia and SamsungPLC analysis of Nokia and Samsung
PLC analysis of Nokia and Samsung
 
product life cycle and marketing strategies
product life cycle and marketing strategiesproduct life cycle and marketing strategies
product life cycle and marketing strategies
 
case study on product life cycle of pepsi
case study on product life cycle of pepsicase study on product life cycle of pepsi
case study on product life cycle of pepsi
 
Product life cycle
Product life cycleProduct life cycle
Product life cycle
 
Nokia product life cycle
Nokia product life cycleNokia product life cycle
Nokia product life cycle
 
Product life cycle of nokia mobiles
Product life cycle of nokia mobilesProduct life cycle of nokia mobiles
Product life cycle of nokia mobiles
 
Product life cycle
Product life cycleProduct life cycle
Product life cycle
 
Product life cycle
Product life cycleProduct life cycle
Product life cycle
 
1. maggi the-product-life-cycle
1. maggi the-product-life-cycle1. maggi the-product-life-cycle
1. maggi the-product-life-cycle
 

Similar to Updated CV JADE GO 2016

Similar to Updated CV JADE GO 2016 (20)

Iftikhar Ahmed CV1
Iftikhar Ahmed CV1Iftikhar Ahmed CV1
Iftikhar Ahmed CV1
 
Farooq al safwani (safety) updated
Farooq al safwani (safety) updatedFarooq al safwani (safety) updated
Farooq al safwani (safety) updated
 
RHYAN CASTANEDA
RHYAN CASTANEDARHYAN CASTANEDA
RHYAN CASTANEDA
 
Willy Jr CV - Sept 2016
Willy Jr CV - Sept 2016Willy Jr CV - Sept 2016
Willy Jr CV - Sept 2016
 
Shahid Ali CV SM
Shahid Ali CV SMShahid Ali CV SM
Shahid Ali CV SM
 
RANJIT CV NEW
RANJIT CV NEW RANJIT CV NEW
RANJIT CV NEW
 
Ronel dave mallari dela cruz old format updated pdf
Ronel dave mallari dela cruz  old format updated pdfRonel dave mallari dela cruz  old format updated pdf
Ronel dave mallari dela cruz old format updated pdf
 
cv1.docx short
cv1.docx shortcv1.docx short
cv1.docx short
 
Gerald L. Adarlo CV
Gerald L. Adarlo CVGerald L. Adarlo CV
Gerald L. Adarlo CV
 
Gerald L. Adarlo CV
Gerald L. Adarlo CVGerald L. Adarlo CV
Gerald L. Adarlo CV
 
cv1
cv1cv1
cv1
 
oliver cv2015
oliver cv2015oliver cv2015
oliver cv2015
 
McGillivray, Glen - CV
McGillivray, Glen - CVMcGillivray, Glen - CV
McGillivray, Glen - CV
 
Sahjahan_CV (2)
Sahjahan_CV (2)Sahjahan_CV (2)
Sahjahan_CV (2)
 
Robert CV
Robert CVRobert CV
Robert CV
 
Cv 2021 parbhakar-hse officer-supervisor 2021
Cv 2021 parbhakar-hse officer-supervisor 2021Cv 2021 parbhakar-hse officer-supervisor 2021
Cv 2021 parbhakar-hse officer-supervisor 2021
 
SAFETY OFFICER-CV-21.4.2015
SAFETY OFFICER-CV-21.4.2015SAFETY OFFICER-CV-21.4.2015
SAFETY OFFICER-CV-21.4.2015
 
CVFTCabunoc
CVFTCabunocCVFTCabunoc
CVFTCabunoc
 
Update CV 01.08.15
Update CV 01.08.15Update CV 01.08.15
Update CV 01.08.15
 
KEVIN CLARK CV1 (Kevin Clark)
KEVIN CLARK CV1 (Kevin Clark)KEVIN CLARK CV1 (Kevin Clark)
KEVIN CLARK CV1 (Kevin Clark)
 

Updated CV JADE GO 2016

  • 1. JADE D. GO MATERIALSUPERVISOR Phone : +966508096539 (KSA) +639174404958 (PHIL) E-mai l : go_ jade2000@yahoo.com Jade.go@daewooenc.com Objective To utilize and enhance my knowledge, skills and abilities in the best possible way for achieving the company’s goal and at the same time my career’s growth. Education January 2000 to March 2004 - Bachelor ofScience in Commerce major in Management Western Leyte College Ormoc City, Leyte Philippines June 1998 to October 1999 - Computer Programming Engineering (CPE) Cebu Institute of Technology Cebu City Philippines WorkExperience 1. Position : Material Supervisor (Piping) Duration : September 19, 2015 - September 18, 2016 Company : DAEWOO E&C Location : JAZAN,Kingdom of Saudi Arabia Project : JAZAN Refinery and Terminal Epc-12, Naphtha Processing and Aromatic Package Job Description : *Coordinates with logistic department and prepare shipping forecast To ensure the preparation of material storage and preservation *Responsible for the receiving and offloading of material deliveries *Responsible for the physical inspection of all received materials as per Vendors packing list, Inspection Release Certificate (IRC), and Material Test
  • 2. Certificate (MTC) *Ensure all materials received are stored in compliance with Saudi Aramco Material handling and preservation procedure. *Prepares Material Receiving Inspection Report (MRIR) and submit to CMS Operators for the preparation of RIR for QC inspection. *Coordinates with Field Engineering and QC regarding technical issues *Prepares Engineering Inspection Request (EIR) for all Damage and Offspec. Materials. *Prepares Overage, Shortage and Damage report (OS and D) *Prepares Material Exception Report (MER) materials *Responsible for the rectification of all re-supplied and for repair MER materials *Assist Qc and Field Engineering (FE) during material inspection *Assist Aramco Project Inspection Division (PID) during final inspection *Supervise material controllers and storekeepers in warehouse stocking and issuance. *Responsible in monitoring Construction Material Request (CMR) *Responsible in receiving all returned scrap, damaged and over issued materials. *Ensure all damaged and offspec. materials are put to quarantine *Ensure the maintenance and preservation of all materials received *Ensure the proper housekeeping of JGC/Daewoo Warehouses and Laydown Yard *Updates daily issuance log sheet *Updates CMR monitoring log sheet *Responsible for the documentation of receiving inspection reports and Issued/Closed CMR’s 2. Position : Material Controller - J-509 ( Piping, Mechanical, Electrical, Temporary Facility Materials and Consumables) Duration : June 8, 2013 - October 7, 2014 Company : Gulf Consolidated Contractors Company (GCC) Location : Khurais, Kingdom of Saudi Arabia Project : Install East West Sales Gas Pipeline Extension (SRG-2 Extension) Saudi Aramco Pipeline Project BI-10-01768, Contract No. 6600030221 Job Description : *Prepare site requisition for Project materials, Temporary Facility Materials, Tools and Consumables. *Coordinates with Procurement,Purchasing Department and Main Warehouse regarding material purchase order and availability *Coordinates with transport department for scheduling and off Loading of the material delivery *Ensure proper material preservation as per Aramco Approved Project Material Management Plan *Updates in SAP system the Goods Received(GR) and Goods Issue(GI)
  • 3. *Prepare daily Material Issuance and Receiving Report *Ensure delivered materials have complete documents(Test Certificates) in preparation for QC inspection. *Ensure delivered material match with the purchase order *Checking of materials received for a possible damages or discrepancy *Update and log all inward and outward material movement *Expedites materials from Aramco Warehouses and Laydown Yard *Update Stock/bin card *Monitor of Fixed assets and tools issuance *Maintaining good housekeeping of warehouse and laydown yard 3. Position : Material Controller – J-506 ( Piping, Mechanical, Electrical, Temporary Facility Materials and Consumables) Duration : April 9, 2011 - June 7, 2013 Company : Gulf Consolidated Contractors Company (GCC) Location : Jubail City, Kingdom of Saudi Arabia Project : Khursaniyah to Ras Al-Khair Saudi Aramco Pipeline Project BI-10-01067, Contract No. 6600026281 Job Description : *Prepare site requisition for Project materials, Temporary Facility Materials, Tools and Consumables. *Coordinates with Procurement,Purchasing Department and Main Warehouse regarding material purchase order and availability *Coordinates with transport department for scheduling and off Loading of the material delivery *Ensure proper material preservation as per Aramco Approved Project Material Management Plan *Updates in SAP system the Goods Received(GR) and Goods Issue(GI) *Prepare daily Material Issuance and Receiving Report *Ensure delivered materials have complete documents(Test Certificates) in preparation for QC inspection. *Ensure delivered material match with the purchase order *Checking of materials received for a possible damages or discrepancy *Update and log all inward and outward material movement *Expedites materials from Aramco Warehouses and Laydown Yard *Update Stock/bin card *Monitor of Fixed assets and tools issuance *Maintaining good housekeeping of warehouse and laydown yard. 4. Position : Material Controller ( Piping )
  • 4. Duration : August 8, 2008 - January 8, 2011 Company : Qatar Kentz (Supplied to Kellogg Brown and Root/KBR) Location : RasLaffan Industrial City, Qatar Project : Qatar PearlShell Gas to Liquid Project Job Description : *Ensure the accurate control of all inward and outward material Movement *Ensure delivered materials match the purchase order and vendor Delivery note *Ensure the quarantine of all non-usable deliveries *Ensure to update the logs: Material receipt and Issuance report *Coordinates with Transportation and equipment department for loading and off- loading materials *Provides/maintain proper stocking, staging and preservation of materials *Updates stock /Bin card to maintain the accuracy of actual Inventory of stocks *Maintain proper housekeeping KBR warehouse and laydown yard *Responsible for the proper stocking of hazardous materials and chemicals to avoid incidents *Take part in the issuance of materials *Receives and checks incoming deliveries *Prepare daily material receiving and issuance report Trainings and Seminars Occupational Safety and Health Administration - Conducted at Samurai Al-Shaiki Hotel, Jubail City ( OSHA) Card # 34-600696862 Kingdom Of Saudi Arabia. 20-January-2013 Fire Watch Training - Conducted at Fire Direct Fire Fighting Training Centre Certificate # 0409 Dammam, Kingdom Of Saudi Arabia 26-February-2012 Basic Fire Fighting Training - Conducted at Arabian Safety Training Centre Certificate # A00000903 Kingdom Of Saudi Arabia 02-February-2012 Material Handling - Conducted at Gulf Consolidated Contractors In-house Safety Training Course Company Training Centre, Dammam, Saudi Arabia 20-June-2011 Fall Protection - Conducted at Gulf Consolidated Contractors In-house Safety Training Course Company Training Centre, Dammam, Saudi Arabia 20-June-2011 Hazardous Material Handling - Conducted at Gulf Consolidated Contractors In-house Safety Training Course Company Training Centre, Dammam, Saudi Arabia 20-June-2011 Lockout and Use of Hold Tags - Conducted at Gulf Consolidated Contractors
  • 5. In-house Safety Training Course Company Training Centre, Dammam, Saudi Arabia 20-June-2011 Work Permit System - Conducted at Gulf Consolidated Contractors In-house Safety Training Course Company Training Centre, Dammam, Saudi Arabia 21-June-2011 Working with Hand Tools and Power Tools - Conducted at Gulf Consolidated Contractors In-house Safety Training Course Company Training Centre, Dammam, Saudi Arabia 21-June-2011 Personal Protective Equipment - Conducted at Gulf Consolidated Contractors In-house Safety Training Course Company Training Centre, Dammam, Saudi Arabia 21-June-2011 Non-Destructive Testing - Conducted at Gulf Consolidated Contractors In-house Safety Training Course Company Training Centre, Dammam, Saudi Arabia 23-June-2011 Incident Reporting and Invistigation - Conducted at Gulf Consolidated Contractors In-house Safety Training Course Company Training Centre, Dammam, Saudi Arabia 23-June-2011 Emergency Reporting and Response - Conducted at Gulf Consolidated Contractors In-house Safety Training Course Company Training Centre, Dammam, Saudi Arabia 23-June-2011 Cranes and Lifting Equipment - Conducted at Gulf Consolidated Contractors In-house Safety Training Course Company Training Centre, Dammam, Saudi Arabia 23-June-2011 Emergency Response - Conducted at Pearl Village Training Centre CBT Course RasLaffan, Qatar 04-May-2009 Working at Height - Conducted at Pearl Village CBT Course RasLaffan, Qatar 02-May-2009 Hand Safety and Manual Handling - Conducted at Pearl Village CBT Course RasLaffan, Qata r 27-April-2009 Confined Space Entry - Conducted at Pearl Village Training Centre CBT Course RasLaffan, Qatar 25-April-2009 Lifting and Rigging Awareness - Conducted at Pearl Village Training Centre CBT Course RasLaffan, Qatar 22-April-2009 Hazard Identification - Conducted at Pearl Village Training Centre CBT Course RasLaffan, Qatar 20-April-2009 Train the Trainer - Conducted at Pearl Village Trainig Centre CBT Course RasLaffan, Qatar 01-November-2008
  • 6. Supervisor Skills - Conducted at Pearl Village Training Centre RasLaffan, Qatar Personal Data Age : 35 Date of Birth : April 2, 1981 Gender : Male Civil Status : Married Height : 167.14cm Weight : 75.8kg Nationality : Filipino Religion : Christian Address : Isabel, Leyte, Philippines Languages Spoken : *English *Tagalog Available Documents Passport : EC4985712 Saudi Aramco ID : 8022760 References: Shinji Sukegawa - Materia Manager JGC/Daewoo Joint Venture Epc-12, Naphtha Processing and Aromatic Package Jazan Refinery and Terminal Project Kingdom of Saudi Arabia Tel. No.: +639771895428 E-mail Add: sukegawa.shinji@jgc.com Nadeem Esmaeel - Project Manager - J-509 Gulf Consolidated Contractors Co. Khurais, Kingdom of Saudi Arabia ARAMCO BI-10-01768, Contract No. 6600030221 Tel. No.: +966-568-129-990 E-mail Add: nesmaeel@gccksa.com Balmukund Shukla - Project Manager - J-506 Gulf Consolidated Contractors Co. Khursaniah , Kingdom of Saudi Arabia BI-10-01067, Contract No. 6600026281 Tel. No.: +966-562-199-056 E-mail Add: bshukla@gccksa.com Jack Fenimore - Material Management Manager Kellogg Brown and Root (KBR) Shell PearlGas to Liquid Project E-mail Add: jack.fenimore@kbr.com