PROFILE:
POSITION: H/P: +65 86068631
EXPERIENCE: Over 15 years in the Oil and Gas Industry EMAIL: sachi1803@gmail.com
DATE OF BIRTH: 20-05-1975 ADDRESS: Blk 269C, #02-93, Compassvalelink
NATIONALITY: Indian Singapore543269
PERSONAL SUMMARY:
A profoundly hard working and career driven professional, with over fifteen year’s experience, working in the oil and gas
construction sector. An extremely focused and strategic planner with a fully comprehensive understanding of all construction
competencies, as well as planning,budgeting and site supervisory duties. Possessing a strongunderstandingof all elements of a
project from front end engineering through to implementation and commissioning of FPSO’s Top Side Modules. Excellent
interpersonal skillsand a highly competent attitude to adaptingto change have led to an extremely determined manager with a
flexible and confident approach. Currently seeks a managerial position within the oil and gas construction sector.
SKILLSETS AND COMPETENCIES: MANAGEMENT AND SUPERVISORY SKILLS:
• Marine & Mechanical Engineering
• Complete understanding of topside process systems
• Integration & Hook up of FPSO’s modules
• Experienced with Construction of Top Side Modules
• Highly competent team working abilities
• Extensive knowledge of Proposal and ProjectExecution
• Ship surveys statutory & certificates,
• Topsideand hull systemacceptanceprocedure
• Well versed with international standardsand class
• Computer literate – competent with MS Office
• AutoCAD, MicrosoftProject, Navis works for 3 D Model
Viewing
• Participatefor the 3D review model and give the
suggestion for the pipingrouting,access for the equipment
& Instruments
• As a squad check team for the every project
implementation drawings such as P & ID, GA and other
drawings
• Project coordination & Site management
• Resource planning and budgeting
• Scheduling and co-ordinating work to tight deadlines
• Management of change
• Influencing& Negotiations
• Deliveringresults on time and to impeccable standards
• Managingvendors, sub-contractors and human resources
• Extremely focused in high-pressuresituations
• Strong presentation and leadership skills
• Initiativeto acteffectively to avoid potential problems
• Successfully executing action plans for construction
activities fromfabrication until mechanical completion
• New Yard development in BATAM
• Implement the “5 S” system to improve the fabrication
area
• Develop the Flow chart, and prepare the in house
procedure, work instruction to develop an high
performance sections ( Department )I ok;
QUALIFICATIONS AND CERTIFICATES:
• Diploma in Mechanical
• ProjectManagement
• Confined spacetraining
• Ship Yard safety course
• Certified in Reciprocatingcompressor and Gas Engine
• Condition monitoringfor Rotatingequipment
• 5 S courses
EMPLOYMENT HISTORY:
VME Process – Top Side Module Package Engineer Sep 2009 – Present
KEY Project experiences
OCTP FPSO Top Side modules for ENI Ghana ( YINSON GINISES FPSO )
 Working as the EPC for Topside module PackageManager Worth of USD 80 Million in a team of over 150.
 Analysing task priorities to scheduled construction activities in logical steps and accomplished scopecompletion in the
required budget and time.
 Involved in project management such as schedulepreparation,WBS preparation,Sub contractor selection
 Overseeing installation, GE , Dresser Rand Packages , pipingand mechanical completion of equipment accordingto
NORSOK Z-007, System ID Z-001/ 002, instruments LCR 003, HSE S-002, flushingand testingLR-004.
 To manage heavy liftworks for Structure pan cake, compressor package, and Heavy equipment.
 Planning,organisingand executing activities to ensure a scheduled Load out of Modules.
Page 2 of 3
 In the Ship Yard Solvingtie In point issues between Hull and topside duringintegration and hook up scope.
 Coordinatingclass approval for documents, key equipment and pipingsystemto meet DNV requirements.
 Singlefocal pointfor ship yard module completion acceptance of essential & non-essential marinesystems and sub-
systems.
 Resolvingassociateto client construction issues related to Keppel Shipyard.
 Identifying,resolvingand developing weekly punch closingreports for Construction manager and QA/ QC
 Bringing up the projectprogress growth by over 8%, saving nearly 5%through budget control from allotted financial
resources by negotiation and bargainingto successfully achievegiven milestones in the set time.
PROJECT EXPERIENCE CONTINUED:
MV 24 Mangratiba Zul FPSO 6 Nos of Compressor Packaging / Testing Manager
 Working on the EPC Compressor project, in collaboration with Mitsubishi 40 Million USD. in a team of 80
 Successfully controlling daily management of site construction activities related to Compressor installation,Pipingand E & I
works. .
 Conferringwith Mitsubishi personnel to establish theTestingprocedures and arrangement of 24 Megawatt temporary power
set up using soft starter, sea water cooling system , Nitrogen and helium gas Handling, associated refrigeration equipment,
piping, and other functional equipment.
 Effectively managing installation and mechanical completion of 10 MW Motor and compressor, piping system, trial and
testing.
 Conducting onsite verification of commissioning checklist and administering dossiers for handover and ABS sign off.
 Successfully completing assigned scope in given time parameters and increasing progress growth by over 9%.
PROJECT EXPERIENCE CONTINUED:
P61 and P74 4 Nos of E house / Project manager
 Working on the Engineering and Construction TLP / FPSO project worth 40 Million USD, in a team of 85.
 Prepare the commercial proposal for the E house including budget.
 Assist to prepare cost sheet with Budgeted Margin
 Involved in project management such as schedule preparation, WBS preparation, and Subcontractor selection.
 Prepare the detail Project execution plan for the E house.
 And fully involved through construction phase and assist for the yard, heavy equipment’s, Job planning and implement.
 As special task , Architecture , HVAC Installation, Electrical load testing
 Lead a team for the E & I which is involved 96 KMcableinstallation and integration with MV/LV Pa nel , transformer , Lighting
system , Telecomm
 Receiving the Employee Excellence Award for overall performance during the project.
PROJECT EXPERIENCE CONTINUED:
BWO/TSB Topside modules
As a Package Engineer
 Working on the Involved in project management such as schedule preparation, WBS preparation, and Sub contractor
selection.
 Prepare the detail Installation execution plan for the Solar 2 x Mars 100 – C61 Compressor Sets.
 To assist the construction manager for the yard, heavy equipment’s, Job planning and implement.
 Assign as special task for the pressure vessel fabrication 33 Nos for the topside module.
 Structure Fabrication Approx. 1300 Ton, Piping fabrication, equipment installation
 Identifying, resolving and developing weekly punch closing reports for Construction manager and QA/ QC.
Page 3 of 3
PREVIOUS PROJECT EXPERIENCE
HS Compression & Process Pte Ltd - Production Superintendent Sep 2005 to Sep 2009
 Subcontract management from prepare the scope of work for the Sub contract Negotiation & finalizing subcontractor for
such as Skid, Vessel, Piping, E&I, Chemical cleaning & testing.
 Experience of working in multi-vendor environment.
 Monitoring project from the engineering, construction and Commissioning stages with proper reporting method.
 Excellent reporting skill for the project, good conflict management and prioritization skills.
 Good coordination for the Project documentation and Prepare and Implement work Instruction such as Vessel,Piping,Skid,
E & I, FAT Testing.
PREVIOUS PROJECT EXPERIENCE - KUWAIT
Kuwait National Petroleum Company (KNPC) MAB Refinery, Kuwait through TECHNIP/ Gulf Spic July 2002 to Feb 2005
 Subcontract management from prepare the scope of work for the Sub contract Negotiation & finalizing subcontractor for
such as Skid, Vessel, Piping, E&I, Chemical cleaning & testing.
 Experience of working in multi-vendor environment. To complete the VACUM RE RUN REVAMP Project.
 Process Package 6 Nos & Compression Package 2 Nos
 structure Fabrication approx 700 Ton
 Pressure Vessel 30 Nos Highest thickness 32 mm, internal epoxy coating, SS chemical tanks.
 Piping system for the chemical injection module
 Process piping , SS , CS ,
Equipment Installation
 Vessels 12 Nos, maximum 30 Tons
 Heater 6 Tons
 Re boiler 4 Tons ( Installed on 2nd Tier )
 Structure 40 Tons (for flipping Tandem Lifting)
EDUCATIONAL DEVELOPMENT:
 Diploma in Mechanical Engineering Ngee Ann Polytechnic Singapore
 MS Project Management
 Certified PMP Course
 Condition Monitoring Program
 Shipyard Safety Training
REFERENCES:
C . Srinivas General Manager, VME Process srinivas.c@vmeprocess.com
Peter Loh Topside construction manager peter.loh@yinsonproduction.com

Topside

  • 1.
    Page 1 of3 G.Sachithananthan PROFILE: POSITION: H/P: +65 86068631 EXPERIENCE: Over 15 years in the Oil and Gas Industry EMAIL: sachi1803@gmail.com DATE OF BIRTH: 20-05-1975 ADDRESS: Blk 269C, #02-93, Compassvalelink NATIONALITY: Indian Singapore543269 PERSONAL SUMMARY: A profoundly hard working and career driven professional, with over fifteen year’s experience, working in the oil and gas construction sector. An extremely focused and strategic planner with a fully comprehensive understanding of all construction competencies, as well as planning,budgeting and site supervisory duties. Possessing a strongunderstandingof all elements of a project from front end engineering through to implementation and commissioning of FPSO’s Top Side Modules. Excellent interpersonal skillsand a highly competent attitude to adaptingto change have led to an extremely determined manager with a flexible and confident approach. Currently seeks a managerial position within the oil and gas construction sector. SKILLSETS AND COMPETENCIES: MANAGEMENT AND SUPERVISORY SKILLS: • Marine & Mechanical Engineering • Complete understanding of topside process systems • Integration & Hook up of FPSO’s modules • Experienced with Construction of Top Side Modules • Highly competent team working abilities • Extensive knowledge of Proposal and ProjectExecution • Ship surveys statutory & certificates, • Topsideand hull systemacceptanceprocedure • Well versed with international standardsand class • Computer literate – competent with MS Office • AutoCAD, MicrosoftProject, Navis works for 3 D Model Viewing • Participatefor the 3D review model and give the suggestion for the pipingrouting,access for the equipment & Instruments • As a squad check team for the every project implementation drawings such as P & ID, GA and other drawings • Project coordination & Site management • Resource planning and budgeting • Scheduling and co-ordinating work to tight deadlines • Management of change • Influencing& Negotiations • Deliveringresults on time and to impeccable standards • Managingvendors, sub-contractors and human resources • Extremely focused in high-pressuresituations • Strong presentation and leadership skills • Initiativeto acteffectively to avoid potential problems • Successfully executing action plans for construction activities fromfabrication until mechanical completion • New Yard development in BATAM • Implement the “5 S” system to improve the fabrication area • Develop the Flow chart, and prepare the in house procedure, work instruction to develop an high performance sections ( Department )I ok; QUALIFICATIONS AND CERTIFICATES: • Diploma in Mechanical • ProjectManagement • Confined spacetraining • Ship Yard safety course • Certified in Reciprocatingcompressor and Gas Engine • Condition monitoringfor Rotatingequipment • 5 S courses EMPLOYMENT HISTORY: VME Process – Top Side Module Package Engineer Sep 2009 – Present KEY Project experiences OCTP FPSO Top Side modules for ENI Ghana ( YINSON GINISES FPSO )  Working as the EPC for Topside module PackageManager Worth of USD 80 Million in a team of over 150.  Analysing task priorities to scheduled construction activities in logical steps and accomplished scopecompletion in the required budget and time.  Involved in project management such as schedulepreparation,WBS preparation,Sub contractor selection  Overseeing installation, GE , Dresser Rand Packages , pipingand mechanical completion of equipment accordingto NORSOK Z-007, System ID Z-001/ 002, instruments LCR 003, HSE S-002, flushingand testingLR-004.  To manage heavy liftworks for Structure pan cake, compressor package, and Heavy equipment.  Planning,organisingand executing activities to ensure a scheduled Load out of Modules.
  • 2.
    Page 2 of3  In the Ship Yard Solvingtie In point issues between Hull and topside duringintegration and hook up scope.  Coordinatingclass approval for documents, key equipment and pipingsystemto meet DNV requirements.  Singlefocal pointfor ship yard module completion acceptance of essential & non-essential marinesystems and sub- systems.  Resolvingassociateto client construction issues related to Keppel Shipyard.  Identifying,resolvingand developing weekly punch closingreports for Construction manager and QA/ QC  Bringing up the projectprogress growth by over 8%, saving nearly 5%through budget control from allotted financial resources by negotiation and bargainingto successfully achievegiven milestones in the set time. PROJECT EXPERIENCE CONTINUED: MV 24 Mangratiba Zul FPSO 6 Nos of Compressor Packaging / Testing Manager  Working on the EPC Compressor project, in collaboration with Mitsubishi 40 Million USD. in a team of 80  Successfully controlling daily management of site construction activities related to Compressor installation,Pipingand E & I works. .  Conferringwith Mitsubishi personnel to establish theTestingprocedures and arrangement of 24 Megawatt temporary power set up using soft starter, sea water cooling system , Nitrogen and helium gas Handling, associated refrigeration equipment, piping, and other functional equipment.  Effectively managing installation and mechanical completion of 10 MW Motor and compressor, piping system, trial and testing.  Conducting onsite verification of commissioning checklist and administering dossiers for handover and ABS sign off.  Successfully completing assigned scope in given time parameters and increasing progress growth by over 9%. PROJECT EXPERIENCE CONTINUED: P61 and P74 4 Nos of E house / Project manager  Working on the Engineering and Construction TLP / FPSO project worth 40 Million USD, in a team of 85.  Prepare the commercial proposal for the E house including budget.  Assist to prepare cost sheet with Budgeted Margin  Involved in project management such as schedule preparation, WBS preparation, and Subcontractor selection.  Prepare the detail Project execution plan for the E house.  And fully involved through construction phase and assist for the yard, heavy equipment’s, Job planning and implement.  As special task , Architecture , HVAC Installation, Electrical load testing  Lead a team for the E & I which is involved 96 KMcableinstallation and integration with MV/LV Pa nel , transformer , Lighting system , Telecomm  Receiving the Employee Excellence Award for overall performance during the project. PROJECT EXPERIENCE CONTINUED: BWO/TSB Topside modules As a Package Engineer  Working on the Involved in project management such as schedule preparation, WBS preparation, and Sub contractor selection.  Prepare the detail Installation execution plan for the Solar 2 x Mars 100 – C61 Compressor Sets.  To assist the construction manager for the yard, heavy equipment’s, Job planning and implement.  Assign as special task for the pressure vessel fabrication 33 Nos for the topside module.  Structure Fabrication Approx. 1300 Ton, Piping fabrication, equipment installation  Identifying, resolving and developing weekly punch closing reports for Construction manager and QA/ QC.
  • 3.
    Page 3 of3 PREVIOUS PROJECT EXPERIENCE HS Compression & Process Pte Ltd - Production Superintendent Sep 2005 to Sep 2009  Subcontract management from prepare the scope of work for the Sub contract Negotiation & finalizing subcontractor for such as Skid, Vessel, Piping, E&I, Chemical cleaning & testing.  Experience of working in multi-vendor environment.  Monitoring project from the engineering, construction and Commissioning stages with proper reporting method.  Excellent reporting skill for the project, good conflict management and prioritization skills.  Good coordination for the Project documentation and Prepare and Implement work Instruction such as Vessel,Piping,Skid, E & I, FAT Testing. PREVIOUS PROJECT EXPERIENCE - KUWAIT Kuwait National Petroleum Company (KNPC) MAB Refinery, Kuwait through TECHNIP/ Gulf Spic July 2002 to Feb 2005  Subcontract management from prepare the scope of work for the Sub contract Negotiation & finalizing subcontractor for such as Skid, Vessel, Piping, E&I, Chemical cleaning & testing.  Experience of working in multi-vendor environment. To complete the VACUM RE RUN REVAMP Project.  Process Package 6 Nos & Compression Package 2 Nos  structure Fabrication approx 700 Ton  Pressure Vessel 30 Nos Highest thickness 32 mm, internal epoxy coating, SS chemical tanks.  Piping system for the chemical injection module  Process piping , SS , CS , Equipment Installation  Vessels 12 Nos, maximum 30 Tons  Heater 6 Tons  Re boiler 4 Tons ( Installed on 2nd Tier )  Structure 40 Tons (for flipping Tandem Lifting) EDUCATIONAL DEVELOPMENT:  Diploma in Mechanical Engineering Ngee Ann Polytechnic Singapore  MS Project Management  Certified PMP Course  Condition Monitoring Program  Shipyard Safety Training REFERENCES: C . Srinivas General Manager, VME Process srinivas.c@vmeprocess.com Peter Loh Topside construction manager peter.loh@yinsonproduction.com