Overview
Overview
• Early 90s initial market studies identified a need for a commercial
aircraft:
 with more capacity
 more range with more comfort
 significantly more efficient (up to 20% lower operating costs)
 more environmentally friendly (less fuel burn, is significantly quieter)
• The Airbus A380: a project involving39 companies in 16 countries with
major manufacturing and assembling done in West Europe.
• Project was started in 2000 and was scheduled to launch in 2006
Design Intent (Scope)
• Improve technological advantage
• Lower fuel usage
• Lower operational cost
• Achieve business dominance over Boeing
• Achieve regional corporation of the EU for financial benefit
• To achieve sustainability advantage
Evaluation Criteria
• Scope Management
• Time Management
• Cost Management
• Communication Management
• HR Management
• Quality Management
• Risk Management
• Procurement Management
• Stakeholder Management
• Environment Factors
Scope Management
• The overall objective of capacity of 850 passengers were
achievable, but the final configuration was for 550 passengers
• Wasn’t able to get a sizeable orders and still has not broken
even (450 aircraft to break-even)
• Achieved the lowest operating cost (20% cheaper than the
standard) but was superseded by the B787 and the A350XWB
• Managed to achieve regional politics
Rating 2/5
Time Management
• Development was delayed several times arising from
several internal quality management issues
• Had to set up crash programs to shorten the time by
launching the ‘Power 8’ program
• Let to the main customer Emirates to state that they have
to review other their options
Rating 1/5
Cost Management
• The overall cost overrun was estimated to be US$ 1.93
billion which was 17% of the original development budget
• The main reason as re-development was needed to reduce
the weight reduced in the aircraft
Rating 2/5
Communications Management
The biggest cause of the delay was a communication gap
between the various manufacturing facilities not having the
same version of the software
• The wire harness which was about 500 Km in length had
issues being installed in the aircraft
• Each plant was blaming the other which was evident of a
communication breakdown
Rating 1/5
HR Management
• Tensions between the French and German
management
• Conflict between the French and German shareholders
on appointment of key Top management positions.
• Management of the 55,000 strong team was good in
several locations.
Quality Management
• The management of quality was poor as there was a clear
difference between the design software in each locations
that led to a major delay.
• There seems to be an unclear role in quality management
and quality management process.
• The re-design to reduce the overall weight was also not
satisfactory.
Rating 2/5
Risk Management
• All transportation risks were taken into consideration.
• Market risks were not fully identified.
• Cost overrun risks were not considered and the breakeven
has changed from 270 aircraft to 450 aircraft.
• Risk of design deficiencies were not fully managed.
Rating 2/5
Procurement Management
The management of logistics were exceptional
• Managed multiple manufacturing locations and sub
contracts
• Needed special transport equipment
• Needed road and infrastructure improvements
• Needed special docks
• Required multi-mode transport requirements
• Had good engine suppliers (Rolls-Royce Trent)
Rating 5/5
Stakeholder Management
• Tensions between the holding company EIDS shareholders on
leadership rolls (Co-CEO by Germany & France)
• Tension caused a blame game culture between the
manufacturing locations on whom to blame for the delays
• Key issues were kept hidden from the stakeholders and resulted
in the resignation of CEO Gustav Humbert and Program
Manager Charles Campion
Rating 1/5
Environment Factors
• Lesser carbon emission per passenger
• Lesser noise pollution
• impact on environment for Infrastructure for operation
(needed bigger terminals)
• Impact on environment - Infrastructure to manufacture
(port terminals, new transport vessels, etc.)
Rating 4/5
Final Ratings
• Scope Management
• Time Management
• Cost Management
• Communication Management
• HR Management
• Quality Management
• Risk Management
• Procurement Management
• Stakeholder Management
• Environment Factors
Final Ratings
Final Rating -
10%
20%
70%
Normal
Good
Bad
Closing Comments
• Although under PMBOK guidelines the evaluating methods scored
low, the result made Airbus the leading force in Aircraft design and
manufacture (holy cow)
• Improved European pride as an innovation hub
• The working model chosen by airbus was not suitable for the
emerging travel market (spoke and hub vs. point to point)
• The first flight took place during the global financial crisis making
the travel market under severe strain
&A
Thank You
Q

More Related Content

What's hot

4380 Case 21 Southwest Airlines
4380 Case 21 Southwest Airlines4380 Case 21 Southwest Airlines
4380 Case 21 Southwest Airlines
heyitshillary
 
Global Operations and Supply Chain Management: Airbus vs. Boeing Final Assig...
Global Operations and Supply Chain Management:  Airbus vs. Boeing Final Assig...Global Operations and Supply Chain Management:  Airbus vs. Boeing Final Assig...
Global Operations and Supply Chain Management: Airbus vs. Boeing Final Assig...
Jamar Johnson
 
Jet Blue
Jet BlueJet Blue
Jet Blue
Meenakshi
 
Heathrow Airport - Refurbishment of Terminal 1
Heathrow Airport - Refurbishment of Terminal 1Heathrow Airport - Refurbishment of Terminal 1
Heathrow Airport - Refurbishment of Terminal 1
Yash Mittal
 
Jetblue airways ppt presentation
Jetblue airways ppt presentationJetblue airways ppt presentation
Jetblue airways ppt presentationMonica Ceasar
 
Boeing Organizational Structure
Boeing Organizational StructureBoeing Organizational Structure
Boeing Organizational Structurerscalmo
 
The Chunnel Project - Quality Management
The Chunnel Project - Quality ManagementThe Chunnel Project - Quality Management
The Chunnel Project - Quality Management
Milind_jagtap_
 
Southwest Airlines
Southwest AirlinesSouthwest Airlines
Southwest Airlines
Kashyap Shah
 
2 basic cargo course ULDs
2   basic cargo course ULDs2   basic cargo course ULDs
2 basic cargo course ULDs
Mohamed Tayfour
 
02 operations performance_Operations Management
02 operations performance_Operations Management02 operations performance_Operations Management
02 operations performance_Operations Management
Brent Weeks
 
Strategy analysis airline industry
Strategy analysis  airline industryStrategy analysis  airline industry
Strategy analysis airline industry
MTM IULM
 
International marketing: Emirates Airlines case study
International marketing: Emirates Airlines case studyInternational marketing: Emirates Airlines case study
International marketing: Emirates Airlines case study
Tamim Bin Shafique
 
Business plan presentation
Business plan presentationBusiness plan presentation
Business plan presentationHamed Jabbari
 
Business ethics jet airways: Retrenchment Case
Business ethics jet airways: Retrenchment CaseBusiness ethics jet airways: Retrenchment Case
Business ethics jet airways: Retrenchment Case
Mohammad Imroz
 
Jet Blue Airways Corporation
Jet Blue Airways CorporationJet Blue Airways Corporation
Jet Blue Airways CorporationKulwant Dhillon
 
Airline Industry
Airline IndustryAirline Industry
Airline Industry
automotive
 
Capstone Research-Southwest Airlines
Capstone Research-Southwest AirlinesCapstone Research-Southwest Airlines
Capstone Research-Southwest Airlines
cpedersen
 
Operations And Productivity
Operations And ProductivityOperations And Productivity
Operations And Productivity
Joanmaines
 
Southwest
SouthwestSouthwest
Southwest
Vishwas Muthyala
 

What's hot (20)

4380 Case 21 Southwest Airlines
4380 Case 21 Southwest Airlines4380 Case 21 Southwest Airlines
4380 Case 21 Southwest Airlines
 
Global Operations and Supply Chain Management: Airbus vs. Boeing Final Assig...
Global Operations and Supply Chain Management:  Airbus vs. Boeing Final Assig...Global Operations and Supply Chain Management:  Airbus vs. Boeing Final Assig...
Global Operations and Supply Chain Management: Airbus vs. Boeing Final Assig...
 
Case 3 strategic management
Case 3 strategic managementCase 3 strategic management
Case 3 strategic management
 
Jet Blue
Jet BlueJet Blue
Jet Blue
 
Heathrow Airport - Refurbishment of Terminal 1
Heathrow Airport - Refurbishment of Terminal 1Heathrow Airport - Refurbishment of Terminal 1
Heathrow Airport - Refurbishment of Terminal 1
 
Jetblue airways ppt presentation
Jetblue airways ppt presentationJetblue airways ppt presentation
Jetblue airways ppt presentation
 
Boeing Organizational Structure
Boeing Organizational StructureBoeing Organizational Structure
Boeing Organizational Structure
 
The Chunnel Project - Quality Management
The Chunnel Project - Quality ManagementThe Chunnel Project - Quality Management
The Chunnel Project - Quality Management
 
Southwest Airlines
Southwest AirlinesSouthwest Airlines
Southwest Airlines
 
2 basic cargo course ULDs
2   basic cargo course ULDs2   basic cargo course ULDs
2 basic cargo course ULDs
 
02 operations performance_Operations Management
02 operations performance_Operations Management02 operations performance_Operations Management
02 operations performance_Operations Management
 
Strategy analysis airline industry
Strategy analysis  airline industryStrategy analysis  airline industry
Strategy analysis airline industry
 
International marketing: Emirates Airlines case study
International marketing: Emirates Airlines case studyInternational marketing: Emirates Airlines case study
International marketing: Emirates Airlines case study
 
Business plan presentation
Business plan presentationBusiness plan presentation
Business plan presentation
 
Business ethics jet airways: Retrenchment Case
Business ethics jet airways: Retrenchment CaseBusiness ethics jet airways: Retrenchment Case
Business ethics jet airways: Retrenchment Case
 
Jet Blue Airways Corporation
Jet Blue Airways CorporationJet Blue Airways Corporation
Jet Blue Airways Corporation
 
Airline Industry
Airline IndustryAirline Industry
Airline Industry
 
Capstone Research-Southwest Airlines
Capstone Research-Southwest AirlinesCapstone Research-Southwest Airlines
Capstone Research-Southwest Airlines
 
Operations And Productivity
Operations And ProductivityOperations And Productivity
Operations And Productivity
 
Southwest
SouthwestSouthwest
Southwest
 

Similar to Airbus a 380 Project Analysis

Discussion 41- AL JOHARA In 1994 the European Channel Tun.docx
Discussion 41- AL JOHARA In 1994 the European Channel Tun.docxDiscussion 41- AL JOHARA In 1994 the European Channel Tun.docx
Discussion 41- AL JOHARA In 1994 the European Channel Tun.docx
AASTHA76
 
D.greenwood, wmg future of low carbon vehicles
D.greenwood, wmg   future of low carbon vehiclesD.greenwood, wmg   future of low carbon vehicles
D.greenwood, wmg future of low carbon vehicles
WMG, University of Warwick
 
Una introducción a HDM-4
Una introducción a HDM-4Una introducción a HDM-4
projectmanagement-170529200343.pdf
projectmanagement-170529200343.pdfprojectmanagement-170529200343.pdf
projectmanagement-170529200343.pdf
sherazahmad237870
 
SPARK16 Presentation: Balancing Financial and Environmental Sustainability at...
SPARK16 Presentation: Balancing Financial and Environmental Sustainability at...SPARK16 Presentation: Balancing Financial and Environmental Sustainability at...
SPARK16 Presentation: Balancing Financial and Environmental Sustainability at...
Urjanet
 
SESAR at ATC Global - Technical Workshop on Green ATM
SESAR at ATC Global - Technical Workshop on Green ATMSESAR at ATC Global - Technical Workshop on Green ATM
SESAR at ATC Global - Technical Workshop on Green ATM
SESAR Joint Undertaking
 
Romax consulting: De-risking investment in the wind industry by Yann Rageul
Romax consulting: De-risking investment in the wind industry by Yann RageulRomax consulting: De-risking investment in the wind industry by Yann Rageul
Romax consulting: De-risking investment in the wind industry by Yann Rageul
Yann Rageul
 
Sustainable Aviation - Cleaner, Quieter , Smarter
Sustainable Aviation - Cleaner, Quieter , Smarter  Sustainable Aviation - Cleaner, Quieter , Smarter
Sustainable Aviation - Cleaner, Quieter , Smarter
Akshaykumar More
 
Alazen ACDM Overview
Alazen ACDM OverviewAlazen ACDM Overview
Alazen ACDM OverviewNick Fisher
 
India Aviation ICT Forum - P.S. Nair, CEO, Corporate, Airport Sector, GMR Air...
India Aviation ICT Forum - P.S. Nair, CEO, Corporate, Airport Sector, GMR Air...India Aviation ICT Forum - P.S. Nair, CEO, Corporate, Airport Sector, GMR Air...
India Aviation ICT Forum - P.S. Nair, CEO, Corporate, Airport Sector, GMR Air...
SITA
 
India Aviation ICT Forum - P.S. Nair, CEO - Corporate, Airport Sector, GMR Ai...
India Aviation ICT Forum - P.S. Nair, CEO - Corporate, Airport Sector, GMR Ai...India Aviation ICT Forum - P.S. Nair, CEO - Corporate, Airport Sector, GMR Ai...
India Aviation ICT Forum - P.S. Nair, CEO - Corporate, Airport Sector, GMR Ai...
SITA
 
Boeing - Reliability Centered Maintenance
Boeing - Reliability Centered MaintenanceBoeing - Reliability Centered Maintenance
Boeing - Reliability Centered Maintenance
Nandhagopal Muralithar
 
TURNING AROUND MALAYSIA AIRLINES (MAS)
TURNING AROUND MALAYSIA AIRLINES (MAS)TURNING AROUND MALAYSIA AIRLINES (MAS)
TURNING AROUND MALAYSIA AIRLINES (MAS)
Stilla Stiletto
 
Resume _Sandeep Kumar Ghosh_ Senior position
Resume _Sandeep Kumar Ghosh_ Senior positionResume _Sandeep Kumar Ghosh_ Senior position
Resume _Sandeep Kumar Ghosh_ Senior positionSandeep Ghosh
 
SWOT, Porters five forces and Environmental factor of Indian airline industry...
SWOT, Porters five forces and Environmental factor of Indian airline industry...SWOT, Porters five forces and Environmental factor of Indian airline industry...
SWOT, Porters five forces and Environmental factor of Indian airline industry...
Deepti Awasthi
 
Profit Potential of Green Airport Strategies
Profit Potential of Green Airport StrategiesProfit Potential of Green Airport Strategies
Profit Potential of Green Airport Strategies
Jawad Rachami
 
Fuel matrix introductory presentation for lond capital october 2020
Fuel matrix introductory presentation for lond capital october 2020Fuel matrix introductory presentation for lond capital october 2020
Fuel matrix introductory presentation for lond capital october 2020
danlovrekovic
 
Raleigh Durham International Airport – PG-1 Structural Modifications
Raleigh Durham International Airport – PG-1 Structural ModificationsRaleigh Durham International Airport – PG-1 Structural Modifications
Raleigh Durham International Airport – PG-1 Structural Modifications
PostTensioningInstitute
 
2022 presentation on using recycled materials in asphalt pavements
2022 presentation on using recycled materials in asphalt pavements2022 presentation on using recycled materials in asphalt pavements
2022 presentation on using recycled materials in asphalt pavements
California Asphalt Pavement Association
 

Similar to Airbus a 380 Project Analysis (20)

Discussion 41- AL JOHARA In 1994 the European Channel Tun.docx
Discussion 41- AL JOHARA In 1994 the European Channel Tun.docxDiscussion 41- AL JOHARA In 1994 the European Channel Tun.docx
Discussion 41- AL JOHARA In 1994 the European Channel Tun.docx
 
D.greenwood, wmg future of low carbon vehicles
D.greenwood, wmg   future of low carbon vehiclesD.greenwood, wmg   future of low carbon vehicles
D.greenwood, wmg future of low carbon vehicles
 
Una introducción a HDM-4
Una introducción a HDM-4Una introducción a HDM-4
Una introducción a HDM-4
 
projectmanagement-170529200343.pdf
projectmanagement-170529200343.pdfprojectmanagement-170529200343.pdf
projectmanagement-170529200343.pdf
 
SPARK16 Presentation: Balancing Financial and Environmental Sustainability at...
SPARK16 Presentation: Balancing Financial and Environmental Sustainability at...SPARK16 Presentation: Balancing Financial and Environmental Sustainability at...
SPARK16 Presentation: Balancing Financial and Environmental Sustainability at...
 
SESAR at ATC Global - Technical Workshop on Green ATM
SESAR at ATC Global - Technical Workshop on Green ATMSESAR at ATC Global - Technical Workshop on Green ATM
SESAR at ATC Global - Technical Workshop on Green ATM
 
Romax consulting: De-risking investment in the wind industry by Yann Rageul
Romax consulting: De-risking investment in the wind industry by Yann RageulRomax consulting: De-risking investment in the wind industry by Yann Rageul
Romax consulting: De-risking investment in the wind industry by Yann Rageul
 
Sustainable Aviation - Cleaner, Quieter , Smarter
Sustainable Aviation - Cleaner, Quieter , Smarter  Sustainable Aviation - Cleaner, Quieter , Smarter
Sustainable Aviation - Cleaner, Quieter , Smarter
 
Alazen ACDM Overview
Alazen ACDM OverviewAlazen ACDM Overview
Alazen ACDM Overview
 
India Aviation ICT Forum - P.S. Nair, CEO, Corporate, Airport Sector, GMR Air...
India Aviation ICT Forum - P.S. Nair, CEO, Corporate, Airport Sector, GMR Air...India Aviation ICT Forum - P.S. Nair, CEO, Corporate, Airport Sector, GMR Air...
India Aviation ICT Forum - P.S. Nair, CEO, Corporate, Airport Sector, GMR Air...
 
India Aviation ICT Forum - P.S. Nair, CEO - Corporate, Airport Sector, GMR Ai...
India Aviation ICT Forum - P.S. Nair, CEO - Corporate, Airport Sector, GMR Ai...India Aviation ICT Forum - P.S. Nair, CEO - Corporate, Airport Sector, GMR Ai...
India Aviation ICT Forum - P.S. Nair, CEO - Corporate, Airport Sector, GMR Ai...
 
Boeing - Reliability Centered Maintenance
Boeing - Reliability Centered MaintenanceBoeing - Reliability Centered Maintenance
Boeing - Reliability Centered Maintenance
 
TURNING AROUND MALAYSIA AIRLINES (MAS)
TURNING AROUND MALAYSIA AIRLINES (MAS)TURNING AROUND MALAYSIA AIRLINES (MAS)
TURNING AROUND MALAYSIA AIRLINES (MAS)
 
Resume _Sandeep Kumar Ghosh_ Senior position
Resume _Sandeep Kumar Ghosh_ Senior positionResume _Sandeep Kumar Ghosh_ Senior position
Resume _Sandeep Kumar Ghosh_ Senior position
 
SWOT, Porters five forces and Environmental factor of Indian airline industry...
SWOT, Porters five forces and Environmental factor of Indian airline industry...SWOT, Porters five forces and Environmental factor of Indian airline industry...
SWOT, Porters five forces and Environmental factor of Indian airline industry...
 
Oman EPC 2015 summary and recommendations
Oman EPC 2015 summary and recommendationsOman EPC 2015 summary and recommendations
Oman EPC 2015 summary and recommendations
 
Profit Potential of Green Airport Strategies
Profit Potential of Green Airport StrategiesProfit Potential of Green Airport Strategies
Profit Potential of Green Airport Strategies
 
Fuel matrix introductory presentation for lond capital october 2020
Fuel matrix introductory presentation for lond capital october 2020Fuel matrix introductory presentation for lond capital october 2020
Fuel matrix introductory presentation for lond capital october 2020
 
Raleigh Durham International Airport – PG-1 Structural Modifications
Raleigh Durham International Airport – PG-1 Structural ModificationsRaleigh Durham International Airport – PG-1 Structural Modifications
Raleigh Durham International Airport – PG-1 Structural Modifications
 
2022 presentation on using recycled materials in asphalt pavements
2022 presentation on using recycled materials in asphalt pavements2022 presentation on using recycled materials in asphalt pavements
2022 presentation on using recycled materials in asphalt pavements
 

Recently uploaded

The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 

Recently uploaded (20)

The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 

Airbus a 380 Project Analysis

  • 1.
  • 2.
  • 3. R The Futuristic Aircraft 3A 80 B SIA U Presented By: Randolph Rajaratnam (AeU/14/14/213) Nishantha Pemachandra (AeU/14/14/209) Clarance Fernando (AeU/14/14/202) Viraj Mathusinghe (AeU/14/14/217) Inoka Gunawardena (AeU/14/14/207) b. Krishnarajan (AeU/14/14/208)
  • 5. Overview • Early 90s initial market studies identified a need for a commercial aircraft:  with more capacity  more range with more comfort  significantly more efficient (up to 20% lower operating costs)  more environmentally friendly (less fuel burn, is significantly quieter) • The Airbus A380: a project involving39 companies in 16 countries with major manufacturing and assembling done in West Europe. • Project was started in 2000 and was scheduled to launch in 2006
  • 6. Design Intent (Scope) • Improve technological advantage • Lower fuel usage • Lower operational cost • Achieve business dominance over Boeing • Achieve regional corporation of the EU for financial benefit • To achieve sustainability advantage
  • 7. Evaluation Criteria • Scope Management • Time Management • Cost Management • Communication Management • HR Management • Quality Management • Risk Management • Procurement Management • Stakeholder Management • Environment Factors
  • 8. Scope Management • The overall objective of capacity of 850 passengers were achievable, but the final configuration was for 550 passengers • Wasn’t able to get a sizeable orders and still has not broken even (450 aircraft to break-even) • Achieved the lowest operating cost (20% cheaper than the standard) but was superseded by the B787 and the A350XWB • Managed to achieve regional politics Rating 2/5
  • 9. Time Management • Development was delayed several times arising from several internal quality management issues • Had to set up crash programs to shorten the time by launching the ‘Power 8’ program • Let to the main customer Emirates to state that they have to review other their options Rating 1/5
  • 10. Cost Management • The overall cost overrun was estimated to be US$ 1.93 billion which was 17% of the original development budget • The main reason as re-development was needed to reduce the weight reduced in the aircraft Rating 2/5
  • 11. Communications Management The biggest cause of the delay was a communication gap between the various manufacturing facilities not having the same version of the software • The wire harness which was about 500 Km in length had issues being installed in the aircraft • Each plant was blaming the other which was evident of a communication breakdown Rating 1/5
  • 12. HR Management • Tensions between the French and German management • Conflict between the French and German shareholders on appointment of key Top management positions. • Management of the 55,000 strong team was good in several locations.
  • 13. Quality Management • The management of quality was poor as there was a clear difference between the design software in each locations that led to a major delay. • There seems to be an unclear role in quality management and quality management process. • The re-design to reduce the overall weight was also not satisfactory. Rating 2/5
  • 14. Risk Management • All transportation risks were taken into consideration. • Market risks were not fully identified. • Cost overrun risks were not considered and the breakeven has changed from 270 aircraft to 450 aircraft. • Risk of design deficiencies were not fully managed. Rating 2/5
  • 15. Procurement Management The management of logistics were exceptional • Managed multiple manufacturing locations and sub contracts • Needed special transport equipment • Needed road and infrastructure improvements • Needed special docks • Required multi-mode transport requirements • Had good engine suppliers (Rolls-Royce Trent) Rating 5/5
  • 16. Stakeholder Management • Tensions between the holding company EIDS shareholders on leadership rolls (Co-CEO by Germany & France) • Tension caused a blame game culture between the manufacturing locations on whom to blame for the delays • Key issues were kept hidden from the stakeholders and resulted in the resignation of CEO Gustav Humbert and Program Manager Charles Campion Rating 1/5
  • 17. Environment Factors • Lesser carbon emission per passenger • Lesser noise pollution • impact on environment for Infrastructure for operation (needed bigger terminals) • Impact on environment - Infrastructure to manufacture (port terminals, new transport vessels, etc.) Rating 4/5
  • 18. Final Ratings • Scope Management • Time Management • Cost Management • Communication Management • HR Management • Quality Management • Risk Management • Procurement Management • Stakeholder Management • Environment Factors
  • 19. Final Ratings Final Rating - 10% 20% 70% Normal Good Bad
  • 20. Closing Comments • Although under PMBOK guidelines the evaluating methods scored low, the result made Airbus the leading force in Aircraft design and manufacture (holy cow) • Improved European pride as an innovation hub • The working model chosen by airbus was not suitable for the emerging travel market (spoke and hub vs. point to point) • The first flight took place during the global financial crisis making the travel market under severe strain