HUMAN  RESOURCE PLANNING
Human Resource Planning -- Outline I.  What is it? II.  Why is it important? III.  How is it done? IV.  Is it really done?
I.  What is it? Human resource planning involves getting the right number of qualified people into the right jobs at the right time.
II.  Why is it important? A.  often long lag times to fill positions B.  often influences both turnover and  productivity C.  the “demographic imperative”  demands more such planning
2.  It works best when it is tied to: a.  the organization’s strategic planning  process b.  all available forecasts (technological,  economic, market, etc.) III.  How do you do it? 1. It is a process of comparing human  resource  supply  with human  resource  demand . A.  General Comments:
3.  When there are variances, action  plans must be formulated, e.g., a.  for  surpluses , will organization use  layoffs, retirement incentives, reduced  hours, or something else? b.  for  shortages , will organization  use  overtime, temporary workers, or recruit  new permanent workers? III.  How do you do it? A.  General Comments:
1.  Approaches to forecasting: a.  Qualitative: III.  How do you do it? B.  Methods Used for Human Resource Planning: i.  Expert opinions ii.  Delphi technique iii. “Bottom-up” approach b.  Quantitative (mathematical modeling): i.  Regression analysis / Trend analysis ii.  Markov analysis
2.  Supply Analysis a.  Skills inventories III.  How do you do it? B.  Methods Used for Human Resource Planning: i.  Card systems ii.  Human Resource Information  Systems (HRIS)  b.  Replacement charts / Succession plans
IV.  Does anybody really do this stuff? A.  Nkomo (1987) survey of Fortune 500  organizations Implementation of Human Resource Planning (N = 264 responses) 46% reported no formal HR planning 39% reported some (incomplete) HR planning 15% reported fully integrated HR planning
IV.  Does anybody really do this stuff? B.  HRP techniques actually used: Implementation of Human Resource Planning Replacement charts Skills inventories Computer simulation Time series analysis Markov analysis Delphi technique 84% 51% 10% 5% 4% 3.5%
HUMAN RESOURCE PLANNING Right number of people with right skills at right place at right time to implement organizational strategies in order to achieve organizational objectives In light of the organization’s objectives, corporate and business level strategies, HRP is the process of analyzing an organization’s human resource needs and developing plans, policies, and systems to satisfy those needs
HUMAN RESOURCE PLANNING Setting human resource objectives and deciding how to meet them Ensuring HR resource supply meets human resource demands
HRP Process Interfacing with strategic planning and scanning the environment Taking an inventory of the company’s current human resources Forecasting demand for human resources Forecasting the supply of HR from within the organization and in the external labor market
HRP Process Cont. Comparing forecasts of demand and supply Planning the actions needed to deal with anticipated shortage or overages Feeding back such information into the strategic planning process.
Example of the Basic Human Resources Planning Model Organizational Objectives Human Resource Requirements Human Resource Programs Feasibility Analysis 1 2 3 4 5
HRP Model Strategic Human Resource Planning  Links 1 & 5: HR objectives are linked to organizational  objectives and planning Designed to insure consistency between organization's strategic planning process and HRP.  So objectives of strategic plan are feasible and HR programs are designed around what organizational objectives and strategies require in terms of human resource goals
Example of the Basic Human Resources Planning Model Organizational Objectives Human Resource Requirements Human Resource Programs Feasibility Analysis 1 2 3 4 5
HRP Model Cont. Operational Human Resource Planning Steps  2,3, & 4 Ensure HRP programs are coordinated and allows the  organization to meet its human resource requirements.
Example of the Basic Human Resource Planning Model 1 2 3 4 3 5 Open new product line Open new factory and distribution system Develop staffing for new installation Production workers Supervisors Technical staff Other managers Recruiting and training programs feasible Transfers infeasible because of lack of managers with right skills Recruit skilled workers Develop technical training programs Transfer managers from other facilities Develop new objectives and plans Recruit managers from outside Too costly to hire from outside
Link 1: Determine  Demand  (labor requirements) How many people need to be working and in what jobs to implement organizational strategies and attain organizational objectives. Involves forecasting HR needs based on organizational objectives Involves consideration of alternative ways of organizing jobs (job design, organizational design or staffing jobs) Example - Peak production could be handled by temporary workers or assigning overtime.  Machine breakdowns assigned to maintenance department or handled by machine operators
Link 2: Determine HR Supply  (availability) Choose  HRM programs (supply) Involves forecasting or predicting effect of various HR programs on employee flowing into, through and out various job classifications. First determine how well existing programs are doing then forecast what additional programs or combination of programs will do Need to know capabilities of various programs and program combinations
Determine Feasibility  Links 3 & 4 Capable of being done  Requires knowledge of programs, how programs fit together and external environmental constraints (e.g., labor force, labor unions, technology created skill shortages) and internal environmental constraints (skill shortages within the organization, financial resources,  managerial attitudes, culture) Do the benefits outweigh the costs Difficulty in quantifying costs and benefits
Revise Organizational Objectives and Strategies Link 5 “ If no feasible HR program can be devised, the organization must revise strategic plans.”
Shortcomings of the model - HRP in Practice Oversimplification of planning process -Planning does not normally proceeds till find first acceptable plan More than one set of HR goals to satisfy link 1 and more that one acceptable plan to satisfy link 2 so: Typically choose the best HR goal for the strategic plan and the best program to satisfy that HR goal
Shortcomings of the model - HRP in Practice Oversimplification of the benefit of planning is the specific plans that result Planning process has value in and of itself HRP in practice is usually less rational and may omit one or more of the steps May lack knowledge required for forecasting Incorrect assumptions about effectiveness of HR programs Does not engage in strategic planning Resistance to change present HR systems
HRP should be: Done to guide and coordinate all HR activities so they work together to support the overall strategy Responsive to internal and external environment Planning  - done in advance Strategic - linked with higher level planning
Human Resource Forecasting Process of projecting the organization’s future HR needs (demand) and how it will meet those needs (supply) under a given set of  assumptions  about the organization’s policies and the environmental conditions in which it operates. Without forecasting cannot assess the disparity between supply and demand  nor how effective an HR program is in reducing the disparity.
Forecasting as a Part of Human Resource Planning DEMAND FORECASTING SUPPLY FORECASTING Determine organizational objectives Demand forecast for each objective Aggregate demand forecast Does aggregate  supply meet aggregate demand? Go to feasibility analysis steps Choose human resource programs External programs Recruiting External selection Executive exchange Internal programs Promotion Transfer Career planning Training Turnover control Internal supply forecast External supply forecast Aggregate supply forecast No Yes
Internal Supply Forecasting Information Organizational features (e.g., staffing capabilities) Productivity - rates of productivity, productivity changes Rates of promotion, demotion, transfer and turnover
External Supply Forecasting Information External labor market factors (retirements, mobility, education, unemployment) Controllable company factors on external factors (entry-level openings, recruiting, compensation)
Demand Forecasting Information Organizational and unit strategic plans Size of organization Staff and Managerial Support Organizational design
Considerations in Establishing a Forecasting System How sophisticated Appropriate time frame Subjective versus objective forecasting methods
System Sophistication Organizational size large organizations require more complex forecasting systems and likely to have the required skilled staff Organizational complexity  complex career paths and diverse skill requirements lead to more complex forecasting systems Organizational objectives the greater the gap between current HR situation and desired HR situation the more sophisticated the system Organizational plans and strategies the complex the plans are the more complex the forecasting system
Forecasting Time Frame Depends on degree of environmental uncertainty Factors creating uncertainty (shortening time frame) many new competitors, changes in technology, changes in social, political and economic climate, unstable product demand Factors promoting stability (longer time frame) strong competitive position, slowly developing technology, stable product demand.
Subjective VS.  Objective Forecasting Objective is inappropriate when: Lack expertise to use objective methods Lack the historical data or HR data base is  inadequate Forecasting horizon is too long for the available objective method
Demand  Forecasting  Methods Delphi Method Staffing Table Approach Regression Analysis Time Series Analysis Linear Programming
Supply Forecasting Methods Skills Inventory Replacement Charts Succession Planning Flow Modeling/Markov Analysis Computer Simulations
Training and Developing a Competitive Workforce
The Strategic Importance of Training and Development Training  and Development Develop competencies that match strategy Foster cohesiveness and commitment Improve recruitment and retention Improve competitiveness Increase legal compliance and protection Smoother mergers and acquisitions
The Strategic Importance of Training and Development Improving Recruitment and Retention Career advancement opportunities Job training Improving Competitiveness Increasing productivity Improving service Implementing new  technology Training for Customers
Learning Organizations and Knowledge Management Learning is recognized as a source of competitive advantage. Knowledge management technologies  Ensure that knowledge from employees, teams, and units is captured, remembered, stored and shared through intranets. Chief Learning/Knowledge Officer coordinates activities.
Training and Development Practices Within the Integrated HRM System Training and Development (T&D) Intentional efforts to improve current and future performance by helping employees acquire the skills, knowledge, and attitudes required of a competitive workforce.
T&D: Key Terms Training Improving employee competencies needed today or very soon Typical objective is to improve employee performance in a specific job. Development Improving employee competencies over a longer period of time Typical objective is to prepare employees for future roles.
Key Terms (cont’d) Socialization Learning how things are done in the organization Objective is to teach new employees about the organization’s history, culture and management practices.  Intense socialization  increases employees’  commitment to the  success of the company .
Components of Training and Development  within an Integrated HRM System
Evaluating Training and Development Effectiveness
The HR Triad: Roles and Responsibilities in Training and Development
Four Components of Needs Assessment
Setting Up a Training and Development System Creating the Right Conditions: Insight Motivation New skills and knowledge Real world practice Accountability
Training for Affective Outcomes Objective Is to Change: Motivation Attitudes Values Example of Objectives  Build team spirit Enhance self-confidence Build emotional intelligence  (self-awareness, self-management, social awareness, relationship management)
On-Site, but Not On the Job Training Programmed instruction on intranet or internet Videos and CDs Interactive video training:  Combines programmed instruction with video Teleconferencing Corporate Universities and executive education
Off the Job Training Formal courses Simulation Vestibule method:  simulates actual job Assessment centers Role-playing Business board games Sensitivity training Wilderness trips and outdoor training
Setting the Stage for Learning Clear Instructions Behavioral Modeling
Team Training and Development Training to develop team cohesiveness Training in team procedures Training to develop work team leaders Supporting disagreement Managing meetings
Cross-Cultural Training To prepare people from several cultures to work together Diversity training To prepare a person for living in another culture Training for expatriates and families
Cross-Cultural Training in  International Context Training for Expatriates  Typically a 3-5 day immersion course in country’s values, customs, traditions Culture-general assimilator uses scenarios to teach understanding of cultural differences Training for Inpatriates Employees from other countries  sent to work abroad  Need info about culture and  help with relocation
Global Leadership Training and Development Managers need to manage operations in several countries at once Training  and development may include: Expatriate assignments Action learning projects Cross-cultural team assignments Classroom training

Human Resource Planning

  • 1.
  • 2.
    Human Resource Planning-- Outline I. What is it? II. Why is it important? III. How is it done? IV. Is it really done?
  • 3.
    I. Whatis it? Human resource planning involves getting the right number of qualified people into the right jobs at the right time.
  • 4.
    II. Whyis it important? A. often long lag times to fill positions B. often influences both turnover and productivity C. the “demographic imperative” demands more such planning
  • 5.
    2. Itworks best when it is tied to: a. the organization’s strategic planning process b. all available forecasts (technological, economic, market, etc.) III. How do you do it? 1. It is a process of comparing human resource supply with human resource demand . A. General Comments:
  • 6.
    3. Whenthere are variances, action plans must be formulated, e.g., a. for surpluses , will organization use layoffs, retirement incentives, reduced hours, or something else? b. for shortages , will organization use overtime, temporary workers, or recruit new permanent workers? III. How do you do it? A. General Comments:
  • 7.
    1. Approachesto forecasting: a. Qualitative: III. How do you do it? B. Methods Used for Human Resource Planning: i. Expert opinions ii. Delphi technique iii. “Bottom-up” approach b. Quantitative (mathematical modeling): i. Regression analysis / Trend analysis ii. Markov analysis
  • 8.
    2. SupplyAnalysis a. Skills inventories III. How do you do it? B. Methods Used for Human Resource Planning: i. Card systems ii. Human Resource Information Systems (HRIS) b. Replacement charts / Succession plans
  • 9.
    IV. Doesanybody really do this stuff? A. Nkomo (1987) survey of Fortune 500 organizations Implementation of Human Resource Planning (N = 264 responses) 46% reported no formal HR planning 39% reported some (incomplete) HR planning 15% reported fully integrated HR planning
  • 10.
    IV. Doesanybody really do this stuff? B. HRP techniques actually used: Implementation of Human Resource Planning Replacement charts Skills inventories Computer simulation Time series analysis Markov analysis Delphi technique 84% 51% 10% 5% 4% 3.5%
  • 11.
    HUMAN RESOURCE PLANNINGRight number of people with right skills at right place at right time to implement organizational strategies in order to achieve organizational objectives In light of the organization’s objectives, corporate and business level strategies, HRP is the process of analyzing an organization’s human resource needs and developing plans, policies, and systems to satisfy those needs
  • 12.
    HUMAN RESOURCE PLANNINGSetting human resource objectives and deciding how to meet them Ensuring HR resource supply meets human resource demands
  • 13.
    HRP Process Interfacingwith strategic planning and scanning the environment Taking an inventory of the company’s current human resources Forecasting demand for human resources Forecasting the supply of HR from within the organization and in the external labor market
  • 14.
    HRP Process Cont.Comparing forecasts of demand and supply Planning the actions needed to deal with anticipated shortage or overages Feeding back such information into the strategic planning process.
  • 15.
    Example of theBasic Human Resources Planning Model Organizational Objectives Human Resource Requirements Human Resource Programs Feasibility Analysis 1 2 3 4 5
  • 16.
    HRP Model StrategicHuman Resource Planning Links 1 & 5: HR objectives are linked to organizational objectives and planning Designed to insure consistency between organization's strategic planning process and HRP. So objectives of strategic plan are feasible and HR programs are designed around what organizational objectives and strategies require in terms of human resource goals
  • 17.
    Example of theBasic Human Resources Planning Model Organizational Objectives Human Resource Requirements Human Resource Programs Feasibility Analysis 1 2 3 4 5
  • 18.
    HRP Model Cont.Operational Human Resource Planning Steps 2,3, & 4 Ensure HRP programs are coordinated and allows the organization to meet its human resource requirements.
  • 19.
    Example of theBasic Human Resource Planning Model 1 2 3 4 3 5 Open new product line Open new factory and distribution system Develop staffing for new installation Production workers Supervisors Technical staff Other managers Recruiting and training programs feasible Transfers infeasible because of lack of managers with right skills Recruit skilled workers Develop technical training programs Transfer managers from other facilities Develop new objectives and plans Recruit managers from outside Too costly to hire from outside
  • 20.
    Link 1: Determine Demand (labor requirements) How many people need to be working and in what jobs to implement organizational strategies and attain organizational objectives. Involves forecasting HR needs based on organizational objectives Involves consideration of alternative ways of organizing jobs (job design, organizational design or staffing jobs) Example - Peak production could be handled by temporary workers or assigning overtime. Machine breakdowns assigned to maintenance department or handled by machine operators
  • 21.
    Link 2: DetermineHR Supply (availability) Choose HRM programs (supply) Involves forecasting or predicting effect of various HR programs on employee flowing into, through and out various job classifications. First determine how well existing programs are doing then forecast what additional programs or combination of programs will do Need to know capabilities of various programs and program combinations
  • 22.
    Determine Feasibility Links 3 & 4 Capable of being done Requires knowledge of programs, how programs fit together and external environmental constraints (e.g., labor force, labor unions, technology created skill shortages) and internal environmental constraints (skill shortages within the organization, financial resources, managerial attitudes, culture) Do the benefits outweigh the costs Difficulty in quantifying costs and benefits
  • 23.
    Revise Organizational Objectivesand Strategies Link 5 “ If no feasible HR program can be devised, the organization must revise strategic plans.”
  • 24.
    Shortcomings of themodel - HRP in Practice Oversimplification of planning process -Planning does not normally proceeds till find first acceptable plan More than one set of HR goals to satisfy link 1 and more that one acceptable plan to satisfy link 2 so: Typically choose the best HR goal for the strategic plan and the best program to satisfy that HR goal
  • 25.
    Shortcomings of themodel - HRP in Practice Oversimplification of the benefit of planning is the specific plans that result Planning process has value in and of itself HRP in practice is usually less rational and may omit one or more of the steps May lack knowledge required for forecasting Incorrect assumptions about effectiveness of HR programs Does not engage in strategic planning Resistance to change present HR systems
  • 26.
    HRP should be:Done to guide and coordinate all HR activities so they work together to support the overall strategy Responsive to internal and external environment Planning - done in advance Strategic - linked with higher level planning
  • 27.
    Human Resource ForecastingProcess of projecting the organization’s future HR needs (demand) and how it will meet those needs (supply) under a given set of assumptions about the organization’s policies and the environmental conditions in which it operates. Without forecasting cannot assess the disparity between supply and demand nor how effective an HR program is in reducing the disparity.
  • 28.
    Forecasting as aPart of Human Resource Planning DEMAND FORECASTING SUPPLY FORECASTING Determine organizational objectives Demand forecast for each objective Aggregate demand forecast Does aggregate supply meet aggregate demand? Go to feasibility analysis steps Choose human resource programs External programs Recruiting External selection Executive exchange Internal programs Promotion Transfer Career planning Training Turnover control Internal supply forecast External supply forecast Aggregate supply forecast No Yes
  • 29.
    Internal Supply ForecastingInformation Organizational features (e.g., staffing capabilities) Productivity - rates of productivity, productivity changes Rates of promotion, demotion, transfer and turnover
  • 30.
    External Supply ForecastingInformation External labor market factors (retirements, mobility, education, unemployment) Controllable company factors on external factors (entry-level openings, recruiting, compensation)
  • 31.
    Demand Forecasting InformationOrganizational and unit strategic plans Size of organization Staff and Managerial Support Organizational design
  • 32.
    Considerations in Establishinga Forecasting System How sophisticated Appropriate time frame Subjective versus objective forecasting methods
  • 33.
    System Sophistication Organizationalsize large organizations require more complex forecasting systems and likely to have the required skilled staff Organizational complexity complex career paths and diverse skill requirements lead to more complex forecasting systems Organizational objectives the greater the gap between current HR situation and desired HR situation the more sophisticated the system Organizational plans and strategies the complex the plans are the more complex the forecasting system
  • 34.
    Forecasting Time FrameDepends on degree of environmental uncertainty Factors creating uncertainty (shortening time frame) many new competitors, changes in technology, changes in social, political and economic climate, unstable product demand Factors promoting stability (longer time frame) strong competitive position, slowly developing technology, stable product demand.
  • 35.
    Subjective VS. Objective Forecasting Objective is inappropriate when: Lack expertise to use objective methods Lack the historical data or HR data base is inadequate Forecasting horizon is too long for the available objective method
  • 36.
    Demand Forecasting Methods Delphi Method Staffing Table Approach Regression Analysis Time Series Analysis Linear Programming
  • 37.
    Supply Forecasting MethodsSkills Inventory Replacement Charts Succession Planning Flow Modeling/Markov Analysis Computer Simulations
  • 38.
    Training and Developinga Competitive Workforce
  • 39.
    The Strategic Importanceof Training and Development Training and Development Develop competencies that match strategy Foster cohesiveness and commitment Improve recruitment and retention Improve competitiveness Increase legal compliance and protection Smoother mergers and acquisitions
  • 40.
    The Strategic Importanceof Training and Development Improving Recruitment and Retention Career advancement opportunities Job training Improving Competitiveness Increasing productivity Improving service Implementing new technology Training for Customers
  • 41.
    Learning Organizations andKnowledge Management Learning is recognized as a source of competitive advantage. Knowledge management technologies Ensure that knowledge from employees, teams, and units is captured, remembered, stored and shared through intranets. Chief Learning/Knowledge Officer coordinates activities.
  • 42.
    Training and DevelopmentPractices Within the Integrated HRM System Training and Development (T&D) Intentional efforts to improve current and future performance by helping employees acquire the skills, knowledge, and attitudes required of a competitive workforce.
  • 43.
    T&D: Key TermsTraining Improving employee competencies needed today or very soon Typical objective is to improve employee performance in a specific job. Development Improving employee competencies over a longer period of time Typical objective is to prepare employees for future roles.
  • 44.
    Key Terms (cont’d)Socialization Learning how things are done in the organization Objective is to teach new employees about the organization’s history, culture and management practices. Intense socialization increases employees’ commitment to the success of the company .
  • 45.
    Components of Trainingand Development within an Integrated HRM System
  • 46.
    Evaluating Training andDevelopment Effectiveness
  • 47.
    The HR Triad:Roles and Responsibilities in Training and Development
  • 48.
    Four Components ofNeeds Assessment
  • 49.
    Setting Up aTraining and Development System Creating the Right Conditions: Insight Motivation New skills and knowledge Real world practice Accountability
  • 50.
    Training for AffectiveOutcomes Objective Is to Change: Motivation Attitudes Values Example of Objectives Build team spirit Enhance self-confidence Build emotional intelligence (self-awareness, self-management, social awareness, relationship management)
  • 51.
    On-Site, but NotOn the Job Training Programmed instruction on intranet or internet Videos and CDs Interactive video training: Combines programmed instruction with video Teleconferencing Corporate Universities and executive education
  • 52.
    Off the JobTraining Formal courses Simulation Vestibule method: simulates actual job Assessment centers Role-playing Business board games Sensitivity training Wilderness trips and outdoor training
  • 53.
    Setting the Stagefor Learning Clear Instructions Behavioral Modeling
  • 54.
    Team Training andDevelopment Training to develop team cohesiveness Training in team procedures Training to develop work team leaders Supporting disagreement Managing meetings
  • 55.
    Cross-Cultural Training Toprepare people from several cultures to work together Diversity training To prepare a person for living in another culture Training for expatriates and families
  • 56.
    Cross-Cultural Training in International Context Training for Expatriates Typically a 3-5 day immersion course in country’s values, customs, traditions Culture-general assimilator uses scenarios to teach understanding of cultural differences Training for Inpatriates Employees from other countries sent to work abroad Need info about culture and help with relocation
  • 57.
    Global Leadership Trainingand Development Managers need to manage operations in several countries at once Training and development may include: Expatriate assignments Action learning projects Cross-cultural team assignments Classroom training